Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Website
http://www.uep.com.pk
COMPANIES PROFILE
FIRMS NAME
Limited
An ISO 9001:2000
Certified Company
COMPLETE ADDRESS
PRIVATE LIMITED.
TELEPHONE NO
00+ 92+21+32468091 -5
FAX NO
00+92+21+32468090.
30-03-1980.
E- MAIL ADDRESS
smasghar@cyber.net.pk
E- MAIL ADDRESS
info@smasghar.com.pk
Web- Page
http://www.smasghar.com.pk
30-03-1980.
20.
1980.
CHIEF EXECUTIVE
GENNERAL MANAGER
:
:
CHIEF EXECUTIVE.
MOHAMMAD ANWER
S.IMDAD ALI.ZAIDI
MOHD SALEEM
MOHD JAVED
SALEEM NOOR
AFTAB AHMED
SAEED KHAN
DILSHAD A. SIDDIQUI.
MANAGER FINANCE
ASIF KHAN
ATIA FASIAL
ASAD ABBAS
MOHSIN KHAN
FIELD OFFICER.
SADDAM HUSSAIN
FIELD OFFICER.
SULEMAN
OFFICE PEON.
USMAN GHANI
OFFICE PEON.
SECTION 1
INTRODUCTION
SECTION 2
SCOPE OF WORK
SECTION 3
DOCUMENTATION
REQUIREMENTS
SECTION 4
PROJECT REFERENCES
SECTION 5
PICUTRE GALLARY
to
our
Petrosin Ravi
SHELL GAS
WEATHERFORD DRILLING
Petrosin Engineering
(One of the Largest Private Sector Project US $ 700 Million
Dollars)
(Re-Location)
DESCON ENGINEERING
SETTING UP OF NEW WIND ENERGY FARM FOR FOUNDATION ENERGY 1
(The Project Cost US $ 130 Million Dollars)
DESCON ENGINEERING
SETTING UP OF NEW WIND ENERGY FARM FOR FOUNDATION ENERGY 2
(The Project Cost US $ 130 Million Dollars)
DESCON ENGINEERING
SETTING UP OF COMPLETE NEW ASPHALT BUILT UNIT (ABU)
(The Project Cost US $ 30 Million Dollars)
Pakistan International Container Limited (PICT) Karachi International Container Limited (KICT)
who
got
the
(Total Investment by Single Largest Group in the Private Sector over US $ 30 Million Dollars)
II
EXPANSION
M/s.
S.M.Asghar
(Pvt)
Limited
was
awarded
by
the
President of Pakistan
for successfully and timely performance in
Clearance and Logistics of JJVL Phase I Project
JJVL
is
Pakistans
single
largest
producer
of
Liquefied
Petroleum
Gas. Situated
in
Dei
Shah
Bukhari,
District
Hyderabad, JJVLs Extraction Plant has a daily output of about
500 metric tonnes of LPG and 150 metric tonnes of NGL/Naphtha.
JJVL accounts for about one-third of the total local LPG production of the
country.
JJVL processes about 200-220 million cubic feet of natural gas condensate
per day piped from British Petroleum's Badin Gas Field through the Liquid
Handling Facility of Sui Southern Gas Co Ltd at Jamshoro
SCOPE OF WORK
BENEFIT OF VAVARIOUS
CONCESSIONARY
SROs & EXEMPTIONS
We shall inform the arrival and the berthing date of the vessel
to the Importer / Representatives of the Importer in order to keep a
close Loop for the berthing of the vessel.
CUSTOM CLEARANCE:
We shall collect in full advance all the
necessary documents for the onward Custom
Clearance
from
the
Importer
/
Representatives of
the Importer when
intimated and will prepare GD and all the
required documents and formalities to be
submitted to the related
Custom Authority
and
Will Complete the preparation of the GD (Goods Declaration) as per
Invoice, Packing List & Bill Of Lading depending on weather the Vessel has
arrived and also subject to the Lodging Of Manifestation of IGM (Import
General Manifest) by the Shipping Company / Shipping Agent.
