Reference
B1-3.6.2.15 page 49
B1-3.6.2.14 page 47
No. Description
1 P & G's
1.1 Geotechnical report (bore logs, trial pits, sounding logs) and to
Actual ground level
Description and limits of various soil layers
Sample taken
SPT results
Water levels
Depth of borehole/pit/sounding
1.2 Topographic survey (10 meter grids and 0.5 meter vertical inte
Obtain topographic survey maps
Ensure position and elevation of all works are correct
1.3 Costs
for obligations,
equipment
or labour,
although
not specifi
Establishment
of site camp
and stores
including
site clearance
Contract
in
terms
of
the
specification
and
Statutory
Requireme
1.4 requirements
standard tables,12 x chairs,1 x mini fridge, 2x cupboard with s
1.5 lights)
1.6 Temporary latrines and sanitary (allowed 1x for ABB office)
1.7 Temporary fence around site establishment
1.10 Temporary gate
1.11 Temporary water connection
1.12 Temporary electricity connection/generator (20kVA)
1.13 Water usage
1.14 Electricity/petrol or diesel
1.15 Tempoary site sign board
1.16 Supervision & Labour
1.17 Health and Saftey - safety signs and PPE according to ABB spec
1.18 Security guard (allow 1x person for day watch and 1 x person f
1.19 De-establishment of site camp and stores
2.2 Rate for overhaul per m3 of spoil for a distance greater than 1
2.3 Dig up and remove concrete foundation
2.4 Remove yard stone and to be stored for later use
2.5 Re-instate yard stone
B02-4.6.7 page 77
CHINTH
Reference
No. Description
Sand
Fillers
Concrete cubes
3.1 Keeping all foundations free of water
3.2 Risk of collapse to sides of all excavations
B1-4.9.7.14 page152
B1-4.9.7.14 page152
B1-4.9.7.14 page152
CHINTH
Reference
B1-4.9.7.17 page 163
B1-4.9.7.17 page 169
B1-4.9.7.17 page 169
No. Description
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
CHINTH
Reference
B1-4.9.7.14 page152
B1-4.9.7.17 page 163
B1-4.9.7.17 page 170
B1-4.9.7.17 page 170
B1-4.9.7.17 page 163
B1-4.9.7.17 page 169
B1-4.9.7.17 page 169
B1-4.9.7.14 page 154
B1-4.9.7.14 page 153
B1-4.9.7.19 page 179
B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66
B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
page152
page 163
page 170
page 170
page 163
No. Description
Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150mm to 9
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 4)
3.7 132 kV Surge Arrestor
Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
B1-4.9.7.14 page152
CHINTH
Reference
B1-4.9.7.14 page152
No. Description
3.9 132 kV Cable Sealing End
Excavation in insitu material
B1-4.9.7.14 page152
B1-4.9.7.14 page152
CHINTH
Reference
B1-4.9.7.19 page 179
B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66
B1-4.9.7.14 page152
No. Description
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 6)
3.12 33 kV Current Transformer
Excavation in insitu material
B1-4.9.7.14 page152
B1-4.9.7.14 page152
3.14 11 kV Isolator
Excavation in insitu material
B1-4.9.7.14 page152
3.15 Auxillary
Excavation in insitu material
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14
B1-4.9.7.14
page
page
page
page
page
163
169
169
154
153
CHINTH
Reference
B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66
B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14
