Sei sulla pagina 1di 2

20530 Federal Register / Vol. 71, No.

77 / Friday, April 21, 2006 / Rules and Regulations

Exception to Service Bulletin New Requirements of This AD Table 1 of this AD is complied with. If a
(i) Where the service bulletin specifies to fractured thrust link is found during any
Terminating Action—Repetitive Replacement
contact Boeing for appropriate action, do the or Overhaul of All Thrust Links replacement or overhaul done in accordance
corrective action using a method approved in with this paragraph: Before further flight, do
accordance with paragraph (l) of this AD. (k) At the applicable compliance times the corrective actions specified in paragraph
specified in Table 1 of this AD: Repetitively
Credit for Certain Corrective Actions (h)(2) of this AD. Repetitive replacement of
replace the thrust link of the rear engine
mount of struts 1, 2, 3, and 4 with a new or all thrust links having P/N 65B90360–1 or –4
(j) Reworking the lugs on the bulkhead
overhauled thrust link, in accordance with terminates the repetitive inspections required
fitting of the rear engine mount as specified
in paragraphs (b)(2), (e), and (f) of AD 2001– Part 2 of the service bulletin; except as by paragraph (g) of this AD. Accomplishing
15–15, amendment 39–12349, is acceptable provided by paragraph (i) of this AD. During the repetitive replacement or overhaul of a
for compliance with accomplishing the any replacement required by this paragraph, thrust link required by paragraph (h) of this
corrective action specified in ‘‘Part 3—Rear an existing thrust link may be replaced with AD constitutes compliance with the
Engine Mount Bulkhead Inspection and Lug a new or overhauled thrust link having P/N requirements of this paragraph for that thrust
Overhaul and Upper Fitting Overhaul and 65B90360–1, –4 or –7, provided that the link only.
Bolt Replacement’’ of the service bulletin. applicable repetitive interval specified in

TABLE 1.—COMPLIANCE TIMES


For thrust link P/N— Initial replacement— Repetitive interval—

65B90360–1 or –4 ............................................. Within 36 months after the effective date of Thereafter at intervals not to exceed 6,000
this AD. flight cycles.
65B90360–7 ...................................................... Within 12,000 flight cycles after the new thrust Thereafter at intervals not to exceed 12,000
link has been installed. flight cycles.

Alternative Methods of Compliance otherwise. On September 30, 2005 (70 FR DEPARTMENT OF TRANSPORTATION
(AMOCs) 54474, September 15, 2005), the Director of
(l)(1) The Manager, Seattle Aircraft the Federal Register approved the Federal Aviation Administration
Certification Office (ACO), FAA, has the incorporation by reference of Boeing Alert
authority to approve AMOCs for this AD, if Service Bulletin 747–71A2309, dated August 14 CFR Part 39
requested in accordance with the procedures 18, 2005. Contact Boeing Commercial
found in 14 CFR 39.19. Airplanes, P.O. Box 3707, Seattle, [Docket No. FAA–2006–24364; Directorate
(2) Before using any AMOC approved in Identifier 2004–NM–272–AD; Amendment
Washington 98124–2207, for a copy of this
accordance with § 39.19 on any airplane to 39–14534; AD 2006–07–07]
which the AMOC applies, notify the service information. You may review copies
appropriate principal inspector in the FAA at the Docket Management Facility, U.S. RIN 2120–AA64
Flight Standards Certificate Holding District Department of Transportation, 400 Seventh
Office. Street, SW., room PL–401, Nassif Building, Airworthiness Directives; Airbus Model
(3) An AMOC that provides an acceptable Washington, DC; on the Internet at http:// A300 B4–600, B4–600R, and F4–600R
level of safety may be used for any repair dms.dot.gov; or at the National Archives and Series Airplanes, and Model C4–605R
required by this AD, if it is approved by an Records Administration (NARA). For Variant F Airplanes (Collectively Called
Authorized Representative for the Boeing information on the availability of this A300–600 Series Airplanes)
Commercial Airplanes Delegation Option
material at the NARA, call (202) 741–6030,
Authorization Organization who has been AGENCY: Federal Aviation
authorized by the Manager, Seattle ACO, to or go to http://www.archives.gov/
Administration (FAA), Department of
make those findings. For a repair method to federal_register/code_of_federal_regulations/
ibr_locations.html.
Transportation (DOT).
be approved, the repair must meet the
certification basis of the airplane, and the ACTION: Final rule; correction.
Issued in Renton, Washington, on April 13,
approval must specifically refer to this AD.
2006. SUMMARY: The FAA is correcting a
(4) The actions identified in paragraphs (g)
and (k) of this AD are approved as an AMOC Ali Bahrami, typographical error in an existing
to paragraphs (c) and (d) of AD 2004–07–22, Manager, Transport Airplane Directorate, airworthiness directive (AD) that was
amendment 39–13566, for the inspections of Aircraft Certification Service. published in the Federal Register on
structural significant item S–2, for the thrust March 31, 2006 (71 FR 16206). The error
[FR Doc. 06–3796 Filed 4–20–06; 8:45 am]
links only, of Boeing Supplemental resulted in an incorrect Docket No. This
Structural Inspection Document D6–35022, BILLING CODE 4910–13–P
AD applies to certain Airbus Model
Revision G, dated December 2000. All
provisions of AD 2004–07–22 that are not A300–600 series airplanes. This AD
specifically referenced in this paragraph, requires modifying nine bolt holes in
including the initial inspection threshold the vertical flange to prevent cracking
required by paragraph (d) of AD 2004–07–22, before the inspection threshold of AD
remain fully applicable and must be 98–18–02.
complied with.
DATES: Effective April 17, 2006.
(5) AMOCs approved previously in
accordance with AD 2005–19–06, ADDRESSES: The AD docket contains the
amendment 39–14271, are approved as proposed AD, comments, and any final
AMOCs for the corresponding provisions of disposition. You may examine the AD
this AD. docket on the Internet at http://
dms.dot.gov, or in person at the Docket
wwhite on PROD1PC61 with RULES

