Welcomes
Anglo American plc
People
MORALE
SAFETY
QUALITY
Financial
COST
Processes
DELIVERY
Resources
Kimberlite Cluster
K03
K11
K02
K08
K05
K06
K01
K16
K12
K07
K04
K10
K18
Kimberlite Cluster
K03
K11
K02
K08
K05
K06
K01
K04
K12
K07
K16
K10
K18
Resource Models
K01 and K02 Modelled
to 1044m below surface
K03
K02
K01
K04
K03 modelled
to 600m below surface
Satellites modelled
to various depth
North
SAFE, SIMPLE AND EFFECTIVE!
K03
K02
K01
K04
Surface to B14
Surface to
B35
B36 to 49
Surface to
B13
B15 to B27
B28 to B58
Surface to
B63
Low Indicated
B59 to B72
High Inferred
Medium Inferred
B64 to B87
Resources
8000000
Open Pit
Cut 4
Underground
Phase 1
Underground
Phase 2
7000000
7000000
6000000
6000000
5000000
4000000
4000000
3000000
Carats
Tones
5000000
3000000
2000000
2000000
Tons 125.9
Carats 168.4
1000000
Tons 57.9
Carats 74.8
Tons 41.9
Carats 36.6
Tons 83.5
Carats 97.8
1000000
0
1 3
5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 61 63 65 67 69 71 73 75 77 79 81 83 85
K01 Indicated Tones
K2 Indicated Tones
K2 Inferred Tons
K3 Inferred
Total Carats
Current Production
YTD (Mar)
7% up vs
budget
1,800
1872
2,000
1653
1,600
1339
Tons in Thousands
2,200
1656
2,400
1,400
1,200
1,000
800
600
400
200
YTD
2009Budget
Budget==4.54mT
1.5Mt
Dec-10
Nov-10
Oct-10
Sep-10
Aug-10
Jul-10
Jun-10
May-10
Apr-10
Mar-10
Feb-10
Jan-10
YTD (Mar)
1% up vs
budget
Kimberlite Mined
Budget = 3.63mT
390
461
500
209
300
YTD
2009Budget
Budget==0.90mT
1.5Mt
Dec-10
Nov-10
Oct-10
Sep-10
Aug-10
Jul-10
Jun-10
May-10
Apr-10
Mar-10
Feb-10
100
64
200
Jan-10
Tons in Thousands
400
YTD (Mar)
6% up vs
budget
1,780
1,717
1,800
1,200
YTD
2009Budget
Budget==5.44mT
1.5Mt
Dec-10
Nov-10
Oct-10
Sep-10
Aug-10
Jul-10
Jun-10
May-10
Apr-10
Mar-10
Feb-10
600
Jan-10
Tons in Thousands
2,400
1,865
2,262
3,000
YTD (Mar)
5% down vs
budget
Kimberlite Treated
Budget = 4.00mT
390
450
312
318
215
270
180
YTD
2009Budget
Budget==0.97mT
1.5Mt
Dec-10
Nov-10
Oct-10
Sep-10
Aug-10
Jul-10
Jun-10
May-10
Apr-10
Mar-10
Feb-10
90
Jan-10
Tons in Thousands
360
YTD (Mar)
0.1% up vs
budget
Carats Recovered
Budget = 3.97mCts
355
362
400
200
178
300
YTD
2009
Budget
Budget
= 0.96mCts
= 1.5Mt
Dec-10
Nov-10
Oct-10
Sep-10
Aug-10
Jul-10
Jun-10
May-10
Apr-10
Mar-10
Feb-10
100
Jan-10
Carats in Thousands
426
500
Looking Forward
Enhancement Opportunities
Mining
30/3
15/3
Ongoing
30/3
20/3
30/3
31/3
15/3
K03 treatment
9/4
Detailed scheduling
Detailed pit (incl. K03), stockpiles
and the Underground schedules
TBC
Iterative
verification of
the interface
with the
Underground
team
Underground expansion
21/4
21/4
Match schedule
to Group
requirements
31/5
5/5
17/5
1830/6
FinalAND
Report (off
mine)
SAFE, SIMPLE
EFFECTIVE!
