Federal Register / Vol. 71, No.

12 / Thursday, January 19, 2006 / Notices 3059

Board, 1535 Command Drive, EE-Wing, SUPPLEMENTARY INFORMATION: The SFEIS Dated: January 10, 2006.
3rd third Floor, Andrews AFB, MD analyzed the following six alternatives Addison D. Davis, IV,
20762–7002. Copies of documents or to meet the need for additional Deputy Assistant Secretary of the Army
other materials submitted cannot be maneuver training lands at Fort Irwin: (Environment, Safety and Occupational
returned. (1) Alternative 1 (preferred Health) DASA (ESOH).
alternative) analyzed expanding training [FR Doc. 06–475 Filed 1–18–06; 8:45 am]
Bao-Anh Trinh, to the east and west to include BILLING CODE 3710–08–M
Air Force Federal Register Liaison Officer. reintroduction of training in Fort Irwin
[FR Doc. E6–540 Filed 1–18–06; 8:45 am] lands previously set aside to the south
BILLING CODE 5001–05–P (UTM 90 area). Additional lands DEPARTMENT OF DEFENSE
totaling approximately 150,510 acres
would be added to the available training Department of the Army; Corps of
DEPARTMENT OF DEFENSE lands. Engineers
(2) Alternative 2 analyzed expanding
Department of the Army training to the east and the south, Intent To Prepare a Draft
including the UTM 90 area. Additional Environmental Impact Statement for
Notice of Availability (NOA) for the the Wilmington Harbor–96 Act, General
lands totaling approximately 156,340
Supplemental Final Environmental Reevaluation Report, New Hanover
acres would be added to the available
Impact Statement (SFEIS) for the County, NC
training lands.
Proposed Addition of Maneuver (3) Alternative 3 analyzed expanding
Training Land at Fort Irwin, CA AGENCY: Department of the Army, U.S.
training to the east. Additional lands Army Corps of Engineers, DoD.
AGENCY: Department of the Army, DoD. totaling approximately 48,760 acres
ACTION: Notice of intent.
would be added to the available training
ACTION: Notice of availability. lands. SUMMARY: The Wilmington Harbor–96
(4) Alternative 4 analyzed expanding Act project is being constructed for the
SUMMARY: This announces the
training to the east, west, and south to purpose of enhancing commercial
availability of the SFEIS for the include reintroducing the UTM 90 area.
Proposed Addition of Maneuver shipping the Cape Fear River and
Additional lands totaling approximately Northeast Cape Fear River, and the State
Training Land at Fort Irwin. The SFEIS 185,301 acres would be added to the
assesses the potential environmental Port in Wilmington, New Hanover
available training lands. County, NC. The project, including
impacts of the addition of maneuver (5) Alternative 5 analyzed expanding
lands to supplement the current training turning basin and mitigation efforts
training to the east and reintroduction of were originally addressed in an
corridors at the National Training the UTM 90 area. Additional lands
Center at Fort Irwin in the Mojave Environmental Impact Statement, Cape
totaling approximately 72,060 acres Fear—Northeast Cape Fear Rivers
Desert of California by approximately would be added to the available training
118,674 acres. The proposed expanded Comprehensive Study, Wilmington, NC,
lands. dated June 1996, which was
maneuver training will improve (6) Alternative 6 analyzed no action,
necessary field training by providing a supplemented by an Environmental
under which no expansion would occur
more realistic battle corridor. The Assessment, Preconstruction
and training would continue as
cooperating agencies for this project are: Modifications of Authorized
currently exists. The Congressionally
Bureau of Land Management (as the Improvements, Wilmington Harbor, NC,
withdrawn lands would be managed
administrator of the vast majority of the dated February 2000. However since
under the Interim Management Plan
lands within the study area), the then, the need for new project features
until further disposition was decided.
National Aeronautics and Space and mitigation issues have arisen. In
Public involvement for this project
Administration (as a tenant on Fort order to address these issues, a General
has included five scoping sessions held
Irwin), and the Federal Aviation Reevaluation Report (GRR) will be
for the Supplemental Draft
Administration (as some of the prepared, and a Draft Environmental
Environmental Impact Statement
alternatives involve possible changes to Impact Statement (DEIS) will be
(SDEIS) which began in November 2001
airspace). included as a part of this process. The
and ended in January 2002; a 45-day
GRR and DEIS will address the
DATES: The waiting period for the SFEIS public review of the SDEIS, with a 15-
proposed relocation of a turning basin
will end 30 days after publication of the day extension; and public hearings at
in the Northeast Cape Fear River, and a
NOA in the Federal Register by the U.S. various locations throughout southern
reevaluation of alternatives for fish
Environmental Protection Agency. No California to receive public comment on
passage at the three locks and dams on
sooner than the expiration of the the SDEIS. Written comments and other
the Cape Fear River.
waiting period, the Army will sign a forms of input from public and private
entities were addressed in the SFEIS. FOR FURTHER INFORMATION CONTACT:
Record of Decision (ROD). A Notice of
Copies of the SFEIS are available for Questions about the proposed action
Availability of the ROD will also be
review at the following libraries: Library and DEIS can be answered by: Mr. Jeff
published in the Federal Register.
of Congress; Riverside Main Library; Richter, Environmental Resources
ADDRESSES: Direct questions and/or Section; U.S. Army Engineer District,
San Diego County Library; and San
written comments regarding the SFEIS Bernardino County Libraries at the Wilmington; Post Office Box 1890;
to, or request a copy of the document following locations: Hesperia, San Wilmington, NC 28402–1890;
from, Ms. Jennifer Barry, Strategic Bernardino, Apple Valley, Trona, telephone: (910) 251–4636.
Planning Office, PO Box 10309, Fort Barstow, Big Bear, Lucerne Valley, SUPPLEMENTARY INFORMATION: The
sroberts on PROD1PC70 with NOTICES

