Item

Reference /
Queries / Comments
No.
Sheet No.
PLUMBING
GENERAL COMMENTS
1.
Please provide Sheet No: P3-02 ( Underground Domestic Water Tank and Pump
Room Residential & Retail (Section))
2.
Please check the locations of Pipe Chase, Water Closet & Bath Tub which are in
conflict with the Concrete Girders.
BASEMENT 06
3.
Typographical error in the designation of Elevator Sump Pit: ESP-1 & ESP-2 should
be ESP-11 & ESP-12.
P1-01
4.
Please verify if we need to provide stub-outs for sump pumps located at elevator pit.
5.
BASEMENT 05
6.

Please verify the position of the HB 32mm CWDF located at Gridline D/8.

Please coordinate with GF&P the column located along Gridline F/4-5 which is
reflected in the Architectural Plan but not in the Structural Plan.
7.
Please coordinate with GF&P the open space below located at Gridline A/1 which is
reflected in the Structural Plan but not in the Architectural Plan.
8.
Please coordinate with GF&P the shaft location at Gridline B-C. There is a girder
S-WGP1-501 passing along the shaft location.
9.
Kindly check: B5G-8A, B5G-17A, B5G-42A, B5G-49A & B5G-61A reflected in the plan
but not shown in the Schedule of Concrete Girders.
10.
Kindly check: B5S-13A & B5S-14A shown in the plan but not reflected in the Schedule
of Slabs.
11.
Kindly check: B5S-4A not shown in the plan but reflected in the Schedule of Slabs.
BASEMENT 04
12.
Kindly check the missing column located at Gridline F/5 which is reflected in the
Structural Plan but not in the Architectural Plan.
13.
Please coordinate with GF&P the column located along Gridline F/4-5 which is
reflected in the Architectural Plan but not in the Structural Plan.
14.
Please coordinate with GF&P the open space below located at Gridline A/1 which is
reflected in the Structural Plan but not in the Architectural Plan.
15. S-WGP1-502 Please coordinate with GF&P the shaft location at Gridline B-C. There is a girder
passing along the shaft location.
16.
Kindly check: B4G-8A, B4G-17A, B4G-42A, B4G-49A, & B4G-61A shown in the plan
but not reflected in the Schedule of Concrete Girders.
17.
Kindly check: B4S-13A & B4S-14A shown in the plan but not reflected in the Schedule
of Slabs.
18.
Kindly check: B4S-4A not shown in the plan but reflected in the Schedule of Slabs.
BASEMENT 03
19.
Please coordinate with GF&P the column located along Gridline F/4-5 which is
reflected in the Architectural Plan but not in the Structural Plan.
20.
Please coordinate with GF&P the open space below located at Gridline A/1 which is
S-WGP1-503
reflected in the Structural Plan but not in the Architectural Plan.
21.
Please coordinate with GF&P the shaft location at Gridline B-C. There is a girder
passing along the shaft location.
22.
Kindly check: B3G-8A, B3G-17A, B3G-42A, B3G-49A, B3G-61A, B3G-88A, B3G105A, B3CG-1, B3CG-2 reflected in the plan but not shown in the Schedule of

Item
No.

Reference /
Sheet No.