Risks
Mine test unit versus production
unit
MODRUP replacement
Upgrade obsolete technology
Improve plant efficiency
Wet Magrolls
Bulk reduction in magnetic material
Increase in throughput rates of satellite and other
magnetic material
Q2 2009 +
Mix 03
-3mm + 1
mm
recovery
tailings
Composition
Grade (@
2DS)
2133 cpht
Grade (@
2DS)
33 cpht
Total tons
114,064
Total tons
8,373,000
Total carats
2,433,000
Total carats
2,746,000
Risks
Grade variation
Accelerated timelines
Red Area Infrastructure/Services Supply
Contaminants (grease, steel etc.)
Long lead items
Risks
63% Waste,
27%
kimberlite
2013 +
Q4 2010 to Q1 2013
Ongoing
Review
Q1 2010 +
Q1 2011 +
Composition
Consist out
of K4, K5,
K6
Composition
MVKBR,
DVK, MVK
Grade (@
2DS)
20 cpht
Reserve
grade
(@2DS)
28 cpht
Total tons
(LOM)
7,534,481
Total tons
12,500,000
Total carats
1,536,000
Total carats
3,500,000
Risks
High yields, exceed recovery capacity
Grade variation
EMV fleet availability
Accelerate EMV capital spend
Satellite Stockpile
K03
SAFE, SIMPLE AND EFFECTIVE!
Bench Heights
Shovel Efficiencies
2009 Year Performance
Equipment Type
BLAST HOLE DRILL RIG 250mm
O&K RH340 SHOVELS
994 FRONT END LOADER
HAULTRUCK CAT 789
HAULTRUCK CAT 793
TRACK DOZER CAT D9R
TRACK DOZER CAT D10R
TYRE DOZER CAT 834
MOTOR GRADER CAT 16H
MOTOR GRADER CAT 24H
WATER TANKER 85 000lt
385 TYPE EXCAVATOR
375 TYPE EXCAVATOR
988 FEL
TYRE HANDLER
SERVICE TRUCKS
Dewatering Truck
Dewatering Excavator Unit
Hiab Trucks
WATER BOWSERS
FUEL BOWSER
LOW BED
SKID STEER
HIGHWALL SCALER
COMPACTOR
Spare RH340 Buckets
220
42.5%
210
Pit Layout
793
Q1 2008 +
10
02
09
12
09
11
09
10
09
09
09
08
09
07
10
01
20
20
20
20
Production Period
Production Period
789
20
09
06
1163
20
1391
09
05
10
01
10
02
20
09
11
09
12
09
10
20
20
20
20
09
09
09
08
09
07
20
20
20
09
03
09
05
09
06
09
04
20
20
20
09
02
09
01
20
20
20
3000
2500
2000
1500
1000
500
0
20
2170 2236
1510
817
09
04
1336 1297
Average Tons
1503
949
09
01
803
09
03
1214 1247
880
500
09
02
1274
1000
20
1940
2000
1500
20
201012
201011
201010
201009
201008
201007
201006
201005
201004
201003
201002
201001
200912
200911
200910
200909
200908
200907
200906
200905
200904
200903
200902
200901
200812
200811
200810
200809
200808
200807
200806
200805
200804
200803
200802
200801
150
20
Average Tons
2500
160
2009
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2010
2011
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
5,270,519
0
0
0
2,400,000
0
0
0
6,449,246
0
0
0
0
0
0
45,515,268
0
0
0
0
0
5,270,519
0
0
0
0
0
0
0
0
0
0
0
0
0
2012
2013
0
80,000,000
0
0
0
0
37,929,390
17,054,778
4,848,308
12,374,533
11,417,365
0
0
0
0
0
0
0
2,000,000
0
0
0
0
0
0
0
0
80,000,000
0
0
0
0
7,585,878
5,684,926
0
0
0
0
0
0
0
2,479,678
0
0
0
1,800,000
1,800,000
0
0
0
0
0
2014
0
0
0
0
137,972,778
0
7,585,878
11,369,852
0
12,374,533
0
0
0
0
0
2,479,678
2,479,678
0
0
0
0
0
0
0
0
0
