Sei sulla pagina 1di 2

4836 Federal Register / Vol. 70, No.

19 / Monday, January 31, 2005 / Notices

Comment Date: 5 p.m. Eastern Time Comment Date: 5 p.m. Eastern Time docket(s). For assistance with any FERC
on February 4, 2005. on February 4, 2005. Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
18. Bellows Falls Power Company, LLC 21. Wisconsin Electric Power Company
(866) 208–3676 (toll free). For TTY, call
[Docket No. ER05–455–000] [Docket No. ER05–458–000] (202) 502–8659.
Take notice that on January 14, 2005, Take notice that on January 14, 2005,
Linda Mitry,
Bellows Falls Power Company, LLC Wisconsin Electric Power Company
(Bellows Falls) submitted for filing, (Wisconsin Electric) submitted Deputy Secretary.
pursuant to section 205 of the Federal proposed amendments to Wisconsin [FR Doc. E5–354 Filed 1–28–05; 8:45 am]
Power Act and part 35 of the Electric’s Electric Tariff, Second Revised BILLING CODE 6717–01–P
Commission’s regulations an Volume No. 2. Wisconsin Electric states
application for market-based rate that the amendments would revise
authorization to sell energy, capacity, Service Schedule F—Dynamic DEPARTMENT OF ENERGY
and ancillary services, and reassign Regulation and Frequency Response
Federal Energy Regulatory
transmission capacity and resell firm Service to broaden its applicability to
transmission rights. Bellow Falls also new generators locating within the Commission
requests the waivers and exemptions control area historically (prior to [Project No. 287–009—IL]
from regulations typically granted to the January 1, 2001) operated by Wisconsin
holders of market-based rate Electric Power Company and the Midwest Hydro Inc.; Notice of
authorization. Bellows Falls requests an historical service territory of Edison Availability of Environmental
effective date as of the date of closing on Sault Electric Company (Wisconsin Assessment
the lease of the Bellows Falls Electric Control Area). Wisconsin
January 24, 2005.
Hydroelectric Project which is expected Electric requests an effective date of
In accordance with the National
to occur by the end of the first quarter March 15, 2005.
Wisconsin Electric states that copies Environmental Policy Act of 1969 and
of 2005.
Comment Date: 5 p.m. Eastern Time of the filing were served on its CST the Federal Energy Regulatory
on February 4, 2005. customers and on the state regulatory Commission’s regulations, 18 CFR part
bodies in Wisconsin and Michigan. 380 (Order No. 486, 52 FR 47879), the
19. PJM Interconnection, L.L.C. Comment Date: 5 p.m. Eastern Time Office of Energy Projects has reviewed
[Docket No. ER05–456–000] on February 4, 2005. the application for a new license for the
Take notice that on January 14, 2005, Dayton Hydroelectric Project, located on
Standard Paragraph the Fox River, in La Salle County,
PJM Interconnection, L.L.C. (PJM),
submitted for filing an executed Any person desiring to intervene or to Illinois, and has prepared an
interconnection service agreement (ISA) protest this filing must file in Environmental Assessment (EA). In the
among PJM, American Municipal accordance with Rules 211 and 214 of EA, Commission staff analyze the
Power-Ohio, Inc. as agent for Ohio the Commission’s Rules of Practice and potential environmental effects of
Municipal Electric Generation Joint Procedure (18 CFR 385.211 and relicensing the project and conclude
Venture 5, and American Electric Power 385.214). Protests will be considered by that issuing a new license for the
Service Corporation as agent for Ohio the Commission in determining the project, with appropriate environmental
Power Company doing business as AEP, appropriate action to be taken, but will measures, would not constitute a major
and a notice of cancellation of an not serve to make protestants parties to federal action that would significantly
interim service agreement that has been the proceeding. Any person wishing to affect the quality of the human
superseded. PJM requests an effective become a party must file a notice of environment.
date of December 16, 2004 for the ISA. intervention or motion to intervene, as A copy of the EA is on file with the
PJM states that copies of this filing appropriate. Such notices, motions, or Commission and is available for public
were served upon the parties to the protests must be filed on or before the inspection. The EA may also be viewed
agreement and the state regulatory comment date. Anyone filing a motion on the Commission’s Web site at
commissions within the PJM region. to intervene or protest must serve a copy http://www.ferc.gov using the
Comment Date: 5 p.m. Eastern Time of that document on the Applicant and ‘‘eLibrary’’ link. Enter the docket
on February 4, 2005. all parties to this proceeding. number excluding the last three digits in
The Commission encourages the docket number field to access the
20. Duquesne Light Company document. For assistance, contact FERC
electronic submission of protests and
[Docket No. ER05–457–000] interventions in lieu of paper using the Online Support at
Take notice that on January 14, 2005, ‘‘eFiling’’ link at http://www.ferc.gov. FERCOnlineSupport@ferc.gov or toll-
Duquesne Light Company (Duquesne) Persons unable to file electronically free at 1–866–208–3676, or for TTY,
submitted an amendment to an should submit an original and 14 copies (202) 502–8659.
Interchange Agreement between of the protest or intervention to the Any comments should be filed within
affiliates of FirstEnergy Corp. Federal Energy Regulatory Commission, 30 days from the issuance date of this
(FirstEnergy) and Duquesne to reflect 888 First Street, NE., Washington, DC notice, and should be addressed to the
the disconnection and retirement from 20426. Secretary, Federal Energy Regulatory
operation of one of the 69kV This filing is accessible on-line at Commission, 888 First Street, NE.,
transmission lines that interconnects the http://www.ferc.gov, using the Room 1–A, Washington, DC 20426.
transmission systems of FirstEnergy and ‘‘eLibrary’’ link and is available for Please affix ‘‘Dayton Project No. 287’’ to
Duquesne. review in the Commission’s Public all comments. Comments may be filed
Duquesne states that copies of the Reference Room in Washington, DC. electronically via Internet in lieu of
filing were served on the state There is an ‘‘eSubscription’’ link on the paper. The Commission strongly
regulatory commissions with Web site that enables subscribers to encourages electronic filings. See 18
jurisdiction over Duquesne and receive email notification when a CFR 385.2001(a)(1)(iii) and the
FirstEnergy. document is added to a subscribed instructions on the Commission’s Web

