Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
DESCRIPTION
ENGG CERT
XK-0092
(GS0C-LUMPSUM)
REV
NO.
DATE
SCOPE OF WORK
DISCIPLINE
ENGINEER
BOS
DATE: 8-31-14
PROJECT
ENGINEER
DATE:
GCA
9-1-14
CERTIFIED
NAA
DATE:
9-7-14
CONSTRUCTION
AGENCY
ESS
8-26-14
DATE:
OPERATIONS
BY:
DATE:
14U187-187
APPROVAL/CERTIFICATION REQUIREMENTS,
7-Sep-14
DHAHRAN
CONTROL NUMBER
SMM
8-26-14
REVISION
CERTIFICATE
REVISIONCERTIFICATION
00
THIS INDICATES THAT REV. NO.__________
EDSD
VERIFICATION
DATE:
SCOPE OF WORK
REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT
M15
DRAWING NO.
.DOC
SAUDI ARABIA
AMMS NO.
HE-359222
SHT.NO.
REV.NO.
1
of
31
00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
PART I
GENERAL REQUIREMENTS
PART II
SCOPE OF WORK
REV
NO.
DATE
JO/EWO
DESCRIPTION
This Project shall be carried out in accordance with all relevant Sections of the General
Requirements, Scope of Work, Drawings, Standards, Specifications and any other
documents referred to therein:
DISCIPLINE
ENGINEER
BOS
DATE: 8-31-14
PROJECT
ENGINEER
DATE:
GCA
9-1-14
CERTIFIED
NAA
DATE:
9-7-14
CONSTRUCTION
AGENCY
ESS
8-26-14
DATE:
OPERATIONS
BY:
DATE:
14U187-187
APPROVAL/CERTIFICATION REQUIREMENTS,
7-Sep-14
CONTROL NUMBER
SMM
8-26-14
REVISION
CERTIFICATE
REVISIONCERTIFICATION
00
THIS INDICATES THAT REV. NO.__________
EDSD
VERIFICATION
DATE:
SCOPE OF WORK
REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT
M15
DRAWING NO.
.DOC
SAUDI ARABIA
AMMS NO.
HE-359222
SHT.NO.
REV.NO.
2
of
31
00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
ENGG CERT
JO/EWO
This Project shall be carried out in accordance with and subject to the
Terms and Conditions of the General Service Order Contract
DATE
TABLE OF CONTENTS
GENERAL
DISCIPLINE
ENGINEER
2.0
BID SUBMISSION
BOS
8-31-14
3.0
MATERIALS
4.0
REV
NO.
1.0
DATE:
PROJECT
ENGINEER
DATE:
GCA
9-1-14
CERTIFIED
NAA
DATE:
9-7-14
CONSTRUCTION
AGENCY
ESS
8-26-14
DATE:
OPERATIONS
BY:
DATE:
14U187-187
APPROVAL/CERTIFICATION REQUIREMENTS,
7-Sep-14
CONTROL NUMBER
SMM
8-26-14
REVISION
CERTIFICATE
REVISIONCERTIFICATION
00
THIS INDICATES THAT REV. NO.__________
EDSD
VERIFICATION
DATE:
SCOPE OF WORK
REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT
M15
DRAWING NO.
.DOC
SAUDI ARABIA
AMMS NO.
HE-359222
SHT.NO.
REV.NO.
3
of
31
00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
DESCRIPTION
ENGG CERT
GENERAL
1.1
1.2
All WORK shall be executed in strict accordance with the Scope of Work and all
relevant Drawing(s).
1.3
All WORK shown on the Drawing(s) and not included in the Scope of Work shall
be deemed to be included in the WORK.
1.4
All WORK included in the Scope of Work and not shown on the Drawing(s) shall
be included in the WORK.
1.5
Any conflict between the Scope of Work and the Drawing(s) shall be referred
immediately to the SAUDI ARAMCO Project Engineer.
1.6
JO/EWO
DESCRIPTION
ENGG CERT
1.0
DATE
2.0
BID SUBMISSION
REV
NO.
2.1
DISCIPLINE
ENGINEER
BOS
DATE: 8-31-14
PROJECT
ENGINEER
DATE:
3.0
GCA
9-1-14
MATERIALS
3.1
3.2
3.3
3.4
Materials will be taken to site only as required and will not be stockpiled at the
site.
3.5
CERTIFIED
NAA
DATE:
9-7-14
CONSTRUCTION
AGENCY
ESS
8-26-14
DATE:
OPERATIONS
BY:
DATE:
14U187-187
APPROVAL/CERTIFICATION REQUIREMENTS,
7-Sep-14
CONTROL NUMBER
SMM
8-26-14
REVISION
CERTIFICATE
REVISIONCERTIFICATION
00
THIS INDICATES THAT REV. NO.__________
EDSD
VERIFICATION
DATE:
CONTRACTOR shall submit a Lump Sum Bid to supply all labor, permanent,
temporary and expendable materials and equipment including spare parts
required for the completion of the works as shown on the Bid Drawings and /or
described in the Scope of Work.
SCOPE OF WORK
REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT
M15
DRAWING NO.
.DOC
SAUDI ARABIA
AMMS NO.
HE-359222
SHT.NO.
REV.NO.
