Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
User Guide
Version 1.0
(e-DPP Add-On Edition)
Copyright 2006-2008
ELTECHS Engineering & Consulting Co., Ltd.
All Rights Reserved
This manual has copyrights by ELTECHS Engineering & Consulting Co., Ltd. All rights reserved. Under
the copyright laws, this manual may not be copied, in whole or in part, without the written consent of
ELTECHS Engineering & Consulting Co., Ltd. The Licensee may copy portions of this documentation
only for the exclusive use of Licensee. Any reproduction shall include the copyright notice. This
exception does not allow copies to be made for other persons or entities, whether or not sold. Under this
law, copying includes translating into another language.
Certain names and/or logos used in this document may constitute trademarks, service marks or trade
names of ELTECHS Engineering & Consulting Co., Ltd.or other entities.
z
z
z
Microsoft Access, Microsoft Excel, Windows 2000, Windows XP and Microsoft Word are registered
trademarks of Microsoft Corporation.
ETAP and ETAP Power Simulator are registered trademark of Operation Technology, Inc.
e-DPP is a registered trademark of ELTECHS Engineering & Consulting Co., Ltd.
ELTECHS Engineering & Consulting Co., Ltd. believes that the information contained herein is accurate
as of its publication date, and such information is subject to change without notice. This information is
provided "as is" without warranty of any kind, either expressed or implied, including but not limited to
the implied warranties of merchantability, fitness for a particular purpose, or non-infringement.
ELTECHS Engineering & Consulting Co., Ltd. assumes no responsibility for errors or omissions in this
publication or any other documents referenced in this publication.
User Guide
Contents
Contents
Chapter 1 Preface........................................................................................................................ 1
1.1 Purpose of Program ..........................................................................................................1-1
1.2 Relation with e-DPP..........................................................................................................1-2
Chapter 2 System Model and Calculation Formula .............................................................2-1
2.1 Nomenclature ....................................................................................................................2-1
2.2 Non-Grounding System ....................................................................................................2-2
2.3 GTR CLR System ..........................................................................................................2-7
2.4 NGR System.......................................................................................................................2-8
Chapter 3 Program Operation................................................................................................3-1
3.1 Getting Started and Basic Operation of Program .........................................................3-1
3.2 Grounding Method Page...............................................................................................3-5
3.3 Ground Capacity Page ..................................................................................................3-9
3.4 Calculation Page ..........................................................................................................3-12
3.5 Protective Device Page ................................................................................................3-15
User Guide
Preface
Chapter 1 Preface
<Abbreviations used in this user guide>
Abbreviation
Description
GTR
Grounding Transformer
EVT
Earthed Voltage Transformer
= (GPT)
= (Grounding Potential Transformer)
NGR
Neutral Grounding Resistor
CLR
Current Limit Resistor
DT
Distribution Transformer
OVG
Ground Over Voltage Relay
OCG
Ground Over Current Relay
DGR
Directional Ground Over Current Relay
Non-grounding
Grounding Transformer (GTR) Current Limit Resistor
Grounding Transformer (GTR) Neutral Grounding Resistor at Primary Winding
Distribution Transformer (DT) Neutral Grounding Resistor
The way of handling these impedances varies upon an applicable grounding method as follows:
Grounding Method
(1) Non-grounding
(2) GTR -CLR
(3) GTR - NGR
(4) DT - NGR
EVT - CLR
GTR - CLR
GTR - NGR
DT - NGR
Required
Optional
C
[micro F]
GFCalc also performs the calculation of detective sensitivity (ground fault resistance) of OVG, OCG
and DGR relays in addition to the calculation of line-to-ground bolted fault current.
1-1
User Guide
Preface
In general, the cable data in the Cable Schedule links with the library (cable) unless the said cable
data was defined manually (not with the use of the library). When GFCalc is executed, GFCalc
retrieves the cable data from e-DPP project and it interacts with the library to retrieves the associated
capacitive admittance Y [Siemens] of the cables and at the same time converts them internally to
capacitance [micro Farad]. (Note: e-DPP standard library contains Y data for JIS standard cables
only.)