Material Incorporated by Reference


(m) You must use Boeing Alert Service Management Facility office between 9
Bulletin 747–71A2309, dated August 18, a.m. and 5 p.m., Monday through
2005, to perform the actions that are required Friday, except Federal holidays. The
by this AD, unless the AD specifies Docket Management Facility office

VerDate Aug<31>2005 16:06 Apr 20, 2006 Jkt 208001 PO 00000 Frm 00008 Fmt 4700 Sfmt 4700 E:\FR\FM\21APR1.SGM 21APR1
Federal Register / Vol. 71, No. 77 / Friday, April 21, 2006 / Rules and Regulations 20531

(telephone (800) 647–5227) is located on SUMMARY: The FAA is adopting a new reports of incidents of PW535A
the plaza level of the Nassif Building at airworthiness directive (AD) for Pratt & turboshaft engines experiencing lack of
the U.S. Department of Transportation, Whitney Canada (PWC) PW535A response to the power lever input
400 Seventh Street, SW., room PL–401, turboshaft engines with serial numbers during engine acceleration, due to an
Washington, DC. This docket number is (SNs) lower than DC0241, and with incorrect adjustment of the HFC ratio
FAA–2006–24364; the directorate hydromechanical fuel control (HFC) unit setscrew. Two events resulted in
identifier for this docket is 2004–NM– part number (P/N) 819735–4, 819735–5, engine in-flight shutdowns.
272–AD. or 819735–6 installed. This AD requires
Relevant Service Information
FOR FURTHER INFORMATION CONTACT: Tim inspection and verification of the proper
Backman, Aerospace Engineer, ANM– adjustment of the ratio unit setscrew We have reviewed and approved the
116, International Branch, Transport adjustment of installed HFC units. This technical contents of PWC Alert Service
Airplane Directorate, FAA, 1601 Lind AD results from incidents of PW535A Bulletin (ASB) No. PW500–72–A30257,
Avenue, SW., Renton, Washington turboshaft engines experiencing lack of Revision 1, dated December 3, 2004,
98055–4056; telephone (425) 227–2797; response to the power lever input that describes procedures for inspecting
fax (425) 227–1149. during attempted engine acceleration, and verifying proper adjustment of the
SUPPLEMENTARY INFORMATION: On March due to an incorrect adjustment of the ratio unit setscrew of installed HFC
15, 2006, the FAA issued AD 2006–07– HFC ratio unit setscrew. We are issuing units. Transport Canada classified this
07, amendment 39–14534 (71 FR 16206, this AD to prevent lack of engine ASB as mandatory and issued AD CF–
March 31, 2006), for certain Airbus response to power lever input, which 2004–28 in order to ensure the
Model A300–600 series airplanes. The could cause a single or dual engine in- airworthiness of these PWC engines in
AD requires modifying nine bolt holes flight shutdown event. Canada.
in the vertical flange to prevent cracking DATES: Effective May 8, 2006. The
Bilateral Airworthiness Agreement
before the inspection threshold of AD Director of the Federal Register
98–18–02. approved the incorporation by reference This PW535A turboshaft engine
As published, the AD lists the Docket of certain publications listed in the model is manufactured in Canada and is
No. as FAA–2006–24124. The correct regulations as of May 8, 2006. We must type certificated for operation in the
Docket No. is FAA–2006–24364. receive any comments on this AD by United States under the provisions of
No other part of the regulatory June 20, 2006. section 21.29 of the Federal Aviation
information has been changed; ADDRESSES: Use one of the following Regulations (14 CFR 21.29) and the
therefore, the final rule is not addresses to comment on this AD: applicable bilateral airworthiness