VerDate jul<14>2003 16:59 Jan 28, 2005 Jkt 205001 PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 E:\FR\FM\31JAN1.SGM 31JAN1
Federal Register / Vol. 70, No. 19 / Monday, January 31, 2005 / Notices 4837

site under the ‘‘eFiling’’ link. For further DEPARTMENT OF ENERGY County, Tennessee and traversing
information, contact Tom Dean at (202) southeasterly to proposed interconnects
502–6041. Federal Energy Regulatory with Columbia Gulf Transmission
Commission Company and East Tennessee Natural
Magalie R. Salas,
[Docket No. PF05–2–000] Gas Company in Trousdale County,
Secretary. Tennessee. The proposed pipeline
[FR Doc. E5–350 Filed 1–28–05; 8:45 am] would deliver up to 120,000 decatherms
Midwestern Gas Transmission
BILLING CODE 6717–01–P
Company; Notice of Intent To Prepare per day (Dth/d) to Piedmont Natural Gas
an Environmental Assessment for the Company, Inc., a local distribution
Proposed MGT Eastern Extension company, for long-term transportation.
DEPARTMENT OF ENERGY Additional pipeline facilities would
Project, Request for Comments on
Federal Energy Regulatory Environmental Issues, and Notice of consist of a pig launcher and piping
Commission Public Scoping Meeting modifications to existing reciprocating
engines at the MGT Portland Station,
[Project No. 1855–027] January 21, 2005. mainline valve assemblies and a pig
The staff of the Federal Energy receiver at the terminus of the line,
USGen New England, Inc.; Notice of Regulatory Commission (FERC or ultrasonic meters with electronic flow
Availability of Environmental Commission) will prepare an measurement, flow control valves, and
Assessment environmental assessment (EA) that will data acquisition control buildings.
discuss the environmental impacts of MGT plans to file a formal application
January 24, 2005.
Midwestern Gas Transmission for this project with the FERC in May
In accordance with the National Company’s (MGT) MGT Eastern
Environmental Policy Act of 1969 and 2005. They are requesting approval to
Extension Project in Sumner and begin construction in June 2006, with a
the Federal Energy Regulatory Trousdale Counties, Tennessee. This
Commission’s (Commission) proposed in-service date of November 1,
notice announces the opening of the 2006.
regulations, 18 CFR part 380 (Order No. scoping process the Commission will
486, 52 FR 47897), the Office of Energy A map depicting MGT’s proposed
use to gather input from the public and pipeline route is provided in Appendix
Projects’ staff has prepared an interested agencies on the project. Your
Environmental Assessment (EA) for an 1.2
input will help the Commission staff Several issues have already been
application for a non-capacity related determine which issues need to be
amendment of the Bellows Falls Project. raised by concerned citizens, which
evaluated in the EA. The Commission include public safety, eminent domain,
The Bellows Falls Project, FERC No. will use the EA in its decision making
1855, is located on the Connecticut proximity to residences, and property
process to determine whether or not to values.
River in Chesire and Sullivan Counties, authorize the project. Please note that
New Hampshire, and Windham and the scoping period will close on March The EA Process
Windsor Counties, Vermont. 3, 2005. Although no formal application for
The EA contains the staff’s analysis of Comments may be submitted in authorizing natural gas facilities has
