Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
TANK SOUNDING
Vessel
Port
Date
Time
TANK
TOTAL
Volume
Cu.M
Density
@15C
Sounding/
Ullage (M)
TANK
Volume
Cu.M
Density
@15C
TOTAL
Remarks:
Master
Chief Engineer
RA KONSULT
TANK SOUNDING
Draft
Temp
Deg (C)
V.C.F
Table 54B
Fwd:
Aft:
Trim:
G.S.V
Cu.M @15C
Metric
Tons
Temp
Deg (C)
Chief Engineer
V.C.F
Table 54B
G.S.V
Cu.M @15C
Metric
Tons
Surveyor
CERTIFICATE
OF
BUNKER QUANTITY
MV.
Port Registry
the survey
is located at
at request of principal, the appointed marine surveyor was carried out a Bunker Survey on board
the ship/vessel/floating crane in purpose of determining the quantity of bunker remained on board
At the time of inspection, Bunker tanks were carefully sounded with the presence of Chief Enginee
found and agreed the following quantities:
:
:
The figures were calculated using the calibrated table provided by the ship/vessel/floating crane a
agreed on above time & figures.
This certificate is signed without prejudice to the Term of Charter Party and the HIRE in accordanc
with the terms, condition and exceptions.
Vessel Master
Chief Engineer
ERTIFICATE
OF
QUANTITY
GRT
Flag
Tons
Local Time.
MT
MT
hief Engineer
Marine Surveyor
CERTIFICATE
OF
REDELIVERY
Place
Date & Time
or
:
:
:
At the time of inspection, Bunker thanks were carefully sounded with the presence of Chief Enginee
found and agreed the following quantities
:
Marine Fuel Oil
The Bunker consumption from the time of inspection up to the time of Redelivery
Marine Fuel Oil
This certificate is signed without prejudice to the Term of Charter Party and the HIRE in accordance
with the terms, condition and exceptions.
Vessel Master
Chief Engineer
CERTIFICATE
OF
REDELIVERY
GRT
Flag
Local Time.
UTC/GMT.
MT
MT
:
MT
MT
MT
MT
Tons
Chief Engineer
Marine Surveyor