B1-4.9.7.14
page152
page 163
page 170
page 170
page 163
page 169
page 169
page 154
page 153
No. Description
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts
4.3 Backill with sifted clean sand in depth of 150mm and compact
4.4
Backfill with excavated insitu material in depths of 150mm and
5.2 Prepare and comply with an approved weed control and spread
Unit
generator (20kVA)
oad
lacement of Material" is required
e method for each second layer of "Backfilling and/or
adwork"
Item
Item
1
1
1
2
1
2
1
1
1
1
1
1
1
2
1
Item
Item
Item
month
Item
Item
Item
Item
Month
Month
Item
Month
Item
Month
Item
104
m2
Km
No
104
104
m2
m2
1
3
1
3
3
2
2
Test
Test
Test
Test
Test
Test
Test
ter
Quantity
2
2
3
Unit
Test
Test
Test
1
1
Item
Item
3.62
m3
0.21
m3
sound timber)
4.20
m2
und timber)
2.91
m2
olumn stub
2.06
6.00
1.13
m3
m
m2
1.85
m3
1.77
207.00
1.00
0.06
8
m3
kg
No
m3
No
2.21
m3
0.13
m3
sound timber)
3.36
m2
und timber)
2.16
m2
olumn stub
1.28
4.80
0.72
m3
m
m2
0.94
m3
1.27
79.00
1
0.04
8
m3
kg
No
m3
No
1.03
m3
0.06
m3
sound timber)
1.96
m2
und timber)
1.32
m2
olumn stub
Quantity
0.71
2.80
0.49
Unit
m3
m
m2
0.36
m3
0.67
47.00
1
0.02
4
m3
kg
No
m3
No
sound timber)
und timber)
olumn stub
Quantity
1.03
0.06
1.96
1.32
0.71
2.80
0.49
0.36
0.67
47.00
1
0.02
4
Unit
m3
m3
m2
m2
m3
m
m2
m3
m3
kg
No
m3
No
1.03
0.06
1.96
1.32
0.71
2.80
0.49
m3
m3
m2
m2
m3
m
m2
0.36
m3
0.67
47.00
1
0.02
4
m3
kg
No
m3
No
1.03
m3
0.06
m3
sound timber)
1.96
m2
und timber)
1.32
m2
olumn stub
0.71
2.80
0.49
m3
m
m2
0.36
m3
0.67
47.00
1
0.02
4
m3
kg
No
m3
No
sound timber)
und timber)
olumn stub
Unit
0.67
m3
0.06
m3
sound timber)
0.20
m2
und timber)
0.36
0.56
2.80
0.49
m2
m3
m
m2
0.14
m3
0.52
38.00
4
0.02
4
m3
kg
No
m3
No
2.43
m3
0.14
m3
sound timber)
3.92
m2
und timber)
3.78
m2
olumn stub
1.54
5.60
0.98
m3
m
m2
0.74
m3
1.69
86.00
1
0.05
8
m3
kg
No
m3
No
1.23
m3
0.14
m3
2.04
m2
olumn stub
sound timber)
und timber)
olumn stub
1.64
6.80
2.73
1.23
m2
m3
m
m2
m3
m3
Quantity
103.00
1.00
0.14
6.00
Unit
kg
No
m3
No
0.85
m3
0.05
m3
sound timber)
1.96
m2
und timber)
1.20
m2
olumn stub
0.64
2.80
0.49
m3
m
m2
0.26
m3
0.59
40.00
1.00
0.02
4.00
m3
kg
No
m3
No
1.20
m3
1.20
m3
1.20
m3
1.20
m3
1.20
m3
1.20
m3
0.49
m3
0.10
m3
2.24
m2
m2
0.78
5.6
1.96
0.00
m3
m
m2
m3
0.49
m3
3.92
m2
sound timber)
und timber)
olumn stub
sound timber)
und timber)
olumn stub
Quantity
1
0.10
4
Unit
No
m3
No
0.13
0.03
0.96
0
0.19
3.20
0.63
0.00
m3
m3
m2
m2
m3
m
m2
m3
0.13
0
0
0.03
0
m3
kg
No
m3
No
x 0.225 x 0.050m)
ved weed control and spread over cable sealing end yard
66.00
m3
30.00
m3
150.00
m3
46.88
m3
100
100
3
m
m
No
42
104.00
m2
104.00
m2
Subtotal
Vat 16%
Final Total
Number
Rate
Total
1,000.00
1,000.00
200.00
200.00
1
1
1
6
1
1
1
1
6
6
1
6
1
6
1
$
$
$
$
$
$
$
$
$
$
$
$
50.00
1,000.00
30,000.00
750.00
8,000.00
200.00
500.00
500.00
500.00
1,000.00
500.00
1,000.00
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
150.00 $
1,000.00 $
50.00
1,000.00
30,000.00
9,000.00
8,000.00
400.00
500.00
500.00
3,000.00
6,000.00
500.00
6,000.00
1,800.00
1,000.00
0.80 $
83.20
20.00
20.00 $
45.00 $
225.00
$
$
0.80 $
1.50 $
83.20
156.00
$
$
$
$
$
$
$
200.00
200.00
200.00
200.00
200.00
100.00
100.00
$
$
$
$
$
