Sei sulla pagina 1di 338

FACOR ALLOYS LIMITED

45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.


EPC TENDER SPECIFICATION

TABLE OF CONTENTS
S. No.

Description

No. of
pages

EPC Main Specification

1 to 22

Annexure-1

Specification for Boiler & Auxiliaries

1 to 20

Annexure-2

Specification for Turbogenerator & Auxiliaries

1 to 22

Annexure-3

Specification for Air Cooled Condenser

1 to 4

Annexure-4

Specification for Fuel Handling System

1 to 10

Annexure-5

Specification for Electrical System

1 to 26

Annexure-6

Specification for Ash Handling System

1 to 4

Annexure-7

Specification for DM Plant, Auxiliary Cooling Tower,


Ventilation and Fire Fighting System

1 to 4

Annexure-8

Specification for Instrumentation & Automation


System

1 to 23

Annexure-9

Scope Matrix

1 to 82

Annexure-10

Questionnaire

1 to 103

Annexure-11

Vendors List

1 to 11

LIST OF DRAWINGS
Drawing No.

Title

HIQ-4036-P-01

Plant general layout

HIQ-4036-H-01

Scheme for fuel handling system

HIQ-4036-H-02

Layout of coal handling system

HIQ-4036-H-03

Scheme for ash handling system

HIQ-4036-E-01

Scheme for electrical system

HIQ-4036I&C-01

DCS system configuration

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006


-1-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION

1.0

GENERAL

M/s.Facor Alloys Limited (FAL ) are proposing to install a CPP, a TG set of


rating 45 mw along with a CFBC boiler of capacity 195 TPH with steam
parameters of 110 ata and 545 deg c.
This specification is issued for implementation of the 45 MW CPP and its
auxiliaries through the EPC mode. This specification covers the design,
engineering, manufacture, assembly / re-assembly, tests at manufacturers works,
packing, ocean shipment and clearance through Indian Port of entry in case of
imported plant & equipment, inland transportation, in-land delivery to the site,
unloading, storage and in-plant transportation within site, complete civil and
structural design and construction work as required for the plant and facilities
covered by this specification, complete services of erection, testing, successful
commissioning, carrying out PG test, handing over and training of Purchasers
personnel, for the power plant complete with all accessories, auxiliaries and
ancillaries as specified hereinafter and elsewhere of this specification and as
required for safe and trouble free operation of the facilities.
The scope shall broadly include the equipment / systems, described in the
subsequent sections of this specification, but shall not be necessarily restricted to
these only. Whatever additional items necessary for safe and efficient operation
of the equipment / systems described elsewhere in this specification, shall also be
included as a part of the total services to be offered by the bidder.
This specification also includes carrying out performance guarantee tests at site
after successful commissioning and all necessary equipment, instruments,
services, labour as required for this purpose shall be under the scope of supply of
the successful bidder.
Any additional plant, equipment, material, services which are not
specifically mentioned here, but are required to make the plants / systems in the
scope of the bidder complete in all respects in accordance with the technical
specification and for safe operation and guaranteed performance, shall be
covered under the scope of this specification.
This specification also includes training of purchasers personnel at
manufacturers works and at site in operation and maintenance of the plant.
1.1

UTILITIES

1.1.1

Power: The plant power system which will be linked to the existing 132 KV bus in
the existing MRSS of the Ferro Alloy Plant for obtaining the start up power and
also for evacuation of the power generated to the 132 KV substation. The power
generated in the proposed CPP which will be at 11Kv will be interfaced with the
switchyard of the CPP through 11KV system. Suitable transformer will be provided
in the CPP switch yard for stepping up/stepping down the power from 11KV or

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-1

FACOR ALLOYS LIMITED


45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Contd)

132 KV and vice versa. The power plant will have an HTpower distribution system
at 3.3 KV and an LT power system at 415 V.
1.1.2

Water: Source of Raw water for cooling and other uses in the plant will be from
the nearby abandoned rivers bunta and bore wells in the area. The approximate
analysis of the raw water from the 2 sources is given below:

ConstituentinPPM
AbandonedBorewell

MinesBunta

TotalHardness 140 380


TDS
200500
PH 88
PhenolphthaleinAlkalinity 12NIL
MethylOrangeAlkalinity120270

The raw water will have to be suitably treated and supplied as make up to the
auxiliary cooling water system and DM plant of the power plant as well as other
uses such as fire fighting, drinking etc. EPC bidder shall include for a raw water
storage tank of capacity 2000 cum in his scope. All necessary treatment facilities
for raw water shall be included in their scope by the EPC bidder.
1.2

PLANT LAYOUT

1.2.1

The proposed plant general layout of the existing facilities indicating the
disposition of the proposed 45 MW CPP plant units is shown in Drawing No.HIQ4036-P-01 Rev.0 enclosed for bidders reference.

1.2.2

Coal washery rejects, Indian coal and Indonesian coal which are the main fuel for
the plant will be received at plant site by road / rail and unloaded and stacked in
the coal storage yard. The coal from the storage yard will be fed by means of front
end loaders into the coal ground hoppers where from the coal will be transported
by a set of belt conveyors to the crushing and screening houses. The crushed and
sized coal and washery rejects of the required size range will be fed to the coal
storage bunkers in the boiler plant.

1.2.3

The turbo generators along with their auxiliaries will be located in the TG building.
A crane of capacity 60 Tons (capacity to be confirmed by EPC bidder) in the TG
building will serve the proposed 45 MW unit. The electrical panels will be located
in the annex to the TG building at ground level. The floor at the TG deck level of
this annex building will house the main control room. The 132 KV switch yard will
be located as shown on the enclosed layout. The other power plant facilities such
as raw water storage, raw water treatment plant, DM plant, auxiliary cooling water
system, air cooled condenser etc will be located as shown on the enclosed layout.

1.3

SITE CONDITIONS

1.3.1

The Bidder should acquaint himself with the site conditions, approaches,
availability of materials, camping facilities for his labour force and all other relevant
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-2-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Contd)

information required for bidding, before submitting the Bids. No claim on account
of any ambiguity due to variations/changes in above conditions will be entertained
by purchaser subsequent to finalisation of contract.
Location

Garividi, Vijanagaram Dt, Andhra


Pradesh.

Max. dry bulb temp.

45 o C

Site altitude above MSL

125 mt

Design dry bulb temp. for :

50 o C

Electrical equipment
Relative humidity for de sign

80%

Design wet bulb temperature

28 deg C

Wind

Velocity

at

10M :

8 m/s as per IS 875 (Part 3)1987

elevation
Susceptibility to earthquake

Zone III as per IS 1893-20

1.4

CODES AND STANDARDS

1.4.1

All requirements of the latest statutory regulations in force such as Indian Boiler
Regulations, Indian Explosives Act, Indian Factories Act, Indian Petroleum Act,
Indian Environmental Act, Indian Electricity Act etc., shall be strictly adhered to for
designing of the plant, equipment & process systems. Bidder shall be responsible
for getting necessary clearances for the plant and equipment from the above
statutory authorities at various stages during execution of this contract.

1.4.2

The components of all other equipment shall be designed, assembled and tested
in accordance with the relevant standards published by Indian Standards
Institution and / or as specified in the relevant technical specification.

1.4.3

Components which are not falling under any Indian Statutory Regulations and
manufactured as per reputed National Standards/ ISO shall also be accepted
unless it is in conflict with the requirements of this Bid Document in which cases
the stipulation of Bid Document shall prevail. Such codes / Standards other than
Indian codes / Standards must be equal to or more stringent than the Indian Code
/ Standards must be submitted to the Purchaser with four (4) copies of their
English versions duly certified.

1.4.4

All electrical equipment supplied shall comply with the latest revision of the Indian
Electricity (Supply) Act, Indian Electricity Rules, Indian Standard (IS) of
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-3-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Contd)

International Electric technical commission (IEC) Publication and also within the
statutory requirements of the Government of India and Government of Orissa as
regards safety, ear thing and other provisions specified therein for installation and
operation of electrical equipment.
1.4.5

The Bidder shall be responsible for obtaining necessary approval and clearance
and making whatever additions / modifications considered necessary by CEIG /
Electricity Company and other Statutory Authorities to bring the installation in
conformity with the above Rules / Regulations at various stages during execution
of this contract.

1.4.6

All Environmental / Pollution Control measures and Monitoring devices are to be


incorporated as per the requirement of relevant standards under Environmental &
Safety Act and as per the stipulations of Pollution Control Board of the state in
which plant is located.

1.4.7

Internationally accepted standards which ensure equal or higher performance


than those specified shall also be accepted.

1.5

STANDARDISATION

1.5.1

Contractor shall standardise various types and make of equipment and


accessories in order to reduce diversity, convenience of operation and
maintenance and minimise inventory.

1.5.2

All moving parts of equipment which can conceivably cause injury to the operator
and otherwise authorised personnel within the vicinity of working area shall be
suitably guarded according to the safety regulations. The complete assembled
units shall be designed so that all parts subject to wear including shafts and
bearings shall be easily accessible for inspection, maintenance and replacement,
with minimum loss of time.

1.5.3

All equipment supplied shall allow access to facilitate connecting up, and shall
operate satisfactorily under such variations of load, pressure and climate
conditions as may occur in working.

1.5.4

The plant and equipment offered shall be of proven latest design and of adequate
capacity strictly as per the requirement mentioned under this specification. The
material shall be new and of first grade quality. The workmanship and design
shall be in accordance with the best engineering practice and shall be such as
have been proved to be suitably for the intended purpose and for giving
satisfactory performance under the prevailing climatic conditions and proposed
system of supply. Liberal factor of safety shall be used throughout the design and
special consideration shall be given for parts subjected to alternating stresses of
shocks.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-4-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Contd)

1.5.5

Systems shall be designed incorporating the latest technology and maximum


flexibility in operation with sufficient stand-by provision. All system design shall be
subjected to the approval of Purchaser.

1.5.6

Equipment furnished by the Bidder shall be complete in every respect with all
mountings, fittings, fixtures and standard accessories which are normally supplied
even though not specifically detailed in the specification. The Purchaser shall not
be called for any extra payment in respect of such mountings, fittings, fixtures and
accessories which are needed for the safe operation of the equipment as required
by applicable codes within Indian Territory though they may not have been
included in this contract.

1.5.7

All equipment shall have suitable approach ladder and platform for repair and
maintenance wherever necessary.

1.5.8

The Bidder shall endeavour to utilise and adopt same codes, standards, and
norms keeping in mind the minimum variation & comprehensive standardisation of
the different spare parts for similar / identical basic component / equipment,
machinery and for the plant as a whole.

1.6

DOCUMENTS FORMING PART OF THIS TENDER

1.6.1

The following documents enclosed to this specification shall be considered as a


part of this tender Document:

Annexure-1

Technical Specification
auxiliaries.

for

Annexure-2

Technical
auxiliaries

specifications

Annexure-3

Technical
auxiliaries

specifications

Annexure-4

Technical specifications for Fuel handling


system and auxiliaries

Annexure-5

Technical specifications for Electrical and


Automation systems

Annexure-6

Technical specifications for Ash handling


system

Annexure-7

Technical specifications for DM Plant


system, Auxiliary cooling tower, Ventilation
system and Fire fighting systems.

for
for

Boiler

and

TG

and

ACC

and

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-5-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Contd)

1.6.2

Bidder shall note that the layout drawings and schematic diagrams furnished with
this specification are for the specific purpose of clarifying purchasers
requirements, which are to be considered for preparing the bid. The schematic
diagrams and layout drawings enclosed with this specification are not valid for
interpretation of scope of work during contract execution stage. Successful bidder
shall prepare drawings and schematic diagrams as required for equipment offered
taking also into consideration the technical specification and typical schematic
diagram for manufacturing, supply and erection. Drawings and schemes which
are finally approved by purchaser shall determine the respective scope of supply
& erection and responsibility of supplier.

1.7

COMPLETE SERVICES TILL COMMISSIONING

1.7.1

The scope of service under this specification has been elaborated in above
clauses. It is stressed that all responsibility from design, manufacture to
successful commissioning and performance acceptance test at site rests totally on
the successful Bidder. Purchaser shall not, in any way, be responsible for any
delay in transportation and clearance through Indian Port of entry.

1.7.2

In case bidder offers equipment from foreign sources, it is suggested that bidder
shall employ reputable Indian agents who will furnish necessary helps to ensure
speedy clearance through port, handling and transportation. Bidder / Indian agent
should make visits to the site before submission of offers in order to assess the
quantum of work involved in transportation and site erection, as accurately as
possible.

1.7.3

Till commissioning, successful bidder shall be responsible for providing any man
power - skilled, semi-skilled or unskilled. However, access of owners Personnel
shall be there for them to familiarise with the equipment before commissioning. All
erection tools and tackles, equipment (like cranes, winches, welding equipment
etc.), consumables like lubricant, welding gas or rods, etc., shall be supplied by
the successful Bidder. It is suggested that reputable local sub-contractor should
be arranged by the Indian agent for this service.

1.8

PROVISIONAL TAKE OVER, PERFORMANCE GUARANTEES, LD / PRICE


REDUCTION FOR NON PERFORMANCE, FINAL TAKE OVER ETC.:

1.8.1

After all the systems have been erected & commissioned (including completion of
steam blow out & target plate clearance for turbine quality of steam and after
completion of setting of relief valves) and completely stabilized and proved safe,
the Contractor in consultation with the Purchaser/ Consultant shall offer the
system as a whole for continuous and safe operation as a Trial run for 15 days.
A reliability run at rated design load for 24 hours of uninterrupted operation shall
also be undertaken during such Trial Run . Minor problems and continuous
interruptions of duration not exceeding 1 hour during the trial run shall be ignored.
However problems leading to interruptions exceeding 1 hour shall be properly
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-6-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Contd)

attended to and the entire trial run repeated for another 15 days. On successful
completion of the trial run and reliability test the boiler will be taken over by the
Purchaser and a Provisional Acceptance Certificate (PAC) issued.
1.8.2

All equipment shall be guaranteed for workmanship and materials, and


satisfactory performance. The guarantee for performance shall cover individual
items and systems including electrics for their ratings/outputs, as required in the
specification. On issue of the PAC as mentioned in para 1.8.1 above supplier shall
conduct the performance guarantee tests within 1 month of issue of PAC to
establish the various parameters guaranteed by him in the contract.

1.8.3

Instruments, gauges and flow meters installed for the normal operation of the
equipment shall be made use of during the acceptance tests as far as practicable.
However, if there is no panel-mounted instrument for measurement, separate
calibrated instruments shall be hooked up for the performance test purpose.
Temporary meters required for PG test shall be arranged by the contractor. The
Performance test on the unit shall be conducted within one month from the date of
Provisional taking over. Upon successful completion of the Performance tests,
and compliance of all contractual conditions by the contractor such as submission
of all final drawings and documents, as built drawings and operation &
maintenance manuals etc. as well as fulfilment of all other obligations, Purchaser
will issue to contractor a final acceptance certificate.

1.8.4

Bidders shall guarantee the following parameters for the major equipment and
facilities in the CPP which shall be established during the guarantee tests after
commissioning of the CPP:
Maximum continuous rating of the boilers
Steam pressure and temperature at super heater outlet
Dust content at outlet of Chimney of the boiler.
Power output of TG at rated turbine inlet conditions.
Noise level at 1m from TG unit.
Vibration of TG train
System capacity (Tons/hour) and gramulometry of coal handling system.
DM plant output and quality of DM water.
Station heat rate
Auxiliary power consumption of CPP
Unburnt carbon in fly ash to be less than 1.5%.

1.8.5

Guaranteed parameters as above shall be established by the supplier by


performing suitable tests as per agreed procedures within 1 month from the date
of Provisional take over by purchaser. In case the supplier fails to establish the
guarantees in the first attempt he shall repair, replace or carry out modifications at
his cost and repeat the test to establish the guarantees within a reasonable period
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-7-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Contd)

to be mutually agreed upon. A maximum of two chances will be given for repair
and retest to bring the parameters within the guaranteed values and the total time
period for such retests shall be a maximum of 4 months from the date of
commissioning. However, if the performance guarantees are not proved within the
above attempts or time period Liquidity Damages (LD) / price reduction as defined
in following clause will be applied in the case of some of the parameters
1.9

LD CLAUSE / PRICE REDUCTION:

1.9.1

Price reduction for Non performance:

The following LD/price reduction shall be applicable in case of non-achievement of


guarantee parameters as per Para 1.8.4 above:
Nature of
Shortfall

LD/price reduction rate

Limit of non acceptability

Maximum
continuous rating
of boiler

0.5% of contract price for


every 1% deficiency or part
thereof.

Deficiency up to 2% will be
accepted with LD. Beyond
2% equipment will have to
be rectified by supplier to
bring it within the
acceptable limit.

Steam pressure
and temperature

Not applicable

No tolerance is acceptable
on these parameters.

Dust content at
output of chimney

Rs.50,000 /- per mg increase


in dust content / Nm3 over
guarantee value

Limit of acceptance with LD


upto 60 mg/Nm3 beyond
which equipment will have
to be connected with no
extra cost to Purchaser.

Power output of
TG

0.5% of contract price for


every 1% deficiency or part
thereof.

Deficiency up to 2% will be
accepted with LD. Beyond
2% equipment will have to
be rectified by supplier to
bring it within the
acceptable limit.

Noise level and


vibration of TG 1

Not applicable

No tolerance is acceptable
on these parameters

Capacity and
granulometry of
coal handling
system & DM
water quality

Not applicable

No tolerance is acceptable
on these parameters.

Station heat rate

0.5% of contract price for


every 1% decrease in

Deficiency up to 2% will be
accepted with LD. Beyond

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-8-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Contd)

Guaranteed
Auxiliary power
consumption

efficiency or part thereof.

2 % equipment will have to


be rectified by supplier to
bring it within the
acceptable limit at no extra
cost to Purchaser.

Rs. 1.5 lakhs for every 1 KW


additional power
consumption over the
guaranteed value

Increase in auxiliary power


consumption upto 3% will
be accepted with LD.
Beyond 3% equipment will
have to be rectified by
supplier to bring it within
the acceptable limit at no
extra cost to Purchaser.

If the total value of the penalties for shortfall in performance exceed ten percent
(10 %) of Total Contract price, and the supplier has expressed his inability to rectify the
defects & bring the equipment performance to the guaranteed value, then the purchaser
retains the option to reject the equipment, and in case of such option the supplier shall,
jointly and severally, replace the equipment with one, which shall meet the guaranteed
values. The replacement shall be done within a reasonable period mutually agreed and
with no extra cost to the purchaser.
For those items for which shortfall in performance is not acceptable beyond the
permissible tolerance, the supplier shall jointly and severally, shall carry out modifications
to obtain the guaranteed performance within the stipulated tolerance. It may be noted that
as these are primary parameters, they must be corrected even before the trial run is
started, and further, these parameters must remain stable throughout the period of trial
run.
If finally, in spite of all practical efforts by the supplier the stipulated guarantees on
these parameters are not established, the purchaser retains the option to reject the
equipment. In case the option to reject is exercised by the purchaser, the supplier shall
jointly and severally be responsible for the replacement of the rejected equipment within a
reasonable time as will be indicated by the purchaser and achieve the performance as
guaranteed.
In the event of equipment rejection for reasons as stated above, it is obvious that
the overall project schedule will be affected. To minimize the loss due to such an
occurrence, the purchaser retains the right to use the faulty equipment until new
replacement arrives at site. It may be noted that as the faulty equipment has not been
taken over by the purchaser the responsibility for it lies entirely with the supplier. During
this period the supplier shall not limit the use of the faulty equipment, except for reasons
of safety during operation, both of personnel and the equipment.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-9-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Contd)

1.9.2

Price reduction for Delay in Delivery:

Time is the crux of the project. The supplier shall endeavour to deliver, install &
commission the plant within time period specified in contract. If the supplier fails to
deliver, install & commission any or all the goods within time period, specified in contract
the Purchaser shall, without prejudice to his other remedies, under contract, deduct from
the contract price, as liquidated damages, a sum equivalent to 0.5% of the total contract
price for each week of delay up to maximum 5 % of contract price. Once the maximum is
reached the purchaser may consider termination of the contract.
1.9.3

Total LD / price reduction

The total price reduction on account of both clause 1.15.1 and 1.15.2 above shall
be applicable independently subject to an overall ceiling (considering an aggregate of all
items) of 10% of the total contract price.
1.10

INSPECTION AT WORKS FOR IBR CLEARANCE:

Equipment shall be offered for inspection prior to despatch. The test shall be
conducted as per the procedure laid down by the concerned Indian Boiler Regulations
(IBR) and got cleared by Boiler Inspectorate for pressure parts as per IBR. Third party
inspection by internationally reputed testing agencies like Lloyds inspection, BVQI shall
be arranged by supplier as per requirement of Indian Boiler Inspectorate. All necessary
cost for getting the IBR clearance shall be included by the bidders in their offers.
Test procedures and other documents required by the testing agency shall be
submitted and got approved before start of inspection. QA plan shall also be submitted for
approval immediately on placement of order.

1.11

INSPECTION BY PURCHASER / CONSULTANT

1.11.1 All plant and equipment as per this specification shall be inspected for ensuring
the required quality as per the inspection plan indicated in this specification.
Supplier shall ensure full and free access to purchasers inspector to the
manufacturing factory /premises any time during contract period, to facilitate him
to carry out inspection and testing. All instruments, apparatus tools & tackles,
gauges, templates, consumables etc. required for testing shall be arranged by the
supplier free of cost to the purchaser. All tests shall be carried out by the supplier
at manufacturing works and purchasers testing engineer will witness such tests.
1.11.2 Inspection report / protocol shall be prepared after inspection and all the test
results, observations shall be recorded neatly, signed in triplicate and two copies
to be handed over to the testing engineer. Based on the inspection report,
inspection engineer will review and issue inspection memo and despatch
clearance from his office to the supplier for further action. In case of stage
inspection, the subsequent stages can be taken up only on obtaining the

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

- 10 -

FACOR ALLOYS LIMITED


45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Contd)

inspection clearance for that stage. Items shall not be despatched without
obtaining inspection clearance.
1.11.3 If any defect / deviation are observed, the same shall be recorded in the report
and corrective measure that will be taken shall be discussed and mutually agreed.
If the correction is not accepted by the testing engineer, the same shall be
referred to the designer / consultant for review and approval. In due course of
inspection, if any additional tests are required to be carried out, the same shall be
done without any additional cost to the purchaser.
1.11.4 Items will be categorised as A, B and C. Major items whose testing is to be
witnessed are categorised as A and those items, which are not to be witness
tested, shall be categorised as B. All other items like foundation bolts, support
structures and similar items shall be categorised as C. Itemised categorisation
will be done at the time of finalisation of order. All routine tests for category A as
per applicable standards will be witnessed by the inspection Engineer. Material
tests certificates and internal inspection test certificates shall be submitted for
category B. Items categorised as category C may be despatched by suppliers
after ensuring the quality themselves.
1.11.5 Even though inspection is conducted, if any defect is found at site, the same shall
be corrected / replaced by supplier without any additional cost to the purchaser.
1.11.6 Following documents shall be submitted and acceptance obtained from purchaser
/ consultant / inspection engineer before start of inspection for items categorised
as A.

Approved drawings for dimensional details, single line diagram etc.

Data sheets for motors etc.

Manufacturer catalogue for standard items

Test procedures wherever required.

Type test certificates as applicable.

Calibration certificate of standard test instruments

Internal inspection report for the tests conducted by manufacturer for the
subassemblies and for the stage inspection at factory.

Material test certificates where required.

1.11.7 Following inspection plan as per table below is generally proposed for the scope
of this tender. However, depending on the scope, the plan will be finalised at the
time of placement of order.
PROPOSED INSPECTION PLAN
Sl.
No

Item description

Routine test

Operation
checks

Boiler / Turbine / ACC / DM plant

X, T, W, D

Hydro test / MR

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

- 11 -

FACOR ALLOYS LIMITED


45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Contd)

/ FHS / AHS

test

Bought outs like boiler feed


pumps etc

X, T, W

Control Panels

X, T,D

Instruments & control

X, T

Motors

X, T

MCC

X, T, W, D

X Routine tests to be conducted


T Type test Certificates to be submitted for review
W Factory tests will be witnessed by purchaser
D Dimensional, general arrangement, workmanship, finish checks
The modalities & the QA plan proposed will be discussed & mutually agreed.
1.12

BOILER REGISTRATION

The boiler shall be manufactured as per Indian Boiler Regulations with latest
amendments. One set of relevant documents and certificates signed by the Chief
Inspector of Boilers of concerned state shall be forwarded to the customer. Boiler
registration formalities, IBR approval and approval by other statutory bodies shall be done
by tenderer. However, Purchaser shall pay only the statutory fees to the concerning
department through the Challan
1.13

WARRANTY

The contractor is liable for any failure of equipment supplied by him and he will be
responsible for making good such failures by replacement of defective and failed parts.
The contractors liability for faulty design, materials or workmanship shall be for a period
of 12 months from the date of commissioning or 18 months from the date of last supply,
whichever is earlier.
1.14

NOISE ABATEMENT

The Bidder shall adopt good engineering practices such as well-balanced


machinery, acoustically correct enclosures, structures and supports from resonance,
acoustically designed fluid paths for ducting and pipe work etc. Noise abatement devices
such as those for sound isolation and for absorption as well as for vibration isolation
and/or dampening shall be provided as per OSHA standards and also conform to ISO
Standards. Noise level shall not exceed 85db at 1 m distance for rotating equipment,
other normal operating equipment, pipe-work etc. Start up vents, Safety valves etc.,
which are expected to operate occasionally shall have silences to limit the noise level at
105db at 10M distance.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

- 12 -

FACOR ALLOYS LIMITED


45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Contd)

1.15

SUPERVISION FOR ERECTION AND COMMISSIONING

Experienced engineers shall be posted at site for erection supervision by the


contractor who shall interact with consultant and client on a day-to-day basis and
reporting shall be on daily basis. For major bought out items like boiler feed pumps etc.
erection & commissioning engineer from OEM shall be made available by contractor.
1.16

TRAINING

All system shall be operated by O&M group of the client from the day of start of
commissioning under the direct supervision of the commissioning team deployed by
contractor. Commissioning engineers of contractors shall operate for at least 6 months
from the date of reaching 60% of full power operation. During the 6 months O&M team
shall be trained and gain confidence for independent operation.
1.17

SUBLETTING OF CONTRACT

Bought out items shall be procured from approved vendors only. List of suggested
vendors is enclosed as Appendix to this specification. The Contractor shall not without the
consent in writing of the Purchaser/Consultant, which shall not be unreasonably withheld,
assign or sublet his Contract or any substantial part thereof other than for raw materials,
for minor details, or for any part of the works of which the makers are named in the
Contract, provided that any such consent shall not relieve the Contractor from any
obligation, duty or responsibility under the Contract.
1.18

ACCESS TO PURCHASER

Complete responsibility of installing and commissioning of the plant lie with the
Bidder. However supervision of work by Owner / Engineer shall be there and involvement
of personnel of purchaser for familiarisation with the equipment shall be allowed. For any
important test or check to be conducted, Owner / Engineer shall be notified in advance for
witnessing the same.
1.19

DESIGN CO-ORDINATION MEETING

The Contractor will be called upon to attend design co-ordination meetings with
the Purchaser / Engineer, other Contractors and the Consultants of the Purchaser during
the period of contract. The Contractor shall attend such meetings at his own cost as and
when required and fully co-operate with such persons and agencies involved during these
discussions.
1.20

TRANSPORTATION & PACKAGING

All the equipment shall be suitably protected, coated or covered or boxed or crate
as per standard package to prevent damage or deterioration during transportation,
handling and storage at site till time of erection, considering tropical humid climate.
Contractor shall be responsible for any loss or damage during transportation, handling &
storage due to improper packing.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

- 13 -

FACOR ALLOYS LIMITED


45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Contd)

1.21

DRAWINGS AND DOCUMENTS

1.21.1 Information to be furnished with the tender


Bidders shall submit following drawings along with the bid for review before
finalisation of the tender.
General layout of Boiler and Auxiliaries proposed by the bidder.
Scheme diagrams of Boiler steam system, Feed water system, Auxiliary
system steam, Deaerator etc.,
1.21.2 Drawings to be submitted after award of contract
Bidders shall submit following drawings after award of contract.
a)

Approval category

Basic design drawings, general arrangement drawings, P&I diagrams,


procurement data sheets for bought out items, pipe routings, electrical single line
diagrams, electrical relays schedules shall be included in the approval category of
drawings. List of drawings, which will be in approved category, will be finalised at the time
of placement of order.
b)

Certified data /Drawings for purchasers input


Contractor shall submit following drawings for purchasers design inputs.
Foundation plan and load data for each item of equipment for civil design
Layout and Dimensional drawing for finalising room/area requirement.
Details of embedment, cut-outs and insert requirement.
Terminal details and terminal flange dimensions
Motor schedule and its details
Instrumentation I/O schedule and DCS details

c)

Information category drawings and documents

Contractor shall submit following drawings for purchasers review and acceptance.
Generally the information content in these drawings will be noted for correctness.
Pipe & Hanger schedules for pressure pipes
List of bought out components / Bill of quantities with specifications
Stress analysis results for piping
Isometric view of piping drawing
Design calculation sheet for adequateness of earthing.
Fault level calculations for electrical buses
d)

Erection drawings and site fabrication drawings

Contractor shall submit the following drawings before start of erection of the
systems
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

- 14 -

FACOR ALLOYS LIMITED


45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Contd)

Instructions showing pre-requisites and procedure for erection


Erection drawings for proper erection and assembly of all equipment.
Pre commissioning check list for erection completion which will be signed
as protocol for erection completion
Commissioning procedures
Check list for completion of commissioning as part of protocol for
commissioning
Handing over protocol
e)

Inspection and Test reports

Purchaser shall submit all factory test reports and inspection reports, minutes of
meeting during inspection etc. and protocol for erection completion, commissioning
protocol etc. at the end of contract for purchaser and plant records.
f)

Operation and maintenance manuals

Contractor shall supply of the following documents & drawings with the delivery of
equipment.
Operation and maintenance manuals.
List of recommended spare parts with specification and supplier reference.
List of consumables with quantum of usage, make, supplier reference etc
All drawings and documents in soft form.
The above drawings and documents are required to be submitted by the in the
following number of copies:
S.
No

Status of the Drawing,


Data etc

No. of copies for


Purchaser

No. of copies for


Consultant

Preliminary

1 Prints

3 Prints + Soft copy

Reference

1 Prints

3 Prints+ Soft copy

For Approval

1 Prints

3 Prints

Final & Certified duly


signed

1 Prints & 1 soft


copy

4 Prints

Operation &
Maintenance Manuals

4 Copies

1 Copies

Performance &
acceptance Test
Procedure

1 Copies

3 Copies

All other Documents

1 Copies

3 Copies

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

- 15 -

FACOR ALLOYS LIMITED


45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Contd)

All design drawings shall be oriented to match the plant arrangement drawings
and shall have a key plan identifying the plant area to which they apply. All layout
drawings shall be made with the NORTH arrow pointing to the TOP of the sheet.
1.22

MISCELLANEOUS

1.22.1 Painting
All items of equipment shall be thoroughly cleaned and painted with two coats of
approved primer and two coats of approved alkyd based finish paint as per
standard practise of the equipment supplier. The successful bidder shall furnish
painting procedure for equipment, piping, structural and other items before start of
erection or before fabrication of the items.
1.28.2 Lubrication
All equipment shall have adequate lubrication arrangements for smooth and
efficient operation. Sufficient lubrication points shall be provided wherever
necessary and all such points shall be easily accessible. Grease guns shall be
provided wherever necessary.
1.23

SPARES, TOOLS AND TACKLES & CONSUMABLES

1.23.1 Commissioning Spares


Provision for all spares required for commissioning of the equipment and for its
efficient operation until provisional acceptance after demonstration of satisfactory
performance in accordance with the guarantees forms part of tendered scope.
These items shall be based on the Bidder's experience in commissioning similar
plants in the past. The commissioning spares are to be included in the main offer
and must be at site along with the main equipment. The successful Bidder shall be
responsible for having the required items at site in sufficient quantities.
1.23.2 Spare Parts for Two (2) years' Normal Working
Supply of Spare parts for two (2) years' normal working of the plant after
provisional acceptance of the plant on demonstration of satisfactory performance
shall be included in the scope of supply and work. List with recommended quantity
and unit price shall be supplied. Purchaser reserves the right to directly order on
the sub supplier for bought out items.
1.23.3 Insurance Spares
List of insurance spares if any based on Bidder's experience shall be furnished
along with unit rates for Purchaser's consideration.
1.23.4 Tools and Tackles
The Bidder shall include in his tender all special tools and tackles required for
normal operation and maintenance of the equipment.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

- 16 -

FACOR ALLOYS LIMITED


45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Contd)

1.23.5 Consumables, etc.


All consumables for erection, testing and commissioning including first fill of all
items such as oil, grease, etc till handing over of the plant and equipment to purchaser
shall be in the scope of the supplier.
2.0 SCOPE OF THE SPECIFICATION
2.1

The scope of supply of equipment and services covered by this specification are
detailed in various sections of this specification. Any item, though not specifically
mentioned but required to make the power plant and auxiliaries complete in all
respects and for its reliable and safe operation and guaranteed performance shall
be included by the tenderer in his offer. Obtaining statutory approvals and
clearances at appropriate stages from various authorities shall also be treated as
though included and the bidder shall include the same, unless otherwise
specifically excluded elsewhere.

2.2

Basic and detailed engineering services including but not limited to the following
for the proposed CPP are covered by this specification:

Basic engineering for the complete Power Plant covering complete process
design, process calculations, material and heat balance, complete system
design for plant and equipment including utilities, electrics, and
instrumentation and automation systems.

Complete procurement specification and data for standard bought out


equipment/items, electrical system, instrumentation and automation
system, utilities, water and other services.

Assignment drawings, load data, anchorage details necessary for building


structure design and carrying out piling and civil design. Complete civil and
structural design for the power plant shall be in tenderer scope

Similar assignments for other services/system/items, which are not


included in bidders scope of supply but are needed for the completion of
the project.

Complete detailed engineering for all plant and equipment, which are
within the scope of supply of successful Tenderer.

Design of all technological structures such as all chutes, ducts, duct


supports, hoods, hoppers, and equipment supports etc.

All drawings, documents, manuals, performance curves, test


certificates including operation and maintenance manual, erection manual,
functional description etc.

As built drawings

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

- 17 -

FACOR ALLOYS LIMITED


45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Contd)

2.3

Supply, erection, testing and commissioning of the following equipment, systems


and services for the power plant are included in this specification:

One (1) Boiler of CFBC design capable of using coal washery rejects,
Indian coal G grade,and Indonesian coal as fuel.However the boiler should
be designed for 100% coal washery rejects. The capacity of the boiler shall
be 195 TPH at required pressure of temperature. The boiler and auxiliaries
shall be as per enclosed specification.

One (1) Turbo generator set of capacity 45 MW at the designed inlet steam
and temperature. The TG and auxiliaries shall be as per enclosed
specification.

One (1) Air cooled condenser with air extraction equipment and other
auxiliaries for the turbine and a set of condensate extraction pumps with
drive motors and other accessories. The ACC and auxiliaries shall be as
per enclosed specification.

Complete piping, auxiliary piping, and interconnecting main steam, feed


water, condensate, auxiliary steam etc. complete with hangers, supports,
valves, specialties, etc. for each TG unit

Raw Water Treatment and auxiliary cooling water system with pumps &
accessories DM plant etc. as per specification enclosed.

Fuel handling system complete with ground hoppers, feeders, coal


crushers, screens, conveyors, dust extraction system with bag filters,
transport equipment such as front end loaders etc. as per specification
enclosed.

Complete pipe work for various water and utility systems with valves,
fittings and accessories, coating and wrapping for underground pipes etc.

Ash Handling System including bed ash handling system of pneumatic


type, and dense phase dry type ash handling system for fly ash complete
with conveying vessels, compressors & receivers complete with
instrumentation, pipes & supporting structures, ash storage silos etc for
the boiler.

All electrical items as specified in enclosed specification for electrical


systems.

Instrumentation and control system with field and panel mounted


instruments, control panels, DCS system, cabling and accessories as per
enclosed specification for Instrumentation and DCS systems.

Compressed air system both for general-purpose service air and


instrument air along with compressors of adequate capacity with standby,
after coolers, air receivers, dryers pipe work and accessories.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

- 18 -

FACOR ALLOYS LIMITED


45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Contd)

Fire detection and protection systems & accessories complete with


detectors, electrics, pumps & associated accessories, pipe work etc and
portable C02 extinguishers and sand filled buckets for electrical rooms,
transformer area, control room, cable vaults, etc. as per requirements

HVAC System & its accessories for turbine building operating and ground
floor, electrical room, battery charger room, control room, office room etc.
including air conditioning & ventilation systems with package and split type
air conditioners, air handling units for washed air supply systems supply
and exhaust fans & associated ducting, piping etc.

Mono rails with electric hoists for ESP, boiler, pump houses and other
areas as required for maintenance.

Inspection at Factory, Quality control at manufacturing works, testing of all


the equipment as specified and as per the requirement of Indian Boiler act.

Commissioning spares as required for all equipment / plant / systems as


recommended by the respective manufacturers for successful
commissioning and operation of the plant till the system is handed over
after successful performance guarantee tests.

Packing and forwarding, arranging transport inland or sea transportation,


port handling and clearance of imported equipment safe transportation
from manufacturers place / port to site, inspection of packing on receipt at
site etc.

Erection of all plant, equipment, piping, instrumentation & control etc.,


supplied under this package, as specified.

All erection tools such as cranes, hoists, welding sets, gas, electrodes,
compressed air, sump pumps, paints, putty and all consumables, stores,
etc., required for erection, testing and commissioning of the plant till
handing over to purchaser.

Flushing and first charge of lubricating oil, governing oil, inhibitor for water
treatment, etc., and also adequate quantity of the same consumables for
topping up for first six (6) months of initial operation after successful
commissioning.

Bidder shall furnish the list with itemised prices sufficient description and
drawings for one set of operational spares required for all equipment / plant
/ systems as recommended by the respective manufacturer for regular
reliable operation of the plant for not less than two (2) years after
commissioning and guarantee tests. These items shall be ordered
separately by the Purchaser.

One (1) set of special tools and tackles, fixtures etc.required for regular
operation and maintenance of the plant and equipment offered. Adequate

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

- 19 -

FACOR ALLOYS LIMITED


45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Contd)

means shall be provided for lifting and handling of each item of plant and
equipment.

All statutory permits license from competent authority approvals from Boiler
Inspectorate, Electrical & Factory Inspector, and TAC/ NFPA, labour etc.
as required for the project.

Carrying out all pre-commissioning and commissioning tests in


consultation with Purchasers Engineer at site and commissioning of the
systems.

Performance Guarantee tests for all the equipment as per mutually agreed
procedure and as per Indian and International Standards.

Submission of all drawings and documents to Purchasers consultants and


obtaining approvals before start of manufacturing or construction.

Preparation of monthly reports in the agreed formats and attending


monthly review meetings, design coordination meetings etc.

Arrange permission for Purchasers / Purchaser representatives entry to


different stage and final inspection / testing of equipment at manufacturers
works.

Receiving and unloading of all equipment, plant and materials at site,


checking with shipment list / consignment note and reporting for missing or
damaged items, and make all arrangements for insurance claim as
necessary.

Proper stocking, storing under contractors custody and security, providing


proper maintenance of stored items and keeping proper records of
materials at store for convenience and proper scheduling of erection work
and for quick identification as and when required. Stores as required shall
have to be constructed by the Bidder in the open space provided by
Purchaser.

Issue of materials from stores and maintaining details of account of the


same as required.

Transportation / shifting of materials from stores to erection site.

Pre-assembly at site after proper checking as required.

Erection and subsequent cleaning / flushing as required.

Preparation of erection check list, carry out pre-start check of the


installation to ensure correctness of the erection.

Preparation of testing, commissioning procedures & start-up procedures &


check lists.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

- 20 -

FACOR ALLOYS LIMITED


45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Contd)

2.4

Carrying out commissioning testing, starting up checks, performance


testing, and handing over of the complete plant / equipment / system / subsystems.

Supply of all drawings, data, test certificates, O & M manuals, etc., as


necessary.

Supply and compilation of different manufacturers operating and instruction


manuals in a comprehensive manner prepared for use by operating and /
or maintenance personnel.

Submit complete As-Built drawings for the plant / system / sub-system /


equipment / material as erected and installed at site incorporating each
change or modifications in the executed works from the approved
construction drawings.

Project engineering and management and periodic reporting till handing


over the plant.

The successful bidder shall provide the following manpower at site during
erection, testing and commissioning:

One experienced Site In charge having at least 15 years of experience in


erection and commissioning of similar projects

Engineers with experience in similar job as Supervisory staff, inspectors,


erection and commissioning engineer for each major system to be decided
at the time of finalisation of the contract.

Skilled, semi-skilled / unskilled workman-labour clerical staffs, watch and


ward staff, store-keeper, drivers etc.

EOT and other crane operators as required for all services till handing over
of the plant.

2.5

The successful bidder shall arrange for the training of reasonable number of
purchasers personnel, to be specified by the purchaser, in the shops
manufacturing the equipment and machinery specified in the contract and also
similar operating installations. The period of training shall be mutually agreed
upon on the basis of total man-days.

2.6

Terminal points for the scope of services as per this tender shall be as defined
below. at all terminal points scope of this contract shall include making the joint
including supply of mating flanges, gaskets, bolts, nuts, etc.

Fuel at the coal storage dump of the fuel storage area near the ground
hopper, necessary dumpers and dozers are in the scope of the supply of
bidder.

Flue gases from boiler at stack outlet.

Dust and fly ash at respective storage silo bottom flange.


HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

- 21 -

FACOR ALLOYS LIMITED


45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Contd)

2.7

Furnace oil/LDO at the inlet of storage tank.

Raw water supply lines at inlet to raw water storage reservoir.

Vents to be taken outside building limit wherever necessary with suitable


bird net, rain protecting hood etc., fitted at the outlet with suitable
approaches for servicing & maintenance.

Drains and blow downs to be taken up to a collection sump through drain


header or drain trench. All above ground drain piping inside the plant shall
also be included by bidder in his scope.

Electrical 132 KV transmission line for power export at gantry of existing


132 KV bus.

Following items of work are excluded from the scope of work covered by this
specification:

Site levelling, soil investigation etc.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

- 22 -

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION

ANNEXURE-1 BOILER & AUXILIARIES


1.0
1.1

DESIGN BASIS

BOILER
Single or bi-drum, vertical, semioutdoor, natural circulation

1.

Type

2.

Normal Continuous rating


(NCR), Steam pressure and 195 TPH, 110 ata, 545 +/- 5 C
Temperature at MSSV outlet

3.

Number

One

4.

FW inlet temperature

219 C ( min)

5.

Steam purity

Total Dissolved Solids: 0.1 ppm


(max)
Silica (max): 0.02 ppm

1.2
1.2.1

6.

Steam system

Steam line from CFBC boiler to be


connected to main steam header in
the TG building which has to be
extended as required. Auxiliary
steam header to be provided as
required.

7.

Deaerator and FW system

One deaerator and two boiler feed


pumps one working and one standby

8.

Feeders

Both drag chain/screw conveyors to


be provided.

9.

No. of under bed fuel Feeders

As per the requirement with VFD for


flow control.

FUEL FOR FBC BOILER


Fuel combination
Boiler furnace shall be deigned for firing the fuels in different combinations
and in quantities on heat basis as indicated below.
Combination 1 : Performance fuel :

Coal washery rejects : 50 %

Indian coal G grade : 50 %

Combination 2:

Imported coal : 25%

Indian coal G grade : 25 %

Coal washery rejects: 50 % .

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-1-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)

Combination 3:

1.2.2

Imported coal : 25%

Washery reject : 25 %

Indian Coal G : 50 % .

Analysis of Fuels:
Approximate indicative analysis of different fuels is given below:
Ultimate Analysis:

1.3

Coal washery Indian coal


rejects
G - grade

Indonesian
coal

S.No

PARTICULARS

Carbon %

23.0

17.10

59.38

Hydrogen %

01.3

0.22

3.15

Nitrogen %

00.6

0.10

01.04

Sulphur %

01.50

0.57

0.38

Moisture %

08.00

06.32

06.00

Ash %

60.50

75.48

25.19

Oxygen %

05.10

0.20

04.86

Gross Calorific Value,


KCal/ Kg

1800

2000

5600

DESIGN REQUIREMENT:
The Fluidised Bed Combustion Boiler and its auxiliary equipment covered
by this specification shall be designed to achieve the following objectives:

Design of equipment shall be as per Indian boiler regulation (IBR


1950 with its latest amendments) and ASME PTC 4.1 for efficiency
calculation by indirect method.

Temperature of flue gas at the outlet of economiser of the boiler


shall not be over 150 deg. C.

Storage bunkers for 16 Hrs of fuel storage for the boiler shall be
provided with proper partitions and feeder arrangements for feeding
any combination of fuels into all compartments.

Super heater outlet temperature control shall be for 60% to 100%


for normal continuous rating and normal kiln gas temperature.

A Deaerator and feed water pumping system will be provided for the
boiler.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-2-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)

1.4

The control of the CPP will be based on a DCS system to be


procured by the purchaser separately. All instruments and controls
provided by the boiler supplier shall be compatible to the DCS and
necessary outputs for feeding the signals to purchasers DCS shall
be provided by the boiler supplier.

ELECTRICAL SYSTEM
All drive motors up to 200 KW shall be suitable for operation on 415 V, 50
Hz, 3 / 4-wire systems. All the motor shall meet the following conditions.

All the AC motors for various auxiliaries should be designed to


operate in humid air with the maximum ambient temperature up to
45 deg. C

All the motors shall be of squirrel cage type

The degree of protection of motors shall be IP 54 & shall confirm to


IS: 325 / IEC 60034.

Motors for outdoor application shall be IP 55 degree of protection


with sheet Steel canopy

The motor winding shall be provided with class F insulation

The motors shall be suitable for + 10 % voltage variation on rated


Voltage and + 5 % frequency variation on 50Hz. Subject to
combined Variation of 10% with maximum temperature rise limited
to limits of Class B insulation.

All the motors shall be of Energy Efficient, Eff -1 range, and shall
meet the following requirements

Highest among the commercially available make & range.

Flat Efficiency curve between 60 % to 100 % load.

Efficiency shall be guaranteed without any negative tolerance


tested.

Supplier shall obtain specific confirmation/ approval from Purchaser


/consultant before procuring the motor for the guaranteed efficiency
figures.

Motors of rating 30 KW & above shall be provided with space


heaters.

Motors of rating 75 KW & above shall be provided with RTDs for


winding.

LV motors shall be suitable for 415 V.

Motors shall be Totally Enclosed Fan Cooled design.

All bearings of motors will be lubricated anti-friction type. No forced


lubrication is acceptable.
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-3-

and

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)

1.5
1.5.1

Fuel Feeders shall be provided with VFDs. VFDs shall be meet the
following requirements:

Rated for 415 V

Suitable for the selected IGBT based variable frequency drive, and
shall match with the drive in respect of over voltage / spike
generated by drives.

Winding shall be VPI treated and two coat enamelled. These motors
shall be sized to operate satisfactorily under the lowest speed
conditions. Operating speed requirement shall be as follows
Boiler Feed Pump

- 30 % to 100 %

Fans

- 30 % to 100 %

Fuel Feeder

- 10 % to 100 %

Motors of rating above 30 KW shall be provided with thermisters in


the windings and higher capacity motors shall be provided with
RTDs

Motor terminals to be rotatable for 4 X 90 Deg. Higher rating motors


shall be provided with extension terminal box to receive the
aluminium cables. The terminal box shall be capable of
withstanding the maximum system fault current for duration of at
least 0.25 second.

The motors shall be capable of operating satisfactorily at full load


for five minutes without injurious heating with 75 % of rated voltage
at its terminals.

The motors shall be capable of withstanding locked rotor current for


at least 5 second longer than the starting time under rated load
conditions.

Starting current shall be less than or equal to 600 % of rated


current and the motor shall be designed for direct on line / reduced
voltage starting.

Continuous duty motors shall be capable of three equally spread


start per hour under normal conditions or two starts in quick
succession from cold or one hot start, under rated load conditions.

For rating 160 KW and above, NDE bearings shall be insulated to


prevent circulation of shaft current.

PIPING SYSTEM
Layout
)
In general, the piping as per this specification shall be routed
overhead. All overhead yard pipe work shall be routed such that

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-4-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)

they will have a minimum clearance of 6.0 metres between bottom


of supporting structures and road crown/ railway track.

1.5.2

All shop headers, except for gravity return fluids, shall be generally
routed along columns in multiple rows at a height 4 to 6 metres
above floor level. The connections to equipment shall be taken
through suitable covered floor trenches for shops at ground floor
and for basements and for elevated operating floors, the equipment
pipe work connections may be taken below the floor level. All
gravity pipes shall also be preferably routed along the same route.
Isolated single pipe connections to equipment may be buried in the
flooring/ equipment foundations. All pipe trenches shall be covered
by chequered plate or by concrete slabs.

The outlet pipes for purging lines and other exhaust pipe work shall
be routed upward along columns / gable ends and / or walls to a
height of 4,000 mm above the roof level.

Platforms, access ladders, hand railing etc shall be provided for


operation and maintenance of valves, instruments and controls. In
case the units and electric drives for the valves are to be located at
a height of more than 1.4 m from the maintenance level, the
platform with stairs shall be envisaged (either stationary or lightweight portable ones).

At all the places needing regular maintenance e.g. gate valves,


throttle valves, orifice plates, hatches, manholes, bleeders etc if
located at a height of over 2.5 m from the maintenance level,
provision shall be made for stationary platforms with the railings
and stairs. For individual platforms, which are used rarely, the
vertical ladders can be provided. Guard railing for the platforms and
stairs shall be at least 1.2 m high.

Sizing of pipe lines


)
Sizing the pipelines shall be within the following velocity limits. The
test pressures shall be as per IBR.

For HP steam (upto 110Kscg & 540 deg. C) velocity shall not
exceed 45 m/s.

For HP steam (upto 70Kscg & 490 deg. C) velocity shall not exceed
40 m/s

For LP steam (upto 10Kscg & 300 deg. C) velocity shall not exceed
30 m/s

For Feed water (upto 100Kscg & 300 deg. C) velocity shall not
exceed 2 m/s

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-5-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)

1.5.3

For condensate (upto 8Kscg & 60 deg. C) velocity shall not exceed
2 m/s

For drain & cooling water (upto 6Kscg & 200 deg. C) velocity shall
not exceed 2 m/s

Valves & Fittings


)
Valves of DN 100 and above shall be provided with by-pass.

Pipes, fittings and valves shall be supplied with IBR certificates.

Valves shall be provided on pipe work for isolation of pipe sections


and equipment, control of pressure, flow and level of fluids, venting,
draining, pressure relief etc. They shall be suitable for the service
conditions in all respects and located suitably considering ease of
operation and maintenance.

The valves provided shall include but not be limited to the


followings:

On all pipelines both at the sources and consumers.

On all branch pipes from main header to consumers.

Isolating and bypass valves for flow meters, filters, trap assembly
etc.

Check valve on all pipelines requiring unidirectional flow.

Pressure regulating valves together with isolating by-pass and relief


valves for all pressure reducing installations.

Manual drain valves at low points and manual vent valves at all high
points of pipe work.

All pressure reducing valve shall be of globe/needle type, with


material specifications, dimensional standards etc as per the
relevant Annexure for the service for which the valve is intended.
The valves shall be actuated by internal pilot diaphragm or piston.
The downstream pressure shall have an adjustable range within
which the required valve can be set manually.

All motor valves operated valve shall be actuated by electric


motors, through reducing gears. The valves shall be in accordance
with the specifications in relevant Annex. The drive assembly for
the valve shall consist of a drive motors transmission gear, limit
switches for on-off control. Valves having proportional control shall
have rheostat and transformer rectifier as required. The drive
assembly shall be enclosed in a suitable casing and internally wired
and ending with terminals suitable for connection to a source of
power supply having voltage as specified.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-6-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)

1.5.4

Relief & safety valves of adequate capacity shall be provided at


required location for ensuring the safe operation of the system.
These shall be of spring-loaded type and shall automatically open
when the pressure and the pipelines, on which they are mounted,
exceed preset values. The valves shall have end connections and
materials specified for throttling valves. Relief/Safety valves for
steam service shall have IBR certification. Relief valves shall have
hand wheel / wrench for adjustment of preset value of relief
pressure.

Expansion and flexibility


)
Piping stress analysis using suitable software package to comply
with the requirements of ANSI B31.1 power piping code and IBR

All pipe work shall be designed to provide sufficient flexibility to


prevent development of undesirable forces or moments at points of
connection to equipment, at anchorages or at guide points due to
thermal expansion.

Flexibility shall be provided by changes of direction or by the use of


bends, loops or offsets. Wherever no self-compensation can be
used to cater for the expansion deformation of the pipelines, special
expansion joints shall be provided. In general, expansion loops
shall be used for pipelines of DN 300 and under.

In the case of steam lines or other fluid pipe work operating at high
temperatures, sections of pipe may be cut short and cold sprung
into place. Unless otherwise specified, all cold springing shall not
exceed one-half the total expected expansion between anchor
points.

For all piping systems, the provision for expansion and flexibility
shall take into consideration the maximum possible temperature
differential between the design temperature and the ambient
temperature in the cold season. The co-efficient of linear expansion
of the piping materials shall be considered and means provided for
proper anchoring or other methods of restraining and to take care of
the anticipated expansion without failure of pipe work and without
imposing excessive loads on connected equipment, structures,
supports etc. For steam pipe work covered under Indian Boiler
Regulations (IBR), expansion joints shall be provided as per IBR.
The axial forces occurring during expansion joint deformation shall
be determined by calculation.

The contractor shall be responsible for the proper fabrication of all


piping systems with regard to expansion and flexibility, including the
branch lines and connections to equipment, even though such
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-7-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)

details might be omitted on the drawings. Supporting shall ensure


freedom for expansion and absence of movement as well as restrict
sagging to reasonable limits.
1.5.5

Supports
)
Pipe supports, anchors, hangers, guides, sway bracings, vibration
dampers etc shall be according to ANSI B 31.1 or equivalent.

1.5.6

Design, material and workmanship for structural steelwork used for


pipe supports shall conform to relevant Indian Standards for
Structural Steelwork and Civil Engineering Work.

Welding
)
The Tenderer shall provide all tools, plant, instruments and
consumable including welding electrodes for carrying out the
welding at site.

The Tenderer shall arrange at his own cost for all tests outlined
below and any other test indicated by the Equipment Manufacturer /
FAL from time to time during the progress of work.

Visual examination.

X-ray and Gamma-ray examination.

Ultrasonic test.

Liquid dye - penetrant test.

Test by blowing.