2015
0
80,000,000
0
18,377,196
91,981,852
5,600,000
0
5,684,926
0
0
0
0
0
5,374,260
0
0
0
5,270,519
0
0
0
0
374,134
2,400,000
0
0
2016
28,500,000
80,000,000
0
36,754,391
68,986,389
5,600,000
0
5,684,926
4,848,308
0
0
11,341,038
0
5,374,260
5,374,260
0
0
0
0
0
0
0
0
0
0
0
2017
2018
57,000,000
0
0
0
206,959,167
0
7,585,878
0
4,848,308
0
0
0
0
0
0
0
0
0
2,000,000
0
0
0
0
0
0
0
2019
2020
0
0
0
0
0
0
15,171,756
0
0
0
0
0
0
0
0
0
0
0
0
1,800,000
1,800,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2,479,678
2,479,678
0
0
0
0
0
0
0
0
0
4,959,356
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2,479,678
0
5,270,519
0
0
0
0
0
0
0
0
7,750,197 1,281,543,927
20
170
Total
10 Q1 = 56%
New Rate: RH340 = 2400tph, RH200 = 1800tph
20
180
Significant Improvement in
December 2009 and January
2010 since Cut 3 and Cut 4
trims backlog has been mined
out
09 YR = 39%
20
10t (5%)
Improvement
190
20
200
Trim
Block
2nd Production
Block
1st Production
Block
2009
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2010
2013
0
0
0
0
24,655,583
0
33,363,800
7,226,888
5,716,367
14,270,647
11,392,410
0
0
0
0
0
0
0
2,000,000
0
0
0
0
0
0
0
0
77,431,189
0
0
49,311,166
0
25,022,850
14,453,776
0
0
0
0
0
0
0
2,479,678
0
0
0
1,800,000
1,800,000
0
0
0
0
0
2014
0
0
0
0
24,655,583
0
0
7,226,888
0
14,270,647
0
0
0
0
0
2,479,678
2,479,678
5,270,519
0
0
0
0
0
0
0
0
2015
0
0
0
0
0
0
0
14,453,776
0
0
0
0
0
5,374,260
0
0
0
0
0
0
0
0
374,134
0
0
0
2016
0
0
0
0
73,966,749
5,600,000
0
0
5,716,367
0
0
5,670,519
0
0
5,374,260
0
0
0
2,000,000
0
0
0
0
0
0
0
2017
2018
2019
2020
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Total
519,648,259
4,959,356
7,750,197
761,895,668
0
0
0
0
0
0
33,363,800
7,226,888
0
0
0
0
5,270,519
0
0
0
0
0
0
0
0
0
0
0
0
0
2012
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2,479,678
2,479,678
5,270,519
0
1,800,000
1,800,000
0
0
0
0
0
Q4 2010 +
Q4 2009 +
2011
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
5,270,519
0
0
0
2,400,000
0
0
0
6,449,246
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2011 +
Ongoing
Review
Q2 2009 +
Q4 2010 to Q4 2013
Q1 2010 +
22.31%
25.84%
34.73%
Attendance
793 U/L
Shovel W/T
51.11%
17.4%
13.7%
11.58%
10.00%
60.00%
2.23%
68.20%
11.58%
2.58%
Idle Time
Phase 1
Shovel Util
789 U/L
2.58%
Bench Heights
Phase 2
Truck W/T
Operational Delays
Drill Efficiencies
Bowl Optimisation
SAFE, SIMPLE AND EFFECTIVE!
Ore Processing
Plant Recovery factor study
(RATU Implementation)
Mining
30/3
Net Effect
Whittle Shells
15/3
Ongoing
K3
Cut 4+
30/3
20/3
7/4
30/3
Cut 3+
K2
31/3
15/3
K03 treatment
9/4
Iterative
verification of
the interface
with the
Underground
team
Detailed scheduling
Detailed pit (incl. K03), stockpiles
and the Underground schedules
TBC
K1
21/4
Cut3+
(HLD)
V27
Dgn
Cut 4+
(HLD)
Cut 3+ &
Cut 4+ (Net)
Ore
37
39
55
92
Waste
271
364
561
751
Stripping Ratio
7.3
9.2
10.2
8.19?