Queries / Comments

Concrete Girders.
23. S-WGP1-503 Kindly check: B3S-13A & B3S-14A shown in the plan but not reflected in the Schedule
of Slabs.
24.
Kindly check: B3S-4A not shown in the plan but reflected in the Schedule of Slabs.
25.
Kindly check: B3B-41A shown in the plan but reflected in the Schedule of Beams.
BASEMENT 02
26.
Please coordinate with GF&P the open space below located at Gridline A/1 which is
reflected in the Structural Plan but not in the Architectural Plan.
27.
Please coordinate with GF&P the shaft location at Gridline B-C. There is a girder
passing along the shaft location.
28.
Kindly check: B2G-8A, B2G-17A, B2G-42A, B2G-49A, B2G-61A, B2G-88A, B2GS-WGP1- 504 105A, B2CG-1, B2CG-2 shown in the plan but not reflected in the Schedule of
Concrete Girders.
29.
Kindly check: B2S-13A & B2S-14A shown in the plan but not reflected in the Schedule
of Slabs.
30.
Kindly check: B2S-4A not shown in the plan but reflected in the Schedule of Slabs.
31.
Kindly check: B2B-41A shown in the plan but reflected in the Schedule of Beams.
BASEMENT 01
32.
Please coordinate with GF&P the open space below located at Gridline A/1 which is
reflected in the Structural Plan but not in the Architectural Plan.
33.
Please coordinate with GF&P the shaft location at Gridline B-C. There is a girder
passing along the shaft location.
34.
Please coordinate with GF&P about the missing columns located at Gridline E/7, E/8
& E/9 which are reflected in the Structural Plan but not in the Architectural Plan.
Kindly check the missing column located along Gridline F/4-5 which is reflected in
35. S-WGP1-505 the Architectural Plan but not in the Structural Plan.
36.
Please coordinate with GF&P the missing column located at Gridline F/8 which is
reflected in the Structural Plan but not in the Architectural Plan.
37.
Kindly check: B1G-8A, B1G-17A, B1G-42A, B1G-49A, B1G-61A, B1G-88A, B1G105A, B1CG-1, B1CG-2 shown in the plan but not reflected in the Schedule of
Concrete Girders.
38.
Kindly check: B1S-13A & B1S-14A shown in the plan but not reflected in the Schedule
of Slabs.
39.
Kindly check: B1S-4A not shown in the plan but reflected in the Schedule of Slabs.
40.
Kindly check: B1B-41A shown in the plan but reflected in the Schedule of Beams.
41.
Kindly check: RMPB-8 shown in the plan but not reflected in the Schedule of Beams.
GROUND FLOOR
42.
Please coordinate with GF&P the columns located at Gridline A/9-10. In the Structural
Plan, the column made an offset to the right along Gridline A/9-10 while in the
Architectural Plan, the columns are directly located at Gridline A/9-10.
43.

Kindly check: GG-23A, GG-29A, GG-38A, GG-46A, GG-54A, GG-67A, GG-75A &
GG124 to GG146 shown in the plan but not reflected in the Schedule of Concrete
Girders.
S-WGP1-506
44.
Kindly check: No girder designation on Gridline E/8-9.
45.
Kindy check: Designation of all beams in the floor plan. Also, GB-52 to GB-92 shown
in the plan but not reflected in the Schedule of Concrete Beams.
46.
Kindly check: GS-3A, GS-3B, GS-8A, GS-10A, GS-10B, GS-11A, GS-12A, GS-13A,
GS-13B, GS-14A, GS-14B, GS-22B, GS-49 not shown in the plan but reflected in the
Schedule of Slabs.
47.
Kindly check: GS-18, GS-36, GS-37, GS-45, GS-46, GS-47, GS-48 not shown in the
plan but reflected in the Schedule of Slabs.
SECOND FLOOR
48.
Please coordinate with GF&P the columns located at Gridline A/9-10. In the Structural
Plan, the column made an offset to the right along Gridline A/9-10 while in the
Architectural Plan, the columns are directly located at Gridline A/9-10.

Item
Reference /
No.
Sheet No.
49.