4
of
31
00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
ENGG CERT
4.0
DESCRIPTION
MINISTRY OF COMMUNICATION
SASO
SSD
REV
NO.
DATE
JO/EWO
DISCIPLINE
ENGINEER
BOS
DATE: 8-31-14
PROJECT
ENGINEER
DATE:
GCA
9-1-14
CERTIFIED
NAA
DATE:
9-7-14
CONSTRUCTION
AGENCY
GI
OIM
RTFS
SACSM
SAES
SAEP
SAUDI
ARAMCO
PROCEDURES
SAMSS
SAUDI
ARAMCO
SPECIFICATIONS
SASC
SASD
ESS
8-26-14
DATE:
BY:
DATE:
14U187-187
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
EDSD
VERIFICATION
REVISION
CERTIFICATE
REVISIONCERTIFICATION
00
THIS INDICATES THAT REV. NO.__________
SMM
8-26-14
7-Sep-14
MATERIALS
SYSTEM
CODES OF PRACTICE
OPERATIONS
DATE:
ENGINEERING
IBC
IFC
UMC
UPC
NESC
SCOPE OF WORK
REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT
M15
DRAWING NO.
.DOC
SAUDI ARABIA
AMMS NO.
HE-359222
SHT.NO.
REV.NO.
5
of
31
00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AA
ALUMINUM ASSOCIATION
AABC
AAMA
ARCHITECTURAL
ALUMINUM
MANUFACTURERS ASSOCIATION
AASHTO
AMERICAN
HIGHWAY
OFFICIALS
AATCC
AMERICAN
COUNCIL
ACI
ACRI
AIR-CONDITIONING
INSTITUTE
ADA
ADC
AEIC
AHA
AI
ASPHALT INSTITUTE
AISC
AMERICAN
INSTITUTE
CONSTRUCTION
AISI
ALSC
AMERICAN
ASSOCIATION
AMCA
ANSI
AMERICAN
INSTITUTE
APA
API
ARI
AIR-CONDITIONING
INSTITUTE
REV
NO.
DATE
JO/EWO
DESCRIPTION
ENGG CERT
STANDARDS: INDUSTRIALS
DISCIPLINE
ENGINEER
BOS
8-31-14
DATE:
PROJECT
ENGINEER
DATE:
GCA
9-1-14
ASSOCIATION
OF
STATE
AND
TRANSPORTATION
ASSOCIATION
AND
TEST
CARPET
REFRIGERATION
OF
STEEL
CERTIFIED
NAA
DATE:
9-7-14
CONSTRUCTION
AGENCY
ESS
8-26-14
DATE:
OPERATIONS
DATE:
14U187-187
BY:
7-Sep-14
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION
CERTIFICATE
REVISIONCERTIFICATION
00
THIS INDICATES THAT REV. NO.__________
EDSD
VERIFICATION
SMM
8-26-14
DATE:
SCOPE OF WORK
LUMBER
NATIONAL
REFRIGERATION
DRAWING NO.
.DOC
M15
AND
STANDARDS
REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT
DHAHRAN
STANDARDS
SAUDI ARABIA
AMMS NO.
HE-359222
SHT.NO.
REV.NO.
6
of
31
00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
AMERICAN
ASSOCIATION
DISCIPLINE
ENGINEER
ASME
AMERICAN SOCIETY
ENGINEERS
ASHRAE
AMERICAN
SOCIETY
OF
HEATING
REFRIGERATION AND AIR CONDITIONING
ENGINEERS
ASTM
AWI
AWPA
AMERICAN
WOOD
ASSOCIATION
AWS
AWWA
BHMA
BUILDERS HARDWARE
ASSOCIATION
CISCA
CEILINGS
AND
INTERIOR
CONTRACTORS ASSOCIATION
CLFMI
CHAIN LINK
INSTITUTE
CRSI
CONCRETE
INSTITUTE
DHI
EIA
EIMA
FM
FM GLOBAL
FGMA
FS
FEDERAL SPECIFICATION
GA
GYPSUM ASSOCIATION
ICC
BOS
8-31-14
DATE:
PROJECT
ENGINEER
DATE:
GCA
9-1-14
CERTIFIED
SOFTWOOD
LUMBER
OF
MECHANICAL
PRESERVATIVES
FENCE
MANUFACTURERS
SYSTEMS
MANUFACTURERS
REINFORCING
STANDARDS
NAA
DATE:
9-7-14
CONSTRUCTION
AGENCY
ESS
8-26-14
DATE:
OPERATIONS
BY:
DATE:
14U187-187
APPROVAL/CERTIFICATION REQUIREMENTS,
7-Sep-14
CONTROL NUMBER
SMM
8-26-14
REVISION
CERTIFICATE
REVISIONCERTIFICATION
00
THIS INDICATES THAT REV. NO.__________
EDSD
VERIFICATION
DATE:
SCOPE OF WORK
REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT
M15
DRAWING NO.
.DOC
SAUDI ARABIA
AMMS NO.
HE-359222
SHT.NO.
REV.NO.
7
of
31
00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
ASLA
REV
NO.
