It is the centres responsibility to complete the below checklist prior to each Connect Plus session.
Task
Computer Specification

Description
All TSA and candidate workstations must meet the minimum required technical
specification.

Reference

Monitor Resolution

Screen Resolutions are set to 4:3 ratios (for example 1024x768 or 1280x1024).
Widescreen resolutions will present test rendering issues.

Technical Guide

Soundcards

Soundcards are functional, not muted.

Create Test Sittings

Create test sittings according to your test venue and test sessions Setup.

Test Administration
Guide

5 days prior to Test Day

Set up Connect Plus


Users

Set up additional accounts in Connect Plus according to your centres venue/room


requirements. Each account must use a valid email address.

Test Administration
Guide

5 days prior to Test Day

Installation

Install Connect Plus TSA and CW software on the required number of workstations
adhering to the recommended TSA: CW ratio detailed below.

Technical Guide

2 days prior to Test Date

Number of TSAs

Ratio of 1 TSA for every 100 candidate workstations. Maximum of 5 TSAs per Test
Centre.

Technical Guide

2 days prior to Test Date

Spare workstations

Setup 1 spare workstation for every 20 candidates taking the test. Spare computers
must be ready to take the test if required.

Technical Guide

2 days prior to Test Date

Familiarisation Test

Run a Familiarisation Test .

Technical Guide

2 days prior to Test Date

Test Content & Test


Keys

Check via the Test Centre website that All test content has been downloaded on to the
candidate workstations and all Test Keys have been downloaded to the TSA machines.

Technical Guide

16.00hrs the day prior to


the Test Date

TSA and CW health

All candidate workstations (CWs) must be registered to TSAs. All TSAs & CWs must be
in a healthy state and show as Ready.

Technical Guide

16.00hrs the day prior to


the Test Date

Connect Plus: Session Checklist


Cambridge Assessment 2012

Deadline

Complete

Technical Guide

Task
Passwords printed

Connect Plus: Session Checklist


Cambridge Assessment 2012

Description
Candidate usernames and passwords have been printed out and are ready to be
handed to the candidates when they arrive.

Reference

Deadline

Complete

Test Administration
Guide

Managing and running tests at a permanent test venue


The flowchart below illustrates the tasks that you need to carry out to manage and run tests, and a typical timeline. The steps shown in this flowchart are described in
detail in the following chapters in this guide.

Connect Plus: Session Checklist


Cambridge Assessment 2012

Managing and running tests at a temporary venue (for example a rented computer lab)
The flowchart below illustrates the tasks that you need to carry out to manage and run tests, and a typical timeline an external venue. The steps shown in this flowchart are
described in detail in the following chapters in this guide.

Connect Plus: Session Checklist


Cambridge Assessment 2012

Potrebbero piacerti anche