BILL E -EXTERNAL WORKS

Descriptions

ITEM NO

Unit

Quantity

Rate

ELEMENT NO.5 - SEWERAGE SYSTEM (ALL


PROVISIONAL)
PIPING WORKS
A.

Excavate trench for pipe exceeding1.50m and not


exceeding 3.00 m deep get out, part return, fill in,
well rammed and remainder loadandcart away

612.00

21.40

B.

Selected earth as backfilling

M3

342.72

13.20

B.

Selected compacted earth as backfilling

M3

55.08

13.20

C.

20mm Graded crusher bed

M3

18.36

30.55

D.

225mm Diameter vitrified clay (class EX) pipe with


spigot and socket end and jointed with rubber ring
laid, in trench on crusher run.

612.00

8.50

TOTAL CARRY TO SUMMARY

BILL E -EXTERNAL WORKS


ITEM NO

Descriptions

Unit

Quantity

Rate

No

10

178.20

No

10

99.30

(End of Piping Works)


G.

Manhole size 1200mm x 1050mm x 900mm deep


internally constructed of 230mm thick concrete
base Grade20, 50mm thick lean concrete, 200mm
thick (average) sulphate resisting concrete Grade
15 benching, 150 mm diameter half round vitrified
clay ware straight channel, 230mm thick brickwallin
common brickin cemet mortar (1:2) with flush
pointed externally,one ring brick on edge arch
including galvanised malleable cast iron steps built
into joints of brickwork and rendered internally with
19mm thick high alumina cement and sand (1:2)
slab reinforced with 16mm diameter mild steel bar
at 150mm centers with hooked end with opening
for 375mm diameter manhole cover (measured
separately) including excavation, formwork and all
other necessary works as per Drawing No.
NA/1296/SP-004 and remove surplus excavated
material away within the site.

H.
Heavy duty cast iron manhole coverfor opening size
600mm diameter complete with frame and setting
in cement and sand (1:3) mortar and sealing cover
with grease and sand and apply two coats
bituminous paint on exposed surfaces and place in
position2 nos, slot lifting hole and other necessary
works asper Drawing No. NA/1296/SP-004

TOTAL CARRIED TO SUMMARY

BILL E -EXTERNAL WORKS


Descriptions

ITEM NO

Unit

Quantity

Rate

ELEMENT NO.1 - SITE CLEARANCE AND


EARTHWORKS (ALL PROVISIONAL)
A.

Cut, fell and remove in bulk all trees irrespectively


Acre
of diameter and height including grubbing out
stumps, roots, etc. including clearing and removing
existing debris, fence, scrapped materials,
abandoned huts, structureand vehicles (if any) and
the like from Site to Contractor's own dump and fell
and remove in bulk all shrubs, etc. and grub all
stumps, roots and strip off top soil and removed
same of the Department of Environment (DEO)

1.67

76.70

B.

Approved imported earthfill obtainable from the


Contractor's own source, transport, deposit, spread,
levelled, compacted and well consolidatedin layers
not exceding 225mm thick including forming and
grading sides of slopes and embankment as
directed

M3

21,150.00

13.20

M3

429.98

RETAINING WALL
C.

Excavation of soil for installing the retaining wall

17.00
D.

Backfilling for retaining wall installation

E.

Sawn formwork of retaining wall as specified:


1. Vertical
2. Diagonal

M3

347.29

13.20

M2
M2

126.525
99.225

38.00
51.20

F.

20mm diameter High tensile steel reinforcement


bar

Kg

3915.02

2.65

G.

Reinforce concrete grade 30

M3

82.69

300.00

Unit

Quantity

Rate

TOTAL CARRIED TO SUMMARY

BILL. A : GENERAL AND PRELIMINARIES


ITEM NO

Descriptions

1.1

Cost in providing Banker's Guarantee for


performance bond

L.S

1.2

Cost in providing SOCSO or workmen's


compensation insurance policy

L.S

1.3

Cost in providing insurance of works

L.S

1.4

ost in providing Third Party Insurance

L.S

1.5

Provide temporary buildings for use by the


Contractor including their subsequent removal on
completion of contract

L.S

1.6

Provide for the Engineer and staff all necessary


assistance (including labour and materials)for
testing, measurement and supervision of the works

L.S

1.7

Provide and maintain for the sole use of the


Engineer for the survey instruments as specified

L.S

1.8

To provide all necessary signboards as required

L.S

1.9

Provide records and progress photographs

L.S

1.10 Allow for provision of of water supply

L.S

1.11 Allow for provision of electricity supply

L.S

1.12 Allow for provision of watchmen

L.S

1.13 Allow for site to be kept tidyand clearance of site on


completion of contract

L.S

1.14 Allow for making tests on steel, cement, etc as


specified including all necessary fees and expenses
incurred

L.S

1.15 Provisional Sum for contigencies

P.S

TOTAL CARRIED TO SUMMARY

Amount

13096.80

4523.90
727.06
560.90
5202.00

24110.66

Amount

1782.00

993.00

2775.00

Amount

127.94

279180.00

7309.66
4584.228

4807.95
5080.32

10374.803

24806.7

336271.60

Amount
1,500.00
1
4,500.00

2,000.00
3,000.00
5,000.00

2,000.00

2,000.00

500.00

500.00

2,000.00
500.00
1,500.00
1,000.00

2,000.00

150,000.00

178,000.00