Welding procedures shall be prepared in line with IS: 7307 and


tests shall be carried out to quality procedures.

Welders employed shall be qualified as per IS: 7310 after passing


necessary tests witnessed by FAL.

Welding consumables shall be of approved type. Such consumables


are, however, subject to qualifying initial check tests as per IS: 814.

The Tenderer shall strictly follow approved welding procedures


during actual welding.

All jointing by electric arc and gas welding processes shall be as


per IS: 823 and 1323 respectively or equivalent. However, the
provisions of mandatory codes such as Indian Boiler Regulations
etc shall be met where required.

Welded carbon steel piping need not be stress relieved except


where specified or required by statutory agencies like IBR. Such
stress relieving may be done by uniformly heating welded area with
Ni-chrome / induction coil to 66015 C, holding the temperature for
one hour for each 25 mm of wall thickness or fraction thereof and
then cooling at a rate not in excess of 315 C per hour in still air.
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-8-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)

1.5.7

1.5.8

Thermal insulation
)
Thermal insulation shall be provided for all surfaces substantially
hotter than ambient conditions. The data regarding ambient
conditions given shall be used for selection of thermal insulation.

The thermal insulation provided shall ensure that the temperature of


outside surface of insulation (Cladding) shall not exceed 60 deg C.
Mineral wool (made from rock, slag & glass) insulation materials
shall be used for hot services. The insulation material shall be one
of the following types.

For pipe work up to DN 350, pipe-sections of light resin-bonded


mineral wool (rock/slag wool) as per IS: 9842 shall be used. In
addition to the compulsory requirements indicated in clauses 4.1 to
4.11 of the IS code, optional requirements laid down in clauses
4.12.1 to 4.12.4 of the IS code shall be fulfilled in all cases.

For pipe sizes above DN 350 and for flat surfaces and equipment,
resin bonded mineral wool (rock wool) mattress as per IS:8183, with
factory stitched G.I. Wire netting on outer surface. In addition to the
compulsory requirements indicated in clauses 4.1 to 4.9 of the IS
code, optional requirements laid down in clauses 4.10.1 to 4.10.7 of
the IS code shall be fulfilled in all cases.

The insulating material shall not cause corrosion of the surface on


which it is applied. The insulating material of the selected bulk
density shall be suitable for continuous use at the maximum service
temperature specified in the technical specification. When tested as
per IS: 3144 by heating to the maximum service temperature, the
material shall maintain its general form and shall not suffer visible
deterioration of the fibrous structure.

Painting
)
All equipment piping, pipe supports pipe racks, structures, hand
rails, platforms etc. shall be thoroughly cleaned and painted with 2
coats of red oxide zinc chromate primer and 2 coats of finish
enamel paint as per relevant IS.
2.0

2.1
2.1.1

SCOPE

SCOPE OF WORK
Design and Engineering
)
Design and Engineering of Complete system and layout for the
boilers and auxiliaries including the main steam piping, auxiliary
steam piping and feed water piping falling under IBR within the
scope of this specification.

Basic design, Preparation of P&I, Schemes, Flow sheets etc.


HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-9-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)

2.1.2

Preparation of detailed GA drawings, Foundation load data


requirements, for main boiler, auxiliaries, piping within the scope
etc.

Manufacture, supply erection & commissioning


)
Complete manufacture and supply of all the equipment, electrics
and piping covered in the scope including shop testing.

Providing engineering drawings, data, and operation manuals to the


Purchaser.

Supply of all equipment, materials, spares and special tools and


tackles, which are required for achieving the specified performance
parameters of the plant. Any special instruments etc. required for
proving the performance of the boilers after the installation at site
shall also be included in the scope.

Testing of the equipment after manufacture at works including


inspection by an approved third party inspection agency as per Para
1.6 above.

Obtaining approval from Indian Boiler Inspectorate for the


equipment supplied, steam and feed water piping and wherever
required by IBR.

Packing, forwarding and arranging transportation / shipment from


manufacturers works.

Unloading, handling and storage at site transport from store to


equipment foundation.

Erection, testing at site, commissioning and performance guarantee


tests of the boilers, auxiliaries and piping within the scope of this
specification.

2.1.3

OEM Experts supervision


Guidance during initial operation till it is handed over to the purchasers
O&M group.

2.2

SCOPE OF SUPPLY
Following major parts of the boilers shall be supplied as per specification.
Bidder shall note that this list is only indicative. All items required for completing
the boiler installation and achieving the specified performance of the boiler within
the battery limits shall be included in tenderers scope of supply.

2.2.1

Pressure Parts
)
Steam drum with internals and fittings.

Convection bank tubes with outer casing.

Bed coil assembly with plain bed tubes and bed coil inlet and outlet
headers. (Bed coil super heater is not acceptable)
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-10-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)

2.2.2

2.2.3

Fin welded water wall furnace enclosure with refractory in bed zone.

Down comers and risers.

Drainable super heater assembly with inlet and outlet header.

Spray type inter stage de super heater assembly.

Necessary piping connecting super heaters and de super heater.

Economiser with plain tubes with casings & hoppers.

Multi tubular air pre heater with tubes, tube sheets, casing and
hoppers.

Furnace
)
Fluidised bed furnace of suitable sizes enclosed by water wall etc.

Firing arrangement

Bed ash drain arrangement

Inspection arrangement

Fuel and air nozzles

Air and Gas ducting


)
Integral Air and Gas ducting of boiler.

Air headers for primary air and secondary air and suitable
distribution in the furnace

Gas ducting from economiser upto suitable elevation for ESP inlet

Necessary duct supports expansion joints etc.

2.2.4

Fuel Feeding
)
Fuel feeding system with fuel feeders and fuel feeding lines to
boiler suitable for feeding 100% boiler fuel requirement.

2.2.5

Air System
)
Air box with distributor plate and fuel nozzles/air nozzles.

2.2.6

Forced draft air ducting from FD fan to air heater and from air
heater to air box.

Primary draft air ducting from air heater outlet to PA fan and PA fan
to fuel feeding arrangement

Feeding mixing nozzles.

Flue Gas System


)
Induced draft fans.

)
2.2.7

Chimney complete.

Refractory and Insulation


)
Complete refractory and insulation for the boilers including cladding
etc.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-11-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)

2.2.8

2.2.9

Boiler Integral Piping


)
Feed piping from NRV, Feed water control station to feed water
header.

Feed piping feed water header to economizer.

Feed water piping from economiser outlet to steam drum.

Spray water piping for desuperheater.

Saturated steam line from steam drum to inlet header of primary


super heater.

Steam line from primary super heater outlet to inlet header of


secondary super heater.

Main steam piping from secondary superheater outlet header up to


outlet of main steam stop valve.

Soot blower steam piping as necessary.

HP dosing unit to feed water line.

Boiler blow down up to boiler blow down tank.

Boiler blow down tank (common for continuous and intermittent


blow down and its associated piping)

Drain piping up to common drain header/ nearest trench.

Safety valve exhaust / air vent piping up to safe elevation.

Auxiliaries
)
Two no. (1 W + 1 SB) of 60 % MCR of FD fans with drives

Two no. (1 W + 1 SB) of 60 % MCR of ID fans with drives

Two no. (1 W + 1 SB) of 60 % MCR of SA fans with drives

Required number of rotary feeders with variable frequency drives at


for bottom feeding depending upon the design of boiler.

Minimum four nos. of drag chain feeder with constant speed geared
drive for top feeding in boiler.

Pneumatically operated power cylinder actuated regulating damper


for each FD fan & ID fan.

Solenoid energised power cylinder actuated open/close on/off type


damper for fluidising and primary air ducts, PA fan suction etc as
required.

Minimum and essential valves and fittings to meet IBR requirement.

Retractable type soot blowers at superheater zones as necessary


and fixed rotary type motorised soot blowers at evaporator and
economiser zones as necessary.

PRV for soot blower steam line.


HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-12-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)

Four no of sample coolers for feed water, saturated steam,


superheated steam and blow down water of boiler.

Flow nozzle, transmitters, Drain valves etc.,

HP dosing system with pumping unit and its drives, supporting,


fittings, valves, agitators etc.,

Feed water control station

Isolation valve at boiler filling line.

Instrument air piping.

Two no. of Safety valve at drum and one no. of safety relief valve at
Main steam header.

Motorised main steam valve and motorised bypass valve

Motorised start up vent valve

2.2.10 Supports and Platforms


)
All steel supporting structure for the boiler over the concrete
platform to be provided.

Minimum & essential operating platforms with approach stairs/


ladders and canopy and side sheeting up to bunker level and side
covering as required to avoid rain beating.

2.2.11 Electrostatic precipitator


)
One set of electrostatic precipitator with suitable number of fields
complete with structural supports, casing, internals, electrics etc.
shall be provided.

Dust content at the outlet of the ESP shall not exceed 50 mg/Ncum
with all the fields in operation.

Number of fields shall be so selected that even with one field out of
operation the boiler shall operate at its full rated capacity with the
dust level in the ESP outlet well within the above limit.

2.2.12 Electrical
)
FD / ID / SA fan motors of CFBC boiler with variable speed control.

Fuel feeder motors with VFD.

HP & LP Dosing pump motors.

Motors for any other driven equipment such as valves etc. in


suppliers scope.

2.2.13 Fuel Storage Bunker


)
One no. fuel storage bunker (Twin bunker design) with discharge
pin type gates with outlets for feeder. Bunker shall have a minimum
capacity to store 16 hours of fuel requirement at full capacity of
boiler.
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-13-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)

Steel supporting structure for the bunker.

2.2.14 Chemical Dosing System


)
Skid mounted LP dosing system including pump set (1W + 1S) with
their motors of required capacity.

Skid mounted HP dosing system including pump set (1W + 1S) with
their motors of required capacity.

LP dosing piping including supports upto feed pump suction.

HP dosing piping including supports upto steam drum.

Minimum & essential valves and fittings.

2.2.15 Deaerator and Boiler Feed Pumps

One Deaerator of capacity 220 tons/hour complete with deaerated water


storage tank of capacity 70 cum complete with all necessary accessories,
safety valves, Insulations, supporting structures, foundation bolts, fittings
etc.

Three boiler feed pumps (1W+1S) each of approximate capacity 240


cum/hr and head to suit the pressure requirement of the boilers and the
pressure drop in the pipe work complete with drive motors, recirculation
valves, balancing valves, strainers, isolation valves, check valves,
foundation bolts and accessories etc.,

The pumps shall be single suction, multi stage centrifugal type with drive
motor of suitable rating, coupling, common base frame, foundation bolts
etc.

The capacity of pumps shall be designed for peak generation and blow
down requirement at 110 % MCR capacity of boilers.

Pumps discharge pressure calculation shall be as follows

The maximum Discharge pressure = (Maximum set pressure of drum


safety valve + Economiser pressure drop + Line losses including flow
meter pressure drop + FCV pressure drop + Pressure drop in ARC valve +
static head)

The pump shall have the following characteristics:

Head Flow Characteristic Curves This should be a suitable


curve with the head continuously increasing from maximum flow
condition to zero flow condition with a maximum head being at
closed delivery valve (zero flow). Both flat curves as well as heavily
drooping curves are not acceptable. Maximum run-out flow should
atleast be 130 % of duty point flow. Specified normal pump capacity
shall be less than rated capacity and these two points shall be to
the left of capacity at Best Efficiency Point (BEP).

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-14-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)

Shut off Head The shut off head should be at least 1.1 times the
duty point head (at boiler MCR) and should not be more than 1.2
times the duty point head (at boiler MCR).

Power Characteristics The power curve should be of nonoverloading type with the maximum power occurring at or near duty
point or towards maximum run out flow. Deeply formed S shaped
power curve should as for as possible be avoided.

NPSHR Characteristics At rated capacity, margin between


required and available NPSH shall be at least 1.0 M

NPSHR curve should be a continuous rising one in the range of


operation, from the minimum flow in the range to the maximum flow
in the range. A bowl shaped NPSHR curve in the operating range is
unacceptable. Required NPSH values shall not exceed available
values over the entire range from minimum to rated flow.

Efficiency Vs Flow Characteristics The efficiency curve should be


fairly flat in the range of +(-) 1% of the BEP flow. The duty point of
the equipment should preferably lie in this flat region, but not a flow
higher than the BEP flow.

Pumps operating in parallel shall have equal head rises from


normal capacity to shut off of at least 10 %.

The feed pumps shall be provided with suitable recirculation and


balance leak-off arrangement. Recirculation flow under low load
shall be automatically controlled. Removable type suction strainers,
with free flow area of (4) times the flow area of the pipe shall be
provided.

The minimum stable flow of the feed pump shall be as low as


possible; so as to operate the boiler feed pumps continuously at low
loads. Minimum flow thermal and minimum flow stable along with
characteristic curves of pump shall be provided during contract
stage. The automatic recirculation valve shall be sized for the
higher of the minimum flow thermal and minimum flow stable
values. The feed water pump performance test shall confirm to the
requirements of Hydraulic Institute standards.

The sealing of glands of pumps shall be of Mechanical seal type.

The bearings of the pump shall have temperature & Vibration


monitoring instruments.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-15-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)

2.2.16 Complete feed water pipework between the Deaerator and feed water pumps,
feed water pumps and individual boilers complete with necessary valves, fittings
and accessories.
2.2.17 Complete main steam pipe work from the MSSV of CFBC boiler up to the existing
common steam header in the TG building including extension of the main steam
header, necessary isolation valve at the header and the steam line from the
common stream header up to inlet flange of TG complete with valves, fittings,
supports and accessories.
2.2.18 Complete steam piping from main steam header to PRDSs , to Auxiliary steam
headers, to Deaerator, to Ejector inlet nozzle, to Sealing steam inlet of TG,
Extraction line from TG extraction steam nozzle to Deaerator and other branching
steam pipelines with valves, accessories, fittings etc.,
2.2.19 Basic Field Instruments for the boiler
)
Thermocouple & RTD (PT100) compatible with DCS for the
following
-

Water temperature at the inlet of economiser.


Water temperature at the outlet of economiser.
Water temperature at the inlet to primary SH
Water temperature at the inlet to secondary SH
Water temperature at the outlet to Primary SH
Water temperature at the outlet to secondary SH
Water temperature at the inlet to tertiary SH
Water temperature at the outlet to tertiary SH
Steam temperature at the main steam line.
Bed temperature for boiler
Flue gas temperature at free board of boiler
Flue gas temperatures at Cyclone inlet
Flue gas temperatures at Cyclone outlet
Flue gas temperatures at Super Heater inlet.
Flue gas temperatures at Super Heater outlet.
Flue gas temperatures at Evaporator outlet.
Flue gas temperatures at Economiser outlet.
Flue gas temperature before multi tubular air preheater
Flue gas temperature after multi tubular air preheater
Air temperature after multi tubular air preheater

Draught gauge with transmitters to measure


- Flue gas pressure at furnace, cyclones and at economiser outlet

Pressure gauges with transmitters to measure


- Steam pressure at steam drum / Superheater
- Bed pressure
- Feed line pressure before feed control valve
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-16-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)

Draught gauges for CFBC boiler with transmitters to measure


- Air box pressure, secondary air pressure
- Furnace pressure
- Flue gas pressure before economiser
- Flue gas pressure before & after multi tubular air heater
- Air pressure before & after multi tubular air heater
- Air pressure at primary air header and secondary air header.
- Compensating cables and impulse piping wherever necessary for the
items, which are under THE CONTRACTOR scope of supply.
- Instrument panel to mount draught gauges supplied by The Contractor.

Boiler Controls:

Following minimum controls are required for the boiler. All field
instruments, switches, level measurements sensors etc shall be provided by the
boiler supplier to enable purchasers DCS control system
- Automatic Three element drum level control
- Automatic Attemperator control to maintain constant temperature for
60 to 100% flow within +/- 5 Deg C
- Automatic Combustion control for CFBC boiler
- Automatic Furnace draught control for CFBC boiler
- Fuel feeders with variable speed drives

)
2.3
2.3.1

Alarms and annunciation sensors for purchasers DCS system

DATA SHEET
Material of construction of boiler:
Materials preferred are indicated below. Supplier shall note that if the
design calls for better material the same shall be provided.
Component

Material

Boiler Pressure Parts


Steam / Water drum

SA 515 Gr. 70

Furnace water wall tubes

BS 3059 Gr.360 ERW

Bunker tubes

SA 210 Gr. A 1

Super heater tubes (< 450 Deg C)

SA 213 Gr.T 11

Super heater tubes (> 450 Deg C)

SA 213 Gr. T 22

Economiser tube

BS 3059 Gr.360 ERW

Piping & Header ( < 400 Deg C)

SA 106 Gr. B

Piping & Header ( < 490 Deg C)

SA 335 P 11

Sample cooler coils & piping

SA 312 TP 304

HP dozing piping

SA 312 TP 304

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-17-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)

Deaerator shell

SA 515 Gr.70/SA 516 Gr.70

Deaerator storage tank

SA 515 Gr.70/SA 516 Gr.70

Non pressure parts


Steam drum drier / mesh

SA 478 Type 304

Air heater corten steel tubes

SA 423 Gr.1 ERW

Fuel bunker conical portion

AISI 304

Fuel distributor exposed to


radiation

AISI 304

Ducting

IS 226 / IS 2062

Bank area baffles

AISI 304

Structural steel

IS 226 / IS 2062

High tensile steel

IS 961

Hand rails

IS 1239 32 NB Medium

Structural fasteners

IS 1363 /1364

Grating

BS 4952 Part 1

LP dozing piping

SA312 TP 304

Dozing pump wetted part

SS 304

Dozing system mixing tank

AISI 304

Blow down tank

IS 2062

Deaerator internals

AISI 304

Boiler Feed water Pumps


Suction casing

SA 216 Gr. WCB

Discharge casing

CA 6 NM

Impeller

CA 6 NM

Shaft

AISI 410

Transfer pumps & initial fill pump


Suction casing

SA 216 Gr. WCB

Discharge casing

AISI 410

Impeller

AISI 410

Shaft

AISI 410

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-18-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)

Piping
Main steam line

ASTM A 335 P11/12

Auxiliary steam of low pressure &


low temperature

SA 106 Gr.B

Feed pump

SA 106 Gr.B

Spray water piping to


desuperheater

SA 106 Gr.B

Fitting & flanges

As per IBR code

Water piping up to NB 150

IS 1239 black medium

Water piping NB 200 & above

IS 3589 ERW

Service air piping

AISI 304 black medium

Instrument air piping

IS 1239 G I

Fittings for Non IBR

IS 1239 II /ASTM B16.9

Insulation & refractory


Insulation Bricks

IS 2042

Refractory

IS 8

Bonded mineral wool

IS 8183

Hexagonal wire netting

IS 3150

Cladding

Al

Miscellaneous

2.3.2

Grouting material

GP.2 SPL

Boiler roof material

G I Sheet

Roof side cladding material

G I Sheet

Schedule of valves & fittings (HP Valves)


Following minimum valves shall be provided for each Boiler
Feed Line
Pressure gauge isolation valve

Flow transmitter isolation valve

Control Valve

Isolation for control valve

By pass for control valve

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-19-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)

Economiser
Stop valve at inlet

Check valve at inlet

Drain valve

Vent valve

Pressure gauge isolation valve

Steam Drum
Spring loaded safety valve

Isolation valves for level gauges

Drain valves for level gauges

Air vent valve

Isolation valve for pressure gauge

Aux. steam stop valve

Isolation valve for level transmitter & level switches

Continuous blow down valve

Bypass for CBD

Mud Drum & WH Bottom HDRS


Blow down valve

Drain Valves

Super Heater & Main Steam Line:


Main steam stop valve (motorized)

Main steam valve bypass valve motorised

Vent valve superheater (motorized)

Spring loaded safety valve

Pressure gauge isolation

Flow transmitter isolation

Main steam non-return valve

Soot Blower System & Steam Line to Soot Blowers:


Stop valve

Drain Valve

Pressure gauge isolation

Pressure reducing valve

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-20-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION

ANNEXURE-2 TURBO GENERATOR & AUXILIARIES


1.0 DESIGN BASIS
1.1

THE TURBO GENERATOR AS PER THIS SPECIFICATION SHALL MEET THE


FOLLOWING REQUIREMENTS:
NO.

1.2

DESCRIPTION

TURBO-GENERATOR

1.

Type

Low or High speed, condensing steam with one bleed


for Deaerator and bleed for HP, LP heaters as per
standard design of supplier.

2.

Type of
condenser

Air cooled condenser

3.

Number

One

4.

Max. Contin.
Rating

45 MW

5.

Press & Temp at


I/L

108 Ksca, 540 deg. C

6.

Condenser
pressure

7.

Governor control

Woodward suitable for parallel operation of the TGs


& grid

8.

Generator rating

45 MW @ 0.8PF

9.

CEP

2 (1W +1S)

10.

HP heaters

As per the design requirement

11.

LP Heater

As per the design requirement

12.

Gen. volt, PF,


Freq

3 Ph. 3 w, 11.0 KV+10%, 0.8PF, 50Hz

13.

System features

45 MW TG will be located in TG building housing the


45 MW generator and TG will receive steam from a
common steam header.

0.18 Ksca

STEAM TURBINE & AUXILIARIES

One multistage steam turbine coupled to generator suitable for working with an
air cooled condenser complete with lubricating oil and governing oil systems, controls and
instrumentation and all necessary auxiliaries as required will be provided. The steam
turbine will be a straight condensing type machine with two HP heaters, one LP heater
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)

and uncontrolled bleed for feed water heating in the deaerator. The output capacity of the
turbine will be 45 MW as measured at generator terminals. Turbo generator set shall be
designed for the fluctuations and transients so that the system as a total will sustain
without any adverse effect on the life of the equipment.
1.3

GENERATOR

Generator of voltage rating 11.0KV suitable for 0.8PF, 57 MVA is envisaged.


Generator shall be complete with exciter, brush less excitation system, automatic voltage
control etc. adequately designed for the requirement of generator. Bidders shall furnish a
write up along with the tender indicating the technical consideration for review and to
convince that they will take care of this fluctuating load requirement in their basic design.
1.4

CONDENSING PLANT

Air-cooled condensing system is envisaged for the turbine (TG). However the
condenser with all necessary standard auxiliaries such as condensate storage tanks,
condensate extraction pumps, flash tanks, two-stage steam jet ejectors, start-up ejector,
hot well level control system, bellows etc. is not included in the scope of this specification.
Gland steam system with steam pressure regulators, de-superheater, Gland Vent
Condenser (GVC), all piping and valves and associated instruments shall be provided.
Auxiliary steam for gland sealing will be supplied at 10kg/cm2 and 300 deg C. The leak
off from steam turbine gland will be received by the GVC and the condensate collected
shall be discharged to condensate tank.
1.5

GOVERNING SYSTEM

To control the turbine speed during varying load demands and fluctuating steam
supply conditions, Woodward speed governor of suitable type will be provided. The speed
governing system will limit the over speed of the TG set on loss of full load so as to avoid
tripping by the emergency over speed device. Common governing and lubricating oil
system is envisaged and the pumps of the common system will be sized accordingly.
1.6

LUBRICATION OIL SYSTEM

The lube oil for the bearings is circulated by the lube oil pump in the system. One
turbine driven main oil pump for normal operation, one electric motor driven (AC) auxiliary
oil pump for start-up having same capacity and discharge head as main turbine oil pump
and an emergency DC electric motor driven oil pump for safe coasting down during total
power failure will be provided for the lubrication oil system. If the tenderer feels
necessary, an overhead emergency oil tank for safe operation of turbine in case of EOP
trip can also be provided. The overhead oil tank back up system shall be complete with
an SS overhead tank, over flow oil tank, SS piping, SS valves & Instrumentation as per
the design requirement.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)

1.7

ELECTRICAL SYSTEM

1.7.1

Generator protection
The generator shall be provided with following minimum protections:

1.8

Phase & ground Inverse time O/C relay.

Phase & ground Instantaneous time O/C relay.

Generator stator E/F and Backup earth fault relay.

Differential protection with CTs on phase and neutral sides.

Loss of excitation.

Negative Phase sequence.

Forward power relay for Low Forward trip.

Reverse Power relay for trip with timer.

Over Voltage relay having 2 stages on generator side.

Under voltage relay having 2 stages on generator side.

Low frequency relay having 2 stages on generator side with timer.

Rotor earth fault relay I stage.

Trip circuit supervision.

Lock out relay for hand reset for generator.

Lock out relay for hand reset for turbine.

Lock out relay for grid breaker.

PT fuse failure relay.

Auxiliary relays and multiplication relays required.

Potential transformer for protection.

Surge suppression protection.

The bidder shall provide necessary CTs & PTs as required.

EARTHING SYSTEM

The earthing at the grid side substation end is solidly earthed. HT voltage level at
plant shall have earthing with arrangement to limit the earth fault current within the
system withstand capacity. As there is generation within the plant, the earth fault current
source will be higher and it is limited by resistance earthing. HT being limited distribution
system resistance earthing is decided.
LT drives will be provided with solid earthing as per the standard followed in any
industry. Control system voltages will be unearthed system to avoid spurious operations
due to earth fault in control systems.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)

1.9

INSTRUMENTATION AND CONTROL

The system envisaged is DCS for the entire CPP having the operator and
Engineering stations in main control room. Auxiliary units like ash handling, fuel handling,
DM Plant will be provided with PC based PLC and the important parameters will be
communicated to DCS for the information of the shift in-charge.
All logics and controls will be provided only in DCS with redundant processors and
hot standby units. Minimum controls shall be

1.10

Split type hot well level control with re-circulation control valves.

Gland steam pressure control system.

LP heater condensate level control system if opted.

Deaerator pressure control for bleed steam.

MISCELLANEOUS

1.10.1 Insulation
All exposed portions of the Turbine, auxiliaries and interconnecting piping which
operate at temperature of above 65C during normal operation shall be thermally
insulated so that the outer surface temperature of the insulating material before cladding
shall not exceed 65C at the ambient temperature of 45C at a Wind velocity of 5 m/sec at
outdoor installations. Indoor wind velocity shall be considered as 1m/sec. The insulation
shall be in the form of rock or slag wool mats with wire netting on both faces.
All insulation shall be provided with weatherproof cladding of 26 gauge thick
aluminium sheets. The cladding shall be supported on spacers made of 25x3mm thick
steel flats; the spacers shall be fitted with 4 mm diameter rivets to angle cleats, welded on
to the surface being insulated.
2.0 SCOPE OF SUPPLY
2.1

TURBINE PROPER

Steam turbine from emergency stop valve up to exhaust flange including


extraction valves complete with all integral accessories as described but not limited to the
following:.

Combined force feed lubrication system for turbine, gear box (if provided)
and alternator complete with lube oil tank, Main oil pump (MOP), Auxiliary
Oil Pump (AOP) with auto cut in and cut out facility, DC motor driven
Emergency lube Oil Pump (EOP) with auto cut in and cut out facility,
Jacking oil pump, overhead emergency oil tank (if required), suction
strainers for the above pumps, pressure relief valves, oil coolers and oil
filters with standby, oil vapour extractor for tank, oil pressure regulating
system and interconnecting piping with valves and accessories.
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)

2.2

2.3

Complete turbine integral piping and other piping including all valves
(isolating, regulating, non-return, hand operated and / or pneumatic,
motorized) actuators, air vents, safety valves, drains, hangers, supports,
anchors and other fittings. Emergency gravity lube oil system with SS
overhead tank, SS piping, SS valves & Instrumentation as per the design
requirement.

Turbine supervisory, protective and governing systems including safety


governors, load limit device, low vacuum tripping device, thrust bearing
protective device, solenoid trip etc., as specified hereinafter and all
equipment mounted/local instruments, pressure, temperature, level switch,
primary sensing device etc., as required. Governing system shall be
electro hydraulic type.

Oil purifier of suitable capacity.

HP heaters with accessories and auxiliaries.

LP heater with accessories and auxiliaries.

Electrical motor operated or Hydraulic turning gear equipment and


provision for hand barring.

Gland steam sealing system with steam pressure regulators, desuperheater, gland steam condenser, all piping and valves and associated
instruments.

Coupling between turbine and generator.

Thermal insulation and cladding for turbine, all auxiliary equipment and
piping covered under turbo generator package.

GLAND VENT CONDENSER:

Gland vent system consisting of its ejector, condenser.

Steam piping from turbine gland to GVC, air piping from GVC to Flash tank
/ condenser

Valves and field instruments as required.

PIPE WORK

Set of all pipe work, interconnecting pipe work as required for


interconnecting the various equipment included in the scope of supply
including all required elbows, flanges, fittings, strainers, non-return valve,
etc.

Pipe supports, strainers, steam traps, drains, vents and isolation Valves as
required.

Drain lines for connecting other drain lines like turbine casing drains, GVC
drains etc.

Stand off pipe for instrumentation


HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)

2.4

2.5

2.6

2.7

ACCESSORIES

Motorized barring gear arrangement with auto engage and auto disengage
facility. In case of turbine trip, the barring gear automatically cuts in when
the rotor speed falls below a preset value and it keeps the rotor rotating at
slow speed to avoid bending of rotor.

QCNRV, FFRV and Isolation valve for all bleed steam lines.

Common base plate for turbine and gearbox

Insulation for Turbine hot parts (lagging & cladding)

Mating flanges for all the equipment connections in the bidders scope of
supply

Base frame, Sole plate for embedment in the concrete, Bottom plate for
foundation bolts.

Set of foundation bolts.

Set of special tools & tackles for maintenance

AC GENERATOR

AC Generator shall be complete with following:

Four pole, cylindrical rotor type alternator

Brush-less exciter

Twin bearings

AVR cum Excitation panel

Anti-condensation heaters

Water leakage detector 1 per cooler

Lube oil flow regulator 1 per bearing

Generator with all its integral accessories and supervisory instruments.

Generator cooling system complete with all accessories.

Slip ring arrangement for monitoring first rotor earth fault.

AUXILIARIES FOR GENERATOR PROTECTION AND CONTROL

Generator protection (Relay) Panel

Metering & synchronizing panel

Lightning arrestor, Surge capacitor and Potential transformer (LA, SC &


PT) panel

Neutral grounding resistor (NGR) panel

ELECTRICAL EQUIPMENT

One (1) lot of drive motors for the various auxiliaries of the TG.

One (1) lot of complete interconnecting power and control cables from the
field switches, motor heaters to the nearest junction boxes.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)

2.8

2.9

2.10

INSTRUMENTATION AND CONTROL

All control gears for turbine and generator whether specifically indicated or
not.

All sensors, field instruments, junction boxes etc for local and remote
monitoring instruments including transmitters, sensing elements,
connecting pipes/tubes and local gauge board.

HP heaters level control valves

LP heater level control valves.

Dial type Pressure gauges as required. List to be furnished with offer.

Temperature gauge as required. List to be furnished

Pressure switches as required. List to be furnished.

Pneumatic and impulse piping with fittings for interconnection within


battery limits.

RTDs (PT 100 type), Thermowells for all the temperature measuring points
for purchasers DCS system.

Provision for level transmitters for purchasers DCS controls and


instrumentation

MISCELLANEOUS ITEMS

Noise abetting hood complete with lighting, ventilation arrangement for


complete steam turbine and generator unit as required to reduce noise
level below 85 dba at 1 m away from the TG unit.

Pressure reducing systems complete with desuperheater, control valves,


isolation valves etc. for auxiliary steam requirement.

All auxiliary steam piping for gland sealing from inlet of PRDS up to gland
sealing inlet, spindle leak-off etc.

Interconnecting pipes with flash vessels drain tanks etc. for recoverable
drains of the cycle.

Embedded thermo-couples for detection of water induction through


extraction lines.

SPARES:

Commissioning spares for items under the scope of work without any
additional cost till TG is commissioned and handed over to operation.

At least two sets of spare blades and vanes in each type provided in the
turbine shall be supplied within the scope of this contract without any
additional charges.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)

2.11

Spares, tools and tackles for operation, repair and maintenance for two
years of trouble free operation (Optional) List of items recommended and
their price valid for 6 months shall be submitted.

Insurance Spares like Generator coils etc. as per mutually agreed basis
(Price shall be furnished along with offer).

SERVICES TO BE RENDERED FOR VARIOUS STAGES OF CONTRACT

2.11.1 Design and Engineering

Complete system design and layout.

Basic design, Preparation of P&I, Schemes, Flow sheets etc.

Preparation of detailed GA drawings, Foundation requirements, details of


auxiliaries etc.

Detailed design of equipment, preparation of drawings for internals,


interfacing details etc.

Preparation of input data for civil and structural design by purchaser.

Sizing of pipe and pipe works preparation of piping layout, routing etc for
interconnection of equipment within the scope of supply as per this
specification.

2.11.2 Manufacturing and supply:

Complete manufacturing including shop testing.

Providing engineering drawings, data, and operation manuals to the


Purchaser.

Supply of all materials, which are required for providing the desired
performance of the plant.

Testing at factory.

Packing, forwarding and transportation / shipment from manufacturers


works.

Arrange permission for Purchasers / Purchaser representatives entry to


different stage and final inspection / testing at manufacturers works.

Supply at the Project site for Indian supplier and Supply at CIF Indian Port
for foreign supplier.

Arrange for dispatch of all the material by ship / rail / road to site with
proper insurance coverage.

2.11.3 OEM Experts supervision

Turbine erection Engineer for Mechanical & Electrical equipment,

Erection and commissioning supervision Engineer for Generator

Erection checking and commissioning Engineer for Governor.

Engineer for safety and control valves settings


HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)

I & C Engineer for all open loop and closed loop controls to commission
the TG controls along with DCS commissioning group

TG commissioning engineer for checking the completion of erection and


commissioning engineer

Performance test group.

2.11.4 Erection and commissioning:

Receipt and unloading at site of all equipment including pipes, valves,


structural steel materials, etc.

Opening of crates and packing cases, thorough cleaning and checking of


completeness of equipment in relation to Equipment Manufacturers
drawings, packing defect. Damages or missing items, if any, shall be
rectified or made good by the successful bidder.

Providing storage and safe custody of the equipment, etc. at site

Supply of erection consumables like weld rods, cleaning agents,


lubricants, grease, and shims, small bolts etc.

Supply of items like pipe, valves, gaskets, bolts, and flanges etc., which
are required during the course of erection at a mutually agreed rate at the
request of purchaser.

Complete assembly and erection of all equipment, pipe work, ductwork,


steelwork, etc. including fabrication and erection of miscellaneous
structural steelwork in pipe supports, cable trays, etc.

Aligning, lining, levelling, coupling and grouting of anchor bolts and base
plates, curing, welding of supports and connecting up electric power
supply, water and utility connections from the tap-off points provided in the
shop to make the equipment ready for commissioning.

Installation of supporting MS channels and MS angles for erection of


panels, junction boxes, gauges, gauge board etc.

Lubricating and greasing in accordance with the equipment manufacturers


instructions / drawing. Consumable such as lubricating oil, grease and
hydraulic oil required for initial filling of the equipment.

General clean up prior to preparing the equipment for trial run and start-up.

Conducting as per Equipment Manufacturers instructions trial runs, startup and commissioning of the equipment including tuning, calibration and
adjustments and carrying out rectification work in equipment erection, if
necessary, as required by the Purchaser.

Supply of consumables such as lubricating oil, grease, etc till


commissioning and handing over to purchaser.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)

Any other work connected with erection and commissioning of the


equipment that is customarily rendered by the successful bidder to
complete the works.
3.0 EQUIPMENT DETAILS

3.1

TURBINE

3.1.1

Casing

The casings shall be designed for hydrostatic test pressure of not less than 50%
in excess of the working pressure. Each turbine casing shall be efficiently drained. The
parts of the turbine, which are expected to be in contact with wet steam in normal
operation or during start-up, shall be provided with a system of inter-stage drainage
whereby extracted water will be prevented from re-entry to the blading and will be
admitted to either a convenient heater extraction branch or the condenser. The casing
drains shall be provided with temperature sensing devices to help ensure proper
evacuation of drains. Bolts, nuts and studs used for the turbine casing flanges and main
turbine valve bonnets etc. shall be with milled threads and of special alloy steel properly
treated. Provision shall be made for electrically heating the bolts to facilitate setting and
loosening. In addition, the supplier shall indicate the design features incorporated to
prevent the seizure of nuts and studs and features, which will facilitate their easy removal
after operating the machine. Bolts shall be designed to distribute load evenly on all the
threads without stress concentration. All the joints shall have sufficient flexibility to
remain tight with rapid changes of temperature. Before shipment, each bolt shall be
thoroughly examined and inspected to ensure freedom from any defects.
Necessary quantities of assorted bolt heaters, torque or other wrenches,
extensometers, bolt thread lubrication shall be included in the offer as part of special
maintenance tools and tackle. The offer shall specify bolt loading and strains and shall
state the estimated period in which retightening or replacement of the bolts will be
required and shall furnish detailed data, method and instruction for this purpose.
3.1.2

Rotor

Prior to machining of the rotor forging adequate number of test specimen shall be
examined to ensure uniformity of material composition and strength. Ultrasonic, magnetic
particle and other methods of test shall be applied to each rotor to ensure homogeneity of
the materials and freedom from non-metallic inclusions voids and cracks
After machining, turbine rotor shall be heat stabilized and the temporary deflection
shall be within the limits of clearances and permanent straightness shall be assured at all
operating temperature.
After the assembly of the blades, the complete rotor shall be balanced for both
static and dynamic conditions so that the assembled rotor will perform satisfactorily under
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

10

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)

all load conditions of operation. The peak-to-peak value of vibrations measured on the
bearing housing shall be within 25 microns.
The critical speed/speeds of the combined turbine and generator rotor shall not lie
within a range of + 20% or 40% to 60% of the rated operating speed.
3.1.3

Nozzle & Blading

All nozzles and blading shall be of hard, corrosion and erosion resisting alloy steel
suitable for the specified steam. In the low pressure stages where the moisture
percentage and the blade peripheral speeds are high, additional protection against
erosion by way of hardened surface of blades or strips of erosion and corrosion resistant
material such as stellite, secured to the leading edge, shall be provided.
The method of fixture of the blades to the rotor shall have been satisfactorily
proved by long use of operation. Care shall be taken to ensure that the natural frequency
of the rotor blades is compatible with the rotational frequency of the machine.
3.1.4

Exhausts

The turbine exhaust shall be designed for velocity recovery and shall be suitable
for connecting to the condenser preferably through expansion joints. The unit shall be
provided with turbine exhaust water spray system. The system shall be provided
complete with spray nozzles, a controller, an automatic spray water control valve and all
interconnecting piping between the nozzles and the spray water control valve. The
exhaust hood shall be equipped with pressure relief bursting diaphragms of sufficient
area to pass the quantity equivalent to steam flow to condenser at maximum continuous
rating. The exhaust shall be suitable for air-cooled condenser pressure.
3.1.5

Permissible Maximum Forces and Moments on External Connections

The maximum forces and moments that can be put on the external connections to
the turbine at main steam connection, all extraction openings and the low pressure
exhaust connection to the condenser shall be furnished during engineering stage.
3.1.6

Bearings

The turbine shall be provided with an adequate number of amply proportioned


bearings to maintain proper alignment under all load conditions of operation. Bearing
temperature shall be maintained within permissible limits by adequate oil supply. All main
bearings shall be pressure oil lubricated. These bearings shall be of self-aligning type
lined with tin base Babbitt and the lining shall be properly secured to the bearing shell. To
reduce maintenance difficulties, all bearings shall be accessible without having to remove
cylinder covers, crossover piping etc. Bearings shall be split so that the upper half is
readily removable. The gauges etc. should have easy access and suitable space should
be provided for ease of erection/maintenance.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

11

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)

The rotor axial position shall be maintained by a thrust bearing assembly of


adequate capacity. Proper arrangement shall be made to maintain oil pressure under all
load conditions of operation. The design shall incorporate arrangements for monitoring
thrust bearing metal temperatures. Devices shall be provided for annunciation of an
impending failure of the turbine thrust bearing. Additional switches shall be provided for
alarm and trip of the unit in case of a thrust bearing failure.
The metal temperature of all bearing shells shall be monitored by thermocouples,
which extend right into the white metal layer. Provision shall also be made for reading the
oil temperature leaving the bearings. Suitable direct reading type thermometers and
separate switches each with two `High signalling contacts for all bearings shall be
provided. Arrangement shall be incorporated in all the bearings for measuring vibrations.
The proposal shall include necessary accessories for remote monitoring of all bearing
metal temperatures, oil temperatures and vibrations.
3.2

TURBINE ACCESSORIES

3.2.1

Coupling

The rotors shall be coupled by means of flanges of aerofoil type of proven make
for ensuring long life. Fitted bolts shall be provided to prevent slippage under abnormal
operating conditions. They shall be such as to facilitate easy alignment during erection.
The coupling is considered as equipment specific and it shall be dependent on the
individual design of the manufacturer.
3.2.2

Turning Gears

Turbine rotors must be turned continuously throughout the process of warming up


prior to start-up and during cooling process following the shutdown. The rotors are turned
very slowly during start-up and shutdown by using the gear.
The turning gear shall be designed to automatically disengage when the shaft
speed increases and automatically engage when the speed comes down to a preset
level. The turning gear system shall have all necessary instruments and controls for
remote operation from turbine generator supervisory panel. In addition to the above,
emergency provision for manual cranking of the turbine shaft shall be made.
3.2.3

Valves

The turbine shall be equipped with emergency stop valves, each operated by
hydraulic actuator and complete with hangers and piping to turbine. The valve shall be
designed for high-speed closing and maximum reliability. The valves shall be opened
hydraulically and closed by spring force. The design of the pipes and valves shall be
such that, steam flow through them does not cause any objectionable noise.
The offer shall include hydraulic/pneumatic quick closing NRV and isolation valves
for extraction lines. The valves shall be suitable for on load testing individually. These
shall also be fail-safe and result in closure of valves under condition of turbine trip,
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

12

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)

hydraulic pressure etc. The extraction line valves shall close positively on turbine trip and
at pre-set high heater level. The non-return valves shall be located as close to the turbine
as possible, to reduce entrapped steam.
3.2.4

Governing System

To govern the turbine speed during varying load demand and fluctuating steam
supply conditions, a speed governor of suitable type shall be provided.
Turbine governing system shall be Woodward 505 electronic type. The governing
system shall be an electronic type with an electric signal being transmitted to a hydraulic
actuator for amplification by the turbine throttle valve relay system. Turbine shall operate
as an independent unit, in parallel with other generating sets of known governing
characteristics or in parallel with the main grid supply, in which case inlet pressure control
shall be utilised.
The speed governing system shall limit the over speed of the TG set on loss of full
load so as to avoid tripping by the emergency over speed device. Emergency governor
shall be provided to keep the turbine well below the safety limit and shall come into
operation when the speed sensitive governor fails to operate. The turbine governor shall
also contain electrical and mechanical trips to shutdown the turbine generator during
abnormal conditions, to prevent damage to the unit.
A quick acting emergency over speed protection system shall be provided to close
instantly the emergency stop valves, control valves, also the non-return valves in the
extraction lines for speeds of about 110% of the rated speed. It shall be capable of being
automatically reset when the speed is reduced to approximately normal thus permitting
the machine to be synchronized with other units.
3.2.5

Vacuum Breaker

To permit the turbine rotor to be brought to rest as quickly as possible whenever


required, necessary vacuum breaker permitting the rapid reduction of vacuum in
condenser will be provided. Provision shall also be made for remote operation of vacuum
breakers.
3.2.6

Turbine Supervisory and Protection System


The following minimum measurements shall be provided:

Bearing vibration both in horizontal and vertical plane.

Axial shift of rotor.

Casing rotor differential expansion of all the modules.

Casing expansion

Shaft eccentricity

Turbine speed

Control valve position


HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

13

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)

Steam temperature

Metal temperatures

Turning gear status

Seal interference monitoring device, if applicable

Pressure indicator for Curtis stage of the H.P. stage

The above list gives the minimum requirement, any other supervisory instrument
as required by the unit offered shall be included in the scope of supply.
The turbine protection system shall put the turbine out of operation by closing the
turbine emergency stop and control valves as soon as any of the following conditions
occur and admissible limits are exceeded:

3.2.7

Condenser pressure very high

Turbine lube oil pressure very low

Trip oil pressure very low

Control oil pressure very low

Turbine shaft vibrations high

Turbine speed very high

Steam temperature very low

Turbine Axial, shaft displacement very high

Emergency trip push button operated

Energisation of generator lockout relay

Master trip lockout relay energized.

Low lubricating oil pressure for bearings

Any other protection as envisaged in design

Generator electrical protection trip

Turbine oil system

The turbine oil system shall be a combined lubrication and governing oil system to
meet the lubrication requirements of the turbine and generator and also the oil
requirement of the turbine governing system. The system shall be complete with tanks,
turbine shaft driven oil pump, auxiliary oil pump, DC motor driven emergency oil pump,
jacking oil pumps and other necessary pumps and drives, lube oil coolers, filters, all
connected piping and valves etc. Emergency gravity lub oil system with SS overhead
tank, SS piping, SS valves & Instrumentation shall be provided if required as per the
tenderers design requirement to ensure the lubrication at the time of emergency due to
failure of the DC operated lub oil pump. The system shall draw oil from an overhead
tank, under gravity, and shall be designed to supply oil for the costing down period of the
machine. The tank elevation shall be finalized based on the oil pressure requirement at
the bearings.
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

14

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)

An oil purification system shall be provided complete with centrifuge, pipe work
etc. to continuously operate as a bypass system handling around 20% per hour of the
total oil in circulation in the oil system. The purifier shall be a separate complete package,
mounted on a skid, complete by itself with drive motor, piping, valves & fittings. Feed to
purifier shall be from the drain end of the reservoir and its operation shall be independent
of the oil system.
3.2.8

HP/LP heaters

HP/ LP heaters shall be provided with inlet steam valves and outlet drain valves
with level controls. Valves are also provided in water lines at both inlet and outlet. All
necessary instrumentation with inter locks are to be provided.
3.2.9

Turbine Gauge Panel

TG Gauge Panel shall house the pressure and temperature gauges for various
operating parameters. Impulse piping with fittings shall be supplied loose for
interconnection between field tap-off points and gauge panel.
3.3

GENERATOR

3.3.1

Stator

Stator body shall be a totally enclosed gas tight, explosion proof fabricated
structure suitably ribbed internally to ensure high rigidity. The stator shall be designed to
withstand fault conditions without any resultant deformation.
All terminals shall be of silver-plated copper to receive standard flexible
connectors. Effective sealing shall be provided between the terminal bushings and the
stator body to avoid possibility of leakage of air/hydrogen.
TG shall have capability for overloading up to 15% for 30 sec.
Quantities and ratios of the current transformer shall be decided by the bidder and
shall be generally in accordance with standard requirements. The current transformer
ratings shall be such as to provide proper accuracys for excitation control, relaying,
voltage regulation and metering under all normal and fault conditions.
3.3.2

Rotor

The rotor shall be of cylindrical type, the shaft and body being forged in one piece
from nickel chromium molybdenum vanadium steel. The rotor with all the details
assembled shall be balanced to a high degree of accuracy and subjected to 20% over
speeding for two minutes as per International Standards to ensure mechanical strength.
The field winding shall consist of coils made up of copper with bonded insulation
and shall be held in position against centrifugal forces in wedges in the slot portion and
by high tensile non-magnetic alloy steel retaining rings in the overhang portion.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

15

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)

Strength test, material analysis and ultrasonic tests shall be performed during the
manufacture of the rotor. The rotor shall be balanced in various planes at different speed
and shall be subjected to over speed test. Individual turns of the rotor coil shall be
insulated against each other.
3.3.3

Fan

The rotor shall have fans mounted on it for the circulation of air inside the
machine. The fixing bolts, pins, nuts, etc. shall be made of non-magnetic material.
3.3.4

Shaft Seals

The shaft seals should be of adequate design to be provided on either side of the
rotor to prevent escape of air from the generator casing along the rotor shaft. The design
should be such that minimum oil should come in contact with the air during the course of
sealing. The shaft seal body on the exciter side shall be suitably insulated from the stator
end shields current.
3.3.5

Bearings

The generator shall be provided with sleeve bearings. The bearings shall be
spherically seated, self-aligning, cylindrical bore type. The liner shall be lined with at least
two-resistance thermometer in each liner for continuous sensing and recording of white
metal temperature. The bearing and the oil pipes of the generator on exciter side shall be
suitably insulated to prevent circulation of currents due to shaft voltage.
3.3.6

Generator Air Coolers

Shell and tube heat exchangers shall be mounted on the machine for air-cooling.
The heat transfer calculations shall be done with a waterside standard fouling factor. The
air cooler shall be in accordance with the latest applicable requirements of the Heat
Exchange Institute. Cleanliness factor of 0.85 shall be considered for design.
Generator stator cooling shall be direct cooling with air as per manufacturers
standard design with water-cooled secondary cooling system
The rotor windings shall be directly cooled by air. The stator core shall be cooled
by air flowing through the radial ventilating ducts. The shaft mounted propeller type fans
on each side shall facilitate circulation of air inside the machine.
The air inside the generator shall be maintained clean and dry by continuously
circulating the air through a suitable air drier and filter arrangement. There should be
125% standby arrangement for the same.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

16

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)

3.3.7

Temperature Measurement

Temperature of various active parts shall be measured. The stator winding


temperature shall be sensed by at least one embedded resistance thermometer for each
coil placed at the bottom of the slots out of which at least six shall be in the end zone.
Temperature of cooling water to the (in case of water cooled machines), air
coolers, hot and cold gas and lubricating oil to the bearings and shaft seals shall also be
sensed by resistance thermometers. The rotor winding temperature shall be measured
by resistance method and shall be continuously recorded. Duplicate sensor shall be
supplied for all the above temperature measurements.
3.3.8

Generator Excitation System

The excitation system shall be brushless type with diodes mounted on the shaft at
location where maintenance access is available without opening the generator cover. The
brushless exciter shall consist of a permanent magnet generator, AC exciter and rotating
rectifier with silicon diodes and indicating fuses. The whole system should be enclosed to
avoid dusty air ingress from outside with adequate cooling arrangement of the closed
circuit air inside.
The excitation system shall be complete with switchgear, control equipment and
automatic voltage regulators. It shall be capable for operating the generator at full range
of operation of voltage, frequency and kVA
Voltage regulator shall be of automatic type capable of regulating the voltage
within the deviation range of 0.5% from no load to full load at full range of frequency of
operation. Regulator shall be of completely solid-state type. The voltage regulator shall
have a maximum and minimum excitation limiter both in auto and manual excitation
control.
3.3.9

Automatic voltage regulator

The AVR shall maintain constant generator terminal voltage under changing load
conditions. In addition to the basic voltage requirement, AVR shall include control loops,
which shall perform other functions such as power factor correction to set value, RKVA
correction to set value, reactive load limiter, over fluxing limiter, rotor current limiter,
minimum excitation limiter, and maximum excitation limiter. Variation in Induction furnace
load and steel rolling mill fluctuation shall be considered and the AVR time constant shall
be selected suitable for coping up the terminal variations.
Selection shall be possible for selecting PF controller and RKVA controller. One
hot standby unit for voltage control shall be provided. Manual control with follow up circuit
shall also be provided.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

17

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)

3.3.10 Surge protection and voltage transformer (SPVT)


A Surge Protection and voltage transformer (SPVT) cubicle for the generator shall
be provided in the turbo generator building at ground floor level. Surge protection shall
comprise lightning arrestors and surge capacitors and shall protect the generator against
high voltage / high frequency surges occurring in the system. The generator neutral shall
be earthed through a resistor to restrict the earth fault current to within limits. An isolator
and a CT shall be provided in the neutral circuit along with a resistor bank, all housed in a
cubicle. This cubicle shall be located in the turbine hall at the ground floor level close to
the generator.
4.0 ELECTRICAL AND INSTRUMENTATION
4.1

AC MOTORS

All AC motors for driving the various auxiliaries of Turbo generator set shall be
rated for 415V, 3-phase and 50 Hz supply. The motors shall be capable of delivering
rated output at rated power factor with a variation in voltage equal to +10% and a
variation in frequency equal to +5% with any combination of these two variations.
The motors shall meet with the requirements of IS: 325. The stator coils of all
motors shall have class F insulation. The temperature of the insulation shall be limited to
class B over an ambient temperature of 50 oC.
The degree of protection provided by the enclosure of the motors shall confirm to
IS: 4691. All indoor motors shall be totally enclosed fan cooled having IP54 degree of
protection and totally enclosed fan cooled design.
All squirrel cage motors shall be designed for direct on line starting at full voltage
with the starting current generally not exceeding 6 times the rated full load current.
The terminal boxes shall be of spacious, dust proof design properly insulated and
suitable for terminating aluminium conductor PVC insulated PVC sheathed armoured
/unarmoured cables. Adequate clearance shall be given between the live motor terminals
and cover. For the stator windings all the 6 terminals shall be brought out to the terminal
box and links shall be provided to give star or delta connection.
4.2

SYNCHRONISING PANEL

Synchronising panel shall be industrial, floor mounting, cubicle type


design, fabricated out of 2.5mm thick sheet for load bearing frames and
2mm thick for the cover panels. The degree of protection shall be IP51.
This panel will be provided in the control room in addition to the DCS as a
back end panel.

Protective relays not located in the switchboard but required for the logic
shall be located in this panel. The metering shall also be provided in this
panel as this panel will be kept in TG control room.
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

18

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)

4.3

The instruments, meters and other devices to be provided in the panel


shall include but not be limited to the following:

Spring return to neutral type Raise / Lower control switches for voltage and
speed raise for TG5.

Synchroscope and synchronising lamps

Double voltmeter and frequency meters

Four position synchronising selector switch for breaker selection for


Incomer to Bus, Generator to bus, DG to LT bus and LT bus to incomer
(DG and LT bus not in the scope of this contract. Only synchronising
provision is required).

Synchronising circuit ON/OFF switch.

Synchronising check relay

Voltmeter 0-15KV range with voltmeter selector switch for Bus, Generator
and incomer

Frequency meter 45 to 55Hz for TG, Grid, and DG frequency


measurement. Signal for DG and grid will be provided from the purchasers
panel for contractors termination at existing panel.

Digital multiple display meter with RS485 Modbus port for export / import
KW, KVAR, KVA, Pf, V, A, MD for KW-KVA-KVAR, cumulative energy
metering KW etc.

Power generation meter with RS485 Modbus port.

Light indication type trip/close switches for HT breakers.

INSTRUMENTATION

The Turbine shall be provided with field-mounted gauges on various


process lines to enable local monitoring of various process conditions.
Field mounted switches shall be provided for alarm and interlocking
conditions separately wherever required.

Pressure gauges Temperature Gauges suitable for mounting in the local


panel shall be provided. The following measurement loops complete with
field mounted primary elements, transmitters, interconnecting screened
and control cables upto local junction boxes shall be included in the scope:

Gland stream control

HP/LP heaters condensate level control

All open loop and closed loop measurements required for air cooled
condenser

Lube oil pressure and temperature

Control oil pressure and temperature

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

19

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)

4.4

4-20 ma DC output signal for Speed, Power. Turbine inlet pressure for
logging in the DCS. These signals shall be made available in the Turbine
panel.