Irwin, California 92310. Victorville, Wrightwood, and Yucca existing basin used for turning ships in
FOR FURTHER INFORMATION CONTACT: Ms. Valley. the Northeast Cape Fear River is
Jennifer Barry at (760) 380–6174; by e- The SFEIS may also be viewed at the downstream of the major terminal, and
mail at Jennifer.Barry@irwin.army.mil; Land Expansion Web Site: http:// there are two bridges between the basin
or by facsimile at (760) 380–6171. fortirwindlandexpansion.com. and terminal. Usually the ships transit

VerDate Aug<31>2005 16:38 Jan 18, 2006 Jkt 208001 PO 00000 Frm 00011 Fmt 4703 Sfmt 4703 E:\FR\FM\19JAN1.SGM 19JAN1
3060 Federal Register / Vol. 71, No. 12 / Thursday, January 19, 2006 / Notices

upstream bow-first through the two Dated: January 10, 2006. special interest groups, and any other
bridges, but must back downstream John E. Pulliam, Jr., interest individuals and organizations.
stern-first through the bridges to the Colonel, EN, Commanding. The Corps will announce availability of
turning basin. For safety reasons, the [FR Doc. 06–485 Filed 1–18–06; 8:45 am] the draft supplemental document in the
docking pilots requested that the BILLING CODE 3710–CE–M Federal Register and other media, and
turning basis be relocated upstream of will provide the public, organizations,
the bridges so ships can proceed bow- and agencies with an opportunity to
first through the bridges in both DEPARTMENT OF DEFENSE submit comments, which will be
directions. The most significant issue addressed in the Final SEIS/EIR. A 45-
related to a relocated turning basin is Department of the Army; Corps of day public review period will be
mitigation of dredging impacts to Engineers provided for individuals and agencies to
primary nursery areas for marine review and comment on the SEIS/EIR.
fisheries. Intent To Prepare a Draft Supplemental All interested parties should respond to
Environmental Impact Statement/ this notice and provide a current
In order to deepen sections of
Environmental Impact Report for the address if they wish to be notified SEIS/
Wilmington Harbor, blasting has been
Yuba River Basin Project, Yuba EIR circulation.
required to remove rock. This blasting
County, CA
could impact the endangered shortnose
2. Project Information
sturgeon that inhabits the harbor. To AGENCY: Department of the Army, U.S.
mitigate for this potential impact, fish Army Corps of Engineers, DoD The Yuba River Basin is located in
passage was required at the most ACTION: Notice of intent. western Yuba County about 50 miles
downstream of the three Cape Fear north of Sacramento. The authorized
River locks and dams. The proposed SUMMARY: In accordance with the
project focused on approximately 21
fish passage plan involved the National Environmental Policy Act
miles of levees along the Yuba and
construction of an approximate 3,800- (NEPA) and the California
Feather Rivers in the variety of
foot long fish bypass channel around the Environmental Quality Act (CEQA), the
Marysville, CA. The Yuba River Basin
lock-and-dam. This plan has not been U.S. Army Corps of Engineers (Corps),
study area was divided into three
implemented due to lack of funds and Sacramento District, is preparing a Draft
reaches: Reach 1—Yuba River/Feather
real estate issues. During the GRR/DEIS Supplemental Environmental Impact
River; reach 2—Feather River (including
process, additional alternatives will be Statement/Environmental Impact Report
Bear River and WP Interceptor Canal
considered that could include (SEIS/EIR) to reevaluate the previously
area); and reach 3—Marysville ring
modification or removal or the locks authorized plan and other alternatives
levee.
and dams. This would require to reduce flood damages and restore
