Sei sulla pagina 1di 25

MUNICIPALITY

Esperanza
Pio V. Corpuz
Cataingan
Placer
Palanas
Uson
Mobo
Balud
Mandaon
Milagros
Aroroy
Baleno
Dimasalang
Batuan
San Fernando
Monreal
Masbate City
Cawayan

DAC/ TF
Dac
Dac
Dac
Dac
Dac
Dac
Dac
Dac
Dac
Dac
Dac
Dac
Dac

Hezer
Kerwin
Adel
Oliver
Mark Bunan
Mark Hagos
Ben
Mario
Rey
Mark Hagos
Mel
Mark Hagos
Jen

Dac Niel
Dac Mark Hagos
Dac Rolando

No. of Barangays
18

29

PAMANA C-2

PAMANA C-3

GPB 2013

MODALITY
GPB 2014

AUSAID2014

AF

NCDDP

Performance Commitment
Deputy Area Coordinator
A. STRATEGIC GOALS
Improve level of well-being of families
7

Quantity
____ brgys
1 report

B. MAIN ROLE

Maintains and updates inventory of qualified suppliers,


technical service providers, contractors, construction
materials pricelists, survey of labor cost rates, material
testing and water quality laboratories, available equipment
and rental rates and list of existing infra projects in the
municipality;

Assists volunteers in the conduct of site validation for the


identified priority areas in the barangay and keeps a
record of the validation reports; Evaluates technical
feasibility of proposed sub-project proposals by conducting ____ ESS Validation Reports
environmental and social safeguards screening and
identifies possible geo-hazards the municipality maybe
prone to;

Supervise Technical Service providers/Municipal


Engineering Offices in the conduct of surveys and in the
preparation of plans.

Reviews/prepares detailed cost estimates and program of


work for proposed sub-projects in coordination with the
Municipal Engineering Office to ensure that Project
technical guidelines and policies are adhered to;

____ POWs, DCE, WS,


specifications

Provide guidance on the preparation of the environmental


management and monitoring plan and in securing
CNC/ECC from EMB

___ EMMP, CNC, ECC

RFRs downloaded with zero defficiency


MCC
7
GPB
PAMANA

___ Updated SI Reports

___ Plans

100% of 1st Tranche Grant


funds Downloaded
____ Cycle 1 RFRs
____ Cycle 2 RFRs
____ Cycle 3 RFRs
_____ RFRs
_____ RFRs

TOTAL
RFRs downloaded with zero defficiency
7

100% of 2nd Tranche


Grant funds Downloaded

(Insert Modality/Cycle)
TOTAL
RFRs downloaded with zero defficiency

(Insert Modality/Cycle)
TOTAL

100% of 3rd Tranche Grant


funds Downloaded

Reviews Change Order requests from communities and


ensures that the changes are only implemented if there is
an approved Change Order Request.

Provides guidance on the operation and maintenance of


sub-projects particularly on the technical aspect of the
structures;

7
7

____ Approved Change


Orders
___ O and M Program

final inspection of completed sub-projects with other


representatives from the community, Municipal Inter____ Final Inspection Report
Agency Committee (MIAC), S/RPMO, Commission on Audit
(COA) and other Project stakeholders;
Conducts joint inspection of on-going sub-projects with
other representatives from the community, Municipal Inter____ Joint Inspection
Agency Committee (MIAC), S/RPMO, Commission on Audit
Report,
(COA) and other Project stakeholders;
Monthly Barangay Individual Physical Progress Report
____ Monthly Individual
submitted at the RPMO
Physical Progress Report

Consolidated Municipal Physical Progress Reports


submitted at the RPMO

4 Municipal Consolidated
Report

Monitors implementation of the community procurement


plan and procurement activities

Consolidated Procurement
Bench Marks

Participates in sub-project meetings with BSPMCs and


provides technical inputs to resolve issues and problems
that may arise during implementation of sub-projects;

___ Minutes of Meetings

Conducts the pre-construction conference at the


community level before the actual start of construction
activities for the sub-project to review implementation
plan, task assignments, work scheduling, LCC
commitments delivery; construction forms and reports
required during construction period;

Activity Report, community


SPI plan

Monitors implementation of Sub-Project Safety Plan

Safety Plan and Monitoring


Report

Monitors Implementation of Environmental Monitoring


Report

___ Monthly EMM Report

Provides technical advice and assistance to community


volunteers in preparing the planned community
procurement packages.