VIBRATION MONITORING SYSTEM

Vibration monitoring system consisting of X-Y probes, signal conditioning unit,


display unit, junction boxes, interconnecting cables for measurement of bearing
vibrations, shaft vibrations, axial shift position, casing expansion, differential expansion,
eccentricity shall be provided. The Vibration monitoring system shall be provided with
isolated 4-20 mA dc output for the above measurements to connect it to customers
distributed computer system (DCS)
Temperature detectors (RTD) associated with bearing temperature, motor winding
temperature measurements shall be connected to DCS. The temperature scanner shall
have communication link facility conforming to MODBUS RTU Protocol RS-485 interface
to provide connectivity to DCS.
4.5

PROTECTION & INTERLOCKING SYSTEMS

The operation of protections shall be accompanied by annunciation, which


will provide definite indication of the primary cause or causes of operation
of the protection. The following basic interlocks and protection
requirements shall be included to provide adequate and reliable protection
for safeguarding the turbine and its auxiliaries under abnormal operating
conditions. These shall be reviewed and modified as per manufacturers
recommendations.

Start-stop and Protection and Interlocks required for MOP/AOP/EOP and


barring gear shall be done in turbine panel. Potential free contacts required
for running/stopped tripped status required for the above shall be made
available in the Turbine panel for logging in DCS.

The turbine protection system shall put the turbine out of operation under
the following conditions:

Condenser pressure very high

Turbine lube oil pressure very low

Trip oil pressure very low

Control oil pressure very low

Turbine shaft vibrations very high

Turbine speed very high

Steam temperature very low

Turbine axial, shaft displacement very high

Emergency trip push button operated


HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

20

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)

4.6

Energisation of generator lockout relay

Master trip lockout relay energized

Low lubricating oil pressure for bearings

Any other protection as envisaged in design

Generator electrical protection trip

Turbine protection interlock system shall be based on hard-wired logic and


shall be carried out in the Turbine control panel. One set of potential free
contacts shall be provided in the turbine panel for the above faults to wire it
to DCS.

The turbine governing system shall be based on Electro hydraulic type


consisting Woodward electronic unit, E-H converters, Hydraulic unit etc.,
the governing system shall be configured to meet the following operating
requirements./Parallel with the 132 KV Grid and existing DG/Island mode
when both existing TG and grid trip./Along with the Woodward speed
governing system necessary load control module required for the turbine
shall also be supplied so that following functions are done:

Dead bus closing

Tie breaker closing

Bidder to submit catalogues for Woodward Governor and Load control


module for review at the time of submitting the offer.

GUIDELINES FOR INSTRUMENTATION & CONTROLS

Transmitters and external gauges shall not be included in the scope of this
work as the same will be included in the main DCS package to procure
along with DCS. Instrument list and I/O requirement shall be furnished
immediately on placement of order.

The transmitter for open loop and close loop monitoring, viz pressure,
temperature, level, flow, etc at various points of the Turbo generator shall
be connected to marshalling cabinets of the DCS system and the signal
will be processed and displayed on the monitor of the PC based DCS. The
various field mounted instruments and other control devices shall be wired
to the DCS panel. DCS panel will be programmed for the sequencing,
protection and interlocking logic of the Turbine system including start/stop
facilities for various drives and monitoring functions.

The DCS will be procured separately and hence the same is not included
in the specification. However all the required information for open loop
monitoring and protection and interlocking as may be applicable for Turbo
generator shall have to be provided so that the same can be implemented
in the DCS. The required assistance and coordination with the other DCS
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

21

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)

supplier during detailed engineering and commissioning shall be included


in the scope of work of this tender.

All outdoor electronic instruments shall be provided with IP-65 enclosure.

Pressure gauges shall be provided with snubber for pump discharge


pressure measurements. Bourdon / movement material of all gauges shall
be of SS. Diaphragm of diaphragm sealed pressure gauges in dosing lines
shall be of SS with Teflon lining. Dial sizes of gauges shall be 150 mm.
Gauge cocks with drain plugs shall be provided for all gauges. For steam
services, syphons shall be provided.

RTD type temperature elements shall be of Pt-100 three-wire type, duplex


RTDs.All thermocouples shall be provided with compensating cables upto
the field mounted transmitter. SMART type temperature transmitters
having 4-20 mA DC output shall be provided for all thermocouples based
temperature measurements.

Generally instruments tubing, isolation valves etc. shall be of the same


material as specified for main piping/tanks. The specification details for the
instrument cables shall be Inter connecting cables between individual
instruments to junction boxes; Single twisted pair cables having 1.0 sq mm
stranded annealed tinned copper conductor insulated with PVC, inner
sheath of PVC aluminium

The instrumentation and control system for the plant shall consist of field
mounted gauges, switches, primary elements, converters, pneumatically
operated final control elements Control room instrumentation, viz. through
DCS to provide integrated monitoring and control of Turbo generator and
auxiliaries

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

22

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION

ANNEXURE-3 AIR COOLED CONDENSER & AUXILIARIES


1.0

DESIGN BASIS

1.1
1.1.1

PROCESS DESCRIPTION
The ACC shall condense the exhaust steam from the turbine, which is at a
pressure of 0.18 ata. The steam is drawn from the turbine to the condenser
through steam ejectors. The outlet temperature of hot well water is estimated as
57deg.C. The ambient dry bulb temperature condition for design shall be
considered as 40deg.C. The hot well water is continuously pumped to deaerator
through condensate extraction pumps with control valves. The condenser shall be
provided with exhaust water spray system to operate when exhaust temp exceeds
65 deg. C, rupture disc and necessary instruments to control the system.

1.2
1.2.1

TECHNICAL PARTICULARS OF AIR COOLED CONDENSER SYSTEM


Design of the ACC shall be suitable for the following conditions.

1.3
1.3.1

Type of Air Cooled


Condenser

Aluminium fin type forced draught


water to air coolers constructed in
dismountable modules with hot &
cold water headers.

Design ambient temperature


for ACC

40 deg. C

Max. ambient to be
considered

45 deg. C

Hot well water temp.

57.0 deg. C

Wet bulb temperature

28 deg. C

Exhaust steam quantity


(max.)

As per design requirement

Steam Temperature

57.41 deg. C

Enthalphy of Steam

622.1 Kcal/kg

Temperature of Condensate

56.32 deg.C

Pressure

0.18 kg/cm2

Heat load to be considered


for ACC

As per the design requirment

Design and construction code

HEI / ASME SEC.VIII DIV. I

QUALITY OF AIR
The ACC will be located at the plant site where furnaces are in operation. The air
in the plant area will be laden with dust of coal and associated ash. This aspect
shall be considered in the design of Air Cooled Condenser. The bidder shall
indicate the quality of air considered in the design of Air Cooled Condenser.
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

-1-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-3 - Air Cooled Condenser & Auxiliaries (Contd.)

1.3.2

Bidder shall provide water cleaning arrangement for the aluminium fins with spray
nozzles having a water jet pressure of at least 3.5 Kg/cm2 which will be provided
from auxiliary cooling water system of the plant.

1.4
1.4.1

CIVIL AND STRUCTURAL


The successful bidder shall supply civil construction drawings for the foundation.

1.4.2

All civil and structural steel work shall be in the scope of the work of this tender.
For design of structure, wind load conditions and Seismic conditions as specified
in this specification shall be considered. While designing the Air Cooled
Condenser structures, either effect of seismic force or wind loads, whichever
produces the worst effect, will be considered along with the usual load conditions.
2.0 SCOPE OF WORK, EQUIPMENT SUPPLY AND SERVICES

2.1

The scope of work of successful Bidder shall include and not be limited to design,
fabrication, manufacture, assembly, testing, packing, Transport, Supply at site,
Erection, start-up, commissioning, and testing for performance.

2.2

Air Cooled condenser unit shall be complete and shall include but not limited to
the following equipment, accessories and services.

2.2.1

Condensing System
Condensing system will be air-cooled condenser comprising of:

2.2.2

Turbine exhaust pipe work from turbine exhaust flange to condenser


steam header.

Expansion bellow with spool piece between turbine exhaust and


condenser pipe inlet

Air cooled Condenser (ACC) fins mounted outside the building with steam
and water header

ACC fans with proper mounting arrangement

Structures above 300mm FFL including tie beams, fan supports, fan
stacks, stiffeners, platforms, corridor etc

Rupture disc for condenser protection

Water spray nozzles with accessories

Drain lines for connecting other drain lines like turbine casing drains, GVC
drains etc

Condenser auxiliaries

Condensate tank with stand pipe for instruments

Flash pipe for receiving steam and water

Horizontal turbine exhaust drain pumps with motors (2 x 100%) along with
isolation and recirculation valves and NRVs
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

-2-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-3 - Air Cooled Condenser & Auxiliaries (Contd.)

2.2.3

2.2.4

2.2.5

Condensate extraction system

Horizontal/ vertical Condensate extraction pumps (CEP) with motors (2 x


100%) along with isolation and recirculation valves and NRVs.

Condensate piping from hot well through CEPs & ejector condensers and
up to inlet of Deaerator.

Split range control valves for Condensate re-circulation along with controls

Pipe supports, strainers, steam traps, drains, vents and isolation Valves as
required.

Drain lines with isolation valves for ejector condenser drains etc.

Dry air/vapour line to ejector with isolation valve.

All high pressure drains lines to flash tank.

Condenser air evacuation system

Steam jet air ejector system complete with:

Twin stage main ejectors (1 working + 1 standby)

Start up ejector (hogging) with silencer

Inter and after condensers individually for each service ejector

Condensing system C&I

Air cooled Condenser split range hot well level control valves complete
with Level transmitters, Control valves, I-to-P converter, and air filter
regulators. Control logic will be programmed in DCS.

Auto start logic for condensate level high and trip when level is low.

Dial type Pressure gauges for condenser tank, CEP & CDP discharges,
Motive steam to ejector, Condenser vapour to ejector, First stage ejector
condenser etc.

Differential pressure gauge for condensate strainer

Temperature gauge for condensate outlet, condensate tank, ejector outlet

Pressure switches for Condenser pressure high trip & alarm, CEP & CDP
auto start interlock on very high level and auto stop on very low level,
alarm for high and low on exhaust drain and condenser tank.

Level switches for Low level, Low-Low level, high level, High-high level &
CEP auto start interlock

Dial type temperature gauges for, Condensate after hot well, Condensate
after inter/after condensers of ejectors, Motive steam to ejector

Transparent level gauge for condenser hot well Level switches for
Condenser hot well level low alarm and CEP dry run interlock, Condenser
hot well level high alarm

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

-3-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-3 - Air Cooled Condenser & Auxiliaries (Contd.)

2.2.6

2.2.7

Pneumatic and impulse piping with fittings for interconnection within


battery limits.

Instruments cables up to junction boxes for connecting to purchasers DCS


system

RTDs, Thermo wells for all the temperature measuring points for
purchasers DCS system.

Provision for level transmitters for purchasers DCS controls and


instrumentation

Vibration switches for high and Very high for each fan for connecting to
DCS logic.

Electrics:

One (1) lot of drive motors for pumps like CEP, CDP, fans and any
electrical drives

Space heaters, its cables up to junction box

Vibration, RTDs etc. as required

Electrical Equipment

2.2.8

2.2.9

One (1) lot of complete interconnecting power and control cables from the
field switches, motor heaters to the nearest junction boxes.

Miscellaneous items

Set of foundation bolts.

Set of special tools & tackles for maintenance

Noise abetting hoods as required, silencers etc to limit noise level within
OSHA standard.

Spares & consumables

Commissioning spares for items under the scope of work without any
additional cost till ACC system is commissioned and handed over to
operation.

Spares, tools and tackles for operation, repair and maintenance for two
years of trouble free operation (Optional) List of items recommended and
their price valid for 6 months shall be submitted.

Insurance Spares like Ejector, headers etc. as per mutually agreed basis
(Price shall be furnished along with offer).

All consumables such as oil, grease, etc., as required till commissioning


and handling over to purchaser.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

-4-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION

ANNEXURE 4 FUEL HANDLING SYSTEM & AUXILIARIES


1.0
1.1

DESIGN BASIS

MATERIAL TO BE HANDLED

Coal washery rejects, Indian coal and Indonesian coal is proposed to be used as fuel
for the boiler. The characteristics of the material to be handled are given below:
TABLE-1: CHARACTERISTICS OF IMPORTED COAL/ INDIAN COAL
250 mm

Top size, mm (max) Indian coal


- Imported coal

50 mm

- Washery rejects

50 mm

Average bulk density, kg/ m3

800

The coal will be received and stored in the coal yard of the plant and stacked in
separate heaps / stockpiles.
1.2

SYSTEM CAPACITY

The plant capacity and specification for equipments are given below in Table 2. The
system diagram is shown on drawing No.HIQ-4036-H-01 R0
TABLE 2: SPECIFICATION OF EQUIPMENTS
Sl.
No.

DESCRIPTION

DATA

1.0

GENERAL

1.1

Maximum number of
hours of operation of the
system to meet daily
requirement

1.2

Rated capacity (Average


hourly system capacity)

90TPH

1.3

Minimum number of
operating days/year

345 days

Size of fuel as required to


be fed to boiler bunkers
1.4

16 hours

100% less than 6mm and free from foreign material for
Imported coal / Char. The fines less than 1mm shall be
restricted to max. Of 30% and less than 2mm shall be
restricted to max. Of 50 %. This size may be checked
and confirmed by the bidders as per their boiler
requirements.

2.0

GROUND HOPPER (GH)

2.1

Quantity

One

2.2

Location

Coal Loading House (CLH)

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-1-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure 4 Fuel handling system & auxiliaries (contd.)

2.3

Hopper size (min.), m

6 m x 4 m with 2 bottom openings

2.4

Grid size, mm

Grizzly 200 mm square opening or as required.

2.5

Hopper material

RCC

3.0

VIBRATING FEEDER
(VF)

VF

3.1

Quantity

One

3.2

Capacity (each)

To be indicated by bidder.

3.3

Type

Electromagnetic vibration

3.4

Location

Below ground hopper (CLH)

3.5

Material of construction

Mild steel

3.6

Vibration frequency

3000 cpm

3.7

Vibration swing

1.6 mm (max)

4.0

BELT CONVEYORS
(BC)

BC
1

4.1

Type

3 roll 30 deg. Trough

4.2

Profile

Inclined

4.3

Material carried

4.4

Quantity

4.5

Location

BC
2

BC
4

BC-3

BC-5

BC-7
tripper

As per Table- 1
1

GH
to
CH1

CH 1to
CH2

CH1 to
TH-1

CH-2
to TH
-3

CH2 to
TH-2

TH-3 to
TripPer

Tripper
For
bunker

AR

AR

AR

AR

AR

AR

4.6

Design capacity

AR

4.7

Belt width (min.), mm

To be specified by the bidder

4.8

Approximate belt speed

Not exceeding to 1.6 m / sec.

4.9

Conveyor length
(horizontal), m

Refer enclosed drawing (HIQ-4036-H-01 R0 and HIQ4036 -H-02 R0)

4.10

Lift, Height in m

As per the design requirement ( AR )

5.0

FUEL SCREEN (FS)

5.1

Quantity

Two

5.2

Type

Mechanically vibrated inclined double deck screen


HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-2-

BC 6

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure 4 Fuel handling system & auxiliaries (contd.)

5.3

Location

CH 1 & CH 2

5.4

Feed size

Less than 250/75 mm

5.5

Product screened size

Less than 75/6 mm

5.6

Rated capacity

As per the design requirement

5.7

Duty

Continuous

6.0

CRUSHER (CR)

6.1

Quantity

Two ( primary/Secondary)

6.2

Design Capacity (each)

As per the design requirement

6.3

Type

Impact type

6.4

Location

Crusher House-I & II

6.5

Fuel to be handled

Coal washery rejects, Indian coal & Indonesian coal

6.6

Feed size (max.)

6.7

Crushed fuel size (max.)

6.8

Permissible fuel over size


from crusher

Primary crusher

- < 250 mm

Secondary crusher - < 50 mm


Primary crusher

- < 50 mm

Secondary crusher - < 6 mm


Shall be less than 10% of input coal through the
crusher.

7.0

MAGNETIC
SEPARATOR

7.1

Quantity

Two

7.2

Type

Suspension type electromagnet

Location

Refer enclosed drawing(HIQ-4036-H-01 R0 and HIQ4036 -H-02 R0)

7.4

Separation capacity

20 kg of iron particles

7.5

Coil winding

Aluminium

7.6

Magnet working face

Non-magnetic stainless steel

8.0

BELT SCALE (BS)

8.1

Quantity

One

8.2

Type

One set electronic load cell type

Location

Refer enclosed drawing(HIQ-4036-H-01 R0 and HIQ4036 -H-02 R0)

8.4

Capacity range required

0 100 TPH

8.5

Belt width, mm

To be specified by the bidder

8.6

Weighing range

0% - 100%

7.3

8.3

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-3-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure 4 Fuel handling system & auxiliaries (contd.)

8.7

Weighing accuracy

0.5%

9.0

GATE, CHUTE, ETC

As required

9.1

Location

GH, CHs,THs & Bunker

10.0

DUST EXTRACTION
SYSTEM (DE)

10.1

No. of dust extraction


points

Three

10.2

Location

CH-I, CH-II & BB

Supply to cover

Blowers, bag filters, hoppers, chimney etc to control


dust at all transfer points in various conveyers.

10.4

Max. air / filter bag cloth


ratio

1.5 m3 / min / m2

10.5

Filter cloth

To be selected considering proximate analysis of coal.

10.6

Dust load in exhaust gas

Within 50 mg / Nm3

10.7

Pressure drop across


system

125 mm WC (Max)

11.0

DUST SUPPRESSION
SYSTEM (DS)

11.1

No. of dust suppression

One

11.2

Type

Plain water type

11.3

Location

Coal Loading House

Supply to cover

Booster pump, water tank, piping, valves, pipe


supports, spray nozzles, headers, etc.

11.5

Water supply

Purchaser will provide service water at a terminal point.

11.6

Quantity & head of water


required

To be specified by bidder

12.0

DEWATERING SYSTEM
(DWS)

12.1

Location

10.3

11.4

Below ground hopper (CLH)

AR As required as per design.


2.0

PROCESS DESCRIPTION

The Fuel Handling System shall screen, crush and feed the coal from the coal
stockyard to the fuel storage bunkers of the boilers at required size and capacity as specified
in the above table. CFBC boiler is provided a bunker with 3 compartments, 2 for coal mix
and one for lime with 12 hrs storage capacity. There shall be single stream of coal handling
system of 100% capacity right from Coal Loading House (CLH) to Boiler Bunker (BB). This
Fuel Handling System will operate for 16 hours per day. The system shall be flexible
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-4-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure 4 Fuel handling system & auxiliaries (contd.)

considering the interconnectivity and interchange ability of equipment such that the
availability of major equipment is ensured at any point of time.
Coal from the coal yard stockpiles will be reclaimed by tractor dozers and fed into
ground hoppers in the Coal Loading House (CLH) where from it will be conveyed through
Belt Conveyer (BC- 1) to the Vibroscreening and crushing plant at Crusher House-I (CH) to
size the coal as per design requirement. Vibratory Feeders (VF) are used below the ground
hopper outlet, which feeds to BC 1. The screened fuel will be crushed in the crusher-I, the
crushed fuel will be taken to BC-1 through Coal Transfer House- 1 (CTH- 1) by Belt
Conveyor (BC- 3) from where it is fed to BC-I by gravity. The accepted coal from vibro
screen is fed to BC-2.The BC-2 belt conveyer feed the coal to the crusher house -2.vibro
screen. The screened fuel will be taken to BC-2 by BC-5 through TH-2.The accepted coal
will be taken to TH-3 by BC-4 then by BC-6 to bunker. BC- 7 through a boiler hopper a tipper
transfers the coal to the each compartment of Boiler Bunker (BB).
On-line magnetic separators are provided at upstream of crushers and boiler bunker
house to prevent damage to the crusher by tramp iron present in the raw coal. Non-ferrous
metals and other objects like stones etc. are detected by metal detectors, provided at
upstream of crushers and boiler bunker house. Belt scales are also provided to measure the
weight of the fuel conveyed by the belts.
Dust Extraction systems (DES) is provided at all transfer points to minimize dust
nuisance. Dust Suppression System (DSS) is provided at coal loading house. For dust
suppression, plain water spray is provided.
The schematic diagram for the proposed FHS is shown in enclosed drawing no.
HIQ-4036-H-01 R0.
3.0
3.1

EQUIPMENT DETAILS

BELT CONVEYORS

Belt Conveyor including structures, head end & take off pulleys, Belts, idlers, drive
unit, skirt board, scraper, hood etc.
3.1.1

CONVEYOR PULLEYS

All belt conveyor pulleys, viz. head, tail, drive, bend, snub and take-up shall be of
welded steel construction with continuous rim and two end- discs fitted with steel hubs. All
pulleys shall be statistically balanced and the permissible balancing weight of pulleys shall
not be more than 5% of the weight of the pulley without shaft. At least 30%steady and 100%
momentary overload shall be considered in designing of pulleys. All pulley bearings shall be
self-aligning spherical roller bearing only having working life of not less than 40,000 hours,
with split type pillow block.
3.1.2

Belting

All belting shall be Nylon / Nylon duck rubber covered with suitable cover thickness
on carrying and return faces to withstand the wear and impact. The number of pliers and
weight shall be selected taking into consideration the maximum belt tension under worst
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-5-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure 4 Fuel handling system & auxiliaries (contd.)

condition, through ability of the belt and the suitability for supporting the load. The cover
grade and thickness shall be selected to give maximum life of the belting giving due
consideration on the lump size, abrasiveness of the material and the loading cycle. The
permanent splicing of the belt shall be within the scope of work and shall be done by
vulcanising after removing the initial stress.
3.1.3

Belt carriers (idlers)

All belt conveyor idler assemblies shall be suitable for continuous operation under full
load conditions. Idler rollers shall be provided with wear resistant deep groove ball bearings
only. The minimum life of the bearing assembly shall be 40,000 working hours. Idlers shall
be self- lubricated and life sealed. The idler rolls shall be made of ERW pipes of medium
shell thickness. The carrying and return idlers shall confirm to the requirements of IS: 8598
and IS: 11592.
3.1.4

Idler spacing

Maximum spacing of toughing rollers shall be in accordance with the nature of


loading, weight of the materials carried and maximum belt tension. The spacing shall not
exceed 1000mm and shall be such that the centenary sag is within two (2) percent.
3.1.5

Take-up

Take-up shall be sufficient to cope up with a maximum elongation of belt during


operation. Counter weighted vertical gravity take-up shall be used for conveyor length about
40 meters and take-up shall be located, near the drive/head pulley to maintain proper
tension of the pulley during the travel. The take-up shall be conventional type with slack side
belt going round two fixed bend pulleys and weighted tension pulley sliding on vertical
structure with lubricated guides. For short conveyors screw type take-up unit shall be used,
the screw take-up shall be provided with minimum of two screws. Vertical gravity take-up
shall be located away from the boiler bunker house. Bidders shall include counter-weight of
concrete slabs in the scope of supply.
3.1.6

Drive unit

The drive unit shall comprise of electric motor, gearbox, hold back / brake, combined
base plate for motor and gearbox, couplings and coupling guard. The drive unit of different
conveyors shall be standardized to the extent possible. The gearbox shall be totally
enclosed, oil immersed, having anti-friction bearings with dust-tight seals at shaft projections.
Couplings shall be flexible type and suitable to transmit the torque provided. Service factor of
1.25 times over the motor rating shall be adopted for gear box and 1.5 times over the motor
KW for couplings.
3.1.7

Skirt boards

Covered skirt boards shall be provided at loading zones of belt and any other places
wherever necessary with the provision for dust sealing. The skirt boards shall be fabricated
from mild steel plates fitted with soft rubber strips at the end.
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-6-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure 4 Fuel handling system & auxiliaries (contd.)

3.1.8

Belt cleaner / scraper

Suitable cleaning device shall be installed at the discharge end of the conveyor on
the return run of the belt so that the carrying side is properly cleaned before it comes in
contact with the return idlers. The belt cleaners shall be preferably be double bladed type
with spring and /or counter weight arrangement for maintaining constant contact with belt at
adequate pressure.
3.1.9

Deck plate

Mild steel deck plate shall be used between the upper and the lower belt of the
conveyor. The decking shall preferably be self-cleaning type.
3.1.10 Conveyor hood
Conveyor hood of 2 mm thick GI sheeting shall be provided for the exposed, Short
Support, portion of the belt conveyor etc.
3.1.11 Stringer, short support, etc
The belt conveyor shall be complete with channel stringer angle or channel, short
support of about 800mm height for support, bracing, suitable head, tail and take-up frame
fabricated from structural steel sections. The supports shall be spaced approximately 3m
apart and shall be designed to withstand fluctuating loads during starting and stopping of
conveyor.
3.2

SHUTTLE CONVEYOR/TRIPPER

To feed bunker compartments for coal, shuttle conveyor shall be supplied along with
suitable chutes and motorized gates.
3.3

GROUND HOPPER

Ground feed hoppers shall be provided below the FFL. Grizzles with chequered
plates on both sides for complete pit portion shall be provided for each feeding point.
3.4

VIBRATING FEEDER

Vibrating feeder body shall be fabricated from steel plate and structures of adequate
strength. It shall be provided with suitable back plate at feed end to prevent spillage of
material. The feeder body shall be supported on adequate number of springs to give
adequate rigidity to the equipment as well as minimum transmission of dynamic force to the
supporting structure. Suitable duty factor shall be considered in account of high shock loads
to which drive may be subjected.
3.5

SCREENS

Fuel screen shall be provided to segregate the over size coal particles from the feed
Coal materials. Tenderer shall ensure and guarantee efficient and trouble free operation of
vibrating screen especially during monsoon. The vibrating screen shall be complete in all
respects including screen body, screen cloth, with its supporting structure, vibrator, spring

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-7-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure 4 Fuel handling system & auxiliaries (contd.)

tensioning screws, dust covers and foundation bolts etc. Bearing used in the screen shall be
vibration duty spherical roller bearing.
3.6

CRUSHERS

The coal crusher (two) receives the coal of sizes less than 250/50 mm and crushes it
to the required size of less than 50/6 mm. It is of impact type and driven by motor.
3.7

BELT SCALE

Belt scale shall be of multi idlerload cell type suitable of indication accurate
conveyor rate flow. The operating accuracy of the belt scale shall be 0.5 % on actual
conveying rate.
3.8

METAL DETECTOR

Metal detector shall be capable of detecting up to minimum 25 mm aluminium sphere


at a maximum working belt speed. Sensitivity to other materials such as stainless steel and
copper shall be proportional to their electrical characteristics.
3.9

TRAMP IRON SEPARATOR (MAGNETIC SEPARATOR)

The suspended magnet shall be able to pick-up tramp iron from the bottom of the
material being carried by the conveyor over which the equipment is fitted. The equipment
shall be complete in all respects, including electro magnet hanging support necessary
fasteners, electrically operated travelling block. Necessary electrics with AC to DC
conversion system & control, necessary sensors for the equipment shall be supplied along
with the equipment.
3.10

DUST EXTRACTION SYSTEM

Dust extraction system with blowers, bag filters, and hoppers, Chimney etc to control
the dust at ground hopper area, crusher house and boiler bunker house covering all transfer
points in various conveyors shall be provided.
Dust collected in the bag filter shall be collected in a hopper with a storage capacity
suitable for 8 hours of operation. The dust from hopper shall be either pneumatically or
through conveyor conveyed to the fuel handling system back either in bunkers or in
conveyor belt or in screens etc to utilise the dust along with the fuel.
3.11

DUST SUPPRESSION SYSTEM

Dust suppression system by spraying service water through spray nozzle, booster
pumps, water tank etc., as required at ground hopper area, crusher house and boiler bunker
house.
3.12

HOIST

Manually operated mono rail hoist/chain pulley block of suitable capacity shall be
provided at screening station /boiler bunker house. Wherever the lifting load is above 2
Tonnes or lift is above 15 meters the tender shall consider electrical operated hoist.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-8-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure 4 Fuel handling system & auxiliaries (contd.)

3.13

BRAKES

Separate electromagnetic brakes, operated through direct current shall be provided


for each motor driven mechanism. Brakes shall be of approved make and shall be
connected so as to apply automatically when power supply fails or when the stop push
button is pressed or stop command is signalled from PLC. The release of the brake shall be
with adjustable time delay proceeded by electronic command for start of push button is
released. Brakes shall be designed as per IS 3938.
3.14

INSTRUMETNATION AND CONTROL

Complete instrumentation and control for all the equipment provided in this
package shall be covered under the scope of this tender. All field instruments shall be wired
up to the junction box where from the same shall be connected to the PLC as per the
requirement.
3.14.1 Controls
Fuel handling system shall be provided with controls for material flow metering, belt
scale electrical drives, conveyor systems, crusher, dust handling, dust suppression system
and other equipment covered under the scope of this contract.
Field warning sound before starting the conveyors, crusher etc by hooters for one
minute in crusher house, ground hopper, and bunker top shall be provided in every
sequence of operation during start up.
The control and all interlocks sequencing shall be PLC based having functional
group control. Local emergency stop and pull chord switches shall be hard wired to MCC.
Coupling relays shall be provided in the PLC where isolation is required to interconnect
PLC with MCC controls.
Field switches, meters, transmitters, transducer, cabling, local JBs etc. required for
the complete system will be under the scope of this contract. Following minimum switches
shall be provided:

Speed and Zero speed switches for sequential start / stop

Hand reset type Emergency Push buttons

Vibrations high alarm and trip switches

Screen chocked switches

Belt sway switches

Jogging switches in crusher

3.14.2 Field instruments


All filed instruments with provision of minimum five (5) terminals for control and
protection of the system shall be included in the contract. Following minimum field
instruments shall be provided:

Pull chord switches shall be of industrial heavy duty type enclosed in a dust
and vermin proof cast iron/cast aluminium box with indirect arrangement for
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-9-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure 4 Fuel handling system & auxiliaries (contd.)

operation. Pull chord switches shall be placed at an every interval of 25


metres on both sides of the conveyor.

3.15

Belt sway switches at every 10M to 15M distances as required in each side of
the belt. It shall be industrial, heavy duty, housed in a dust and vermin proof
cast iron / cast aluminium box with indirect arrangement for operation.

Zero speed switches / belt slip switches shall be non-contact induction type
with associated electronic unit. Necessary potentiometer for adjustment of
speed setting shall be provided in the electronic unit in each conveyor.

Material flow metering like belt scale shall be of load cell type hermetically
sealed with IP-67 protection class suitable for remote indication of rate of flow
as well as totalised amount material conveyed at any point of time. The
operating accuracy of belt scale shall be + 0.5% on actual conveying rate.

The weighing scale transmitter shall be installed in a safe location.

SAFETY DEVICES

All equipment shall be complete with approved safety device wherever a potential
hazard to personal exists and with provision for safe access of personnel to and around the
equipment for carrying out operational and maintenance function. The offer shall include the
entire safety item such as coupling guard, conveyor tail pulley guards, gearing and chain
guard, guard deflector, protection and/or shield etc., shall be supplied.
3.16

CIVIL AND STRUCTURAL:

All structures like gantry, conveyor supports, grizzly etc. shall be made of structural
steel of standard ISMB sections are fabricated from standard angles and channels. All
structures above 300mm from natural ground level shall be steel structure designed,
fabricated, erected under the scope of this work. Civil work above ground shall generally be
avoided including in platform, corridor, etc.
3.17

MAINTAINABILITY

The term maintainability cover all aspects of design, layout and facilities for handling
that contribute to the ease with which the equipment can be serviced, maintained and
repaired. It relates to all allied concepts of accessibility, replaceability and interchangeability
detailed below. Machinery and equipment shall be designed to good maintainability.
All working parts shall be arranged for convenience of operation, inspection,
lubrication and ease of repair and replacement of parts and sub- assemblies with minimum
downtime. Suitable working platform, walkway, ladder, lifting tackles and tools required for
above shall be provided. Specification and sizes of wearing parts used in machinery like
packing, seals, bearing shall be standardized to provide interchangeability. Standardized
parts only shall be used on equipment furnished.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

- 10 -

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION

ANNEXURE-5 ELECTRICAL EQUIPMENT AND SYSTEMS


1.0

INTRODUCTION

The plant consists of one number Steam Turbine Generator of 45 MW rating, the
generation voltage level 11KV. The plant electrics have been designed for the power
evacuation 11 KV power distribution system and auxiliary power for the boiler, TG, BOP
auxiliary loads. The power evacuation, auxiliary distribution system shall be in 132 KV and
415 V voltage level. For steel plant loads like steel plant, inter connection of existing plant,
connection with generator, input to the auxiliary transformer, power evacuation inter
connection from the generator switch board shall be in 11 KV voltage level.
The power distribution for plant electrics is envisaged at 3.3 kV and 415 V level. The
plant outline design is detailed in drawing nos. HIQ-4036-E-01/R-00.
1.1

GENERAL PRINCIPLES OF DESIGN CONCEPT

The design concept of the electrical system as a whole is based on the requirements
for the safe and reliable performance of steam turbine generator sets and the interconnected
electrical system with provision for easy maintenance and overhauling.
The design principles and standards delineated herein is generally in compliance
with latest IEC / IS Standards and the Code of Practice already established in the country.
Indian Electricity Rules wherever applicable have also been complied with.
1.1.1

SYSTEM DESCRIPTION
1
1.1
2

Rated Frequency

50 Hz

Variation

5%

Rated Voltages

2.1

Generated voltage

11kv

2.2

Variation

10%

2.3

Power evacuation voltage

132 kV

2.4

Variation

10%

2.5

Plant Auxiliary System Voltage

3.3 kV

2.6

Variation

10%

2.7

Plant LT Auxiliary System


Voltage

415 V

2.8

Variation

10%

2.9

Combined variation of voltage


and frequency

10%

2.8

Motor Voltage

415 V

2.9

Motors 200 kW and above

3.3 kV

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-1-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 Electrical System (contd.)

2.10

Control Supply Voltages

110 V AC
110 V DC

3.0

Fault Levels

3.1

132 kV

31.5kA for 1 sec

3.2

11KV

40kA for 3 sec

3.3

3.3 kV

31.5 kA for 1sec

3.4

415 V

50 kA for 1 sec

DC System

110 V DC

Grounding

5.1

Generator neutral

Neutral Grounding Secondary Resistor

5.2

132 kV System

Solidly Grounded

5.3

3.3 kV System

Medium Resistance Grounded

5.4

415 V System

Solidly Grounded

5.6

DC System

Ungrounded

One minute power frequency


withstand voltage

6.1

132 kV System

275 kV

6.2

3.3 kV System

10 kV

6.3

11 kv system

28kV

6.4

415 V system

10 kV

Impulse withstand voltage

7.1

132 kV System

650 kVp

7.2

11kv system

85 kVp

7.3

3.3 kV System

40 kVp

7.4

415 V system

2 kVp

8
8.1

Creepage distance
Pollution level for creepage
distance

25 mm / kV (Heavily polluted)

8.2

Total creepage distance

10500 mm

8.3

Protected creepage distance

5250 mm

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

-2-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 Electrical System (contd.)

Note:
1. Continuous duty 415V motors will be controlled by contactors.
2. HT motors will be controlled by Vacuum circuit breakers. Coal handling system
motors (HT) will be controlled by fused vacuum contactors, considering frequent
starting.
1.2

GENERATORS

The generator coupled with steam turbine will have the following salient technical
features.
Type

Synchronous generator

Rated capacity

45 MW (56.25 MVA) to suit the Turbine


rating

Rated power factor

0.8 lag

Rated Voltage
Rated terminal voltage

11 kV

Voltage variation

10%

Rated Frequency
Rated frequency

50 Hz

Frequency variation range

-5% to +3% (47.5 Hz to 51.5 Hz)

Combined variation range

10%

No. of phase

Rated speed

3000 rpm

Insulation class

F (Temperature rise limited to class B)

Cooling
Cooling - Stator winding

Directly cooled by Water

Cooling - Stator Core

Directly cooled by Air

Cooling - Rotor winding

Directly cooled by Air

1.2.1

Stator

Generator stator body shall be a totally enclosed gas tight, explosion proof fabricated
structure suitably ribbed internally to ensure high rigidity. The stator shall be designed to
withstand fault conditions without any resultant deformation.
All terminals shall be of silver-plated copper to receive standard flexible connectors.
Effective sealing shall be provided between the terminal bushings and the stator body to
avoid possibility of leakage of air.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

-3-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 Electrical System (contd.)

Quantities and ratios of the current transformer provided for protection shall be
decided by the bidder and shall be generally in accordance with standard requirements. The
current transformer ratings shall be such as to provide proper accuracys for excitation
control, relaying, voltage regulation and metering under all normal and fault conditions.
1.2.2

Rotor

The rotor shall be of cylindrical type, the shaft and body being forged in one piece
from nickel chromium molybdenum vanadium steel. The fully assembled rotor shall be
balanced to a high degree of accuracy and subjected to 20% over speeding for two minutes
as per International Standards to ensure mechanical strength.
The field winding shall consist of coils made up of copper with bonded insulation and
shall be held in position against centrifugal forces in wedges in the slot portion and by high
tensile non-magnetic alloy steel retaining rings in the overhang portion.
Strength test, material analysis and ultrasonic tests shall be performed during the
manufacture of the rotor. The rotor shall be balanced in various planes at different speed
and shall be subjected to over speed test. Individual turns of the rotor coil shall be insulated
against each other.
1.2.3

Fan

The rotor shall have fans mounted on it for the circulation of air inside the machine.
The fixing bolts, pins, nuts, etc. shall be made of non-magnetic material.
1.2.4

Shaft Seals

The shaft seals should be of adequate design to be provided on either side of the
rotor to prevent escape of air from the generator casing along the rotor shaft. The design
should be such that minimum oil should come in contact with the air during the course of
sealing. The shaft seal body on the exciter side shall be suitably insulated from the stator
end shields current.
1.2.5

Bearings

The generator shall be provided with sleeve bearings. The bearings shall be
spherically seated, self-aligning and cylindrical bore type. The liner shall be lined with at
least two-resistance thermometer in each liner for continuous sensing and recording of white
metal temperature. The bearing and the oil pipes of the generator on exciter side shall be
suitably insulated to prevent circulation of currents due to shaft voltage.
1.2.6

Air Coolers

Shell and tube heat exchangers shall be mounted on the machine for air-cooling. The
heat transfer calculations shall be done with a waterside standard fouling factor. The air
cooler shall be in accordance with the latest applicable requirements of the Heat Exchange
Institute. Cleanliness factor of 0.85 shall be considered for design.
Generator stator cooling shall be direct cooling with air as per manufacturers standard
design with water cooled secondary cooling system

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

-4-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 Electrical System (contd.)

The rotor windings shall be directly cooled by air. The stator core shall be cooled by air
flowing through the radial ventilating ducts. The shaft mounted propeller type fans on each
side shall facilitate circulation of air inside the machine. The air inside the generator shall be
maintained clean and dry by continuously circulating the air through a suitable air drier and
filter arrangement. There should be 100% standby arrangement for the same.
1.2.7

Temperature Measurement

Temperature of various active parts shall be measured.


The stator winding
temperature shall be sensed by at least one embedded resistance thermometer for each coil
placed at the bottom of the slots out of which at least six shall be in the end zone.
Temperature of cooling water to the (in case of water cooled machines), air coolers,
hot and cold gas and lubricating oil to the bearings and shaft seals shall also be sensed by
resistance thermometers. The rotor winding temperature shall be measured by resistance
method and shall be continuously recorded. Duplicate sensor shall be supplied for all the
above temperature measurements.
1.2.8

Generator Excitation System

The excitation system shall be brushless type. The brushless exciter shall consist of a
permanent magnet generator, AC exciter and rotating rectifier with silicon diodes and
indicating fuses. The whole system should be enclosed to avoid dusty air ingress from
outside with adequate cooling arrangement of the closed circuit air inside.
The excitation system shall be complete with switchgear, control equipment and
automatic voltage regulators. It shall be capable for operating the generator at full range of
operation of voltage, frequency and kVA.
Voltage regulator shall be of automatic type capable of regulating the voltage within the
deviation range of 0.5% from no load to full load at full range of frequency of operation.
Regulator shall be of completely solid-state type. The voltage regulator shall have a
maximum and minimum excitation limiter both in auto and manual excitation control.
1.2.9

Automatic voltage regulator

The AVR shall maintain constant generator terminal voltage under changing load
conditions. In addition to the basic voltage requirement, AVR shall include control loops,
which shall perform other functions such as reactive load limiter, over fluxing limiter, rotor
current limiter, minimum excitation limiter, and maximum excitation limiter.
1.2.10 Surge protection and voltage transformer (SPVT)
A Surge Protection and voltage transformer (SPVT) cubicle for the generator shall be
provided in the turbo generator building at ground floor level. Surge protection shall comprise
lightning arrestors and surge capacitors and shall protect the generator against high voltage
/ high frequency surges occurring in the system. The generator neutral shall be earthed
through neutral grounding transformer with secondary resistance to restrict the earth fault
current to within limits. An isolator and a CT shall be provided in the neutral circuit along
with a resistor bank, all housed in a cubicle. This cubicle shall be located in the turbine hall
at the ground floor level close to the generator.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

-5-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 Electrical System (contd.)

Generator will conform to IEC-34. The generator will be capable of withstanding short
circuit level as per IEC. Short circuit ratio will not be less than 0.5. Generator will be suitable
to operate continuously with a negative sequence current of 8% of the rated value, and I2T
will not be less than 8.
The generator withstands capability for 3-phase short circuit at the generator terminals
when operating at rated MVA and p.f. with 5% over voltage will be for a period of not less
than 3 seconds. The generator will be capable of delivering 100 % of the rated output with
one cooler out of service.
Line charging capability (MVAR) of generator will be not be less than 40% rated MVA
at zero p.f. leading.
The generator winding will be star connected and all the six leads of the generator
phase and neutral side will be brought out of the stator frame for connection to busduct. The
neutral of the generator will be earthed through distribution transformer and secondary
resistor to limit the ground fault current to above 10 amps.
Surge diverters and protective capacitors will be provided near STG to protect the
insulation of the generators from the onslaught of surges, both from steepness of wave front
and magnitude of surge level.
The generator will be provided with either brush less excitation system consisting of
exciter with rotating diode assembly along with Permanent Magnet Generator (PMG) or
static excitation achieving high degree of operational reliability and minimum maintenance.
The excitation system will have fast response time to meet the system requirement.
The excitation system will have automatic voltage regulator to maintain steady generator
terminal voltage under variable load conditions and for parallel operation with the grid.
Ceiling voltage for exciter will be 200%.
AVR response time will be short so that it can control generator during system
disturbances requiring rapid changes in excitation to maintain the system dynamic stability
margins. Excitation system will be provided with power system stabilizer for achieving
dynamic stability under varying operating conditions. .
The excitation system will have in-built protective as well as limiting devices so as to
safeguard the generator and excitation system against all possible faults, troubles and maloperation, if any. The static thyristor excitation system will be equipped with features such as
cross current compensation, volt / frequency ratio controller, slip stabilization, rotor angle
limiter, stator and rotor current limiter, follow-up circuits, field suppression gear.
1.3

ELECTRICAL FACILITIES IN THE PLANT

The equipment shall also conform to the latest edition of relevant standards of the
following standard instruction as applicable
National Electrical Manufactures Association(NEMA)
International Electro technical Commission (IEC)
Indian Standards Institution (ISI)

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

-6-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 Electrical System (contd.)

Electrical equipment and its systems that will be provided for the proposed Power Plant
(PP) as shown in the SLD No: HIQ-4036-E-01/R-00.
1.3.1

132 KV switchyard bays :


The existing switchyard main bus (one bay) shall be extended for
interconnection of proposed 45MW power plant. The synchronization system
to be provided in existing switchyard in both outgoing breaker and alteration
of the existing metering system shall be done in the same the accounting of
both input and output of power. The extended switchyard bay in existing
132KV switchyard shall be connected to the proposed power plant switchyard
through HT cable. The cable length is approximately 600mtrs. Bidders to visit
the existing switchyard in the Ferro alloy plant and satisfy themselves
regarding availability of space and flexibility for existence of the existing
132KV facilities.
Single bus system with suitable post insulators, Bus Potential transformer
with isolators etc.
One section breaker for main bus with CTs on either side
Three sets of Potential transformers one set on each of the sections of main
bus and one on transfer bus.
Lightning arrestors for each side.
CTs shall have 3 secondary namely (i) for Bus Differential protection (ii)
Protection clause core for protection (ii) Metering clause of 0.5. Protection
system as follows:

1.3.2

Relevant feeder protection on transformers and transmission lines

overload, short circuit and other standard features

Transformers
S.
No
1

Description

Type

Generator
Transformer (GT
Outdoor, oil type

HT aux.
Transformer
Outdoor, oil type

LT Aux.
Transformer
Outdoor, oil type
or indoor dry type

Quantity

1 nos.

1 nos.

2Nos

Phase, Winding

3,2

3,2

3,2

Voltage ratio

11 kV / 132 kV

11 kV / 3.3 kV

11 kV / 433 V

Rating

53 MVA

3 MVA

2500kVA(indicative)

(indicative)
6

Vector

(indicative)

YNd11

YNy0

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

-7-

Dyn11

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 Electrical System (contd.)

Cooling

ONAN / ONAF

ONAN / ONAF /
OFAF

ONAN / ONAF

Tap Changer
& Range

OCTC, 5 % in
steps of 2.5%

OLTC, 10 % in
steps of1.25%

OCTC, 5 % in
steps of2.5%

Impedance

12.5 %

6.25%

5 % / 6.25 %

10

Basic Insulation level

11

HT

650kVp

75 kVp

75 kVp

LT

75 kVp

60 kVp

2.5 kVp

Sizing Criteria

To match the
generator MCR
rating and shall be
design ambient
temperature of 50c

Rated to
meet the unit
HT loads

For supplying the


unit LT loads ans
stations LT loads.
The transformers
are sized on the
basis of 2 x 100%
rating.

1.3.3 Generator Electrics:

1.3.4

Generator protections

11 KV HT Bus duct with aluminium enclosure from generator to 11KV switch


board with 3500A rating with suitable thermal barrier for wall crossing at TG
building.

Generator potential transformer and surge suppressor.

Bus duct for LASPT, Neutral grounding system

Neutral grounding secondary resistance

AVR, Generator Relay Panel, Turbine Control Panel, Metering cum


synchronizing panel.

Bus ducts
S.NO

DESCRIPTION

TYPE

LOCATION

11Kv system

SPBD

From Generator terminals to 11KV switch board


and generator to LAVT panel, NGR panel.

415system

NSPDB

Between LT Service Transformers to their


respective LV Switchgears.

The supports and buses are to be designed to withstand the electromechanical and thermal stresses set up during short circuit condition without
damage or deterioration of the material. The maximum temperature of the bus
and the enclosure will be limited to 90 Deg. and 70 Deg. respectively.
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

-8-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 Electrical System (contd.)

1.3.5

Switchgears
S.
No.

Description

11KV switchgear

3.3 kV Switchgear

415V Switchgear

Type

Metal clad /metal


enclosed, cubical
type, free floor
standing, dust &
vermin proof, draw
out type

Metal clad /metal


enclosed, cubical
type, free floor
standing, dust &
vermin proof, draw
out type

Metal clad /metal


enclosed, cubical
type, free floor
standing, dust &
vermin proof, draw
out type

Constru-

Single front

Single front

Single front

ction
3

Design

Sectionalized
Sectionalized
Sectionalized
single bus bar with single bus bar with single bus bar with
tie breakers
tie breakers
tie breakers

IP
protection

Fault level

40KA for 3 sec

31.5KA for 1 sec

50KA for 1 sec

Incomers

VCB breakers

VCB breakers

ACB breakers

Panel sheet
steel
thickness

IP-42

IP-42

2mm

IP-42

2mm

2mm

Protection

Standard
Standard
Standard protection
protection
along protection
along along
with
with 2OC+1EF
with 2OC+1EF
2OC+1EF

PT & CTs

As required

Metering

Multifunction digital Multifunction digital Multifunction digital


or kV, A, kW, pf, or kV, A, kW, pf, or kV, A, kW, pf,
Hz, kWh
Hz, kWh
Hz, kWh

10

11

12

As required

As required

Max.
working
height from
FFL

2000mm

2000mm

2000mm

Min.
working
height from
FFL

500mm

500mm

500mm

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

-9-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 Electrical System (contd.)

13

Max.
Panel
height
from FFL

2400mm

2400mm

2400mm

14

Control
Supply

110V DC

110V DC

110V AC

15

Incomer
Cable
Entry

Bottom

Bottom

Top entry

Outgoing
Cable
Entry

Bottom

Bottom

Bottom

16

The High Tension and Low Tension switchboards shall generally comprise of
adequately rated circuit breakers for tiebreaker and outgoing circuits. The switch boards
shall be complete with draw-out type circuit breakers, earthing switches, bus bars, drawout type voltage transformers, CTs, cable connections etc. Earthing trucks of approved
design shall be provided in case inbuilt earth switch is not standard feature in the design.
The boards shall comprise factory assembled and wired totally enclosed, metal clad,
dead front cubicles of fully interlocked and compartmentalized design. Separate selfcontained, duly partitioned housing shall be provided for individual switchgear units and
associated auxiliary equipment. The cubicles shall be arranged to form a continuously selfsupporting board made up of bolted steel members with front, back and side panels of heavy
gauge pressed sheet steel having minimum thickness of 2 mm and the construction shall
conform to IP 42 degree of protection for the enclosure. The complete assembly shall be
capable of withstanding stresses set up during severe short circuit conditions. The design of
the boards shall be such as to permit future extension at both the ends. The circuit breaker
shall be draw-out type and shall be mounted on a truck. Each cubicle shall have separate
lockable doors for the circuit breaker feeder compartment and the metering compartment.
The design of the board shall permit the movable portion to be withdrawn and
provide for isolation of the main contacts by means of plug and socket connections. Non
metallic automatic safety shutters shall be provided over the isolating contacts in the
stationary portion and shall be so designed that the bus bar compartment is completely
segregated from the breaker bus compartment for all positions of the circuit breaker.
The current transformers (CTs) shall be mounted on the side of the breaker away
from the main bus bars so as to allow safe and easy access by personnel. CT secondary
leads shall be brought to a short-circuiting type terminal board provided for testing purpose,
before connecting to their respective circuits. The CTs shall be cast resin insulated.
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

-10-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 Electrical System (contd.)

The potential transformers (PTs) shall be mounted on independent draw-out type


carriages in HT board and fixed chassy in LT board in separate panels. In HT board the PT
shall be arranged such that in the draw-out position the PTs together with the protective
HRC fuses shall be disconnected from the high voltage circuit and automatic shutters shall
isolate bus side / line side contacts. The PTs shall be cast resin insulated.
The racking mechanism of the circuit breaker truck shall permit smooth operation
without jerk. It shall be possible to engage and lock the circuit breaker truck in Service, i.e.
fully drawnin and isolated i.e. fully drawn out positions. In the Test position, the circuit
breaker shall be drawn out with low voltage circuit connected to permit testing. All these
positions shall be achieved with the front door closed. Suitable earthing connections
between the circuit breaker truck and the cubicle shall be provided so that the earth
continuity is maintained in Service and Test positions. All necessary connections
between the fixed and the moving portions of the equipment shall be made with positive
pressure contacts without any possibility of loose connections. Flexible jumper connections
with plugs and sockets shall be provided with the equipment so that it will be possible to
operate the breaker for testing when in test position. All standard interlocks of switchgears
shall be provided.
Micro switches shall also be provided for the circuit breakers for incorporating
positional interlocks in the control scheme.
Cable box for incoming and outgoing cables shall be suitable for terminating heat
shrinkable type indoor cable terminations. Terminations shall be fully contained within the
concerned cubicle forming an integral part thereof mounted in the rear and shall be freely
accessible for cable connection.
All low voltage internal wiring of switchboard shall be of stranded PVC insulated
copper conductor cable/wire. The terminal blocks shall be conveniently located and not more
than two wires shall be connected to one terminal. Separate blocks shall be provided for
distribution of control power. Each terminal block shall be provided with at least 20 percent
spare terminals. All terminals as well as termination at various devices shall be provided
with interlocked type ferrules having engraved numbers. Wherever multiple control voltages
such as AC/DC and different voltage supply exist in one cubicle, suitable colour coding and
segregation shall be adopted.
Control power supply to each individual section should be protected and for isolation
of the circuits for maintenance will be through adequately rated Miniature Circuit Breakers
(MCBs). All devices within the board shall be clearly identified by durable and eligible tags
corresponding to those used in applicable drawings.
Each section of the board and devices mounted on it shall be identified by
nameplates in the front as well as rear. The nameplates in the front as well as rear shall be
made of engraved anodised aluminium. Units shall be numbered consecutively from left to
right when facing the front of the board.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

-11-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 Electrical System (contd.)

Strip type space heaters shall be provided in the cable chambers and front breaker
chambers. The space heaters shall be rated for 240V SPN supply and controlled through
thermostat and a switch shall be provided on the front panel on individual cubicles.
1.3.6

Circuit-breakers

Circuit breaker shall be tested and proven design and robust construction. The
minimum rating of the circuit breakers of LBDS shall be 630A for 11KV outgoing and 1200A
for grid & generator breaker. The breaker capacity shall be minimum of 1250A for MCC
feeders and 4000A for Generator, grid and tie breakers. No part of the circuit breaker or any
other part of the equipment carrying the fault current or any supporting structure shall be
unduly strained or damaged when making or breaking the specified fault current. Circuit
breakers should be provided with necessary auxiliary switches for indication, control,
interlocking, protection and other purposes. Four spare sets of auxiliary contacts, two
normally closed and two normally open shall be left free in each unit wired up to the control
cable terminal board. The auxiliary contacts shall be mounted in an accessible position. If
contact multiplication is required, CB normally open (NO) auxiliary contacts shall only be
used along with relays.
Each circuit breaker shall have shunt trip device suitable for operation at a voltage of
110V DC and shall be provided with ON and OFF position indicators and operation counter.
Spring charging motor shall be designed to operate at a voltage of 240VAC.
Rated current of all secondary windings of CTs shall be 1A unless otherwise specified.
For differential protection, CTs matching ratio shall be provided. The accuracy limit factor for
all CT cores for protective relaying shall be 5P10 and those for differential protection shall
have accuracy class PS having knee point voltage suitable for the specific application. The
CT cores for measuring and indication shall have accuracy class of 1.0 and for AVR shall be
0.5. Interposing CTs (ICTs) shall be provided for ratio and phase matching when required.
ICTs shall have PS class accuracy for application in differential with knee point voltage
matching to the corresponding CTs.
All PTs shall be either single-phase or three-phase type as specified and shall have
secondary rating of 110 V. The PTs shall have insulation level corresponding to the
switchgear with which these are associated. The PTs for indoor switchboards shall be
protected by suitable HRC fuses both on the primary and secondary sides.
The PTs and CTs shall have 25% additional VA capacity over and above that required
for meters, relays and instruments connected initially. 415 TPN Switch Fuse Units (SFU) in
Power control centre
The individual switch fuse units shall be triple pole and neutral. The switches shall be
of load break AC 23 category confirming to IS: 13947. . Non deteriorating type HRC fuses
having rupturing capacity not less than 50 kA RMS at 415 V confirming to IS: 13703 shall be
provided. Feeders rated 250 A and above shall be provided with along with ammeter,
selector switch, CTs etc.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

-12-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 Electrical System (contd.)