GFCalc stores the data required for ground fault current calculation in the associated e-DPP project.
1-2
User Guide
V0
I0
Ig
Rg
RN
Rn1
Rn 2
n1
n2
r0
xC
Z&
2-1
User Guide
3Rn 2 =
Re 2
2
n 2 ()
3
(1-1)
If there are more than one EVT servicing in a system, the parallel combination of the equivalent
zero sequence resistance of each EVT-CLR is taken.
(Note: Zero sequence resistance is equal to 3 times of neutral resistance.)
The zero sequence resistance is;
r0 = 3Rn 2 ()
(1-2)
2-2
User Guide
xC =
1
1
=
( )
C 2 f C
(1-3)
Zero sequence impedance is composed of the parallel combination of zero sequence resistance
(ro) and zero sequence reactance (xc) and is given by;
Z& 0 = R0 jX C =
1
1
1
+
r0 jxC
jx C r0 r0 xC2 jr02 xC
=
=
( )
r0 jxC
r02 + xC2
(1-4)
(1-5)
I&0 =
Ea
( A)
&
Z 0 + Z&1 + Z& 2
(1-6)
where;
Z1 , Z 2 Z 0
Then, approximately the line-to-ground bolted fault current is;
3E
I&g = 3I&0 = a ( A)
Z& 0
(1-7)
or
2-3
User Guide
3E
3E
I&g = a + j a ( A)
xC
r0
(1-8)
V&0
Ea
VS
VE
(1-9)
where;
(1-10)
Then;
Z& 0
Z& 0 + 3Rg
VS
VE
(1-11)
(R
2
0
+X
2
C
Rg
V
E
VS
3
X C2 R0
()
(1-12)
Also, the line-to-ground fault current at the time of relay operation is calculated as;
I&g =
3E a
Z& 0 + 3R g
(R
3E a
+ 3R g ) + X C
2
( A)
(1-13)
2-4
User Guide
Z& 0
Z& 0 + 3Rg
%VS
100
(1-14)
The fault resistance Rg at which voltage input becomes equal or greater than %VS (%) is given as;
(R
2
0
+X
2
C
Rg
100
%VS
3
X C2 R0
()
(1-15)
Also, the line-to-ground fault current at the time of relay operation is calculated as same as the
formula in (1-13).
<Current Element>
Since charged current derived from ground capacity of the faulted feeder does not flow through
ZCT of the said feeder, the effective ground capacity at the location of fault is;
C " = C C k [micro F]
(1-16)
Where;
C" =
C =
Ck =
(1-17)
and the operating criterion of relay against the setting value I S (A) of current element is given as;
3E a
Z& + 3R g
"
0
(R
3E a
"
0
+ 3R g
+X
"2
C
I S (A)
(1-18)
The fault resistance Rg at which current input becomes equal or greater than I S (A) is given as;
Rg
3E a
IS
2
X C" R0"
()
3
(1-19)
Also, the line-to-ground fault current at the time of relay operation is calculated as same as the
formula in (1-13).
2-5
User Guide
The smallest value out of these 2 fault resistances [(1-15) & (1-19)] calculated above will be an
overall detective sensitivity of ground directional relay.
2-6
User Guide
In GTR - CLR grounding system, the zero sequence resistance of GTR - CLR is combined in the
above "2.2 Non-Grounding System" in parallel. However, it is optional whether EVT is included or
not. In case EVT is not included, the resultant zero sequence resistance consists of GTR -CLR
resistance only.
The equivalent zero sequence resistance of GTR-CLR is
3Rn1 =
Re1
2
n1 ()
3
(2-1)
If there are more than one GTR in service in a system, the parallel combination of the equivalent
zero sequence resistance of each GTR is taken.
