Federal Register / Vol. 70, No.

170 / Friday, September 2, 2005 / Notices 52373

Online service, please e-mail and the ‘‘unexceptional nature of this FPL Energy MH 50, LP; FPL Energy New
FERCOnlineSupport@ferc.gov, or call request.’’ Motion at 2. Mexico Wind, LLC; FPL Energy North
(866) 208–3676 (toll free). For TTY, call 2. Upon consideration, notice is Dakota Wind, LLC; FPL Energy North
(202) 502–8659. hereby given that an extension of time Dakota Wind II, LLC; FPL Energy
to submit cost filings to the Commission Oklahoma Wind, LLC; FPL Energy
Magalie R. Salas,
is granted to and including September Power Marketing, Inc.; FPL Energy
Secretary. 14, 2005, as requested. Seabrook, LLC; FPL Energy Sooner
[FR Doc. E5–4810 Filed 9–1–05; 8:45 am] Wind, LLC; FPL Energy South Dakota
Magalie R. Salas,
BILLING CODE 6717–01–P Wind, LLC; FPL Energy Vansycle, LLC;
Secretary.
FPL Energy Wyman, LLC; FPL Energy
[FR Doc. E5–4813 Filed 9–1–05; 8:45 am]
Wyman IV, LLC; FPL Energy Wyoming,
DEPARTMENT OF ENERGY BILLING CODE 6717–01–P
LLC; FPLE Rhode Island State Energy,
Federal Energy Regulatory L.P.; Gray County Wind Energy, LLC;
Commission Hawkeye Power Partners, LLC; High
DEPARTMENT OF ENERGY
Winds, LLC; Jamaica Bay Peaking
[Docket Nos. EL00–95–000 and EL00–98– Federal Energy Regulatory Facility, LLC; Lake Benton Power
000] Commission Partners II, LLC; Meyersdale
Windpower LLC; Mill Run Windpower,
San Diego Gas & Electric Company, Combined Notice of Filings #1 LLC; North Jersey Energy Associates,
Complainant, v. Sellers of Energy and L.P.; Northeast Energy Associates, a
Ancillary Services Into Markets August 29, 2005. Limited Partnership; Pennsylvania
Operated by the California Take notice that the Commission Windfarms, Inc.; POSDEF Power
Independent System Operator and the received the following electric rate Company, LP; Somerset Windpower,
California Power Exchange, filings. LLC; Waymart Wind Farm, L.P., and
Respondents; Investigation of Docket Numbers: ER97–1781–001. Florida Power & Light Company.
Practices of the California Independent Applicants: Strategic Power
Description: The above-referenced
System Operator and the California Management Inc.
Description: Strategic Power applicants submit revised tariff sheets to
Power Exchange; Notice Granting reflect a correction to the Market
Extension of Time Management Inc., in compliance with
the Commission’s order issued 5/31/05 Behavior Rules.
Filed Date: 08/12/2005.
August 26, 2005. (112 FERC ¶ 61,175 (2005)), submits
Accession Number: 20050824–0224.
1. On August 25, 2005, IDACORP statement indicating that it is wholly
Comment Date: 5 p.m. eastern time on
Energy L.P. (IDACORP), on behalf of ‘‘a without market power and submits
Friday, September 8, 2005.
substantial number’’ of participants revisions to its market-based rate tariff.
attending the August 25, 2005 Technical Filed Date: 08/23/2005. Docket Numbers: ER04–691–060;
Conference 1 held in the above- Accession Number: 20050825–0232. EL04–104–057; ER04–106–015.
captioned proceeding, filed a Joint Comment Date: 5 p.m. eastern time on Applicant: Midwest Independent
Motion for Adjustment to Filing Date for Tuesday, September 13, 2005. Transmission System Operator, Inc.
Docket Numbers: ER02–2559–005; Description: Midwest Independent
Cost Filings (Motion). The August 8,