Queries / Comments

Kindly check: 2CG-2, 2CG-5, 2CG-7, 2CG-8, 2G-3, 2G-4, 2G-9, 2G-10, 2G-11 to 2G15, 2G-19 to 2G-40, 2G-44 & 2G-45 not reflected in the plan but shown in the
Schedule of Concrete Girders.
50. S-WGP1-507 Kindly check: 2B-43 shown in the plan but not reflected in the Schedule of Concrete
Beams.
51.
Kindly check: 2B-1 to 2B-19, 2CB-1, 2CB-2, 2CB-3 & 2CB-6 not shown in the plan but
reflected in the Schedule of Concrete Beams.
52.
Kindly check: 2S-1 to 2S-8, 2S-17, 2S-18, 2S-26, 2S-35 to 2S-38 not shown in the
plan but reflected in the Schedule of Slabs.
53.
Kindly check: 2CS-1 shown in the plan but not reflected in the Schedule of Slabs.
THIRD FLOOR
Please coordinate with GF&P the columns located at Gridline A/9-10. In the Structural
54.
Plan, the column made an offset to the right along Gridline A/9-10 while in the
Architectural Plan, the columns are directly located at Gridline A/9-10.
Kindly check: 3CG-2, 3CG-5, 3CG-7, 3CG-8, 3G-3, 3G-4, 3G-9, 3G-10, 3G-11 to 3G55.
15, 3G-19 to 3G-40, 3G-44 & 3G-45 not reflected in the plan but shown in the
Schedule of Concrete Girders.
S-WGP1-508 Kindly check: 3B-43 shown in the plan but not reflected in the Schedule of Concrete
56.
Beams.
Kindly check: 3B-1 to 3B-19, 3CB-1, 3CB-2, 3CB-3 & 3CB-6 not shown in the plan but
57.
reflected in the Schedule of Concrete Beams.
Kindly check: 3S-1 to 3S-8, 3S-17, 3S-18, 3S-26, 3S-35 to 3S-38 not shown in the
58.
plan but reflected in the Schedule of Slabs.
59.
Kindly check: 3CS-1 shown in the plan but not reflected in the Schedule of Slabs.
FIFTH FLOOR
Please coordinate with GF&P the columns located at Gridline A/9-10. In the Structural
Plan, the column made an offset to the right along Gridline A/9-10 while in the
60.
Architectural Plan, the columns are directly located at Gridline A/9-10.
Please coordinate with GF&P about the missing columns located at Gridline F/4 &F/6
61.
which are reflected in the Structural Plan but not in the Architectural Plan.
Kindly check: 5CG-2, 5CG-5, 5CG-7, 5CG-8, 5G-3, 5G-4, 5G-9, 5G-10, 5G-11 to 5G62.
15, 5G-19 to 5G-40, 5G-44 & 5G-45 not reflected in the plan but shown in the
S-WGP1-509 Schedule of Concrete Girders.
Kindly check: 5B-43 shown in the plan but not reflected in the Schedule of Concrete
63.
Beams.
Kindly check: 5B-1 to 5B-19, 5CB-1, 5CB-2, 5CB-3 & 5CB-6 not shown in the plan but
64.
reflected in the Schedule of Concrete Beams.
Kindly check: 5S-1 to 5S-8, 5S-17, 5S-18, 5S-26, 5S-35 to 5S-38 not shown in the
65.
plan but reflected in the Schedule of Slabs.
66.
Kindly check: 5CS-1 shown in the plan but not reflected in the Schedule of Slabs.
SIXTH FLOOR
Please coordinate with GF&P the columns located at Gridline A/9-10. In the Structural
67.
Plan, the column made an offset to the right along Gridline A/9-10 while in the
Architectural Plan, the columns are directly located at Gridline A/9-10
Please coordinate with GF&P about the missing columns located at Gridline F/4 &F/6
68.
which are reflected in the Structural Plan but not in the Architectural Plan.
Kindly check: 6CG-2, 6CG-5, 6CG-7, 6CG-8, 6G-3, 6G-4, 6G-9, 6G-10, 6G-11 to 6GS-WGP1-510
69.
15, 6G-19 to 6G-40, 6G-44 & 6G-45 not reflected in the plan but shown in the
Schedule of Concrete Girders.
Kindly check: 6B-43 shown in the plan but not reflected in the Schedule of Concrete
70.
Beams.
Kindly check: 6B-1 to 6B-19, 6CB-1, 6CB-2, 6CB-3 & 6CB-6 not shown in the plan but
71.
reflected in the Schedule of Concrete Beams.
Kindly check: 6S-1 to 6S-8, 6S-17, 6S-18, 6S-26, 6S-35 to 6S-38 not shown in the
72.
S-WGP1-510 plan but reflected in the Schedule of Slabs.
73.
Kindly check: 6CS-1 shown in the plan but not reflected in the Schedule of Slabs.
SEVENTH FLOOR

Item
No.

