Sei sulla pagina 1di 1

9378 Federal Register / Vol. 70, No.

37 / Friday, February 25, 2005 / Notices

pursuant to an exploration plan to be Comments, including names and the existing Gold Acres heap leach
approved by the Bureau of Land addresses or respondents, will be facility and move the ore to the South
Management. The exploration plan, as available for public review at the above Area heap leach facility for further
submitted by Transalta Centralia Mining address during regular business hours, processing; and continue management
LLC, is available for public inspection at Monday–Friday, excluding holidays. of mine dewatering as outlined in the
the Bureau of Land Management office Individual respondents may request Pipeline Infiltration Plan and South
at the street address above during confidentiality. If you wish to withhold Pipeline EIS. The proposed additional
regular business hours (8:30 a.m. to 4 your name or street address from public development of the South Pipeline ore
p.m.), Monday through Friday. review or from disclosure under the deposit would provide up to seven
This notice is published in the Freedom of Information Act, you must additional years of mining and
Federal Register pursuant to 43 CFR state this prominently at the beginning processing. The combined life of the
3410.2–1(c)(1). of your written comment. However, we Pipeline Project, the South Pipeline
Dated: October 26, 2004. will not consider anonymous Project and the Proposed Action would
Robert D. DeViney, Jr.,
comments. Such requests to withhold be up to 25 years.
your name or street address from public
Chief, Branch of Realty and Records Services. Gerald M. Smith,
review will be honored to the extent
[FR Doc. 05–3629 Filed 2–24–05; 8:45 am] allowed by law. All submissions from Field Manager.
BILLING CODE 4310–33–P organizations or business, and from [FR Doc. 05–3628 Filed 2–24–05; 8:45 am]
individuals identifying themselves as BILLING CODE 4310–HC–P
representatives of officials of
DEPARTMENT OF THE INTERIOR organizations or businesses, will be
available for public inspection in their DEPARTMENT OF THE INTERIOR
Bureau of Land Management
entirety. The FSEIS is available at the
Bureau of Land Management
Battle Mountain Field Office at the
[NV–060–3809]
above address. [NV–020–1990–EX]
Notice of Availability: Pipeline/South FOR FURTHER INFORMATION CONTACT: Pam
Jarnecke, Battle Mountain BLM at (775) Notice of Intent To Prepare an
Pipeline Pit Expansion Project Final Environmental Impact Statement (EIS)
Supplemental Environmental Impact 635–4144.
and To Initiate the Public Scoping
Statement SUPPLEMENTARY INFORMATION: Cortez
Process
Gold Mines (CGM) proposes to expand
AGENCY: Bureau of Land Management, its current gold mining operations 30 AGENCY: Bureau of Land Management;
Interior. miles southeast of Battle Mountain, Interior.
Cooperating Agency: Nevada Nevada. The proposed Pit Expansion ACTION: Notice of intent.
Department of Wildlife. Project would not result in an increase
ACTION: Notice of availability of the in surface disturbance beyond the 7,676 SUMMARY: Pursuant to section 102(2) (c)
Pipeline/South Pipeline Pit Expansion acres previously approved. Actions of the National Environmental
Project final supplemental associated with the Project would PolicyAct (NEPA) of 1969, and the
environmental impact statement. consist of the following: expand the Federal Land Policy and Management
South Pipeline open pit to the east, Act (FLPMA) of 1976, notice is hereby
SUMMARY: Pursuant to Section 102(2)(c) given that the Winnemucca Field Office
southeast, and southwest; increase the
of the National Environmental Policy depth of the Pipeline/South Pipeline of the Bureau of Land Management
Act of 1969 and the Council on open pit; use resulting waste rock as (BLM) is initiating the preparation of an
Environmental Quality Regulations backfill into portions of the Pipeline/ EIS to analyze a proposed silver and
found at 40 CFR parts 1500–1508, notice South Pipeline open pit; increase the gold mine expansion, closure, and
is hereby given of the availability of the height of the approved South Area Heap reclamation plan as proposed by Coeur
Final Supplemental Environmental Leach pad from a height of 250 feet to Rochester, Inc. (CRI), in Plan of
Impact Statement (FSEIS) for comment, 300 feet above ground surface; increase Operations Amendment 7 for the Coeur
prepared by the Battle Mountain Field the approved Area 28 tailings and heap Rochester Mine, located in Pershing
Office of the Bureau of Land leach facility height from 250 feet to 300 County, Nevada.
Management (BLM). The FSEIS analyzes feet above ground surface; construct an DATES: The public scoping period will
the environmental effects of the additional waste rock dump on the commence with the publication of this
Proposed Action, Complete Backfill backfilled portion of the open pit; notice and will end 30 days after
Alternative, No Backfill Alternative, and construct the 125-acre Gap waste rock publication. Public meetings will be
the No Action Alternative. dump; increase the approved mining announced through the local news
DATES: Written comments must be post- rate from an average 150,000 tons per media, and a BLM Web site at least 15
marked or otherwise delivered by 4:30 day (tpd) with a maximum of 250,000 days prior to the event. Comments
p.m. (Pacific Time Zone) by no later tpd to an average of 350,000 tpd with a should be received on or before the end
than 30 days after the date that the maximum of 500,000 tpd; translocate of the scoping period at the address
Environmental Protection Agency waste rock within the Pipeline/South listed below.
publishes this Notice in the Federal Pipeline open pit, including portions of ADDRESSES: Written comments should
Register. A limited number of copies of the expanded open pit; conduct certain be sent to the Winnemucca Field Office,
the FSEIS may be obtained at the Battle activities at the approved Cortez facility Bureau of Land Management, 5100 East
Mountain BLM Field Office. without modification to the facility; Winnemucca Blvd., Winnemucca,
ADDRESSES: Written comments should install ground water extraction wells Nevada 89445, via fax at (775) 623–1503
be addressed to the Bureau of Land (ground water extraction from the or online at: http://www.nv.blm.gov/
Management, Attn: Pam Jarnecke, Battle existing and planned wells would not winnemucca. Comments, including
Mountain Field Office, 50 Bastian Road, exceed the approved annualized average names and addresses of respondents
Battle Mountain, Nevada 89820. rate of 34,500 gallons per minute); close will be available for public review at the

VerDate jul<14>2003 19:31 Feb 24, 2005 Jkt 205001 PO 00000 Frm 00112 Fmt 4703 Sfmt 4703 E:\FR\FM\25FEN1.SGM 25FEN1

Potrebbero piacerti anche