Sei sulla pagina 1di 1

5664 Federal Register / Vol. 71, No.

22 / Thursday, February 2, 2006 / Notices

subregional/reports.htm: ‘‘Rocky Mountain ENVIRONMENTAL PROTECTION access or services for individuals with
Area Transmission Study’’—September 2004. AGENCY disabilities, please contact Lara P. Autry
3. Available on California Energy at the number above. To request
Commission Web site at http:// [FRL–8027–8]
accommodation of a disability, please
www.energy.ca.gov/2005publications /CEC– contact Lara P. Autry, preferably at least
Environmental Laboratory Advisory
100–2005–006/CEC–100–2005–006–CTF.PDF: 10 days prior to the meeting, to give
Board (ELAB) Meeting Dates and
‘‘Committee Final Strategic Transmission EPA as much time as possible to process
Agenda
Investment Plan (Committee Final Strategic your request.
Plan), California Energy Commission, AGENCY: Environmental Protection
November 2005.’’ Agency. George M. Gray,
4. Available on the Public Service ACTION: Notice of teleconference Assistant Administrator, Office of Research
Company of Colorado Web site at http:// and Development.
meetings.
www.rmao.com/wtpp.psco_studies.html: [FR Doc. E6–1422 Filed 2–1–06; 8:45 am]
‘‘Colorado Long Range Transmission SUMMARY: The Environmental Protection BILLING CODE 6560–50–P
Planning Study’’—April 27, 2004. Agency’s Environmental Laboratory
5. Available from WECC (Phase 3 Accepted Advisory Board (ELAB), as previously
Path Rating Study Report)—Call (801) 582– announced, will have teleconference ENVIRONMENTAL PROTECTION
0353: ‘‘Southwest Power link and Palo meetings on January 18, 2006 at 1 p.m. AGENCY
Verde—Devers 500kV Series Capacitor E.T.; February 15, 2006 at 1 p.m. E.T.;
[FRL–8026–5]
Upgrade Project’’—dated December 2, 2004. March 15, 2006 at 1 p.m. E.T.; April 19,
6. Available from CAISO Web site. 2006 at 1 p.m. E.T.; and May 17, 2006 Position Statement on Environmental
6.1. CAISO testimony to the CPUC for the at 1 p.m. E.T. to discuss the ideas and Management Systems (EMSs)
Palo Verde—Devers #2 Project http:// views presented at the previous ELAB
www.caiso.com/14cf/14cf82f921c90.pdf. meetings, as well as new business. Items AGENCY: Environmental Protection
6.2. Information on the Southwest to be discussed by ELAB over these Agency (EPA).
Transmission Expansion Plan (STEP) http:// coming meetings include: (1) Expanding ACTION: Notice of availability.
www.caiso.com/docs/2002/11/04/ the number of laboratories seeking
2002110417450022131.html. National Environmental Laboratory SUMMARY: This notice is to inform the
6.3. Documents on the Palo Verde—Devers Accreditation Conference (NELAC) public that EPA has updated its Position
#2 project http://www.caiso.com/docs/2005/ accreditation; (2) homeland security Statement on Environmental
01/19/2005011914572217739.html. issues affecting the laboratory Management Systems (EMSs). This
6.4. Information on the CAISO community; (3) ELAB support to the updated statement replaces the 2002
Transmission Economic Assessment Agency’s Forum on Environmental Position Statement on EMS signed by
Methodology (TEAM) http://www.caiso.com/ Measurements (FEM); (4) implementing Administrator Whitman and reflects
docs/2003/03/18/ the performance approach; (5) EPA’s experiences to date with the
2003031815303519270.html. increasing state participation in NELAC; promotion of voluntary EMSs as well as
7. Available from Northwest Power Pool and (6) follow-up on some of ELAB’s our continued commitment to be a
Web site (Northwest Regional Transmission past recommendations and issues. In leader in this area. The Position
Association reports). addition to these teleconferences, ELAB Statement explains EPA’s policy on
7.1. ‘‘Puget Sound Area Upgrade Study will be hosting their next face-to-face EMSs and the Agency’s intent to
Report’’—November 2004 http:// meeting on January 30, 2006 at the continue to promote the voluntary wide-
www.nwpp.org/ntac/pdf/ Westin Chicago River North in Chicago, spread use of EMSs across a range of
PSASG%20Final%20Draft.pdf. Illinois from 9:30–12 C.T. and an open organizations and settings. EPA
7.2. ‘‘Montana—Pacific Northwest forum session on January 31, 2006 also encourages organizations to implement
Transmission Upgrade Study’’ http:// at the Westin Chicago River North in EMSs that result in improved
www.nwpp.org/ntac/pdf/MT–NW% Chicago, Illinois at 5:30 p.m. C.T. environmental performance and
20Study%20Report%202005–Oct.zip. Written comments on laboratory compliance, cost-savings, pollution
7.3. http://www.nwpp.org/ntac/pdf/ accreditation issues and/or prevention through source reduction,
Selected%20Transmission% environmental monitoring issues are and continual improvement.
20Siting%20constraints.pdf. encouraged and should be sent to Ms. FOR FURTHER INFORMATION CONTACT:
8. Available from the Southwest Area Lara P. Autry, DFO, U.S. EPA (E243– Shana Harbour 202–566–2959.
Transmission Sub-Regional Planning Group 05), 109 T. W. Alexander Drive, SUPPLEMENTARY INFORMATION:
Web site. Research Triangle Park, NC 27709, faxed
8.1. ‘‘Report of the Phase I Study of the to (919) 541–4261, or e-mailed to Background
Central Arizona Transmission System’’ autry.lara@epa.gov. Members of the During the past decade, public and
http://www.azpower.org/cats/ public are invited to listen to the private organizations have increasingly
default.asp#phase1.
teleconference calls, and time adopted formal Environmental
8.2. ‘‘Report of the Phase II Study of the
permitting, will be allowed to comment Management Systems (EMSs) to address
Central Arizona Transmission System’’
on issues discussed during this and their environmental responsibilities.
http://www.azpower.org/cats/
previous ELAB meetings. Those persons The most common framework an EMS
default.asp#phase2.
interested in attending should call Lara uses is the plan-do-check-act process,
8.3. ‘‘Report of the Phase III Study of the
P. Autry at (919) 541–5544 to obtain with the goal of continual improvement.
Central Arizona Transmission System’’
http://www.azpower.org/cats/
teleconference information. The number EMSs provide organizations of all types
hsrobinson on PROD1PC71 with NOTICES

default.asp#phase3.
of lines for the teleconferences, with a structured system and approach
however, are limited and will be for managing environmental and
[FR Doc. E6–1394 Filed 2–1–06; 8:45 am] distributed on a first come, first serve regulatory responsibilities to improve
BILLING CODE 6450–01–P basis. Preference will be given to a overall environmental performance and
group wishing to attend over a request stewardship, including areas not subject
from an individual. For information on to regulation such as product design,

VerDate Aug<31>2005 15:26 Feb 01, 2006 Jkt 208001 PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 E:\FR\FM\02FEN1.SGM 02FEN1

Potrebbero piacerti anche