Parallel calculation of the zero sequence resistances derived from the formulas (1-1) and (2-1) is as
follow;
3Rn 2 =
r0 =
Re 2
2
n 2 ()
3
1
1
1
+
3Rn1 3Rn 2
(1-1)
( )
(2-2)
The same formulas as (1-3) through (1-19) in "2.2 Non-Grounding System" are applied to the
calculation hereafter.
Eltechs Engineering & Consulting
2-7
User Guide
The neutral grounding resistor is a method to connect a resistor to the neutral point of the secondary
side of distribution transformer or the primary side of GTR. The same formulas are applied to both
methods.
2-8
User Guide
3 R N ()
(3-1)
If there are more than one distribution transformers or GTRs of which the neutral points are
grounded with resistor, the parallel combination of such are taken.
Parallel calculation of the zero sequence resistances derived from the formulas (1-1) and (3-1) is as
follow;
3Rn 2 =
r0 =
Re 2
2
n 2 ()
3
1
1
1
+
3R N 3 Rn 2
(1-1)
()
(3-2)
In case EVT is not included, the resultant zero sequence resistance consists of NGR resistance only.
r0 = 3R N ()
(3-3)
The same formulas as (1-3) through (1-19) in "2.2 Non-Grounding System" are applied to the
calculation hereafter.
2-9
User Guide
Program Operation
After "Ground Fault Current Calculation" dialog is brought up, click "Study Case" button to open a
new dialog.
3-1
User Guide
Program Operation
Select or copy the existing study case, or create a new study case you are going to examine on this
dialog.
"Study case" is an entity where the set of input data used for the ground fault calculation is stored.
Multiple study cases can be created.
[Create]
Create a new study case.
Enter a new ID in "New Study Case ID" cell up to 26 characters and then click [Create] button.
Any description up to 120 characters may be entered in "Description" cell. This is optional.
[Copy]
Create a new study case by copying the existing one.
Select the source study case in "GFC Study Case ID" list, enter a new ID in "New Study Case ID"
cell up to 26 characters and then click [Copy] button. "Description" cell is optional.
Clicking the small [Copy] button adjacent to "Description" cell of the selected study case copies the
content of existing "Description" cell to new one.
Also, clicking the small [Save] button saves the content of "Description" cell. The existing
"Description" cell is editable.
[Delete]
Delete the selected study case. If the currently loaded study case is deleted, the main screen of
GFCalc will be reset. The study case once deleted cannot be restored.
Eltechs Engineering & Consulting
3-2
User Guide
Program Operation
[Select]
Load the selected study case into the main screen of GFCalc.
If another study case had been loaded before, all of screen data will be overwritten.
[Help]
Open the online help.
[Close]
Close the "Study Case" selection dialog.
After the study case has been loaded, the main screen will populated with data (if any) as shown
below.
There are six (6) pages (2 for future) in the dialog window. The six (6) buttons in the lower part are
common to all the pages.
[Calculate All]
Perform the calculations in "Calculation" and "Protective Device" (described later) pages
simultaneously in sequence.
[Save All]
Save all the active data in the four (4) pages.
[To Excel]
Export the input data and calculation results to MS Excel. It is necessary to confirm if the
calculations had been completed using the latest data before exporting to MS Excel. Note that unless
3-3
User Guide
Program Operation
the calculations are performed after the input data have been altered, there might be conflicts
between the input data and the contents of MS Excel output report.
[Study Case]
Open "Study Case" selection dialog to switch to another study case.
[Help]
Open the online help.
[Close]
Close the main screen and terminate the ground fault current calculation program GFCalc.
3-4
User Guide
Program Operation
[Distribution Transformer]
Enter the rating of distribution transformers.
Irrespective of the selected grounding method, at least one distribution transformer needs to be
specified. If there is the second or third transformer in parallel, check the checkbox "No.2" or "No.3"
respectively and enter the appropriate data.
Enter the line-to-line voltage of the transformer's primary and secondary winding in the "Prim.