$
$
200.00
600.00
200.00
600.00
600.00
200.00
200.00
Number
$
$
$
Rate
100.00 $
100.00 $
200.00 $
Total
200.00
200.00
600.00
$
$
100.00 $
100.00 $
100.00
100.00
7.00
25.32
190.00
40.42
30.00
126.00
25.00
72.75
1
1
1
$
$
$
265.00
4.00
5.00
$
$
$
546.96
24.00
5.63
7.00
12.92
1
1
1
1
1
$
$
$
$
$
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
12.39
621.00
5.50
0.39
40.00
7.00
139.23
190.00
222.30
30.00
907.20
25.00
486.00
9
9
9
$
$
$
265.00
4.00
5.00
$
$
$
3,062.34
172.80
32.40
7.00
59.22
9
9
9
9
9
$
$
$
$
$
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
80.01
2,133.00
49.50
2.27
360.00
7.00
21.60
190.00
34.49
30.00
176.40
25.00
99.00
Number
3
3
3
$
$
$
Rate
265.00
4.00
5.00
$
$
$
Total
561.27
33.60
7.35
7.00
7.56
3
3
3
3
3
$
$
$
$
$
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
14.04
423.00
16.50
0.51
60.00
Number
3
3
3
3
3
3
3
3
3
3
3
3
3
$
$
$
$
$
$
$
$
$
$
$
$
$
Rate
7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
$
$
$
$
$
$
$
$
21.60
34.49
176.40
99.00
561.27
33.60
7.35
7.56
14.04
423.00
16.50
0.51
60.00
6
6
6
6
6
6
6
$
$
$
$
$
$
$
7.00
190.00
30.00
25.00
265.00
4.00
5.00
$
$
$
$
$
$
$
43.20
68.97
352.80
198.00
1,122.54
67.20
14.70
7.00
15.12
6
6
6
6
6
$
$
$
$
$
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
28.08
846.00
33.00
1.03
120.00
7.00
36.00
190.00
57.48
30.00
294.00
25.00
165.00
5
5
5
$
$
$
265.00
4.00
5.00
$
$
$
935.45
56.00
12.25
7.00
12.60
5
5
5
5
5
$
$
$
$
$
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
23.40
705.00
27.50
0.86
100.00
Total
Number
Rate
Total
7.00
27.95
190.00
68.97
30.00
35.28
6
6
6
6
$
$
$
$
25.00
265.00
4.00
5.00
$
$
$
$
54.45
888.81
67.20
14.70
7.00
6.05
6
6
6
6
6
$
$
$
$
$
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
21.90
684.00
132.00
1.03
120.00
7.00
34.03
190.00
54.34
30.00
235.20
25.00
189.00
2
2
2
$
$
$
265.00
4.00
5.00
$
$
$
818.32
44.80
9.80
7.00
10.42
2
2
2
2
2
$
$
$
$
$
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
23.62
516.00
11.00
0.69
80.00
7.00
8.60
190.00
25.94
30.00
61.20
25.00
1
1
1
$
$
$
265.00
4.00
5.00
$
$
434.07
27.20
13.65
7.00
7.00
8.61
Number
1
1
1
1
$
$
$
$
Rate
3.00
5.50
7.00
5.00
$
$
Total
309.00
5.50
$
$
0.96
30.00
7.00
17.85
190.00
28.50
30.00
176.40
25.00
90.00
3
3
3
$
$
$
265.00
4.00
5.00
$
$
$
511.19
33.60
7.35
7.00
5.46
3
3
3
3
3
$
$
$
$
$
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
12.39
360.00
16.50
0.51
60.00
7.00
42.00
265.00
1,590.00
7.00
42.00
7.00
50.40
265.00
1,908.00
7.00
50.40
7.00
3.43
190.00
18.62
30.00
67.20
25.00
1
1
1
1
$
$
$
$
265.00
4.00
5.00
7.00
$
$
$
$
207.76
22.40
9.80
-
7.00
3.43
3.00
11.76
nal Total
Number
1
1
1
$
$
$
Rate
5.50
7.00
5.00
$
$
$
5.50
0.69
20.00
1
1
1
1
1
1
1
1
$
$
$
$
$
$
$
$
7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
$
$
$
$
$
$
$
$
0.88
5.99
28.80
50.09
12.80
3.15
-
1
1
1
1
1
$
$
$
$
$
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
0.91
0.22
-
7.00 $
462.00
7.00
Total
$
$
$
$
328.13
-
200.00 $
8,400.00
1.00 $
104.00
1,560.00
$
$
$
112,208.12
17,953.30
130,161.41
15.00
LU
Reference
B1-3.6.2.15 page 49
B1-3.6.2.14 page 47
No. Description
1 P & G's
1.1 Geotechnical report (bore logs, trial pits, sounding logs)
Actual ground level