DATE
JO/EWO
DESCRIPTION
ENGG CERT
INSULATED
ASSOCIATION
CABLE
ENGINEERS
IEEE
INSTITUTE
OF
ELECTRICAL
ELECTRONICS ENGINEERS
IEC
INTERNATIONAL
COMMISSION
IES
IMIAC
ISA
LSGA
MFMA
METAL
FRAMING
ASSOCIATION
NCCA
NEBB
NATIONAL
BUREAU
NEC
NECA
NATIONAL
ELECTRICAL
ASSOCIATION
NEMA
NATIONAL ELECTRIC
ASSOCIATION
NETA
INTERNATIONAL
ASSOCIATION
NFPA
NRCA
NATIONAL
ROOFING
ASSOCIATION
NTMA
OSHA
OCCUPATIONAL
AGENCY
PDI
PEI
RCSC
RESEARCH COUNCIL
CONNECTIONS
AND
ELECTROTECHNICAL
MANUFACTURERS
ENVIRONMENTAL
BALANCING
DISCIPLINE
ENGINEER
BOS
DATE: 8-31-14
PROJECT
ENGINEER
DATE:
GCA
9-1-14
CERTIFIED
NAA
DATE:
9-7-14
CONSTRUCTION
AGENCY
ESS
8-26-14
DATE:
OPERATIONS
BY:
DATE:
14U187-187
APPROVAL/CERTIFICATION REQUIREMENTS,
7-Sep-14
CONTROL NUMBER
SMM
8-26-14
REVISION
CERTIFICATE
REVISIONCERTIFICATION
00
THIS INDICATES THAT REV. NO.__________
EDSD
VERIFICATION
DATE:
SCOPE OF WORK
ELECTRICAL
TESTING
CONTRACTORS
SAFETY
ON
AND
HEALTH
STRUCTURAL
DRAWING NO.
.DOC
M15
MANUFACTURERS
REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT
DHAHRAN
CONTRACTORS
SAUDI ARABIA
AMMS NO.
HE-359222
SHT.NO.
REV.NO.
8
of
31
00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
ICEA
REV
NO.
DATE
JO/EWO
DESCRIPTION
ENGG CERT
SIGMA
SEALED
INSULATED
MANUFACTURERS ASSOCIATION
SMACNA
SSPC
TCA
UL
UNDERWRITERS LABORATORY
WWPA
GLASS
DATE
JO/EWO
4.2
SDI
REV
NO.
BOS
DATE: 8-31-14
PROJECT
ENGINEER
DATE:
GCA
9-1-14
CERTIFIED
NAA
DATE:
9-7-14
CONSTRUCTION
AGENCY
ESS
8-26-14
DATE:
OPERATIONS
BY:
DATE:
14U187-187
APPROVAL/CERTIFICATION REQUIREMENTS,
7-Sep-14
CONTROL NUMBER
SMM
8-26-14
REVISION
CERTIFICATE
REVISIONCERTIFICATION
00
THIS INDICATES THAT REV. NO.__________
EDSD
VERIFICATION
DATE:
SCOPE OF WORK
REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT
M15
DRAWING NO.
.DOC
SAUDI ARABIA
AMMS NO.
HE-359222
SHT.NO.
REV.NO.
9
of
31
00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
DESCRIPTION
ENGG CERT
DESCRIPTION
REV
NO.
DATE
JO/EWO
TABLE OF CONTENTS
DISCIPLINE
ENGINEER
BOS
8-31-14
DATE:
PROJECT
ENGINEER
DATE:
1.0
INTRODUCTION
2.0
PROJECT SUMMARY
3.0
SPECIFIC REQUIREMENTS
4.0
WORK DESCRIPTION
5.0
DRAWINGS
6.0
TECHNICAL REQUIREMENTS
GCA
9-1-14
CERTIFIED
NAA
DATE:
9-7-14
CONSTRUCTION
AGENCY
ESS
8-26-14
DATE:
OPERATIONS
BY:
DATE:
14U187-187
APPROVAL/CERTIFICATION REQUIREMENTS,
7-Sep-14
CONTROL NUMBER
SMM
8-26-14
REVISION
CERTIFICATE
REVISIONCERTIFICATION
00
THIS INDICATES THAT REV. NO.__________
EDSD
VERIFICATION
DATE:
SCOPE OF WORK
REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT
M15
DRAWING NO.
.DOC
SAUDI ARABIA
AMMS NO.
HE-359222
SHT.NO.
REV.NO.
10
of
31
00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
ENGG CERT
DESCRIPTION
ENGG CERT
1.0
1.1
This Scope of Work must be read in conjunction with the drawings as listed in
Section 5.1.1 of this Scope of Work.
1.2
It is the intent of this Scope of Work to generally describe only the major
components of the work. It shall not be construed to be an itemized listing of
each element of the WORK or procedure for the construction of the entire
project. All works shown on the drawings listed in Paragraph 5.0 shall be
performed though not specifically described herein.
1.3
PROJECT SUMMARY
2.1
This Scope of Work describes the proposed modification & improvement of lights
in Zuhoor Court & Yasmeen Court.
2.2
2.2.2
REV
NO.
DATE
JO/EWO
2.0
INTRODUCTION
DISCIPLINE
ENGINEER
BOS
8-31-14
3.0
DATE:
PROJECT
ENGINEER
DATE:
SPECIFIC REQUIREMENTS
3.1
GCA
9-1-14
CERTIFIED
NAA
DATE:
The facility will be in operation throughout the duration of the WORK; thus,
WORK will be done with minimal interruptions, which will be agreed by the Saudi
ARAMCO Project Engineer and CONTRACTOR during the project kick-off
meeting.