deauthorization of the lock and dam riparian and aquatic habitat in the lower The Feasibility Report and Final EIS/
project. This action may be proposed Yuba River Basin, part of the Feather EIR were completed in April 1998.
because there is no longer any River Basin, and the city of Marysville, Congress authorized the project in the
commercial traffic using the locks and in Yuba County, CA. This notice Water Resources Development Act of
dams, which is the authorized project replaces the one previously published 1999, and the Record of Decision was
purpose. Significant issues related to in the Federal Register on March 17, signed in June 2000. The authorized
fish passage include water supply users 2004 (69 FR 12646). The general project included specific levee
upstream of the locks and dams and reevaluation is needed because recent modifications on 6.1 miles of the left
recreational and commercial fisheries. technical, environmental, and economic bank of the Yuba River upstream of the
studies have indicated that additional confluence with the Feather River; 10
All private parties and Federal, State, miles of levee on the left bank of the
refinement and reformulation are
and local agencies having an interest in Feather River downstream of the
needed to determine the feasibility and
the study are hereby notified of the confluence of the Yuba River; and 5
extent of Federal and non-Federal
intent to prepare a DEIS and are invited miles of the Marysville ring levee. The
interest in the project. The basic study
to comment at this time. A scoping levee modification work as authorized
authority for the Yuba River Basin study
meeting was held on June 30, 2005 to was intended to bring the level of flood
was provided under the Flood Control
help determine whether an EIS or EA protection for these levees up to about
Act of 1962.
should be prepared. All comments a 200-year level of protection.
received as a result of this notice of ADDRESSES: Send written comments and
intent and the scoping meeting will be suggestions concerning this study to Mr. Since the final Yuba River Basin
considered in the preparation of the Robert Koenigs, U.S. Army Corps of project was authorized, geotechnical
DEIS. Engineers, Sacramento District, Attn: investigations and updated hydrology
Planning Division (CESPK–PD–R), 1325 have identified previously unknown
The lead agency for this project is the J Street, Sacramento, CA 95814. levee foundation problems in portions
U.S. Army Engineer District, Requests to be placed on the mailing list of the study area/authorized project.
Wilmington. Cooperating agency status should also be sent to this address. Levees along the Bear River and the WP
has not be assigned to, nor requested by,
FOR FURTHER INFORMATION CONTACT: Mr. Interceptor Canal have also been shown
any other agency.
Robert Koenigs, E-mail at to have stability and seepage problems
The DEIS is being prepared in Robert.L.Roenigs@usace.army.mil, that may cause flooding in lower Yuba
accordance with the requirements of the telephone (916) 557–6712, or fax (916) County. Because flooding is still a
National Environmental Policy Act of 557–7856. significant problem for the affected
1969, as amended, and will address the communities along the Yuba, Feather,
sroberts on PROD1PC70 with NOTICES

SUPPLEMENTARY INFORMATION:
relationship of the proposed action to and Bear Rivers, the State of California
all other applicable Federal and State 1. Public Involvement Reclamation Board has requested that
Laws and Executive Orders. The Yuba River Basin project will be the Corps initiate a general reevaluation
The DEIS is currently scheduled to be coordinated between Federal, State, and of the project to determine a new
available in October 2007. local governments; local stakeholders; feasible project.