Description and limits of various soil layers
Sample taken
SPT results
Water levels
Depth of borehole/pit/sounding
1.2 Topographic survey (10 meter grids and 0.5 meter vertic
Obtain topographic survey maps
Ensure position and elevation of all works are correct
1.3 Establishment
Costs
forx obligations,
equipment
or for
labour,
although
nott
site1 camp
and stores
including
site clea
Allow 1
officeof
and
x boardroom
ABB
(containers
complete
the
Contract
in
terms
of
the
specification
and
1.4 requirements
standard tables,12 x chairs,1 x mini fridge, 2x cupboardS
2 SITE WORKS
2.1 Remove all bushes, shrubs and trees and strip 150mm o
for later use. All material not used will be dumped at a s
within 10km from site
2.2 Breaking up and removing concrete foundations
LU
Reference
No. Description
3 TESTS (shall be performed for each 500m3 of fill)
Analyzing the ingredients of the water used for performa
Gravity of soil
Bearing capacity of soil for static load
Brain size analysis of soils, if "Replacement of Material"
Density of soil in place of sandcone method for each sec
replacement
of material and/or roadwork"
Cement
Aggregate
Sand
Fillers
Concrete cubes
3.1 Keeping all foundations free of water
3.2 Risk of collapse to sides of all excavations
B1-4.9.7.14 page152
B1-4.9.7.14 page152
LU
Reference
B1-4.9.7.20 page 180
B1-4.2.1 page 66
B1-4.9.7.14 page152
No. Description
Grout - 35mPa to top of stub
Greasing of HD Bolts (M24X 8)
3.5 132 kV Circuit Breaker
Excavation in insitu material
LU
Reference
B1-4.9.7.14 page152
No. Description
Excavation in insitu material
B1-4.9.7.14 page152
153
179
179
180
B1-4.9.7.14 page152
B1-4.9.7.17 page 163
LU
Reference
B1-4.2.1 page 66
B1-4.9.7.14 page152
No. Description
Greasing of HD Bolts (M24 X 8)
3.9 132 kV Low Post Insulator
Excavation in insitu material
B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14
B1-4.9.7.14
page152
page 163
page 170
page 170
page 163
page 169
page 169
page 154
page 153
B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14
B1-4.9.7.14
page152
page 163
page 170
page 170
page 163
page 169
page 169
page 154
page 153
3.11 33 kV Gantry
Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150m
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
LU
Reference
B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66
B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14
B1-4.9.7.14
page152
page 163
page 170
page 170
page 163
page 169
page 169
page 154
page 153
B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14
B1-4.9.7.14
page152
page 163
page 170
page 170
page 163
page 169
page 169
page 154
page 153
B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14
page152
page 163
page 170
page 170
page 163
page 169
page 169
page 154
No. Description
HD Bolts - Template and installation (ABB to supply bolts
Grout - 35mPa to top of stub
Greasing of HD Bolts (M36 X 8)
LU
Reference
B1-4.9.7.14 page 153
B1-4.9.7.19 page 179
B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66
B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14
B1-4.9.7.14
page152
page 163
page 170
page 170
page 163
page 169
page 169
page 154
page 153
B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14
B1-4.9.7.14
page152
