INSPECTIONS
Spring 2011
OFFICIAL JOURNAL OF THE INSTITUTE OF ELECTRICAL INSPECTORS AUSTRALIA
RETURN ADDRESS: PO Box 411 Essendon North Vic 3041
www.iei.org.au
Page 1
The Institute of Electrical Inspectors or the Editor cannot accept responsibility for any product or service statements made herein, and
the opinions and comments from contributors are not necessarily those of the Institute or the Editor. Contents of this Journal are
copyright but may be reprinted with the permission of the Institute. Advertisers and/or advertising agencies upon and by lodging material with the publisher for publication or authorization or approving of the publication of any material, indemnify the publisher, its servants and agents against all liability, claims or proceedings whatsoever arising from the publication, and without limiting the generality
of the foregoing to indemnify each of them in relation to defamation, slander of title, breach of copyright, infringement of trademarks or
names of publication titles, unfair competition or trade violation of rights or privacy and warrant that the material complies with all relevant laws and regulations and that its publication will not give rise to any rights against or liabilities in the publisher, its servants or
agents, and, that nothing therein is capable of being misleading or deceptive or otherwise in breach of Part V of the Trade Practices
Act 1974.
Page 2
Editors bit
Dear Members,
AGM 2011 was a huge success with all attending remarking on how well the event was run. Many commented on the venues chosen for meals and the ladies day out.
A revamped Electrical Inspections this edition with more technical information added.
The website has been updated to reflect the new Board of Directors and AGM Dates and Locations have
been set for the next two years, please take the time to note these dates in your long range Calendar.
A huge thank you to the Master Electricians and especially Andrew Bailey for his time organising and coordinating the Institutes AGM event this year.
Many items of discussion took place over the weekend, two main topics that surfaced numerous times is
what the administration can do to achieve higher membership levels and gaining interest from younger
members to get involved in the running of the Institute,
Without members involvement in the running of the Institute, your Institute will not exist into the future, please
take the time to consider volunteering for a small role to assist the administration and learn along the way.
Regards,
David Bibby
Editor
Page 3
Regards
David Bibby
Secretary
Page 4
Page 5
P a g e
No.
Clause/
Subclause
No.
66
Para/
Fig./
Table
No.
Comment
Proposed Change
2.3.3.4(d)
Add sub clause (e) In Non Domestic Multiple load centres >100Amps, a single line
diagram showing the relationship of all
incoming and outgoing supplies with respect to installed switchgear shall be
available for inspection at all times in the
vicinity of the Load centre the diagram
represents. This diagram shall be legible
and permanent
4,5 & 6
FAQ
2009
210
&
5.3.3.1.1 &
5.3.3.2
10:
5.1
213
Page 6
Construction
Location
Wiring
Safety
Wiring Neutrals
Description
References
DistCo
Supply Available
DistCo
ESR 209
Service Protection
S.I.R-6.7.2
Safety Services
Coordination
AS3000-2.5.7.2
AS3000-2.3.3
Advisory
Forms of Segregation
AS3439-7.7
AS3000-2.3.3
Fire Proofing
AS3000-2.9.7
Egress paths
AS3000-2.9.2.2
AS3000-2.9.3.3
Wiring Clearances
AS3000-2.9.6
AS3000-2.9.7
AS3000-2.9.3.1
Classification of Assemblies
AS3439-Sect 3
AS3000 2.9.2.2
Suitability
AS3000 2.9.3.2
Restricted areas
AS3000-2.9.2.5
External Installation
AS3000-7.2
AS3000-Appendix H
AS3000-3.9.9.3
AS3439-7.8
Page 7
Coordination
Labelling
Earthing Systems
ESR 233
Location
ESR 235
Size
AS3000-5.3
M.E.N Link
Route
ESR 207
Supply arrangement
S.I.Rs
Connection
AS3000-5.5.1.2
Resistance
AS3000-5.5.1.4
Protective devices
AS3000-2.5.7
S.P.D Rating
DistCo
AS3000-2.3.3.4
AS3000-2.9.2.4
Relationship of equipment
AS3000-2.9.5
AS3000-5.3.6.4
AS3000-5.5.1.3
Advisory
Compliance plate
AS3439
Safety Services
AS3000-7.2.6
AS3439
ESR 218
Alternative supplies
ESR 210
4. Testing
Prescribed tests
AS3000 2.9.2.4
AS3000 2.9.2.4
Installation
Installation
ESR 231
AS3000-Section 8
Prescribed work
Inspection
Certificate of Compliance
Details Legible
Obligations
Defects
ESR 238
ESR 239
ESR 240 & 251
ESR 241 & 252
ESR 242, 245 & 246
ESR 248 & 249
5. Certification
Note:
This guideline has been produced to notify the reader as to the basic requirements of Electrical Switchboard
Inspection. All points in this guideline may not pertain to every Electrical Switchboard Inspection.
The IEI intends to run further meetings in Victoria to produce similar checklists on other Electrical Inspections for
Victorian Inspectors due to the nature of the Industry.
Page 8
Page 9
Description
Current Version
ASNZS 3000
2007
ASNZS 3001
2008
ASNZS 3002
2008
ASNZS 3003
2011
ASNZS 3004.1
2008
AS/NZS 3004.2
2008
AS 3007.1
2004
AS 3007.2
2004
AS 3007.3
2004
AS 3007.4
2004
AS 3007.5
2004
ASNZS 3008.1
2009
ASNZS 3010
2005
ASNZS 3012
2010
ASNZS 3017
2007
ASNZS 3018
Not Available
ASNZS 3019
2009
ASNZS 2067
2008
ASNZS 3760
2010
AS/NZS 4761.1
2008
AS/NZS 4761.2
2008
Page 10
Amendments
Amdt 1: Published 2009
Amdt 2: Draft
Description
Current
Version
ASNZS 5033
2005
ASNZS 4777.1
2005
ASNZS 4777.2
2005
ASNZS 4777.3
2005
ASNZS 4836
ASNZS 4741
2010
ASNZS 3439.1
2002
ASNZS 3439.2
2002
ASNZS 3439.3
2002
ASNZS 3439.4
2009
ASNZS 3439.5
AS/NZS
60079.0
AS/NZS
60079.1
AS/NZS
60079.2
AS/NZS
60079.5
AS/NZS
60079.6
AS/NZS
60079.7
AS/NZS
60079.10
Amendments
Amdt 1: 2009
Description
Current
Version
AS/NZS
60079.11
AS/NZS
60079.12
AS/NZS
60079.25
AS/NZS
60079.26
AS/NZS
60079.27
2008
AS/NZS
60079.28
2007
Amendments
2004
If members require any other Australian Standards to be listed here for future reference, please email the IEI Secretary
or send a note to the Secretary at the Postal address and we will endeavour to add it to this list.
The Institute will attempt to keep the list up to date so as all members can be notified if an update is published on any of
the Standards in the list.
I did not add any prices to the list of Standards for two reasons: 1. SAI Global may change the prices without notice and
2. I did not want any members receiving a shock.
Happy Reading.
Page 12