SECTION C PART 2
PROJECT SPECIFICATION
SECTION 5: CONCRETE
PART 16 MISCELLANEOUS
16.6
REPAIR OF CONCRETE
16.6.1
General
Delete paragraphs 1 and 2 and substitute with the following:
The extent and nature of the defects in the concrete shall be established in
accordance with Part 13 of this Section 5 for new concrete or following an inspection
jointly undertaken by the Engineer and the Contractor where existing concrete is to
be refurbished. Typical details to be noted during this inspection are:
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
(i)
(j)
(k)
(l)
(m)
(n)
If remedial works are required the Contractor shall submit a detailed method
statement identifying the specific materials to be used and the sequence of activities
for the repair to the Engineer for approval. No work shall commence until the
method statement has been approved. The method statement shall include but not
necessarily be limited to:
(a)
Material Details:
(i)
(ii)
(iii)
(iv)
(v)
(vi)
(vii)
(viii)
(ix)
Manufacturer
Product name
Application procedure
Primers required
Method of application
Special precaution required
Technical details and properties
References or case studies of previous applications of a similar
nature
Guarantees applicable to the use of the product in the locations to be
repaired.
IA 12/13 C 057 ST
C2/S5/42
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A
February 2013
TECHNICAL SUBMISSION
SECTION C PART 2
(b)
Installation:
(i)
(ii)
(iii)
(iv)
(v)
(vi)
16.6.2
PROJECT SPECIFICATION
SECTION 5: CONCRETE
Honeycombing or Spalling
Delete paragraph 1 and substitute with the following:
16.6.5
Repair Methodology
Include after paragraph 3 the following:
The preferred method is high pressure water jetting specifically developed for
cleaning concrete. Light mechanical breakers may be used but the use of heavy
breakers shall not be allowed.
Delete paragraph 4 and substitute with the following:
IA 12/13 C 057 ST
C2/S5/43
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A
February 2013
TECHNICAL SUBMISSION
SECTION C PART 2
16
PROJECT SPECIFICATION
SECTION 5: CONCRETE
The formwork shall be inspected by the Engineer and, if approved, filled with clean
water which demonstrates that the formwork is grout-tight and saturates the
prepared concrete surfaces. The existing concrete shall be saturated with potable
water for a period of not less than 24 hours. Where formwork is not used saturation
shall be by spray. The formwork shall then be completely drained and resealed.
Add new paragraphs 25, 26, 27 and 28 as follows:
25
Where mortar is used for repair polymer modified mortar shall be mixed in a high
shear pan-type mixer for the minimum time necessary to produce the required
consistency. Free fall mixers may cause air entrainment and shall not be allowed.
For quantities of less than 10 kg, hand mixing may be used.
26
The mortar shall be applied by trowel over tacky bond coat in layers not exceeding
the thickness recommended by the manufacturer. Each layer shall be surface
scored, coated with bonding agent and allowed to take up its initial set prior to the
application of subsequent layers. If sagging occurs due to the applied layer being
too thick, the material shall be completely removed and fresh mortar re-applied at a
reduced thickness.
27
Any fine hair cracks which develop around the perimeter of the repaired area shall
be sealed after 28 days by cement grout gauged with a suitable acrylic emulsion.
28
Repairs which do not adhere and display a hollow sound when tapped with a light
hammer shall be broken out completely and repeated.
IA 12/13 C 057 ST
C2/S5/44
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A
February 2013