We shall complete all the formalities required by the relative Shipping Agent /
Main Carrier Agent/ relevant Port Authority and will obtain the Delivery
Order from the Shipping Company/ OR their Agent against the
presentation/ submission of Original Bill of Lading.
The delivery Order's are generally issued after filing of IGM in order to
ascertain the goods have not been Transshipped.
NECESSARY ASSISTANCE:
We shall provide all necessary Assistance and
Consultancy Services Concerning Custom Clearance to
the Importer / Representatives of the Importer.
AIR CARGOES:
We shall also perform the Works Related to the Air Cargo As per request of
Importer / Representatives of the Importer
DELIVERY AT / TO THE PLANT SITE
We shall safely Transport the Cargo by the Trucks, Trailers, Multi Axle, Low
Bed OR as per the requirement & Nature of Cargo to the Warehouse or the
open storage area as per the instruction of Importer / Representatives of
the Importer.
CUSTOM DUTIES
TAXES
SROs AND
NECESSARY
PERMITS
All the Plant, Machinery, Equipment and Parts/Spares which are imported
into Pakistan shall be subject to Custom Duties and Taxes Prevailing at the
time of Import.
From 5% Minimum
To 20% Maximum
17 %
Income Tax/Taxes
5.5%
EAST WHARF:
a)
b)
KPT owns few Berths such as Berth No 1 Open, Shed No 02, Shed No
03, Berth No 04 Open, Berth 10, 11, 12,13,14,15,16 And 17.
c)
2)
WEST WHARF:
a)
b)
KPT owns few Berths such as Berth Namely 18, 19, 20, 21, 22, 23, 24
And 25
c)
Berth Number 25 is for Heavy Lift Cargo that has On Shore Heavy
Crane for capacity 50 M/Tons.
If there is a delay in the arrival of the Original Bill of Lading, can cause a
delay in getting the Goods/ Cargo release of the from the Port
premises/Yard. A Shipping Guarantee Letter/Bond for the said Bill of Lading
would be therefore required by the shipping company in order to issue the
Delivery Order. It shall be discussed and settle before arrival of the vessel.
We will provide all necessary assistance and advice for the Shipping
Guarantee to the Importer / Representatives of the Importer.
During the Unloading of the Break Bulk/ loose Cargo from the vessel
There are chances of getting the goods Damage OR in case we find any
Loss of Goods and or the Goods already Damage on or after its receiving
We shall report to the Importer / Representatives of the Importer
or
Arrange a joint survey as soon as possible. Marine/Transit insurance
of
the
METHOD STATEMENT
Newly Implemented Web-Based
One Customs WeBoc) SYSTEM
At the present there are 02 procedures for Custom Clearance:-
(KPT)
(KICTL)
(PICTL)
(QICTL Port Qasim)
(AFU)
Goods Declaration (GD) is prepared on Line Under the New WeBOC System
(Via Electronic Mail Data Transfer System).
The G.D (Goods Declaration) is prepared in accordance with the
declaration of the Importer and the documents provided by the Importer
i.e. Commercial Invoice, Bill of Landing and the Packing List. Thereafter the
G.D is submitted to the Custom for Assessment on Line.
*
The amount of Custom Duties & Taxes and the Sindh Infra Structure
Fee (CESS) has to be paid in advance as per the Importer declaration.
In case the goods have been processed under WeBOC SYSTEM does not
accept the Importer Declaration, than the Importer may asked for additional
Duties & Taxes or If the Importer wants to Contest with the views of the
Customs than they can go for appeal & meet the Senior Custom Officials
along with the relevant Documents & Proof to justify their claims.
The Custom Authorities may differ in three basic ways:
1)
2)
3)
PCT
SRO
Valuation
above
PCT
SRO
Valuation
Than the GD is forwarded to the Port Side for Physical Examination to
check the goods are in conformity to the declaration of the Importer &
under the light of Examination Report GD will be completed by the
concerned Group in the Custom House.