2005 Order on Cost Recovery, Revising ER01–1071–006; ER02–669–006; ER02– Transmission System Operator, Inc.
2018–006; ER01–2074–006; ER05–222– submits proposed revisions to its Open
Procedural Schedule for Refunds, and
002; ER00–2391–006; ER98–2494–010; Acess Transmission and Energy Markets
Establishing Technical Conference 2
requires cost filings to be filed ‘‘no later ER00–3068–006; ER05–487–001; ER04– Tariff, FERC Electric Tariff, Third
127–003; ER03–34–005; ER98–3511– Revised Volume 1 in compliance with
than September 10, 2005.’’ 3 Movants
010; ER02–1903–005; ER99–2917–007; the Commission’s Orders issued 6/21/05
request an extension of the cost filing
deadline until September 14, 2005, to ER03–179–006; ER03–1104–002; ER03– (111 FERC ¶ 61,448 (2005)) and 8/6/04
take into account the guidance provided 1105–002; ER03–1332–002; ER98–3566– (108 FERC ¶ 61,163 (2004)).
013; ER02–1838–006; ER03–1333–003; Filed Date: 08/19/2005.
by Staff at the Technical Conference.
ER03–1103–002; ER01–838–006; ER98– Accession Number: 20050823–0143.
Movants further request action on the
3563–010; ER98–3564–010; ER03–1025– Comment Date: 5 p.m. eastern time on
Motion before receipt of any answer to
003; ER02–2120–004; ER01–1972–006; Friday, August 26, 2005.
the motion, given the short time frame
for preparing cost filing submissions, ER98–2076–009; ER03–155–005; ER03– Docket Number: ER05–1194–001.
623–006; ER98–4222–005; ER04–290– Applicant: Yaka Energy LLC.
1 IDACORP states that parties joining in or not 001; ER01–1710–007; ER04–187–003; Description: Yaka Energy LLC submits
opposing this request include: Avista Energy, Inc., ER05–236–004; ER02–2166–005; ER04– an Amendment to Petition for
BP Energy Company, California PX, Constellation 947–004; ER01–2139–008; ER03–1375– Acceptance of Initial Rate Schedule,
Energy Commodities Group, Inc., Coral Power, 002; ER97–3359–009. Waivers, and Blanket Authority filed on
L.L.C., IDACORP Energy, L.P., NEGT Energy 7/5/05 in Docket No. ER005–1194–000.
Trading-Power, L.P., Portland General Electric
Applicants: Backbone Mountain
Company, Powerex Corp., Public Service Company Windpower LLC; Badger Windpower, Filed Date: 08/23/2005.
of New Mexico, Puget Sound Energy, Inc., Sempra LLC; Bayswater Peaking Facility, LLC; Accession Number: 20050825–0231.
Energy Trading Corp., TransAlta Energy Marketing Blythe Energy, LLC; Calhoun Power Comment Date: 5 p.m. eastern time on
(CA) Inc., TransAlta Energy Marketing (US) Inc., Tuesday, September 6, 2005.
Golden Energy Services, APX, and AEPCO
Company I, LLC; Diablo Winds, LLC;
(collectively, ‘‘Movants’’). Motion at 1. IDACORP Doswell Limited Partnership; ESI Docket Number: ER05–1215–002.
states that it makes no representations on behalf of Vansycle Partners, L.P.; FPL Energy Applicant: Wholesale Electric Trading
the California Parties, but is authorized by all other Cape, LLC; FPL Energy Cowboy Wind, LP.
parties attending the August 25, 2005 Technical
Conference to request this extension.
LLC; FPL Energy Green Power Wind, Description: Wholesale Electric
2 San Diego Gas & Electric Co. v. Sellers of Energy LLC; FPL Energy Hancock County Trading LP submits an amendment to its
and Ancillary Services, 112 FERC ¶ 61,176 (2005). Wind, LLC; FPL Energy Maine Hydro petition for acceptance of initial rate
3 Id. at Ordering Paragraph (D). LLC; FPL Energy Marcus Hook, L.P.; schedule, waivers and blanket authority

