SEC COA
Substation No.
S/S : 8515
Contractor
DELTA Co.
Contract No.
Sheet No.
SUD1-03-001
Page 1 of 6
HICO
2. Mechanical Check And Visual Inspection: As per TCS P105 Item no 4.1
Item
Description
Check tightness of all connections
1
Inspect for physical damage / defects
2
Panel condition, cleanliness, organization, labeling, readiness for service, panel
3
doors, handles...etc
4
CT shorting checked
Indications checked
5
6
Check the ferrules as per specification
Panel Earthing checked
7
Confirm that each panel has been properly secured to the floor in its final service
8
location.
Confirm that panels are constructed and wired as per SEC relevant
9
specification.
10
Check case cover and gasket for proper seal against dust.
Check all installed equipment nameplate information for compliance to
11
approved drawings and equipment /material lists.
For all internal and external panel wiring, confirm that all screw terminations are
tight and that crimp connectors are firmly secured to the wire and to the
12
termination point. Ensure that no part of the wire is bent
at the termination point. Check Ferrules.
Check that panel equipment is mounted securely and protected against
13
mal operation due to vibration, shock, etc
Use of ring type terminals for wire termination for current circuit wires.
14
15
16
Checked
Yes
N/A
Yes
N/A
Yes
N/A
Yes
Yes
Yes
Yes
Yes
N/A
N/A
N/A
N/A
N/A
Yes
N/A
Yes
Yes
N/A
N/A
Yes
N/A
Yes
N/A
Yes
N/A
Yes
N/A
Yes
N/A
3. Electrical Tests
Item
1
2
3
4
5
Description
Insulation Resistance Test report of all wires to be submitted by the
contractor prior witnessing and made available
Dc power/ control supply checked.
AC Power/ Control supply checked.
Circuit Breaker, Disconnector and Earth Switch Open/Close status
checked
All CBS, DSWs and ESWs should be tested before starting function
Check
ENG/MOHAMED AMIN
Yes
Checked
N/A
Yes
Yes
Yes
N/A
N/A
N/A
Yes
N/A
Date of Test
ENG/MOHAMED HAIDER
10/06/2014
Signature:
Control/Record No.: R/PP/TC/1.084
Customer
SEC COA
Substation No.
S/S : 8515
Contractor
DELTA Co.
Sl no.
Contract No.
Sheet No.
Page 2 of 6
Description
st
1
2
3
4
5
SUD1-03-001
CB blocked status
Closing
Tripping
5.7 bar
5.5 bar
6.7 bar
20 SEC
----
Remarks
OK
OK
OK
OK
OK
136
Operation
Command
Open/
close
Open/
close
Close
130
Open
131A
131B
Open/
close
Condition
Remarks
Service
OK
Test
OK
Service
OK
Test
OK
Service
OK
Test
OK
Service
OK
Test
OK
LCC
CR
SAS
LCC
CR
SAS
Indication
ENG/MOHAMED AMIN
OK
independent
condition
OK
Date of Test
ENG/MOHAMED HAIDER
10/06/2014
Signature:
Control/Record No.: R/PP/TC/1.084
Customer
SEC COA
Substation No.
S/S : 8515
Contractor
DELTA Co.
Contract No.
SUD1-03-001
Sheet No.
Page 3 of 6
Operation
Condition
Close/open
Test
Close*
Service
Trip
Test & Service
Equipments
Ds 134 & 136
DS 134 & 136
Protection Relays
Status
Fo
FC
Operated
Remarks
OK
OK
As Per Sch Dwg
Condition
Close/open
Test
Close/open
Service
Equipments
Es 131A & 141A
ES 131B
CB130
ES 131A, 131B & 141A
Status
FC
FO
O
FO
Remarks
OK
OK
Condition
1
Close/open
Test
Close/open
Service
Equipments
ES 131B & 261A
ES 131A
Status
FC
FO
CB130
`ES 131A, 131B & 261A
O
FO
Remarks
OK
OK
.
Test Performed by:
Name:
ENG/MOHAMED AMIN
Date of Test
ENG/MOHAMED HAIDER
10/06/2014
Signature:
Control/Record No.: R/PP/TC/1.084
Customer
SEC COA
Substation No.