____ Correctly Filled Up


PCPPs

Provides technical advice and assistance to community


volunteers in preparing the procurement action plans.

____ Correctly Filled Up


PAPs

Acts as Resource Speaker during the Community


Procurement Training and provides technical advice and
assistance as needed to ensure completeness, consistency
and correctness of procurement and other technical
documents before the community submits the same to the
RPMO;

Activity Report

Conducts review of procurement transactions prior to the


BSPMCs' perfection of contracts with contractors and
suppliers,In coordination with the finance staff, assists the
community in providing guidance and coaching during
regular fiduciary reviews on procurement and financial
transactions.

Consolidated CF
Procurement Redflag
Report

Ensure completion of Sub-Projects according to the


approved work schedule

Assists in the compilation and review of Technical


documents to support Sub-Project Completion Report.

Prepare presentation materials and analysis on SP


Implementation Status during RPMT and other local
meetings.
In the absence of the Area Coordinator (AC) in the
municipality, temporarily acts as the Team Leader of the
ACT;
Where requested and necessary, appear in MDCs, SBs and
MATs to discuss on technical matters of the Project.

_____ WSPPR reflecting


100% P.A.
____ SPCRs with complete
attachments
____ Reports

Coordinates with the LGU, particularly the LCE and ME


regarding project implementation issues.
Performs such other tasks that maybe assigned by the
Area Coordinator,Sub-Regional Project Coordinator,
Community Infrastructure Officer 3, Community
Procurement Officer, Regional Infrastructure Officer or
Regional Community Infrastructure Specialist from time to
time.

____ Issue Reports Duly


Received by LGU

ANA/

C. ACCOUNTABILITY
Performance Contract for 1stSemester, 2014
7
7

1 PC
Performance Appraisal Matrix for 1st Semester, 2014
Feedback Report on Monitoring/TA Activities conducted at
the ACT level

210

1 PAM
ANA/

mitment
dinator
Quality
Empowered KC communities
At least 30% of jobs generated during
SP Construction benefit women

Complete and updated inventory of


qualified suppliers, technical service
providers, contractors, construction
materials pricelists, survey of labor
cost rates, material testing and water
quality laboratories, available
equipment and rental rates and list of
existing infra projects in the
municipality;

Completely filled up ESS validation


forms

KC standard compliant technical plans


submitted in accordance to the
timeline stated in the TOR and
contract

KC standard compliant
POW,DCE,WS,PCCP,PAP

Completely filled up EMMPs


RFRs reviewed,submitted and
downloaded according to the required
service standard

RFRs reviewed,submitted and


downloaded according to the required
service standard

RFRs reviewed,submitted and


downloaded according to the required
service standard

Time

ANA/
Detailed maintainance activities
reflected in the O&M program
Completely filled up Final Inspection
report reflecting planned and actual
measurements

@
Completion

Completely filled up Joint Inspection


Report with punch list

@90%
Progress

Completely filled up WSPPR

30th of each
month

Completely filled up Municipal


Consolidated Physical and Financial
Report

30th of each
month

Completely filled up procurement


benchmarks

30th of each
month

Issues fully discussed and TA provided


Monthly
to BSPMCs for their resolution.

