PAT Document For MW Transmission Link

General Information
Link Name

(Site Code A-Site Code B)


Link Code

Vendor

Link Type(SDH/PDH)

Near End ID

Far End ID

PAT Date

Region

Zone

Acceptance status of BTS


Accepted
Accepted with snag
Not accepted
Remarks:

Implementation Engineer
Signature

Acceptance Engineer
Signature

Name:
Contact no:

Name:
Contact no:

PAT Document for MW Link, Version:QA/2014/V3.1 QA/RO/Robi Axiata Limited

PAT Document for MW Link, Version:QA/2014/V3.1 QA/RO/Robi Axiata Limited

PAT Document for MW Link, Version:QA/2014/V3.1 QA/RO/Robi Axiata Limited

PAT Document for MW Link, Version:QA/2014/V3.1 QA/RO/Robi Axiata Limited

New
Snag
Code

Severity

Ok NOK

Description

PATTXN01 All the equipmensts installaed as per e.co approved layout

PATTXN02
PATTXN03
PATTXN04
PATTXN05
PATTXN06
PATTXN07
PATTXN08
PATTXN09
PATTXN10
PATTXN11
PATTXN12
PATTXN13
PATTXN14
PATTXN15
PATTXN16
PATTXN17
PATTXN18
PATTXN19
PATTXN20
PATTXN21
PATTXN22
PATTXN23
PATTXN24
PATTXN25

Critical

On Site BER Test Report by BER Tester/Link Generated BER test of


the MW link during PAT (2 hours for PDH and 4 Hour for SPDH) is ok
24 Hour MW Link Generated PM report is ok
E1 is sequentially dropped
Software version is matched with planning recommendation
Link budget is available in LDMA
NTP server configuration in the node is updated on real time
All alarm configuration is ok
External alarm configuration where BTS is not available to connect 3
basic alarm(Mains/DC low/High Temp) of the serving power system
1+1 switching is working properly if the link is 1+1 (HW and Path)
Adaptive modulation is as per Link budget
System Configuration and installation (Capacity, Frequency,
Protection, Tributary,modulation) is as per plan.
IF cable/ Wave guide is not damaged
There is no alarm in the System
There is no interference found (threshold RSL is -85dbm)
NE is connected to NMS
Link data/information is updated in LDMA
Loop test of E1 ports is ok (from DDF to IDU)
Power Card redundancy is available for more than 23E1
configuration
Vertical gap between two NEs is 1U (44mm)
(can be varried from 1U to 2U on practical situation)

Super
Critical
Major
Major
Major
Critical
Major
Major
Super
Critical
Critical
Major

Rating of DC circuit breakers is as per standard


DCDB is used if there is no free CB available at rectifier
Marking of Power cable to IDU & Circuit Breaker is done properly
separate breaker is used for redundant power card
IDU power is taken from Critical load of the rectifier

Major
Major
Minor
Major
Critical

PATTXN26 Antenna installation is done with proper diameter


PATTXN27 Antenna height is as per Plan (Deviation +/- 1m)
PATTXN28 MW link has been installed according to planned frequency.
PATTXN29 Polarization is according to plan.
PATTXN30 Receive level is according to plan (+/- 3 dB)
PATTXN31 Support pipe has been installed for 1.2m & greater dia antenna
Support pipe has been installed in proper angle to 1.2 m & greater
PATTXN32
dia dish(90 deg, deviation: +/- 20 deg)
PATTXN33 Connectors at ODU, IDU have been made and sealed properly
PATTXN34 Fixing of antenna & ODU has been done properly
PATTXN35 Separate DDF for MW and dedicated DX block for each IDU are
PATTXN36 XPD difference value for XPIC links is as per standard
PATTXN37 For XPIC link, Individual XPIC channel is working properly
PATTXN38 No Physical damage is found in IDU/ODU

Critical
Critical
Major
Critical
Major
Critical
Major
Major
Major

Major
Critical
Super
Critical
Major
Super
Critical
Critical
Major
Major
Minor
Minor
Critical
Super
Critical
Critical

PAT Document for MW Link, Version:QA/2014/V3.1 QA/RO/Robi Axiata Limited

PATTXN39
PATTXN40
PATTXN41
PATTXN42
PATTXN43

IDU is grounded as per standard


ODU is grounded as per standard
TX rack is grounded properly
IF cable is grounded properly
Proper Cables and Lugs are used for inside grounding

Major
Major
Major
Major
Major

PATTXN44 IDU, ODU and IF cable labeling is done as per Robi Standard
IF and PCM cable has been laid in a systematic way through the
PATTXN45
ladder and clamp is used as per standard
PATTXN46 Logical labeling of E1 is ok as per standard
PATTXN47 Transmission rack and DDF labeling is done properly
PATTXN48 IF cable hole sealing using silica gel is done properly
Labeling at Tributary cabling between IDU and DDF is done as per
PATTXN49
Robi Standard