Voltage" and "Sec. Voltage" cells respectively. The secondary voltage is the one accounted in the
system calculation. Note that the secondary voltage is assumed equal to all the transformers
involved on the basis of parallelism, hence the same cells in the second and third transformers bear
the same value entered in No.1.
As "Capacity" and "Prim. Voltage" cells are not referred by the calculation, they are optional.
When "Non-Grounding" method is selected, at least one set of EVT has to be specified. When the
other method is selected, this data input is optional.
Max. 8 sets of EVT can be specified. When two (2) or more EVT are specified, check the
corresponding checkbox captioned "No.2" through "No.8".
3-5
User Guide
Program Operation
Enter the line-to-line voltage in "Prim. Voltage" & "Sec. Voltage" cells and the induced voltage at a
broken delta terminal in "Ter. Voltage" cells. These values are internally converted to the line-toground voltages by the program.
The data entry in "Prim. Voltage" cell is valid for the first EVT only. The same cells of the second
through eighth EVTs will have the same value as that of the first one and not editable.
As "Sec. Voltage" cells are not referred by the calculation, they are optional.
When "GTR - Current Limit Resistor" method is selected at least one set of GTR has to be specified.
If there is a second or third GTR, check the checkbox "No.2" or "No.3" respectively and enter the
appropriate data.
Enter the line-to-line voltage in "Prim. Voltage" cells and the induced voltage at a broken delta
terminal in "Sec. Voltage" cells. These values are internally converted to the line-to-ground voltages
by the program.
The data entry in "Prim. Voltage" cell is valid for the first GTR only. The same cells of the second
and third GTRs will have the same value as that of the first one and not editable.
As "Capacity" cells are not referred by the calculation, they are optional.
3-6
User Guide
Program Operation
When "GTR - Neutral Resistor" method is selected, at least one set of GTR has to be specified.
If there is the second or third GTR, check the checkbox "No.2" or "No.3" respectively and enter the
appropriate data.
Enter the line-to-line voltage in "Prim. Voltage" cells and the induced voltage at a broken delta
terminal in "Sec. Voltage" cells. These values are internally converted to the line-to-ground voltages
by the program.
The data entry in "Prim. Voltage" cell is valid for the first GTR only. The same cells of the second
and third GTRs will have the same value as that of the first one and not editable.
When "Current" or "Resistance" is entered, the other one is automatically calculated based on the
primary voltage.
As "Capacity" cells are not referred by the calculation, they are optional.
With "DT - Neutral Grounding Resistor" method is selected, at least one set of NGR has to be
specified.
When "Current" or "Resistance" is entered, the other one is automatically calculated based on the
line-to-ground voltage "L-G Volt.".
[Enlarge] button
Enlarge the presently shown system image. Double clicking on the image will do the same operation.
Eltechs Engineering & Consulting
3-7
User Guide
Program Operation
[Save] button
Save the data shown on the current page only. If all the data included in the other pages need to be
saved as well, click [Save All] button instead.
3-8
User Guide
Program Operation
[Read Data]
Read out the data from e-DPP cable schedule. The cables can be filtered with three (3) criteria
namely "Cable Voltage", "Switchboard" and "Bus". Each criterion interacts with AND relationship.
Specifying the criteria and then clicking [Read Data] button, the data will be loaded into the table.
3-9
User Guide
Program Operation
[Cable Data]
[Cable ID]
[Type]
[Core]
[Size (mm2)]
These data are retrieved from e-DPP cable schedule and not editable by user. If these data
need to be modified, go to the cable schedule editor of e-DPP.
[Length (m)]
Length data are retrieved from e-DPP cable schedule as well. They are editable by user for
case studies but the changes made here are not reflected to the e-DPP cable schedule.
[micro F/1000m]
Ground capacity C [micro F] of the associated cable derived from the admittance Y [S] data
stored in e-DPP cable library per linear length.