9-7-14
CONSTRUCTION
AGENCY
3.1.1
3.1.2
ESS
8-26-14
DATE:
OPERATIONS
CONTROL NUMBER
SMM
8-26-14
7-Sep-14
DATE:
14U187-187
BY:
3.2
APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION
CERTIFICATE
REVISIONCERTIFICATION
00
THIS INDICATES THAT REV. NO.__________
EDSD
VERIFICATION
DATE:
Safety Requirements
Without limiting the generality of the application of the SAUDI ARAMCO
Construction Safety Manual (CSM) and other SAUDI ARAMCO Safety
Standards, the Safety Requirements shall include but not necessarily be
limited to the following as applicable:
SCOPE OF WORK
REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT
M15
DRAWING NO.
.DOC
SAUDI ARABIA
AMMS NO.
HE-359222
SHT.NO.
REV.NO.
11
of
31
00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
3.2.2
REV
NO.
DATE
JO/EWO
DESCRIPTION
ENGG CERT
3.2.1
DISCIPLINE
ENGINEER
BOS
DATE: 8-31-14
PROJECT
ENGINEER
DATE:
3.2.2.1
3.2.2.2
3.2.2.3
3.2.2.4
GCA
9-1-14
CERTIFIED
NAA
DATE:
9-7-14
CONSTRUCTION
AGENCY
ESS
8-26-14
DATE:
OPERATIONS
BY:
DATE:
14U187-187
APPROVAL/CERTIFICATION REQUIREMENTS,
7-Sep-14
CONTROL NUMBER
SMM
8-26-14
REVISION
CERTIFICATE
REVISIONCERTIFICATION
00
THIS INDICATES THAT REV. NO.__________
EDSD
VERIFICATION
DATE:
SCOPE OF WORK
REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT
M15
DRAWING NO.
.DOC
SAUDI ARABIA
AMMS NO.
HE-359222
SHT.NO.
REV.NO.
12
of
31
00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
ENGG CERT
3.2.2.5
DESCRIPTION
3.2.3
CONTRACTOR Responsibility
3.2.3.1
3.2.3.2
JO/EWO
B.
C.
REV
NO.
DATE
3.2.3.3
DISCIPLINE
ENGINEER
BOS
DATE: 8-31-14
PROJECT
ENGINEER
DATE:
GCA
9-1-14
CERTIFIED
NAA
DATE:
9-7-14
CONSTRUCTION
AGENCY
ESS
8-26-14
DATE:
3.2.3.4
OPERATIONS
BY:
3.2.3.5
DATE:
14U187-187
APPROVAL/CERTIFICATION REQUIREMENTS,
7-Sep-14
CONTROL NUMBER
SMM
8-26-14
REVISION
CERTIFICATE
REVISIONCERTIFICATION
00
THIS INDICATES THAT REV. NO.__________
EDSD
VERIFICATION
DATE:
Work Permit
A.
SCOPE OF WORK
REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT
M15
DRAWING NO.
.DOC
SAUDI ARABIA
AMMS NO.
HE-359222
SHT.NO.
REV.NO.
13
of
31
00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
ENGG CERT
B.
DATE
JO/EWO
DESCRIPTION
3.2.3.6
REV
NO.
3.2.3.7
B.
C.
B.
DISCIPLINE
ENGINEER
BOS
DATE: 8-31-14
PROJECT
ENGINEER
DATE:
GCA
9-1-14
CERTIFIED
NAA
DATE:
9-7-14
CONSTRUCTION
AGENCY
ESS
8-26-14
DATE:
3.2.3.8
OPERATIONS
BY:
A.
B.
DATE:
14U187-187
APPROVAL/CERTIFICATION REQUIREMENTS,
7-Sep-14
CONTROL NUMBER
SMM
8-26-14
REVISION
CERTIFICATE
REVISIONCERTIFICATION
00
THIS INDICATES THAT REV. NO.__________
EDSD
VERIFICATION
DATE:
SCOPE OF WORK
REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT
M15
DRAWING NO.
.DOC
SAUDI ARABIA
AMMS NO.
HE-359222
SHT.NO.
REV.NO.
14
of
31
00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
specific HIP.
ENGG CERT
C.
DESCRIPTION
3.2.3.9
Medical
A.
B.
REV
NO.
DATE
JO/EWO
DISCIPLINE
ENGINEER
BOS
DATE: 8-31-14
PROJECT
ENGINEER
DATE:
GCA
9-1-14
CERTIFIED
NAA
DATE:
9-7-14
CONSTRUCTION
AGENCY
ESS
8-26-14
DATE:
OPERATIONS
CONTROL NUMBER
SMM
8-26-14
7-Sep-14
DATE:
14U187-187
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION
CERTIFICATE
REVISIONCERTIFICATION
00
THIS INDICATES THAT REV. NO.__________
EDSD
VERIFICATION
DATE:
SCOPE OF WORK
REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT
M15
DRAWING NO.
.DOC
SAUDI ARABIA
AMMS NO.
HE-359222
SHT.NO.