Minor
Minor

PATTXN50 Cleaning of Tx room and outside


PATTXN51 No Dismantle/unused material in the site

Minor
Major

Minor
Minor
Major
Major

PAT Document for MW Link, Version:QA/2014/V3.1 QA/RO/Robi Axiata Limited

N/A
Remarks

Link
generated/BER
Teser

PAT Document for MW Link, Version:QA/2014/V3.1 QA/RO/Robi Axiata Limited

PAT Document for MW Link, Version:QA/2014/V3.1 QA/RO/Robi Axiata Limited

Site Name:

PAT Date:
Asset Data

Sl. No.
PATTX49
Sl No

Description
All asset(s) Checked and verified
accorgig to SAP and found OK (No
Card Name

Severity
Major
Part No

OK

NOK

N/A

Serial No

PAT Document for MW Link, Version:QA/2014/V3.1 QA/RO/Robi Axiata Limited

Remarks:

Implementation
Signature

RO
Signature

Name:
Contact no:

Name:
Contact no:

PAT Document for MW Link, Version:QA/2014/V3.1 QA/RO/Robi Axiata Limited

Remarks

Status

PAT Document for MW Link, Version:QA/2014/V3.1 QA/RO/Robi Axiata Limited

PAT Document for MW Link, Version:QA/2014/V3.1 QA/RO/Robi Axiata Limited

NE Name:
FE Name:

General Information
PAT Date :
Vendor
:

Basic Information
Planned

Actual findings

Frequency Band (GHz)


Configuration (1+0)/(1
Capacity (E1)
Antenna Type/Model
Antenna Dia
Antenna Height
Polarization

Parameters Verification
Planned Data

Actual Findings

Software version
TX Frequency (Main)
RX Frequency (Main)
TX Frequency (Stnd By)
RX Frequency (Stnd By)
TX Power (Main)
RX Power (Main)
TX Power (Stnd By)
RX Power (Stnd By)
NE RSL (Main)
FE RSL (Main)
NE RSL (Stnd By) (Considering
5dbm coupler loss)
NE RSL (Stnd By) (Considering
5dbm coupler loss)
RX threshold level (dBm)
RX threshold criteria (BER)

NE IP Address
FE IP Address
NE Subnet mask
FE Subnet mask
NE Network Addre
FE Network Addre

NMS Connectivity
Planned Data
_____ ._____ ._____ . _____
_____ ._____ ._____ . _____
_____ ._____ ._____ . _____
_____ ._____ ._____ . _____
_____ ._____ ._____ . _____
_____ ._____ ._____ . _____

Actual Findings
_____ ._____ ._____ ._____
_____ ._____ ._____ ._____
_____ ._____ ._____ ._____
_____ ._____ ._____ ._____
_____ ._____ ._____ ._____
_____ ._____ ._____ ._____

PAT Document for MW Link, Version:QA/2014/V3.1 QA/RO/Robi Axiata Limited 13

NE OSPF Area ID
FE OSPF Area ID

_____ ._____ ._____ . _____


_____ ._____ ._____ . _____

_____ ._____ ._____ ._____


_____ ._____ ._____ ._____

PAT Document for MW Link, Version:QA/2014/V3.1 QA/RO/Robi Axiata Limited 14

PCM Allocation Info.


Link Name
1st Node Name
2nd Node Name
900

PCM No
1800 1800 2nd EDGE

PAT Document for MW Link, Version:QA/2014/V3.1 QA/RO/Robi Axiata Limited 15

XPD value verification


Near End
Radio
Terminal

Polarization

Near- End

Near- End

Polarization
Site -B

Transmitter

ON

ON

ON

OFF

Near- End

ON

OFF

Near- End

ON

ON

Near End

Transmitter

RX from far
end (dBm)

XPD
separation

Far End

Radio
Terminal
Near- End
Near- End
Near- End
Near- End

Polarization
RX from far Polarization
Transmitter
end (dBm)
Site -A
Far End
V
ON
V
H
ON
H
V
ON
V
H
ON
H

Transmitter

ON
OFF
OFF
ON

XPD
separation

Link Name:

PAT Date:
Observation List

Sl No

Description of Observation

Responsible
Party

Date
Cleared

Robi's
Signature

Remarks:

PAT Document for MW Link, Version:QA/2014/V3.1 QA/RO/Robi Axiata Limited

17

Implementation
Name:
Signature:
Date:

QA/RO
Name:
Signature:
Date:

PAT Document for MW Link, Version:QA/2014/V3.1 QA/RO/Robi Axiata Limited

18

Potrebbero piacerti anche