S/S : 8515
Contractor
DELTA Co.
Contract No.
Sheet No.
SUD1-03-001
Page 4 of 6
Operation
Close/open
Condition
Service
Equipments
DS 134 & 136
Status
FO
Remarks
OK
Condition
Service
Equipments
DS 134 & 136
Status
FO
Remarks
OK
Note:
FO: fully open
O: open
ENG/MOHAMED AMIN
Date of Test
ENG/MOHAMED HAIDER
10/06/2014
Signature:
Control/Record No.: R/PP/TC/1.084
Customer
SEC COA
Substation No.
S/S : 8515
Contractor
DELTA Co.
ENG/MOHAMED AMIN
Sheet No.
SUD1-03-001
Page 5 of 6
Status
OK
OK
OK
OK
OK
no.
1
2
3
4
5
Contract No.
Date of Test
ENG/MOHAMED HAIDER
10/06/2014
Signature:
Control/Record No.: R/PP/TC/1.084
Customer
SEC COA
Substation No.
S/S : 8515
Contractor
DELTA Co.
Contract No.
Projects6& Supplies
CBCo.
TRIP-2
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
Channel
no.
38
39
40
41
42
43
SUPPLY FAIL
INDICATION & GAS ALARM SUPPLY FAIL
LOAD TRANSFER CONTACT MULTIPLICATION RELAY FAIL
ALARM DC SUPPLY FAIL
ALARM AC SUPPLY FAIL
BCU SUPPLY FAIL
LCC AC SUPPLY FAIL
DS SWITCHING INCOMPLETE
ES SWITCHING INCOMPLETE
CB MOTOR RUNTIME EXCEED &SPRING UNCHARGE
CB OPERATING MECHANISM FAIL
DS/ES MANUAL MODE
SPARE
VT ISOLATOR(194A) OPEN
VT ISOLATOR(194A) SWITCHING INCOMPLETE
VT ISOLATOR(226A) OPEN
VT ISOLATOR(226A) SWITCHING INCOMPLETE
SPARE
SPARE
COMP.G130-1 SF6 GAS PRESSURE LOW STAGE-1
COMP.G130-1 SF6 GAS PRESSURE LOW STAGE-2
COMP.G130-2 SF6 GAS PRESSURE LOW STAGE-1
COMP.G130-2 SF6 GAS PRESSURE LOW STAGE-2
COMP.G130-3 SF6 GAS PRESSURE LOW STAGE-1
COMP.G130-3 SF6 GAS PRESSURE LOW STAGE-2
COMP.G130-5 SF6 GAS PRESSURE LOW STAGE-1
COMP.G130-5 SF6 GAS PRESSURE LOW STAGE-2
COMP.G130-6 SF6 GAS PRESSURE LOW STAGE-1
COMP.G130-6 SF6 GAS PRESSURE LOW STAGE-2
COMP.G130-7 SF6 GAS PRESSURE LOW STAGE-1
COMP.G130-7 SF6 GAS PRESSURE LOW STAGE-2
COMP.G130-1 SF6 GAS PRESSURE HIGH
Events
SPARE
COMP.G130-2 SF6 GAS PRESSURE HIGH
SPARE
COMP.G130-3 SF6 GAS PRESSURE HIGH
SPARE
COMP.G130-5 SF6 GAS PRESSURE HIGH
Test Performed by:
Name:
Sheet No.
ENG/MOHAMED AMIN
SUD1-03-001
Page 6 of 6
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
Status
OK
OK
OK
OK
OK
OK
Date of Test
ENG/MOHAMED HAIDER
10/06/2014
Signature:
Control/Record No.: R/PP/TC/1.084
Customer
SEC COA
Substation No.
S/S : 8515
Contractor
DELTA Co.
Contract No.
Projects
44& Supplies
CBCo.
SF6
45
46
47
48
49
50
51
52
53
54
55
56
Sheet No.
SUD1-03-001
Page 7 of 6
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
Note:
All interlock points were checked according to interlocking conditions table which is approved
by system Operation department
ENG/MOHAMED AMIN
Date of Test
ENG/MOHAMED HAIDER
10/06/2014
Signature:
Control/Record No.: R/PP/TC/1.084