Communities provided with


orientation on SPI,roles, forms and
reports.
Safety Plan and Report reflecting
activities conducted during SPI to
ensure safety.
Updated EMMPs
PCPPs correctly filled up as basis for
the tranching of the request for grant
funds
PAPs prepared according to the
standards of the project
Community Volunteers able to
comprehend and demonstrate
knowledge in community based
procurement

Procurement activities conducted


according to Community Based
Procurement Manual
Sub-Projects completed according to
plans and specifications
Completely filled up SPCRs with
complete attachments

1 month
after SP
Completion

Presentations shows updated physical Monthly


status, issues and concerns and best (RPMT
practices
Meetings)
ANA/
ANA/

Implementation issues discussed with


Monthly
key LGU officials and issues resolved

Met standards of form and substance


and signed by the Division Chief/

PAM
February
28, 2014

Met standards of form and substance


and signed by the Division Chief/

PAM June
30, 2014

In accordance with the required


template and submitted to RD/

Within 5
days after
the activity

A. STRATEGIC GOALS
B. MAIN ROLE
C. ACCOUNTABILITY

Performance Commitment
Deputy Area Coordinator

A. STRATEGIC GOALS
80% of barangays with some citizens other than public
officials participated in Municipal Level Resource Allocation
Forum
B. MAIN ROLE

Maintains and updates inventory of qualified suppliers,


technical service providers, contractors, construction
materials pricelists, survey of labor cost rates, material
testing and water quality laboratories, available equipment
and rental rates and list of existing infra projects in the
municipality;

Maintains list of SPs with prior commitment from other


funding agenies and local governments showing cost,
year of funding, agency/lgu responsible and scope of
proposed SP

Assists in tabulating the results of the 3 criteria used for


the ranking oc communities during the conduct of the
Municipal Consultation Meeting on Disaster Damage

Assists volunteers in the conduct of site validation for the


identified priority areas in the barangay and keeps a
record of the validation reports; Evaluates technical
feasibility of proposed sub-project proposals by conducting
environmental and social safeguards screening and
identifies possible geo-hazards the municipality maybe
prone to;

Prepares indicative costs of each validated proposed subproject to be used during the Municipal Forum for Resource
Allocation

7
7
56

C. ACCOUNTABILITY
Performance Contract for 2ndSemester, 2014
Feedback Report on Monitoring/TA Activities conducted at
the ACT level

Performance Commitment
Deputy Area Coordinator
Quantity
____ List of Attendees

___ Updated SI Reports

Quality
Attendance Sheet/Municipal Activity
Minutes Form identifying non-BLGU
official who attended the activeity

Time
EO
December
2014

Complete and updated inventory of


qualified suppliers, technical service
providers, contractors, construction
materials pricelists, survey of labor
EO
cost rates, material testing and water November
quality laboratories, available
2014
equipment and rental rates and list of
existing infra projects in the
municipality;

_____ List of SPs with prior Complete list of SPs with prior
funding commitment
commitment for funding

EO
November
2014

____ Matrix of Ranked


Barangays

Ranked barangays according to the


approved criteria indicating the
severity of the damage

EO
November
2014

____ ESS Validation Reports

Completely filled up ESS validation


forms

EO
December
2014

_____ SPs with indicative


costs

Municipal Forum Resoultion indicating EO


indicative costs of prioritized
December
barangays
2014

1 PC

Met standards of form and substance


and signed by the Area Coordinator/

PAM

ANA/

In accordance with the required


template and submitted to RD/

Within 5
days after
the activity

A. STRATEGIC GOALS

B. MAIN ROLE
C. ACCOUNTABILITY

Performance Commitment
Deputy Area Coordinator

A. STRATEGIC GOALS
80% of barangays with some citizens other than public
officials participated in Municipal Level Resource Allocation
Forum
B. MAIN ROLE

Maintains and updates inventory of qualified suppliers,


technical service providers, contractors, construction
materials pricelists, survey of labor cost rates, material
testing and water quality laboratories, available equipment
and rental rates and list of existing infra projects in the
municipality;

Maintains list of SPs with prior commitment from other


funding agenies and local governments showing cost,
year of funding, agency/lgu responsible and scope of
proposed SP

Assists in tabulating the results of the 3 criteria used for


the ranking oc communities during the conduct of the
Municipal Consultation Meeting on Disaster Damage

Assists volunteers in the conduct of site validation for the


identified priority areas in the barangay and keeps a
record of the validation reports; Evaluates technical
feasibility of proposed sub-project proposals by conducting
environmental and social safeguards screening and
identifies possible geo-hazards the municipality maybe
prone to;

Prepares indicative costs of each validated proposed subproject to be used during the Municipal Forum for Resource
Allocation

Supervise Technical Service providers/Municipal


Engineering Offices in the conduct of surveys and in the
preparation of plans.