republished in the Federal Register. • DOT Docket Web site: Go to http:// agreement. Under this bilateral
The effective date of this AD remains dms.dot.gov and follow the instructions airworthiness agreement, Transport
April 17, 2006. for sending your comments Canada kept the FAA informed of the
In the Federal Register of March 31, situation described above. We have
electronically.
2006, on page 16206, in the first • Government-wide rulemaking Web examined the findings of Transport
column; on page 16207, in the third site: Go to http://www.regulations.gov Canada, reviewed all available
column; and on page 16208 in the and follow the instructions for sending information, and determined that AD
second column; the Docket No. of AD your comments electronically. action is necessary for products of this
2006–07–07 is corrected to read as • Mail: Docket Management Facility; type design that are certificated for
follows: FAA–2006–24364. U.S. Department of Transportation, 400 operation in the United States.
Issued in Renton, Washington, on April 13, Seventh Street, SW., Nassif Building,
2006. Room PL–401, Washington, DC 20590– FAA’s Determination and Requirements
Ali Bahrami, 0001. of This AD
Manager, Transport Airplane Directorate, • Fax: (202) 493–2251. The unsafe condition described
Aircraft Certification Service. • Hand Delivery: Room PL–401 on previously is likely to exist or develop
[FR Doc. 06–3797 Filed 4–20–06; 8:45 am] the plaza level of the Nassif Building, on other PW535A turboshaft engines of
BILLING CODE 4910–13–P 400 Seventh Street, SW., Washington, the same type design. We are issuing
DC, between 9 a.m. and 5 p.m., Monday this AD to prevent lack of engine
through Friday, except Federal holidays. response to power lever input, which
DEPARTMENT OF TRANSPORTATION Contact Pratt & Whitney Canada, 1000 could cause a single or dual engine in-
Marie-Victorin, Longueuil, Quebec, flight shutdown event. This AD requires
Federal Aviation Administration Canada, J4G 1A1; telephone 800–268– inspection and verification of the proper
8000; fax 450–647–2888, for the service adjustment of the ratio unit setscrew of
14 CFR Part 39 information identified in this AD. installed HFC units. You must use the
[Docket No. FAA–2006–24117; Directorate FOR FURTHER INFORMATION CONTACT: Ian service information described
Identifier 2006–NE–07–AD; Amendment 39– Dargin, Aerospace Engineer, Engine previously to perform the actions
14570; AD 2006–08–13] Certification Office, FAA, Engine and required by this AD.
RIN 2120–AA64 Propeller Directorate, 12 New England
Executive Park, Burlington, MA 01803; FAA’s Determination of the Effective
Airworthiness Directives; Pratt & telephone (781) 238–7178; fax (781) Date
Whitney Canada (PWC) PW535A 238–7199. Since an unsafe condition exists that
Turboshaft Engines SUPPLEMENTARY INFORMATION: Transport requires the immediate adoption of this
AGENCY: Federal Aviation Canada, which is the airworthiness AD, we have found that notice and
authority for Canada, recently notified opportunity for public comment before
wwhite on PROD1PC61 with RULES

Administration (FAA), Department of


Transportation (DOT). us that an unsafe condition may exist on issuing this AD are impracticable, and
PWC PW535A turboshaft engines with that good cause exists for making this
ACTION: Final rule; request for
SNs lower than DC0241. Transport amendment effective in less than 30
comments.
Canada advises that they received days.

VerDate Aug<31>2005 16:06 Apr 20, 2006 Jkt 208001 PO 00000 Frm 00009 Fmt 4700 Sfmt 4700 E:\FR\FM\21APR1.SGM 21APR1

Potrebbero piacerti anche