REV.NO.
15
of
31
00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
ENGG CERT
3.2.3.10
JO/EWO
DESCRIPTION
A.
DATE
REV
NO.
B.
DISCIPLINE
ENGINEER
BOS
DATE: 8-31-14
PROJECT
ENGINEER
SAPO name
GCA
9-1-14
Project title
CERTIFIED
DATE:
NAA
DATE:
9-7-14
CONSTRUCTION
AGENCY
ESS
8-26-14
DATE:
OPERATIONS
3.2.3.11
BY:
DATE:
14U187-187
APPROVAL/CERTIFICATION REQUIREMENTS,
7-Sep-14
CONTROL NUMBER
SMM
8-26-14
REVISION
CERTIFICATE
REVISIONCERTIFICATION
00
THIS INDICATES THAT REV. NO.__________
EDSD
VERIFICATION
DATE:
B.
SCOPE OF WORK
REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT
M15
DRAWING NO.
.DOC
SAUDI ARABIA
AMMS NO.
HE-359222
SHT.NO.
REV.NO.
16
of
31
00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
ENGG CERT
3.2.3.12
Housekeeping
DESCRIPTION
A.
B.
C.
REV
NO.
DATE
JO/EWO
DISCIPLINE
ENGINEER
BOS
DATE: 8-31-14
PROJECT
ENGINEER
DATE:
GCA
9-1-14
CERTIFIED
NAA
DATE:
3.2.3.13
9-7-14
CONSTRUCTION
AGENCY
A.
B.
Excavation Planning
ESS
8-26-14
DATE:
OPERATIONS
BY:
DATE:
14U187-187
APPROVAL/CERTIFICATION REQUIREMENTS,
7-Sep-14
CONTROL NUMBER
SMM
8-26-14
REVISION
CERTIFICATE
REVISIONCERTIFICATION
00
THIS INDICATES THAT REV. NO.__________
EDSD
VERIFICATION
DATE:
SCOPE OF WORK
Evaluation
done
by
DRAWING NO.
.DOC
M15
be
REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT
DHAHRAN
shall
SAUDI ARABIA
AMMS NO.
HE-359222
competent
SHT.NO.
REV.NO.
17
of
31
00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
JO/EWO
DESCRIPTION
ENGG CERT
DATE
REV
NO.
DISCIPLINE
ENGINEER
BOS
DATE: 8-31-14
PROJECT
ENGINEER
DATE:
GCA
9-1-14
CERTIFIED
NAA
DATE:
C.
9-7-14
CONSTRUCTION
AGENCY
Permit
ESS
8-26-14
DATE:
OPERATIONS
BY:
DATE:
14U187-187
APPROVAL/CERTIFICATION REQUIREMENTS,
7-Sep-14
D.
(DCC) NO. _____________________
CONTROL NUMBER
SMM
8-26-14
REVISION
CERTIFICATE
REVISIONCERTIFICATION
00
THIS INDICATES THAT REV. NO.__________
EDSD
VERIFICATION
DATE:
SCOPE OF WORK
REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT
M15
DRAWING NO.
.DOC
SAUDI ARABIA
AMMS NO.
HE-359222
SHT.NO.
REV.NO.
18
of
31
00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
JO/EWO
DESCRIPTION
ENGG CERT
DATE
E.
Excavation
foundation.
REV
NO.
DISCIPLINE
ENGINEER
BOS
DATE: 8-31-14
PROJECT
ENGINEER
GCA
9-1-14
CERTIFIED
NAA
DATE:
9-7-14
CONSTRUCTION
AGENCY
ESS
8-26-14
DATE:
OPERATIONS
F.
BY:
existing
Sloping System
SCOPE OF WORK
DRAWING NO.
.DOC
M15
under
REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT
DHAHRAN
permitted
DATE:
14U187-187
APPROVAL/CERTIFICATION REQUIREMENTS,
7-Sep-14
CONTROL NUMBER
SMM
8-26-14
REVISION
CERTIFICATE
REVISIONCERTIFICATION
00
THIS INDICATES THAT REV. NO.__________
EDSD
VERIFICATION
DATE:
not
Dewatering
DATE:
is
SAUDI ARABIA
AMMS NO.
HE-359222
SHT.NO.
REV.NO.
19
of
31
00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
G.
Benching System
Shoring System
Sheeting System
Shield system
DESCRIPTION
REV
NO.
DISCIPLINE
ENGINEER
BOS
DATE: 8-31-14
PROJECT
ENGINEER
DATE:
GCA
9-1-14
CERTIFIED
NAA
DATE:
9-7-14
H.
CONSTRUCTION
AGENCY
ESS
8-26-14
DATE:
Emergency Response
OPERATIONS
CONTROL NUMBER
SMM
8-26-14
7-Sep-14
CONTRACTOR
shall
provide
appropriate
emergency
rescue
equipment
(breathing
apparatus, full body harness and lifeline, basket
stretcher) during excavation work as applicable.
DATE:
14U187-187
BY:
I.
APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION
CERTIFICATE
REVISIONCERTIFICATION
00
THIS INDICATES THAT REV. NO.__________
EDSD
VERIFICATION
DATE:
DATE
JO/EWO
SCOPE OF WORK
REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT
M15
DRAWING NO.