II
III
IV
Certificate of Origin
VII
VIII
IX
Import Registration
XI
Gross
Any other document that may be requested by the Custom to verify the
declaration of Importer
II
III
IV
Certificate of Origin
VI
VII
VII
Any other document that may be requested by the Custom to verify the
declaration of Importer
POSSBLE
DELAYS
II
III
IV
VI
VII
PREVIOUS
PROJECTS
HANDLED
.
CLIENTS
PROJECTS
CLIENTS
PROJECTS
CLIENTS
PROJECTS
CLIENTS
PROJECTS
2)
3)
4)
5)
DREDGING
MDF
PLANT
CLIENTS
BOARD
PROJECTS
C-
BREAK BULK
LIQUID CHEMICALS &
PETROCHEMICALS
HANDLING
PROJECTS IN HAND
AFTAB TRADERS
(LPG)
PARCELS
*
CRESS LPG
GAS (LPG)
PARCELS
LIQUIFIED
PETROLEUM
IN BULK OF VARIOUS
RELIANCE CONSULTANCY
LIQUIFIED PETROLEUM GAS
(LPG)
IN BULK OF VARIOUS
PARCELS
*
IN BULK OF VARIOUS
PARCELS
ETHELYNE
IN
BULK
OF
VARIOUS
UNDER GOING
PROJECTS
IN HAND
2)
3)
EXPANSION OF
(OLPER'S MILK)
EXISTING
DAIRY
MILK
PLANT.
KARKEY PAKISTAN
POWER SHIP & OIL SUPPLY
TANKER
2)
DUBAR
3)
4)
KWSB K-III
KHAWAR
DAM
HYDRO
POWER
100,000
BPSD
OIL
ON RELOCATION BASIS
2)
3)
4)
5)
HYDERABAD WATER
TREATMENT PROJECT.
HYDROPOWER PROJECTS
From our background experience, strength & experiences from
industrial development projects, S.M.Asghar (Pvt) Limited
has rapidly established itself as a key player in infrastructure
projects.
We
successfully
did
the
Custom
Clearance
&
In-land
HYDROPOWER
PROJECT
Location:
Taunsa Barrage
Rehabilitation And
Modernization
Taunsa Pakistan
Year Of Project
March 2006-2007
Cost Of Project
Completion :
May 2008
HYDROPOWER
PROJECT
MANGLA DAM
RAISING PROJECT
LOCATION
Mangla
NATURE OF JOB
COST OF
PROJECT
Expected
Completion Date:
September 20 2007
HYDROPOWER
PROJECT.
SATPARA DAM
HYDROPOWER
PROJECT
LOCATION
PAKISTAN
NATURE OF JOB
COST OF PROJECT
Completion :
March 2007
Project Name
Kachhi Canal
Project Contract #
KC-03
Location:
NATURE OF JOB
COST OF
PROJECT
US $ 65 MILLION DOLLARS
Completion:
January 2009
Project Name
GOMAL ZAM
HYDROPOWER
PROJECT
CLIENT
NATURE OF
JOB
COST OF
PROJECT
Completion:
4 YEARS
Project Name
Location:
Duber Khwar
The project located on river Duber Khwar,
right bank tributary of Indus river near
Patan in NWFP at a distance 265 Km from
Islamabad.
NATURE OF JOB
COST OF PROJECT
Completion:
4 YEARS
Location:
Allai Khwar
Hydropower Plant
The Project is located on
Allai Khwar River, Left
Tributary of River Indus near
Besham in NWFP, 245 km
from Islamabad.