[Ground Capacity (micro F)]
[Cable]
Absolute Ground capacity C [micro F] of the associated cable.
C-R
If a feeder circuit breaker is of vacuum type and C-R suppressor is installed for the purpose
of protection against switching surge, enter its ground capacity if any. Typical value is
approx. 0.1 [micro F] per phase.
[Motor]
If ground capacity of a high voltage & large motor is not negligible, enter its capacity per
phase. For reference, the typical values of ground capacity for high voltage, 3-phase, squirrel
cage induction motors are shown below.
Ground Capacity of Several Types of High Voltage, 3-Phase, Squirrel Cage Induction
Motors
(Reference Data)
3300V 60Hz Machine micro F/phase
110kW
160kW
300kW
2P
4P
6P
2P
4P
6P
2P
4P
6P
0.019 0.022 0.034 0.024 0.029 0.038 0.034 0.039 0.052
500kW
2P
4P
0.053 0.055
6P
0.075
1500kW
4P
0.16
6P
0.17
2P
0.048
850kW
2P
4P
6P
0.063 0.075 0.093
1000kW
2P
4P
6P
0.045
0.11
0.12
[Others]
If there are other devices for which the ground capacity needs to be considered, enter their
values.
[Total]
Summation of ground capacity of the above [Cable], [C-R], [Motor] and [Others].
Eltechs Engineering & Consulting
3 - 10
User Guide
Program Operation
I m = 6f C m E a ( A)
<Descriptions of Other Buttons>
[Calculate] button
Recalculate the charged currents (A) in the table.
[Save] button
Save the data shown in this page only. If all the data included in the other pages need to be saved as
well, click [Save All] button instead.
[Preview] button
Click "Preview" button to show printable layout of the ground capacity table (grid).
[To Excel] button
Export the data in the table to MS Excel.
[Selected Only] / [Show All (E)] button
Toggle to show the checked records only or show all records instead.
3 - 11
User Guide
Program Operation
If "0 (ohm)" is shown in the resistance, reactance or impedance cell, it means such device or element
is not present (ironically it means "Infinite" (ohm)). Note that it does not mean the circuit is shorted.
[Calculate] button
Perform a calculation on the current page only.
3 - 12
User Guide
Program Operation
[Zero Sequence Reactance (ohm) <For L-G Bolted Fault Current Calculation>]
Total zero sequence reactance due to the total ground capacity of the entire grounding system under
consideration.
3 - 13
User Guide
Program Operation
3 - 14
User Guide
Program Operation
The setting value must be less than the rated zero sequence voltage.
3 - 15
User Guide
Program Operation
As "Rated Current" cell is not referred by the calculation, this input is optional.
Note that if an improper value is entered in "Setting" cell, the detective sensitivity (fault resistance)
might become negative (negative resistor).
As "Rated Zero Sequence Voltage", "Rated Current" or "Phase Angle of Max Sensitivity" cell is not
referred by the calculation, these inputs are optional.
Note that if an improper value is entered in "Setting" cell for the current element, the detective
sensitivity (fault resistance) might become negative (negative resistor).
The lower value between the calculated two (2) fault resistances and the corresponding fault current
is the one accounted in "Detective Sensitivity" - "Overall" cells.
3 - 16
User Guide
Program Operation
As they are not referred by the calculation, these inputs are optional.
As they are not referred by the calculation, these inputs are optional.
[Calculate] button
Perform the calculation on the current page only. As the calculation in this page is based on the data
in the "Calculation" page, it is necessary to execute the calculation in the "Calculation" page in prior.
Note that if the data in the other pages were modified and the calculation in the "Calculation" page
has not been performed yet there might be a conflict in the calculation results in this page.
When the entire calculations are performed by [Calculate All] button located in the lower area, no
conflict will occur.
[Save] button
Save the data shown in this page only. If all the data included in the other pages need to be saved as
well, click [Save All] button instead.
(End of Document)
3 - 17