The cable terminal arrangement for all outgoing circuit-breaker and SFU units shall be
housed in separate cable compartments and shall be suitable for multi-core aluminium
conductor PVC insulated armoured/un-armoured cables of number, types and sizes as
specified. The termination arrangement of multiple cables shall permit easy connection and
disconnection of individual cables without disturbing the other cables. For termination of
cables suitable bus-bar extension of proper size shall be provided.
1.3.7

Circuit-breaker Handling Truck

A suitable universal type truck shall be provided for withdrawing the breakers from the
board. The trucks shall have platforms of adequate mechanical strength for bearing the
weight of the largest circuit-breaker unit and shall be provided with necessary guide rails and
stops. The height of the platform shall be adjustable to suit the levels at which the different
circuit breakers are mounted on the switchboard.
1.3.8

Motor Control Centres:

MCCs will be provided for TG, Water treatment plant, DM Plant, Cooling tower and
pump house, AHS, FHS, Boiler, ESP, capacitor panel with APFC relay, PDB, LDB , etc. The
source of power will be from PCC provided in the LT side of distribution transformer.
Feeders shall be selected such that the LT loads above 1KW and below 50KW are
connected to DOL Starter. Above 50KW motor shall be provided with star delta starter. All
valves and conveyors wherever required shall have Reverse DOL starter.
1.3.9

Motors:

All LT motors will be squirrel cage induction type machines and will operate on 415V, 3
phase, and 50Hz power supply. The rating and speed of various motors will be suitably
selected based on duty requirements of driven equipment. Motors of rating 200KW, below
will have rated voltage of 415V, and above 200KW and above shall be rated for 3.3KV
voltage. DC motors for emergency oil pump of TG will be connected to 110V DC supply. DC
motor will be capable of operating with a voltage variation between 10% of nominal value.
AC motors shall have a margin of at least 10% over the requirement of driven
equipment and capable of delivering rated output at rated PF at

Terminal voltage differing from its rated value not more than 10%.

Frequency differing from its rated value not more than 5%.

Any combination of (i) and (ii) above subject to a limit of 10%.

All AC medium voltage induction motors shall fully confirm to IS: 325 for all essential
design, construction and test features. The motors shall have standardized dimensions and
ratings strictly conforming to IS: 1231 for foot mounted. The stator windings of all motors
shall have class F insulation. The temperature rise of windings shall be limited to that of
class B insulation. The degree of enclosure protection for the motors shall be IP55 and shall
be supplied with arrangements to provide protection against weather and water entry.
Canopy shall also be provided for motors additionally. The motors shall generally be fancooled design having method of cooling IC0141 as per IS: 6362 with fan directing air over
the motor frame. The rating of motors selected shall be based on the class of duty and the
load imposed by the equipment keeping 10% margin. LT motors rated 37 KW and above will
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

-13-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 Electrical System (contd.)

be provided with space heaters.


The speed-torque characteristics of the motors shall be matched with those of the
coupled machines so that smooth acceleration is obtained without over-heating the motor
and over-stressing the mechanical parts of the driven equipment. The terminal boxes shall
be of adequate size for terminating the required number and size of PVC insulated,
armoured, aluminum conductor cables after considering the required derating factors. The
motor shall be dynamically balanced to comply with the requirements of IS: 12075 including
the amplitude of vibration specified therein. The motor feet shall be integrally cast with the
stator and shall be of such a design as to prevent breakage or other failures due to vibration
normally encountered in power plants. The motor body shall have two separate earthing
terminals. Motors shall be provided with lifting hooks / lugs for frame sizes 100 and above.
1.3.10

Capacitors

Capacitors shall be provided at the load end or in each MCC end which is the source of
the low power factor. However, Capacitors of adequate KVA shall be provided in MCCs to
correct the power factor to 0.9 so that the rating of electrical equipment will be economical
and operation will be optimum. The capacitors shall be equally provided on either side of
each bus. The power factor correction in bulk loaded MCC (say above 200KVA) shall have
automatic cutting in and cutting out of capacitors and the control requirement shall be
programmed in DCS system.
1.4

CONTROL AND PROTECTION

Central Control Room (CCR) shall have free floor standing vertical panels to provide
controls of generators and auxiliary system. The control and indications as well as
annunciation systems for generator, generator transformer, 132 kV breakers, generator
excitation system, field breaker and unit auxiliary transformer etc shall be provided. The
generator auto manual synchronization shall also be provided.
Indications and annunciations shall also be provided in vertical control panel.
Necessary synchronization instruments shall also be provided in these panels.
Emergency DG set shall also have control and synchronizing facility from this panel. The
switch yard equipments like isolators & earth switches shall be provided with proper interlock
to avoid any wrong operation of isolators and earth switches due to human error.
1.4.1

Annunciation System

Alarm annunciation system for switchyard as well as plant shall be provided on


control panel by means of visual and audible alarms in order to draw the attention of
operator to operating conditions or the operation of some protective devices. All the
protective relays shall have proper flags to indicate that a particular relay has operated.
1.5

PROTECTIVE SYSTEM

The necessary protective relaying system according to the established norms shall
be provided for generators, transformers, motors, auxiliary systems etc for minimizing
damage to equipments in case of fault and abnormal conditions.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

-14-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 Electrical System (contd.)

For protection of equipment against abnormal system conditions, adequate protective


devices will be installed in the respective switchgear and / or relay panels. A group of such
protective devices will be necessary to protect the equipment under different abnormal
conditions arising in the system. In all cases, proper discrimination shall be achieved to
isolate the faulty elements only keeping the healthy part of the system in service.
All protective relay panels will be of free standing, floor mounting, sheet steel
enclosed with a degree of protection of not less than IP 40. The panels will be located in air
conditioned rooms.
All protective relays will be comprehensive numerical type capable of measuring all
electrical parameters like voltage, current, power, power factor, frequency etc. The relays will
be capable of communicating all analogue and digital signals with plant DCS system, as
applicable.
All protective relays will be of draw out type with built in testing facilities. Small auxiliary
relays may be of non-draw-out type and mounted within the cubicle. All relays will have
hand-reset and means for visual indication of their operation.
Fully graded protection system with requisite speed, sensitivity and selectivity will be
provided for the entire power station. Critical equipments / systems will be provided with
duplicate protection.
The unit protection relays will be divided into two independent groups including
separate power supply so that in case of failure of one group, the protection system shall be
still functioning and protection of the unit is guaranteed.
Set of duplicated hand reset lock out relays (86), one for each protection channel fed
from different DC bus supplies, will be provided separately for Generators, Generator
Transformers and Unit Transformers. All relays will have hand-reset flags or other means for
visual indication of their operation.
Supervision relays will also be provided to monitor DC supply for each trip relay. All
current and voltage transformers required for protection system will have adequate VA
burden, knee point voltage, instrument safety factor and other characteristics suitable for the
application.
1.5.1

132 KV switchyard Protection

Please refer our Single line diagram for existing switchyard extension bay and
proposed switchyard protection relays. Bidders to suggested Please add further protection
relays if any required.
1.5.2

Local Breaker Back up Protection

This protection is provided as a safeguard against the breaker failure when it is


required to trip at the occurrence of faults. The protection initiate bus bar protection at the
local end to de-energize the bus to which the faulty / breaker is connected and send a direct
command to remote end.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

-15-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 Electrical System (contd.)

The protection has two over currents and one earth fault current check elements and
a timer with a continuously adjustable setting of 0.5 sec. This protection shall be provided for
each breaker separately.
1.5.3

1.5.4

Generator Protection

Differential protection - generator winding

Over voltage protection

Stator Earth fault protection

Reverse power protection

Negative phase sequence current protection

Field failure protection

Rotor Earth fault protection

Generator overload protection

Overall differential protection for generator, GT and UAT.

Generator under frequency protection

Local breaker back up protection

Diode failure relay

Backup Impedance Protection

Low forward Power protection

Pole slipping protection

Winding temperature protection

Standby stator earth fault protection

Loss of field protection

VT fuse failure protection

Intertum fault protection

Dead machine protection

Generator Transformer

Differential protection

HV restricted earth fault protection

HV backup over current protection

HV backup earth fault protection

Buchholz protection

Oil winding temperature protection

Over fluxing protection.

Pressure Relief Valve

LBB protection

Oil surge protection


HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

-16-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 Electrical System (contd.)

1.5.5

1.5.6

1.5.7

LT Service Transformers

Over current protection (IDMTL & instantaneous)

Earth fault Protection

LV side Backup Earth fault protection

Buchholz protection

Oil winding temperature protection

HT Auxiliary Transformers

Differential protection

Restricted Earth Fault protection for LV winding

Over current protection on 1IkV side & LV side

Backup Earth fault protection

Bucholtz protection

Oil/winding temperature protection

Pressure Relief valve

OLTC surge relay protection.

3.3 kV Motors

Multifunction
Numerical
motor
accommodate following protections

1.6

protection

relay

having

flexibility

to

Instantaneous over current and definite time - over current protection

Earth fault protection

Single phase and phase unbalance protection

R.T.Ds. for winding / bearing temperature protection (for motors rated


1000 kW and above)

Locked Rotor Protection

INTERCOMMUNICATION SYSTEM

The plant communication system will be provided to facilitate operations by


establishing quick communications among the operating personnel stationed at various
locations of the plant. The plant Communication System will consist of the following:

1.6.1

Page and Party System with Master station & Slave Stations.

Telephone system completes with EPABX, telephone sets in the Power Plant
and associated administration buildings

P&T (Posts and Telegraph) telephone system.

Page and Party System

The system will provide for quick and reliable communication between plant
personnel located in different areas. The design will be such as to provide two-channel
communication. The system characteristics will be such as to cover the speech band
faithfully, particularly over the frequency range of 500 Hz to 5000 Hz and dynamic range of
40 to 80 db.
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

-17-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 Electrical System (contd.)

1.6.2

Telephone System

The Power plant and housing colony will be provided with microprocessor based
intercom telephone system to facilitate inter-communication for operation/administrative
purposes. This consists of an Electronic Private Automatic Branch Exchange (EPABX) of
suitable capacity. All the instruments for subscribers will also have the provision for hooking
up with P&T lines.
The telephone sets will be installed in various areas of power plant and colony. The
EPABX at Power plant and EPABX at colony will be interconnected.
In hazard areas such as oil storage, wall telephone sets with explosion proof and
corrosion resistant metal cases will be provided.
1.7

ILLUMINATION SYSTEM

The plant lighting system includes the normal AC lighting and emergency Lighting
which contributes together 100% lighting as well as emergency DC lighting in selected areas
of the plant during plant emergency conditions. The emergency AC lighting will provide
about 20% of the total AC lighting.
The plant lighting (illumination level) is varying at different locations of the Plant
depending on the utility and nature of work expected to be carried out at that area.
1.7.1

Normal A.C. Lighting of the Plant

Lighting feeders will be provided with lighting transformers of voltage ratio 1:1 for
reducing fault level. For general illumination, fluorescent fixtures are taken into
consideration. However, in some places where fluorescent fixtures are not suitable, high
intensity discharge (metal halide / sodium vapour lamps) and incandescent lighting fixtures
of suitable design are considered. This lighting will be energized from 3-phase, 4-wire, 415 V
main lighting distribution boards fed from suitably rated lighting transformers. These MLDBs
will feed lighting panels for each individual area / room.
1.7.2

Emergency AC Lighting

Emergency AC lighting will be fed from DG set through emergency switchgear and
lighting transformer. Under normal plant running condition, Emergency AC lighting will' be
fed from PCC through emergency switchgear and lighting transformer.
1.7.3

Emergency DC Lighting

Emergency DC lighting will be provided in specific areas such as control room,


switchgear rooms, areas near local panels, staircases and other strategic areas during AC
supply failure.
Industrial type receptacles rated for 20A, 240 AC will be provided for all indoor and
semi indoor areas such that any point is accessible within 25 m for maintenance and testing,
portable tools and other services. Flush type single phase receptacles will also be provided
for office rooms, control rooms and false ceiling areas.
1.7.4

Receptacles

Industrial type receptacles rated for 20A, 240 AC shall be provided for all indoor and
semi indoor areas such that any point is accessible within 25 m for maintenance and testing,
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

-18-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 Electrical System (contd.)

portable tools and other services. Flush type 5 A and 15 A single phase receptacles shall
also be provided for office rooms, control rooms and false ceiling areas.
1.7.5

Illumination Levels
Illumination levels proposed at various places are listed below:

Location

Illumination
level (lux)

Control room, control equipment room, testing


laboratories

400

Switchgear rooms, MCC room

200

Turbine hall

200

Air compressor house, pump house, water treatment


plant.

150

Basement floors, boiler house including platforms,


crusher house,

100

Cable galleries, passages, stairs, toilets


Coal conveyors (outdoor), fuel oil delivery header, oil
storage tanks

50

Outdoor Transformer yard & switchyard

30 to 50

General yard lighting, coal unloading area and coal


storage areas

20

Street lighting - main roads

20

- secondary roads

1.7.6

10

Office Rooms, Relay rooms

300

Battery room

150

Power Distribution Board (415V)


Power distribution board shall be provided for various location in the power plant for
the following purposes, like.
a) Power socket
b) Welding socket
c) Water heater
d) Air Condition (Window & Spilt AC)

1.8

POWER & CONTROL CABLES

3.3 kV cables will be of stranded aluminium/copper conductor with heavy duty XLPE
insulated, each core screened on conductor as well as on insulation, colour coded, extruded
bedding, and extruded PVC inner sheathed, armoured and overall FRLS PVC sheathed. The
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

-19-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 Electrical System (contd.)

cables will be suitable for unearthed system.


LT power cables will be 1100 V grade with stranded aluminium/copper conductor,
XLPE/PVC insulated, extruded PVC inner sheathed, armoured and overall FRLS PVC
sheathed.
Control cables will be multicore 1100 V grade, PVC insulated, PVC inner sheathed
armoured and overall FRLS PVC sheathed with 2.5 mm stranded copper conductors.
Main factors which will be taken into consideration for selection of cable sizes are as
follows:

System short circuit current

Derating factors due to higher ambient temperature and grouping of cables

Continuous current rating.

Voltage drop during starting and continuous operation

Standardization of the cable size to minimize too many sizes of cables.

The cables will conform to the relevant Indian / IEC standards in general with the
following special, FRLS properties for the outer sheath. BOQ of cables shall be submitted
with design basis for approval.

1.9

PLANT DC SYSTEM

The DC power system provides DC power to protection and control requirements and
the essential loads that are required to function on a loss of AC power. The DC system
comprises of:

1.9.1

110 V DC battery

Battery chargers (float cum boost charger)

DC distribution boards

Capacity of the system shall be computed by the bidder based on his system
requirement. A margin as follows shall be provided while deciding the final
rating of the system:

Battery cell and voltage not to fall below 90% of nominal value,

Temperature correction as per the manufacturers recommendation,

Future additional loads 10%,

Design margin of 15%,

Ageing factor 25%,

Any other over sizing factor applicable to VRLA batteries due to loss
of capacity related to voltage reversal & voltage drops that these cells
experience.

Battery

The batteries will be sized for the required load and one hour duty cycle duration,
taking into account approximate temperature correction, design margin and ageing
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

-20-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 Electrical System (contd.)

compensation factors.
Battery will be of storage type lead acid with plate or tubular positive plates. Two (2)
nos. redundant battery set at Main Power, Plant has been considered. Separate batteries for
switchyard, telephone, fire fighting system and other systems, and remote areas like coal
handling plant to be provided.
1.9.2

1.9.3

Battery Chargers

One (1) No. Battery charger for each battery set (float cum boost) of suitable
capacity will be provided for quick boost and trickle charging.

The battery charger will be of solid-state control rectifier type, completely


automatic and self-regulating.

The float charger will be capable of floating the battery and at the same time
supply the continuous DC load of the unit.

The boost charger will be capable of boost charging the battery a fully
discharged battery to a state of full charge in 12 hours.

BATTERY AND BATTERY CHARGER LOAD DETAILS:

The following minimum requirement loads shall be considered for the battery and
battery charger system design.

1.9.4

415V PCC and MCC panel (trip coil, closing coil, shunt trip coil, protection
relays, indications)

3.3KV & 11KV switchgear (trip coil, closing coil, shunt trip coil, protection
relays, indications)

AVR and excitation system

Jacking oil pump

Emergency oil pump

Generator control and relay panels

NGR, LAPT panel

Switchyard bay (protection relays, meters, indications)

RTCC

Transformer control & relay panel

All protection relays

DC lighting

DC Distribution Boards

The main DC distribution boards and other DC switchboards will be suitably designed
to meet the requirement of the plant and these boards will have short-circuited ratings
consistent with the available short circuit current.
1.10

GROUNDING & LIGHTNING PROTECTION

The plant grounding system will be designed as per the requirements of IEEE80/IEEE 142 / IS-3043.
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

-21-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 Electrical System (contd.)

The earth mat of the station will be designed such that the total ground impedance
does not exceed 1.0 ohm. The plant grounding will utilize GI flat /mild steel rods. Equipment
grounding conductor will be of galvanized steel flats / GI wire.
Each large structure and building complex will have a ground loop around its
perimeter. The ground loops around each structure will be connected to the ground grid.
The fence within the ground grid will be bonded to the plant ground system. The
power plant ground grid will be tied together with the switchyard ground grid.
The grounding system will be connected to all metallic equipment, electrical as well
as non-electrical (except underground pipelines), located at the plant site. All these will be
connected at two distinct points. This will include all structures, buildings, towers, etc.
The chimney and powerhouse building will be equipped with lightning protection.
Lightning protection conductors located on the top of the structures will be connected to the
ground loop surrounding the structures with down comers as per the provisions contained in
the latest issues of Indian Electricity Rules and IS 2309.
1.11

EMERGENCY POWER SUPPLY SYSTEM

A separate emergency power supply for safe shut down of power plant shall be
provided.
One (1) No. of 625 kVA DG sets will deliver power at 415V, 3 phase, 50 Hz, 4 wire.
The estimated capacity of the set will take care of the following loads:

Barring Gears.

Lube oil pumps

Cranking motor or variable frequency drive starting.

Power for Gas turbine generator.

One auxiliary cooling water pump.

Emergency lighting in vital areas.

Fire Alarm Control Panel

Other essential auxiliaries.

Fire Protection Jockey Pump

Emergency DG sets will be provided to cater the loads during emergency conditions.
The DG Sets will be started automatically in case of failure of AC Power. Manual starting
facility from Central Control Room will also be provided in addition to automatic starting.
Necessary diesel storage tank, pumping system, pipe work etc. shall be included in the
scope of the bidder.
1.12

UN-INTERRUPTIBLE POWER SUPPLY SYSTEM

The uninterruptible power supply (UPS) system furnishes a reliable and interruption
free source of required voltage, three/single phase power to equipment/instrument vital for
plant control and emergency shutdown.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

-22-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 Electrical System (contd.)

Two (2) UPS units (2x100%) will be furnished for the Power Plant sized to feed
essential AC loads like DCS and other C&I equipment. The UPS system will be provided
with two (2) nos. 100% capacity inverter.
An alternative 110 V A.C. single-phase source through by pass transformer and
stabilizer is provided through a static transfer switch to feed the vital A.C. loads during the
failure of both the inverters.
1.12.1 TECHNICAL DATA SHEET FOR UPS SYSTEM
SL.NO

GENERAL DATA

DESCRIPTION

Continuous rating

Suitable rating

Quantity

Two Sets.

Location

Indoor.

Input supply

110 V +/- 10%

Output supply

110 V +/- 10%

Input frequency

50 +/- 5%

Overall efficiency

80 ~ 85 %

Inverter Type

SPWM, IGBT Technology

Rating of inverter

10kVA at 0.8 PF

Efficiency of each inverter unit

>90 %

Inverter output Voltage

230 V +/- 1 % NL to FL

Inverter output Frequency

50 Hz +/- 0.1 %

Inverter permissible overload

120% for 10 Min. 150 % for 1


Min

Inverter output Waveform

Sinusoidal

< 2 % for linear Load, Max 5%


for Non-linear load

Inverter no of Static Switch

Two Nos in Redundant


configuration

Transfer time in case of inverter


fault

<1 ms

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.

13.
14.
Inverter total Harmonic Distortion
15.

16.

17.
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

-23-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 Electrical System (contd.)

Transfer time on manual transfer

Synchronous - Break free

Charger Type

FCBC, Constant Voltage with


Charging current Limit.

Charger Efficiency

>90%

Discharging time

60 minutes

Type of battery

Nickle Cadmium

Type of electrolyte in the battery

Potassium Hydroxide (KOH)


Density: 1.19

Type of Cell container in the


battery

Translucent Polypropylene

Permissible overload

120% for 10 Min. 150 % for 1


Min

Degree of protection

IP 42

Paint shade

RAL 7035

18.

19.
20.
21.
22.

23.

24.
25.

26.
27.
1.12.2 UPS DESIGN :
UPS shall be designed to withstand 125% overload for 15 minutes and 150%
overload for 10 sec. The charger shall have necessary features to prevent damage to the
battery. The output voltage shall be stabilized to within specified limits for a given mains
input through out the tolerance limits. Charger shall have adjustable current limiting feature
controlling the output current and the battery current in float and boost mode. Charger output
to the battery shall be passed through a smoothing circuit so that the ripple content is limited
to a value safe for the battery.
The charger shall be designed to boost charge the completely discharged, batteries
in 10 -14 hrs. The changeover between boost charge mode and float charge mode shall be
automatically. Necessary alarms to indicate battery discharged and DC over voltage
conditions shall be provided. The inverter unit shall be designed to operate from the charger
output continuously without use of battery smoothing effect. With the battery connected to
the UPS system, a filter shall be provided at the input of inverter unit to reduce-the AC feed
back from the inverter to the battery to a maximum of 2%. Efficiency of the Inverter shall not
be less than 80% at rated load and pf. The output waveform distortion shall not be greater
than 3%.
The inverters shall be suitable for synchronizing with the mains having frequency
variation of +/- 3%.The inverters shall be delinked when the variation exceeds this and shall
run on its own oscillator maintaining its output frequency to +/- 1 % of 50 Hz. Current limit
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

-24-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 Electrical System (contd.)

protection shall be provided which will protect the inverter against overloads and short
circuits at the output. The current limit shall be adjustable. Once the overload is removed,
the inverter shall automatically resume normal operation.
The inverter output shall have spike / surge suppression filters to protect the loads
By-pass transformer shall be natural air-cooled type suitable for indoor location. Links shall
be provided on 415 V windings to give offload tapings of +/- 2.5% & +/- 5% of normal
voltage.
A manual Bypass switch, make before break type, shall be provided to take the
system out for maintenance without interrupting power to the load. The switch shall be
mounted in the inverter section. The enclosure to be of IP 3X or better The SUPPLIER shall
ensure that neutral of the all transformers are solidly connected to earth to ensure that the
potential between earth and neutral is zero at all conditions.
1.12.3 PRINCIPLE OF OPERATION:
The uninterrupted power supply system shall be complete with chargers, inverters,
static switches, by pass transformer with Automatic voltage regulator and manual bypass
switch. Normally the system will supply the load in UPS mode. In case of any trouble with
one of the Inverter Sections, the load shall be catered by the redundant system if both the
inverters fail, loads shall be transferred to the bypass transformer without any interruption.
A manual by pass switch (make before break) shall be provided to isolate the
inverters and static switches for maintenance. When it becomes necessary to boost charge
the battery (i.e. when the battery has discharged during mains failure), the charger shall be
set to the boost mode automatically. The rectifier section shall now cater for boost charging
the battery and at the same time supplying the inverter. After completion of boost charging,
the charger shall be reset to float mode automatically. It shall be possible to run the system
at rated load for one hour and at about 75% load continuously without any damage in case
of failure of cooling fans.
The following minimum requirement loads shall be considered for the UPS system
design.

DCS system cabinets

PCC panel

All LT MCC panel

VFD panel

Fire fighting panel

Communication system

11KV switchgear

3.3KV switchgear

Generator relay panel

Metering cum synchronizing panel

Turbine control panel

Turbine gauge panel


HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

-25-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 Electrical System (contd.)

1.13

Switchyard control panel

Transformer control panel

SWAS system panel

Field instruments

CEMS panel

Annunciator panel

AHS PLC control panel

FHS PLC control panel

DM plant control panel

CABLE TRAY:

Prefabricated ladder type/ perforated type cable trays shall be used for laying of
cables in cable trenches while routing cables along technological structures etc. Cable trays
shall be galvanized after fabrication.
Ladder type cable trays shall be fabricated by means of 2.5mm thick hot rolled sheet
for longitudinal members and cross members. The cross members shall be placed at an
interval of 250 mm along the length of the rack with 30mm slotted holes for cable clamping
purpose. Width of the rung shall be 50mm and above. Cable tray ends shall be suitable for
connecting the jointing plates. The cable trays shall be of widths 300mm, 450 mm, 600 mm
and 900mm. The ladder type racks shall be used for power and control cables.
Perforated type trays shall be made of 2.5 mm thick mild steel sheet. Perforated trays
shall be used for instrumentation and signal cables. The cable trays shall be of widths
50mm, 100mm, 150mm, 300mm, 450mm, 600mm and 900 mm.
All installation accessories/ fittings required for the cables trays/ conduits shall be
supplied to suit actual requirement at site. All cable accessories shall be hot dip galvanized.
The size and assembly of cable trays shall be as per our enclosed drawing.
The cable tray system shall be suitable for fixing of vertical and horizontal supports of
structural steel with ISMC 100 channels or 50 x 50 x 6 mm angles for vertical members and
50x50x6 mm angles for horizontal members. The supports shall be provided at an interval of
1500 mm for horizontal runs and 1000 mm for vertical runs.
1.13.1 Accessories for cabling :
Cable accessories like cable glands for various size of the cables (The no of glands
lugs, sleeves shall be as per the load list), lugs, Sleeves and termination of various LT loads
both panel and motor ends.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006

-26-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION

ANNEXURE -6 ASH HANDLING SYSTEM & AUXILIARIES


1.0

DESIGN BASIS FOR SYSTEM

1.1

BASIC DETAILS OF DRY DENSE PHASE SYSTEM:


Following are the basic details of the proposed ash handling system for CFBC.
Description

Details

No of boilers and
capacity

1 Nos of CFBC boiler of capacity 195TPH

Fuel combinations
used in boiler

1. 50% Washery rejects, plus 50% Indian coal


2. 50%Washery rejects, 25% Indian coal, 25%
Indonesian coal
3. 25% Washery rejects 50% Indian coal, 25%
Indonesian coal.

Ash collection points

2.0

Furnace, Cyclones, Eco/APH and hopper below the


ESP fields.

THE SCOPE OF SUPPLY FOR THE ASH HANDLING SYSTEM SHALL


INCLUDE BUT NOT BE LIMITED TO THE FOLLOWING:

The following scope of supply for the ash handling system shall include but not be
limited to the following.

Companion flanges at Boiler ash hopper, transition hopper from purchaser


ash hopper to ash vessel etc., with bolts and nuts as required.

Suitably sized pressure vessel in each hopper bottom in which material is


thoroughly fluidised such that the discharge flow characteristics resemble
those of a liquid.

Ash conveying arrangement under each hopper suitably designed for the
quantities and characteristics of ash.

Supply of materials like standard structural steel, pipe supports, paint etc.

Ash piping work for complete system that is resistant to the abrasive
qualities of ash when it is transported at its design conveying velocity and
matching accessories including couplings, adaptors and expansion joints.
The following numbers of ash pipe lines shall be provided from boiler to
the ash silos.
For Boiler bottom / furnace ash one full capacity lines connected to all
the ash discharge points below the boiler and upto the bottom ash silo.
For cyclone ash from each boiler one line connected to the two
cyclones ash outlets at the boiler and upto the respective fly ash silo.
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-1-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure 6 Ash Handling System & Auxiliaries (Contd.)

For APH / Economiser one ash pipe line from the APH / Economiser
hopper to the respective fly ash silo.
ESP all lines from the ESP ash hopper to the respective fly ash silo.
Abrasion resistant type Pipe fittings like Lateral, Elbow or Tee as
required changing direction or diameter.

Pneumatic piping interconnecting the compressor, air receiver, receiver


outlet to the required points complete with supports, accessories, various
traps, strainers, etc., as required.

Ash storage silos of RCC construction one no for boiler bottom ash and
one number for fly ash. Capacity of bed ash silo 150 m3 and Capacity of
fly ash silo 600 m3.

All ash conveying lines, vent fans, dust collectors aeration blowers and
level indicating instrumentation etc.,

Pocket feeder below the silo to transport ash to dust unloaders.

Dry dust unloaders or pug mill unloaders on the silo at elevated level
above ground to allow access to ash transport vehicles below with water
spray arrangements.

Lubricated screw type air compressors with oil and moisture separators of
required capacity complete with required number of air receivers of
adequate capacity complete with valves and accessories.

Compressors including standby complete with drive motors, related


instruments, auto start/stop, load in/unloading facility etc.

Power distribution board for the solenoids, small drives complete LT power
cabling, control cabling and above ground earthing of all equipment etc.,
except compressor power feeder.

Other items.

Commissioning spares as required.

Consumables for erection and commissioning.

Special tools and tackles that is required for maintenance of this system.

Spares for 2 years, which are recommended by the supplier.

Complete instrumentation and control for the system including dedicated


PLC located at the Field Control Panel, cabling from Field Instruments to
the Local Control Panel. AHS System shall be selected both in Manual
Mode / AUTO Mode at the Local Control Panel.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-2-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure 6 Ash Handling System & Auxiliaries (Contd.)

Communication with DCS for monitoring control sequence & other critical
parameters will be through built-in Communication port available in the
PLC. Data communication to the DCS will be through special cable
(Modbus Communication cable). Memory mapping details will be furnished
by the PLC supplier to interface with DCS.

3.0

DESIGN AND CONSTRUCTION

3.1

Design of the system has to adequately cover for anticipated variations and be
capable of handling the worst scenario. System has to be environmentally friendly,
reliable with least maintenance problems and energy efficient.

3.2

Design shall use positive pressure to utilise a blow tank to collect the material
before being transferred into the pipeline in batches. With dense phase systems, a
controlled use of both air pressure and volume shall push the batch of material
from the blow tank and into the pipeline in a plug flow form.

3.3

The systems shall use low volume, medium pressure air stream and shall rely on
a continuously expanding volume of air pushing cohesive slugs of material along
the pipe. This system shall use a transfer vessel/pump tank to feed the material
into the conveying line. It is a batch system with plugs of material separated by
cushions of air.

3.4

The compressor shall work on load / no-load basis. Whenever conveying is in


progress, the compressed air shall be fed by conveying air compressor through air
receiver. When there is no material available in the hopper and conveying does
not take place, compressor shall switch over to no-load condition for saving
power.

3.5

The silo shall have ash collection equipment on the roof and a fluidizing system on
the floor of the silo.

3.6

Two telescoping dry dust chutes to unload the stored ash into enclosed bulk
tanker trucks. These chutes shall have a venting system to return displaced air
from the trucks back into the silo.

3.7

Complete energy balance analysis shall be taken into account for designing
maximum and minimum lengths of horizontal run of pipe from all pickup points to
the silo.

3.8

Initial and final pipeline internal diameters shall be designed with minimum
velocities maintained throughout all conditions and when conveying from all
pickup points and nominal differential pressures from pick-up points to disposal
point.

3.9

Vent filter of silo shall be bag filter mounted over an opening on an ash storage
silo that typically vents to atmosphere. It shall filter out dust from displaced air
exiting the silo. The bag filter shall be sized to simultaneously handle all potential
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-3-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure 6 Ash Handling System & Auxiliaries (Contd.)

incoming air sources. Typically, the filter bags shall be "jet-pulse" cleaned. Silo
vent filter bag cleaning shall be continuous.
3.10

Pipe line support structure shall be as per the standard.

3.11

Valve access door shall be provided in each chamber for ease of maintenance
and inspection.

3.12

Flapper style gates shall swing completely out of material flow path to minimise
component wear.

3.13

Wear back fittings shall be provided to have plain-end and shall be removable for
pipeline inspection.

3.14

Bellows Expansion Joints shall be inserted in long pipe runs and before ash
collection vessels to accommodate thermal expansion.

3.15

Velocity in ash conveying pipelines shall be less than 2 m/sec.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-4-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION

ANNEXURE-7 DM PLANT, AUXILIARY COOLING WATER SYSTEM,


VENTILATION SYSTEM & FIRE FIGHTING SYSTEM
1.0

DM WATER SYSTEM

1.1

PLANT CAPACITY
All equipment shall be designed for the atmospheric conditions. Maximum and
ambient temperatures shall be considered for design of equipment and systems as it is
proposed to operate under extreme conditions. The demineralisation (DM) plant
production parameters shall be as follows:
Capacity of DM plant, m3 /hr

Service cycle hr/day

20

Net output per day, m3 /day

160

No. of streams

No. of regeneration per day

1.2
1.2.1

WATER QUALITY PARAMETERS


Make up water analysis
Make up water with the following analysis at ambient temperature will be made
available by purchaser at inlet to raw water storage tank to be provided by EPC
contractor..
S.No

1.3

Parameters

Concentration

pH

Methyl Orange Alkalinity`

270

Total hardness as CaCO3 (mg/ltr)

380

Total dissolved solids (mg/ltr)

500

DM WATER QUALITY
The quality of DM water at mixed bed (MB) outlet shall be as follows:
S.No.

PARAMETERS

CONCENTRATION

pH

7.2 to 7.5

Conductivity, S/cm

0.6 (Max)

Total dissolved solids, ppm

Not more than100 ppm

Total Suspended solids, ppm

NIL

Silica as SiO2, ppm

Less than 0.02

Oxygen as O2

0.007 (Max)

Iron, ppm

0.01(Max)

Copper

0.01(Max)

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006


-1-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Anneuxre-7 DM Plant, Auxiliary cooling water system, Ventilation system, Fire fighting system (contd.)

1.4

Total CO2

NIL

10

Free chlorine

NIL

11

Oil

NIL

DEMINERALISING PLANT SHALL CONSIST OF BUT NOT BE LIMITED TO


THE FOLLOWING:
One of raw water tank with accessories.
Two nos. of chlorination dosing system.
Two (1W+1S) nos. of raw water pump with accessories.
One (1) Multi Grade Filter (MGF) with back flush, fast flush recirculation
etc.
One (1) Activated Carbon Filter (ACF) with back flush, fast flush /
recirculation / CIP arrangement, tanks, dosing system etc as required.
One set of RO membrane with back flush, chemical cleaning,
arrangements , high pressure pumps, chemical dosing pump etc.,
Permeate tank and pump with accessories.
One set of conventional DM plant with cation exchanger and anion
exchanger complete with resins and accessories along with degasser
tower with tower packing and necessary accessories.
One (1) mixed bed exchanger complete with resins and accessories and
air blower for mixed bed unit complete with electric motor and
accessories. The same blower shall be used for neutralisation pit air
agitation.
One (1) bulk acid tank One bulk caustic tank and accessories, One (1)
caustic preparation tank with agitator and accessories, One (1) acid
dilution measuring tank one (1) caustic dilution /measuring tank with
agitator etc with Two (2) acid unloading pumps
Air grid, lime tank with hand operated agitator, priming tank, etc. for
neutralisation pit.
Chemical dosing system complete with, chemical solution tank and pump
and accessories which includes foot valve with strainer fitted on pump
suction assembly, tank level switch, etc. to improve pH value of DM
water from normal 7.2 to 8.5 during initial boiler filling and
commissioning.
2 Nos. DM water storage tanks each of capacity 100 cum MSRL or FRP.
Interconnecting pipe work complete with valves, fittings, supports and
accessories including air agitation grid in neutralisation pit.
Level switches, level gauge & level switch interlocks for all storage tanks.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006


-2-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Anneuxre-7 DM Plant, Auxiliary cooling water system, Ventilation system, Fire fighting system (contd.)

Flow meter, Pressure gauges, flow indicator cum totaliser, on-line PH


indicator (1), and on-line conductivity indicator two (2Nos).
Set of foundation bolts for equipments under scope of supply.
Supply of motors for all rotating equipment in the scope of this
specification is included in the scope of this contract.
The scope of supply includes all field mounted gauges, sample points for
pH/conductivity measurements, all primary elements, field mounted
electronic units for pH and conductivity measurements, flow meters,
protection & interlocking system and associated initiating devices viz.
level switches etc., for start /trip pumps.
2.0
RAW WATER & AUXILIARY COOLING WATER SYSTEM
The raw water as per analysis given elsewhere in the specification will be
supplied by purchaser at the inlet of the raw water tank of capacity 2000 cum to be
provided by the bidder. Bidder to include necessary raw water treatment facilities as
required in their offer.
Auxiliary cooling tower shall be of the mechanical induced draught type with
counter flow arrangement. The cooling tower size shall be as per the design requirement
atleast 1000 m3/hr with two cells of capacity of 500 m3/hr each. The basin shall be of
RCC and storage capacity at least 20 mts.
The cooling water shall be pumped to the turbine oil coolers, generator air
coolers, water / steam sample coolers in Boiler, ash cooling system and compressor
cooling etc.
The system consists of two numbers of recirculation centrifugal water pumps with
strainers isolating valves of NRVs with required pressure gauges.
The underground pipe lines shall be properly insulated with proper coating or
painting.
The scope included complete cooling tower with accessories, cooling fans
diffusers, water pumps motors with required valves and instrumentation.
3.0
VENTILATION SYSTEM
The Ventilation system covers Air Conditioning System in TG Control room and
Ventilation System for TG MCC room, PCC room with required air changes.
Pressure Ventilation System also recommended for electrical room at FHS, TG
building as required.
The following design conditions to be achieved in the various areas,
a.

Air Conditioning System for Control room,


Temperature: 22 2C
Relative humidity, Max: 55 5%

b.

Ventilation System for various electrical room,


Temperature, Max: 5C over the ambient temperature.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006


-3-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Anneuxre-7 DM Plant, Auxiliary cooling water system, Ventilation system, Fire fighting system (contd.)

Window model split or package air conditioners shall be of standard reputed


make suitable to meet the requirement as per the standard shall be provided.
Integrated air ventilation system for electrical room with AHU adequate fan
capacity & suitable ducting shall be recommended. The maximum positive pressure shall
be +5 mmWC.
Ventilation system of having throw fans and exhaust fans for required capacity
shall be considered for TG hall. Required quantity of roof exhausters with required
capacity of air flow shall be selected for TG hall.
Man cooler shall be provide in TG hall in ground floor, 5 mtrs Floor and TG hall
to maintain good ventilation with required air changes.
4.0
FIRE FIGHTING SYSTEM
The system covers protection, alarm, and detection fire fighting system required
for various units of the power plant.
Water based fire hydrant system with pipe work, hydrants, hose, and hose reels,
hose cabinet branch pipe coupling hydrant valves and other accessories and auxiliaries.
One AC pump (270 m3/hr), Two (2) jockey pumps each of 10 cum/hr and one diesel
pump of capacity 270 cum/hr shall be provided with valves auto start and stop control to
pump, the water where ever required from the pump house near raw water tank. Hydro
pneumatic tank and compressor shall be provided as required. The water hydrant
system covers complete power plant area.
MVWS is recommended for coal conveyor with all accessories and auxiliaries
and necessary instruments for auto water spray.
HVWS system is recommended for GT transformer with all necessary
accessories and auxiliaries.
Portable fire extinguishers are recommended for TG hall, TG control room, TG
MCC room and other MCC rooms. As per the requirement, the size, type and capacity of
the fire extinguisher shall be designed as per location, convenient and requirements.
Fire detection and alarms shall be provided in TG building MCC room and other
MCC rooms and main control room.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI-600 006


-4-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION

ANNEXURE 8
INSTRUMENTATION & AUTOMATION SYSTEM
1.0
1.1

DESIGN BASIS OF DCS

The following shall be basis for design of the instrumentation and control
systems for the CPP

Steam Generator System (CFBC)

All field Instruments from the different locations will be wired & terminated
up to the local junction box by the boiler supplier. The supplier will furnish the JB
internal wiring details. The junction boxes shall be located at floor wise in the
boiler area depending on the requirement.
From the local junction boxes multi core cable will be laid through the
cable tray to the DCS marshalling cabinet. Scope of laying cable from JB to DCS
including detailing will be under the DCS Supplier scope.
Operating & controlling the system will be from the DCS station located at
CCR. Initial start-up of the system with all protection interlocks/permissive shall be
from the DCS located at CCR.

Steam Turbine Generator (STG)

All field Instruments from the different locations will be wired & terminated
up to the local junction box by the equipment STG supplier. The supplier will
furnish the JB internal wiring details. The junction boxes shall be located at Floor
wise in the TG building depending on the requirement.
From the local junction boxes multi core cable will be laid through the
cable tray to the DCS. Scope of laying cable from JB to DCS including detailing
will be under the DCS supplier scope.
Controlling the system with protection & monitoring will be from both
Turbine Control Panel (TCP) & DCS Station located at CCR.

Fuel Handling System (FHS)

Controlling the system will be from the dedicated redundant PLC located at
the field control panel. Supply of PLC including cabling from field instruments up
to the PLC shall be in the FHS supplier scope. The Control of FHS shall be
selected through Manual or Auto mode switch which will be located in the local
control panel. Brief write-up on entire FHS operational & control sequence shall be
furnished by supplier.
Communication with the DCS for monitoring the sequence & other
parameters will be through the built-in communication port available in the PLC.
The data communication to the DCS will be through special cable (modbus
communication cable).The Memory mapping details to be furnished by the PLC
supplier to interface the PLC with the DCS. Scope of engineering, detailing &
laying of cable from PLC to the DCS shall be carried out by DCS Supplier.

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE 8 INSTRUMENTATION AND AUTOMATION SYSTEM (CONTD.)

Ash Handling System (AHS)

Controlling the System will be from the dedicated redundant PLC located
in the field control panel. Supply of PLC including cabling from field instruments up
to the PLC shall be in the AHS supplier scope. The control of AHS shall be
selected through Manual or Auto mode switch which will be located in the Local
Control Panel. Brief write-up on entire AHS operational & control sequence shall
be furnished by supplier.
Communication with the DCS for monitoring the sequence & other
parameters will be through the built-in Communication port available in the PLC.
The Data Communication to the DCS will be through special Cable (Modbus
Communication Cable).Memory mapping details to be furnished by the PLC
supplier to interface the PLC with DCS. Scope of engineering, detailing & laying
of cable from PLC to the DCS shall be carried out by DCS Supplier.

DM Plant

Controlling the System will be from the dedicated PLC located in the field
control panel. Supply of PLC including cabling from field instruments up to the
PLC shall be in the DM Plant supplier scope. The control of DM Plant shall be
selected in Manual or Auto mode switch which will be located in the local control
panel.
Communication with the DCS for monitoring the sequence & other
parameters will be through the built-in Communication port available in the PLC.
The data communication to the DCS will be through special cable (modbus
communication cable).Memory mapping details to be furnished by the PLC
supplier to interface the PLC with DCS. Scope of engineering, detailing & laying
cable from PLC to the DCS shall be carried out by DCS Supplier.

ESP

Controlling / Sequencing the System will be from the dedicated


microprocessor based controller located at the ESP Control Room. The supply of
controller shall be under ESP supplier.
Communication to the DCS for monitoring the critical parameters shall be
from the communication port (modbus port) available in the controller itself. Scope
of supply, engineering & laying cable from local controller to the DCS shall be
carried out by DCS Supplier.

Compressed Air System

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-2-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE 8 INSTRUMENTATION AND AUTOMATION SYSTEM (CONTD.)

Start-up / Controlling / Sequencing the System will be from the dedicated


micro-processor based controller at the local controller console. The supply of
controller will be under compressor supplier scope.
For monitoring the critical process parameters, communication to the DCS
will be through modbus communication port available in the controller itself. Scope
of supply engineering & laying cable from local controller to the DCS shall be
carried out by DCS Supplier.

Water System

The entire cooling water pump, auxiliary cooling water, CT make up pump
and DM transfer pumps shall be controlled through the DCS from the CCR.
Auto/Manual selection & the corresponding trip Interlock shall be wired in the DCS
panel itself.
For monitoring the process parameters like level, pressure, flow,
temperature, pH, conductivity, pump running status etc shall be hardwired from
the field Instruments to the DCS marshalling panel by the DCS Supplier. Scope of
supply, engineering & laying cable from local controller to the DCS shall be carried
out by DCS Supplier.

Cooling Tower Monitoring

Control of cooling tower fans shall be from the local control panel in the
MCC. Auto/Manual selection & the safety Interlock shall be wired in the local
panel itself.
Monitoring of critical parameters like pressure, flow, temperature, vibration
alarm, and lube oil level alarm, fan, pump running status etc will be hard wired
from field Instruments to the local JB shall be under scope of package supplier.
Scope of supply, engineering & laying cable from local JB to the DCS shall
be carried out by DCS Supplier. .

Power System

All the HT/ LT Breaker, Switch Gear for 6.6KV & 11 KV etc shall be
controlled from local control panel in the MCC & also from the DCS through
hardwire.
Controlling & monitoring the status of the switch gear & breaker from the
MCC / PCC to the DCS shall be through hardwire.
Monitoring other electrical parameters like voltage, current, PF, etc shall
be wired through Modbus Communication port available in the Panel Indicator
(through Multi Function Meter) itself.
Scope of supply, engineering & laying cable from MCC/PCC to the DCS
shall be carried out by DCS Supplier.
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-3-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE 8 INSTRUMENTATION AND AUTOMATION SYSTEM (CONTD.)

Emission Monitoring System

Monitoring the emission of CO, SO2, Nox, & other important parameters
in the combustion gas & volatile emission will be from the analyzer mounted at
critical location.
The Emission Monitoring System shall be supplied by the boiler supplier.
All critical parameters from these analyzers shall be hardwired to the DCS for
monitoring. In addition to that these analyzers shall also be provided with built-in
modbus communication port.
Scope of supply, engineering & laying cable from MCC/PCC to the DCS
shall be carried out by DCS Supplier. .

SWAS System

Separate analyzing & measurement unit will be mounted in the field for
measuring the parameters like pH, silica, conductivity, dissolved oxygen, in steam
& Feed water.
The SWAS System shall be supplied by the boiler supplier. All the critical
parameters from these analyzers shall be hardwired to the DCS for monitoring. In
addition to that these analyzers shall be provided with built-in modbus
communication port.
Scope of supply, engineering & laying cable from MCC/PCC to the DCS
shall be carried out by DCS Supplier. .

DG Set
Start-up & control will be from the local control panel itself.

Monitoring the critical parameters like DG running status, KW, lube oil
temperature, cooling water temperature etc, shall be hardwired to the DCS.
Scope of supply, engineering & laying cable from MCC/PCC to the DCS
shall be carried out by DCS Supplier. .
1.2

Special microprocessor based instruments such as electronic governor, tri-vector


meters, precision meters which shall be provided as part of the package
equipment supply, shall have RS 485 MODBUS serial interface connectivity and
the DCS shall have MODBUS Protocol converter to acquire data from these
instruments as shown in the system configuration diagram no: HIQ-4036-I&C-01.
Special MODBUS BELDEN Cables for connecting from the instruments to the
DCS shall be supplied as part of the DCS. The approximate cable length is 200
meters.

All the Analog inputs will be categorized into the following:


4 20 mA DC: 2-wire / 4-wire AI - I

For 2 Wire transmitters, powering of


the filed transmitters shall be from the

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-4-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE 8 INSTRUMENTATION AND AUTOMATION SYSTEM (CONTD.)

DCS analog input module.


T/C Thermocouple Input AI T

Compensating
cables
shall
be
provided as part of the field cabling up
to the marshalling cabinet.

RTD 3 Wire AI R

For Pt-100 3Wire RTD inputs

All the analog outputs shall be of 4-20mA DC capable of driving a load of


700 .

All the digital inputs wired to the DCS from the field limit switches,
proximity switches, process switches and MCC contacts will be potential
free and suitable for 24V DC interrogation voltage.

The digital output transmitted from the DCS to the field solenoid valves
and the MCC shall be through potential free relay contacts. Necessary
interposing relays and contactors shall be provided for all the digital
outputs. Modules with built-in relays are preferred and the specification of
the relay contacts shall meet the duty cycle ratings.

Separate marshalling cabinets along with terminal blocks shall be provided


to terminate cable from the field as well as from MCC. The terminal blocks
shall be arranged as per the field cable schedule, which shall be furnished
during detail engineering.

A separate Power supply distribution cabinet shall be provided for


powering the operator stations, system cabinets, marshalling cabinets and
the printers.

The supply voltage for all the sub-system and the workstations of DCS
shall be of 110VAC 50Hz. This supply shall be derived from the UPS to be
provided by purchaser. The tenderer to indicate the maximum power
consumption figure in his offer.
2.0

SYSTEM CONFIGURATION & DESCRIPTION

The DCS shall be inclusive with following subsystems, associated software, &
hardware connected with each other.

Fully redundant Controller, I/O subsystems for Closed Loop Control, Open
Loop Control (Sequential/Protection/Interlocking), Data Acquisition & SOE.

Operator Interface (HMI)

Communication & Data Highway (fully redundant)

Subsystem for Third party Interface

Power supply subsystem (fully redundant)

In case of client server system, it shall be fully redundant at server level


with redundant power supply for each other
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-5-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE 8 INSTRUMENTATION AND AUTOMATION SYSTEM (CONTD.)

Control/Communication facility to Turbine Governing System, Energy


Meter, OPC Server MIS, SCADA Terminal with RS-485 Link

Controller & IO subsystem capable of performing the following functions

CLCS

OLCS (Sequential / Protection & Interlocking)

Data Acquisition

SOE with 1 m sec resolution

Third Party Integration using standard protocol like Modbus MasterSlave/Modbus RTU or through Ethernet to the Data Highway

The system configuration shall be as per the drawing no. HIQ-4036-I&C-01 titled System
Configuration Diagram enclosed to this specification.
This power plant has been unit wise classified in to the following for the purpose of
DCS.
SECTION: CFBC ,STG & BOP

The DCS has been configured in the functional distribution concept having
separate field control sub-system section wise (FCS 1 ~ 3) for section respectively to
perform the monitoring, closed loop and sequential, protection and interlocking logics as
per the requirements.
The DCS supplier shall offer the system such that only FCS 1 to 3 is provided for
the CFBC Boiler, STG & other associated systems.
The configuration shall have the concept of distributed database (station based)
and global access. Configuration with server /client architecture with global database and
global access are not preferred.
The system configuration shall consist of the following sub systems and operator
workstations as shown in the configuration diagram.
i)

FCS - 1 ~ 3

Field Control Sub-system for the CFBC ,TG &


BOP

ii)

EWS - 01

Engineering cum Operator work Station 1

iii)

OWS

Operator Stations 1 to 3.
Alarm and report printers for FCS 1& 3 (DMP
Type)

iv)

PR-1 to PR-4

Printer 3 for ES (LASER Type)


Printer - 4 for Engineering Station (LASER
Type)

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-6-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE 8 INSTRUMENTATION AND AUTOMATION SYSTEM (CONTD.)

v)

NX- 1 &2

High speed, redundant fast Ethernet data


highway network consisting of Ethernet
switches.

The system offered shall be from latest series introduced to the market by the
tenderer in the last 2 years and systems that are old by more than 5 years are not
acceptable even though improvements/up gradations are made to the system.
The system offered shall be from the same nativity of Processor, I/Os and
Software packages developed exclusively as a total system. Configuration with hybrid
components or software packages is not to be offered.
The Tenderer to configure the system, based on the I/O List. While configuring the
system, the following design aspects are to be considered.
The system components shall be identical as far as possible with high degree of
inter changeability and flexibility.
System with minimum types of modules shall be preferred. The Tenderer should
list out all the types of modules envisaged in the configuration diagram separately in the
offer.
The system offered shall be suitable for upward expandability for future
expansions and additions. This expandability should be ensured with respect to Operator
stations, FCS and also for the software modules to handle the process point tags. The
Tenderer to indicate clearly the maximum permissible boundaries of the system offered
with respect to hardware and software.
The redundancy shall be provided in all levels. Except the I / Os modules and the
redundancy shall be true to the extent that any single failure in the system should not
affect the continuous operation of the system except the I/O.
3.0

SCOPE OF SPECIFICATION

DCS panel shall be supplied as per specification. The parameter indicated in


design basis shall be strictly followed for design of items covered under the scope of this
tender. All items required for performance of DCS within the battery limit shall be included
in the scope of supply. All design and engineering of the items and systems covered
under this tender shall be included in the scope of work.

3.1

FUNCTIONAL SPECIFICATION:

This section furnishes requirements for the various hardware modules and
software packages of the DCS. The configuration may be categorized in to the following
five major sections and the functional specification requirements for each of these
sections are furnished below:
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-7-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE 8 INSTRUMENTATION AND AUTOMATION SYSTEM (CONTD.)

3.2

1.

Field control sub systems

2.

PC based engineering and operator workstations

3.

Interconnecting data highway network

4.

System & Marshalling cabinets

5.

Software packages

FIELD CONTROL STATION (FCS):

The FCS offered shall be of rack-based system with passive back plane type for
better reliability. Complete manufacturing including shop testing.
The field control stations offered shall be complete with mounting racks, processor
units, input/output modules, interconnecting data cables and other accessories like
terminal units etc.
3.3

MOUNTING RACKS:

The mounting back plane shall be of passive type without any electronic
components embedded on the back plane .The power supply for the system and field
interrogation shall be injected to the back plane from the external power supply sources
preferably of 24Vdc. Generally systems with rack power supply modules are not preferred
and in case system with rack power supply modules are offered, the power supply
modules shall be redundant in 2 X 100 % capacity for each I/O rack.
The spare requirements for the system are to be taken in to consideration as
follows:

The I/O Table: The DCS I/O list enclosed to this specification provides the
complete I/O counts including SOE inputs for actual requirements as well
as the channel spares to be provided.

Actual requirements: Under this category the actual requirements of the


inputs and outputs are given for each process section to perform the
complete operation of that particular unit.

Spare capacity: Under this category, the installed spare capacity in terms
of inputs and outputs shall be 10% for each type. For this capacity
complete hardware, software modules, power supply units, interposing
relays/contactors, terminal blocks, interconnecting wiring etc., shall be
provided as part of the system and this installed spare capacity is readily
usable with minimum field wiring connections for future spares or
additional requirements.