page 163
page 170
page 170
page 163
page 169
page 169
page 154
page 153
No. Description
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 4)
3.16 33 kV Disconnetor
Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150m
LU
Reference
B1-4.9.7.14 page 154
No. Description
Backfill with excavated insitu material in depths of 150m
Stock pile insitu surplus material (for carting away)
LU
Reference
No. Description
Type D3: 885 x 2100mm Frame and door including all iro
Internal wall finishes:
Walls to be plastered and painted to match existing
External wall finish:
LU
Reference
No. Description
500mm strip to be plastered and painted to match exist
4 EARTH MAT
4.1 Excavate 300mm (width) x 1000mm (depth) for earth gr
4.2 Backfilling to earthing grid and compact the ground surf
compacting to 95% Mod AASHTO density
5.4 Concrete trench cover for 500mm wide trench (with max
B1-3.6.2.12 page 46
6 DRAINAGE
6.1
Subsoil Drain
Supply, lay and joint 2 x 160mm diameter pr
1100mm below NGL in trench which is to be lined with g
A6) and backfill with 50 to 75mm diameter stone, includ
support of sides, keeping excavations dry, complete (ref
6.2 Construct cast insitu concrete manhole with lid and incl
material, temporary support of sides, keeping excavatio
drawing no. ZZZ 824-200)
6.3 Supply, lay, joint and bed 300mm diameter class 50D sp
sewer pipes including necessary bends and tees from tra
separator
6.4 Supply, lay, joint and bed 450mm diameter class 50D sp
sewer pipes including necessary bends and tees
6.5 Supply, lay, joint and bed 110mm Diameter PVC pipe inc
tees
6.7 Oil trap (refer to drawing no. ZZZ 824-200)
Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
LU
Reference
B1-4.9.7.14
B1-4.9.7.15
B1-4.9.7.15
B1-4.9.7.15
B1-4.9.7.14
B1-4.9.7.15
B1-4.9.7.15
B1-4.9.7.15
B1-4.9.7.15
No. Description
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of concrete to fit covers
100mm Diameter concrete cut out
Wood float top of concrete slab
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
16mm Diameter galvanised iron steps 1650mm long
Heavy duty manhole covers
200mm Diameter steel pipe
100mm Diameter ventilator PVC pipe with bend
100mm lay,
Diameter
concrete
pipe Diameter uPVC pipe in
Supply,
joint and
bed 160mm
tees
Paint x 2 layers of bitumen to internal surfaces of separa
page
page
page
page
page
page
page
page
page
152
156
156
158
152
156
156
158
156
7 ROAD
7.1 Access road
Excavation in insitu material
8 YARD WORKS
8.1 The complete, supply and installation of a security fence
parts, gates etc. 2m High diamond mesh plastic coated g
300mm flat wrap razor wire on the overhang fence and c
45 degree inclination at the apex, fence to be fixed on a
LU
Reference
B1-4.9.7.17 page 171
B1-4.9.7.17 page 171
B1-4.9.7.14 page 155
No. Description
8.2 5m Wide motorised electric fence, with a frame height th
8.3 1m Wide pedestrian gate with a frame height that match
8.4 Prepare and comply with an approved weed control and
B1-3.6.2.13 page 46
Unit
Number
Item
Item
1
1
1
2
1
2
1
1
1
1
1
1
1
2
1
Item
Item
Item
month
1
1
1
8
1
1
1
1
8
8
1
8
1
8
1
blishment
generator (20kVA)
te foundations
for a distance greater than 10km - rate per km
aterial
and black cotton
