Program : Boiler O&M Training for Mong Duong in Vietnam
Trainees : 12 Trainees
Training Duration : '13. 11. 4 ~ 11. 29
Hours : 120 Hours(6 Hours by the Day)

2. Charge of Class : Mr. Roh Sung Ho


3. Curriculum Construction
Training Time
Sort
Hour
(hr)
Ratio
(%)

Curriculum Construction

Total

Site
Tour

Teaching
Hour

Total

120

18

102

120

60

35

25

100

15

85

100

50

29

21

Theory Practice Common

4. Lecture Type & Instructor Portion


Training Technique
Sort
Lecture Practice

Instructor

Site
Tour

etc

Total

Internal External Total

Hour
(hr)

60

35

18

120

62

58

120

Ratio
(%)

50

29

15

100

52

48

100

5. Detail Training Subject


Subjects
Simulation

(24h)

Mechanical
System

(23h)

Simulation Training Using Simulator in


Thermal Power Plant
Sub Total

Common
(25h)

24

CFBC Boiler Theory & Principle

Kang Jun Soo - KPLI

Boiler Tube Maintenance

Lee Deuk Han - KPS

Boiler Failure Cases

Oh Keung Hwan - KOMIPO

Fan Operation Theory & Practice

Yang Sang Ho - SW E&B


Ju Seung Il - KPLI

23

Pump Design & Theory

Kyeun Young Soo - KOSEP

Pump Diagnosis & Inspection

Kyeun Young Soo - KOSEP

Hydraulic System Principle & Theory

Park Sang Hun - KPLI

Hydraulic System Practice

Park Sang Hun - KPLI

Vibration Principle & Theory

Park Jong Keun - EWP

17

Generator Principle & Operation

Jeong Seong Woo - KOSPO

Safety for Power Plant Engineer

Jeong Seong Woo - KOSPO

Motor Principle & Practice

Kang Hong Ju - KORCM

Power Plant Electricity System

Kang Hong Ju - KORCM

Transformer Principle & Maintenance

Kang Hong Ju - KORCM

10

Basic of Control System

Kim Sung Ho - KPLI

Basic of PLC Practice

Oh Seung Hwan - KPLI

Control Tuning Theory & Practice

Oh Seung Hwan - KPLI

Sequence Control & Practice

Park Min Kyu - KPLI

Instrument Principle & Practice

Kim Joon Wook - KPLI

Sub Total
Water
Chemistry
(6h)

Coal Fired System

Yoo Joon Hee - KPLI

Sub Total

I & C
(15h)

24

Sub Total

Electrical
System
& Safety
(10h)

Remarks

Thermodynamics

Sub Total

Pump &
Hydraulic
System
(17h)

Hours

15

Boiler Water Treatment

Lee Jin Yeong - KPLI

Water Chemistry

Hyong Cheal Gyu - KPLI

Sub Total

Site Tour & Discussion

18

Common (Introduction/Test/Completion)

Outlook of Korea Power Generation

Sub Total
Total

25
120

3 Power Plants

Jeong Kang Sik - KPLI

6. External Instructor Introduction


Instructor

Cell Phone

e-mail

Position

Mr. Lee Deuk Han

010-9580-4464

deokhanl@kps.co.kr

KPS

Mr. Oh Keung Hwan

010-2401-9882

91105659@komipo.co.kr

KOMIPO

Mr. Yang Sang Ho

010-3786-0759

turboh5@hanafos.com

SW E&B

Mr. Kyeun Young Soo

010-5550-0745

kyeunyous@kosep.co.kr

KOSEP

Mr. Park Jong Keun

010-9400-5632

park0425@ewp.co.kr

EWP

Mr. Jeong Seong Woo

010-3013-0085

jongsu@kospo.co.kr

KOSPO

Mr. Kang Hong Ju

010-9455-7832

hjkang0613@hanmail.net

KORCM

Attachment : Training Timetable for Mong Duong in Vietnam. The End.