The Table: B furnishes the no. of channels required for each section and
separate mounting racks shall have to be provided for each process
section as per the I/O list. While sizing the mounting rack requirements,

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-8-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE 8 INSTRUMENTATION AND AUTOMATION SYSTEM (CONTD.)

10 % spare slots or 1 slot in each rack whichever is higher is to be


provided as slot spare.

3.4

The racks shall be exclusive for each unit and mixing of I/O channels in the
racks is to be avoided.

CONTROLLER UNIT

The processor shall be of high speed, 32 Bit, latest state-of-the art technology with
powerful instruction set. The processor shall have advanced features for high speed
processing, power and flexibility to perform application and communication oriented task.
The processor shall be provided with memory of flash RAM type with minimum
capacity of 64 MB. However the memory of the system shall be sized such that the
loading of the memory is only to the tune of 60 to 70% after loading all the programmes.
The system shall have standard features like automatic error detection and
correction, watchdog timers, Status indications, self-diagnostic routines for fault finding
and reporting up to I/O level.
The processor & memory loading on the main controller, I/O cards, and
communication processor shall not exceed 60% under the worst loaded condition &
taking 10% I/O requirement of the future.
The Controller shall be able to operate in manual, auto, cascade mode.
The processor shall be provided with hot stand-by redundant configuration with
dual processor units with high-speed fibre optic data link between the processor for data
exchange.
Each processor shall have redundant, isolated high speed data network link to
connect to the data highway network in cross link configuration. System with dual
communication modules with redundant data link connected thro the cross-link
configuration is preferred.
The system shall permit positioning of the primary and secondary processors in
different mounting racks to achieve the back plane redundancy
The hot stand-by configuration shall functionally meet the following requirements
and the same is to be demonstrated during FAT.

Both processors shall hold the same programme in its memory at any point
of time and any programme change done on the primary processor shall
automatically get transferred to the secondary processor thro the highspeed data link.

The programme loading can be done only to the primary processor and
the secondary processor cannot be accessed separately in hot stand by
mode.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-9-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE 8 INSTRUMENTATION AND AUTOMATION SYSTEM (CONTD.)

The change over from the primary processor to the secondary processor in
case of failure of the primary processor shall be bump less and balance
less. The failure of the primary processor shall have to be diagnosed and
reported in the system.

The redundant data link provided in the processor shall work


independently in redundant configuration and failure of any one link will not
initiate the hot stand by change over process.

The failure of any of the data link connection shall be diagnosed by the
processor and reported to the system.

When the Secondary processor takes over on the failure of the primary
processor, the status of the secondary processor shall automatically
change from secondary to primary without any operator initiation. Once the
failed primary processor gets rectified and replaced, this new processor
will get assigned as secondary processor without disturbing the continuous
functioning of the working processor

The hot stand-by redundancy offered for the field control station shall have
the feature of segmental redundancy concept considering the processors,
communication links, power supplies etc as a redundant pair. With the
segmental redundancy concept failure of any component in a pair will
make the other component to take care of the failure without the change
over of the whole set.

For example the failure of the one communication link or the module will
make the other link or module to work in the same processor or the
communication module instead of changing over to the stand-by processor
or communication module as a whole. This concept reduces the probability
of failure for changing over and hence enhances the availability of the
system.

The components, which are responsible for the change over initiation, shall
have to be replaced without shutting down the system.

The processor units shall be provided with status indication lamps with flashing
and colour changing features for the purpose of diagnostic and to indicate the transition
steps involved during the change over process.
Since the system is for a captive power plant, the system offered shall have built-in
SOE function integral to the system and the time base for the whole system shall be from
single FCS processor clock source selectable and all the other FCS and the operator
stations shall be time synchronized to master source. All the SOE, alarm and trending
points are referenced to this master source.
Requirement of scan times for the various inputs are indicated below:

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

- 10 -

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE 8 INSTRUMENTATION AND AUTOMATION SYSTEM (CONTD.)

The scan time includes the time for scanning the input, A/D conversion, signal
processing and control and outputting as followed

3.5

Protection & Interlock for Digital Signals

250 msec.

Digital Signals

100 msec.

Analog Signal (Std Closed Loops)

100 msec

Analog Signal (Critical Closed Loops)

250 msec

Analog Signal (Open Loops)

500 msec ~ 1 sec

Digital Inputs (SOE)

1msec with time stamping

Self Diagnosis
The System shall have an extensive set of self diagnostic features such that
any failure detected shall be displayed on the operator screen.
At local level, failure mode in any subsystem shall be monitored by an
individual LED.
Diagnostic software shall have the capability to provide information about the
failed module.
Diagnostics feature to display the sensor condition.

3.6

Input / Output Subsystem


The IO Modules shall be mounted in the IO racks with redundant link to the
Controller.
The maximum number of inputs/outputs per I/O Module shall be as per
following:
Sl.No

Type of Module

No of I/O per module

Analog Input Module

16

RTD Module

8 /16

Thermo-couple Module

8 /16

Analog Output Module

8 /16

Digital Input Module

16 /32

Digital Output Module

16 /32

The Complete system I/O summary has given in the Annexure-2

The IO Module isolation shall be electrically isolated from external circuit


preferably Optical type.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

- 11 -

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE 8 INSTRUMENTATION AND AUTOMATION SYSTEM (CONTD.)

3.7

On line replacement of IO modules shall be possible without influencing


other logic function.

All modules shall have self diagnostic feature with LED indication

Analog Input modules shall be capable of accepting 4 ~ 20mA DC & shall


provide 24 Vdc power to the field transmitter. However when 4-wire
transmitters are used the modules shall be capable of accepting
4 ~ 20mA DC isolated signal.

RTD modules shall be capable of accepting RTD, Pt-100 signal that shall
be individually configured.

Thermo-couple modules shall be compatible for various types of Thermocouples like J, K, R, S, T, E, B or N with cold junction compensation.

AO Modules shall have following default option upon failure of the card to
receive fresh output like Hold last value / predefined value from processor
module.

AO Modules shall be capable of driving up to 700 total loop resistance at


4 ~ 20mA DC.

DI Modules shall accept the input voltages at 24 Vdc.

DI signal shall be through fused TB with LED indication.

DO Modules shall be capable of driving the auxiliary contactors in the


MCC

Interposing relays shall be externally mounted type. All DO have to be


protected through fused TB with LED indication & the contact rating shall
be 110V AC/ 5 Amps.

The Interposing relay boards to be connected with redundant power &


neutral connection.

All AI / AO modules shall have channel to channel isolation with noise


filtration circuit.

Engineering and Operator Workstations

The Engineering and Operator workstations of the DCS shall be identical and
interchangeable. These machines shall be of Business Grade PC units from reputed
MNC Brand and shall be complete with processor, memory, power supply, bulk memory
units, high resolution colour monitor, key-board, mouse, communication interface
modules, etc., along with necessary system software modules.
The work stations shall be of the latest configuration available in the market at the
time of delivery of the system and shall have the following minimum features

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

- 12 -

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE 8 INSTRUMENTATION AND AUTOMATION SYSTEM (CONTD.)

Core 2 Duo Processor or higher family with 32 bit processor having


minimum speed of 3.0 GHz with working memory (RAM) capacity of
min 2 GB.

High-resolution 22 digital LCD colour monitor (Flat Screen) with minimum


pixel resolution of 1024 x 780.

Bulk memory units (HDD) of not less than 160GB.

One no CD ROM- Drive unit for Operator Station

One no CD Read/Write unit for Engineering Station

Dual ETHERNET 100 MBPS interface modules for connecting the data
highway network and one no ETHERNET interface module for connecting
to the higher-level information network in future.

Console type sheet steel enclosures for mounting the monitors, keyboard,
mouse and the CPU unit of the PC stations.

Engineering and operating workstation console desk shall have furniture


arrangements with ergonomic chairs, considering safety and comfort.

The workstations shall be operating using the latest Windows XP platform.


Tenderer shall furnish details of the workstation along with the operating system, in his
offer clearly.
3.8

OPERATOR STATION DISPLAYS


The Operator Station shall be configured with following displays.

Overview Display that shall accommodate minimum 12 groups.

Group Display that shall have loop displays in groups of 8.

Trend Display capable of supporting instantaneous trends of minimum


8 variables either in Historical or Real time up to 200 points in each
console with store-up for a period of one month.

Alarm Display shall be in chronological order with the most current alarms
appearing at top of the display page that can handle minimum 200 alarms

Event Summary shall be possible to store minimum 20000 messages with


archiving facility to log comments for the same occurrence.

SOE Summary

Control Strategy / Logic Displays shall be possible during run time.

Status Display shall be capable of displaying Communication network


status & Module status.

Pop-up faceplate shall be available without additional engineering in a


plant graphic display.
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

- 13 -

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE 8 INSTRUMENTATION AND AUTOMATION SYSTEM (CONTD.)

3.9

Engineering Station Display

3.10

Graphics shall be dynamic & interactive.

The Engineering Station offered shall provide following functions both online & off-line.

System Configuration

Controller Configuration

Fault diagnostics

Modification / Addition of Control Loops

Generation / Modification of Graphics/displays/logs & reports

Programming of controllers

Database configuration including configuration of all displays

Automatic downloading of the configurations.

Configuration of various control functions / Alarm settings/Tuning

Defining the key lock functions

On-line Compilation of all types of dynamic graphic displays

Plant/Alarm group inhibit function

Preparation & compilation of logs/reports/historical trend points

Detailed self diagnostic displays

It shall be possible to save all data & configuration data to all modules
from single location

On-line simulation on testing shall be provided without disturbing the


plant process.

Communication Subsystem

It shall be a digital communication bus that provides high speed data


transfer.

It shall be dual redundant & active at all times.

The transfer to the redundant back-up device shall be automatic in case of


main bus failure without affecting the system operation.

It shall be possible to switchover the communication from main bus to the


redundant bus without disturbing the system operation

Error checks & control shall be transparent on communication system by


cyclic redundancy check / any other advanced codes.
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

- 14 -

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE 8 INSTRUMENTATION AND AUTOMATION SYSTEM (CONTD.)

3.11

3.12

If the system is based on client server architecture then switched to be


used at every point of communication, as required. Hubs are not accepted.

Ethernet (for top layer) at any point of time to be loaded to the extent of
20 ~ 25% only.

Ethernet card shall be 32bit concurrent processing card confirming to


IEEE 802.3, BNC port/UTP port & 910 base T, TCP/IP protocol.

Power Supply & its Distribution

110V AC,50Hz,Single Phase UPS & 230V AC, 50Hz Single Phase normal
Supply shall be made available at any one point in Control room from the
Purchasers scope.

The distribution network for AC power shall be designed such that a single
power fault at any branch shall not cause a trip of any other branch.

Power distribution network shall use bus bars of adequate capacity with
MCB in each branching.

All system cabinet / marshalling cabinets lighting shall be rated for 230V
AC, 50Hz Single Phase normal Supply

Power supply module shall accept 110V AC & convert to + 24V dc through
SMPS. Module shall generate all DC voltage levels required for the
system

Each Controller & IO rack shall be provided with redundant Power module
with surge protection devices.

Bulk power supply to be loaded to the extent of 60% only

Each System cabinet to be designed for redundant 110 Volts UPS input
supply from Purchasers main Distribution Board.

PRINTER

Two nos (Dot matrix) Printer, Black and white 132 column dot matrix type printers
for printing alarms and event logging shall be provided. This printer shall be connected to
the print server unit which in turn connected to the data highway unit as shown in the
configuration diagram such that this printer shall be available to all the PC stations.
Two nos Colour laser printer (A4 size) shall be provided for printing logs, reports
and also for printing hard copies of displays. This printer shall also be connected to the
print server unit, which in turn connected to the data highway unit as shown in the
configuration diagram.
Suitable printer trolleys for mounting the printers shall be provided.
Consumables required such as printer papers, cartridges etc., required during
installation, testing and commissioning for both the printers shall borne by the Tenderer.
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

- 15 -

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE 8 INSTRUMENTATION AND AUTOMATION SYSTEM (CONTD.)

After successful commissioning of the system consumables shall be provided for a


minimum of three months operation.
3.13

FAST ETHERNET DATA HIGHWAY NETWORK

The PC based workstations and the Field control sub systems (FCS) are networked with
a redundant fault tolerant high-speed control data highway network as shown in the
configuration diagram. The control data highway shall be of high speed Ethernet open
network and systems with proprietary type network are not acceptable. The data highway
network shall have the following main features:

Bus topology of network architecture with high speed Ethernet Backbone


through redundant fast Ethernet manageable L2 type switches .The
network shall have cross-link independent connections to each node on
the network.

Communication medium shall be of high quality data cable with speed


transmission not less than 100 MBPS.

Communication method shall be of Ethernet conforming to IEEE 802.3


standard

The redundant buses shall concurrently share the traffic load and in case of failure
of one bus, the other shall cater to the full traffic demand. The transfer shall bump less.
3.14

SOFTWARE MODULES AND SOFTWARE DEVELOPMENT

The software modules and the software development work to be carried out for
DCS and the HMI stations shall include but not be limited to the following:

3.15

System software modules

Application software modules

Software at FCS

Software development

System Software Modules

The System software shall include the following

MMI runtime & development software

Controller runtime & development software

Communication software

Self diagnostic software

System shall be supplied with following software

Development software with runtime software for the MMI interface.

Software for programming controller subsystem


HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

- 16 -

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE 8 INSTRUMENTATION AND AUTOMATION SYSTEM (CONTD.)

MS office (latest version) with database in Relational Data Base


Management System (RDBMS)

System software & MMI software shall run on windows OS

Minimum features of MMI development software & controller subsystem


programming software shall be

On line programming

On line programming modification

Input / Output disable / force facility

Logic monitoring

Graphic capability

Alarm printing

Documentation

Log report generation & it shall be in excel format

Controller runtime software & MMI runtime software shall be copied on the CD &
two nos of the same shall be delivered with the system including licence.
Controller development software shall have the programming languages as following.

Function block

Sequential flow chart

Ladder logic

The System shall be widows based & shall be possible to take reports on the
forcing done on the controller.
3.16

Application Software Modules

This includes the Human Machine interface HMI software package with powerful
utilities to perform the functions like database generation, process graphic displays with
dynamic data update, alarm and event logging, report generation etc., Process graphic
application symbol shall preferably ISA standard. The application software modules shall
be compatible to the WINDOWS XP environment. The software modules shall have the
following minimum features:

Dynamic data exchange capability.

Open data base connectivity supporting SQL for higher-level interface.

OPC server connectivity on the Engineering work station for higher-level


data interface.

In-Built performance calculation packages to perform the efficiency


calculations of the Boilers, Economiser, TG, and condenser. The tenderer
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

- 17 -

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE 8 INSTRUMENTATION AND AUTOMATION SYSTEM (CONTD.)

shall elaborate in his offer the various performance calculations available


as part of the system with supporting catalogues for the same.
3.17

Software at FCS

The Field Control station shall have powerful instructions and function
blocks for complex control loops facilitating effective analog signal processing. The
software shall have the following features:

3.18

On-line editing and down loading of the programme.

On line upload of the programme from the FCS processor for review and
editing.

SOFTWARE DEVELOPMENT

The Tenderer shall be required to develop job specific application software


modules using the utility packages. This shall include but not limited to the following:
i)

ii)

Database generation (for each work :


station)
Process graphic mimic displays with :
dynamic graphic definitions

iii)

Alarm monitoring, trending and :


reporting
(for
each
Operator/
supervisory work stations)

iv)

Hourly, shift and daily log formats

As required

Approximate 25nos

As required
5 nos.

:
v)

5 nos

Shift, daily and monthly report formats


:

vi)

Control logics programming for closed


loops,
open
loops,
sequential,
protection and interlocking logics as
per the process requirements.

As required

The process graphic displays and the formats for the various logs, reports shall be
discussed and finalized with the successful Tenderer during the engineering stage.
A write-up on the various requirements of the process and the operator interfaces
with respect to start/stop facilities shall be given to the successful Tenderer during
engineering stage. The Tenderer shall codify, develop and demonstrate the performance
during Factory Acceptance tests of the DCS at manufacturers works.
The system and application software modules supplies shall be duly licensed in
the name of the Purchaser. One (1) set of the above software shall be provided in CD's
along with necessary tools to reload at site, if required.
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

- 18 -

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE 8 INSTRUMENTATION AND AUTOMATION SYSTEM (CONTD.)

3.19

Environment Condition

All Control Panel, Operator/Engineering Stations, Printers shall be located in the


Central Control Room with ambient temperature of 23C 2C with 50% relative humidity.
However upon failure of air conditioning system the equipment shall be capable of
withstanding 50C with relative humidity of 95%.
4.0
4.1

SYSTEM, I/O AND MARSHALLING CABINETS

MARSHALLING CABINETS

The system, I/O and marshalling cabinets shall be of free standing, vertical closed
cubicle type with front and rear opening single doors. Separate cabinets shall be provided
for power distribution arrangement. The width, depth and height of the individual cabinets
shall not exceed 800mm (W) x 800mm (D) x 2200mm (H) respectively for the purpose of
easy handling and installation. The make of the cabinet shall be preferably of RITTAL or
HOFFMAN.

The cabinets shall be fabricated out of cold rolled sheet steel (CRCA)
enclosure of thickness 2.5 mm on front & sides and 2mm for Top & Doors
with welded/bolted construction. All welds shall be smooth and all the
corners to be rounded and the weld spatters shall be cleaned.

Mounting angle, flush with bottom shall be provided. All panels shall be
supported on suitably sized vibration rubber pads designed for bolting to
cabinet frame.

Cabinets shall be provided with eyebolts for lifting.

Cabinets shall be provided with internal illumination arrangement


interlocked with door limit switch.

Control Cabinets shall include exhaust fans located in the top positions
and it shall have free airflow from the opening window provided and the
window shall have the filter arrangements for to avoid dusty particles.

Control cabinet shall have the provisions of thermal detection points and it
has to be considered as Digital input point to the system for system status
monitoring.

The cable entry for all the cabinets/control desks shall be from bottom.
Gland plate shall be made of 3mm thick plate. The enclosure protection for
the cabinets/control desks which are located inside the main control rooms
shall be of IP 54 and for those which are to be located in the plant floors
shall be IP 55. In case of remote I/O cabinets, where ambient conditions
are not suitable for the continuous functioning of the system, airconditioned (cabinets with panel coolers) cabinets may be considered as
per the requirements.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

- 19 -

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE 8 INSTRUMENTATION AND AUTOMATION SYSTEM (CONTD.)

No.of terminations on one side of the DCS IO cabinet shall not


exceed 300.

Cabinet colour and painting.


All the panels and cabinets shall be pre-treated and powder coated as per
the following colour coding.

4.2

i)

Exterior

Pebble grey as per shade RAL 7035

ii)

Interior

Milky White

Wiring Termination & Ferruling


a.

All incoming and outgoing wires except the thermocouple lead wires shall
be routed through suitable sizes of clip-on type terminal blocks of minimum
size of 2.5mm. Special terminal blocks such as double ducker, fused TB
with LED indication, disconnecting type etc., shall be used wherever
applicable. The preferable make of the terminal block shall be of
WAGO/PHEONIX.

b.

Terminal blocks shall be provided for external wiring with proper


identification strips.

c.

Terminal blocks shall have laminated plastic engraved tag in white letters
with black back ground fixed on each Terminal Block.

d.

Wiring shall be done as per general purpose classification for nonhazardous areas defined in the NEC.

e.

Wiring shall be routed & supported in non-flammable PVC wiring raceways


neatly dressed using nylon clippers.

f.

All cables shall be flame, vermin & rodent proof.

g.

Wiring Colour code for the Panel Internal wiring shall be

h.

Power Supply Phase

Neutral

Black Colour

Shield

Green Colour

Analog Signal

White Colour

Digital & Power Signal Red Colour

Analog Signal

White Colour

Alarm Signal

Red Colour

Blue Colour

Multi stranded copper cables shall be used for signal wiring. All the cables
shall be of 1100V grade. The power and signal cables shall be as per the
following details.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

- 20 -

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE 8 INSTRUMENTATION AND AUTOMATION SYSTEM (CONTD.)

i.

All Power cables 2.5 mm

All Signal Cables 1.0 mm

All Alarm Cable 1.0 mm

All terminal block shall include at least 20 % spare terminals.


Wires shall run in PVC cable trough s inside the panel. All wires shall be
plainly and durably labelled at both ends for easy identification and must
conform to the wiring-labelling scheme shown in the interconnection
drawing. All spare cores shall be terminated with terminal blocks with
proper identity.

j.

4.3

Separate safety and signal earthing shall be provided in each system


cabinet. The system earth shall be insulated from the body and shall be
connected to a separate earth pit.

CONTROL DESK
The following cabinets/control desks shall be provided.
i)

Power distribution cabinet for DCS : One (1) no.

ii)

System cabinets for FCS

: As required.

iii)

I/O cabinets for the I/O racks

: As required

5.0
5.1

CABLING, FERRULING AND EARTHING

CABLING

The power cabling required for the automation system equipment from the
marshalling cabinet to the various components of DCS shall be provided by the Tenderer.
Only at one point the power will be given from the UPS by the Purchaser.
The signal and control cables and termination of the same in the marshalling
cabinet (field side) from the field and MCC shall be done by others. The Tenderer shall
do necessary cross wiring within the marshalling cabinet terminals (System side) so that
the inputs and outputs match the system I/O allocation.
Supply, installation of the special cables such as system cables, data highway
cables shall be provided by the Tenderer. Wherever necessary these cables shall be laid
in GI conduits in cable trenches clamped on walls. All required installation accessories
such as clamps, bends and pull boxes shall be included in the scope.

5.2

FERRULING

Engraved identification plastic ferrule identifying terminal block / terminal number


shall be fitted at both ends of each wire.
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

- 21 -

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE 8 INSTRUMENTATION AND AUTOMATION SYSTEM (CONTD.)

Ferrules shall fit tightly on the wires & shall not fall off when the wire is
disconnected form terminal blocks
The philosophy of cross + direct ferruling shall be followed for all internal &
external wiring in the Control Panel, MCC, Junction Boxes etc..
5.3

EARTHING

The Tendered shall include in his scope of supply all necessary items required for
the isolated special earthing arrangement called as system earth exclusively for the DCS.
Details of this arrangement shall be indicated in the offer.
However, earthing
arrangement (safety earthing) throughout the plant including earth mat in the control room
shall be provided by the Purchaser. All the panel and the cabinet bodies shall be
connected to this safety earth and the system shall be connected to the system earthing
arrangement.
Exclusive earthing pits (power earth & system earth) for the DCS as per the
requirements of the vendor shall be provided by the purchaser and rest of all the work
related to earthing shall be in the scope of work of the tenderer.
6.0

MANDATORY SPARE REQUIREMENTS

Following Mandatory spares shall be supplied

10 % of the Input / Output connected to each I/O Card shall be supplied as


spare.

10 % Wired slots to accommodate to each IO modules for future with


wiring space required.

10 % Terminal blocks in system / marshalling cabinets to connect spare


slots.

Consumable like paper, cartridge, etc required for 6 months.

Audible Alarm facility (hooter) shall be provided for the DCS.


7.0

INSPECTION (FAT)

The system & all its associated components shall be inspected & tested at
the Vendors work by the User/Consultant.

User/Consultant reserve the right to inspect any bought out items.

Cost of Inspection/Testing shall be borne by the vendor.

For Inspection the vendor shall give minimum notice of 2 weeks.

Safety earthing of all panels from a bus bar given provided at Console /
Cabinet

Mounting of all hard wares like IO Card, Power Supply etc.

Intrinsic safe earthing of all panels from a separate bus bar provided at
Console/Cabinet.
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

- 22 -

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE 8 INSTRUMENTATION AND AUTOMATION SYSTEM (CONTD.)

Powering up / loading the system system configuration & carryout internal


loop checks.
8.0

8.1

PERFORMANCE GUARANTEE

Demonstration of guarantee & performance test shall be with the


Acceptability as follows.
Redundant System

8.2

100 %

Performance Guarantee Specification


Percentage loading shall be as follows

8.3

CPU loading (maximum)

60 %

Memory utilisation (maximum)

60 %

I /O loading ( maximum)

60 %

Communication processor loading

60 %

Call up time

The Call up time for the Type of display shall be 1 ~ 4 seconds for the Overview
,Group Display, Loop Display Dynamic Graphics, Real Time Trend, Historic Trend, Alarm
Summary ,Alarm History & Configuration.
System Capacity shall be as follows
No. of over view pages

as required.

No. of Graphs/Overview

as required

No. of Graphics pages

500

No. of Loops & Groups

No. of points in Alarm Summary

3000 Min

No. of points in Alarm History

3000 Min

No. of Trends per display

No. of Multi trend displays

as required.

No. of Tags to be logged

all tags

The Vendor must guarantee that all spare parts & service support will be available for
10 years after the guarantee period.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

- 23 -

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION

ANNEXURE 9 SCOPE MATRIX


Note: EPC Contr.
FAL

: Scope of EPC Contractor as per this specification


: Scope of M/s. Facor Alloys Limited or by other agency

A. CFBC BOILER
ENGINEERING
SL.
NO

1.

2.

BASIC
DESIGN
INCL
P&ID
ETC.

DESCRIPTION

STEAM DRUM
Fully welded steam drum with
internals, man holes and
necessary nozzle connections
for mounting valves, Safety
valves & fittings
WATER WALL
Water
cooled
membrane
enclosure
with headers and
necessary
connections
like
drains
a. Bed tubes and headers

3.

SUPERHEATER
CONVECTION SUPERHEATER
a. Superheater
tube
assemblies with inlet and
outlet header
b. Superheater
supports

4.

coil

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

RADIANT SUPERHEATER
a. Super
heater
tube
assemblies with inlet and
outlet headers

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-1-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
SL.
NO

DESCRIPTION

b. Super
heater
supports
5.

BASIC
DESIGN
INCL
P&ID
ETC.
coil

MANUFACTURE
AND SUPPLY

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

b. Convection SH outlet
header to De-SH inlet

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

c. De-SH outlet to radiant


SH inlet header

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

b. Economiser / evaporator
coils supports

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

c. Access door

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

d. Economiser / evaporator
casing with stiffener

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

SUPERHEATER LINKS
a. Drum to convection SH
inlet header

d. Radiant SH outlet to
MSSV with accessories
safety valve, flow meter
etc.
e. MSSV to Turbine inlet

6.

DETAILED AND
CONSTRUCTION
DRGS

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

ECONOMISER/EVAPARATOR
a. Economiser / evaporator
tube assemblies with
inlet & outlet headers

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-2-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
SL.
NO

BASIC
DESIGN
INCL
P&ID
ETC.

DESCRIPTION

e. Economiser / evaporator
Ash hopper with isolation
gate
7.

soot
soot

b. Drive motors

c. Local gauge
Control panel

panel

d. PRV/PRDS

AIR PREHEATER
a. Air preheater tubes and
tube sheets
b. Access door

c. Air-heater
stiffener

casing

with

d. Air-heater ash hoppers

9.

MANUFACTURE
AND SUPPLY

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

SOOT BLOWERS
a. Retractable
blower/Rotary
blowers

8.

DETAILED AND
CONSTRUCTION
DRGS

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

DOWNCOMERS

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-3-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
SL.

BASIC
DESIGN
INCL
P&ID
ETC.

DESCRIPTION

NO

10.

RISERS

11.

INTEGRAL PIPING
WATER PIPING
a. From outlet of deaerator
to
Economizer
inlet.
through HP, LP heaters
including
delivery
header, with fittings,
accessories, motorized
control valves & bypass
valves etc.,

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

b. From economiser outlet


to steam drum inlet

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

c. DASH
spray
control system

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

e. Minimum
recirculation
line from BFWP station
to deaerator with Orifice.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

f.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

water

d. Boiler initial filling line,


with isolation valve

Balance leak off lines


from BFWP station to
Deaerator with Orifice

g. Steam and water flow


nozzle and transmitters.
h. Pipe supports & hangers

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-4-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
SL.
NO

12.

BASIC
DESIGN
INCL
P&ID
ETC.

DESCRIPTION

STEAM PIPING, MAIN STEAM


HEADER,
AUX.
STEAM
HEADER, PRDS for aux.
Steam, Spray control valves of
PRDS, and their inter-related
piping with vent, drains, anchor
supports, sliding supports, insert
plates etc., tapping point to
dump PRDS from MS header
with IBR approval

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

All steam lines including stress


analysis,
preparation
of
isometric drawings, steam line
spring
&
other
supports
complete. Main steam piping will
be up to the inlet flange of TG.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

14.

Steam line supporting rack


design, supply, fabrication and
erection

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

15.

COOLING WATER PIPING


EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

a. Blow down piping from


steam drum to blow
down tank including all
valves & instrumentation.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

b. Drain
piping from
individual
drain points
to common header

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

13.

Piping between cooling tower to


individual equipments
16.

BLOWDOWN / DRAIN

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-5-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
SL.
DESCRIPTION

NO

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

c. Common drain header

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

d. Common drain header to


blowdown tank

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

e. Piping from blowdown


tank outlet to nearest
trench

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Flash steam recovery


piping from continuous
blowdown
tank
to
deaerator and exhaust

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

g. Supports for Blowdown,


drain & vent piping

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

h. Blowdown tank separate


for
Intermediate
&
Continuous blow down.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

f.

17.

BASIC
DESIGN
INCL
P&ID
ETC.

VENT
a. From individual vent
connections on steam
drum and main steam
line where ever required
complete with isolation
valves with piping led up
to a safe elevation above
the roof.
b. Safety valves exhaust
piping
upto
safe
elevation above the roof.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-6-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
SL.
NO

18.

BASIC
DESIGN
INCL
P&ID
ETC.

DESCRIPTION

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

b. PA fan suction ducting

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

c. From PA fan discharge


to air heater /Header/ Air
box.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

d. Inlet ducting to SA Fan


and form SA Fan to
boiler.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

PA fan
& motor with all
accessories/ auxiliaries, 2 x 60%
capacity with
Voith
turbo
hydraulic couplings

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

AIR DUCTING
a. Air
flow
measuring
device as required.

20.

Power operated
regulated
delivery
damper/
power
operated damper for suction
duct for PA fan
21.

MANUFACTURE
AND SUPPLY

AIR BOX
Air box with air nozzle & fuel
nozzle and ash drain pipe
with knife gates

19.

DETAILED AND
CONSTRUCTION
DRGS

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

SA fan
& motor with all
accessories/auxiliaries, 2 x 60%
capacity with
Voith
turbo
hydraulic couplings

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-7-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
SL.
NO

BASIC
DESIGN
INCL
P&ID
ETC.

DESCRIPTION

Power operated
regulated
delivery
damper/
power
operated damper for suction
duct for SA fan
22.

Fuel feeding system from


bunker
to
boiler
burning
chamber including sliding gates,
fuel feeders with VFD, drag
chain
conveyors
/
screw
feeders, chutes and driving
motors.

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

23.

Seal pot blowers/ motors with


auxiliaries complete

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

24.

Ash cooler blowers/ motors with


auxiliaries complete

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

25.

Metallic expansion joints in air


ductings

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

26.

Cyclones with auxiliaries and


accessories, refractory work of
cyclones.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

27.

GAS DUCTING
a. From exit of boiler bank
to
cyclones,
from
cyclones back to boiler
etc.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

b. From water wall outlet to


ESP inlet.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-8-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
SL.
NO

28.

29.

BASIC
DESIGN
INCL
P&ID
ETC.

DESCRIPTION

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

c. From ESP outlet to


chimney inlet including
the ID Fan ducting
complete with necessary
power
operated
dampers.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

d. Damper & expansion


joints
in
Flue
gas
ducting

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

e. Inlet & outlet expansion


joints of ESP

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

ID Fan & motor with all


accessories/auxiliaries, 2 x 60%
capacity with
Voith
turbo
hydraulic couplings

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Power
operated
regulated
suction damper/ power operated
damper for delivery duct for ID
fan

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

b. Supporting
steel
structures for bunker roof
& side cladding

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

c. GI sheets for roof & side


cladding for bunker (upto
top level of bunker or
upto operating platform)

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

a. Bunker
with
supporting structure from
ground level, Capacity
minimum
16
hours
storage of worst fuel.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-9-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
SL.
DESCRIPTION

NO

30.

BASIC
DESIGN
INCL
P&ID
ETC.

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

d. SS lining of 2mm thk


from conical portion

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

e. Bed material bunker with


supporting structure from
ground level

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

f.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

b. Operating platform

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

c. Staircases, ladders upto


operating floor

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

d. Handrails for operating


floor

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

e. Platform above operating


floor

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

f.

Staircases,
ladders
above operating floor

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

g. Foundation bolts for


supplied equipments

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

h. Insert plate for Boiler


supports

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Lime stone bunker with


supporting structure from
operating floor

SUPPORTING STRUCTURE
a. Supporting
structure
from ground level

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-10-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
SL.

BASIC
DESIGN
INCL
P&ID
ETC.

DESCRIPTION

NO

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

i.

Complete
steel
supports for ducting

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

j.

Refractory
casing

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Supporting
steel
structures for boiler roof
& side cladding

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

m. Approach platform from


boiler to turbine hall

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

n. GI sheets for roof and


side cladding for boiler
(upto drum operating
floor or upto boiler
operating platform)

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

o. Buckstay
assemblies
for furnace

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

31.

Refractory complete where ever


required

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

32.

Insulation
with
cladding
complete where ever required

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

33.

Oil system
EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

supports

&

k. Hanger rod
l.

a. LDO
oil
tank
with
pumping and filtering
units with piping upto
Boiler hot gas generator.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-11-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
SL.
NO

BASIC
DESIGN
INCL
P&ID
ETC.

DESCRIPTION

b. Hot
gas
complete

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

generator

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

c. Combustion control and


management system as
required.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

b. Boiler
feed water
control station.
i) 1x100% FCS with
pneumatic control.
ii) 1x100% mot. Control
station.
iii) 1x30%
pneumatic
FCS

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Orifice assembly for feed flow,


steam flow measurement with
transmitted where ever required.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

36.

DE-SUPERHEATER
SPRAY
WATER CONTROL STATION

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

37.

STEAM DRUM

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

34.

VALVES & MOUNTINGS


a. Motorised valves where
ever required

35.

a. Water level gauges


b. Spring
loaded
mechanical safety valve

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-12-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
SL.

BASIC
DESIGN
INCL
P&ID
ETC.

DESCRIPTION

NO

c. All isolation, drain & root


valves
38.

MANUFACTURE
AND SUPPLY

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

b. Spring
loaded
mechanical safety valve

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

c. Non return valve

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

d. Silencer on SH safety
valve & start-up vent

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

e. Flow nozzle in steam line

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

f.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

MAIN STEAM LINE ( Upto Inlet


of turbine)
a. Isolation & root valves
for drain

39.

DETAILED AND
CONSTRUCTION
DRGS

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

All isolation, drain & root


valves

OTHER SECTIONS
a. All IBR valves in steam
line, feed line and spray
line
b. All isolation, drain & root
valves

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-13-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
SL.
NO

40.

BASIC
DESIGN
INCL
P&ID
ETC.

DESCRIPTION

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

c. Air box drain valve

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

d. Air box bleed off valve

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

e. Air & gas line non IBR


valves

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC

EPC Contr.

EPC Contr.

EPC Contr.

INSTRUMENTATION & CONTROL 


INSTRUMENTATION
LOCAL FIELD INSTRUMENTS / TRANSMITTER

Thermocouples to measure
Bed temperature
Free
board
necessary
Flue
gas
economiser
Flue gas
economiser

where

ever

temp.

before

temperature after

Flue gas
temperature after
multi-tubular air pre heater
Air
temperature
multitubular air preheater

after

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-14-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
SL.
NO

BASIC
DESIGN
INCL
P&ID
ETC.

DESCRIPTION

Feed water temp-erature before


economiser

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

Contr.

Feed water temperature after


economiser
Steam temp. before and after
desuperheater
41.

Pressure gauges to measure


Steam pressure at steam drum
& superheater outlet
Bed pressure

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Feed line pressure before feed


control valve
42.

Draught gauges to measure


Air box pressure
Furnace pressure
Flue gas pressure in cyclones
and before economiser
Flue gas pressure before and
after multitubular air preheater.
Air pressure before & after multi
tubular air preheater.
Air pressure
header.

43.

at

primary

air

Power operated regulating type


damper at,

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-15-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
SL.
NO

44.

BASIC
DESIGN
INCL
P&ID
ETC.

DESCRIPTION

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

ID fan inlet

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

PA fan inlet

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

SA fan inlet

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Power operated open & close


type damper at
PA header
SA header
ID fan outlet
PA fan outlet
SA fan outlet

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-16-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
SL.
NO

45.

BASIC
DESIGN
INCL
P&ID
ETC.

DESCRIPTION

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

FIELD
INSTRU-MENTS
REQUIRED FOR
CONTROL SYSTEM
Three element drum
control consists of

level

Three
nos.
drum
level
transmitters (1 no. for wide
range and 2 nos for Left & Rt.)
Two no. steam flow transmitter.
(one for measurement & other
for control)

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Two
no.
feed
flow
transmitter(one
for
measurement & other for
control)
One no. I/P converter. (These
are required as per pneumatic
control
valves).
Any
other
instrument
as
required for proper & safety
control of the system.
46.

Furnace
consists of

draught

control

Two no.
transmitter

furnace

pressure

One no. I/P converter


Any
other
instrument
as
required for proper & safety
control of the system.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-17-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
SL.
NO

47.

BASIC
DESIGN
INCL
P&ID
ETC.

DESCRIPTION

Auto
combustion
consists of
Two
no.
transmitter

steam

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

control
pressure

One no. air flow transmitter

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Any
other
instrument
as
required for proper & safety
control of the system.
48.

Superheater steam temperature


control consists of
Two no. thermocouple
Two no. temp. transmitter
One no. I/P convertor
Any
other
instrument
as
required for proper & safety
control of the system.

49.

Soot blower pressure control


One no. pressure transmitter
One no. I/P convertor
Any
other
instrument
as
required for proper & safety
control of the system.

50.

Instrument air piping


source to battery limit

from

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

51.

Instrument air piping from boiler


battery
limit
to
individual
consuming point

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-18-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
SL.
DESCRIPTION

NO

52.

BASIC
DESIGN
INCL
P&ID
ETC.

Impulse
piping,
instrument
cables and signal cables from
field instruments to DCS

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Compensating cables upto DCS


panel for all Thermocouple.
53.

SWAS

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

54.

Vibration monitoring systems for


fans

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

55.

Stack monitoring system

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

56.

Cables beyond junction boxes

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

57.

Junction
boxes
instruments.

the

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

58.

Instrument panel
draught gauges.)

mount

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

59.

DCS / DDC / DAS

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

60.

Compressor
&
driers
instrument air supply.

for

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

61.

Uninterrupted
system (UPS).

supply

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

for

(to

power

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-19-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
SL.
NO

62.

BASIC
DESIGN
INCL
P&ID
ETC.

DESCRIPTION

MANUFACTURE
AND SUPPLY

SAMPLE COOLERS
EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

b. Motor for HP&LP dosing


system, Cyclone, Coal
feeders,
lime
and
cyclone
screw,
Ash
handling
system,
compressor
motors,
MOVs, Slide gate etc,

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

c. ESP transformer rectifier


set, panel for ESP,
auxiliaries
for
ESP.
Rapper
controller,
heaters, Cabling and
Earthing,
Auxiliary
control panel for ESP
etc.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

d. Incoming cables to LT
MCC

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

e. 415 V LT MCC for boiler


& its auxiliaries
f. Single line diagram

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Blowdown / Boiler water /


saturated steam / SH steam /
feed water etc
63.

DETAILED AND
CONSTRUCTION
DRGS

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

ELECTRICALS
a. All motors for
ID/FD/SA/blowers, feed
pump motors and other
related motors required.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-20-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
SL.

BASIC
DESIGN
INCL
P&ID
ETC.

DESCRIPTION

NO

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

g. Load list with in battery


limits

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

h. VVFDs
/
Hydraulic
couplings with in battery
limits

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Local
push
button
stations for the motors
supplied
by
EPC
CONTR.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Interconnecting
LT
power
&
control
cables
including cable
trays from LT MCC to
drives supplied by EPC
CONTR.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

k. Earthing of electrical
equipments supplied by
EPC CONTR. above
ground level.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

m. Sub earth mat & main


earth mat

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

n. Lighting
protection
system & installation

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

o. All lightings for boiler


and their accessories

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

i.

j.

l.

Earthing pit

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-21-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
SL.
NO

64.

65.

BASIC
DESIGN
INCL
P&ID
ETC.

DESCRIPTION

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

p. Power control center,


transformer, switch gear,
starters required for HT
motors

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Dearator of capacity 230


tons/hour with storage tank of
capacity 60 tons complete with
all accessories, inter connecting
pipes including pegging steam
line, level controller, pressure
controller, safety valve, vent
valve and Emergency drain v/v
with piping & accessories
terminating at flash tank to store
hot DM water for reuse.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

a. Feed pumps, 2x 100%


capacity,
1 W + 1S
complete
with
drive
motors, variable speed
hydraulic couplings and
accessories.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

b. Auto recirculation valves

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

c. Valves and mounting at


feed pump outlet

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

BOILER
FEED
PUMPING STATION

WATER

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-22-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
SL.
NO

66.

67.

68.

BASIC
DESIGN
INCL
P&ID
ETC.

DESCRIPTION

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

d. BFP
inlet
piping
complete with valves and
accessories
from
Deaerator outlet and all
recirculating lines from
pump
outlet
to
Deaerator.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Complete
electrostatic
precipitator of suitable size and
number of fields to ensure a
dust concentration of less than
50mg/Ncum at outlet with all
fields in operation and less than
75 mg/Ncum with one field
down.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

a. Low pressure dosing


system
(Chemical :
sodium
sulphite
/
hydrazine)

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

b. High pressure dosing


system
(Chemical :
Trisodium phospate)

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

CHEMICAL DOSING SYSTEM

ASH DISCHARGE SYSTEM


BED ASH
a. Bed ash drain pipe
b. Slide gate

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-23-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
SL.
NO

BASIC
DESIGN
INCL
P&ID
ETC.

DESCRIPTION

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

c. Bed ash cooler with all


auxiliaries/accessaries

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Ash hopper at the bottom of


radiant chamber, second pass,
economiser bottom, ESP etc.for
Dust collection with valve, with a
minimum clearance of 2500mm
between bottom of the outlet
flange and ground with isolation
gate, expansion bellow and
other accessories as required.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

70.

BED ASH DISPOSAL SYSTEM


beyond outlet of ash hoppers at
various locations.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

71.

FLY ASH HANDLING SYSEM


beyond outlet of ash hoppers at
various locations.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

72.

CHIMNEY (RCC) with refractory


lining and all accessories
aviation
lamps,
lightening
arrestor etc.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

69.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-24-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

B. STEAM TURBO GENERATOR & ITS AUXILIARIES


ENGINEERING
MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

LP heaters with all auxiliaries &


accessories
including
the
condensate water line with
necessary control & by pass
valves, drain lines, valves etc.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Dumping steam system of 30%


total steam flow to turbine
complete with control valves
PRDS
water
system
etc
including
stress
analysis,
supports and IBR approval

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

SL.

BASIC
DESIGN
INCL
P&ID
ETC.

DETAILED AND
CONSTRUCTION
DRGS

Steam Turbine complete with


top and bottom casings /
barrel casing, rotor, bearings,
hydraulically operated stop and
emergency valve, integral steam
strainer, hydraulically operated
throttle/governing valves, etc

EPC
Contr.

HP heaters with all auxiliaries &


accessories
including
the
condensate water line with
necessary control & by pass
valves, drain lines, valves etc.

NO.

DESCRIPTION

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-25-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

All required safety devices for


the turbine

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Oil cooler system with all


accessories, inter connecting
pipes, valves complete

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Oil centrifuge complete including


interconnecting piping, local
panel etc.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

10

Gear box (if Required based on


speed of turbine)

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

SL.

BASIC
DESIGN
INCL
P&ID
ETC.

DETAILED AND
CONSTRUCTION
DRGS

Steam
supply
lines
with
necessary
PRDS,
valves,
metering instruments, supports
etc for supply of steam from the
boiler main steam header to the
ejectors as well as the gland
sealing
system
including
preparation
of
drawings/documents
and
obtaining IBR approval.

EPC
Contr.

Combined
lube
oil
cum
governing oil system complete
with MOP, AOP,EOP etc,
strainers, filters, interconnecting
oil lines, with all required
instruments
including
local
instruments, transmitters, flow
meters and safety valves, OH oil
tank, over flow oil tank etc.

NO.

DESCRIPTION

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-26-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
SL.
NO.

DESCRIPTION

BASIC
DESIGN
INCL
P&ID
ETC.

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

11

Turbine governing system

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

12

Gland sealing system with GVC


etc.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Local gauge panel

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

14

Accessories such as barring


gear, QCNRV, FFRV, isolation
valves etc. in bleed lines.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

15

Common base plate for turbine


and gear box

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

16

Jacking oil pump foundation &


bolts etc.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

17

Mating flanges for all equipment


connections with in the battery
limits including turbine exhaust.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

18

Insulation for turbine hot parts


and insulation for steam line

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

19

Base
frame,
sole
foundation bolts and
embedment in concrete

plate,
other

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

20

AC generator with stator and


rotor, complete with brushless
excitor, air coolers, bearings,
AVR cum excitation panel, anti

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

13

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-27-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

23

Turbine
control
and
instrumentation including dial
type pressure and temperature
gauges, pressure switches, level
gauges for lube oil tank, etc.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

24

Condenser
control
and
instrumentation including dial
type pressure and temperature
gauges, pressure switches, etc

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

25

Generator
control
and
instrumentation including dial
type temperature gauges for
bearing oil, hot and cold air,
winding temperature RTDs,
temperature scanner etc.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

26

Vibration monitoring system for


the complete TG train.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

27

Turbine
panels

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

SL.

BASIC
DESIGN
INCL
P&ID
ETC.

DETAILED AND
CONSTRUCTION
DRGS

21

Generator metering , protection


and control system including
LAPT, MCSP, NGR and inter
connecting cables etc

EPC
Contr.

22

Motors for TG auxiliaries and


EOP along with starters.

DESCRIPTION

NO.

condensation heater, water


leakage detector, lube oil flow
regulator etc.

control
with

and gauge
connecting

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-28-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
SL.
NO.

DESCRIPTION

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

EPC Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC Contr.

BASIC
DESIGN
INCL
P&ID
ETC.

DETAILED AND
CONSTRUCTION
DRGS

EPC
Contr.

EPC
Contr.

pipes/tubes etc.

28

29

Instrument
air
requirement
2x100 % air compressor with 7
to 8 kg/cm2 (g) discharge
pressure will be provided in
load/ unload operation mode.
2nos of air driers and required
nos of air receiver.
a. Ventilation system (A/C)
complete in TG building
to maintain control room
temperature 22 + 2
degree C.
b. Ventilation fans with
required air changes in
TG bay.
c. Pressurized Ventilation
system for electrical
panel rooms.
d. Required partitions of
rooms for in-chargers, O
&
M
team,
instrumentation
managers and laboratory
facilities as required.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-29-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

C. AIR COOLED CONDENSER & ITS AUXILIARIES


ENGINEERING
MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

6.

Heat exchanger bundles & its


accessories. Frame structure
for support of fins tube bundles,
with partition walls and doors.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

7.

Fan bridges for support of fans,


motors and gearboxes.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

SL.
NO.

1.

2.

3.

4.

5.

DESCRIPTION

Turbine exhaust duct from


turbine exhaust flange to ACC
inlet duct with expansion
bellow, transition piece etc.
Air cooled Condenser (ACC)
complete with structures
ACC fans & Gear boxes with
proper mounting arrangement
and vibration sensor & oil level
sensor.
Fan motors with VFD & other
accessories
like
bearing
temperature sensors, vibration
sensors, complete.
Steam distribution duct at the
top of the fin tube bundles,
including
manhole
and
condensate
extraction
&
dephlegmator piping below the
fin tube bundles.

BASIC
DESIGN
INCL
P&ID
ETC.

DETAILED AND
CONSTRUCTION
DRGS

EPC
Contr.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-30-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
SL.
DESCRIPTION

NO.

BASIC
DESIGN
INCL
P&ID
ETC.

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

8.

Fan rings

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

9.

Rupture disc

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

10.

Drain lines for connecting other


drain lines like turbine casing
drains, GVC drains etc

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

11.

Condenser auxiliaries

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC

EPC Contr.

EPC Contr.

EPC Contr.

Condensate tank with stand


11.1

11.2

pipe for instruments


Flash pipe for receiving steam
and water
Horizontal

11.3

turbine

exhaust

drain pumps with motors (2 x


100%) along with isolation and
recirculation valves and NRVs

12.

Condensate

extraction

system

12.1

12.2

Vertical Condensate extraction


pumps (CEP) with motors (2 x
100%) along with mechanical
seal, isolation and recirculation
valves and NRVs.
Condensate piping from hot
well through CEPs & ejector

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-31-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
SL.

BASIC
DESIGN
INCL
P&ID
ETC.

DESCRIPTION

NO.

condensers, GVC, LP Heater

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

Contr.

and up to inlet of Deaerator.


12.3

Split range control valves for


Condensate
re-circulation
along with controls

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Drain lines with isolation valves


for ejector condenser drains
etc.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Dry air/vapour line to ejector

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Pipe supports, strainers, steam


12.4

traps,

drains,

vents

and

isolation Valves as required.


12.5

12.6

with isolation valve.


12.7

All high pressure drains lines to


flash tank.

13.

Condenser

air

evacuation

system complete with


13.1

Steam jet air ejector system


complete with

13.2

Twin stage main ejectors (1


working + 1 standby)

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

13.3

Start up ejector (hogging) with


silencer

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-32-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Split range hot well level control


valves complete with Level
transmitters, Control valves, Ito-P converter, and air filter
regulators. Control logic will be
programmed in DCS.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

15.2

Auto start logic for condensate


level high and trip when level is
low.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

15.3

Dial type Pressure gauges for


condenser tank, CEP & CDP
discharges, Motive steam to
ejector, Condenser vapour to
ejector, First stage ejector
condenser etc.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

15.4

Differential pressure gauge for


condensate strainer

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

SL.
DESCRIPTION

NO.

Inter
13.4

and

after

condensers

individually for each service

BASIC
DESIGN
INCL
P&ID
ETC.

DETAILED AND
CONSTRUCTION
DRGS

EPC
Contr.

ejector
Fin cleaning system:
Fin cleaning system with water
14.

pumps, motor required pipe


lines or high pressure hoses,
valves, water tank etc.

15.

C&I

for ACC comprising but

not limited to:

15.1

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-33-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
SL.
NO.

DESCRIPTION

BASIC
DESIGN
INCL
P&ID
ETC.

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

15.5

Temperature
gauge
for
condensate outlet, condensate
tank, ejector outlet

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

15.6

Pressure
switches
for
Condenser pressure high trip &
alarm, CEP & CDP auto start
interlock on very high level and
auto stop on very low level,
alarm for high and low on
exhaust drain and condenser
tank.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

15.7

Level switches for Low level,


Low-Low level, high level,
High-high level & CEP auto
start interlock

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

15.8

Dial type temperature gauges


for, Condensate after hot well,
Condensate after inter/after
condensers of ejectors, Motive
steam to ejector

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

15.9

Transparent level gauge for


condenser hot well Level
switches for Condenser hot
well level low alarm and CEP
dry run interlock, Condenser
hot well level high alarm

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

15.10

Pneumatic and impulse piping


with fittings for interconnection
within battery limits.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-34-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
SL.
NO.

DESCRIPTION

BASIC
DESIGN
INCL
P&ID
ETC.

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

15.11

Instruments cables up to
junction boxes for connecting to
purchasers DCS system

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

15.12

RTDs, Thermo wells for all the


temperature measuring points
for purchasers DCS system.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

15.13

Provision for level transmitters


for
DCS
controls
and
instrumentation

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

15.14

Vibration switches for high and


Very high for each fan for
connecting to DCS logic.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

15.15

Level control valves for hot


well.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Complete
interconnecting
power and control cables from
the field switches, motor
heaters to the nearest junction
boxes.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Mating flanges
equipment

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Drive motors for pumps like


CEP, CDP, fans etc.
16.

17.

for

all

the

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-35-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

D. FUEL HANDLING SYSTEM (90 TPH min)


ENGINEERING
BASIC
DESIGN
INCL
P&ID
ETC.

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

SL.
NO.

DESCRIPTION

Electromechanical
Vibrating
feeder of required capacity at
outlet of Coal ground hopper.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

Required motor with gear box,


couplings, coupling guards with
push button for BC1.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

Belt of N/N of required size of


strength with all drive pulley,
end pulleys, snap pulleys, VST
complete,
impact
rollers,
conveyor rollers, skirt rubbers
etc.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

Magnetic separators, metal


detector, belt snag switches,
zero speed switches, pull card
switches, self belt aligner, belt
scrappers etc.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

Return belt
aligner etc.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

Belt conveyor BC-01 of rated


capacity, from coal ground
hopper to primary crusher, with
closed gallery of CGI cladding
and
roofing,
both
sides
walkway,
gratings,
trestle
supports, etc.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

idler,

self

belt

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-36-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
BASIC
DESIGN
DETAILED AND
INCL
CONSTRUCTION
P&ID
DRGS
ETC.

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

EPC contr.

EPC contr.

EPC contr.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

Bypass chute for primary


crusher,
vibrating
screen
complete with duct, pneumatic /
rack & pinion gates etc.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

10

Belt conveyor (BC-02)


capacity from primary
house to secondary
with closed gallery
cladding
and
walkways,
gratings,
supports, etc.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

11

Belt conveyor of rated capacity


for feeding crushed material for
primary crusher to BC1 with
transfer tower complete. It
includes closed gallery of CGE
cladding of roofing both side
walkways,
gratings,
trestle
supports etc.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

12

Secondary
crusher
House
Surge hopper 250cu.m water
volume, steel construction,
cover plate at top, with two
individual outlets at bottom of
each surge hopper with rack
and pinion gate below / outlet of
hopper.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

SL.
NO.

DESCRIPTION

Flip flow vibrating screen of


rated capacity to separate
250mm coal before primary
crusher.

EPC
contr.

Primary crusher 1 required


capacity with drive motor for
crushing coal from 250 mm size
to 75mm size with motor
pulleys, belt safety guards etc.

of rated
crusher
crusher,
of CGI
roofing,
trestle

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-37-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
BASIC
DESIGN
DETAILED AND
INCL
CONSTRUCTION
P&ID
DRGS
ETC.

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

EPC contr.

EPC contr.