.DOC
SAUDI ARABIA
AMMS NO.
HE-359222
SHT.NO.
REV.NO.
20
of
31
00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
ENGG CERT
REV
NO.
DATE
JO/EWO
DESCRIPTION
ENGG CERT
J.
3.2.3.14
DISCIPLINE
ENGINEER
BOS
DATE: 8-31-14
PROJECT
ENGINEER
DATE:
Scaffolding
GCA
9-1-14
CERTIFIED
NAA
DATE:
9-7-14
CONSTRUCTION
AGENCY
ESS
8-26-14
DATE:
OPERATIONS
BY:
DATE:
14U187-187
APPROVAL/CERTIFICATION REQUIREMENTS,
7-Sep-14
CONTROL NUMBER
SMM
8-26-14
REVISION
CERTIFICATE
REVISIONCERTIFICATION
00
THIS INDICATES THAT REV. NO.__________
EDSD
VERIFICATION
DATE:
SCOPE OF WORK
REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT
M15
DRAWING NO.
.DOC
SAUDI ARABIA
AMMS NO.
HE-359222
SHT.NO.
REV.NO.
21
of
31
00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
ENGG CERT
3.2.3.15
Asbestos
DESCRIPTION
3.2.3.16
Hazardous Materials
REV
NO.
DATE
JO/EWO
All WORK shown in the drawings listed in Paragraph 5.0 hereinafter but not
described or specified in this Scope of Work and vice versa shall be considered
part of the WORK.
3.4
Before doing any WORK, CONTRACTOR shall verify all measurements at the
construction area for their accuracy. No extra charge or compensation will be
allowed on account of differences in actual dimensions and measurements.
3.5
Prior to demolition, reconfirm which items and structures are to be removed and
which materials are to be salvaged and reused. All materials identified for
salvage shall be carefully protected and stored as directed by the SAUDI
ARAMCO Project Engineer.
3.6
3.7
All areas in the vicinity of WORK shall be protected from damage. Any item that
is damaged or marred as a direct or indirect result of the WORK shall be restored
to its original state by the CONTRACTOR. Any items which cannot be removed
shall be protected against the effects of the work and any water damage or
mechanical defect.
BOS
DATE:
3.3
DISCIPLINE
ENGINEER
DATE: 8-31-14
PROJECT
ENGINEER
GCA
9-1-14
CERTIFIED
NAA
DATE:
9-7-14
CONSTRUCTION
AGENCY
ESS
8-26-14
DATE:
OPERATIONS
BY:
DATE:
14U187-187
APPROVAL/CERTIFICATION REQUIREMENTS,
7-Sep-14
CONTROL NUMBER
SMM
8-26-14
REVISION
CERTIFICATE
REVISIONCERTIFICATION
00
THIS INDICATES THAT REV. NO.__________
EDSD
VERIFICATION
DATE:
SCOPE OF WORK
REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT
M15
DRAWING NO.
.DOC
SAUDI ARABIA
AMMS NO.
HE-359222
SHT.NO.
REV.NO.
22
of
31
00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
DESCRIPTION
4.0
3.8
Keep the area of WORK clean and orderly at all times, as directed and to the
satisfaction of the SAUDI ARAMCO Project Engineer.
3.9
3.10
Upon completion of WORK, cart away all unused materials, containers, debris,
etc., as directed by the SAUDI ARAMCO Project Engineer.
WORK DESCRIPTION
General:
4.1.1
4.1.2
4.1.3
4.1.4
4.1.5
4.1.6
4.1.7
4.1.8
All wiring shall be color coded and properly mark as per SAUDI
ARAMCO Standard.
4.1.9
4.1.10
REV
NO.
DATE
JO/EWO
4.1
DISCIPLINE
ENGINEER
BOS
8-31-14
DATE:
PROJECT
ENGINEER
DATE:
GCA
9-1-14
CERTIFIED
NAA
DATE:
9-7-14
CONSTRUCTION
AGENCY
ESS
8-26-14
DATE:
OPERATIONS
BY:
DATE:
14U187-187
APPROVAL/CERTIFICATION REQUIREMENTS,
7-Sep-14
CONTROL NUMBER
SMM
8-26-14
REVISION
CERTIFICATE
REVISIONCERTIFICATION
00
THIS INDICATES THAT REV. NO.__________
EDSD
VERIFICATION
DATE:
SCOPE OF WORK
REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT
M15
DRAWING NO.
.DOC
SAUDI ARABIA
AMMS NO.
HE-359222
SHT.NO.
REV.NO.
23
of
31
00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
ENGG CERT
ENGG CERT
Separation of not less than 300 mm (12 in) vertically or 600 mm (24 in)
horizontally must be maintained between buried power and
communication cables.
4.1.12
4.1.13
4.1.14
4.1.15
DESCRIPTION
JO/EWO
4.2
DATE
4.2.1
REV
NO.