Reviews/prepares detailed cost estimates and program of


work for proposed sub-projects in coordination with the
Municipal Engineering Office to ensure that Project
technical guidelines and policies are adhered to;

Provide guidance on the preparation of the environmental


management and monitoring plan and in securing
CNC/ECC from EMB
RFRs downloaded with zero defficiency
MCC

7
GPB 2013
GPB 2014
PAMANA
TOTAL
RFRs downloaded with zero defficiency
7

(Insert Modality/Cycle)
TOTAL
RFRs downloaded with zero defficiency

(Insert Modality/Cycle)
TOTAL
Reviews Change Order requests from communities and
ensures that the changes are only implemented if there is
an approved Change Order Request.
Provides guidance on the operation and maintenance of
sub-projects particularly on the technical aspect of the
structures;

7
7

final inspection of completed sub-projects with other


representatives from the community, Municipal InterAgency Committee (MIAC), S/RPMO, Commission on Audit
(COA) and other Project stakeholders;
Conducts joint inspection of on-going sub-projects with
other representatives from the community, Municipal InterAgency Committee (MIAC), S/RPMO, Commission on Audit
(COA) and other Project stakeholders;
Monthly Barangay Individual Physical Progress Report
submitted at the RPMO

Consolidated Municipal Physical Progress Reports


submitted at the RPMO

Monitors implementation of the community procurement


plan and procurement activities

Participates in sub-project meetings with BSPMCs and


provides technical inputs to resolve issues and problems
that may arise during implementation of sub-projects;

Conducts the pre-construction conference at the


community level before the actual start of construction
activities for the sub-project to review implementation
plan, task assignments, work scheduling, LCC
commitments delivery; construction forms and reports
required during construction period;

Monitors implementation of Sub-Project Safety Plan

Monitors Implementation of Environmental Monitoring


Report

Provides technical advice and assistance to community


volunteers in preparing the planned community
procurement packages.

Provides technical advice and assistance to community


volunteers in preparing the procurement action plans.

Acts as Resource Speaker during the Community


Procurement Training and provides technical advice and
assistance as needed to ensure completeness, consistency
and correctness of procurement and other technical
documents before the community submits the same to the
RPMO;

Conducts review of procurement transactions prior to the


BSPMCs' perfection of contracts with contractors and
suppliers,In coordination with the finance staff, assists the
community in providing guidance and coaching during
regular fiduciary reviews on procurement and financial
transactions.

Ensure completion of Sub-Projects according to the


approved work schedule

Assists in the compilation and review of Technical


documents to support Sub-Project Completion Report.

Prepare presentation materials and analysis on SP


Implementation Status during RPMT and other local
meetings.
In the absence of the Area Coordinator (AC) in the
municipality, temporarily acts as the Team Leader of the
ACT;
Where requested and necessary, appear in MDCs, SBs and
MATs to discuss on technical matters of the Project.

Coordinates with the LGU, particularly the LCE and ME


regarding project implementation issues.
Performs such other tasks that maybe assigned by the
Area Coordinator,Sub-Regional Project Coordinator,
Community Infrastructure Officer 3, Community
Procurement Officer, Regional Infrastructure Officer or
Regional Community Infrastructure Specialist from time to
time.

7
7
231

C. ACCOUNTABILITY
Performance Contract for 2ndSemester, 2014
Feedback Report on Monitoring/TA Activities conducted at
the ACT level

Performance Commitment
Deputy Area Coordinator
Quantity
____ List of Attendees

___ Updated SI Reports

Quality
Attendance Sheet/Municipal Activity
Minutes Form identifying non-BLGU
official who attended the activeity

Time
EO
December
2014

Complete and updated inventory of


qualified suppliers, technical service
providers, contractors, construction
materials pricelists, survey of labor
EO
cost rates, material testing and water November
quality laboratories, available
2014
equipment and rental rates and list of
existing infra projects in the
municipality;

