19174 Federal Register / Vol. 71, No.

71 / Thursday, April 13, 2006 / Notices

Electric Power Cooperative, Bonneville DEPARTMENT OF ENERGY Procedural Matters


Power Administration, Citizens Utilities Any person desiring to become a
Company, Eastern Maine Electric [OE Docket No. EA–289–A] party to these proceedings or to be heard
Cooperative, International Transmission by filing comments or protests to this
Company, Joint Owners of the Highgate Application to Export Electric Energy; application should file a petition to
Project, Long Sault, Inc., Maine Electric Intercom Energy, Inc. intervene, comment or protest at the
Power Company, Maine Public Service address provided above in accordance
Company, Minnesota Power Inc., AGENCY: Office of Electricity Delivery
with §§ 385.211 or 385.214 of the
Minnkota Power Cooperative, New York and Energy Reliability, DOE.
FERC’s Rules of Practice and Procedures
Power Authority, Niagara Mohawk ACTION: Notice of application. (18 CFR 385.211, 385.214). Fifteen
Power Corporation, Northern States copies of each petition and protest
Power, and Vermont Electric SUMMARY: Intercom Energy, Inc.,
should be filed with DOE on or before
Transmission Company. The (Intercom) has applied to renew its the dates listed above.
construction, operation, maintenance, authority to transmit electric energy Comments on the Intercom
and connection of each of the from the United States to Mexico application to export electric energy to
international transmission facilities to pursuant to section 202(e) of the Federal Mexico should be clearly marked with
be utilized by FC as more fully Power Act. Docket EA–289–A. Additional copies
described in the application, has DATES: Comments, protests, or requests are to be filed directly with Ernesto
previously been authorized by a to intervene must be submitted on or Pallares, Chief Executive Officer,
Presidential permit issued pursuant to before May 15, 2006. Intercom Energy, Inc., 303 H Street, Suit
Executive Order 10485, as amended. 401, Chula Vista, CA 91910, and Jon L.
ADDRESSES: Comments, protests, or
Procedural Matters requests to intervene should be Brunenkant, James W. Moeller,
addressed as follows: Office of Brunenkant & Haskell, LLP, 805 15th
Any person desiring to become a Street, NW., Suite 1101, Washington,
party to this proceeding or to be heard Electricity Delivery and Energy
Reliability, Mail Code: OE–20, U.S. DC 20005, and Daniel J. Mogin, The
by filing comments or protests to this Mogin Law Firm, P.C., 110 Juniper
application should file a petition to Department of Energy, 1000
Independence Avenue, SW., Street, San Diego, CA 92101.
intervene, comment or protest at the A final decision will be made on this
address provided above in accordance Washington, DC 20585–0350 (FAX 202–
586–5860). application after the environmental
with §§ 385.211 or 385.214 of the impacts have been evaluated pursuant
FERC’s Rules of Practice and Procedures FOR FURTHER INFORMATION CONTACT:
to the National Environmental Policy
(18 CFR 385.211, 385.214). Fifteen Steven Mintz (Program Office) 202–586–
Act of 1969, and a determination is
copies of each petition and protest 9506 or Michael Skinker (Program
made by DOE that the proposed action
should be filed with DOE on or before Attorney) 202–586–2793.
will not adversely impact on the
the date listed above. SUPPLEMENTARY INFORMATION: Exports of reliability of the U.S. electric power
Comments on the FC application to electricity from the United States to a supply system.
export electric energy to Canada should foreign country are regulated and Copies of this application will be
be clearly marked with Docket EA–308. require authorization under section made available, upon request, for public
Additional copies are to be filed directly 202(e) of the Federal Power Act (FPA) inspection and copying at the address
with Jean-Jacques Taza, Director, First (16 U.S.C. 824a(e)). provided above or by accessing the
Commodities Ltd, Worthing Corporate Intercom is a California company with program’s Home Page at http://
Center, Worthing, Christ Church, its principal place of business in Chula www.fe.doe.gov/programs/
Barbados BB15008. Vista, California. Intercom does not own electricityregulation/. Upon reaching the
A final decision will be made on this or control electric generation or Home page, select ‘‘Pending
application after the environmental transmission assets in the United States Proceedings.’’
impacts have been evaluated pursuant or Mexico. In addition, Intercom has no
to the National Environmental Policy Issued in Washington, DC, on April 7,
franchised electric service area. 2006.
Act of 1969, and a determination is On May 19, 2004, the Department of
made by DOE that the proposed action Anthony J. Como,
Energy (DOE) issued Order No. EA–289
will not adversely impact on the Director, Permitting and Siting, Office of
authorizing Intercom to transmit electric Electricity Delivery and Energy Reliability.
reliability of the U.S. electric power energy from the United States to Mexico
supply system. [FR Doc. E6–5502 Filed 4–12–06; 8:45 am]
as a power marketer. That two year
Copies of this application will be authorization will expire on May 18, BILLING CODE 6450–01–P
made available, upon request, for public 2006.
inspection and copying at the address
On March 9, 2006, Intercom filed an DEPARTMENT OF ENERGY
provided above or by accessing the
application with DOE for renewal of the
program’s Home Page at http:// [OE Docket No. EA–216–B]
export authority contained in Order No.
www.fe.doe.gov/programs/
EA–289 for an additional five-year term.
electricityregulation/. Upon reaching the Application to Export Electric Energy;
Intercom proposes to export electric
Home page, select ‘‘Pending Transalta Energy Marketing (U.S.) Inc.
energy to Mexico and to arrange for the
Proceedings.’’
delivery of those exports over the AGENCY: Office of Electricity Delivery
Issued in Washington, DC, on April 7, international transmission facilities
HSRObinson on PROD1PC61 with NOTICES

and Energy Reliability, DOE.


2006. presently owned by San Diego Gas & ACTION: Notice of application.
Anthony J. Como, Electric Company, El Paso Electric
Director, Permitting and Siting, Office of Company, Central Power & Light SUMMARY: Transalta Energy Marketing
Electricity Delivery and Energy Reliability. Company, and Comision Federal de (U.S.) Inc. (TEMUS) has applied to
[FR Doc. E6–5501 Filed 4–12–06; 8:45 am] Electricidad, the national electric utility renew its authority to transmit electric
BILLING CODE 6450–01–P of Mexico. energy from the United States to Canada

VerDate Aug<31>2005 14:20 Apr 12, 2006 Jkt 208001 PO 00000 Frm 00015 Fmt 4703 Sfmt 4703 E:\FR\FM\13APN1.SGM 13APN1