CONTRACTOR shall:
4.2.1.1
DISCIPLINE
ENGINEER
BOS
DATE: 8-31-14
PROJECT
ENGINEER
DATE:
4.2.2
GCA
9-1-14
CERTIFIED
4.2.2.2
4.2.2.3
4.2.2.4
4.2.2.5
NAA
DATE:
9-7-14
CONSTRUCTION
AGENCY
ESS
8-26-14
DATE:
OPERATIONS
BY:
DATE:
14U187-187
APPROVAL/CERTIFICATION REQUIREMENTS,
7-Sep-14
CONTROL NUMBER
SMM
8-26-14
REVISION
CERTIFICATE
REVISIONCERTIFICATION
00
THIS INDICATES THAT REV. NO.__________
EDSD
VERIFICATION
DATE:
SCOPE OF WORK
REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT
M15
DRAWING NO.
.DOC
SAUDI ARABIA
AMMS NO.
HE-359222
SHT.NO.
REV.NO.
24
of
31
00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
4.1.11
4.2.2.6
4.2.2.7
4.2.2.8
Place terra tape marker and red tile directly above the cable
buried with sand.
4.2.2.9
JO/EWO
4.2.2.10 Existing surface which have been affected by new work shall
be patched repair as required and shall be scribed neatly and
perfectly match.
DATE
4.2.3
New Works: (Refer to Drawing No. HA- 359217 Sheet No. 002
Revision 00, HA-359219 Sheet No. 001 Revision No. 00).
REV
NO.
CONTRACTOR shall:
DISCIPLINE
ENGINEER
4.2.3.1
4.2.3.2
Install new light posts including pole arms, pole mounted LED
lighting fixtures with LED driver including cables, fittings and
other related accessories.
4.2.3.3
4.2.3.4
4.2.3.5
BOS
DATE: 8-31-14
PROJECT
ENGINEER
DATE:
GCA
9-1-14
CERTIFIED
NAA
DATE:
9-7-14
CONSTRUCTION
AGENCY
ESS
8-26-14
DATE:
OPERATIONS
CONTROL NUMBER
7-Sep-14
DATE:
14U187-187
BY:
4.2.4
APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION
CERTIFICATE
REVISIONCERTIFICATION
00
THIS INDICATES THAT REV. NO.__________
EDSD
VERIFICATION
SMM
8-26-14
DATE:
SCOPE OF WORK
REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT
M15
DRAWING NO.
.DOC
SAUDI ARABIA
AMMS NO.
HE-359222
SHT.NO.
REV.NO.
25
of
31
00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
DESCRIPTION
ENGG CERT
ENGG CERT
4.2.4.2
5.0
DRAWINGS
5.1
Project Drawings
DESCRIPTION
5.1.1
JO/EWO
HA-359217
002
00
HA-359219
001
00
Miscellaneous Detail
As Built Drawings
5.2.1
Upon completion of all works, the CONTRACTOR shall submit one set
of As-Built Drawing to the Saudi ARAMCO. These Drawings shall
indicate all deviations from the contract Drawings and shall include
dimensions, quantities, materials and products used in the construction
with vendors name, address and prepared from records kept up on a
daily basis throughout the duration of the project. The As-Built records
shall be subject to examination by the Saudi ARAMCO Project
Engineer.
5.2.2
5.2.3
5.2.4
NAA
DATE:
9-7-14
CONSTRUCTION
AGENCY
ESS
8-26-14
DATE:
OPERATIONS
CONTROL NUMBER
TECHNICAL REQUIREMENTS
7-Sep-14
DATE:
14U187-187
BY:
6.1
APPROVAL/CERTIFICATION REQUIREMENTS,
00
THIS INDICATES THAT REV. NO.__________
EDSD
VERIFICATION
SMM
8-26-14
DATE:
6.0
Reinforced Concrete
6.1.1
SCOPE OF WORK
REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT
DHAHRAN
DRAWING NO.
.DOC
M15
Title
00
BOS
CERTIFIED
Rev.
No.
DATE: 8-31-14
PROJECT
ENGINEER
GCA
9-1-14
Index
No.
001
REV
NO.
DATE
5.2
Sheet
No.
HA-359217
DISCIPLINE
ENGINEER
REVISION
CERTIFICATE
REVISIONCERTIFICATION
Drawing No.
DATE:
SAUDI ARABIA
AMMS NO.
HE-359222
SHT.NO.
REV.NO.
26
of
31
00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
6.1.3
6.1.4
DESCRIPTION
ENGG CERT
6.1.2
REV
NO.
DATE
JO/EWO
6.1.4.1
6.1.5
6.1.6
6.1.7
6.1.8
6.1.9
DISCIPLINE
ENGINEER
BOS
DATE: 8-31-14
PROJECT
ENGINEER
DATE:
GCA
9-1-14
A.
CERTIFIED
NAA
DATE:
9-7-14
CONSTRUCTION
AGENCY
ESS
8-26-14
DATE:
6.1.10
OPERATIONS
CONTROL NUMBER
SMM
8-26-14
DATE:
14U187-187
BY:
7-Sep-14
6.1.11
APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION
CERTIFICATE
REVISIONCERTIFICATION
00
THIS INDICATES THAT REV. NO.__________
EDSD
VERIFICATION
DATE:
Curing
A.
SCOPE OF WORK
REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT
M15
DRAWING NO.
.DOC
SAUDI ARABIA
AMMS NO.
HE-359222
SHT.NO.
REV.NO.
27
of
31
00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
C.
D.
DESCRIPTION
ENGG CERT
B.
DATE
JO/EWO
REV
NO.