diate material
Item
Item
Item
Item
Month
Month
Item
Month
Item
Month
Item
4,423.60
m2
10.00
No
1.00
Km
1,500.00
m3
150.00
m3
150.00
75.00
m3
m3
1,500.00
m3
663.54
m3
Unit
Number
1.00
3.00
1.00
3.00
3.00
2.00
2.00
2.00
2.00
3.00
Test
Test
Test
Test
Test
Test
Test
Test
Test
Test
1.00
1.00
Item
Item
10.75
m3
0.51
m3
sound timber)
5.04
und timber)
3.84
olumn stub
4.84
5.60
1.96
m3
m
m2
9
9
9
5.80
m3
4.96
267.00
1
0.10
8
m
kg
No
m3
No
9
9
9
9
9
2.21
m3
33
0.13
33
sound timber)
3.36
33
und timber)
2.16
m2
33
olumn stub
1.28
4.80
0.72
m3
m
m2
33
33
33
0.94
m3
33
1.27
79.00
1
m3
kg
No
33
33
33
oad
lacement of Material" is required
e method for each second layer of "Backfilling and/or
adwork"
ter
Number
33
33
3.62
m3
0.21
m3
sound timber)
4.20
und timber)
2.91
olumn stub
2.06
6.00
1.13
m3
m
m2
4
4
4
1.85
m3
1.77
207.00
1.00
0.06
8
m
kg
No
m3
No
4
4
4
4
4
Quantity
0.04
8
Number
12
0.06
m3
12
sound timber)
1.96
12
und timber)
1.32
m2
12
olumn stub
0.71
2.80
0.49
m
m
m2
12
12
12
0.36
m3
12
0.67
47.00
1
0.02
4
m3
kg
No
m3
No
12
12
12
12
12
1.03
m3
12
0.06
12
sound timber)
1.96
m2
12
und timber)
1.32
12
0.71
2.80
0.49
m
m
m2
12
12
12
0.36
0.67
47.00
1
0.02
4
m3
m3
kg
No
m3
No
12
12
12
12
12
12
3.83
m3
10
4.10
3.92
3.12
2.04
5.60
0.98
m3
m2
m2
m3
m
m2
10
10
10
10
10
10
2.24
m3
10
1.60
128
1
0.05
m
kg
No
m3
10
10
10
10
olumn stub
sound timber)
und timber)
olumn stub
Quantity
1.03
Number
10
1.03
m3
17
0.06
17
sound timber)
1.96
m2
17
und timber)
1.32
17
olumn stub
0.71
2.80
0.49
m
m
m2
17
17
17
0.36
m3
17
0.67
47.00
1
0.02
4
m
kg
No
m3
No
17
17
17
17
17
1.03
0.06
1.96
1.32
0.71
2.80
0.49
0.36
m3
m3
m2
m2
m3
m
m2
m3
9
9
9
9
9
9
9
9
0.67
47.00
1.00
0.02
4.00
m3
kg
No
m3
No
9
9
9
9
9
5.08
0.24
5.04
2.64
3.22
5.60
1.96
1.62
m3
m3
m2
m2
m3
m
m2
m3
7
7
7
7
7
7
7
7
3.46
188.00
m3
kg
7
7
sound timber)
und timber)
olumn stub
sound timber)
und timber)
olumn stub
Quantity
8
sound timber)
und timber)
olumn stub
sound timber)
und timber)
olumn stub
sound timber)
und timber)
olumn stub
Quantity
1.00
0.10
8.00
Unit
No
m3
No
Number
7
7
7
1.23
0.14
2.04
1.64
6.80
2.73
-
m3
m3
m2
m2
m3
m
m2
m3
2
2
2
2
2
2
2
2
1.23
103.00
1.00
0.14
6.00
m3
kg
No
m3
No
2
2
2
2
2
0.85
0.05
1.96
1.20
0.64
2.80
0.49
0.26
m3
m3
m2
m2
m3
m
m2
m3
0
0
0
0
0
0
0
0
0.59
40.00
1.00
0.02
4.00
m3
kg
No
m3
No
0
0
0
0
0
0.85
0.05
1.96
1.20
0.64
2.80
0.49
0.26
m3
m3
m2
m2
m3
m
m2
m3
2
2
2
2
2
2
2
2
sound timber)
und timber)
olumn stub
sound timber)
und timber)
olumn stub
Quantity
0.59
40.00
1.00
0.02
4.00
Unit
m3
kg
No
m3
No
Number
2
2
2
2
2
0.85
0.05
1.96
1.20
0.64
2.80
0.49
0.26
m3
m3
m2
m2
m3
m
m2
m3
2
2
2
2
2
2
2
2
0.59
40.00
1.00
0.02
4.00
m3
kg
No
m3
No
2
2
2
2
2
1.78
0.10
3.36
1.80
1.13
4.80
0.72
0.69
m3
m3
m2
m2
m3
m
m2
m3
5
5
5
5
5
5
5
5
1.09
83.00
1.00
0.04
4.00
m3
kg
No
m3
No
5
5
5
5
5
8.32
0.58
7.35
9.07
m3
m3
m3
m3
cond layer)
Quantity
4.54
Unit
m3
20.78
m3
0.76
0.03
1.05
2.27
m3
m3
m3
m3
3.02
0.33
12.60
4.54
4.41
m3
m3
m3
m3
m3
2.24
11.40
m2
m2
13.46
19
m2
m
45.36
21
m2
m2
45.36
42
m2
m2
45.36
m2
4.54
m3
m2
31.28
m2
125.12
2.22
8.00
20.10
1
50
m2
m
m
Item
m2
1.00
3.00
11.00
No
No
No
Number
Unit
to match existing
297.07
14.73
m2
m2
210.00
210.00
m2
m2
30.4
38
m2
m
7.00
4.00
No
No
1.00
1.00
2.00
No
No
No
297.07
m2
14.73
m2
2.00
No
70.71
36.00
m2
m2
1.00
No
1.00
No
70.71
m2
to match existing
Number
Quantity
36.00
600.00
m3
600.00
m3
177.00
590.00
No
Unit
m2
41
137.00
No
84
No
12
35
45
97.00
3.45
235.00
m3
m3
m2
ZZZ 824-200)
sound timber)
Number
Quantity
45.00
12.80
2.00
46.13
97.00
7520.00
8.00
4.00
1.00
1.00
0.50
46
259.98
81
40.5
36.00
8.4
Unit
m3
m
No
m2
m3
Kg
No
No
m
No
m
m
m2
m3
m3
m3
m3
226.80
113.40
97.20
21.60
m3
m3
m3
m3
10.00
No
110.00
m2
pieces
234.00
3
1
50
481.72
Item
Item
m
Number
rk kiosk
Quantity
1.00
1.00
Unit
No
No
6,218.36
m2
6,218.36
m2
1.00
621.84
Item
m2
Subtotal
Vat 16%
Final Total
Number
Rate
Total
1,000.00 $
1,000.00
200.00 $
200.00
$
$
$
$
$
$
$
$
$
$
$
$
$
$
50.00
1,000.00
30,000.00
750.00
8,000.00
200.00
500.00
500.00
500.00
1,000.00
500.00
1,000.00
$
$
$
$
50.00
1,000.00
30,000.00
12,000.00
$
$
$
$
$
$
$
$
$
150.00 $
1,000.00 $
8,000.00
400.00
500.00
500.00
4,000.00
8,000.00
500.00
8,000.00
2,400.00
1,000.00
0.80
$
3,538.88
450.00
45.00 $
20.00 $
7.00 $
10,500.00
7.00 $
1,050.00
$
$
8.00 $
20.00 $
1,200.00
1,500.00
7.00 $
10,500.00
7.00
20.00
4,644.78
Rate
Total
$
$
$
$
$
$
$
$
$
$
200.00
200.00
200.00
200.00
200.00
100.00
100.00
100.00
100.00
200.00
$
$
$
$
$
$
$
$
$
$
200.00
600.00
200.00
600.00
600.00
200.00
200.00
200.00
200.00
600.00
$
$
100.00 $
100.00 $
100.00
100.00
7.00 $
677.38
190.00 $
875.52
30.00 $
1,360.80
25.00 $
864.00
$
$
$
265.00 $
4.00 $
5.00 $
11,533.86
201.60
88.20
7.00 $
365.15
$
$
$
$
$
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
312.23
7,209.00
49.50
6.17
360.00
7.00 $
510.51
190.00 $
815.10
30.00 $
3,326.40
25.00 $
1,782.00
$
$
$
265.00 $
4.00 $
5.00 $
11,228.58
633.60
118.80
7.00 $
217.14
$
$
$
7.00 $
3.00 $
5.50 $
293.37
7,821.00
181.50
Rate
Total
$
$
7.00 $
5.00 $
8.32
1,320.00
7.00 $
101.27
190.00 $
161.69
30.00 $
504.00
25.00 $
291.00
$
$
$
265.00 $
4.00 $
5.00 $
2,187.84
96.00
22.50
7.00 $
51.70
$
$
$
$
$
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
49.57
2,484.00
22.00
1.58
160.00
Rate
Total
7.00 $
86.39
190.00 $
137.94
30.00 $
705.60
25.00 $
396.00
$
$
$
265.00 $
4.00 $
5.00 $
2,245.08
134.40
29.40
7.00 $
30.24
$
$
$
$
$
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
56.15
1,692.00
66.00
2.06
240.00
7.00 $
86.39
190.00 $
137.94
30.00 $
705.60
25.00 $
396.00
$
$
$
265.00 $
4.00 $
5.00 $
2,245.08
134.40
29.40
$
$
$
$
$
$
7.00
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
$
30.24
56.15
1,692.00
66.00
2.06
240.00
7.00 $
268.35
$
$
$
$
$
$
190.00
30.00
25.00
265.00
4.00
5.00
$
$
$
$
$
$
7,790.00
1,176.00
780.00
5,403.35
224.00
49.00
7.00 $
156.49
$
$
$
$
7.00
3.00
5.50
7.00
$
$
$
$
111.86
3,840.00
55.00
3.43
Rate
Total
5.00 $
400.00
7.00 $
122.39
190.00 $
195.42
30.00 $
999.60
25.00 $
561.00
$
$
$
265.00 $
4.00 $
5.00 $
3,180.53
190.40
41.65
7.00 $
42.84
$
$
$
$
$
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
79.55
2,397.00
93.50
2.92
340.00
$
$
$
$
$
$
$
$
7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
$
$
$
$
$
$
$
$
64.80
103.46
529.20
297.00
1,683.81
100.80
22.05
22.68
$
$
$
$
$
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
42.12
1,269.00
49.50
1.54
180.00
$
$
$
$
$
$
$
$
7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
