Sei sulla pagina 1di 1

12862 Federal Register / Vol. 70, No.

50 / Wednesday, March 16, 2005 / Notices

‘‘eFiling’’ link at http://www.ferc.gov. and operate a 70-mile pipeline leg and will receive copies of all documents
Persons unable to file electronically a 3-mile pipeline leg and related filed by the applicant and by all other
should submit an original and 14 copies facilities to transport natural gas on an parties. A party must submit 14 copies
of the protest or intervention to the open access basis. In Docket No. CP05– of filings made with the Commission
Federal Energy Regulatory Commission, 85–000, Port Arthur Pipeline requests a and must mail a copy to the applicant
888 First Street, NE., Washington, DC blanket certificate under section 7(c) of and to every other party in the
20426. the NGA and Part 157, Subpart F of the proceeding. Only parties to the
This filing is accessible on-line at Commission’s regulations to perform proceeding can ask for court review of
http://www.ferc.gov, using the routine activities in connection with the Commission orders in the proceeding.
‘‘eLibrary’’ link and is available for future construction, operation and Persons who wish to comment only
review in the Commission’s Public maintenance of the proposed pipeline. on the environmental review of this
Reference Room in Washington, DC. Finally, Port Arthur Pipeline requests project, or in support of or in opposition
There is an ‘‘eSubscription’’ link on the authorization in Docket No. CP05–86– to this project, should submit an
Web site that enables subscribers to 000 to provide the natural gas original and two copies of their
receive e-mail notification when a transportation services on a firm and comments to the Secretary of the
document is added to a subscribed interruptible basis pursuant to section Commission. Environmental
docket(s). For assistance with any FERC 7(c) of the NGA and Part 284 of the commentors will be placed on the
Online service, please e-mail Commission’s regulations. Commission’s environmental mailing
FERCOnlineSupport@ferc.gov, or call These applications are on file with the list, will receive copies of the
(866) 208–3676 (toll free). For TTY, call Commission and open to public environmental documents, and will be
(202) 502–8659. inspection. These filings are available notified of meetings associated with the
Comment Date: March 24, 2005. for review at the Commission in the Commission’s environmental review
Public Reference Room or may be process. Environmental commentors
Magalie R. Salas, viewed on the Commission’s Web site at will not be required to serve copies of
Secretary. http://www.ferc.gov using the filed documents on all other parties.
[FR Doc. E5–1147 Filed 3–15–05; 8:45 am] ‘‘eLibrary’’ link. Enter the docket The Commission’s rules require that
BILLING CODE 6717–01–P number excluding the last three digits in persons filing comments in opposition
the docket number field to access the to the project provide copies of their
document. For assistance, please contact protests only to the applicant. However,
DEPARTMENT OF ENERGY FERC Online Support at the non-party commenters will not
FERCOnlineSupport@ferc.gov or toll receive copies of all documents filed by
Federal Energy Regulatory free at (866) 208–3676, or for TTY,
Commission other parties or issued by the
contact (202) 502–8659. Commission (except for the mailing of
[Docket Nos. CP05–83–000, CP05–84–000, In Docket No. PF04–11–000, Port environmental documents issued by the
CP05–85–000, and CP05–86–000] Arthur LNG and Port Arthur Pipeline Commission) and will not have the right
participated in a pre-filing National to seek court review of the
Port Arthur LNG, L.P. and Port Arthur Environmental Policy Act review of the Commission’s final order.
Pipeline, L.P.; Notice of Applications proposed project to identify and resolve The Commission strongly encourages
potential landowner and environmental electronic filings of comments, protests,
March 10, 2005. problems before the applications were
Take notice that on February 28, 2005, and interventions via the internet in lieu
filed. of paper. See, 18 CFR 385.2001(a)(1)(iii)
Port Arthur LNG, L.P. (Port Arthur LNG) Any initial questions regarding these
filed an application in Docket No. and the instructions on the
applications should be directed to
CP05–83–000 seeking authorization to Commission’s Web site under the
Georgetta J. Baker, Sempara Energy , 101
site, construct and operate a liquefied Ash Street, HQ13D, San Diego, ‘‘e-Filing’’ link.
natural gas (LNG) terminal and Comment Date: March 31, 2005.
California 92101, Phone: (619) 699–
associated facilities to import and 5064, Fax: (619) 699–5027 or Magalie R. Salas,
deliver up to 1.5 Bcf per day of natural gbaker@sempra.com or Stacy Van Goor, Secretary.
gas during Phase I, increasing to 3.0 Bcf Sempra Energy, 101 Ash Street, HQ8, [FR Doc. E5–1146 Filed 3–15–05; 8:45 am]
per day during Phase II. The terminal San Diego, California 92101, Phone: BILLING CODE 6717–01–P
and associated facilities will be located (619) 696–2264, Fax: (619) 696–2500 or
in the City of Port Arthur, Texas and in svangoor@sempraglobal.com.
Jefferson County, Texas. The LNG There are two ways to become DEPARTMENT OF ENERGY
terminal will provide LNG tanker involved in the Commission’s review of
terminal services to third party shippers this project. First, any person wishing to Federal Energy Regulatory
who would be importing LNG from obtain legal status by becoming a party Commission
foreign sources. Port Arthur LNG made to the proceedings for this project
[Project No. 382]
the request to site, construct and operate should, on or before the comment date,
the LNG terminal pursuant to section file with the Federal Energy Regulatory Southern California Edison Company;
3(a) of the Natural Gas Act and Part 153 Commission, 888 First Street, NE., Notice of Authorization for Continued
of the Commission’s regulations. Washington, DC 20426, a motion to Project Operation
Also, take notice that on February 28, intervene in accordance with the
2005, Port Arthur Pipeline, L.P. (Port requirements of the Commission’s Rules March 10, 2005.
Arthur Pipeline) filed in Docket No. of Practice and Procedure (18 CFR On February 26, 2003, Southern
CP05–84–000, an application seeking a 385.214 or 385.211) and the Regulations California Edison Company, licensee for
certificate of public convenience and under the NGA (18 CFR 157.10). A the Borel Project No. 382, filed an
necessity, pursuant to section 7(c) of the person obtaining party status will be application for a new or subsequent
NGA and Part 157, Subpart A of the placed on the service list maintained by license pursuant to the Federal Power
Commission’s regulations, to construct the Secretary of the Commission and Act (FPA) and the Commission’s

VerDate jul<14>2003 16:45 Mar 15, 2005 Jkt 205001 PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 E:\FR\FM\16MRN1.SGM 16MRN1

Potrebbero piacerti anche