Electric Power Cooperative, Bonneville DEPARTMENT OF ENERGY Procedural Matters
Power Administration, Citizens Utilities Any person desiring to become a Company, Eastern Maine Electric [OE Docket No. EA–289–A] party to these proceedings or to be heard Cooperative, International Transmission by filing comments or protests to this Company, Joint Owners of the Highgate Application to Export Electric Energy; application should file a petition to Project, Long Sault, Inc., Maine Electric Intercom Energy, Inc. intervene, comment or protest at the Power Company, Maine Public Service address provided above in accordance Company, Minnesota Power Inc., AGENCY: Office of Electricity Delivery with §§ 385.211 or 385.214 of the Minnkota Power Cooperative, New York and Energy Reliability, DOE. FERC’s Rules of Practice and Procedures Power Authority, Niagara Mohawk ACTION: Notice of application. (18 CFR 385.211, 385.214). Fifteen Power Corporation, Northern States copies of each petition and protest Power, and Vermont Electric SUMMARY: Intercom Energy, Inc., should be filed with DOE on or before Transmission Company. The (Intercom) has applied to renew its the dates listed above. construction, operation, maintenance, authority to transmit electric energy Comments on the Intercom and connection of each of the from the United States to Mexico application to export electric energy to international transmission facilities to pursuant to section 202(e) of the Federal Mexico should be clearly marked with be utilized by FC as more fully Power Act. Docket EA–289–A. Additional copies described in the application, has DATES: Comments, protests, or requests are to be filed directly with Ernesto previously been authorized by a to intervene must be submitted on or Pallares, Chief Executive Officer, Presidential permit issued pursuant to before May 15, 2006. Intercom Energy, Inc., 303 H Street, Suit Executive Order 10485, as amended. 401, Chula Vista, CA 91910, and Jon L. ADDRESSES: Comments, protests, or Procedural Matters requests to intervene should be Brunenkant, James W. Moeller, addressed as follows: Office of Brunenkant & Haskell, LLP, 805 15th Any person desiring to become a Street, NW., Suite 1101, Washington, party to this proceeding or to be heard Electricity Delivery and Energy Reliability, Mail Code: OE–20, U.S. DC 20005, and Daniel J. Mogin, The by filing comments or protests to this Mogin Law Firm, P.C., 110 Juniper application should file a petition to Department of Energy, 1000 Independence Avenue, SW., Street, San Diego, CA 92101. intervene, comment or protest at the A final decision will be made on this address provided above in accordance Washington, DC 20585–0350 (FAX 202– 586–5860). application after the environmental with §§ 385.211 or 385.214 of the impacts have been evaluated pursuant FERC’s Rules of Practice and Procedures FOR FURTHER INFORMATION CONTACT: to the National Environmental Policy (18 CFR 385.211, 385.214). Fifteen Steven Mintz (Program Office) 202–586– Act of 1969, and a determination is copies of each petition and protest 9506 or Michael Skinker (Program made by DOE that the proposed action should be filed with DOE on or before Attorney) 202–586–2793. will not adversely impact on the the date listed above. SUPPLEMENTARY INFORMATION: Exports of reliability of the U.S. electric power Comments on the FC application to electricity from the United States to a supply system. export electric energy to Canada should foreign country are regulated and Copies of this application will be be clearly marked with Docket EA–308. require authorization under section made available, upon request, for public Additional copies are to be filed directly 202(e) of the Federal Power Act (FPA) inspection and copying at the address with Jean-Jacques Taza, Director, First (16 U.S.C. 824a(e)). provided above or by accessing the Commodities Ltd, Worthing Corporate Intercom is a California company with program’s Home Page at http:// Center, Worthing, Christ Church, its principal place of business in Chula www.fe.doe.gov/programs/ Barbados BB15008. Vista, California. Intercom does not own electricityregulation/. Upon reaching the A final decision will be made on this or control electric generation or Home page, select ‘‘Pending application after the environmental transmission assets in the United States Proceedings.’’ impacts have been evaluated pursuant or Mexico. In addition, Intercom has no to the National Environmental Policy Issued in Washington, DC, on April 7, franchised electric service area. 2006. Act of 1969, and a determination is On May 19, 2004, the Department of made by DOE that the proposed action Anthony J. Como, Energy (DOE) issued Order No. EA–289 will not adversely impact on the Director, Permitting and Siting, Office of authorizing Intercom to transmit electric Electricity Delivery and Energy Reliability. reliability of the U.S. electric power energy from the United States to Mexico supply system. [FR Doc. E6–5502 Filed 4–12–06; 8:45 am] as a power marketer. That two year Copies of this application will be authorization will expire on May 18, BILLING CODE 6450–01–P made available, upon request, for public 2006. inspection and copying at the address On March 9, 2006, Intercom filed an DEPARTMENT OF ENERGY provided above or by accessing the application with DOE for renewal of the program’s Home Page at http:// [OE Docket No. EA–216–B] export authority contained in Order No. www.fe.doe.gov/programs/ EA–289 for an additional five-year term. electricityregulation/. Upon reaching the Application to Export Electric Energy; Intercom proposes to export electric Home page, select ‘‘Pending Transalta Energy Marketing (U.S.) Inc. energy to Mexico and to arrange for the Proceedings.’’ delivery of those exports over the AGENCY: Office of Electricity Delivery Issued in Washington, DC, on April 7, international transmission facilities HSRObinson on PROD1PC61 with NOTICES
and Energy Reliability, DOE.
2006. presently owned by San Diego Gas & ACTION: Notice of application. Anthony J. Como, Electric Company, El Paso Electric Director, Permitting and Siting, Office of Company, Central Power & Light SUMMARY: Transalta Energy Marketing Electricity Delivery and Energy Reliability. Company, and Comision Federal de (U.S.) Inc. (TEMUS) has applied to [FR Doc. E6–5501 Filed 4–12–06; 8:45 am] Electricidad, the national electric utility renew its authority to transmit electric BILLING CODE 6450–01–P of Mexico. energy from the United States to Canada