VerDate Aug<18>2005 18:00 Sep 01, 2005 Jkt 205001 PO 00000 Frm 00013 Fmt 4703 Sfmt 4703 E:\FR\FM\02SEN1.SGM 02SEN1
52374 Federal Register / Vol. 70, No. 170 / Friday, September 2, 2005 / Notices

filed 7/15/05, as amended on 8/15/05 in Description: Southern California eLibrary system by clicking on the
Docket Nos. ER05–1215–000 and 001. Edison Company submits revised rate appropriate link in the above list. They
Filed Date: 08/24/2005. sheets to the Amended and Restated are also available for review in the
Accession Number: 20050825–0230. Ormond Beach Generating Station Commission’s Public Reference Room in
Comment Date: 5 p.m. eastern time on Radial Lines Agreement between Washington, DC. There is an
Wednesday, September 14, 2005. Southern California Edison Company eSubscription link on the Web site that
Docket Number: ER05–1378–000. and Reliant Energy Ormond Beach, enables subscribers to receive e-mail
Applicant: American Electric Power L.L.C. notification when a document is added
Service Company. Filed Date: 08/24/2005. to a subscribed docket(s). For assistance
Description: American Electric Power Accession Number: 20050825–0229. with any FERC Online service, please e-
Service Corporation, as agent for its Comment Date: 5 p.m. eastern time on mail FERCOnlineSupport@ferc.gov or
affiliate Indiana Michigan Power Wednesday, September 14, 2005. call (866) 208–3676 (toll free). For TTY,
Company, submits a revision to the Docket Number: ER05–1389–000. call (202) 502–8659.
Interconnection and Local Delivery Applicant: San Juan Mesa Wind Linda Mitry,
Service Agreement No. 1262 between Project, LLC. Deputy Secretary.
Wabash Valley Power Association and Description: San Juan Mesa Wind
American Electric Power Service [FR Doc. E5–4809 Filed 9–1–05; 8:45 am]
Project, LLC submits application for
Company. market-based rate authorization, certain BILLING CODE 6717–01–P
Filed Date: 08/19/2005. waivers and blanket authorizations and
Accession Number: 20050824–0167. request for expedited action.
Comment Date: 5 p.m. eastern time on DEPARTMENT OF ENERGY
Filed Date: 08/24/2005.
Friday, September 9, 2005. Accession Number: 20050826–0193. Federal Energy Regulatory
Docket Number: ER05–1384–000. Comment Date: 5 p.m. eastern time on Commission
Applicant: ISO New England Inc.; Wednesday, September 14, 2005.
Northeast Utilities Service Company. Any person desiring to intervene or to
Description: ISO New England Inc. [Docket No. CP05–92–000]
protest in any of the above proceedings
(ISO–NE) and Northeast Utilities must file in accordance with Rules 211 Liberty Gas Storage, L.L.C.; Notice of
Company, on behalf of its affiliate the and 214 of the Commission’s Rules of Availability of the Environmental
Connecticut Light and Power Company Practice and Procedure (18 CFR 385.211 Assessment for the Proposed Liberty
(CL&P), submit the executed Standard and 385.214) on or before 5 p.m. eastern Gas Storage Project
Large Generator Interconnection time on the specified comment date. It
Agreement by and among ISO-NE, CL&P is not necessary to separately intervene August 26, 2005.
and the University of Connecticut. again in a subdocket related to a The staff of the Federal Energy
Filed Date: 08/24/2005. compliance filing if you have previously Regulatory Commission (FERC or
Accession Number: 20050825–0234. intervened in the same docket. Protests Commission) has prepared an
Comment Date: 5 p.m. eastern time on will be considered by the Commission environmental assessment (EA) on the
Wednesday, September 14, 2005. in determining the appropriate action to natural gas pipeline facilities proposed
Docket Number: ER05–1385–000. be taken, but will not serve to make by Liberty Gas Storage, L.L.C. (Liberty
Applicant: Idaho Power Company. protestants parties to the proceeding. Gas Storage) in the above-referenced
Description: Idaho Power Company Anyone filing a motion to intervene or docket.
submits revised tariff sheets to be protest must serve a copy of that The EA was prepared to satisfy the
incorporated into Attachment J to its document on the Applicant. In reference requirements of the National
Open Access Transmission Tariff, FERC to filings initiating a new proceeding, Environmental Policy Act. The staff
Electric Tariff First Revised Volume No. interventions or protests submitted on concludes that approval of the proposed
5. or before the comment deadline need
Filed Date: 08/23/2005. project, with appropriate mitigating
not be served on persons other than the measures, would not constitute a major
Accession Number: 20050825–0233. Applicant.
Comment Date: 5 p.m. eastern time on Federal action significantly affecting the
The Commission encourages quality of the human environment.
Tuesday, September 13, 2005. electronic submission of protests and
Docket Number: ER05–1386–000. interventions in lieu of paper, using the The EA assesses the potential
Applicant: Central Hudson Gas & FERC Online links at http:// environmental effects of the
Electric Corporation. www.ferc.gov. To facilitate electronic construction and operation of the
Description: Central Hudson Gas & service, persons with Internet access proposed Liberty Gas Storage Project
Electric Corporation (Central Hudson) who will eFile a document and/or be including:
submits Fifth Revised Sheet Nos. 9, 10, listed as a contact for an intervenor • Two existing brine solution mining
11, & 12 to FERC Rate Schedule No. 202, must create and validate an caverns owned by PPG Industries, Inc.
which set forth the terms and changes eRegistration account using the (PPG) (PPG Cavern 15 and PPG Cavern
for substation service provided by eRegistration link. Select the eFiling 17) that would be converted to natural
Central Hudson to Consolidated Edison link to log on and submit the gas storage caverns capable of storing
Company of New York, Inc. under the intervention or protests. 23.4 billion cubic feet (Bcf) of natural
Rock Tavern Substation Agreement. Persons unable to file electronically gas; and
Filed Date: 08/24/2005. should submit an original and 14 copies • A 1.3-mile-long 20-inch-diameter
Accession Number: 20050825–0235. of the intervention or protest to the pipeline with a maximum allowable
Comment Date: 5 p.m. eastern time on Federal Energy Regulatory Commission, operating pressure (MAOP) of 3,280
Wednesday, September 14, 2005. 888 First St., NE., Washington, DC pounds per square inch (psig) that
Docket Number: ER05–1387–000. 20426. would connect the natural gas storage
Applicant: Southern California Edison The filings in the above proceedings cavern wells to the new On-site
Company. are accessible in the Commission’s Compressor Station.

VerDate Aug<18>2005 18:00 Sep 01, 2005 Jkt 205001 PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 E:\FR\FM\02SEN1.SGM 02SEN1

Potrebbero piacerti anche