DISCIPLINE
ENGINEER
BOS
8-31-14
DATE:
PROJECT
ENGINEER
DATE:
6.2
GCA
9-1-14
CERTIFIED
NAA
DATE:
6.3
9-7-14
CONSTRUCTION
AGENCY
Electrical Material
6.3.1
ESS
8-26-14
DATE:
6.3.1.1
OPERATIONS
CONTROL NUMBER
SMM
8-26-14
6.3.2
DATE:
14U187-187
BY:
7-Sep-14
Conduit: RSC/PVC;
6.3.2.1
APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION
CERTIFICATE
REVISIONCERTIFICATION
00
THIS INDICATES THAT REV. NO.__________
EDSD
VERIFICATION
DATE:
Submittal
SCOPE OF WORK
REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT
M15
DRAWING NO.
.DOC
SAUDI ARABIA
AMMS NO.
HE-359222
SHT.NO.
REV.NO.
28
of
31
00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
ENGG CERT
6.3.2.2
6.3.3
Wire; 600 V
DESCRIPTION
6.3.3.1
6.3.4.1
6.3.4.2
6.3.4.3
6.3.4.4
DISCIPLINE
ENGINEER
BOS
DATE: 8-31-14
PROJECT
ENGINEER
DATE:
GCA
9-1-14
a.
b.
c.
d.
e.
CERTIFIED
NAA
DATE:
Grounding
REV
NO.
DATE
JO/EWO
6.3.4
TC-8 PVC: Extra strength; direct burial (Type D.B); with one
belled end; for underground installation of electrical and
communication utilities; conforms to National Electric
Manufacturers
Association
(NEMA).
Underwriters
Laboratories (UL) listed.
9-7-14
CONSTRUCTION
AGENCY
ESS
8-26-14
DATE:
6.3.4.5
Mold #: M-5799
Price Key: 4
Weld Metal: 45
Handles Clamps: B106
Lead Time: 2
OPERATIONS
a.
b.
c.
d.
e.
DATE:
14U187-187
BY:
7-Sep-14
6.3.5
Sealant
6.3.5.1
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION
CERTIFICATE
REVISIONCERTIFICATION
00
THIS INDICATES THAT REV. NO.__________
EDSD
VERIFICATION
SMM
8-26-14
DATE:
SCOPE OF WORK
REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT
M15
DRAWING NO.
.DOC
SAUDI ARABIA
AMMS NO.
HE-359222
SHT.NO.
REV.NO.
29
of
31
00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
ENGG CERT
6.3.6
Al-Fanar Trading
Tel. No.: 859-3832
Fax No.: 859-3812
Or
DESCRIPTION
B.
C.
JO/EWO
D.
DATE
E.
REV
NO.
Note:
DISCIPLINE
ENGINEER
BOS
DATE: 8-31-14
PROJECT
ENGINEER
DATE:
6.3.7
GCA
9-1-14
CERTIFIED
NAA
DATE:
9-7-14
CONSTRUCTION
AGENCY
ESS
8-26-14
DATE:
6.3.8
OPERATIONS
6.3.8.1
CONTROL NUMBER
7-Sep-14
DATE:
14U187-187
BY:
Or
APPROVAL/CERTIFICATION REQUIREMENTS,
EDSD
VERIFICATION
REVISION
CERTIFICATE
REVISIONCERTIFICATION
SMM
8-26-14
DATE:
00
THIS INDICATES THAT REV. NO.__________
6.3.8.2
SHAIRCO
P.O. Box 9301, Jeddah 21413, Saudi Arabia
Tel. No. 02-6637666 (10 lines)
Fax No. 02-6659424
E-Mail: info@shairco.net
Website: www.shairco.net
SCOPE OF WORK
REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT
M15
DRAWING NO.
.DOC
SAUDI ARABIA
AMMS NO.
HE-359222
SHT.NO.
REV.NO.
30
of
31
00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
Or
ENGG CERT
6.3.8.3
DESCRIPTION
6.3.8.4
Hubbell Lighting
Tel. No. 864-678-1000
Fax No.864-678-1065
www.hubbell-ltg.com
www.hubbell lighting.com
Or
6.3.8.5
JO/EWO
6.3.8.6
DATE
Or
Saudi ARAMCO Approved equal
REV
NO.
6.3.8.7
DISCIPLINE
ENGINEER
BOS
DATE: 8-31-14
PROJECT
ENGINEER
DATE:
GCA
9-1-14
CERTIFIED
NAA
DATE:
9-7-14
CONSTRUCTION
AGENCY
ESS
8-26-14
DATE:
OPERATIONS
BY:
DATE:
14U187-187
APPROVAL/CERTIFICATION REQUIREMENTS,
7-Sep-14
CONTROL NUMBER
SMM
8-26-14
REVISION
CERTIFICATE
REVISIONCERTIFICATION
00
THIS INDICATES THAT REV. NO.__________
EDSD
VERIFICATION
DATE:
SCOPE OF WORK
REPLACE INEFFCIENT LUMINAIRES W/ ENERGY EFFICIENT LED @ ZUHOOR & YASMEEN COURT
M15
DRAWING NO.
.DOC
SAUDI ARABIA
AMMS NO.
HE-359222
SHT.NO.
REV.NO.
31
of
31
00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS