Sei sulla pagina 1di 20

CoilComm

SM

DID YOU KNOW


WHEN OBJECTS GO DOWN UNEXPECTEDLY,
INJURIES GO UP EXPONENTIALLY.
In fact, objects falling on people, (often from heights) do lead to
serious injuries.
We can all decrease falling object incidents by increasing falling
object awareness. Institute procedures for inspecting equipment and
fixtures, and securing tools and loose objects. Establish restricted
areas and post signs under work at height. Institute Stop Work
Authority if theres any doubt about safety. Eliminating injuries from
dropped objects should always be a high priority.
At Halliburton, solving customer challenges is second only to keeping
everyone safe and healthy. You can find more safety tips at
www.halliburton.com/HSE

Dropped Objects
The Halliburton 10 to Zero Life Rules are a compilation of basic rules
that all Halliburton employees know and live by. These are key components

for identifying and managing the hazards in our business.


2015 HALLIBURTON. ALL RIGHTS RESERVED.
2014 Halliburton. All rights reserved.

CoilComm Services
SM

Content:
Real -Time Service

System Components
Distributed Temperature Sensing (DTS)

Distributed Acoustic Sensing (DAS)


Type of Services

2015 HALLIBURTON. ALL RIGHTS RESERVED.

CoilComm Services
SM

Real Time CT Fiber Optics Solution


A real time, non intrusive Coiled Tubing technology to help maximize
well performance and intervention success rate
BHA Measures:
Internal and External Pressure
Downhole Temperature

CCL (Depth Co-relation)


Distributed Temperature Sensing
(DTS)
Distributed Acoustic Sensing (DAS)

2015 HALLIBURTON. ALL RIGHTS RESERVED.

CoilComm Services
SM

6 Fibers installed in tube-in-tube concentric housing, 4mm


Minimum cross sectional area reduction
Acid, Solvent and Abrasive Sand resistance
Ball Drop Capability
Negligible added weight

2015 HALLIBURTON. ALL RIGHTS RESERVED.

CoilComm Services
SM

Real Time Measurements:


Internal & External Pressure
Downhole Temperature
CCL (Depth Corelation)
Specifications:
2-1/8 O.D; 11ft long

2-1/4 O.D; 11ft long


3-3/8 O.D; 14ft long
Min. ball size 5/8
350 F
15K psi
2015 HALLIBURTON. ALL RIGHTS RESERVED.

CoilComm Services
SM

CoilComm BHA Specifications:


BHA Specifications

O.D

2.125

2.25

3.375

I.D.

0.65

0.65

1.25

Length

11ft

11ft

14ft

Max Ball drop size

5/8

5/8

Pressure Rating

10,000 psi

15,000 psi

15,000psi

Temperature Rating

350 F

350 F

350 F

Max Pump Rate (Slick


Fluid)

2 BPM

2 BPM

7 BPM

Max Pump Rate


(Abrasive Fluid)

0.9 BPM

0.9 BPM

3 BPM

2015 HALLIBURTON. ALL RIGHTS RESERVED.

CoilComm Services
SM

Acquisition Software:
IWI user friendly software for best data visualization and handling
Depth co-relation interface window
One single Software Program to support the whole job
Facilitate immediate monitoring by CT operator
Real time availability of Acquisition data in Client Offices worldwide

2015 HALLIBURTON. ALL RIGHTS RESERVED.

CoilComm Services
SM

Distributed Temperature Sensing (DTS):


Fiber optics-based sensing capability
DTS allows tracking of temperature changes along the entire
length of Coiled Tubing
It can be used to analyze distribution of flow:
During an acid job

Hot/Cold slugs
Gas entry points
Cross- flows

2015 HALLIBURTON. ALL RIGHTS RESERVED.

CoilComm Services
SM

Distributed Acoustic Sensing (DAS):


Frac monitoring, flow in/out of perforations
Production monitoring
Completion evaluation
Seismic, vertical seismic profiling, surface seismic, microseismic