_____ List of SPs with prior Complete list of SPs with prior
funding commitment
commitment for funding

EO
November
2014

____ Matrix of Ranked


Barangays

Ranked barangays according to the


approved criteria indicating the
severity of the damage

EO
November
2014

____ ESS Validation Reports

Completely filled up ESS validation


forms

EO
December
2014

_____ SPs with indicative


costs

Municipal Forum Resoultion indicating EO


indicative costs of prioritized
December
barangays
2014

___ Plans

KC standard compliant technical plans


EO
submitted in accordance to the
November
timeline stated in the TOR and
2014
contract

____ POWs, DCE, WS,


specifications

KC standard compliant
POW,DCE,WS,PCCP,PAP

EO
November
2014

___ EMMP, CNC, ECC

Completely filled up EMMPs

EO
November
2014

100% of 1st Tranche Grant


funds Downloaded
____ Cycle 1 RFRs
____ Cycle 2 RFRs
RFRs reviewed,submitted and
____ Cycle 3 RFRs
downloaded according to the required
service standard
_____ RFRs
_____ RFRs
_____ RFRs
_______ RFRs
RFRs reviewed,submitted and
100% of 2nd Tranche
downloaded according to the required
Grant funds Downloaded
service standard

EO
December
2014

RFRs reviewed,submitted and


100% of 3rd Tranche Grant
downloaded according to the required
funds Downloaded
service standard

____ Approved Change


Orders
___ O and M Program

ANA/
Detailed maintainance activities
reflected in the O&M program

____ Final Inspection


Report

Completely filled up Final Inspection


report reflecting planned and actual
measurements

@
Completion

____ Joint Inspection


Report,

Completely filled up Joint Inspection


Report with punch list

@90%
Progress

Completely filled up WSPPR

30th of each
month

____ Monthly Individual


Physical Progress Report

Completely filled up Municipal


4 Municipal Consolidated
Consolidated Physical and Financial
Report
Report

30th of each
month

Consolidated Procurement Completely filled up procurement


Bench Marks
benchmarks

30th of each
month

___ Minutes of Meetings

Issues fully discussed and TA provided


Monthly
to BSPMCs for their resolution.

Communities provided with


Activity Report, community
orientation on SPI,roles, forms and
SPI plan
reports.
Safety Plan and Report reflecting
Safety Plan and Monitoring
activities conducted during SPI to
Report
ensure safety.
___ Monthly EMM Report

Updated EMMPs

____ Correctly Filled Up


PCPPs

PCPPs correctly filled up as basis for


the tranching of the request for grant
funds

____ Correctly Filled Up


PAPs

PAPs prepared according to the


standards of the project

Activity Report

Community Volunteers able to


comprehend and demonstrate
knowledge in community based
procurement

Consolidated CF
Procurement Redflag
Report

Procurement activities conducted


according to Community Based
Procurement Manual

_____ WSPPR reflecting


100% P.A.

Sub-Projects completed according to


plans and specifications

____ SPCRs with complete Completely filled up SPCRs with


attachments
complete attachments
____ Reports

1 month
after SP
Completion

Presentations shows updated physical Monthly


status, issues and concerns and best (RPMT
practices
Meetings)
ANA/
ANA/

____ Issue Reports Duly


Received by LGU

Implementation issues discussed with


Monthly
key LGU officials and issues resolved

ANA/

1 PC

Met standards of form and substance


and signed by the Area Coordinator/

PAM

ANA/

In accordance with the required


template and submitted to RD/

Within 5
days after
the activity

A. STRATEGIC GOALS
B. MAIN ROLE
C. ACCOUNTABILITY

Performance Commitment
2nd Semester CY 2014
Name: Kerwin Jay C. Condor
Position: Deputy Area Coordinator

A. STRATEGIC GOALS
Pantawid HH's beneficiaries in covered municipalities engaged in CEAC
activities

Quantity
1 database per month with
MOV's
1 database per month with
MOV's

B. MAIN ROLE

Maintains and updates inventory of qualified suppliers, technical service


providers, contractors, construction materials pricelists, survey of labor
cost rates, material testing and water quality laboratories, available
equipment and rental rates and list of existing infra projects in the
municipality;