[Attachment]

Training Timetable for Mong Duong in Vietnam


Course

Boiler O&M Training for Mong Duong in Vietnam

Duration

1th Week(Nov. 4 ~ Nov. 8)

09:00

10

11

14

15

16

09:00

10

11.05

11

(Tue)

14

15

16

09:00

10

11.06

11

(Wed)

14

15

16

09:00

10

11.07

11

(Thu)

14

15

16

09:00

10

11.08

11

(Fri)

14

15

16

11.04
(Mon)

Intorduction

Roh, Sung Ho

CFBC Boiler Theory & Principle

Kang, Jun Soo

Thermodynamics

Yoo, Joon Hee

Boiler Failure Cases

Oh, Keung Hwan

Pump Design & Theory


Kyeun, Young Soo
Pump Diagnosis & Inspection

Vibration Principle & Theory

Site Visit

Park Jong Keun

Yeosu Thermal Power Plant


- Boiler Type : CFBC Boiler

Course

Boiler O&M Training for Mong Duong in Vietnam

Duration

2st Week(Nov. 11 ~ Nov. 15)

09:00

10

11

14

15

16

09:00

10

11.12

11

(Tue)

14

15

16

09:00

10

11.13

11

(Wed)

14

15

16

09:00

10

11.14

11

(Thu)

14

15

16

09:00

10

11.15

11

(Fri)

14

15

16

11.11
(Mon)

Transformer Principle &


Maintenance
Motor Principle & Practice

Kang, Hong Ju

Power Plant Electricity System

Boiler Tube Maintenance

Lee, Deuk Han

Yang, Sang Ho
Fan Operation Theory & Practice

Ju, Seung Il

Basic of Control System

Kim, Sung Ho

Basic of PLC Practice

Oh, Seung Hwan

Site Visit

Donghae Thermal Power Plant


- Boiler Type : CFBC Boiler

Course

Boiler O&M Training for Mong Duong in Vietnam

Duration

3nd Week(Nov. 18 ~ Nov. 22)

09:00

10

11

14

15

16

09:00

10

11.19

11

(Tue)

14

15

16

09:00

10

11.20

11

(Wed)

14

15

16

09:00

10

11.21

11

(Thu)

14

15

16

09:00

10

11.22

11

(Fri)

14

15

16

11.18

Control Tuning Theory & Practice

Oh, Seung Hwan

Sequence Control & Practice

Park, Min Kyu

Instrument Principle & Practice

Kim, Joon Wook

Boiler Water Treatment

Lee, Jin Yeong

Water Chemistry

Hyong, Cheal Gyu

Hydraulic System Principle &


Theory

Park, Sang Hun

(Mon)

Site Visit

Taean Thermal Power Plant


- Boiler Type : Coal Fired

Generator Principle & Operation


Jeong, Seong Woo
Safety for Power Plant Engineer
Hydraulic System Practice

Park, Sang Hun

Course

Boiler O&M Training for Mong Duong in Vietnam

Duration

4rd Week(Nov. 25 ~ Nov. 29)

09:00

10

11

14

15

16

09:00

10

11.26

11

(Tue)

14

15

16

09:00

10

11.27

11

(Wed)

14

15

16

09:00

10

11.28

11

(Thu)

14

15

16

09:00

10

11.29

11

(Fri)

14

15

16

11.25
(Mon)

-Overview of Simulation System


Simulation Training

- Basic Theory of Power Plant


- Startup Preparation(Practice)

- Startup Preparation(Continue)
Simulation Training

- Startup BFP and Vacuum Up


- Cold Startup Operation

-Cold Startup Operation(Continue)


Simulation Training

- Steam Turbine Startup


- Plant Shutdown Operation

- Warm Startup Operation


Simulation Training

- Steam Turbine Startup


- Special or Emergency Operation

Oulook of Korea Power


Generation

Jeong, Kang Sik

Test

Completion Ceremony

Park, Yong Nam

Potrebbero piacerti anche