Description: North American Energy interventions in lieu of paper, using the (final EIS) for the project. The projects
Credit & Clearing—Risk Management FERC Online links at http:// occupy 522.69 acres of Bureau of Land
LLC submits its petition for acceptance www.ferc.gov. To facilitate electronic Management (BLM) and Forest Service
of initial rate schedule, waivers and service, persons with Internet access land: the Yale Project occupies 84.00
blanket authority. who will eFile a document and/or be acres of BLM land, the Swift No. 1
Filed Date: 03/15/2006. listed as a contact for an intervenor Project occupies 63.25 acres of BLM
VerDate Aug<31>2005 15:32 Mar 29, 2006 Jkt 208001 PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 E:\FR\FM\30MRN1.SGM 30MRN1
Federal Register / Vol. 71, No. 61 / Thursday, March 30, 2006 / Notices 16141
land and 229.00 acres of Forest Service or may be viewed on the Commission’s government agencies; elected officials;
land, the Merwin Project occupies Web site at http://www.ferc.gov using environmental and public interest
142.65 acres of BLM land, and the Swift the ‘‘eLibrary’’ link. Enter the docket groups; Native American tribes; other
No. 2 Project occupies 3.79 acres of number excluding the last three digits in interested parties; and local libraries
Forest Service land. the docket number field to access and newspapers. We encourage
The final EIS contains staff documents. For assistance, contact government representatives to notify
evaluations of the applicant’s proposal FERC Online Support at their constituents of this proposed
and the alternatives for relicensing the FERCOnlineSupport@ferc.gov or toll- project and encourage them to comment
Lewis River Projects. The final EIS free at 1–866–208–3676, or for TTY, on their areas of concern.
documents the views of governmental (202) 502–8659.
Anyone may file comments on the Summary of the Proposed Project
agencies, non-governmental
organizations, affected Indian tribes, the draft EA. The public as well as federal Kinder Morgan proposes to construct,
public, the license applicant, and and state resource agencies are operate and maintain approximately 133
Commission staff. encouraged to provide comments. All miles of natural gas pipeline in
A copy of the final EIS is available for written comments must be filed within Cameron, Calcasieu, Jefferson Davis,
review in the Commission’s Public 30 days of the issuance date of this Acadia and Evangeline Parishes,
Reference Branch, Room 2A, located at notice shown above. Send an original Louisiana. According to Kinder Morgan,
888 First Street, NE., Washington, DC and eight copies of all comments the purpose of this project is to provide
20426. The final EIS also may be viewed marked with the project number, P– an additional source of long-term,
on the Commission’s Web site at http:// 516–417, to: The Secretary, Federal competitively priced natural gas from
www.ferc.gov under the eLibrary link. Energy Regulatory Commission, 888 the Sabine Pass Liquefied Natural Gas
Enter the docket number excluding the First Street, NE., Washington, DC 20426. (LNG) Terminal to intrastate and
last three digits in the docket number Comments, protests and interventions interstate natural gas markets. Kinder
field to access the document. For may be filed electronically via the Morgan has stated that this project is
assistance, contact FERC Online Internet in lieu of paper; see 18 CFR necessary to help meet the growing
Support at 385.2001(a)(1)(iii) and the instructions imbalance between national supply and
FERCOnlineSupport@ferc.gov or toll- on the Commission’s Web site under the demand.
free at 1–866–208–3676, or for TTY, ‘‘e-Filing’’ link. The Commission
Specifically, Kinder Morgan is
(202) 502–8659. strongly encourages electronic filings.
If you have any questions regarding proposing to construct, operate and
You may also register online at http:// maintain:
www.ferc.gov/docs-filing/ this notice, please call Shana High at
(202) 502–8674. • 130 miles of 42-inch-diameter
esubscription.asp to be notified via e- pipeline beginning within the Sabine
mail of new filings and issuances Magalie R. Salas, Pass LNG Terminal in Cameron Parish
related to this or other pending projects. Secretary. and extending northward and easterly
For assistance, contact FERC Online [FR Doc. E6–4588 Filed 3–29–06; 8:45 am] through Calcasieu, Jefferson Davis and
Support. BILLING CODE 6717–01–P Acadia Parishes until it connects with
For further information, contact Ann- an existing Columbia Gulf Transmission
Ariel Vecchio at (202) 502–6351 or at interstate pipeline in Evangeline Parish,
ann-ariel.vecchio@ferc.gov. DEPARTMENT OF ENERGY Louisiana.
Magalie R. Salas, • 1 mile of 36-inch-diameter bi-
Federal Energy Regulatory
Secretary. directional pipeline beginning within
Commission
[FR Doc. E6–4648 Filed 3–29–06; 8:45 am] the Sabine Pass LNG Terminal and
BILLING CODE 6717–01–P
[Docket No. PF06–16–000] extending northward until it connects
with the existing Natural Gas Pipeline
Kinder Morgan Louisiana Pipeline, Company of America pipeline
DEPARTMENT OF ENERGY L.L.C.; Notice of Intent To Prepare an approximately one mile north of the
Environmental Impact Statement for LNG terminal in Cameron Parish,
Federal Energy Regulatory the Proposed Kinder Morgan Pipeline Louisiana.
Commission Project and Request for Comments on
• 2.2 miles of 24-inch-diameter
Environmental Issues
[Project No. 516–417] pipeline extending eastwardly from
March 24, 2006. approximately Milepost 109 of the 130-
South Carolina Electric & Gas The staff of the Federal Energy mile leg described above until it
Company; Notice of Availability of Regulatory Commission (FERC or connects with the existing Florida Gas
Draft Environmental Assessment Commission) will prepare an Transmission Company’s Compressor
environmental impact statement (EIS) Station #7 near the town of Williams in
March 23, 2006.
for the Kinder Morgan Pipeline Project Acadia Parish, Louisiana.
A draft environmental assessment
proposed in southwest Louisiana by • Associated mainline block valves,
(EA) is available for public review. The
Kinder Morgan Louisiana Pipeline, metering, tie-in and pigging facilities.
draft EA analyzes the environmental
L.L.C. This notice describes the The Kinder Morgan Pipeline would
impacts of an application for non-
proposed project, the EIS process and deliver approximately 3.4 million
project use of project lands and waters
how the public can participate in our 1 decatherms (Dth) of natural gas per day
filed for the Saluda Project. The project
cprice-sewell on PROD1PC66 with NOTICES
VerDate Aug<31>2005 15:32 Mar 29, 2006 Jkt 208001 PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 E:\FR\FM\30MRN1.SGM 30MRN1