1 Updated SI Reports

Maintains list of SPs with prior commitment from other funding agenies
and local governments showing cost, year of funding, agency/lgu
responsible and scope of proposed SP

1 List of SPs with prior funding


commitment

Assists in tabulating the results of the 3 criteria used for the ranking oc
communities during the conduct of the Municipal Consultation Meeting
on Disaster Damage

1 Matrix of Ranked Barangays

Assists volunteers in the conduct of site validation for the identified


priority areas in the barangay and keeps a record of the validation
reports; Evaluates technical feasibility of proposed sub-project proposals
by conducting environmental and social safeguards screening and
identifies possible geo-hazards the municipality maybe prone to;

Prepares indicative costs of each validated proposed sub-project to be


used during the Municipal Forum for Resource Allocation

18 SPs with indicative costs

Supervise Technical Service providers/Municipal Engineering Offices in


the conduct of surveys and in the preparation of plans.

2 Plans (2 GPB sub-projects)

Reviews/prepares detailed cost estimates and program of work for


proposed sub-projects in coordination with the Municipal Engineering
Office to ensure that Project technical guidelines and policies are
adhered to;

2 POWs, DCE, WS, specifications


(2 GPB sub-projects)

Provide guidance on the preparation of the environmental management


and monitoring plan and in securing CNC/ECC from EMB
RFRs downloaded with zero defficiency

18 ESS Validation Reports

2 EMMP, CNC, ECC (2 GPB subprojects)


100% of 1st Tranche Grant funds
Downloaded

GPB
TOTAL

2 RFRs
2 RFRs

C. ACCOUNTABILITY
6 minutes & AS
ACT-MCT Meetings
Individual Performance Contract Review for 2nd Semester, 2014
Feedback Report on Monitoring/TA Activities conducted at the ACT level

Admin Concern

Prepared by:
KERWIN JAY C. CONDOR
Deputy Area Coordinator
Date
Reviewed & Noted by:
MAJALLEL T. LLORIN
Area Coordinator
Date:

1 IPCR
ANA

6 DTR's with accomplishment


report & 3 TEV claims

itment

2014
Division/Unit/Section: KALAHI-CIDSS NCDDP

Quality
30% of Pantawid household beneficiaries in
covered municipalities are engaged in CEAC
activities
80% of barangays with some citizens, other
than public officials participated in municipallevel resource allocation forums

Time
Every 5th of
the suceeding
month
Every 5th of
the suceeding
month

Complete and updated inventory of qualified


suppliers, technical service providers,
contractors, construction materials pricelists,
EO November
survey of labor cost rates, material testing and
2014
water quality laboratories, available equipment
and rental rates and list of existing infra
projects in the municipality;

Complete list of SPs with prior commitment for EO November


funding
2014

Ranked barangays according to the approved


criteria indicating the severity of the damage

EO November
2014

Completely filled up ESS validation forms

EO December
2014

Municipal Forum Resoultion indicating


indicative costs of prioritized barangays

EO December
2014

KC standard compliant technical plans


EO November
submitted in accordance to the timeline stated
2014
in the TOR and contract

KC standard compliant POW,DCE,WS,PCCP,PAP

EO November
2014

Completely filled up EMMPs

EO November
2014

RFRs reviewed,submitted and downloaded


according to the required service standard

EO December
2014

RFRs reviewed,submitted and downloaded


according to the required service standard

EO December
2014

Meetings attended as reflected in the


minutes/attendance sheet; participated in the
discussion

Twice every
month
(OctoberDecember)

IPCR for 2nd semester evaluated by AC &


submitted to RPMO

15-Dec-14

In accordance with the required template and


submitted to RD/

Within 5 days
after the
activity

Submit zero deficiency DTR's with


Accomplishment Report and TEV's.

Every 18th day


of the month
and 3rd day for
16-31
Attendance
and TEV's

Concurred by:
CORAZON B. MIA
Asst. Regional Director for Operations
Date:

ARNEL B. GARCIA, CESO II


Regional Director
Date:

Potrebbero piacerti anche