2015 HALLIBURTON. ALL RIGHTS RESERVED.

10

Stimulation Analysis & Optimization using DAS

2014 HALLIBURTON. ALL RIGHTS RESERVED.

11

Microseismic & Fiber Optics Plug & Perf - Barnett


VIDEO

2014 HALLIBURTON. ALL RIGHTS RESERVED.

12

Holley et al;
SPE 136565

Tool Description
Coiled Tubing
Downhole Tool

Fiber Cable

CCL
Pressure Gauge
Temp Gauge

Perforation Cleanup Tool

2014 HALLIBURTON. ALL RIGHTS RESERVED.

CT Unit with FO
Cable

13

Coilcomm Case 1 - Bricol

8 Open Intervals over 417m.


Naturally Fractured Reservoir
v

v
v
12 Previous Stimulations
Fluid Placement Uncertainty

417 m

Incremental Production with


previous Stimulations ~195 BPD
Obstruction
6682m

2014 HALLIBURTON. ALL RIGHTS RESERVED.

vv
14

Xylene injection
5200

5400

5600

Depth (m)

5800

6000

6200

6400

6600
130

135

140

145
150
Temperature (C)

155

160

Base Temp (April 12 - 2:54)


Xylene in Formation (April 13 - 7:29)
Xylene in Formation (April 13 - 7:43)

Temp

Slurry Rate

Treating Pressure

Temperature profiles almost parallel to base temperature, most treatment fluids went through
the lower perforations.
2014 HALLIBURTON. ALL RIGHTS RESERVED.

15

Pre and Post Perforation Cleanup (Pulsonix) Profiles


Before
Cleanup

Perforation
Cleanup with
Coiled Tubing

5200

After
Cleanup

5400

5600

NO DATA WAS
RECORDED,
COILED TUBING
WAS BEING
MOVED

Depth (m)

5800

6000

6200

6400

6600
140

145

150
Temperature (C)

155

160

Base Temp (April 12 - 2:54)


Temp Prod Before CT (April 13 - 04:27)

Temp

Slurry Rate

Temp Prod After CT (April 14 - 10:59)

Cooling effect observed due to the stimulation, but TEMPERATURE below punchers (5,380m)
is HIGHER after perforation cleansing with coiled tubing, indicating an INCREASE in general
PRODUCTION.
2014 HALLIBURTON. ALL RIGHTS RESERVED.

16

Warmback Analysis after pumping Biovert 4ppg

5200

2:46 2:50

6:36

7:23

5400

5600

Depth (m)

5800

6000

6200

Temp

6400

Slurry Rate

6600
115

Sections 2 & 6 present slope changes


indicating zones where more fluid went
through.

2014 HALLIBURTON. ALL RIGHTS RESERVED.

17

120

125

130

135
140
145
Temperature (C)

150

155

Base Temp (April 12 - 2:54)

Closed Well (April 16 - 02:46)

Closed Well (April 16 - 02:50)

Closed Well (April 16 - 06:36)

Closed Well (April 16 - 07:23)

Closed Well (April 16 - 08:21)

160

Bricol Summary
Fiber Optic Cable inside
Coiled Tubing

Degradable Divergent
Particles

Real Time temperature


monitoring

Perforation Cleanup with


Coiled Tubing

THE GAIN
78% Increase in Production Post-Stimulation
Roughly 4 TIMES improved production compared to
previous stimulation methods.

Acid Volume Reduction of ~70% compared to


Previous Stimulations.
2014 HALLIBURTON. ALL RIGHTS RESERVED.

18

CoilComm Services
SM

Type of Services:
Perforation Cleanouts

Packer Setting

Nitrogen Kick-off

Wellbore Monitoring with DTS

Matrix stimulation with DTS

Milling

Abrasive pumping

Perforating

2015 HALLIBURTON. ALL RIGHTS RESERVED.

19

Q & A Session

2015 HALLIBURTON. ALL RIGHTS RESERVED.

20

Potrebbero piacerti anche