19
By Frank Turley
Management-Plaza.com
(SB) Managing a
Stage Boundary
Highlight Reports
Auth.
2 Proceed
Auth.next
stage
Authorize Project
Approved PID
Give ad hoc
direction
Exception Report
Authorize a Stage
or Exception Plan
Authorize
the project
Management
Direction
Corp..
The Project Manager allocates Work Packages to the Team Leaders. A Work Package contains
information on one or more products to be developed, which includes such information as product
descriptions, planning data, and constraints. This becomes the agreement between the Project
Manager and the Team Leader.
Work Package
Accept a WP
Delivery
Accept a WP
MP Ob je c tive s
- Agree work between PM & TM
- Products are produced in the Activity
Execute a Work Package
- TM hands back complete work to PM
Tip : S m a ll P ro je c ts
- No need for Team Manager
- Team Members report directly to PM
Work Package
Deliver a WP
The activity Authorize a Work Package can happen many times during a single Controlling a
Stage process. Other tasks for the Project Manager during the Controlling a Stage process are to
Manage Quality, Manage Changes, Monitor Risks, Taking Corrective action, Reporting and
Communication.
Agree on the details of the work to be done between the Project Manager and Team
Leader, and make sure that the Team Leader understands what they need to deliver.
Do the Work: meaning the Team Manager manages the development of the products and
takes the necessary steps to ensure quality for each product.
Provide regular progress information to the Project Manager using Checkpoint Reports.
Handing back the completed work to the Project Manager and obtaining approval for each
product after the work is done and quality has been checked.
Tip: For small projects, the team members (who do the work) will work directly for the Project
Manager, so there will be no need for a Team Manager and this process will be less formal.