Reference /
Sheet No.

Queries / Comments

Please coordinate with GF&P about the missing columns located at Gridline A/9 &
A/10 which are reflected in the Structural Plan but not in the Architectural Plan.
Please coordinate with GF&P about the missing columns located at Gridline G/1,
75.
G/9, H/1 to H/9, F/4 & F/6 which are reflected in the Structural Plan but not in the
Architectural Plan.
Kindly check: 7CG-2, 7CG-5, 7CG-7, 7CG-8, 7G-3, 7G-4, 7G-9, 7G-10, 7G-11 to 7G76.
15, 7G-19 to 7G-40, 7G-44 & 7G-45 not reflected in the plan but shown in the
S-WGP1-511 Schedule of Concrete Girders.
Kindly check: 7B-43 shown in the plan but not reflected in the Schedule of Concrete
77.
Beams.
Kindly check: 7B-1 to 7B-19, 7CB-1, 7CB-2, 7CB-3 & 7CB-6 not shown in the plan but
78.
reflected in the Schedule of Concrete Beams.
Kindly check: 7S-1 to 7S-8, 7S-17, 7S-18, 7S-26, 7S-35 to 7S-38 not shown in the
79.
plan but reflected in the Schedule of Slabs.
80.
Kindly check: 7CS-1 shown in the plan but not reflected in the Schedule of Slabs.
EIGHT FLOOR
Please coordinate with GF&P about the missing columns located at Gridline A/9 &
81. S-WGP1-512
A/10 which are reflected in the Structural Plan but not in the Architectural Plan.
82.
83.
49TH FLOOR
1
S-WGP1-518 Please coordinate with GF&P about the
TYPICAL 9TH, 15TH & 30TH FLOOR
74.

30

A2-115

Kindly revisit and coordinate with SY^2 the missing Garbage Chute block outs for
Residential Tower which are not reflected in the structural framing plan.

CROSS SECTION
31

A3-301

Please provide Longitudinal section of the proposed building to be used as reference


for other trades coordination.

BAY SECTION 01 - 02

32

A3-401 to
A3-403

Please coordinate with MPI the appropriate dimensions for heat pumps, balancing
tanks etc.

Please verify to SY^2 if theres any provision for double slab at Wading Pool
Amenity Level for water leak prevention.
ENLARGED PLANS / REFLECTED CEILING PLANS

33

A4-101 to
A4-184a

Please revisit and coordinate with MPI the Reflected Ceiling Plans most specially for
the Common Areas and T&B which are in conflict with MPIs Lighting Layout in the
Electrical Plans.

BASEMENT 05 REFLECTED CEILING PLAN


34

A6-101

Please revisit and coordinate with MPI the Basement 05 - RCP which is in conflict
with MPIs Lighting Layout in the Electrical Plans.

BASEMENT 04 REFLECTED CEILING PLAN


35

A6-102

Please revisit and coordinate with MPI the Basement 04 - RCP which is in conflict
with MPIs Lighting Layout in the Electrical Plans.

BASEMENT 03 REFLECTED CEILING PLAN

Item
No.
36

Reference /
Sheet No.

Queries / Comments

A6-103

Please revisit and coordinate with MPI the Basement 03 - RCP which is in conflict
with MPIs Lighting Layout in the Electrical Plans.

BASEMENT 02 REFLECTED CEILING PLAN


37

A6-104

Please revisit and coordinate with MPI the Basement 02 - RCP which is in conflict
with MPIs Lighting Layout in the Electrical Plans.

BASEMENT 01 REFLECTED CEILING PLAN


38

A6-105

Please revisit and coordinate with MPI the Basement 01 - RCP which is in conflict
with MPIs Lighting Layout in the Electrical Plans.