EPC contr.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

Required motor with gear box,


couplings, coupling guards with
push button for BC1.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

16

Belt of N/N of required size of


strength with all drive pulley,
end pulleys, snap pulleys, VST
complete,
impact
rollers,
conveyor rollers, skirt rubbers
etc.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

17

Magnetic separators, metal


detector, belt snag switches,
zero speed switches, pull card
switches, self belt aligner, belt
scrappers etc.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

18

Return belt
aligner etc.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

19

Belt conveyor of rated capacity


for feeding crushed material for
primary crusher to BC1 with
transfer tower complete. It
includes closed gallery of CGI
cladding of roofing both side
walkways,
gratings,
trestle
supports etc.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

SL.
NO.

DESCRIPTION

13

Secondary crushers of rated


capacity to crush the oversize
material (75 mm size) to (-) 10
mm with motors, pulleys, belt
drive safety guard etc.

EPC
contr.

14

Flip flow type vibrating screens


of rated capacity to separate
out (-) 10 mm, complete with
supporting frame, chutes and
dust cover before secondary
crusher.

15

idler,

self

belt

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-38-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
BASIC
DESIGN
DETAILED AND
INCL
CONSTRUCTION
P&ID
DRGS
ETC.

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

EPC contr.

EPC contr.

EPC contr.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

22

Belt conveyor of rated capacity


for feeding crushed material for
primary crusher to BC1 with
transfer tower complete. It
includes closed gallery of CGI
cladding of roofing both side
walkways,
gratings,
trestle
supports etc.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

23

Electronic Belt weigh scale 2


nos. (1 in BC & 1 in BC4).

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

24

Belt type
system.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

25

Travelling trippers as per the


bunker requirements with the
chutes, rails, rail clamps,
bunker sealing arrangement
and other accessories on near
to bunker.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

26

Drive platform for all belt


conveyors
with
necessary
supports.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

SL.
NO.

DESCRIPTION

20

Monorails with hoists at primary


crusher
house,
secondary
crusher house, screen house
and transfer tower. The lifting
capacities to be decided by the
bidder.

EPC
contr.

21

Belt conveyors (BC-04) of rated


capacity,
from
secondary
crusher to boiler bunkers, with
closed gallery of CGI cladding
and
roofing,
both
sides
walkway,
gratings,
trestle
supports, etc.

bunker

sealing

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-39-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
BASIC
DESIGN
DETAILED AND
INCL
CONSTRUCTION
P&ID
DRGS
ETC.

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

EPC contr.

EPC contr.

EPC contr.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

29

Dust extraction system (DE-01)


with Bag filter, exhaust fan and
rotary air lock at primary
crusher house.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

30

Dust extraction system (DE-02)


with Bag filter, exhaust fan and
rotary air lock at secondary
crusher / screen house.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

31

Bag filters (IBF-01 & IBF-02)


with Bag filter, exhaust fan and
rotary air lock at bunkers for
boiler.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

32

Sprinkler System for Dust


Suppression ground hoppers. It
consists of 2nos of pumps with
associated piping, valves and
nozzles for complete dust
suppression.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

33

Complete
electrical
and
instrumentation system for FHS
including drives, MCC panels,
cabling, PLC, local emergency
push
button
stations,
equipment earthing, Junction
boxes,
marshalling
boxes
tray/trench
and
lightning
protection etc., as per the
specification.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

SL.
NO.

DESCRIPTION

27

Compressed
air
piping
distribution for coal handling
system.

EPC
contr.

28

All foundation bolts required for


installation of all equipment and
structure under CHS vendors
scope.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-40-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

E. ASH HANDLING SYSTEM


ENGINEERING

SL.

DESCRIPTION

NO.

BASIC
DESIGN
INCL
P&ID
ETC.

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

A. CFBC BOILER FURNACE


1.

Bottom ash hopper

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

2.

Sliding gate.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

3.

Surge hopper

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

4.

Isolation plate valve

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

5.

Level probe and accessories

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

6.

Expansion joints

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

7.

Dome valve etc

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

8.

Ash conveying vessel (master


& slave) complete

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

9.

Ash conveying line bends

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

10.

Ash conveying
flanges, gaskets)

(pipe,

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

11.

Service/ash conveying air line


up to terminal point

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

12.

Instrument air/water line up to


terminal point

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

line

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-41-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING

SL.

DESCRIPTION

NO.

13.

Supporting
structure
vessels/ash pipe line

for

BASIC
DESIGN
INCL
P&ID
ETC.

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

CFBC BOILER CYCLONES


14.

Bottom ash hopper

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

15.

Sliding gate.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

16.

Surge hopper

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

17.

Isolation plate valve

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

18.

Level probe and accessories

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

19.

Expansion joints

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

20.

Dome valve etc

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

21.

Ash conveying vessel (master


& slave) complete

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

22.

Ash conveying line bends

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

23.

Ash conveying
flanges, gaskets)

(pipe,

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Service/ash conveying air line


up to terminal point

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

24.

line

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-42-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING

SL.

DESCRIPTION

NO.

BASIC
DESIGN
INCL
P&ID
ETC.

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

25.

Instrument air/water line up to


terminal point

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

26.

Supporting
structure
vessels/ash pipe line

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

for

CFBC BOILER ECO / APH


27.

Bottom ash hopper

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

28.

Sliding gate

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

29.

Surge hopper

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

30.

Isolation plate valve

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

31.

Level probe and accessories

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

32.

Expansion joints

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

33.

Dome valve etc

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

34.

Ash conveying vessel (master


& slave) complete

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

35.

Ash conveying line bends

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

36.

Ash conveying
flanges, gaskets)

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

line

(pipe,

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-43-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING

SL.

DESCRIPTION

NO.

BASIC
DESIGN
INCL
P&ID
ETC.

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

37.

Service/ash conveying air line


up to terminal point

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

38.

Instrument air/water line up to


terminal point

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

39.

Supporting structure for vessels


& pipe line

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

CFBC BOILER ESP


40.

Bottom ash hopper

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

41.

Sliding gate.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

42.

Surge hopper

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

43.

Isolation plate valve

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

44.

Level probe and accessories

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

45.

Expansion joints

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

46.

Dome valve etc

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

47.

Ash conveying vessel (master


& slave) complete

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

48.

Ash conveying line bends

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-44-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING

SL.

DESCRIPTION

NO.

line

BASIC
DESIGN
INCL
P&ID
ETC.

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

49.

Ash conveying
flanges, gaskets)

(pipe,

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

50.

Service/ash conveying air line


up to terminal point

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

51.

Instrument air/water line up to


terminal point

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

52.

Supporting structure for vessels


& pipe line

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

CFBC BOILER BED ASH STROAGE SILO


53.

Silo

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

54.

Silo accessories (bag filters, fan


etc)

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

55.

Bottom chute

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

56.

Terminal end unit at silo top

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

57.

Fluidizing pads

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

58.

Fluidizing air compressor

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

59.

Fluidizing pads air line & valves

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

60.

Sliding gate (manual)

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-45-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING

SL.

DESCRIPTION

NO.

BASIC
DESIGN
INCL
P&ID
ETC.

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

61.

Rotary feeder

62.

Ash
conditioner
complete

assembly

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

63.

Plate valve
vessel)

conveying

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

64.

Dome valve

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

65.

Ash conveying vessel (master


& slave) complete

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

66.

Ash conveying line bends

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

67.

Ash conveying
flanges, gaskets)

(pipe,

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

68.

Service/ ash conveying air line


up to common terminal point

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

69.

Instrument air/water line up to


terminal point

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

70.

Supporting
structure
for
vessels, ash conditioner & pipe
line

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

(ash

line

CFBC BOILER FLY ASH STORAGE SILO


71.

Silo

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

72.

Silo accessories (bag filters, fan


etc)

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-46-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING

SL.

DESCRIPTION

NO.

BASIC
DESIGN
INCL
P&ID
ETC.

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

73.

Bottom chute

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

74.

Terminal end box at silo top

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

75.

Sliding gate (manual)

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

76.

Rotary feeder

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

77.

Ash
conditioner
complete

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

78.

Fluidizing pads

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

79.

Fluidizing air compressor

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

80.

Fluidizing pads air line & valves

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

81.

Supporting structure for ash


conditioner assembly

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

assembly

CFBC BOILER ASH HANDLING COMPRESSERS


82.

Screw compressor of suitable


capacity complete with stand by

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

83.

Air receiver
accessories

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

84.

Air driers complete

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

with

standard

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-47-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
BASIC
DESIGN
INCL
P&ID
ETC.

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

85.

Necessary compressed air


piping, instrument and manual
valves with in battery limit.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

86.

Service air requirement 2x100


% air compressor with 7 to 8
kg/cm2 (g) discharge pressure
will be provided in load/ unload
operation mode and required
nos of air receiver.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

SL.

DESCRIPTION

NO.

B. ELECTRICAL
87.

Motors of suitable capacity

88.

EPC Control
junction box

89.

Junction boxes field

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

90.

Local push button

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

91.

Cables form junction boxes

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

92.

Lightening protection

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

93.

Earthing

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

cable

up

to

C. INSTRUMENTATIONS
94.

All suitable field instruments

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-48-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING

SL.

DESCRIPTION

NO.

BASIC
DESIGN
INCL
P&ID
ETC.

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

95.

Junction boxes

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

96.

Cables up to junction boxes

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

97.

DCS

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

98.

Cables from PLC panel to DCS

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

99.

Copper tubing for air line to the


field instruments.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

100.

Cable from local Junction box


to PLC panel.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-49-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

F. DM PLANT
ENGINEERING
BASIC
DESIGN
INCL
P&ID
ETC.

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

SL.
NO.

DESCRIPTION

One No. water storage tank of


4 hrs holding capacity.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Two Nos. (1W +1S) pump sets


for feeding treated water to
MGF.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Two Nos. (1 x
Multi Grade
complete with
valves, media
instrument etc.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

1 X 100% Activated Carbon


Filters (ACF) for removal of
odour, colour, oil and chlorine,
if any.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC Contr.

100%) Vertical
Filters (MGF)
frontal piping,
and Internals,

RO PLANT
5

Complete with required no. Of


modules.

2 x 100% high pressure pump.

1 x 100% back wash pump.

2 x 100% chemical dosing


pump as per the system
requirements, complete internal
pipings, and interconnecting
pipings
with
required
instrumentation.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

1 X 100% Degasser Tower.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.
EPC
Contr.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-50-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
BASIC
DESIGN
INCL
P&ID
ETC.

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

2 X 100% (1W+1S) blower sets


for Degasser tower.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

11

One No. of Degassed Water


Storage tank for each stream
(MSEP)
having
capacity
equivalent
to
150%
of
degassed water required for
regeneration.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

12

2 X 100% WBA feed pumps for


feeding water from DG tank to
WBA, SBA and MB.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

13

1 X 100% Weak Base Anion


exchanger operating on 20hrs
cycle.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

14

1 X 100% Strong Base Anion


exchanger operating on 20hrs
cycle.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

15

1
X
100%
Mixed
bed
exchanger (MB) operating on
140hrs cycle.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

16

1 X 100% Ultra filtration module


for removal of colloidal silica.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

17

1 X 100% pH correction system


(Morpholine dosing).

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

18

Two numbers (1W + 1S) rotary


twin blowers common for MB
and Multi grade filters.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

19

Necessary resins for all the


exchangers in DM chain.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

20

2 Nos. DM water storage tanks

EPC

EPC Contr.

EPC Contr.

EPC Contr.

SL.
NO.

DESCRIPTION

10

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-51-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
SL.
NO.

BASIC
DESIGN
INCL
P&ID
ETC.

DESCRIPTION

(MOC: FRP) of capacity 100


m3 each.

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

Contr.

21

Three Nos. (2W+1S) DM water


transfer pumps of capacity 7
m3/hr with a head 90MWC
(min.) for Boiler make up and
LP / HP dosing system.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

22

1Nos. boiler initial fill pumps


each of capacity 50 m3/hr with
a head of 90 MWC.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

23

Neutralizing pit with 1 nos.


sump pump sets. Bidder shall
connect
the
necessary
Neutralizing lines from Acid &
Alkali Bulk tank with the
Neutralizing pit. As well as
recirculation lines from effluent
transfer pump sets for proper
agitation.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

24

1 no. bulk acid tank (MOC shall


be MSRL).

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

25

1 no. of acid unloading pump


shall be considered.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

26

1 no. acid day tanks (MOC


shall be FRP) for SAC & MB
units.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

27

One no. bulk alkali tank (MOC


shall be MSRL) for 30 days
requirement.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Balance of Plant (BOP)

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-52-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
BASIC
DESIGN
INCL
P&ID
ETC.

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

28

1 no. (1W+1S) of caustic


unloading pumps shall be
considered.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

29

1 no. caustic day tanks (MOC


shall be MSRL) for SBA & MB
units.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

30

Chlorination system for cooling


tower water shall be provided.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

31

All frontal/interconnecting pipe


work/Valves/Fittings/Resin
traps.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

32

O/P platforms, ladders, hand


rails and pipe supporting
structures.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

33

Orifice metering V-notch boards


for all exchangers/Filters.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

34

Foundation bolts, nuts (noncorrosive material), gaskets,


blind flanges.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC Contr.

SL.
NO.

DESCRIPTION

OTHERS

ELECTRICAL
35

All drive motors for equipment


in bidders scope of supply.

36

LPBS for the above motors.

37

MCC panel and mimic panel.

38

Cable trays for power and

EPC
Contr.
EPC
Contr.
EPC

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-53-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
SL.
NO.

BASIC
DESIGN
INCL
P&ID
ETC.

DESCRIPTION

control cables
supports.

with

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

steel

Contr.

39

Inter connecting cables both


power and control, cable glands
and lugs with in the battery
limit.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

40

Lightning
protection
earthing work.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

41

All instruments viz. pressure


gauge, flow indicators, flow
transmitters, flow totalizes,
conductivity analyzers, silica
analyzers,
indicators,
transmitters, level gauges, pH
analyzer indicator, transmitters,
level alarms, density indicators,
pressure switch.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

42

All instruments and controls as


required.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

and

INSTRUMENT

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-54-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

G. AUXILIARY COOLING TOWER


ENGINEERING

SL.
NO

BASIC
MANUFACTURE
AND SUPPLY
DESIGN DETAILED AND
INCL CONSTRUCTION
P&ID
DRGS
ETC.

DESCRIPTION

FABRICATION,
ERECTION,
TESTING AND
COMMISSIONING

Cooling Tower complete with


Tower fills, fill supports, water
distributors, drift eliminators,
fans, gearbox etc.,

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Complete hot water piping with


isolation
valves
and
accessories.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Foundation bolts, embedded


parts, inserts pipes etc.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Pipe work of the cooling tower.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Electrical motors for the fans

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Push button stations for the fan


motors
Field gauges

Vibration limit switches, level


switches for oil in reduction
gear / fans

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-55-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

H. WATER PUMPS AND PIPINGS


ENGINEERING
MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Combined base frame for pump


and motor with drain collector,
foundation bolts, structural
materials etc.,

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Counter flanges along with


gaskets and connecting bolts

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Pipe work of Auxiliary cooling


water system and
water
system pumps

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

All necessary water piping,


NRVs, valves etc required for
water system.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

SL.

BASIC
DESIGN
INCL
P&ID
ETC.

DETAILED AND
CONSTRUCTION
DRGS

Auxiliary cooling water system


pump, Raw water pumps,
Deaerator Makeup pumps,
Effluent discharge pumps, DM
plant make up pumps, Drinking
water pump, Boiler blow down
pumps, Reuse water pumps,
Initial filling pump and its motor.

EPC
Contr.

Motor
complete,
coupling,
coupling guard etc, for all
pumps. (Make ABB, Bharath
Bijlee and Siemns).

NO

DESCRIPTION

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-56-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

I.

EOT CRANE
ENGINEERING

SL.
NO.

BASIC
MANUFACTURE
AND SUPPLY
DESIGN DETAILED AND
INCL CONSTRUCTION
P&ID
DRGS
ETC.

DESCRIPTION

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

One No. minimum 60 Tonnes


lifting capacity, Double girder
Electric Overhead Travelling
Crane with plain shank hook for
main hoist and one no. auxiliary
hoist (5 Tonnes), complete with
all accessories as detailed in
the crane data sheet and Data
specification sheets, for Steam
Turbine Generator building.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

Maintenance platforms and


access ladders as required,
also monorail facility at the end
of bay to be provided for crane
auxiliaries
and
equipment
maintenance.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

Crane shall have suitable


alarms, interlocks etc safety
features.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

Suitable Gantry Rails

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

PVC Shrouded DSL system


(GI) & DSL cabling.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

Electrical control panel shall be


located at one point in the
crane and wiring from control
panel to equipment.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-57-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
SL.
NO.

BASIC
MANUFACTURE
AND SUPPLY
DESIGN DETAILED AND
INCL CONSTRUCTION
P&ID
DRGS
ETC.

DESCRIPTION

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

All hoist and travel motors


including creep motors for
crane as applicable.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

All power and control cabling /


wiring bridge cross conductors,
current collectors etc. as
required
for
safe
and
satisfactory operation of the
crane.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

All safety switches.

10

All protective, control and


lighting panels, push buttons
etc.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

All crane control systems


including controllers resistors,
limit switches, hooter etc.

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

12

Crane illumination and crane


earthing / grounding system

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

13

Girder for supporting the long


travel rails

EPC
contr.

EPC contr.

EPC contr.

EPC contr.

11

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-58-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

J. FIRE FIGHTING SYSTEM


ENGINEERING
BASIC
DESIGN
INCL
LAYOU
T ETC

DETAILED
AND
CONSTRUCTI
ON DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

SL.NO

DESCRIPTION

Fire hydrant system for complete


plant with necessary pumps i.e
1W + 1S AC pumps, 1W+1S
Jacking oil pump & 1 no diesel oil
pump with required capacity
270m3/hr and hookup to DCS

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Hydrant line from the pump house


to all interior area covering all
buildings and equipments, coal
yard
with
required
valves,
hydrants points, hoses etc.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

MVWS system for conveyors and


bunker with all the auxiliaries &
accessories and hookup to DCS

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

HVWS system for GT transformer


with all auxiliaries & accessories
and hookup to DCS

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Portable fire extinguishers for


turbine
hall,
control
room,
electrical room, MCC rooms
located in various area.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Fire bridge station with required


auxiliaries & accessories

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Fire detection, alarm, sensors as


per the requirement in TG building
each floors & MCC rooms of
different areas

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-59-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

K. VENTILATION & A/C SYSTEM


ENGINEERING
BASIC
DESIGN
INCL
LAYOU
T ETC

DETAILED
AND
CONSTRUCTI
ON DRGS

MANUFACTURE
AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONING

SL.NO.

DESCRIPTION

Supply air system for electrical


rooms

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

A/C system from control room

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

TG operating floor and


building general ventilation

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

A/C system local control /


electrical room in FHS, AHS etc
as required.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

TG

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-60-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

L. ELECTRICAL SYSTEM
ENGINEERING

BASIC
DESIGN

DETAIL
ED AND
CONST
RUCTIO
N DRGS

MANUFAC
TURE
AND
SUPPLY

FABRICATION
, ERECTION,
TESTING AND
COMMISSIONI
NG

EPC
Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

SL.
DESCRIPTION

NO

1.

Generator and its Auxiliaries:


AC electric generator rating of 45 MW capable of
operating with a power factor of 0.8 lag, generation
voltage 11 KV and frequency 50 Hz shall be
supplied. The generator shall be capable of stable
operation even with a variation in voltage of +/- 5%
and frequency variation of +/- 5%.

2.

The excitation system shall be brushless type. The


brushless exciter shall consist of a permanent
magnet generator, AC exciter. Shell and tube heat
exchangers shall be mounted on the machine for
air-cooling.

EPC
Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

3.

Lightning Arrestor and Surge Protection (LAPT)


cubicle for the Generator.

EPC
Contr.

EPC
Contr

EPC Contr.

EPC Contr.

4.

Neutral Earthing Equipment for the generator

EPC
Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

5.

Generator Relay Panel with redundancy

EPC
Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

6.

Metering cum synchronizing panel with auto


synchronizer

EPC
Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

7.

AVR panel

EPC
Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

8.

Turbine Control & gauge Panel

EPC
Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

9.

Requirement of CT, PT ratings as per SLD.

EPC
Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

10.

11KV HT bus duct:

EPC
Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

Rating of 3500A phase segregated bus duct for


TG, NGR, LAPT, 11KV HT panel.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-61-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING

BASIC
DESIGN

DETAIL
ED AND
CONST
RUCTIO
N DRGS

MANUFAC
TURE
AND
SUPPLY

FABRICATION
, ERECTION,
TESTING AND
COMMISSIONI
NG

EPC
Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

SL.
DESCRIPTION

NO

11.

Switchyard:
132/11 KV Switchyard & accessories and
switchyard end connect to existing 132KV bus
through 132KV HT cables.

12.

Single bus system with suitable post insulators,


Bus Potential transformer with isolators, breaker for
main bus with CTs on each side, Potential
transformers, Lightning arrestors and feeder
protection on transformers and transmission lines.

EPC
Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

13.

Generator Transformers:

EPC
Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

1 no. of generator transformers of capacity 53


MVA, ONAN/ONAF of voltage rating 11KV / 132
KV, 50HZ suitable for export of power with ON load
tap changer.
14.

LT Auxiliary transformers:
2 nos of LT Auxiliary transformer of capacity 2.5
MVA, voltage rating 11KV / 433 V, 50HZ suitable
for distribute the power with Off load tap changer.

15.

HT Auxiliary transformers:
1no of HT auxiliary transformer of capacity 3MVA
voltage rating 11KV/3.3KV, 50HZ suitable for
distribute the power with off load tap changer.

16.

Transformers accessories as per IS 2026

EPC
Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

17.

HT Switchgear:

EPC
Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC

EPC

EPC Contr.

EPC Contr.

11KV HT panel and no. of feeders as per SLD. and


3.3KV switchgear
18.

LT Switchgear:
415V PCC, MCCs Panel

19.

The switch boards shall be draw-out type circuit

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-62-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING

FABRICATION
, ERECTION,
TESTING AND
COMMISSIONI
NG

DESCRIPTION

BASIC
DESIGN

breakers, earthing switches, bus bars, draw-out


type voltage transformers, CTs, cable connections
etc. sheet steel having minimum thickness of 2 mm
and the construction shall conform to IP 52 degree
of protection for the enclosure. Panel height should
not exceed 2200mm.

Contr.

MCC Panels:

EPC
Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

SL.
NO

20.

MANUFAC
TURE
AND
SUPPLY

DETAIL
ED AND
CONST
RUCTIO
N DRGS
Contr.

TG MCC, Boiler, ESP, DM plant, ACC, WTS, AHS,


FHS, MPDB, MLDB, Capacitor Panel with APFC,
VFD panel.
21.

LT motors will be squirrel cage induction type


machines and will operate on 415V, 3 phase, and
50Hz power supply. Motors of rating 200KW and
below will have rated voltage of 415V and above
200KW shall be rated for 3.3KV voltage.

EPC
Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

22.

Complete interconnecting power and control cables


from the field switches, motor heaters to the
nearest junction boxes.

EPC
Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

23.

DB, local push button station

EPC
Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

24.

LT Bus duct:

EPC
Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

Bus duct from distribution transformers to Power


control centre. Rating of 3200A non - segregated
phase bus duct.
25.

DG set:
DG set unit of capacity of 625KVA shall be
provided. All the small emergency loads like UPS,
Battery charger, DM transfer pumps etc will be
connected to emergency bus to avail DG power.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-63-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING

BASIC
DESIGN

DETAIL
ED AND
CONST
RUCTIO
N DRGS

MANUFAC
TURE
AND
SUPPLY

FABRICATION
, ERECTION,
TESTING AND
COMMISSIONI
NG

EPC
Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

SL.
DESCRIPTION

NO

26.

Battery & battery charger:


110V DC suitable capacity of battery will be
provided for catering the power requirement of TG,
Breaker closing and tripping coils, relays and
protection panels etc. Suitable battery charger with
float/ trickle/ boost charging will be provided.
Suitable DCDB shall be included for control supply
and other DG emergency load.

27.

UPS:
2 nos of Single phase uninterrupted power system
of 110VAC of suitable capacity will be provided for
supplying control power supplies. The source for
this UPS will be from Emergency PCC. Suitable
AC distribution board shall be included in the scope
for control supply.

28.

Earthing and lightning protection:


1) Earthing pit
2) Main and sub earth mat

29.

The design of earthing station shall be as per IS:


3043, adequate protection for lightning shall be
provided in each building and tall structures as per
BIS standard.

EPC
Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

30.

Plant lighting:

EPC
Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

Lighting and fixtures for entire power plant.


Illumination level of buildings shall be as per IS
3646 (Part I): 1992. Lighting for the plant will be
designed as per current industrial standards.
31.

Cables:
Cables and cabling accessories (HT & LT cables):
All necessary power and control interconnection as

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-64-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING

BASIC
DESIGN

DETAIL
ED AND
CONST
RUCTIO
N DRGS

MANUFAC
TURE
AND
SUPPLY

FABRICATION
, ERECTION,
TESTING AND
COMMISSIONI
NG

SL.
DESCRIPTION

NO

required evacuating the power.


32.

BOQ of cables & lighting shall be submitted with


design basis for approval.

EPC
Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

33.

Cable tray/ cable rack and trench

EPC
Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

34.

Control and protection:

EPC
Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

a) Generator control panel


b) Generator protection relay panel
c) Transformers protection relay panel
35.

Civil foundations :
All civil and structural works including switchyard,
power transformers, cable tray & cable rack and LT
transformers, etc

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-65-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

M. CONTROL & INSTRUMENTATION


ENGINEERING
MANUFA
CTURE
AND
SUPPLY

FABRICATION
, ERECTION,
TESTING AND
COMMISSIONI
NG

DESCRIPTION

BASIC
DESIGN

DETAILE
D AND
CONSTR
UCTION
DRGS

Complete design, system detailed engineering,


documentation, manufacture, supply, software
development, Installation, Inspection.

EPC
Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

All automation Systems and their subsystem


covered in this specification shall be designed,
manufactured and tested in compliance with the
latest relevant codes and standards of practices
published by the Bureau of Indian Standards and
Foreign Standards.

EPC
Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

DCS shall be inclusive with its subsystems,


associated software & hardware connected with
each other

EPC
Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

Redundancy shall be provided at all levels in DCS.


except the I / Os modules

EPC
Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

Redundant Field Control Station shall be rackbased system with passive back plane type for
better reliability

EPC
Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

Redundant Field control stations shall be complete


with mounting racks, processor units, input/output
modules, interconnecting data cables and other
accessories like terminal units

EPC
Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

Digital output transmitted from the DCS to the field


shall be through potential free relay contacts.
Necessary interposing relays and contactors shall
be provided for all the digital outputs.

EPC
Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

All the digital inputs wired to the DCS from the


process switch contacts shall be potential free and
suitable for 24V DC interrogation voltage.

EPC
Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

All the analog outputs shall be of 4-20mA DC

EPC

EPC

EPC

EPC Contr.

SL.
NO

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-66-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING
MANUFA
CTURE
AND
SUPPLY

FABRICATION
, ERECTION,
TESTING AND
COMMISSIONI
NG

capable of driving a load of 700 .

Contr.

DETAILE
D AND
CONSTR
UCTION
DRGS
Contr.

10

Separate marshalling cabinets with terminal blocks


shall be provided at DCS panels to terminate cable
from the field as well as from MCC

EPC
Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

11

Scan time includes the time for scanning the input,


A/D conversion, signal processing and control and
outputting shall be 2 to 500ms.

EPC
Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

12

System shall be provided with self diagnostic


features.

EPC
Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

13

Engineering and Operator workstations of the DCS


shall be identical and interchangeable. These shall
be of Business Grade PC units from reputed MNC
Brand and shall be complete with processor,
memory, power supply, bulk memory units, high
resolution colour monitor, key-board, mouse,
communication interface modules,

EPC
Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

14

Two nos (Dot matrix) Printer. Black and white 132


column dot matrix type printers for printing alarms
and event logging.

EPC
Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

15

Two nos. Colour laser printer (A4 size) shall be


provided for printing logs, reports and also for
printing hard copies of displays.

EPC
Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

16

Control data highway shall be of high speed


Ethernet
open
network
and
systems
&
Communication medium shall be of high quality
data cable with speed transmission not less than
100 MBPS.

EPC
Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

EPC
Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

SL.
NO

17

DESCRIPTION

BASIC
DESIGN

System, I/O and marshalling cabinets shall be of


free standing, vertical closed cubicle type with front
and rear opening single doors. Panels and cabinets

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-67-

Contr.

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING

BASIC
DESIGN

DETAILE
D AND
CONSTR
UCTION
DRGS

MANUFA
CTURE
AND
SUPPLY

SL.
DESCRIPTION

NO

FABRICATION
, ERECTION,
TESTING AND
COMMISSIONI
NG

shall be pre-treated and powder coated.


18

The supply voltage for all the sub-system and the


workstations of DCS shall be of 110VAC 50Hz

EPC
Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

19

Redundant 110 Vac UPS with required VA rating

EPC
Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

20

Special microprocessor based instruments such as


electronic governor, tri-vector meters, precision
meters which shall be provided as part of the
package equipment supply, shall have RS 485
MODBUS serial interface connectivity to the DCS.

EPC
Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

21

Design, supply, procurement & delivery to site of


instrumentation & control cable

EPC
Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

22

Cable laying & Termination from Field instruments


to the DCS along with Testing / checking of all
Control Loops.

EPC
Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

23

Power cabling required for the automation system


equipment from the marshalling cabinet to the
various components of DCS

EPC
Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

24

Cable tray routing drawing including details of cable


trays from field JBs to DCS.

EPC
Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

25

The philosophy of cross & direct ferruling shall be


followed for all internal & external wiring in the
Control Panel, MCC, Junction Boxes

EPC
Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

26

Isolated special earthing arrangement called as


system earth exclusively for the DCS. Exclusive
earthing pits for the DCS

EPC
Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

27

In-built performance calculation packages to


perform the efficiency calculation of boiler, turbine,
economiser, STG & condenser

EPC
Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

28

Software

EPC

EPC

EPC

EPC Contr.

development,

Installation,

Inspection,

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-68-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING

BASIC
DESIGN

Testing (FAT),packing, shipment, delivery to the


site,

Contr.

Supervision
of
erection,
system
setup,
commissioning, performance/acceptance test (SAT)
training of purchaser persons O & M manuals, &
final handing over of the Plant Automation System

EPC
Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

Organizing training programmes at manufacturers


works as well as at site during commissioning for
the purchasers personnel in operation and
maintenance of DCS.

EPC
Contr.

EPC
Contr.

EPC
Contr.

EPC Contr.

NO

30

FABRICATION
, ERECTION,
TESTING AND
COMMISSIONI
NG

DESCRIPTION

SL.

29

MANUFA
CTURE
AND
SUPPLY

DETAILE
D AND
CONSTR
UCTION
DRGS
Contr.





HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-69-

Contr.

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

N. CIVIL AND STRUCTURAL WORKS


ENGINEERING

SL.
NO

DESCRIPTION

BASIC
DESIGN
ETC.

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTUR
E AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONI
NG

1. CFBC Boiler
1.1

RCC for column supporting


and operating floor slabs.
Staircase wherever required.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

1.2

Rain gutters and drain piping


for boiler hopper, roof and
side cladding

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

2.1.1

Foundation of ID fan & its


auxiliaries including the
foundation for ID for covering
shed.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

2.1.2

Foundation of SA fan & its


auxiliaries including the
foundation for ID for covering
shed.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

2.1.3

Foundation of PA fan & its


auxiliaries including the
foundation for ID for covering
shed.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

2.1.4

Ducting supporting column


foundation.

2.
2.1.

Boiler Auxiliaries
Fans

EPC
Contr.

EPC Contr.

EPC Contr.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-70-

EPC Contr.

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING

SL.
NO

2.2.
2.2.1

2.3.

2.3.1

2.4.
2.4.1

2.5.

DESCRIPTION

MANUFACTUR
E AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONI
NG

BASIC
DESIGN
ETC.

DETAILED AND
CONSTRUCTION
DRGS

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Electro precipitator static


Electro static precipitator
column foundation and
staircase column foundation.
Chimney (100 mts)
RCC Chimney complete
including foundation, inside
refractory work with lending
wherever required staircases,
hand- railing, aviation lamp
assembly etc.
Blowdown Tank
Blowdown tank foundations
Steam Piping

2.5.1

Design and preparation of


construction drawings of
steam line support rack
columns etc.

2.5.2

Steam piping support column


foundation, pipe rack steel
structures.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

3. TG building
3.1

Complete TG Building RCC


works including TG building
column, opening floor slab.

EPC
Contr.

EPC Contr.

EPC Contr.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-71-

EPC Contr.

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING

SL.
NO

DESCRIPTION

MANUFACTUR
E AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONI
NG

BASIC
DESIGN
ETC.

DETAILED AND
CONSTRUCTION
DRGS

TG Deck foundation. The


deck foundation, deck slab
with required cut-outs.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

TG auxiliary foundations
a. Oil system
i. Emergency Oil Pump.
ii. Auxiliary Oil Pump.
iii. Jacking Oil Pump
iv. Main oil tank and
pump
Iii. Centrifuge oil purifier
system
iv. Over head oil tank/
over flow oil tank.
v. Oil coolers
b. Flash tank
c. QCNRV station
d. GVC

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

3.4

Boiler feed pump and its


auxiliaries, RCC foundation

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

3.5

Deaerator cum storage tank


foundation

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

3.6

Air compressor , receiver


RCC foundation

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

3.7

HP heater foundation

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

3.8

LP heater foundation

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

3.2

3.3

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-72-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING

SL.
NO

DESCRIPTION

BASIC
DESIGN
ETC.

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTUR
E AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONI
NG

EPC Contr.

3.9

HP/LP dosing system


foundation

EPC
Contr.

EPC Contr.

EPC Contr.

3.10

Staircase and walkways


wherever required

EPC
Contr.

EPC Contr.

EPC Contr.

3.11

Approach platform between


TG building and air cooled
condenser building &
approach platform TG building
to boiler.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

3.12

RCC work, MCC room and


PCC room wherever required.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

3.13

Partition and rooms for in


charges, O&M team ,
Instrumentation managers
room and levorotary facilities

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

3.14

Cable trench and drain works


flooded water drainage
system.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

3.15

Grouting for equipments

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC Contr.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-73-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING

SL.
NO

DESCRIPTION

BASIC
DESIGN
ETC.

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTUR
E AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONI
NG

4.0

Air Cooled Condenser

4.1

Complete air cooled


condenser RCC and structural
works including tie beams, fan
supports, fan stacks,
stiffeners, platforms and
corridor etc.,.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

4.2

Condensate extraction pump


foundation

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

4.3

Condensate drain Boot pump


foundation

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

4.4

Fin cleaning system pump


foundation

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

4.5

Exhaust steam duct, support


column foundations.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

4.6

RCC supporting structure


including fan deck & deck
slab, supporting columns,
beams, condensate tank
supporting structure with
platform, ejector supporting
structure with platform, stair
case & walk way of RCC.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

Wind wall with structural steel


column.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

4.7

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-74-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING

SL.
NO

DESCRIPTION

5.0

Balance of Plant

5.1

Fuel Handling System

BASIC
DESIGN
ETC.

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTUR
E AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONI
NG

5.1.1

Ground Hopper in RCC


construction with square
grizzly on top, manual rack
and pinion gate at bottom,
with wear resistant liner on
inclined surfaces.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

5.1.2

Ground hopper, conveyor


structure column foundation,
crusher house, crusher
foundation etc.,

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

5.1.3

Primary crusher house civil


foundation complete for
crusher, crusher motor,
crusher house column etc.
steel structure of crusher
house complete with side
sheeting and staircase
wherever required.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

5.1.4

Secondary crusher house civil


foundation complete for
crusher, crusher motor,
crusher house column etc.
steel structure of crusher
house complete with side
sheeting and staircase
wherever required.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-75-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING

SL.
NO

DESCRIPTION

BASIC
DESIGN
ETC.

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTUR
E AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONI
NG

5.1.5

Fuel transfer house and civil


foundation etc.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

5.1.6

Steel structure with side


sheeting and staircases
wherever required

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

5.1.7

Portable dewatering pumps


RCC Tunnel.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

5.2

Ash Handling System

5.2.1

Ash handling system


foundation, Ash conveying
pipe racks steel structure and
pipe supports

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

5.2.2

Ash silo RCC foundation and


complete steel structure

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

5.3

DM plant

5.3.1

DM plant Building

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

5.3.2

DM plant equipment
foundations

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

5.3.3

DM storage tank foundations

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

5.3.4

Foundation bolts, nuts (noncorrosive material), gaskets,


blind flanges.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-76-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING

SL.
NO

5.4

DESCRIPTION

BASIC
DESIGN
ETC.

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTUR
E AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONI
NG

Auxiliary Cooling Tower


and Pump

5.4.1

Civil work complete, including


basin of required capacity

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

5.4.2

Auxiliary cooling tower


foundations including basin

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

5.4.3

Auxiliary cooling water pump


foundation

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

5.5

Water system piping and


pumps

5.5.1

Pump foundations

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

5.5.2

Excavation & pipe laying and


Protecting Casting for pipe
work of all water piping.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

6.0

Electrical

6.1

Switchyard Equipment
foundations

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

6.2

Transformer & DG set

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

6.3

ESP control room

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

6.4

Cable trench works

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-77-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING

SL.
NO

DESCRIPTION

BASIC
DESIGN
ETC.

DETAILED AND
CONSTRUCTION
DRGS

MANUFACTUR
E AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONI
NG

7.0

General

7.1

Soil investigation

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

7.2

Site leveling

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

7.3

Excavation

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

7.4

Approach roads to all main


equipments of coal yard.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

7.5

Weighbridge foundation /
complete.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

7.6

Design and preparation of


construction drawings for all
RCC & steel column
structures.

7.7

Design and preparation of


construction drawings for all
equipments

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

7.8

Foundation bolts for all


equipments

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

7.9

Insert plates and curb angles


wherever required.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

7.10

Roads and drainages works

EPC

EPC Contr.

EPC Contr.

EPC Contr.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-78-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

ENGINEERING

SL.
NO

MANUFACTUR
E AND SUPPLY

FABRICATION
ERECTION,
TESTING AND
COMMISSIONI
NG

DESCRIPTION

BASIC
DESIGN
ETC.

within the CPP area and


around plant buildings
including flood water drainage
system.

Contr.

7.11

All RCC & steel column


structures.

EPC
Contr.

7.12

Grouting for all equipments

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

7.13

Flood water drainage, cable


trench valve pits.

EPC
Contr.

EPC Contr.

EPC Contr.

EPC Contr.

DETAILED AND
CONSTRUCTION
DRGS

EPC Contr.

EPC Contr.















HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-79-

EPC Contr.

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

O. COMMON FOR ALL PACKAGES


S.NO

DESCRIPTION

Scope
EPC Contr.

Commissioning spares

Set of special tools and tackles for the


all equipments

The initial requirement of all


consumables and first fill of materials
such as oil, lubricants etc. required till
final commissioning

EPC Contr.

Unloading at site

EPC Contr.

Performance test

EPC Contr.

Two years O&M spares List of


recommended spares to be furnished
for all equipments.

EPC Contr.

PAINTING Two coats of primer and


Two coats of finish painting of all
equipment, structures, piping, ducting
etc. done at factory or site.

EPC Contr.

Noise hood, noise level < 85 dBa at 1 m


from equipment.

EPC Contr.

Remarks

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-80-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

P. SITE FACILITIES AND SERVICES


S.NO
1

DESCRIPTION

Scope

Providing Erection tools, tackles,


hoists, derricks, slings, scaffolding,
rigging tools, welding sets,
instruments, appliances, consumables
required for unloading, transporting,
storing, erection, inspection, testing and
commissioning to accomplish the work.

EPC Contr.

Unloading at site

EPC Contr.

Steam blowing Pre-commissioning


check, trial run of equipment calibration
of instrument & control etc.

EPC Contr.

Pre-commissioning check, trial run of all


equipment calibration of instrument &
control etc.

EPC Contr

Providing instrument for above testing

EPC Contr.

Performance test at shop and at site


after commissioning.

EPC Contr.

Construction of site office and store


room for use by Supplier

EPC Contr.

Storage space and access road

EPC Contr.

Local conveyance, Boarding & Lodging


for EPC CONTR. site personnel

EPC Contr.

10

Training of purchasers O & M personal

EPC Contr.

11

O&M staff for Boiler startup,


commissioning & operation

EPC Contr.

12

Supply of construction power on


chargeable basis and water free of

EPC Contr.

Remarks

Only area will be identified at the site by


FACOR. Fencing etc. by EPC CONTR..

Under guidance of supplier Engineers


till such time

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-81-

FACOR ALLOYS LIMITED


45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)

S.NO

DESCRIPTION

Scope

Remarks

cost at one point


13

All IBR approvals / formalities till steam


test and safety valve floating.

EPC Contr.

14

Telephone facilities

EPC Contr.

15

Emergency / first aid medical facilities


to SUP staff and erection crew posted
at site

EPC Contr.

16

Security, Inventory and accounting of


SUP equipment and property till final
take over by FACOR

EPC Contr.

17

Lighting facilities at erection site

EPC Contr.

18

Transportation of equipment from EPC


CONTR. manufacturing units to FACOR
site

EPC Contr.

19

Transit insurance

EPC Contr.

20

Site storage insurance

EPC Contr.

21

Applicable taxes and duties

EPC Contr.

FACOR will be only responsible for the


overall lighting such as road lighting,
lighting in the erection site etc. in the
plant area. Lighting within EPC
CONTR. facilities i.e EPC CONTR.
storage area, office etc will be
responsibility of EPC CONTR.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-82-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION

ANNEXURE 10
QUESTIONNAIRE
A. BOILER & AUXILIARIES
S.NO
1

DESCRIPTION

UNITS

TECHNICAL
PARAMETERS

Type of Boiler

1.1

Number of boiler

1.2

Type of circulation

1.3

Type of feeding system

1.4

Type of support

1.5

Design code

1.6

Steam generated,

1.7

Steam purity

1.8

Steam pressure in the steam drum,

Kg/cm2

1.9

Steam pressure at the main steam


stop valve,

kg/cm2

1.10

Steam temperature at the main


steam stop valve,

deg. C

1.11

Desuper heater Spray water temp.

1.12

Steam temperature at inlet of,

1.12.1

- Primary Superheater

1.12.2

- Final Superheater

No

Tons / hr

deg. C

1.13

Feed water temperature at the inlet


and outlet of economiser,

deg. C

1.14

With HP heater in service

deg. C

1.15

Excess air at furnace exit

1.16

Excess air at outlet of air heater

Feed water pressure at inlet to


economiser,

kg/cm2

2.1

Fuel mix considered

2.2

Fuel analysis considered for design

2.3

Anticipated boiler efficiency

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI


-1-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

DESCRIPTION

UNITS

2.4

Ash analysis/qty considered for


design

2.5

Flue gas temperature,

deg. C

2.5.1

- At APH outlet

deg. C

2.5.2

- At ID fan outlet

deg. C

2.6

Turn down ratio boiler

2.7

Superheater steam temp. Control


range first stage

% BMCR

2.8

Super heater steam temp. Control


range - second stage

2.9

Combustor outlet temperature

2.10

Cyclone efficiency

2.11

Primary air qty/ % of total air

2.12

Secondary air qty/ % of total air

2.13

Drum operating temp.

Deg.C

3.0

Mass Balance details

3.1.1

Fuel flow

Kg/hr

3.1.2

Combustion air total

Kg/hr

3.1.3

Lime stone

Kg/hr

3.1.4

Total input

Kg/hr

3.2.1

Flue gas produced

Kg/hr

3.2.2

Total ash generated

Kg/hr

3.2.3

Total output

Kg/hr

4.0

Temperature Profile

4.1

Flue gas

4.1.1

Furnace inlet

deg. C

4.1.2

Inlet final superheater

deg. C

4.1.3

Outlet final superheater

deg. C

4.1.4

Inlet secondary superheater

deg. C

TECHNICAL
PARAMETERS

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-2-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

DESCRIPTION

UNITS

4.1.5

Outlet secondary superheater

deg. C

4.1.6

Inlet primary superheater

deg. C

4.1.7

Outlet primary superheater

deg. C

4.1.8

Inlet economizer

deg. C

4.1.9

Outlet economizer

deg. C

4.1.10

Inlet air heater

deg. C

4.1.11

Outlet air heater

deg. C

4.1.12

Inlet of ESP

deg. C

4.1.13

Outlet of ESP

deg. C

4.1.14

At stack entrance

deg. C

4.2

Air

4.2.1

Inlet air preheater

deg. C

4.2.2

Outlet air preheater

deg. C

4.2.3

Inlet wind box

deg. C

4.3

Steam

4.3.1

Primary superheater inlet

deg. C

4.3.2

Primary superheater outlet

deg. C

4.3.3

Inlet secondary superheater

deg. C

4.3.4

Outlet secondary superheater

deg. C

4.3.5

Inlet final superheater

deg. C

4.3.6

Outlet final superheater

deg. C

4.4

Feed water

4.4.1

Inlet economizer

deg. C

4.4.2

Outlet economizer

deg. C

5
5.1
5.1.1

TECHNICAL
PARAMETERS

Pressure drop
Steam side
Superheater circuit including
Desuperheater(from drum outlet to

Kg/cm2

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-3-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

DESCRIPTION

UNITS

TECHNICAL
PARAMETERS

final superheater outlet header)


5.2
5.2.1

Water side
From feed pump discharge to steam
drum inlet

6.0

Velocity

6.1

Gas side

Kg/cm2

6.1.1

Fluidizing velocity

m/s

6.1.2

Super heater zone

m/s

6.1.3

Economizer zone

m/s

6.1.4

Air heater zone

m/s

6.2
6.2.1

Air side
Air heater region

m/s

7.0

Ducting

7.1

Cold air

m/s

7.2

Hot air

m/s

7.3

Flue gas

m/s

7.4

Feed pipe line

m/s

7.5

Main steam pipe line

m/s

7.6

Heating surface area (Thermal)

7.7

Furnace

m2

7.8

Superheater

m2

7.9

Economizer

m2

7.10

Air heater

m2

8.0

Steam drum

8.1

Type of construction

8.2

Material

8.3

Design pressure

ata

8.4

Internal diameter

mm

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-4-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

DESCRIPTION

UNITS

8.5

Thickness

mm

8.6

Corrosion allowance

mm

8.7

Type of dished end

8.9

Drum internals

9.0

Water fall / furnace

9.1

Type of construction

9.2

Furnace depth

9.3

Furnace width

9.4

Furnace volume

m3

9.5

Furnace height

9.6

Tube size (OD)

mm

9.7

Tube thickness

mm

9.8

Tube material

9.9

Fin width

mm

9.10

Fin thickness

mm

9.11

Fin material

9.12

No. off headers

9.13

Header Dia (OD)

9.14

Header material

10.0

Fluidised bed

10.1

Bed width X length

10.2

Bed plate section (cooled /


uncooled)

10.3

Material of air nozzle cap & Body

10.4

Method of nozzle attachment to the


bed plate

10.5

No. off plenum chamber

10.6

Thickness of wall plate

11.0

Cyclone Separator

TECHNICAL
PARAMETERS

mm

mXm

mm

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-5-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

DESCRIPTION

UNITS

11.1

Type

11.2

Nos

11.3

Type of construction

11.4

Tube OD

mm

11.5

Tube thickness

mm

11.6

Tube material

11.7

Fin width

mm

11.8

Fin thickness

mm

12.0

Super heaters

12.1

Type of flow

12.2

Type of arrangement

12.3

Material

12.4

Tube diameter

mm

12.5

Tube thickness

mm

12.6

Inlet header diameter

mm

12.7

Inlet header material

12.8

Outlet header diameter

12.9

Outlet header material

13.0

Economizer

13.1

Type of flow

13.2

Type of arrangement

13.3

Material

13.4

Tube diameter

mm

13.5

Tube thickness

mm

13.6

Inlet header diameter

mm

13.7

Inlet header material

13.8

Outlet header diameter

13.9

Outlet header material

14.0

Air pre heater

TECHNICAL
PARAMETERS

mm

mm

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-6-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

DESCRIPTION

UNITS

14.1

Type

14.2

No.

14.3

Fluid inside tubes

14.4

Fluid outside tubes

14.5

Arrangement

14.6

Tube OD

mm

14.7

Tube thickness

mm

14.8

Tube material

14.9

No of blocks

14.10

Casing material

14.11

Casing thickness

14.12

Expansion joint

15.0

Fuel storage system

15.1

No of bunkers

15.2

Type of bunkers

15.3

Bunker plate material

15.4

Capacity of bunker

m3

15.5

Fuel qty requirement @MCR

TPH

15.6

Storage time for fuel

Hrs

16.0

Bunker lining

16.1

Lining material

16.2

Lining thickness

16.3

Lining height

17.0

Fuel feeding system

17.1

No of fuel feed points

17.2

Type of feeders

17.3

Location of feeders

17.4

No of feeders

17.5

Capacity of each feeder

TECHNICAL
PARAMETERS

mm

mm

TPH

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-7-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

DESCRIPTION

UNITS

17.6

Motor rating

17.7

Type of control

18.0

Lime stone storage system

18.1

No off bunker

18.2

Type of bunker

18.3

Bunker plate material

18.4

Capacity of bunker

m3

18.5

Limestone consumption

TPH

18.6

Sulphur capture efficiency

18.7

Ca: S molar ratio

18.8

Storage time for limestone

19.0

Limestone feeding system

19.1

Type of feeder

19.2

Location of feeder

19.3

No; off feeders

19.4

Capacity of each feeders

TPH

19.5

Motor rating

kw

19.6

Type of control

20.0

Bed material storage system

20.1

No: off bunker

20.2

Type of bunker

20.3

Bunker plate material

20.4

Capacity of bunker

m3

20.5

Storage for bed material

hrs

21.0

Bed material feeding system

21.1

Type of feeder

21.2

Location of feeder

21.3

No: off feeder

21.4

Capacity of each boiler

TECHNICAL
PARAMETERS

KW

Hrs

TPH

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-8-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

DESCRIPTION

UNITS

21.5

Motor rating

21.6

Type of control

22.0

Start up oil firing system

22.1

Type

22.2

Bunkers/ steam generator

nos

22.3

Capacity of each bunker

% MCR

22.4

Type of oil pump

22.5

Oil pressure at burner inlet

Kg/cm2 (g)

22.6

Atomizing air pressure

Kg/cm2 (g)

22.7

Type of oil used for start -up

22.8

GCV of oil considered

22.9

Turn down ratio

22.10

Igniters type

22.11

Day oil tank capacity

23.0

Centrifugal fans

23.1

No: off @ MCR

23.2

Capacity / fan @BMCR

m3/s

23.3

Head @ BMCR

mmwc

23.4

Design temperature

Deg c

23.5

Flowing medium

23.6

Fan speed

rpm

23.7

Motor rating

kw

23.8

Type of control

23.9

Type of lubrication

23.10

Type of coupling

23.11

Type of wear liners for ID fans

24.0

Other blowers

24.1

Quantity

24.2

Capacity / fan @ BMCR

TECHNICAL
PARAMETERS

kw

Kcal / kg

m3

m3/sec

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-9-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

DESCRIPTION

UNITS

24.2

Head @ BMCR

mmwc

24.3

Speed of the blower

rpm

24.4

Type of coupling

25.0

Safety valves

25.1

Location

25.2

Type

25.3

Relieving capacity

Kg/hr

25.4

Set pressure

Kg/cm2

25.6

Over pressure / blow down pressure

26.0

Feed water pumps

26.1

Type

26.2

No:

26.3

Feed water temp. at the inlet of feed


pump

Deg c

26.4

Design flow

m3/hr

26.5

Design head

mWC

26.6

Type of casing

26.7

Mechanical seals

26.8

Type of lubrication

26.9

Recirculation type

26.10

Speed of the pump

rpm

26.11

Motor rating

kw

26.12

Type of speed control

26.13

Performance standards

27.0

Electro static precipitator

27.1

ESP design fuel

27.2

Flue gas flow

m3/sec

27.3

Outlet dust concentration

Mg/Nm3

27.4

Flue gas temperature

Deg c

TECHNICAL
PARAMETERS

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-10-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

DESCRIPTION

UNITS

27.5

No. of fields

27.6

No . of hoppers

28.0

HP dosing system

28.1

Type of system

28.2

Tank capacity

28.3

Tank material

28.4

Chemical dosing system

28.5

Type of stirrer

28.6

Type of pump

28.7

No. of pump

28.8

Piping material from dosing tank to


steam drum

29.0

LP dosing system

29.1

Type of system

29.2

Tank capacity

29.3

Tank material

29.4

Chemical to be closed

29.5

Type of stirrer

29.6

Type of pump

29.7

No. of pump

29.8

Piping material from dosing tank to


steam drum

30.0

Blow down tanks

30.1.0

Continuous blow down tank

30.1.1

Tank material

30.1.2

Type of level control in tank

30.1.3

Flash steam recovery

30.1.4

Type of internals

30.1.5

No. of safety valves

TECHNICAL
PARAMETERS

Ltrs

Ltrs

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-11-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

DESCRIPTION

UNITS

30.1.6

Safety valves set pressure

Kg/cm2(g)

30.1.7

Corrosion allowance

mm

30.2.0

Intermittent blow down tank

30.2.1

Tank material

30.2.2

Drain

30.2.3

Vent

30.2.4

Corrosion allowance

mm

31.0

Insulation

31.1

Type of insulation material

31.2

Density of insulation material

31.3

Type of cladding sheet for main


boiler

31.4

Thickness of cladding sheet for


main boiler

31.5

Cladding sheet for other areas

31.6

Thickness of cladding sheet for


other areas

32.0

Refractory

32.1

Type of refractory

32.2

Application

32.3

Thickness of refractory layer

33.0

Ash system

33.1

Location of ash collection points

33.2

No of collection points

33.3

Elevation of outlet flanges

33.4

Ash loading for design

33.5

Temp. of ash

Deg c

33.6

Density of ash

Kg/m3

34

TECHNICAL
PARAMETERS

Kg/m3

mm

Ducts

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-12-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

DESCRIPTION

34.1

Type

34.2

Material

34.3

Thickness of plate

35.0

Painting

35.1

No. of primer coats

35.2

Type of primer paint

35.3

No. of final coat

35.4

Type of final paint

36
36.1

UNITS

mm

Feed water system


Deaerator cum storage tank

36.1.1

Deaerator

36.1.2

Type

36.1.3

Design standard

36.1.4

Design condition

36.1.5

Deaeration capacity

Kg/hr

36.1.6

Design temperature

Deg c

36.1.7

LP steam pressure at control valve


inlet

Ata

36.1.8

LP steam temperature at control


valve inlet

Deg c

36.1.9

Deaerated water temperature

Deg c

36.2

Deaerated water storage tank

36.2.1

Storage capacity

36.2.2

Support type

36.2.3

Location

36.3

TECHNICAL
PARAMETERS

Material of construction

36.3.1

Plate material for shell, dished end


and storage tank

36.3.2

Pipe nozzles
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-13-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

DESCRIPTION

UNITS

36.3.3

Spray nozzles / trays

36.3.4

Internals

36.3.5

Piping between deaerator and boiler


feed pump

37

TECHNICAL
PARAMETERS

Chimney

37.1

General

37.2

Quantity

37.3

Mode of operation

37.4

Height

37.5

Supporting arrangements

37.6

Flue gas temperature at exit

37.7

Material of construction

37.8

Lightning arrestor

37.9

Aviation lamps

37.10

Platforms at top and intermediate


levels

Deg c

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-14-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

B.