8.2
Rev/Cost Ratio
27%
23%
16%
LOM @3.5Mt
11
12
16
27
LOM @ 4Mt
10
14
23
21/4
Match schedule
to Group
requirements
31/5
5/5
17/5
K4
Cut 3 (Design)
Underground expansion
130/6
Q1 2010
C4 V27 (Design)
Q2 2010
(study complete)
Q1 2010 Approval
Ongoing
Review
Q2 2010
(study complete)
Q1 2010 Approval
Q1 2011 +
Ultimate Pit (RG)
Mineral
Resource
F = 36.9m
Bottom
Bench
Tonnes
(Million)
Carats
Million
Cpht
(+2#)
37m
Intrinsic
Value
(Million
US$)
if berm is 1.8m
K3
K3
Cut 4+
A = 8.4m
Our berms are
1.80
metres high i.e
0m additional
for safety reasons
120m
K2
Skin Analysis
79.48/CKW
2009
50
42.26
7.62
18
791.6
2005
13
12.98
2.61
20
245.5
104.57/CK&VK
K03
K02
Ca 104
K01
Cut 3+
120m
K03
K1
K1
K4
K02
B = 1.8m
Toe = 0m
Cut 3 (Design)
E = A x a = 29.3m
Cut3+
(HLD)
V27
Dgn
Cut 4+
(HLD)
Cut 3+ &
Cut 4+ (Net)
Ore
37
39
55
92
Waste
271
364
561
751
Stripping Ratio
7.3
9.2
10.2
8.19?
8.2
Rev/Cost Ratio
27%
23%
16%
LOM @3.5Mt
11
12
16
27
LOM @ 4Mt
10
14
23
C = 5.6m
C4 V27 (Design)
Cut 3+ (tuck-in)
Whittle shells
K01
K03 Mining
d
in
W
g n
lin io
ai ect
v
r
re Di
SCOPE
Premature Closure Estimate
LOM Closure Estimate
per annum
K3
K2
INPUT
SHEETS
K4
K1
Explosives
Magazine
Primary
Crusher
MTP
e
s, S
tore
MV
s, E
vice
Grid reference
Offices
Annual values:
Field
Air
Coarse
Tailings
SUMMARY SHEET
SURVEY
AND
RECONCILIATION
Access Control
& Change House
Y0
Y1
(A) Premature
(A) Premature Y0
+
Balance
Y2
Y3, Y4
Y End
(A) Premature Y1
(B) Liability
accrual Y1
(B) Liability
accrual Y2
(C) Rehabilitation Y1
(C) Rehabilitation Y2
Balance Y1
Balance Y2
LoM est.
Q4 2010 +
Ongoing
Review
Q2 2010
Q1 2011 +
Additional
operational
disturbance
Ongoing
rehabilitation
Liability
Working smart
Initial
operational
disturbance
Existing Premature
closure estimate in
this region
Initial
development of
infrastructure
and projectrelated
disturbance
MINE CLOSURE
FRD 1
CESSATION OF MINING
OPERATIONS
Twin Shaft
Complex
Time
Initial
development of
infrastructure
and projectrelated
disturbance
Initial
operational
disturbance
with little
opportunity for
rehabilitation
Operation of
mine
Treatment of
stockpiles &
rehabilitation
effort using ex
mining
machinery
Rehabilitation
effort post mine
closure towards
obtaining
closure
certificate
Closure liability should NO rehabilitation effort be conducted prior to the cessation of mining operations
Closure liability should ongoing rehabilitation be conducted in line with current mine designs and dumping strategies
Closure liability should ongoing rehabilitation be conducted in addition to improved mine designs and deposition
strategies
Baseline Program
Thank You