the potential environmental impacts of written form or verbally. Further details been filed, the FERC staff is initiating its
the proposal and concludes that on how to submit written comments are National Environmental Policy Act
approval of the proposal would not provided in the public participation (NEPA) review now. The purpose of the
constitute a major federal action section of this notice. In lieu of sending FERC’s Pre-filing Process is to
significantly affecting the quality of the written comments, you are invited to encourage the early involvement of
human environment. attend the public scoping meeting that interested stakeholders and to identify
A copy of the EA is attached to a is scheduled as follows: and resolve issues before an application
January 21, 2005 Commission order Tuesday, February 24, 2005, 7 p.m. is filed with the FERC.
titled Order Approving Change In (CST): Sumner County Building, 355 The FERC will use the EA to consider
Project Boundary, 110 FERC ¶ 62,046, No. Belvedere Drive, Gallatin, TN, (615) the environmental impact that could
which is available for review and 452–3604. result if it issues MGT a Certificate of
reproduction at the Commission’s This notice is being sent to affected Public Convenience and Necessity.
Public Reference Room, located at 888 landowners; federal, state, and local This notice formally announces our
First Street, NE., Room 2A, Washington, government representatives and preparation of the EA and the beginning
DC 20426. The EA may also be viewed agencies; environmental and public of the process referred to as ‘‘scoping’’.
on the Commission’s Web site at interest groups; Native American tribes; We are soliciting input from the public
http://www.ferc.gov using the ‘‘elibrary’’ other interested parties; and local and interested agencies to help us focus
link. Enter the docket number (prefaced libraries and newspapers in this the analysis in the EA on the potentially
by P-) and excluding the last three proceeding. We 1 encourage government significant environmental issues related
digits, in the docket number field to representatives to notify their to the proposed action.
access the document. For assistance, constituents of this planned project and Our independent analysis of the
contact FERC Online Support at encourage them to comment on their issues will be included in an EA that
FERCOnlineSupport@ferc.gov or toll- areas of concern. will be mailed to federal, state, and local
free at (866) 208–3676, or for TTY,
contact (202) 502–8659. Summary of the Proposed Project
2 The appendices referenced in this notice are not
For further information, contact MGT proposes to construct and being printed in the Federal Register. Copies are
Rebecca Martin at (202) 502–6012. operate about 30 miles of 16-inch- available on the Commission’s Web site at the
diameter pipeline commencing at the ‘‘eLibrary’’ link or from the Commission’s Public
Magalie R. Salas, Reference and Files Maintenance Branch, Room 2A
MGT Portland Station in Sumner or call (202) 502–8371. For instructions on
Secretary.
connecting to ‘‘eLibrary’’ refer to the end of this
[FR Doc. E5–351 Filed 1–28–05; 8:45 am] 1 ‘‘We’’, ‘‘us’’, and ‘‘our’’ refer to the notice. Copies of the appendices were sent to all
BILLING CODE 6717–01–P environmental staff of the Office of Energy Projects. those receiving this notice in the mail.

VerDate jul<14>2003 16:59 Jan 28, 2005 Jkt 205001 PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 E:\FR\FM\31JAN1.SGM 31JAN1

Potrebbero piacerti anche