NATURE OF JOB
COST OF PROJECT
Completion:
4 YEARS
MIRANI DAM
Project Name
Location:
NATURE OF JOB
COST OF PROJECT
Completion:
4 YEARS
ENGRO PAKTANK
LPG TERMINAL
Location:
NATURE OF JOB
COST OF PROJECT
US$ 10 million
CAPACITY
LPG BULLETS
10 LPG bullets
Completion:
1997 -98
ENGRO PAKTANK
VCM TERMINAL
Location:
NATURE OF JOB
CAPACITY
SPHERICAL TANK
2 SPHERICAL TANK
Completion:
1997 -98
PARAXYLENE
ACETIC ACID
PHOSPHORIC ACID (HANDLING ONLY)
VINYL CHLORIDE MONOMER
ACRYLONITRILE
LIQUEFIED PETROLEUM GAS
MONO ETHYLENE GLYCOL
Project Name
ENGRO ASAHI
POLYMER &
CHEMICALS LIMITED
Location:
NATURE OF JOB
COST OF PROJECT
US$ 80 million
CAPACITY
CLIENT
Completion:
1999-2000
Location:
NATURE OF JOB
COST OF PROJECT
CLIENT
Completion:
1998
Location:
MULTAN, PAKISTAN
NATURE OF JOB
COST OF PROJECT
US$ 80 million
CLIENT
DESCON ENGINEERING
Completion:
1998
Location:
JAMSHORO, SINDH
NATURE OF JOB
COST OF PROJECT
US$ 80 million
CLIENT
ASSOCIATED GROUP
Completion:
2005
-------
Location:
NATURE OF JOB
COST OF PROJECT
CLIENT
Completion:
UNDER CONSTRUCTION
Location:
NATURE OF JOB
COST OF PROJECT
CLIENT
Completion:
UNDER CONSTRUCTION
WIND POWER
PROJECTS
Project Name
Location:
NATURE OF JOB
COST OF PROJECT
CLIENT
Completion:
ALREADY COMPLETED
Project Name
Location:
NATURE OF JOB
COST OF PROJECT
US$ 30 Million
Completion:
DECEMBER 2012
Project Name
Location:
JHAMPIR, KARACHI
NATURE OF JOB
COST OF PROJECT
Completion:
SEPTEMBER 2014
Project Name
Location:
JHAMPIR, KARACHI
NATURE OF JOB
COST OF PROJECT
Completion:
SEPTEMBER 2014
Project Name
Location:
NATURE OF JOB
COST OF PROJECT
US$ 70 Million
Completion:
SEPTEMBER 2016
Project Name
Location:
NATURE OF JOB
COST OF PROJECT
US$ 30 Million
Completion:
DECEMBER 2012
Project Name
Location:
NATURE OF JOB
COST OF PROJECT
US$ 3.4
Completion:
STILL UNDERGOING
Project Name
Location:
NATURE OF JOB
COST OF PROJECT
CLIENT
Completion:
UNDER CONSTRUCTION
KARACHI INTERNATIONAL
CONTAINER TERMINAL (KICTL)
KARACHI
Project Name
Location:
NATURE OF JOB
COST OF PROJECT
CLIENT
KICTL PAKISTAN
Completion:
UNDER CONSTRUCTION
Location:
RAWALPINDI, PAKISTAN
NATURE OF JOB
COST OF PROJECT
CLIENT
Completion:
S.M.Asghar
(Pvt)
Limited
ACCIDENTS DONT JUST happen, theyre
believes
that
caused, and it is the
duty of the Company to remove and minimize all possible causes of
Accidents.
We at S.M.Asghar (Pvt) Limited takes preliminary guide to
the recognition of potential hazards to the following.
MOST-SAFE-PLACES
M
MACHINERY
OPENINGS
S
STACKS
Process.
TOOLS
SAFE-PLACES
S
STRUCTURE
ATMOSPHERE
FIRE
ELECTRICITY
PRESSURE VESSEL
LADDERS
ATTIRE
CRANES
EXPLOSIVES
For SIGNALS
Safety Belts
Emergency Lights :
Premise/ Highways
Safety Helmets
Area
Safety Boots
Premises
Safety Glasses
who