SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - June 2008)

Rev 3

SAUDI ARAMCO INSPECTION CHECKLIST

SAIC NUMBER

Exhaust Fan Installation Inspection

SAIC-K-4002

PROJECT TITLE

WBS / BI / JO NUMBER

EQUIPMENT ID NUMBER(S)

EQUIPMENT DESCRIPTION

LAYOUT DRAWING NUMBER

REV. NO.

SCHEDULED INSPECTION DATE & TIME

ACTUAL INSPECTION DATE & TIME

30-Jun-08
DATE APPROVED

QR NUMBER

15-Dec-09

HVAC

CONTRACTOR / SUBCONTRACTOR

EQPT CODE

SYSTEM ID.

PURCHASE ORDER NUMBER

PLANT NO.

EC / PMCC / MCC NO.


QUANTITY INSP.

MH's SPENT

TRAVEL TIME

SAUDI ARAMCO USE ONLY

SAUDI ARAMCO TIP NUMBER

SAUDI ARAMCO ACTIVITY NUMBER

SAUDI ARAMCO INSPECTION LEVEL

CONTRACTOR INSPECTION LEVEL

WORK PERMIT REQUIRED?

ITEM
No.

ACCEPTANCE CRITERIA

REFERENCE

A1

Fans shall be air-foiled, backward-inclined, backward curved, or forwardcurved.

SAES-K-001
Para 4.8.9.1

A2

Variable speed fan shall be provided in variable air volume systems

SAES-K-001
Para 4.8.9.1

A3

All exhaust fans shall have back draft dampers which shall close when
fan is off.

SAES-K-001
Para 4.8.9.2

A4

All fans shall be isolated from their ducts by flexible connections.

SAES-K-001
Para 4.8.14.3

A5

Equipment (fan assembly) clearance shall be provided with a minimum


of 1 m clearance on each side of equipment with openable panel or
controls, unless equipment manufacturer requires greater clearances.

SAES-K-001
Para 5.1.4

A6

Exhaust shall be directly to the outside with a point of discharge of at


least 1.5 m away from any openable window or door, and a minimum of
1m above and 3 m away from any air intake.

SAES-K-001
Para 4.4.10.3

A7

Exhaust fan used for ventilating the Battery Room shall have their
exhaust point (air outlet) located in the ceiling or its upper edge flush
with ceiling if it is located in a wall.

SAES-K-002
Para 6.4

A8

Fans and their Motors shall be accessible for servicing and maintenance
(UMC Para 503.1)

SAES-K-100
Section 1

PASS

FAIL

N/A

RE-INSP DATE

REMARKS:

REFERENCE DOCUMENTS:
1-SAES-K-001 -- Heating, Ventilating and Air Conditioning (HVAC), 25 November, 2006
2-SAES-K-002 -- Air Conditioning System for Essential Operating Facilities 31 May , 2004
3- Uniform Mechanical Code (UMC), 1997
4-SAES-K-100 -- Saudi Aramco Mechanical (HVAC) Code, 31 May , 2004

Contractor / Third-Party

Saudi Aramco

Construction Representative*

PMT Representative

Work is Complete and Ready for Inspection:


Name, Initials and Date:

QC Inspector

QC Record Reviewed

Work Verified

T&I Witnessed

QC Record Reviewed

Work Verified

T&I Witnessed

QC Record Reviewed

Work Verified

PID Representative
Performed Inspection

Work / Rework May Proceed

Name, Initials and Date:

Name, Initials and Date:

QC Supervisor

Proponent and Others


Quality Record Approved:

Name, Sign and Date:

T&I Witnessed
Name, Initials and Date:

Name, Organization,
Initials and Date:

Page 1 of 2

*Person Responsible for Completion of Quality Work / Test

Y = YES

Page 2 of 2

N = NO F = FAILED