LOWER GROUND REFLECTED CEILING PLAN


39

A6-106

Please revisit and coordinate with MPI the Lower Ground - RCP which is in conflict
with MPIs Lighting Layout in the Electrical Plans.

GROUND FLOOR REFLECTED CEILING PLAN


40

A6-107

Please revisit and coordinate with MPI the Ground Floor - RCP which is in conflict
with MPIs Lighting Layout in the Electrical Plans.

2nd FLOOR REFLECTED CEILING PLAN


41

A6-108

Please revisit and coordinate with MPI the 2nd Floor - RCP which is in conflict with
MPIs Lighting Layout in the Electrical Plans.

3rd FLOOR REFLECTED CEILING PLAN


42

A6-109

Please revisit and coordinate with MPI the 3rd Floor - RCP which is in conflict with
MPIs Lighting Layout in the Electrical Plans.

5th FLOOR REFLECTED CEILING PLAN


43

A6-110

Please revisit and coordinate with MPI the 5th Floor - RCP which is in conflict with
MPIs Lighting Layout in the Electrical Plans.

6th FLOOR REFLECTED CEILING PLAN


44

A6-111

Please revisit and coordinate with MPI the 6th Floor - RCP which is in conflict with
MPIs Lighting Layout in the Electrical Plans.

7th - 8th FLOOR REFLECTED CEILING PLAN


45

A6-112

Please revisit and coordinate with MPI the 7th & 8 th Floor - RCP which are in conflict
with MPIs Lighting Layouts in the Electrical Plans.

TYPICAL 9th, 15th, 30th / 10th, 19th, 27th, 33rd, 38th FLOOR REFLECTED CEILING PLAN
46

A6-113

Please revisit and coordinate with MPI the above-mentioned Floors - RCP which are
in conflict with MPIs Lighting Layouts in the Electrical Plans.

TYPICAL 11th-14th, 16th-18th, 20th-22nd, 26th, 28th, 29th, 31st, 32nd & 34th-37th FLOOR REFLECTED
CEILING PLAN

Item
No.

Reference /
Sheet No.

Queries / Comments
Please revisit and coordinate with MPI the above-mentioned Floors - RCP which are
in conflict with MPIs Lighting Layouts in the Electrical Plans.

47

A6-114

23rd FLOOR REFLECTED CEILING PLAN


Please revisit and coordinate with MPI the 23 rd Floor - RCP which is in conflict with
MPIs Lighting Layout in the Electrical Plans.
48

A6-114

24th 25th FLOOR REFLECTED CEILING PLAN


Please revisit and coordinate with MPI the 24 th 25th Floor - RCP which are in conflict
with MPIs Lighting Layouts in the Electrical Plans.
49

A6-115

41st / TYPICAL 39th, 40th, 42nd FLOOR REFLECTED CEILING PLAN


Please revisit and coordinate with MPI the 39th to 42nd Floor - RCP which are in
conflict with MPIs Lighting Layouts in the Electrical Plans.
50

A6-116

46th to 47th FLOOR REFLECTED CEILING PLAN


Please revisit and coordinate with MPI the 46 th to 47th Floor - RCP which are in
conflict with MPIs Lighting Layouts in the Electrical Plans.
51

A6-118

48th to 49th FLOOR REFLECTED CEILING PLAN


Please revisit and coordinate with MPI the 48 th to 49th Floor - RCP which are in
conflict with MPIs Lighting Layouts in the Electrical Plans.
52

A6-119

50th FLOOR REFLECTED CEILING PLAN


53

A6-120

Prepared by:

Please revisit and coordinate with MPI the 50th Floor - RCP which is in conflict with
MPIs Lighting Layout in the Electrical Plans.

Noted By:

I.A Campbell & Associates, Inc.


Thadeo C. Pobocan
Project Architect

William L. Cabato, R.A., PMP, AIA


Project Manager