Sei sulla pagina 1di 2

SAUDI ARAMCO ID/PID - 05/18/05 - REV 0 (Standards Cutoff - June 2008)

REV 03

SAUDI ARAMCO INSPECTION CHECKLIST

SAIC NUMBER

Emergency Eyewash/Shower Receiving, Handling, Storage


and Preservation
PROJECT TITLE

SAIC-B-4001
WBS / BI / JO NUMBER

EQUIPMENT ID NUMBER(S)

EQUIPMENT DESCRIPTION

LAYOUT DRAWING NUMBER

REV. NO.

SCHEDULED INSPECTION DATE & TIME

ACTUAL INSPECTION DATE & TIME

15-Dec-09

SYSTEM ID.

PURCHASE ORDER NUMBER

MH's SPENT

TRAVEL TIME

SAUDI ARAMCO USE ONLY

SAUDI ARAMCO INSPECTION LEVEL

CONTRACTOR INSPECTION LEVEL

REFERENCE

Handling, Storage and Preservation

A1

Verify that approved procedures for handling, storage and preservation of


emergency eyewash / shower lists all the required inspection schedules for
maintaining the quality of the material and /or equipment.

Receiving (Units and their accessories)

B1

Visually inspect all material/equipment for defects / damage

Schedule"Q"

B2

An emergency Shower is equipped with an eyewash. However eyewash


does not always have to include a shower (SAES-B-069, Section 6.2)

SAES-B-069
Para 4.1.3

B3

Ensure and Verify that the equipment and materials meet SAES-S-069 and
tested in accordance with ANZI Z358.1, Eyewash and Shower Equipment.

SAES-B-069
Para 4.1.4

B4

Eyewash and showers shall be constructed of a material resistant to


corrosion in their installed environment

SAES-B-069
Para 4.3.1

B5

Verify that the water supply piping shall be consistent with materials
provided for the source water system as specified in SAES-L-132

SAES-B-069
Para 4.3.2

B6

Verify that the combination eyewash/shower unit is capable of flowing


through both units simultaneously with the flow rate, pressure and
temperature requirements specified.

SAES-B-069
Para 5.2.2

B7

Verify that the eyewash nozzles are protected with covers, that can be
easily removed, to prevent nozzle contamination and clogging.

SAES-B-069
Para 5.2.5

B8

Verify that the Eyewash / Shower is provided with pressure controllers or


self-regulating orifices to ensure that excessive water velocity if the water
supply pressure exceeds 207 kPa (30 psig) design flowing pressure in
ANSI Z358.1 will not injure the eyes, unless the system is designed such
that this pressure could not be exceeded. This needs to be verified with the
designers through SAPMT.

SAES-B-069
Para 5.4

B9

Verify that the water supply piping for the Eyewash / Shower is equipped or
provided with a cross connection or backflow prevention device in
reference to SAES-L-310; SAES-S-040; SAES-S-060 and SAES-S-070
requirements.

SAES-B-069
Para 5.5

B10

Verify whether the Eyewash / Shower is required to be equipped or


provided with an Alarm, if yes ensure that flowswitches or other
microswitches are provided with the operating valves to transmit signal to
display boards in the attended location to identify the location of the
emergency.

SAES-B-069
Para 6.5

Page 1 of 2

PLANT NO.

EC / PMCC / MCC NO.


QUANTITY INSP.

SAUDI ARAMCO ACTIVITY NUMBER

ACCEPTANCE CRITERIA

PLUMB

CONTRACTOR / SUBCONTRACTOR

EQPT CODE

SAUDI ARAMCO TIP NUMBER

ITEM
No.

30-Jun-08
DATE APPROVED
QR NUMBER

Schedule"Q"
Att IV Section
5

WORK PERMIT REQUIRED?

PASS

FAIL

N/A

RE-INSP DATE

SAUDI ARAMCO ID/PID - 05/18/05 - REV 0 (Standards Cutoff - June 2008)

REV 03

SAUDI ARAMCO INSPECTION CHECKLIST

SAIC NUMBER

Emergency Eyewash/Shower Receiving, Handling, Storage


and Preservation
PROJECT TITLE

B11

SAIC-B-4001
WBS / BI / JO NUMBER

Manufacturer's instruction shall be provided for assembling combination


units (eyewash and shower), if shipped with the components separate.
(ANSI Z-358.1 Para 9.4.3)

30-Jun-08
DATE APPROVED
QR NUMBER

15-Dec-09

PLUMB

CONTRACTOR / SUBCONTRACTOR

SAES-B-069
Section 7

*Acceptable evidence shall be a label or tag on the equipment marked ANSI Z358.1, or a certified test report from a recognized independent testing
laboratory indicating that the equipment has been tested and conforms to ANSI Z358.1.
REMARKS:

REFERENCE DOCUMENTS:
1-SAES-B-069 -- Emergency Eyewash and Showers, 05 September 2006
2-Schedule "Q" -- Saudi Aramco quality Requirements
3-ANSI Z-358.1 -- American National Standard for Emergency Eyewash and Shower Equipment, 1990

Contractor / Third-Party
Construction Representative*

Saudi Aramco
PMT Representative

Work is Complete and Ready for Inspection:


Name, Initials and Date:

Name, Initials and Date:

QC Inspector
Name, Initials and Date:

T&I Witnessed

QC Record Reviewed

Work Verified

T&I Witnessed

QC Record Reviewed

Work Verified

T&I Witnessed

QC Record Reviewed

Work Verified

PID Representative
Performed Inspection

Work / Rework May Proceed

QC Supervisor

Name, Initials and Date:

Proponent and Others


Quality Record Approved:

Name, Sign and Date:

Name, Organization,
Initials and Date:

*Person Responsible for Completion of Quality Work / Test

Y = YES

Page 2 of 2

N = NO F = FAILED

Potrebbero piacerti anche