TURBINE & AUXILIARIES

S.NO

DESCRIPTION

1.0

TURBINE

1.1

Make

1.2

Type and description

1.3

Inlet steam conditions

1.4

Pressure, Ksca

1.5

Temperature, C

1.6

Number of Extractions

TECHNICAL PARAMETERS

Bleed conditions for Deaerator


1.7

Flow (TPH),
Pressure (Ksca)
Temperature (C)
HP heater steam
-Flow

1.8

-Temperature
-Pressure
-Outlet temperature of water
LP heater steam
-Flow

1.9

-Temperature
-Pressure
-Outlet temperature of water

1.10

Direction of rotation

1.11

Speed

1.12

Critical speeds

1.13

No. of stages

1.14

Type of casing

1.15

Type of rotor

1.16

Bore, mm

1.17

Suction branch connection

1.18

Discharge branch connection

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-15-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

DESCRIPTION

TECHNICAL PARAMETERS

1.19

Governor

1.20

Make

1.21

Type

1.22

Range of speed control

1.23

Critical speed of rotor

1.24

Type of bearing

1.25

Thrust

1.26

Journal

1.27

Type of bearing lubrication system and


description

1.28

Material specifications for

1.29

Casing

1.30

Rotor

1.31

Shaft

1.32

Blade

1.33

Bearing

1.34

Shaft seal

1.35

Inter stage diaphragm

1.36

Gland

1.37

Shroud

1.38

Others (specify)

1.39

Whether following safety devices


provided

1.40

Bearing temperature indicators

1.41

Bearing oil pressure indicators

1.42

Shaft vibration indicator

1.43

Shaft position indicator

1.44

Automatic shut-off in case of failure of


cooling water

1.45

Automatic shut-off in case of low

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-16-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

DESCRIPTION

TECHNICAL PARAMETERS

lubricating oil pressure


1.46

Noise level at 1 m, dba

1.47

Details of special measures for noise


attenuation

1.48

Type and details of vibration isolator

1.49

Base plate details

1.49

Overall dimensions of turbine assembly

1.50

Details of insulation of turbine

1.51

Weight, kg

1.52

Pipe work

1.53

Details of pipe work covering material


specifications, dimensional, fabrication
and testing standards shall be furnished
service wise for different conditions of
temperature and pressure

1.54

Schedule for pipes, valves, fittings and


supports included in the supply shall be
furnished service wise for different
conditions of temperature and pressure

1.55

Insulation

1.56

Details for each class and type of


insulating material shall be furnished in
the following format

1.57

Class and type

1.58

Applicability range of temperature

1.59

Manufacturer

1.60

Chemical composition

1.61

Physical properties such as thermal


conductivity, density, shrinkage, etc.

2.0

GENERATOR

2.1

Make

2.2

Type and description

2.3

Standards followed in design,


HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-17-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

DESCRIPTION

TECHNICAL PARAMETERS

manufacturing and testing


2.4

Maximum continuous rating, kW

2.5

Maximum continuous rating, kVA

2.6

Rated terminal voltage and permissible


voltage variation

2.7

Rated power factor

2.8

Rated stator current

2.9

Rated frequency and permissible


frequency variation

2.10

Rated speed

2.11

Number of phases

2.12

Phase connection

2.13

Flux density at rated operating point

2.14

Excitation current at rated power output


and rated power factor

2.15

Capacitance of stator winding

2.16

- Effective capacitance of ground per


phase (UF)

2.17

- All phases connected together (UF)

2.18

Efficiency at

2.19

Output (Enclose the load Vs efficiency


curve) at UPF and 0.8PF at 100% load

2.20

Total losses of the generator with


tolerance, kW

2.21

- Field I2R at 75oC, kW

2.22

- Excitation losses, kW

2.23

- Mechanical losses, friction and Windage


losses, kW

2.24

Losses in bearings, etc, kW

2.25

Open circuit core losses, kW

2.26

Armature I2R losses at 75oC, kW

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-18-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

DESCRIPTION

TECHNICAL PARAMETERS

2.27

Stator resistance at 75oC, ohms

2.28

Rotor resistance at 75oC, ohms

2.29

Maximum value of sudden short circuit


current including DC component

2.30

Sustained three phase short circuit


current (peak/rms values)

2.31

Sustained line to line short circuit


(peak/rms values)

2.32

Permissible momentary over-loads as


percent of full load and duration

2.33

Permissible asynchronous operation time


under loss of excitation

2.34

Permissible operating time under single


phase to ground fault

2.35

Maximum inductive and capacitive output


at the rated voltage and speed at zero PF
lagging & leading respectively

2.36

Continuous negative sequence current

2.37

Rated short circuit ratio

2.38

Temperature rise of stator winding and


method of measurement

2.39

Maximum hot spot temperature of stator


winding

2.40

Temperature rise of stator core and


method of measurement

2.41

Temperature rise of rotor winding and


method of measurement

2.42

Maximum hot spot temperature of rotor


winding

2.43

Temperature rise of rotating rectifiers


method of measurement

2.44

Type of cooling

2.45

Direction of rotation viewed from turbine


end
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-19-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

DESCRIPTION

TECHNICAL PARAMETERS

2.46

Critical speed, rpm

2.47

Generator housing diameter, mm

2.48

Winding cooling details

2.49

Stator

2.50

Rotor

2.51

Winding insulation details

2.52

Stator

2.53

Rotor

2.54

Moment of inertia of rotor GD2

2.55

Material specification for slip rings

2.56

Grade of brushes for slip rings

2.57

Details of insulation for slip rings

2.58

Number of embedded RTDs and type

2.59

Weight, kg

2.60

Stator

2.61

Rotor

2.62

Overall dimensions of the generator, in


meters

2.63

Generator Cooling System

2.64

Make

2.65

Type

2.66

Number

2.67

Capacity, peak/hr.

2.68

Material and construction details

2.69

Quantity of cooling water required, m3/hr

2.70

Maximum temperature of water at inlet to


cooler, oC

2.71

Maximum temperature of cooling air at


cooler exit, oC

2.72

Capability of generator with one cooler

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-20-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

DESCRIPTION

TECHNICAL PARAMETERS

section out of service


2.73

Excitation System

2.74

AC Exciter

2.75

Make

2.76

Standard followed

2.77

Rated output

2.78

Rated voltage

2.79

Rated current

2.80

Exciter ceiling voltage

2.81

Maximum continuous exciter current

2.82

Nominal exciter response ratio

2.83

Rated speed

2.84

Class of insulation

2.85

Rotating Rectifiers

2.86

Make of diode

2.87

Rated voltage

2.88

Rated current

2.89

AVR Equipment

2.90

Make

2.91

Type

2.92

Standard Followed

2.93

Rated current

2.94

Rated voltage

2.95

Block diagram indicating control system


employed

2.96

Sensitivity of AVR from no load to full


load

2.97

SPVT

2.97.1

- Make

2.97.2

- Details
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-21-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

DESCRIPTION

2.98

Gear Box

2.99

Manufacturer

2.100

Type of gear box

2.101

Service

2.102

Gear type

2.103

Teeth

2.104

Rated, kW

2.105

Input speed, rpm

2.106

Max. Continuous, rpm

2.107

Max. Torque

2.108

Service factor as per AGMA 421

2.109

Gear efficiency, %

TECHNICAL PARAMETERS

3.0

Turbine Oil System

3.1

Lubricating and Control Oil System

3.1.1

- Type of System

3.1.2

- System hold up, litre

3.2

Main oil pump

3.2.1

Make

3.2.2

Type and description

3.2.3

Number

3.2.4

Capacity, litre/min.

3.2.5

Total differential pressure, kg / sq. cm

3.2.6

Speed, rpm

3.2.7

Type of shaft sealing

3.2.8

Bearings

3.2.9

Others (specify)

3.3

Auxiliary oil pump

3.3.1

Make

3.3.2

Quantity

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-22-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

DESCRIPTION

TECHNICAL PARAMETERS

3.3.3

Type and description

3.3.4

Number

3.3.5

Capacity, litre/min.

3.3.6

Total differential pressure, kg/sq. cm.

3.3.7

Speed, rpm

3.3.8

Power required at shaft, kW

3.3.9

Bearings

3.3.10

Others (specify)

3.4

Emergency oil pump

3.4.1

Make

3.4.2

Type and description

3.4.3

Number

3.4.4

Capacity, litre/min.

3.4.5

Total differential pressure, kg/sq. cm

3.4.6

Speed, rpm

3.4.7

Power required at the Shaft, Kw

3.5

Oil coolers

3.5.1

Make

3.5.2

Type and description

3.5.3

Number

3.5.4

Capacity, kcal/hr.

3.5.5

Design code

3.5.6

Cooling water Flow rate, cu m /hr.

3.5.7

Cooling water Temperature rise, oC

3.6

Oil filters

3.6.1

Make

3.6.2

Type and description

3.6.3

Number

3.6.4

Capacity, litre/min.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-23-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO
3.6.5
3.7

DESCRIPTION
Filtration efficiency, % particle size
Oil tank

3.7.1

Type

3.7.2

Number

3.7.3

Capacity, litre

3.7.4

Material specifications

3.8

TECHNICAL PARAMETERS

Oil vapour removal system

3.8.1

Type

3.8.2

Capacity, N cu m / hr.

4.0

Gland Vent Condenser (GVC)

4.1

Make, Type and description

4.2

Number

4.3

Steam condensing rate, tons/hour

4.4

Design code

4.5

Design heat transfer coefficient, kcal/hr.,


sq. m., oC

4.6

Design heat exchange area, sq. m

4.7

No. of passes

4.8

Shell side

4.9

Tube side

4.10

Tubes

4.11

Number

4.12

OD x Wall thickness

4.13

Condensate water quantity, cu m / hr.

4.14

Condensate water inlet and outlet


temperature

4.15

GVC Condenser pressure, kg/sq.cm (abs)

4.16

Is any blower provided for GVC

4.17

Details of blower if provided

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-24-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

DESCRIPTION

5.0

Flash Tank

5.1

Make

5.2

Type and description

5.3

Number

5.4

Design Steam flow, tons/hour

6.0

Piping & Utilities

6.1

Pipe work

TECHNICAL PARAMETERS

6.1.1

Details of pipe work covering material


specifications, dimensional, fabrication
and testing standards shall be furnished
service wise for different conditions of
temperature and pressure

6.1.2

Schedule for pipes, valves, fittings and


supports shall be furnished service wise
for different conditions of temperature and
pressure

6.2
6.2.1

Insulation
Details for each class and type of
insulating material shall be furnished in
the following format

6.2.1

Class and type

6.2.2

Applicability range of temperature

6.2.3

Manufacture

6.2.4

Chemical composition
Physical properties such as

6.2.5

Thermal conductivity, density,


Shrinkage, etc.

6.2.6
6.2.7
6.2.8

Graph showing guaranteed heat


Transfer coefficient Vs temperature
Any other features (specify)
Detailed specification for
Insulation application procedure

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-25-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

DESCRIPTION

TECHNICAL PARAMETERS

7.0

Instrumentation And Control

7.1

Furnish P & ID with list of instruments

8.0

Governing System

8.1

Make

8.2

Write-up on governing system with


catalogs and literature

8.3

Schematic diagram for governing system


envisaged

8.4

Turbine Supervisory system

8.5

Make and model no of the Vibration


monitoring system offered

8.6

Make model no of the Temperature


scanner system offered

8.7

Whether list of measurements provided


for TG unit and auxiliary condenser is
included

9.0

Services and Utilities Required For


Operation

9.1

Auxiliary Steam in

9.2

Total requirement, Tons/hr

9.3

List of consumers

9.4

Steam pressure and temperature, Ksca &


0
C

9.5

Water (Auxiliary Cooling & general


purpose use)

9.6

Pressure, Ksca

9.7

Temperature, 0C at inlet and outlet

9.8

Total requirement, m3 / hr

9.10

List of consumers for auxiliary cooling

9.11

Return water quality, quantity,


temperature and pressure at battery limit

9.12

Thermal Insulations

Aux. Steam
enclosed

flow

to

Water flow diagram to be enclosed

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-26-

diagram

be

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

DESCRIPTION

TECHNICAL PARAMETERS

9.13

Maximum temperature of surface where


insulation not provided

9.14

Maximum surface temperature of Al


cladding for insulated surfaces

9.15

Wind speed considered for design of


insulation Indoor and outdoor

9.16

Al cladding thickness

10.0

Parameters Guaranteed

10.1

Turbine steam flow at rated output when


bleed taken for heating steam

10.2

Turbine exhaust pressure with air cooled


condenser and ambient temperature of 45
deg C

10.3

Vibration level in different location of the


turbine train.

10.4

Total auxiliary power required for


operation of equipment within the scope
of supply

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-27-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

C.

ACC & AUXILIARIES:

S.NO.

DESCRIPTION

UNIT

A. DESIGN DATA
1

Turbine Exhaust Steam flow rate

Tons/Hr.

Guaranteed Back Pressure

Steam Enthalpy / Dryness fraction

Temperature at TG Exhaust

Condensate temperature

Heat rejected

Overall heat transfer coeff ( Bare /


Fin )

MTD

Design ambient Temperature (dry)

10

Outlet temp of air

11

Altitude

12

Initial Temperature Difference (ITD)

13

Sound Pressure level at 1 m

14

Fouling factor (Tube / Air side)

Kg/cm2 (A)
kcal/ kg

Kcal/hr
kcal/hr m2C

dB(A)
hr m2 C/kCal

B. PERFORMANCE DATA
1

TG Exhaust back pressure@Design


point

Kg/cm2 (A)

Total Power consumption for fans @


motor shaft

BKW

Sound Pressure level at 1 m below


fan

dB(A)

C-1. CONDENSER DATA


1

Modules size ( L x W )

mxm

Number of modules

Nos

Number of Street

Nos

Number of modules / bank

Nos

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-28-

TECHNICAL
PARAMETERS

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO.

DESCRIPTION

UNIT

Plot area without walkways

mxm

Plot area with walkways

mxm

Number of bundles per module

Air inlet height

mts

Platform height

mts

10

Total height up to top of duct

mts

C-2. HEAT TRANSFER SURFACE


1

Finned Area

sq.m

Bare Tube area

sq.m

C-3. POWER CONSUMPTION


1

At fan motor @ Motor shaft (Each)

BkW

At CEP Motor shaft

BkW

At Drain Pump Motor shaft

BkW

Total power (Guarantee )

kW

C-4. WEIGHTS
1

Supporting structure/Platform etc.

Tons

Heat Exchanger bundles

Tons

Steam Duct & Aux. Equip.

Tons

C-5. HEAT EXCHANGER


1

No. of Bundles

Nos

Shape of Tubes / Fins

Tube diameter

Tube material / Fin material

No of tube rows

Nos

No of tubes/row

Nos

Tube length / thickness

mm

Fin pitch / Type

Fin diameter

mm

fins / inch
mm

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-29-

TECHNICAL
PARAMETERS

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO.

DESCRIPTION

10

Tube pitch

11

Tube sheet MOC

12

Tube-to-tube sheet connection

UNIT
mm

C-6. FANS
1

Make / Model

No. of fans

Diameter / Speed

mm / rpm

Air flow Quantity for each fan

cum/sec

Total air flow quantity (for all fans)

Bundle face velocity

Static pressure

mmWC

Fan shaft power

FkW

Sound pressure level

dBA

10

Speed Reducer Type / Reduction


Ratio / Make

11

Nos

kg / hr

m/sec

Vibration Switch Make / Quantity per


fan

C-7. MOTORS
1

Motor Rated Power

Supply

Control

Motor Make

kW
V / Ph / Freq

C-8. EXHAUST STEAM DUCT


mm/Mts/mm

Outer Diameter / Horizontal


Length/Thickness

Vertical Length

Mts.

Distribution duct

mm/Mts/mm

Material of construction
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-30-

TECHNICAL
PARAMETERS

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO.

DESCRIPTION

UNIT

C-9. CONDENSATE PIPING


1

Diameter

NB

Material of construction

C-10. AIR EVACUATION PIPING


1

Diameter

NB

Material of construction

C-11. RUPTURE DISC


1

Size/Qty

mm/Nos

Rupture pressure

Kg/cm2(g)

C-12. CONDENSATE TANK


1

Capacity (Total)

Cu.m

Retention time

Material of construction

Thickness / Corrosion allowance

mm

Diameter X Length

Mm

min

C-13. STEAM JET EJECTORS


1

Hogging ejector

Quantity

Motive steam pressure/Temperature

Steam Quantity

Holding ejector:

Quantity

Motive steam pressure/Temperature

Steam Quantity

Nos
kg/cm2/ oC
Kgs/Hr

Nos
kg/cm2/ oC
Kgs/Hr

C.14. CONDENSATE EXTRACTION PUMP


1

Type

Quantity

centrifugal
No

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-31-

TECHNICAL
PARAMETERS

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO.

DESCRIPTION

Capacity / Head

Motor rating

Pump Make

UNIT
Cu.m/hr/MWC
KW

C-15. DRAIN PUMP


1

Type

centrifugal

Quantity

Capacity / Head

Motor rating

Motor Make

No
Cu.m/hr/MWC
KW

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-32-

TECHNICAL
PARAMETERS

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

D.

FUEL HANDLING SYSTEM

Sl. No

DESCRIPTION

TECHNICAL PARAMETERS

1.0

Rated Capacity of System, TPH

2.0

No. of Operating hours per day

3.0

Power Consumption for Operating at maximum


rated capacity

4.0

BELT CONVEYORS

4.1

Rated and design capacity, TPH

4.2

Belt width, mm

4.3

Belt speed, mps

4.4

Material of belt

4.5

Toughing angle, degree

4.6

Drive unit - Details

4.7

Gear Box Details

4.7.1

Make and type of gear box

4.7.2

Reduction ratio of gear box

4.7.3

Service factor of gear box over


motor KW

4.8
4.8.1
4.9

Rating

Couplings (high speed and


low speed side)
Make and type
Belt

4.9.1

Type of fabric

4.9.2

Belt rating / designation

4.9.3

Width

4.9.4

Cover thickness (top / bottom)

4.9.5

Duty condition

4.9.6

Cover grade

4.9.7

No. of ply
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-33-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

Sl. No
4.10

DESCRIPTION

TECHNICAL PARAMETERS

Brake

4.10.1

Type and quantity

4.10.2

Make and size

4.10.3

Hold back type and make

4.10.4

Furnish details of pulleys & idlers with shell dia.


& thickness and shaft dia. at bearing and
bearing designation, no. & its quantity

4.10.5

Details of safety switch & spacing

5.0

PRIMARY COAL CRUSHER

5.1

Type

5.2

Make

5.3

Design capacity, TPH

5.4

Feed size, mm

5.5

Product size, mm

5.6

Percentage of Rejects for 100% Rated Capacity

5.7

Material of Construction

6.0

SECONDARY COAL CRUSHER

6.1

Type

6.2

Make

6.3

Material handled

6.4

Design capacity, TPH

6.5

Feed size, mm

6.6

Product size, mm

6.7

Percentage of Rejects for 100% Rated Capacity

6.8

Material of Construction

7.0

VIBRATORY SCREEN

7.1

Make
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-34-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

Sl. No

DESCRIPTION

7.2

Type

7.3

Material handled

7.4

Design capacity, TPH

7.5

Feed size, mm

7.6

Product size, mm

7.7

Screen size (l x w), mm

7.8

Screen deck opening, mm

7.9

Top deck

7.10

Bottom deck

7.11

Frequency of vibration, cycle/sec

7.12

Declination of Screen, deg

7.13

Type of mounting

7.14

Drive details

7.15

Damping device provided

7.16

Screen cloth material

7.17

Efficiency of Screen, %

8.0

VIBRATORY FEEDER

8.1

Make

8.2

Type

8.3

Material handled

8.4

Location

8.5

Design capacity, TPH

8.6

Feed size, mm

8.7

Product size, mm

8.8

Feeder size (l x w), mm

8.9

Frequency of vibration, cycle/sec

TECHNICAL PARAMETERS

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-35-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

Sl. No

DESCRIPTION

TECHNICAL PARAMETERS

9.0

METAL DECTOR

MD-03

10.0

TRAMP IRON SEPARATOR (PERMANENT


MAGNET) / INLINE MAGNETIC SEPARATOR

10.1

Type

10.2

Make

10.3

Location

11.0

BELT SCALE

11.1

Type

11.2

Make

11.3

Location

11.4

Number of load cells per belt scale

12.0

GATES

12.1

Type

12.2

Location

12.3

Liner material

13.0

CHUTES

13.1

Type

13.2

Location

13.3

Thickness of chute plate

13.4

Liner material

14.0

HOISTS

14.1

Type

14.2

Make

14.3

Capacity

14.4

Quantity

15.0

SUMP PUMP

15.1

Type

CGH

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-36-

WGH

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

Sl. No

DESCRIPTION

15.2

Qty

15.3

Make

15.4

Location

15.5

Pump capacity, cu. m /hr

TECHNICAL PARAMETERS

DUST EXTRACTION SYSTEM


16.0

Give full details/ contents of the system.


Enclose scheme and typical GA drawing of
similar system
DUST SUPPRESSION SYSTEM

17.0

Give full details/ contents of the system and


quantity. Enclose scheme diagram

18.0

INSTRUMENTATION AND CONTROL

18.1

Details of instrumentation and control


system provided

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-37-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

E.

ASH HANDLING SYSTEM:

S.NO

DESCRIPTION
Rated capacity of each System

1.1

- For CFBC BOILER- fly ash System-I


- For CFBC BOILER bed ash System-II

1.2

Rated power consumption of Compressor when CFBC


boiler operating at full load.
CAPACITIES/NO ;s

1.3

Bed ash transfer vessel below furnace ash hoppers

1.4

Fly ash Transfer vessel below hoppers of CFBC BOILER


- Cyclone hopper
- Eco./APH hopper
- ESP-1 hopper
- ESP-2 hopper
- ESP-3 hopper
- ESP-4 hopper
- ESP-5 hopper

1.5

Sliding gate valves details/ nos

1.6

Dome valves details/nos

1.7

Solenoid valves details/nos

1.8

Ash cooler hoppers details/nos


PLC PANEL DETAILS
ABRASION RESISTANCE PIPES AND FITTINGS

1.9

Material of pipe

1.10

Material of coating

1.11

Dia of pipe for each type of line of CFBC BOILER in fly ash
system

1.12

Dia of pipe for each type of line of CFBC in bed ash system

1.13

Type of couplings

1.14

Type of adaptors

1.15

Type of Integral Wear-back and replaceable Wear-back


HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-38-

TECHNICAL
PARAMETER

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO
1.16

DESCRIPTION
Details of ceramic lined pipe work
DENSE PHASE VESSEL

1.17

Type and Make

1.18

Material of construction

1.19

Valve access door arrangement

1.20

Pressure for sealing

1.21

Conveying pressure

1.22

Inlet and outlet nozzle size


ACCESSORIES

1.23

Adopters type and make

1.24

Equaliser valve make and type

1.25

Ash handling valves make and type

1.26

Arrangement for increasing the abrasive resistance


GEAR BOXES FOR BED ASH SILO

1.27

List of gear boxes

1.28

Make and type

1.29

Ratio of gear boxes

1.30

Material of gears

1.31

Material of casing
GEAR BOXES FOR FLY ASH SILO

1.32

List of gear boxes

1.33

Make and type

1.34

Ratio of gear boxes

1.35

Material of gears

1.36

Material of casing
BED ASH STORAGE SILO

1.37

Type and size of bottom opening for unloading

1.38

Vent Filters size and capacity

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-39-

TECHNICAL
PARAMETER

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

DESCRIPTION

1.39

Vent blowers capacity and other details

1.40

Capacity and Details of Aeration blowers

1.41

Vacuum pressure and relief door details


FLY ASH STORAGE SILO

1.42

Type and size of bottom opening for unloading

1.43

Vent Filters size and capacity

1.44

Vent blowers capacity and other details

1.45

Capacity and Details of Aeration blowers

1.46

Vacuum pressure and relief door details


DUST UNLOADER FOR BED ASH SILO TRUCK

1.47

Type and Make

1.48

Pocket feeder motor power KW/RPM

1.49

Capacity

1.50

Screw conveyor Motor power KW/ RPM

1.57

Capacity

1.58

Spray water quantity and pressure


DUST UNLOADER FOR FLY ASH

1.59

Type and Make

1.60

Pocket feeder motor power KW/RPM

1.61

Capacity

1.62

Screw conveyor Motor power KW/ RPM

1.63

Capacity

1.64

Spray water quantity and pressure


STRUCTURAL STEEL

1.65

Weight of steel for un loader platform - each silo ( I,II&III)


- Supports structure for unloader
- Supports and platform structure
- Ladders and other accessories
- Pipe support structure complete.
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-40-

TECHNICAL
PARAMETER

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

DESCRIPTION
ELECTRICAL DRIVES

1.66

List of drives

1.67

Rating of the motor

1.68

Make of motors

1.69

Operating frequency / Duty cycle


AIR COMPRESSORS

1.70

Type

1.71

Make

1.72

Quantity

1.73

Capacity, Nm3/hr

1.74

Delivery pressure, Kg/cm2

1.75

Material of construction

1.76

Drive motor rating, kw

1.77

Details of Air intake filter

1.78

Details of inter cooler

1.79

Details of after cooler

1.80

Details of moisture separator

1.81

Details of instruments
AIR RECEIVER

1.82

Quantity

1.83

Capacity, Nm3

1.84

Design Pressure, Kg/cm2

1.85

Material of construction

1.86

Design & construction code

1.87

Details of moisture separator

1.88

Details of instruments

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-41-

TECHNICAL
PARAMETER

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

F.

DM WATER PLANT

S.NO.

DESCRIPTION

TECHNICAL PARAMETERS

DM Plant capacity
1.0

MGF

1.1

No. of units

1.2

Type

1.3

Flow rate (normal and maximum),

1.4

Design surface flow rate, cum/hr sqm

1.5

Total water requirement for back wash & rinse


(cu m), flow rate (cu m/hr), duration (min.).

1.6

Design pressure, kg/sq cm (g)

1.7

Test pressure. Kg/sq. cm (g)

1.8

MOC

2.0

ACTIVATED CARBON FILTER (ACF)

2.1

No. of units

2.2

Type

2.3

Flow rate (normal and maximum),

2.1

Design surface flow rate, cum/hr sqm

2.5

Total water requirement for back wash & rinse


(cu m), flow rate (cu m/hr), duration (min.).

2.6

Design pressure, kg/sq cm (g)

2.7

Test pressure. Kg/sq. cm (g)

3.0

FILTER MEDIA

3.1

Type of filter media

3.2

Volume of filter media, cu m

3.3

Bed depth, mm

3.4

Free board, mm

cu m / hr

cu m / hr

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-42-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO.

DESCRIPTION

4.0

CONSTRUCTION FEATURES

4.1

Material

4.2

Diameter x HOS, mm

4.3

Thickness, mm

4.3.1

- Shell

4.3.2

- top dish

4.3.3

- bottom dish

4.4

Inlet distribution system

4.4.1

- type

4.4.2

- material

4.5

TECHNICAL PARAMETERS

Under bed collector system

4.5.1

- Type

4.5.2

- Material

4.6

Vessel design code

5.0

RO SYSTEM

5.1

No. of streams

5.2

Type of operation

5.3

Feed flow rate (normal and maximum),


hr

5.4

Product flow rate, cum/hr

5.5

Average recovery

5.6

Operating hours

5.7

Operating pressure

6.0

ION EXCHANGE UNITS

6.1

No. of units

6.2

Design flow, cu m/hr

6.3

Design surface flow rate, cum / hr m2

cu m /

Anion bed

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-43-

Cation bed

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO.

DESCRIPTION

TECHNICAL PARAMETERS

6.4

Design pressure, kg/sq. m (g)

6.5

Test pressure, kg/sq.cm (g)

6.6

Total water treated per unit between two


consecutive regenerations, cu m

6.6.1

- Gross, cu m

6.6.2

- Duration of regeneration, min

6.7

Total waste water generated per each


generation (m3)

7.0

RESIN DETAILS

7.1

Name of resin

7.2

Manufacturer

7.3

Resin type

7.4

Exchange capacity, kg CaCo3 /cu m of resin


(enclose resin curves)

7.5

Whether 10% derating factor considered in


arriving at exchange capacity

7.6

Resin bed depth, mm

7.7

Free board, mm

7.8

Volume of resin active, cu m

7.9

Attrition loss per year, %

8.0

REGENERATION

8.1

-Regenerant used

8.2

-Mode of regeneration, CO/CCR

8.3

-Regeneration level, kg/cu m of resin

8.4

-Regenerant concentration, %

8.5

-Total flow rate, cum/hr

8.6

-Quantity of regenerant required (100%) per


regeneration per unit, kg

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-44-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO.

DESCRIPTION

8.7

-Total volume of rinse water, cum

9.0

CONSTRUCTION FEATURES

9.1

-Shell diameter, mm

9.2

-Height of shell, mm

9.3

-Thickness, mm

9.3.1

- Shell

9.3.2

- Top dish

9.3.3

- Bottom dish

9.3.4

- Lining

9.4

Inlet distribution system

9.4.1

- Type

9.4.2

- Materials

9.5

TECHNICAL PARAMETERS

Under bed collector system

9.5.1

- Type

9.5.2

- Materials

9.6

Vessel design code

10.0

DEGASSER MODULE

10.0

DEGASSER TOWER

10.1

Type

10.2

No. of units

10.3

Flow rate, cu m/hr

10.4

Surface flow rate, cu m/hr sq.m

10.5

Diameter, mm

10.6

Height, mm

10.7

Shell thickness, mm

10.8

CO2 content in the effluent, PPM as CO2

10.9

Quantity of fill per tower, cu m


HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-45-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO.

DESCRIPTION

10.10

Fill type

10.11

Fill material

10.12

Shell material

10.13

Rubber lining thickness, mm

10.14

Pumps

10.15

Blowers

10.16

Tank

11.0

PUMPS

11.1

Type of pump

11.2

Capacity in cu m/hr

11.3

Total developed head, in mmWC

11.4

No. of working

11.5

No. of standby

11.6

Motor rating, KW

11.7

Pump speed, RPM

11.8

Material of construction

11.8.1

- Casing

11.8.2

- Impeller

11.8.3

- Shaft

12.0

BLOWERS

12.1

Type of blower

12.2

Capacity in N cu m/hr

12.3

Total differential pressure, mmWC

12.4

No. of working

12.5

No. of standby

12.6

Speed, rpm

12.7

Motor rating, kW

TECHNICAL PARAMETERS

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-46-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO.
12.8

DESCRIPTION

TECHNICAL PARAMETERS

Material of construction

12.8.1

- Casing

12.8.2

- Impeller

12.8.3

- Shaft

13.0

REGENERATION SYSTEM

13.1

Preparation / Dilution Tank

13.2

Number of tanks

13.3

Capacity, cu m

13.4

Dia x Height

13.5

Material of construction

13.6

Agitator type & material

13.7

Agitator kW rating

13.8

Level indicator

13.9

Ejector material

14.0

STORAGE TANKS

14.1

No. of tanks

14.2

Useful capacity, cu m

14.3

Tank dimensions

14.3.1

- Diameter, mm

14.3.2

- Height, mm

14.3.3

- Shell thickness, mm

14.4

Design pressure, bar (g)

14.5

Test pressure, bar (g)

14.6

Vessel design code

14.7

Tank material & RL thickness, mm

14.8

Level indicator

14.9

Level switch
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-47-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO.

DESCRIPTION

14.9.1

- Number

14.9.2

- Type

14.9.3

- Make

TECHNICAL PARAMETERS

15.0

MIXED BED UNIT

15.1

No. of units

15.2

Design flow, cu m/hr

15.3

Design surface flow rate, cum / hr m2

15.4

Design pressure, kg/sq. m (g)

15.5

Test pressure, kg/sq.cm (g)

15.6

Total water treated per unit between two


consecutive regenerations, cu m

15.6.1

- Gross, cu m

15.6.2

- Duration of regeneration, min

15.7

Total waste water generated per each


generation (m3)

16.0

RESIN DETAILS

16.1

Name of resin

16.2

Manufacturer

16.3

Resin type

16.4

Exchange capacity, kg CaCo3 /cu m of resin


(enclose resin curves)

16.5

Whether 10% derating factor considered in


arriving at exchange capacity

16.6

Resin bed depth, mm

16.7

Free board, mm

16.8

Volume of resin active, cu m

16.9

Attrition loss per year, %

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-48-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO.

DESCRIPTION

TECHNICAL PARAMETERS

17.0

REGENERATION

17.1

-Regenerant used

17.2

-Mode of regeneration, CO/CCR

17.3

-Regeneration level, kg/cu m of resin

17.4

-Regenerant concentration, %

17.5

-Total flow rate, cum/hr

17.6

-Quantity of regenerant required (100%) per


regeneration per unit, kg

17.7

-Total volume of rinse water, cum

18.0

CONSTRUCTION FEATURES

18.1

-Shell diameter, mm

18.2

-Height of shell, mm

18.3

-Thickness, mm

18.3.1

- Shell

18.3.2

- Top dish

18.3.3

- Bottom dish

18.3.4

- Lining

18.4

Inlet distribution system

18.4.1

- Type

18.4.2

- Materials

18.5

Under bed collector system

18.5.1

- Type

18.5.2

- Materials

18.6

Vessel design code

18.7

Total water requirement for back wash & rinse


(cu m), flow rate (cu m/hr), duration (min.).

18.8

Flow rate of air (cu m/hr)

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-49-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO.

DESCRIPTION

19.0

CHEMICAL DOSING SYSTEM (CDS) FOR PH


CONTROL

19.1

Pump

19.1.1

-Type

19.1.2

-Capacity

19.1.3

-Quantity

19.2

Chemical used for dosing :

19.2.1

-Name of chemical

19.2.2

-Quantity of chemical, liters

19.2.3

-Dosing rate liters /hr

19.3

TECHNICAL PARAMETERS

Chemical solution tank

19.3.1

-Capacity

19.3.2

-Diameter

19.3.3

-Height

19.3.4

-Quantity

19.3.5

-Material

19.4

Accessories

19.5

Instrumentation

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-50-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

G.
S.NO.

1.0.

AUXILIARY COOLING TOWER PUMPS:


TECHNICAL
PARAMETERS

DESCRIPTION

COOLING TOWER

1.1

Type of cooling tower

1.2

No. of cells

1.3

Capacity of each cell,m3/hr

1.4

Total capacity of the cooling tower, m3/hr

1.5

Cooling range and hot & cold water temperature.

1.6

Drift loss

1.7

Wet bulb temperature

1.8

Make up water requirement with a cycle of concentration


of 4.

1.9

Design hot water temperature, deg C

1.10

Design cold water temperature, deg C

1.11

Tower basin size (W x L x D), m (considering free board


of 500 mm)

Tower fill

2.1

Type of flow i.e. splash, film or other

2..2

Type of fill material

2.3

Fill height, m

Fan

3.1

Type and make of fan

3.2

Diameter, m

3.3

Speed, rpm

3.4

Fan stack- material

3.5

Motor rating, Kw

3.6

Fan shaft power, Kw

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-51-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO.
4
4.1
5

TECHNICAL
PARAMETERS

DESCRIPTION
Distribution system
Type

Reduction gear box

5.1

Make and type

5.2

Service factor at design kW

5.3

Reduction ratio

Valves, gate and retaining grate details (indicate quantity against each item)

6.1

Cell inlet water control valve, mm dia

6.2

Cell isolation valve, mm dia

6.3

Desludging valve, mm dia

6.4

Sluice gate, mm x mm

6.5

Refuse retaining grate and screen

Material of Construction

7.1

Distribution headers

7.2

Structural members

7.3

Inner and outer casing

7.4

Fan stacks

7.5

Louvers

7.6

Connecting base plates

7.7

Bolts, nuts, washers, rails, rig connectors etc

8.0 INTERCONNECTING PIPE WORK


8.1

Service conditions and pipe specifications for each


category indicating the following:

i) Pipe material

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-52-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO.

TECHNICAL
PARAMETERS

DESCRIPTION
iii) Pressure rating and Class

9.0 INSTRUMENTS AND GUAGES


10.0 ELECTRICALS
10.1

Motor

10.1.1

Make

10.1.2

Type

10.1.3

KW rating

10.1.4

Type of enclosure, IP No. (including terminal box)

10.1.5

Class of insulation

10.2 AUXILARY COOLING WATER PUMPS


10.2.1

Make

10.2.2

Type

10.2.3

Model and size

10.2.4

Number of pumps.

10.2.5

Capacity, m3/hr

10.2.6

Total Differential Head, MWC at rated flow

10.2.7

Pump shut off head

10.2.8

Speed

10.2.9

Pump shaft input KW

10.3

Motor

10.3.1

Make and type

10.3.2

Rated capacity

10.3.3

Voltage, frequency and variations

10.3.4

Speed

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-53-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

H.
S.NO.

INSTRUMENTATION & AUTOMATION SYSTEM


TECHNICAL
PARAMETERS

DESCRIPTION

1.0

GENERAL

1.01

Name and address of the Tenderer

1.02

Place of Manufacturing

1.03

Location of Service Centre

1.04

List of Installation Reference

1.05

No. of Trained Engineers

1.06

Satisfactory system performance certificate

1.07

MTBF figure of the offered system

1.08

Bar chart for the delivery schedule

1.09

Offered System Name / Series

1.10

Operator Station name & model

1.10

Control Station name & model

1.11

Maximum Operating Temperature in C

1.12

Operating Humidity

1.13

No. of Nodes configured & supported

1.14

No. of Operator station configured/supported


(for dual redundant only)

1.15

No. of Engineering Station configured

1.16

No. of Printers offered / type

1.17

No. of characters per line

1.18

Make / Model

1.19

Printing Speed (CPS)

1.20

No. of Field Control Station

1.21

VA (power) rating & heat dissipation of entire DCS

1.22

Length of data highway offered / supported

2.0

OPERATOR STATION

2.01

CPU Features

2.02

CPU make & model


HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-54-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO.

TECHNICAL
PARAMETERS

DESCRIPTION

2.03

Clock Speed

2.04

Word Length

2.05

Main Memory

2.06

RAM provided / expandable

2.07

Cache Memory (MB)

2.08

Flash Memory provided (MB)

2.09

Capacity of Hard disk (GB)

2.10

Capacity & Speed CD R/W (MB)

2.11

Size / Type of Screen

2.12

Resolution of Screen

2.13

No. Colours supported

2.14

Type of Key Board

2.15

Details of Mouse

3.0

SOFTWARE

3.01

Specify the operating system

3.02

Total Tags supported/quoted per Operator Station

3.03

Availability of Alarm / Event handling package

3.04

Availability of graphic builder package

3.05

Availability of Trend (Real/history) package

3.06

Availability of Shift / daily / monthly log package

3.07

Time taken to reboot Operator Station after shutdown

3.08

Time taken to reboot Operator Station after power failure

4.0

REAL TIME TREND

4.01

No. of Graphics pages that can be stored in each


Operator Station

4.02

No. of Tags that can be assigned

4.03

Maximum no. of dynamic points/screen

4.04

Sampling Interval (in sec)

4.05

Zooming facility on time & data axis


HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-55-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO.

TECHNICAL
PARAMETERS

DESCRIPTION

4.06

No. of Tags per trend group

4.07

Is X Y plotting possible

5.0

HISTORICAL TREND

5.01

No. of Graphics pages that can be stored in each


Operator Station

5.02

No. of Tags that can be assigned

5.03

Maximum no. of dynamic points/screen

5.04

Sampling Interval (in sec)

5.05

Zooming facility on time & data axis

5.06

No. of Tags per trend group

5.07

Is X Y plotting possible

6.0

WINDOW FEATURE (multiple Screen)

6.01

Max. no. of dynamic graphics screens (multiple Screen)

6.02

Is Positioning & sizing of displays freely configurable

6.03

Does it support user friendly 3D graphics with animation


linked to dynamic data

7.0

LOG

7.01

Types of logs available

7.02

Datas collected per hour for computing the average

7.03

Where & how long the logs are stored

7.04

Does it supports Tantalisation

7.05

Availability of automatic print out

8.0

ALARM PACKAGE

8.01

No. of alarms that can be stored in alarm summary

8.02

No. of alarms per package

8.03

Precision of timing stamping in msec

8.04

No. of alarm priority levels

8.05

Is alarm inhibit function stored/printed

8.06

Is alarm sorting possible between two time limits

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-56-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO.

TECHNICAL
PARAMETERS

DESCRIPTION

9.0

SYSTEM ALARM

9.01

No. of alarms that can be stored in alarm summary

9.02

No. of alarms per page

9.03

Is the audio tone distinct from process alarm

9.04

Possibility to store alarms in hard disk beyond the alarm


summary

10.0

COMMUNICATION at Supervisory network

10.01

Communication Standard

10.02

Communication protocol

10.03

100 % redundancy provided for communication hardware

10.04

Data Highway

10.05

Highway topology

10.06

Access Method

10.07

Rate of Data Transmission

10.08

Type of cable

10.09

Maximum distance between the nodes

10.10

Possibility to changeover to redundant communication link


manually

11.0

COMMUNICATION at Process network

11.01

Communication Standard (IEEE, ISO etc.)

11.02

Communication protocol

11.03

Highway topology (ring/hub/bus)

11.04

Access Method (deterministic / stochastic)

11.05

Rate of Data Transmission

11.06

Type of cable

11.07

Maximum distance between the nodes

11.08

Possibility to changeover to redundant communication link


manually

11.09

Whether short circuitry of communication bus within the


nodes affect other nodes
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-57-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO.

TECHNICAL
PARAMETERS

DESCRIPTION

11.10

Time taken to change over to the standby communication


link bus

12.0

OPEN SYSTEM CONNECTUVITY with LAN/Expert


System

12.01

Open system connectivity at what level

12.02

Data Server required

12.03

Data exchange method (DDE / OPC)

12.04

Graphic support availability

12.05

Active X support

12.06

Rate of Data Transmission

12.07

Topology

12.08

Media Type

12.09

Length supported

13.0

FIELD CONTROL SYSTEM

13.01

CPU Features

13.02

CPU Type

13.03

Clock speed ( in MHz)

13.04

RAM word length

13.05

RAM capacity (MB) offered / expandable up to

13.06

Availability of back-up support for application programme


& data base at CPU cards

13.07

Battery back-up support time without power (in Hrs)

13.08

CPU location details (standalone or with I / O s)

13.09

Data highway communication true dual redundant


(i.e. module / media)

13.10

Total I/O capacity supported (specify collectively)

13.11

Software licence permits the usage of CPUs full


I/O capacity

14.0

I / O Features

14.01

I/O Rack or Cluster or File Size

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-58-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO.

TECHNICAL
PARAMETERS

DESCRIPTION

14.02

No. of slots per rack or cluster or file

14.03

Is Power Supply redundant

14.04

I/O Rack or Cluster or File communication with CPU true


redundant (module & media)

14.05

Wiring done directly on the module TB or on remote


terminal plan

14.06

Possibility of on-line replacement of I/O modules &


Communication Processor

14.07

Is it necessary to disconnect any cable to replace


I/O modules

14.08

Is the system able to detect open/short circuit of sensor


open/short circuit of sensor & output device

14.09

Is bulk Power Supply regulated & redundant

15.0

DIGITAL INPUT MODULE (DI)

15.01

Type (24 V dc)

15.02

Module model No

15.03

No. of channels per module

15.04

Provision of Isolation at Field to Module & Channel to


Channel

15.05

Off to ON delay (in msec)

15.06

On to Off delay (in msec)

15.07

Status LED for all channels

15.08

Isolation potential & exposure time

15.09

DI Interface cards required

15.10

Status relays are pluggable type with LED at Input &


Output

15.11

Output of static relay is High at a voltage greater or equal


to 85 volts ac.

16.0

DIGITAL OUTPUT MODULE (DO)

16.01

Type ( PFC)

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-59-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO.

TECHNICAL
PARAMETERS

DESCRIPTION

16.02

Module model No

16.03

No. of channels per module

16.04

Provision of Isolation at Field to Module & Channel to


Channel

16.05

Off to ON delay (in msec)

16.06

On to Off delay (in msec)

16.07

Status LED for all channels

16.08

Current rating(surge/steady state ) per channel in Amps

16.08

Short circuit / overload protection of Outputs

16.09

DO Interface cards required

16.10

Provision of changing the output channel to wet or dry


provided

17.0

ANALOG INPUT MODULE (AI)

17.01

Type (4 ~ 20mA)

17.02

Module model No

17.03

No. of channels per module

17.04

Provision of galvanic Isolation at Field to Module &


Channel to Channel

17.05

Two wire Transmitter Powering (Is it integral with module


or through external 24 V Bulk Power Supply)

17.06

Scan Time per channel (in msec)

17.07

Type of Input Isolation boards with noise filter considered

17.08

Analog Accuracy

17.09

In A/D Conversion no. of A/D Converters offered

17.10

A/D Converter resolution (no. of bits)

18.0

ANALOG OUTPUT MODULE (AO)

18.01

Type (4 ~ 20mA)

18.02

Module model No

18.03

No. of channels per module

18.04

Scan Time per channel (in msec)


HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-60-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO.

TECHNICAL
PARAMETERS

DESCRIPTION

18.05

Type of Input Isolation boards with noise filter considered

18.06

Analog Accuracy

18.07

In D/A Conversion no. of D/A Converters offered

18.08

D/A Converter resolution (no. of bits)

18.08

Maximum load resistance in .

18.09

Output Interface-isolation board type

19.0

RTD INPUT MODULE (PT - 100)

19.01

Type (3 wire or 4 wire)

19.02

Module model No

19.03

No. of channels per module

19.04

Provision of galvanic Isolation at Field to Module &


Channel to Channel

19.05

Scan Time per channel

19.06

A/D Converter Accuracy (no. of bits)

19.07

Maximum permissible load resistance / core in .

19.08

Drift

19.09

Analog Accuracy

20.0

SOFTWARE FEATURES IN FCS

20.01

Programming Language

20.02

Status of output fail upon failure of FCS / Communication


module (both analog & digital)

20.03

Scan time for closed loop (from analog signal scan to


output final control elements)

20.04

Details of Control Algorithm

20.05

Variable ramping rate for set points to each controller

20.06

Specify scan rate

20.07

No. of loops that can be used in various scan rates

20.08

Limitation on usage of advanced control function

20.09

Memory for user programme (MB) available/expandable

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-61-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO.

TECHNICAL
PARAMETERS

DESCRIPTION

20.10

Memory for Real Time Trending (MB)

20.11

Memory for database (MB)

21.0

ENGINEERING PACKAGE

21.01

No. of Control Station that can be loaded with HMI/FCS


engineering package

21.02

Is it necessary to HMI edits to all other stations

21.03

Possibility to do concurrent engineering of HMI/FCS from


non-resident operator station

21.04

Is engineering package offered separately for OS & FCS

21.05

Is it possible to edit one package without closing the other


package

21.06

On-line editing available

21.07

Possibility of editing the FCS engineering package from


an active graphic display when the plant is in operation

21.08

Is the database global

21.09

Is the I/O of the control station to be mapped in to the OS


database

21.10

Is the programming technique object oriented

21.11

No. of security levels provided for view, operate,


&configure

22.0

SELF DIAGNOSTIC FEATURES

22.01

Is system configuration available in graphic form with


status / diagnostic messages

22.02

Node failure notification

22.03

Communication interface failure notification

22.04

Communication Link failure notification

22.05

Controller CPU failure notification

22.06

Controller PSU failure notification

220.7

I/O Module failure notification with location details

22.08

Is Ethernet failure switch failures are reported on the OS


as system alarm
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-62-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO.

TECHNICAL
PARAMETERS

DESCRIPTION

23.0

SYSTEM RESPONSE TIME

23.01

Control Processing switch over time to redundant pair of


Controller

23.02

Display call-up time with dynamic data

23.03

Display update time

23.04

Elapsed time between the operator command & the


actual change in output value

23.05

Elapsed time between fault occurrence & the time trip


within one field control system

23.06

Scan time for closed loops

23.07

Scan Time for open loops (Analog & RTD)

23.08

Scan Time for sequence control (DI/DO)

24.0

SPECIAL REQUIREMENTS

24.01

Possibility of Import / Export data to excel spreadsheet

24.02

Alternative in case of hard disk failure on the system

24.03

Availability of CD/DVD R/W for each operator station

24.04

List of spares furnished for 2 years

24.05

Required furnitures for Control Room furnished

24.06

Is the communication subsystem is open architecture with


RDBMS

25.0

MODULES OFFERED

25.01

No. of AI Modules offered (Current)

25.02

No. of spare AI Modules offered (Current)

25.03

No. of AO Modules offered (Current)

25.04

No. of spare AO Modules offered (Current)

25.05

No. of AI Modules offered (RTD)

25.06

No. of spare AI Modules offered (RTD)

25.07

No. of AI Modules offered (T/C)

25.08

No. of spare AI Modules offered (T/C)

25.09

No. of DI Modules offered


HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-63-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO.

TECHNICAL
PARAMETERS

DESCRIPTION

25.10

No. of spare DI Modules offered

25.11

No. of DI-SOE Modules offered

25.12

No. of spare DI-SOE Modules offered

25.13

No. of DO Modules offered

25.14

No. of spare DO Modules offered

25.16

No. of FCS offered

25.17

No. of Processor Panel offered

25.18

No. of IO cum Marshalling Panel offered

25.17

No. of Engineering Station

25.18

No. of Operator Station

25.19

No. of Control Desk

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-64-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

I.

VENTILATION SYSTEM

S.NO.

DESCRIPTION

1.0

THROW FLOW FANS

TECHNICAL PARAMETERS

1.1

Make

1.2

Type

1.3

Model and size

1.4

Number of fans.

1.5

Operating fluid

1.6

Specific gravity of fluid considered

1.7

Capacity, m3/hr

1.8

Total Differential Head, mmWC at normal flow


Pressure

1.9

Suction

Discharge

1.10

Operating temperature, C

1.11

Speed

1.12

Critical speed of fan

1.13

Efficiency of the Fan

Fan input KW at rated flow

1.14

Suction Air filter size

1.15

Type of Air filters

1.16

Impeller diameter

1.17

Impeller width & Thick

1.18

Impeller mounting

1.19

Casing type

1.20

Casing mounting

1.21

Direction of rotation

1.22

Make and type

1.23

Rated capacity

1.24

Voltage, frequency and variations

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-65-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO.

TECHNICAL PARAMETERS

DESCRIPTION

1.25

Accessories as per standard

1.26

Degree of protection as per IS

1.27

Type of cable box

1.28

Weight
Material Specification

1.29

Impeller

Base frame

Air Filter

1.30

Type

Internals

Material details

Air Pressure at inlet

Air Pressure at outlet

1.31

Method of Lubrication

1.32

Weight of Fan

2.0

AXIAL FLOW FANS

2.1

Make

2.2

Type

2.3

Model and size

2.4

Number of fans.

2.5

Operating fluid

2.6

Specific gravity of fluid considered

2.7

Capacity, m3/hr

2.8

Total Differential Head, mmWC at normal flow


Pressure

2.9

Suction
Discharge

2.10

Operating temperature, C

2.11

Speed

2.12

Critical speed of fan


HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-66-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO.

TECHNICAL PARAMETERS

DESCRIPTION

2.13

Efficiency of the Fan

2.14

Fan input KW at rated flow

2.15

Impeller diameter

2.16

Impeller width & Thick

2.17

Impeller mounting

2.18

Casing type

2.19

Casing mounting

2.20

Direction of rotation

2.21

Make and type

2.22

Rated capacity

2.23

Voltage, frequency and variations

2.24

Accessories as per standard

2.25

Degree of protection as per IS

2.26

Type of cable box

2.27

Weight
Material Specification

2.28

Impeller

Base frame

2.29

Method of Lubrication

2.30

Weight of Fan

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-67-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

J.

132KV SWITCHYARD

S.NO

DESCRIPTION

1.

Name of manufacturer

2.

Standards followed in design, manufacture, testing


and erection of 132KV Switch yard & its accessories
with integral instruments

TECHNICAL
PARAMETERS

SF6 CIRCUIT BREAKER

3.
3.1

Make

3.2

Type

3.3

Rated Voltage

3.4

Rated frequency

3.5

Rated current

3.6

Short circuit breaking current

3.7

Making current

3.8

Operating duty

3.9

Auto Reclosing

3.10

Execution of poles
Total interrupting time
. Minimum
. Maximum
Closing time
Rated transient recovery voltage for terminal faults

3.11

Rated transient recovery voltage for short-line fault.

3.12

Insulation level of the breaker


One minute power frequency with stand voltage.
Impulse withstand voltage
Switching surge withstand test voltage

3.13

Corona and visual discharge


Radio interference voltage
Test voltage
RI level
Visual discharge voltage for falling power frequency
voltage
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-68-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO
3.14

TECHNICAL
PARAMETERS

DESCRIPTION
Minimum clearances in air
Between phases
Between live parts and earth

3.15

Type of operating mechanism


Method of tripping
Normal / Emergency
Normal voltage of trip coil
Pick-up range
Power for tripping mechanism

3.16

Method of closing
Normal voltage of closing coils
Power for closing mechanism

3.17

Rated line charging breaking current

3.18

Rated cable charging breaking current.

3.19

Rated (single) capacitor bank breaking current

3.20

Maximum over voltage to earth of the circuit


breaker when breaking currents of :
Unloaded transformers
Unloaded lines
Capacitor banks
Cable charging

3.21

When switching off asynchronous system:


Maximum current
Maximum recovery voltage between contacts of one
pole

3.22

Overall dimension of
breaker with structure

complete

3-phase

3.23

Weight of complete 3-phase circuit breaker

circuit

132KV ISOLATORS

4.
4.1

Rating

4.2

Application

4.3

Quantity

4.4

Voltage

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-69-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

DESCRIPTION

4.5

Frequency

4.6

No. of phases

4.7

Rated conditions current

4.8

Short time current

TECHNICAL
PARAMETERS

Rating and duration

4.9

Rated peak short circuit current

4.10

Capacity to interrupt magnetizing current at p f

4.11

Capacity to interrupt line charging current at p f

4.12

Design requirements for isolator

4.13

Ambient temperature

4.14

Insulation level

4.15

Phase spacing

4.16

Type of break

4.17

Type of mounting

4.18

Operating device
-For isolator
-For earth switch

5.

INSULATOR DATA

5.1

Type

5.2

Number of units

5.3

Height of stack(M)

5.4

Cantilever strength upright(KG)

5.5

Power frequency dry / wet flashover voltage

5.6

1.2/50 micro sec. Impulse flashover positive wave

5.7

1.2/50 micro sec. Impulse withstand voltage

5.8

Total Creepage distance

5.9

Visual discharge voltage for complete isolator

5.10

RIV for complete isolator with fittings

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-70-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

DESCRIPTION

5.11

Miscellaneous

5.12

Auxiliary supply

5.13

Interlocks with circuit breakers

5.14

Whether type tests carried out on similar isolators

5.15

Whether all routine / acceptance tests as per latest


standards will be carried out on each isolator

6.

132 KV CURRENT TRANSFORMER

6.1

Type

6.2

Nominal / Highest system voltage

6.3

Frequency

6.4

No. of cores

6.5

Rated primary current for each core

6.6

Rated secondary current

6.7

Ratio taps for each core

6.8

Turns ratio for each core

For protection cores

7.1

Accuracy class

7.2

Rated burden

7.3

Accuracy limit factor

7.4

Minimum Knee point voltage Vk

7.5

Maximum excitation current at Vk/2

7.6

Maximum secondary resistance

TECHNICAL
PARAMETERS

For metering cores

8.1

Accuracy class

8.2

Rated burden

8.3

Rated power factor

8.4

Instrument security factor

8.5

Short time thermal rating

8.6

Dynamic rating

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-71-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

DESCRIPTION

8.7

Class of Insulation

8.8

Maximum temp. rise of winding above ambient of

TECHNICAL
PARAMETERS

50C

8.9

Cantilever strength of CT at the terminal

8.10

1.2 /50 sec impulse positive & negative.

8.11

One min. power frequency withstands voltage.

8.12

Creepage distance

8.13

Partial discharge level

LIGHTNING ARRESTER

9.1

Quantity

9.2

Installation

9.3

System Voltage Nominal / Highest

9.4

Type of earthing

9.5

Type of arrester

9.6

Rating

9.7

Rated arrester voltage

9.8

Maximum continuous operating voltage

9.9

Rated frequency

9.10

Nominal discharge current of 8 /20 s wave shape

9.11

Impulse current withstand

9.12

One minute power frequency dry & wet

9.13

Minimum total Creepage distance mm

9.14

Minimum cantilever strength of arrester assembly

9.15

Pressure relief class

9.16

Minimum prospective symmetrical fault current

9.17

Maximum Radio interference voltage

10

INSULATOR & HARDWARE

10.1

Bus post insulator

10.2

Type

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-72-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

DESCRIPTION

10.3

Voltage class

10.4

Total Creepage distance

10.5

Cantilever strength

10.6

Withstand voltages

TECHNICAL
PARAMETERS

a) 1 min. power frequency Dry / wet


b) 1 min. Impulse withstand voltage Dry / wet

10.7
11

Puncture voltage
Disc Insulator

11.1

Voltage class

11.2

Type

11.3

Creepage distance

11.4

Electromechanical strength

11.5

Withstand /flashover voltages


a) 1 min. power frequency Dry / wet

b) 1 min. Impulse withstand voltage Dry / wet


11.6

Puncture voltage

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-73-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

K.

TRANSFORMERS

SL.
NO
1
1.1

Power
Transformer

DESCRIPTION
Name of manufacturer
Standards followed in design,
manufacture and testing

Continuous Rating, KVA

Performance guarantee Parameters

3.1

Rating in KV- HV/LV

3.2

Losses in HV / LV

Transformer No-load Voltage

Transformer Rated current

Rated frequency

Number of phases

Vector group reference

Impedance voltage between HV


and LV at rated current for the
principal tapping

10

Design ambient temperature, deg C

11

Terminal Arrangement

11.1

HV

11.2

LV

12

Temperature rise over specified


ambient temperature, deg C

12.1

Top Oil

12.2

Winding

12.3

Max. hot spot temperature, deg C

13

One-minute dry power frequency


test withstand voltage, kV

14

Impulse test withstand voltage with


1.2 x 50 microseconds wave, kV

15

Switching pulse withstand voltage

16

For short circuit withstand time

17

Maximum possible overloading and


time

18

Cooling system

18.1

HT aux.
Transformer

No of Banks of coolers
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-74-

Auxiliary
Transformer

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

SL.
NO
18.2

No of coolers per bank

18.3

Logics proposed

18.4

Capacity of each cooler

18.5

Motor rating

19

No. of plus taps

19.2

No. of minus taps

19.3

Voltage per step

19.4

Time for one tap change

19.5

On load or off load?


Guaranteed loss particulars

20.1

Iron losses in kW at rated voltage


and frequency

20.2

Copper losses in kW at rated fullload current and frequency at 75C

20.3

Calculation for capitalisation of


losses

21

Reactance voltage in % at rated


full-load current and frequency at
75C

22

Impedance voltage in % at rated


full-load current and frequency at
75C

23

Regulation in % of No-load voltage


at full-load current at 75C and with
power factor

23.1

Unity

23.2

0.8 lagging

24

HT aux.
Transformer

Type of tap changer

19.1

20

Power
Transformer

DESCRIPTION

Efficiency at 75 C and unity power


factor

24.1

100% load

24.2

75% load

24.3

50% load

25

No-load current in amperes at rated


voltage and frequency

26

In rush magnetising current in % of


normal full-load current
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-75-

Auxiliary
Transformer

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

SL.
NO
27

Name of manufacturer

27.2

Type

27.3

Dry flash over voltage, kV

27.4

One-minute dry withstand test


voltage, kV

27.5

Rated short-time fault current and


its duration
Dimensions

28.1

Overall dimensions of transformer


complete with radiator banks (L x W
x B) m

28.2

Transportation dimension

28.3

De-tanking height

29

Weights

29.1

Total Weight including oil

29.2

Transportation

29.3

Core

29.4

Winding

29.5

Bushing

30

Oil

30.1

Type of oil

30.2

Quantity of oil in transformer

30.3

Quantity of oil in tap changer comp

30.4

Quantity of oil in bushing

31

Neutral side CT provided?

31.1

HV side

31.2

LV side

32

HT aux.
Transformer

Details of bushings

27.1

28

Power
Transformer

DESCRIPTION

Transformer accessories provided

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-76-

Auxiliary
Transformer

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

L.

11KV INDOOR VCB

S.NO

DESCRIPTION

1.0

Name of manufacturer

2.0

Standards followed in design, manufacture and testing


for switch board and the vacuum interrupter

3.0

VACUUM CIRCUIT BREAKER PANEL

3.1

No. Phases

3.2

Continuous current rating of the main busbars

3.3

System Voltage & frequency

3.4

System earthing considered

3.5

Rated current of feeders/ bus bar

3.6

Rated power frequency withstand voltage

3.7

Rated lighting impulse withstand voltage

3.8

Rated short-circuit breaking current

3.9

Rated short time current withstand

3.10

Rated short circuit making current (peak)

3.11

Outdoor / Indoor?

3.12

Switch board Dimensions ( width x height x depth in


mm)

3.13

Degree of protection of enclosure in terms of IP no.

3.14

Vacuum Interrupter make

3.15

Material and size of earth bus in the panel

3.16

Control wiring - size and specification

3.17

Control cable make

3.18

Control voltage rating

3.19

Make/ type and catalogue no. of HRC fuses

3.20

Make / Type / spec and catalogue no. of Relays

3.21

Specification of vacuum interrupter

3.22

Make/spec of energy meter

3.23

Make/spec of instruments

3.24

Make/spec of push buttons

3.25

Make/spec of indicating lamps

3.26

Make / spec of control & selector switches

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-77-

TECHNICAL
PARAMETERS

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

TECHNICAL
PARAMETERS

DESCRIPTION

3.27

Overall size (L x B x H), mm

3.28

Weight of Panel

3.29

Catalogue of switchgear panel enclosed?

4.0

CURRENT TRANSFORMER

4.1

Make / Type

4.2

No of core

4.3

Accuracy class / burden

4.4

Outdoor / Indoor?

4.5

Enclosed illustrative catalogue / brochure?

5.0

POTENTIAL TRANSFORMER
(BUS PT, TRANSFORMER LINE PT, GENERATOR PT)

5.1

Make / Type

5.2

Ratio

5.3

Accuracy class / burden

5.4

Draw out / non- draw out

5.5

Outdoor / Indoor?

5.6

Enclosed illustrative catalogue / brochure?

6.0

FEEDERS (INCOMER / OUTGOING) DETAILS


(EACH FEEDER TO BE FURNISHED IN TABLE FORM)

6.1

Feeder rating in MVA

6.2

Rated current

6.3

Breaker type

6.4

Rating of busbar tapping for feeder

6.5

CT Ratio and number of cores

6.6

Accuracy class

6.7

Indicating Instruments and their range

6.8

List of meters, tri-vector meters its range and make

7.0

PROTECTIONS PROVIDED IN EACH FEEDER

7.1

Type of relays

7.2

Make of relays

7.3

Range of relays

7.4

List of logics and interlocks provided


HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-78-

Yes / no

Yes / no

Yes / no

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

M.

3.3KV VCB

S.NO

DESCRIPTION

Name of manufacturer

Standards followed in design, manufacture, testing and


erection of SF6 Circuit breaker & its accessories with
integral instruments

Vaccum circuit breaker

Make

Type

Rated Voltage

Rated frequency

Rated current

Short circuit breaking current

10

Making current

11

Operating duty

12

Auto Reclosing

13

Gas pressure

14

Maximum working pressure

15

Operating device type

16

Insulation level of the breaker


One minute power frequency with stand voltage.
Impulse withstand voltage
Switching surge withstand test voltage

17

Corona and visual discharge


Radio interference voltage
Test voltage
RI level
Visual discharge voltage for falling power frequency voltage

18

Minimum clearances in air


Between phases
Between live parts and earth

19

Type of operating mechanism


Method of tripping
Normal / Emergency
Normal voltage of trip coil
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-79-

TECHNICAL
PARAMETERS

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

DESCRIPTION
Pick-up range
Power for tripping mechanism

20

Method of closing
Normal voltage of closing coils
Power for closing mechanism

21

Rated line charging breaking current

22

Rated cable charging breaking current.

23

Overall dimension of complete 3-phase circuit breaker with


structure

24

Weight of complete 3-phase circuit breaker

25

Control panels

26

Control panel Dimensions ( width x height x depth in mm)

27

Degree of protection of enclosure in terms of IP no.

28

Material and size of earth bus in the panel

29

Control wiring - size and specification

30

Control cable make

31

Control voltage rating

32

Make/ type and catalogue no. of HRC fuses

33

Make / Type / spec and catalogue no. of Relays

34

Specification of Relays

35

Make of energy meter

36

Make of instruments

37

Make of push buttons / indication lamps

38

Make control & selector switches

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-80-

TECHNICAL
PARAMETERS

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

N.

HT CABLES

S.NO

DESCRIPTION

1.0

Name of Manufacturer

2.0

Whether offered cable design is type tested. If yes


enclose the type test certificate.

3.0
4.0

Standards followed in design, manufacture and


testing for switch board and the vacuum interrupter
Type of Cables

7.

Voltage rating

8.

Current rating Nominal

9.

Voltage grade

10.

11.
12.

Derating factors to be considered


Laid on ground / air
Temperature correction Ground / air
Thermal resistivity of soil
Grouping factor
Depth of laying
Thermal resistivity
Number of cores
Nominal cross section area of conductor and type

13.

Sheathing and filler details

14.

Armour details

15.

Insulation detail

16.

Diameter of the cable

17.

Weight per meter of cable

18.

Dielectric constant of the cable

19.

Allowable bending radius of the cable

20.

Dielectric strength of the cable

21.

Drum weight

22.
23.

Reactance and resistance per M


Length of cable on the drum

24.

Description of routine test

25.

Description of Special test

TECHNICAL
PARAMETERS

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-81-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

O.

LT CABLES
S.NO

DESCRIPTION

Name of Manufacturer

Whether offered cable design is type tested. If yes


enclose the type test certificate.

3
4

Standards followed in design, manufacture and


testing for switch board and the vacuum interrupter
Type of Cables

Voltage rating

Current rating Nominal

Voltage grade

Derating factors to be considered


Laid on ground / air
Temperature correction Ground / air
Thermal resistivity of soil
Grouping factor
Depth of laying
Thermal resistivity
Number of cores

10

Nominal cross section area of conductor and type

11

Sheathing and filler details

12

Armour details

13

Insulation detail

14

Diameter of the cable

15

Weight per meter of cable

16

Dielectric constant of the cable

17

Allowable bending radius of the cable

18

Dielectric strength of the cable

19

Drum weight

20

Reactance and resistance per M

21

Length of cable

22

Description of routine test

23

Description of Special test

11KV CABLE
TECHNICAL
PARAMETERS

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-82-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

P.

LT CABLES
S.NO

DESCRIPTION

Name of manufacturer

2
3

Standards followed in design, manufacture


and testing
Type of cable (Armoured / un armoured)

Voltage Grade

Materials of conductor

Cross- section of conductor

No of cores

Overall diameter of cable

PVC insulated?

Yes / No

10

PVC sheathed?

Yes / No

11

Thickness of insulation in mm

12

Material used for conductor screening

13

Material and area of metallic part of insulation


screening
Maximum standard drum length of cable in m

14
15
I)

Basic current rating of cables considering


bonding at both ends
Installed in air at. Deg. C temp.

ii)

Directly buried in ground at Deg. C

16

De-rating factors for cable installed in an air


for site ambient and grouping on racks / trays
etc.
De-rating factors for cable installed in ground
for different soil resistively, ground
temperature, depth of burial, axial spacing etc
Short circuit current carrying capacity of each
type and size of cable for 1 second and 0.5
second (pl. furnish chart)
Maximum earth fault current carrying capacity
of metallic screen and armouring combined

17
18
19

LT Control
TECHNICAL
PARAMETERS

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-83-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

DESCRIPTION

20

with time duration, for each type and size of


cables, with final temperature not exceeding
200deg.c
Maximum conductor temperature permissible

a)

Continuous operation deg. C

b)

During short circuit condition deg. C

c)

Short circuit current for one second, deg. C

21

24

Whether metallic screening armour provided


would carry specified earth fault current. A
with final temperature not exceeding 200
deg.c
Copies Of All Type Test Certificates, including
that of earth fault current carrying capacity
enclosed?
Yes / No
Cable Fully Confirm To IS Specification? Yes
/ No
Weight per metre of completed cable in kg

25

Maximum standard drum length of cable in m

26
27

Weight of maximum standard drum length of


cable in m
Overall size of drum in m

28

Catalogue Enclosed? Yes / No

22
23

LT Control
TECHNICAL
PARAMETERS

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-84-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

Q.

CABLE RACK / TRAYS


S.NO

DESCRIPTION

Make

Material

Galvanised or not

Thickness of sheet for perforated trays, mm

Sizes of trays offered, mm

Weight per metre of different sizes of ladder and


perforated type trays, kg

Enclose illustrative literature/catalogues

TECHNICAL
PARAMETERS

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-85-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

R.

LT PANELS
S.NO

DESCRIPTION

1.0

About Company

TECHNICAL
PARAMETERS

1.1

Tenderer Name & Address

1.2

Quotation number and date

1.3

Previous experience list of similar job with year of


supply, name of purchaser etc

1.4

Deviation proposed by the bidder

2.0

Documents details

2.1

Drawing no of Single line diagram showing


current rating, CT& PT details

2.2

Technical documents enclosed with bid

2.3

Commercial documents enclosed with bid

2.4

Any certification for factory, design etc.

2.5

List of drawings that will be furnished after


contract finalisation

2.6

All DOL, RDOL, S/D and VFD control wring shall


be as per our drawing?

2.7

List of catalogues enclosed

3.0

Motor control centre (MCC)

3.1

-Make & Type

3.2

-Standards followed

3.3

-Draw-out/ Non-draw out

3.4

-Sheet steel thickness, mm

3.5

-Arrangement of bus bars

3.6

-Arrangement of cable chambers

3.7

-Continuous current rating for main busbar, A

3.8

-Short circuit withstand rating for 1 sec.

3.9

-Busbar sizes and materials

3.10

-Temperature rise of Busbars over 45 deg C


ambient while carrying rated current and installed
in IP54 enclosure for main Bus and tappings

3.11

-Material and size of earth bus

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-86-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

TECHNICAL
PARAMETERS

DESCRIPTION

3.12

-Degree of protection for enclosure

3.13

-Control voltage rating

3.14

-Control voltage supply arrangement

3.15

-Details of incomers

3.16

415V Air break circuit breaker

3.17

Make & Type

3.18

Electrical or manual operation

3.19

Protection device provided Micro processor /


solid state- details of release

3.20

Standards followed

3.21

Manufacturers type designation

3.22

Dimensions and weight of each complete unit in


kg

3.23

Rated voltage and current

3.24

Maximum voltage in V at which the breaker


operator under normal condition

3.25

Maximum voltage in V at which the breaker can


interrupt its rated MVA

3.26

Draw-out/ Non-draw out

3.27

-List and details of outgoing feeders

3.28

-Make and type of circuit breakers

3.29

-Make type and catalogue no. Of load-break


isolators

3.30

-Make type and catalogue no. Of HRC fuses

3.31

-Make type and catalogue no. Of contractors

3.32

-Make type and catalogue no. Of motor


protection relay

3.33

-Make type and catalogue no. Of bimetal


overload relays

3.34

-Make and type of CT

3.35

-CT- Ratio, VA

3.36

-Make of control transformer

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-87-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.NO

TECHNICAL
PARAMETERS

DESCRIPTION

3.37

-Make of push buttons & control switches

3.38

-Make of indicating lamps

3.39

-Make of indicating meters

3.40

-Single line diagram enclosed

3.41

-Overall size (Lx B x H), mm

3.42

-Weight of MCC

3.43

-Enclose technical literature/brochure for MCC


enclosed?

4.0

Power & Lighting distribution board (PDB&LDB)

4.1

Make & Type

4.2

Rated voltage

4.3

Continuous current rating for main Bus bars- A

4.4

Bus bar sizes and materials

4.5

Rating of incomer, A

4.6

Ratings of outgoing feeders, A

4.7

Load breaker switch Make & Type

4.8

HRC fuses Make & Type

4.9

Make & Size of Ammeter/ voltmeter/KWH meter

4.10

Selector Switches Make & Type

4.11

Current transformer Make & Type

4.12

Sheet steel thickness mm

4.13

Overall dimensions LxDxH mm

5.0

Other items

5.1

Junction boxes make, type etc

5.2

Local push button system make, type

5.3

Breaker trolley make and type

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-88-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S.

PCC PANEL
S. No

DESCRIPTION

1.0

About Company

1.1

Tenderer Name & Address

1.2

Quotation number and date

1.3

Previous experience list of similar job with year of


supply, name of purchaser etc

1.4

Deviation proposed by the bidder

2.0

Power control centre (PCC)

2.1

Standards followed

2.2

Rated voltage

2.3

Rated insulation voltage

2.4

Continuous current rating of Bus bars specified


ambient temperature while installed in switchboard

2.5

Material of Bus bars / grade used

2.6

Nominal cross section of Bus bars Sq. mm

2.7

Short time current rating KA/ 1 sec

2.8

Degree of protection of enclosure IP

2.9

Constructional details- thickness of sheet steel


used etc.

2.10

Temperature rise of Bus bars over 45 dec C


ambient while carrying rated current and installed
in IP enclosure for main bus and tapping

2.11

Overall dimension (LXBXH)

2.12

Weight, ton

3.0

TECHNICAL
PARAMETERS

415V Air break circuit breaker

3.1

Make & Type

3.2

Electrical or manual operation

3.3

Protection device provided -Micro processor / solid


state- details of release

3.4

Standards followed

3.5

Manufacturers type designation

3.6

Dimensions and weight of each complete unit in kg

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-89-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S. No

DESCRIPTION

3.7

Rated voltage and current

3.8

Maximum voltage in V at which the breaker


operator under normal condition

3.9

Maximum voltage in V at which the breaker can


interrupt its rated MVA

3.10

Spring charge motor details and voltage required

3.11

Draw-out/ Non-draw out

3.12

Make type and catalogue no. of HRC fuses

3.13

Make and type of CT

3.14

CT- Ratio, VA, class

3.15

Make/ specification of potential transformer

3.16

Make/ specification of push buttons, switches

3.17

Make / specification of indicating lamps

3.18

Make/ specification of indicating meters

3.19

Make/ specification of energy meters

3.20

Make / type and specification of protection relay

3.21

Enclose technical literature/brochure for the panels

4.0

TECHNICAL
PARAMETERS

Bus ducts

4.1

Standards followed in design, manufacture and


testing for bus-duct

4.2

No. Phases

4.3

Rated system voltage and frequency

4.4

System earthing

4.5

Maximum fault level (three phase symmetrical)

4.6

Type of bus-duct

4.7

Max. Voltage at which the bus-duct can operate


continuously

4.8

Bus bar material- conductor

4.9

Rated continuous current

4.10

Rated short time withstand duration

4.11

Rated peak with stand current (peak)

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-90-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

S. No

DESCRIPTION

4.12

Insulation class

4.13

Rated insulation voltage

4.14

One minute power frequency voltage

4.15

Max. Hot spot temp.raise over ambient temp. Of


50C

4.16

Bus enclosure and support structure

4.17

Clearance in air

4.18

Phase to phase

4.19

Phase to earth

TECHNICAL
PARAMETERS

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-91-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

T.

BATTERY & BATTERY CHARGER


SL.NO

DESCRIPTION

1.0

Name of manufacturer

2.0

4.0

List of reference for supply of similar panels with


contact addresses
Standards followed in design, manufacture and
testing for the panel
Whether offer is as per specification.

5.0

Delivery schedule

3.0

5.1

Drawings and document submission

5.2

Despatch of material

6.0

Deviations (Enclose list of deviations)

7.0

PANELS- GENERAL

7.1

Standards followed for panel construction

7.2

Limiting Dimension

7.3

Degree of protection

7.4

System Voltage & frequency

7.5

System earthing considered

7.6

Rated short time current withstand

7.7

Material and size of earth bus in the panel

7.8

Control wiring - size and specification

7.9

Control cable make

7.10

Control voltage rating

7.11

Make/ type and catalogue no. of HRC fuses

8.0

DC DISTRIBUTION BOARD

8.1

Voltage rating

8.2

Current rating of incomer and bus bar

8.3

Current ratings of feeders

9.0

BATTERY CUM
CHARGER

BATTERY AND BATTERY CHARGER

9.1

Type of battery

9.2

Capacity of battery

9.3

Rating of each cell

9.4

No of cells

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-92-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

SL.NO

DESCRIPTION

9.5

Normal Voltage per cell

9.6

Float charge voltage per cell

9.7

Boost charge voltage per cell

9.8

Mounting arrangement

9.9

Whether stand is supplied along with batteries

9.10

Inter-cell connectors details

9.11

End terminal connection details

9.12

Battery charger details

9.13

Type

9.14

Features provided

9.15

Input voltage rating

9.16

Permissible input voltage variation

9.17

Output regulation and variations guaranteed

9.18

Protections provided at input for overload and


charger faults

9.19

Protections provided at DC side for overload and


faults

9.20

Modes of operation

9.21

Output Voltage & current during normal operation


when battery is fully charged and floating.

9.22

Output Voltage & current during normal operation


when battery is partially discharged and float
charging mode

9.23

Output Voltage & current during operation when


battery is fully discharged and boost charging in
progress

9.24

Capacity of Battery & Battery charger

BATTERY CUM
CHARGER

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-93-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

U.

UPS
Sl. No

DESCRIPTION

1.0

UPS System details

1.1

Capacity of UPS

1.2

Type

1.3

Parallel Redundant Unit

1.4

Continuous rating

1.5

Location

1.6

Degree of protection

1.7

Tentative dimension

1.8

Paint shade

1.9

Input supply

TECHNICAL
PARAMETERS

1.10 Input frequency


1.11 Output supply
1.12 Overall efficiency
2.0

INVERTER

2.1

Type

2.2

Rating of inverter

2.3

Efficiency of each inverter unit

2.4

Output Voltage

2.5

Output Frequency

2.6

Permissible overload

2.7

Output Waveform

2.8

Total Harmonic Distortion

2.9

No of Static Switch

2.10 Transfer time in case of inverter fault


2.11 Transfer time on manual transfer

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-94-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

TECHNICAL
PARAMETERS

Sl. No

DESCRIPTION

3.0

CHARGER ( RECTIFIER )

3.1

Type

3.2

DC Output

3.3

Float Charging Mode

3.4

Boost charging Mode

3.5

Rating

3.6

Efficiency
BATTERY

4.0
4.1

Type

4.2

Type of electrolyte

4.3

Type of Cell container

4.4

No of cells / battery

4.5

Capacity of fully charged cell (AH)

4.6

Cell voltage

4.7

Nominal

4.8 Float charge


4.9

Boost charge

4.10 Nominal DC voltage


5.0

SERVO VOLTAGE STABILIZER

5.1

Output

5.2

Efficiency

5.3

Rating

5.4

Permissible overload

6.0
6.1

HARMONIC DISTORTION
Total harmonic distortion

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-95-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

Sl. No
6.2
7.0

TECHNICAL
PARAMETERS

DESCRIPTION
Single harmonic
OVERLOAD CAPABILITY

7.1

125% of full load

7.2

150% of full load

7.3

Power factor range

7.4

Branch fuse clearing capability

8.0
8.1

STATIC TRANSFER SWITCHES


Type

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-96-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

V.

EPABX SYSTEM
S.NO

DESCRIPTION

Name of manufacturer

Whether offer is as per specification.

Delivery schedule

Drawings and document submission

Despatch of material

Deviations ( Enclose list of deviations)

System Voltage & frequency

System earthing considered

Features

10

Cabling - size and specification

11

Cable make

12

Whether RS 232/485 ports are connected


for PC connectivity

13

UPS details

14

Longitudinal balance

15

Extn. Loop resistance

16

Dial speed

17

Cross talk attenuation

18

Break ratio

19

Input power

20

Ambient condition

EPABX DETAILS

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-97-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

W.

MCB DISTRIBUTION BOARD


Sl.No

Description

MCB distribution boards/MLDB

Make of board

Standards followed for MCB

Rated voltage and frequency

Make and type of MCB

Rated current A

Breaking capacity A

Tripping time ms

Sheet steel thickness of the board

10

Degree of protection for enclosure

II

415V TPN isolator in sheet steel enclosure

Make

Rated voltage V,at 50Hz

Rated continuous current

Rated insulation voltage

Rated short circuit making capacity(rms)

Rated short time withstand current KA for 1 Sec

Max.size of Aluminium cable that can be


terminated

Degree of protection for enclosure

Sheet steel thickness , mm

III

TECHNICAL
PARAMETERS

415V TPN Industrial Switch Socket Outlet

Make and Type

Rated voltage V, at 50Hz

Rated continuous current

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-98-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

Sl.No

Description

Max.size of Aluminium cable that can be


terminated

Degree of protection for enclosure

Sheet steel thickness, mm

10

Other accessories, if any

IV

TECHNICAL
PARAMETERS

240V SPN Switch Socket Outlet

Make and Type

Rated voltage V, at 50Hz

Max.size of Aluminium cable that can be


terminated

Degree of protection for enclosure

Sheet steel thickness, mm

MCB isolating switch

Make and Type

Rating of MCB isolator

Max.size of Aluminium cable that can be


terminated

Degree of protection for enclosure

Sheet steel thickness, mm

VI

Junction boxes

Make

Rated voltage V, at 50Hz

Rated continuous current

Details of terminals Max.size of Alu/copper cable


that can be terminated

Degree of protection for enclosure

Sheet steel thickness, mm

10

Other accessories, if any


HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-99-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

X.

PLANT LIGHTING
Sl.No

TECHNICAL
PARAMETERS

Description

Voltage

Luminaries

Make

Ballast & capacitor used


Floodlight-HPSV -70W
Well glass fitting -70W
Industrial type HPSV -250W
Industrial type HPSV -150W
Out door type Fluorescent lamp-36w
Mirror optic type Fluorescent lamp2X36w
Twin tube light with lamp-2x36w
Single tube light with lamp-36w
Street light fitting-HPSV-150W

Nominal power factor


Floodlight-HPSV -70W
Well glass fitting -70W
Industrial type HPSV -250W
Industrial type HPSV -150W
Out door type Fluorescent lamp-36w
Mirror optic type Fluorescent lamp2X36w
Twin tube light with lamp-2x36w
Single tube light with lamp-36w
Street light fitting-HPSV-150W

Control gear box

Type
Floodlight-HPSV -70W
Well glass fitting -70W
Industrial type HPSV -250W
Industrial type HPSV -150W
Out door type Fluorescent lamp-36w
Mirror optic type Fluorescent lamp2X36w
Twin tube light with lamp-2x36w
Single tube light with lamp-36w
Street light fitting-HPSV-150W
HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-100-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

Catalogue no
Floodlight-HPSV -70W
Well glass fitting -70W
Industrial type HPSV -250W
Industrial type HPSV -150W
Out door type Fluorescent lamp-36w
Mirror optic type Fluorescent lamp2X36w
Twin tube light with lamp-2x36w
Single tube light with lamp-36w
Street light fitting-HPSV-150W

Degree of protection IP

10

Material of construction details


Floodlight-HPSV -70W
Well glass fitting -70W
Industrial type HPSV -250W
Industrial type HPSV -150W
Out door type Fluorescent lamp-36w
Mirror optic type Fluorescent lamp2X36w
Twin tube light with lamp-2x36w
Single tube light with lamp-36w
Street light fitting-HPSV-150W

11

Colour finish
Floodlight-HPSV -70W
Well glass fitting -70W
Industrial type HPSV -250W
Industrial type HPSV -150W
Out door type Fluorescent lamp-36w
Mirror optic type Fluorescent lamp2X36w
Twin tube light with lamp-2x36w
Single tube light with lamp-36w
Street light fitting-HPSV-150W

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-101-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

Y.

BALANCE LIGHTING
Sl.No

Description

Voltage

Luminaries

3
4

Make

TECHNICAL
PARAMETERS

Ballast & capacitor used


Floodlight-HPSV -250W
Street light fitting-HPSV-150W
Well glass fitting -70W
Out door type Fluorescent lamp-40W
Twin tube light with lamp-2x40W
Single tube light with lamp-40W

Nominal power factor


Floodlight-HPSV -250W
Street light fitting-HPSV-150W
Well glass fitting -70W
Out door type Fluorescent lamp-40W
Twin tube light with lamp-2x40W
Single tube light with lamp-40W

Control gear box

Type
Floodlight-HPSV -250W
Street light fitting-HPSV-150W
Well glass fitting -70W
Out door type Fluorescent lamp-40W
Twin tube light with lamp-2x40W
Single tube light with lamp-40W

Catalogue no
Floodlight-HPSV -250W
Street light fitting-HPSV-150W
Well glass fitting -70W
Out door type Fluorescent lamp-40W
Twin tube light with lamp-2x40W
Single tube light with lamp-40W

Degree of protection IP

10

Material of construction details


Floodlight-HPSV -250W
Street light fitting-HPSV-150W

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-102-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)

Well glass fitting -70W


Out door type Fluorescent lamp-40W
Twin tube light with lamp-2x40W
Single tube light with lamp-40W
11

Colour finish
Floodlight-HPSV -250W
Street light fitting-HPSV-150W
Well glass fitting -70W
Out door type Fluorescent lamp-40W
Twin tube light with lamp-2x40W
Single tube light with lamp-40W

Z.

CAPACITOR
S.NO

DESCRIPTION

Make

Type

Capacitor
(YES/NO)

design

calculation

DETAILS

furnished

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-103-

FACOR POWER LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION

ANNEXURE-11
VENDOR LIST
S.NO
A

VENDORS NAME

DESCRIPTION
MECHANICAL EQUIPMENT

1.

TURBINE

SIEMENS/APT/HTC/BHEL

2.

BOILER

THERMAX/CVL/IJT/BHEL

3.

AIR COOLED CONDENSER

GEA/PAHARPUR

AUXILIARY COOLING TOWER

PAHARPUR/PALTECH/SHRIRAM
COTRELL/SOUTHERN COOLING
TOWER

DM PLANT

THERMAX/ DOSION / TRIVENI / ION


EXCHANGE/

FUEL HANDLING SYSTEM

BEVCON/ HYQUIP/ TECPRO/ PROMAC/


ELECON / TRF

ASH HANDLING SYSTEM

BEVCON/ MACAWBEEKAYAR/
MECGALE/ OSM

FIRE FIGHTING SYSTEM

STERLING WILSON/ NEW FIRECON/


FIRECON/ GPR

HVAC

BLUESTAR / VOLTAS

4.

5.
6.
7.
8.
9.

10. BFP
11.

KSB / SULZAR / KIRLOSKAR EBBARA

FANS & ACCESSORIES

12. CHEMICAL PUMPS


13.
14.
15.

KISHORE PUMPS / VK PUMPS

ELECTROSTATIC
PRECIPITATOR

BHEL/ABB /THERMAX/ACC/ELEX

CHEMICAL DOSING SYSTEM

ENPRO/TECHNO/METACHEM/V.K
PUMPS

SOOT BLOWERS

BHEL/SITSON/RR TECHNOMECH/GD
WORKS

16. REFRACTORY
17.

THERMAX / FLAKT/TLT/ /INDUSTRIAL


SYSTEMS / BATTLIBOI

INSULATION

18. BELLOWS
AIR & FLUE GAS DAMPERS

ACC/ BHILAI REFRACTORY / MPR


LLOYDS / MINWOOL / MURUGAPPA /
ROCKWOOL INDUSTRIES
METALLIC BELLOW /LONESTAR

19.

FOURESS METROVICKS /
BACHMANN INDIA / DEVIKRIPA ENGG.
TRICHY (EFFOX, USA)

20. AGITATORS

REMI / STANDARD / TRIVENI

21. TURBINE CENTRIFUGE

ALFA LAVAL / PENNVAULT

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-1-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
ANNEXURE 11 VENDOR LIST (CONTD.)

22. VIBROMETER

BENTLE NEVEDA

23. FLUID COUPLING

VOITH/ELECON/FLUIDOMAT/PEMBRIL
(GREAVES)

24. TYPE COUPLING

LOVEJOY/FENNER/ ESBI

25. GEAR COUPLING

NAW/FENNER/ELECON/FMG/HI-CLIFF
/LOVEJOY/ WMI CRANES / FLENDER

26. PIN-BUSH COUPLING

NAW/FENNER/LOVEJOY/ELECON

27. RESILIENT COUPLING

LOVEJOY (BIBBY)/GBM/FENNER

28. DISC BRAKE

KATEEL/SVENDBORG

29. THRUSTER BRAKE

SVENDBORG/STROM KRAFT/KAKKU

30.

BALL BEARING /ROLLER


BEARING

SKF/KOYO/NTN/INA/NBC/FAG/ZKL

31. BELT VULCANIZING UNIT

SV DATTER

32. RUBBER LINER

TEGA/KAVERI/FORECH

33.

SUSPENDED
ELECTROMAGNET

34. METAL DETECTOR

ERIEZ/ELEKTROMAG/POWER BUILD/
ELECTROZAVOD/KAKKU
THERMO-RAMSEY/ELEKTROMAG/ PBL

BELT SCALE

SCHENCK J&N/IPA/TRANSWEIGH/
KISTLER-MORSE/PBL

36.

ELECTROMAGNETIC VIBRO
FEEDER

IC/ELECON/TRF/ELECKTROMAG/
SAYAJI/BHP (VIMEC)

37.

ELECTROMECHANICAL VIBRO
FEEDER

IC/ELECON/TRF/BHP (VIMEC)

35.

CRUSHER (HAMMER MILL,


38. ROLL & RING GRANULATOR)

SAYAJI /TRF
/MBE/L&T/SANDVIK/METSO/
KOBE/KRUPP

39. BURNER

OLM/COEN BARADTH

40. TRANSMISSION CHAINS

ROLCON

41. SPROCKET

ROLCON/TI/DIAMOND/ROLON

AIR POLLUTION CONTROL


42. SYSTEM

ALSTOM/ACC/THERMAX/
RIECO/BHE

43.

BAG FILTER

THERMAX/RIECO/ALSTOM PROJECTS
INDIA LTD/ACC/ANFREW YULE

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-2-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
ANNEXURE 11 VENDOR LIST (CONTD.)

44.

GREASE LUBRICATION
SYSTEM

LINCOLN HELIOS INDIA


LTD/DELIMON/AFMC MAIN

PNEUMATIC CYLINDERS

VELJAN/NUCON/FESTO/SCHRADER

45.

/NORGREN/SMC (JAPAN)/PARKER

46. PNEUMATIC AIR BOOSTER

SMC (JAPAN)

PNEUMATIC CONVEYING
47. SYSTEM

RIECO/MBE/MACAWBERBEEKAY/MAHINDRA
ASHTECH/ENERGO/VCC

PRESSURE VESSELS

BHARAT HEAVY PLATES &


VESSELS/ISGEC/ASSOCIATED PLATES
& VESSELS/DECTEL/LLOYDS STEEL/L
& T/BOC

AIR COMPRESSOR

ATLAS COPCO / IR / ELGI / KIRLOSKER


PNEUMATICS

AIR DRYER

DELAIR/INDCON/ATLAS COPCO/PACE

48.

49.
50.

DUST SUPPRESSION
SYSTEM(SPRINKLER/DRY51.
FOG TYPE)

TPS/F.HARLEY/ KAVERI / PROJECTS &


CONTROL

PIPE WORK, VALVES &


FITTINGS

1.

PIPES (ASTM SPECN)

SAIL/TISCO/KALYANI / JINDAL / BST

2.

SEAMLESS & ERW PIPES


(IS:1239)

SAIL/TATA/KALYANI/SURYA ROSHNI
LTD / BST

3.

BLOW DOWN VALVE

BHEL/LEVCON / UNITED ENGINEERS

BALL VALVE (CI)

VALTEC/UNIFLOW/CRESCENT
/DEWRANCE MACNEILL

RELIEF & SAFETY VALVES

BHEL / JNM / MAZDA / AUDCO /


MOORCO / IL / MASONEILAN /
TYCOSANMAR

6.

CONTROL VALVES

IL/MASONEILAN/MASCOT/ARCA/JNM

7.

BUTTERFLY VALVE

INTERVALVE/ AUDCO / KSB / CRESENT

8.

AL. CLADDING

BALCO / INDALCO / HINDALCO

9.

AUTOMATIC DRAIN VALVE

TRIDENT/EQUIVALENT

STEAM TRAPS

GREAVES / JN MARSHALL/ DRAYTON /


UNI KLINGER

4.

5.

10.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-3-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
ANNEXURE 11 VENDOR LIST (CONTD.)

11.

PROCESS VALVES
i.

IBR

ii. NON IBR

12.

SPRING HANGER

INSTRUMENTATION &
CONTROLS

1.
2.
3.
4.

AUDCO / BHEL / M&M /KSB / BDK /


FOURESS
BDK/ BHEL/ AUDCO /KSB /FISCHER
XOMAX / FOURESS / VALTECH /
BERMACO/ CRESENT /NECO
SARATHI / MYRICKS

GOVERNOR

WOODWARD505E

TEMPERATURE GAUGES

H. GURU / GENERAL INSTRUMENTS


/BELLS / OLYMPUS

PRESSURE GAUGES

H. GURU / GENERAL INSTRUMENTS


/A.N. INSTRUMENTS /BELLS/ OLYMPUS

LEVEL GAUGES

LEVCON

PRESSURE TRANSMITTER

ROSEMOUNT /YBL /TATA HONEYWELL


/

5.

C.G. HARTMAN & BROWN


FLOW TRANSMITTERS
6.

ROSEMOUNT /YBL /TATA HONEYWELL


/
C.G. HARTMAN & BROWN

TEMPERATURE
TRANSMITTERS

ROSEMOUNT / SHREYAS / BELLS /C.G.


HARTMAN & BROWN

THERMOCOUPLE

GENERAL INSTRUMENTS / NUTECH


ENGINEERS / TEMPSONS / NAGMAN

9.

FLOW NOZZLES

BALIGA/ IL / MICROPRECISION

10.

PRESSURE SWITCHES

SWITZER / DONFOSS /INDFOSS

LEVEL SWITCHES

LEVCON / SAPCON / V. AUTOMAT &


INSTRUMENTS

I/P CONVERTERS

ROSEMOUNT / SHREYAS / BELLS / C.G.


HARTMAN & BROWN

OXYGEN ANALYSER

C.G. HARTMAN & BROWN / YBL / L.G.


BALAKRISHNAN & BROS LTD
/ROSEMOUNT

COMPENSATING CABLE

THERMOPADS / ECI / ASSOCIATED


CABLES

DISTRIBUTED CONTROL

YOKOGAWA / HONEYWELL / EMERSON


/ INVENSYS/(FOXBORO) / ABB /

7.
8.

11.
12.

13.

14.
15.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-4-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
ANNEXURE 11 VENDOR LIST (CONTD.)

SYSTEM (DCS)

SIEMENS

PLC

ROCKWELL AUTOMATION / SIEMENS


/ABB

16.
/SCHNEIDER/ GE-FANUC
HMI-PC

IBM / HP / DELL

HMI SOFTWARE (3RD PARTY)

WONDERWARE (INTOUCH) /
INTELLUTION(FIX) / US DATA
(FACTORY LINK)

CONTROLLER

YOKAGAWA/HONEYWELL/SIEMENS/AB
B/EUROTHER M/ INVENSYS
(FOXBORO)

RECORDER

YOKOGAWA/LAXONS(CHINO)/EUROTH
ERM/ABB/ HONEYWELL

BARGRAPH & DIGITAL


INDICATOR

MASIBUS/ EUROTHERM/ YOKOGAWA/


HONEYWELL

TOTALISER

YOKOGAWA / ABB / MASIBUS/


HONEYWELL

SCANNER

MASIBUS/APLAB/ECIL/WAAREE/M B
CONTROLS / PROCON

ALARM ANNUNCIATOR

IIC/ MINILEC/ PROCON/ PIRI/ APLAB/


ICA/ DIGICONT /MB
CONTROLS&SYSTEM /
MINILEC/PROCON / SEMUDA

25.

SIGNAL
ISOLATOR/MULTIPLIER

MTL/ YOKOGAWA/ MASIBUS/ PEPPERL


& FUCHS

INSTRUMENT
PANEL/CABINET/DESK

RITTAL/RKC/SIMCON/VERO/PYROTECH

26.

POWER SUPPLY UNIT

SIEMENS / PHOENIX / MTL/ COSEL

17.

18.

19.

20.

21.

22.

23.

24.

27.
28.

INTRINSIC SAFETY BARRIER


ROTAMETER

29.

MTL/P&F/ABB/ENDRESS-HAUSER
KHRONE /IEPL /EMERSON(BROOKS)
/EUREKA/ALFLOW/ TRANSDUCERS &
CONTROLS / FROBES MARSHALL /

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-5-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
ANNEXURE 11 VENDOR LIST (CONTD.)

INSTRUMENTATION ENGINEERS /
KROHNE MARSHALL/ INSTRUMENTS /
PLACKA/ ROTA
VORTEX FLOWMETER

ENDRESS
HAUSER/YOKOGAWA/KRHONE/
EMERSON/ABB

CONTROL VALVE AND ON-OFF


VALVE

IL/FISHER-XOMOX/SAMSON/ DRESSER
MASONEILAN/ FOURESS/FORBES
MARSHALL(ARCA)/ R.K.CONTROLS /
MIL / ABB (INTROL)

ELECTRIC ACTUATOR

AUMA / IL / LIMITORQUE / ROTORK /


ABB

SOLENOID VALVE

AVCON/ROTEX/ASCO/VICKERS/SCHRA
DER

AIR FILTER REGULATOR

PLACA/SHAVO NORGREN

ENCODER

P&F/ROCKWELL/HUBNER

GAS ANALYSERS

EMERSON
SIEMENS

30.

31.

32.

33.
34.
35.

36.

ABB

/YOKOGAWA/
(TELEDYNE)
WATER ANALYSERS

37.
PH
AND
METER
38.

ANALYTICAL

HONEYWELL

FORBES MARSHALL/ ABB ANALYTICAL


/YOGOKAWA/ E+H / EMERSON

CONDUCTIVITY EMERSON / ABB ANALYTICAL /


YOKOGAWA/
FORBES
MARSHALL
/INVENSYS(FOXBORO)/
TOSHBRO
CONTROLS

INFRARED PYROMETER

NAGMAN (IRCON) / EUROTHERM


(LAND) / LAXSON(CHINO)/HONEYWELL/
FLUKE/ TOSHNIWAL (RAYTEK)

MOISTURE ANALYSER

CONCORD (BERTHHOLD) / EMERSON


(K-RAY) / ECIL/ENDRESS HAUSER /
EMERSON
/
YOKOGWAWA/CHINOLAXSONS / ABB ANALYTICAL

39.

40.

41.

VIBRATION

SENSOR

& BENTLEY-NEVADA

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-6-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
ANNEXURE 11 VENDOR LIST (CONTD.)

MONITOR

FROBESMARSHALL
SHERMAN

(SHINKAWA)/

42.

POLLUTION
CONTROL
& DRAGER/ HONEYWELL/ ENVIROTECH/
STACK MONITORINR SYSTEM
EMERSON/
FROBES
MARSHALL/
DURAG/ OPSIS

43.

FLAME DETECTOR

HONEYWELL/
FIRE-EYE/
SCHODER/ DURAG

FROM

AUXILIARIES

1.

PAINTS

BERGER / SHALIMAR / NEROLAC

2.

CRANES

UNITEK / WMI

3.

WEIGHIGHING m/c

J&N / IPA / PHILIPS

4.

COMPRESSORS

ELGI / INGARSOL RAND / KIRLOSKAR /

CRUSHER

TRF OR EQVT. TO BE APPROVED BY


CONSULTANT

M.S.TANKS / SS TANKS

FABRICATED IN A REPUTED
MANUFACTURING UNIT SUBJECT TO
APPROVAL OF CONSULTANT

PVC / POLYFIBRE TANKS

SINTEX / DEVI POLYMER / EQVT.

CONVEYOR IDLERS, PULLEYS

KALI / IGP / TRF / ELECON /EQT.


CONVEYOR SUPPLIER MAKE TO BE
APPROVED

GEAR BOX

ELECON / DAVID BROWN / SHANTI /


CROMPTON GREAVES

5.

6.
7.
8.

9.

10. CONVEYOR BELTS

NIRLON / HILTON / MRF / FENNER

11. METAL DEDUCTOR

ELECTROMAG / MCI

12.

HOISTS

TRACTOR TIRFOR / BATLIBOI / WH


BRADY / MM ENGINEERS / ARMSEL /
UNITEK / REVA /BOMBAY POWER LIFT

13. VIBRATING SCREEN

SAYAGI / TRF

ELECTRICAL

1.

GENERATOR

2.

SF6 CIRCUIT BREAKERS

3.

DISCONNECTING SWITCH/
ISOLATORS

SIEMENS / APT POWER / GREENSOL


POWER / BHEL
ABB / AREVA / BHEL/ CGL / SIEMENS
ELPRO / HIVELM/ ALLIANCE

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-7-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
ANNEXURE 11 VENDOR LIST (CONTD.)

4.

LIGHTNING ARRESTORS

ELPRO / AREVA (WSI) / CGL / ABB

5.

CTS

BHEL / ABB / TELK / CGL / AREVA


(WSI)

6.

PTS

BHEL / ABB / TELK / CGL / AREVA


(WSI)

7.

INSULATORS

JAYASHRI INSULATOR / WSI /


MODERN INSULATOR / BHEL

8.

HT BUS DUCT

C&S/ ECC/ STAR DRIVE/ ENPRO/


GENERAL ENGINEERING

9.

VACUUM CONTACTORS

AREVA / BHEL / SIEMENS / ABB

10.

HRC FUSES

AREVA / DP / S&S/ COOPER BUSSMAN

11.

NEUTRAL GROUNDING
RESISTOR

NARKHADE / PEFCO / RESITECH /


NATIONAL

12.

TRANSFORMERS

CGL / AREVA / VOLTAMP / EMCO/ TELK


ABB / SIEMENS

13.

METERS

AE /IMP/ L&T

14.

CURRENT TRANSFORMER

KAPPA / AE

15.

INDICATING LAMPS

VAISHNAV / TEKNIC

16.

CONTROL SWITCHES

ALSTOM / SALZAR / KAYCEE

17.

INSTRUMENT
TRANSFORMERS

KAPPA / CURRENT ELECTRICAL

18.

HT PANELS

AREVA / ABB / SIEMENS/ L&T / VENUS


CONTROL / PYRAMID SWITCHGEAR

19.

PROTECTION RELAYS

AREVA / ABB / SIEMENS

20.

METERS

AE/IMP

21.

TRI-VECTOR METERS / MFM

CONZERV / L&T

22.

INDICATING LAMPS / PUSH


BUTTONS

VAISHNAV / TECKNIC/SIEMENS

23.

CONTROL SWITCHES

AREVA /SALZAR /KAYCEE

24.

INSTRUMENT
TRANSFORMERS

KAPPA

25.

LT PANELS

ABB /SIEMENS /SCHNEIDER/ UNILEC /

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-8-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
ANNEXURE 11 VENDOR LIST (CONTD.)

VENUS CONTROL / PYRAMID


SWITCHGEAR
ACB

L&T / SIEMENS / ABB / SCHNEIDER /


C&S

MCCB

L&T / SIEMENS / ABB / SCHNEIDER /


C&S

SFU

L&T / SIEMENS / ABB / SCHNEIDER /


C&S

CONTACTOR

L&T / SIEMENS / ABB / SCHNEIDER /


C&S

OVER LOAD RELAY

L&T / SIEMENS / ABB / SCHNEIDER /


C&S

VFD

L&T / SIEMENS / ABB / SCHNEIDER /


C&S

32.

CT/PTS

KAPPA / VOLTAMP / AE

33.

INSTRUMENTS

AE / IMP

34.

ENERGY METERS / MFM

CONSERV / L&T

35.

PUSH BUTTONS

VISHNAV/ TECNIK / ESBEE / BCH

36.

INDICATING LAMPS

VISHNAV / TECNIK / ESBEE / BCH

37.

APFC RELAY

L&T / BELUK / BCH

38.

CAPACITOR

L&T-MEHER/ EPCOS / BCH

39.

TERMINAL BLOCKS

ELMEX / CONNECT WELL

40.

PROTECTIVE RELAYS

AREVA / SIEMENS / ABB / ER / BCH

41.

SELECTOR SWITCHES

KAYCEE / SALZAR / BCH

42.

L.T. BUS DUCT

STARDRIVE/ ECC/C&S/PCE/HCE/
BRIGHTENGINEERS/UNITED ELECTRIC

43.

HT MOTOR

KEC /BHEL / CGL / AREVA

44.

LT MOTOR

SIEMENS / CGL / KEC / BHEL / AREVA

45.

L.T. GEARED MOTOR

KIRLOSKAR (KEC)/POWER
BUILD/IC/BHARAT BIJLEE / SEW/FIMET

26.

27.

28.

29.

30.

31.

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-9-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
ANNEXURE 11 VENDOR LIST (CONTD.)

46.

AC DRIVES, VVVF DRIVE

ABB / SIEMENS /
HITACHI/AREVA/CGL/KEC/BBL

47.

MOTOR PROTECTION RELAYS

GE POWER / SCHNEIDER / L&T /


SIEMENS / ABB /C&S

48.

AUXILIARY RELAYS

AREVA / EASUN / ABB / L&T /


SCHNEIDER / SIEMENS/BCH /
ROCKWELL / GE

49.

NUMERICAL PROTECTION
RELAYS (FOR HT SYSTEM)

ABB / SIEMENS / AREVA / GE / L&T

50.

NUMERICAL PROTECTION
RELAYS (FOR LT SYSTEM

51.

52.

132KV/ 11KV/ 3.3 KV XLPE


CABLE

1.1 KV PVC/XLPE/HRPVC
CABLE (POWER)

ABB/ SIEMENS /AREVA /GE


SCHNEIDER / L&T / ASHIDA
RPG / UNIVERSAL / CCI/NICCO /
TORRENT CABLES /
INDUSTRIAL/INCAB / CRYSTAL/
UNIFLEX
RPG / UNIVERSAL /CCI
/NICCO/TORRENT/INDUSTRIAL/
POLYCAB / FINECAB / INCAB /
RADIANT/ CRYSTAL / KEI / UNIVERSAL /
NICCO / TORRENT

53.

1.1 KV PVC/XLPE/HRPVC
CABLES(CONTROL)

INDUSTRIAL/POLYCAB / DELTON /CCI /


CORDS / SPECIAL / CAPCAB/ FINECAB/
RADIANT/ INCAB/ CRYSTAL/ LAPP

54.

TERMINAL BLOCK

ELMEX / ESSEN / CONNECTWELL /


C&S/WAGO/PHOINEX

55.

HT CABLE TERMINATION KIT

RAYCHEM / M-SEAL (MECP)


/YAMUNAGASES (DENSION)/

56.

LT CABLE TERMINATION KIT

RAYCHEM / M-SEAL / DENSION/CCI

57.

AC POWER CONTACTOR

SIEMENS / L&T / BCH / ABB /


SCHNEIDER / GE- POWER

58.

DC POWER CONTACTOR

BCH / BHEL / SIEMENS / L&T / ABB

59.

AUXILIARY RELAY/ CONTROL


CONTACTOR

SIEMENS / L&T / BCH / C&S (TM) / ABB /


GE POWER/SCHNEIDER / ROCKWELL

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-10-

FACOR ALLOYS LIMITED


45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
ANNEXURE 11 VENDOR LIST (CONTD.)

60.

UPS

KELTRON / GUJRAT HI-REL / SIEMENS /


EMERSON /GE / DB POWER
CONTROLS

61.

CONTROL SWITCH

SIEMENS / KAYCEE / AREVA / L&T /


VAISHNO / C&S

62.

PUSH BUTTON

SIEMENS / BCH / L&T / VAISHNO / C&S /


SCHNEIDER / TECHNIC / KAYCEE

63.

LIMIT SWITCH

AG SYSTEMS/JAY
BALAJI/TECHNOCRATS/ ELECTROMAG/
JSI/ TECHNIC (SIEMENS / BCH MAY BE
CONSIDERED ONLY FOR LIGHT DUTY)

64.

CHANGE OVER
SWITCH/SELECTOR SWITCH

C&S / STANDARD / HHE /KAYCEE /


SIEMENS/ BCH/L&T/ INDOASIAN

65.

DISCREPANCY CONTROL
SWITCH

ABB / AG SYSTEMS

66.

EPABAX SYSTEM

AVAYA / TADIRAN /GTL (NORTEL) /


SIEMENS

67.

BATTERY

AMARA RAJA /AMCO/STANDARD/EXIDE

68.

DG SET

GEMMCO/ MAHENDRA

69.

LIGHTING FITTING

PHILIPS / GE / BAJAJ
FLOROCRAFT/ WIPRO

HIQ POWER ASSOCIATES PRIVATE LIMITED, CHENNAI

-11-

CGL