$
$
$
$
$
$
$
$
249.02
321.86
1,058.40
462.00
5,965.68
156.80
68.60
79.38
7.00 $
3.00 $
169.54
3,948.00
$
$
Rate
$
$
$
Total
5.50 $
7.00 $
5.00 $
38.50
4.80
280.00
$
$
$
$
$
$
$
$
7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
$
$
$
$
$
$
$
$
17.20
51.87
122.40
868.14
54.40
27.30
-
$
$
$
$
$
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
17.22
618.00
11.00
1.91
60.00
$
$
$
$
$
$
$
$
7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
$
$
$
$
$
$
$
$
$
$
$
$
$
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
$
$
$
$
$
$
$
$
7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
$
$
$
$
$
$
$
$
11.90
19.00
117.60
60.00
340.79
22.40
4.90
3.64
Rate
Total
$
$
$
$
$
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
8.26
240.00
11.00
0.34
40.00
$
$
$
$
$
$
$
$
7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
$
$
$
$
$
$
$
$
11.90
19.00
117.60
60.00
340.79
22.40
4.90
3.64
$
$
$
$
$
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
8.26
240.00
11.00
0.34
40.00
$
$
$
$
$
$
$
$
7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
$
$
$
$
$
$
$
$
62.18
99.28
504.00
225.00
1,498.58
96.00
18.00
23.98
$
$
$
$
$
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
38.20
1,245.00
27.50
1.26
100.00
$
$
$
$
7.00
7.00
7.00
7.00
$
$
$
$
58.21
4.03
51.45
63.50
Rate
Total
7.00 $
31.75
7.00 $
145.45
$
$
$
$
190.00
190.00
190.00
190.00
$
$
$
$
143.64
6.08
199.50
430.92
$
$
$
$
$
260.00
260.00
260.00
260.00
260.00
$
$
$
$
786.24
85.02
3,276.00
1,179.36
$
$
20.00 $
20.00 $
44.80
228.00
$
$
20.00 $
20.00 $
269.28
380.00
$
$
8.00 $
8.00 $
362.88
168.00
$
$
8.00 $
8.00 $
362.88
336.00
40.00 $
1,814.40
$
$
19.00 $
1.00 $
86.18
31.28
1.00 $
125.12
$
$
$
$
$
100.00
150.00
150.00
500.00
10.00
10
10
10
$
$
$
$
$
222.00
1,200.00
3,015.00
500.00
500.00
$
$
$
10.00
30.00
110.00
Rate
Total
2
2
$
$
594.14
29.46
30
25
$
$
6,300.00
5,250.00
0
0
$
$
$
$
890.00 $
265.00 $
6,230.00
1,060.00
$
$
$
100.00 $
120.00 $
120.00 $
100.00
120.00
240.00
9.00 $
2,673.63
9.00 $
132.57
20.00
$
$
2.00 $
2.00 $
141.41
72.00
100.00 $
100.00
100.00 $
100.00
9.00 $
636.35
10
Rate
Total
9.00 $
324.00
7.00 $
4,200.00
7.00
4,200.00
10.00 $
1,770.00
60.00 $
35,400.00
10.00 $
410.00
60.00 $
8,220.00
100.00 $
8,400.00
265.00 $
1,060.00
15.00 $
180.00
100.00 $
3,500.00
18.00 $
810.00
$
$
$
7.00 $
190.00 $
33.00 $
679.00
656.26
7,755.00
$
$
$
$
$
$
$
$
$
$
$
$
$
Rate
190.00
1.00
20.00
5.30
6.00
2.50
225.00
120.00
45.00
20.00
20.00
6.00
5.00
Total
$
$
$
$
$
$
$
$
$
$
$
$
$
8,550.00
12.80
40.00
244.49
582.00
18,800.00
1,800.00
480.00
45.00
20.00
10.00
276.00
1,299.90
$
$
$
$
7.00
25.00
20.00
19.00
$
$
$
$
567.00
1,012.50
720.00
159.60
$
$
$
$
7.00
25.00
20.00
19.00
$
$
$
$
1,587.60
2,835.00
1,944.00
410.40
30.00 $
300.00
500.00 $
55,000.00
2.00 $
468.00
$
$
$
10.00 $
10.00 $
2.00 $
30.00
10.00
100.00
200.00 $
96,344.00
$
$
Rate
500.00 $
100.00 $
1.00 $
6,218.36
15.00 $
93,275.40
1,000.00 $
1,000.00
1,000.00 $
621,836.00
1,272,108.78
1,272,108.78
Total
500.00
100.00
B1-3.6.2.14 page 47
No. Description
1 P & G's
1.1 Geotechnical report (bore logs, trial pits, sounding logs) and to include:
Actual ground level
Description and limits of various soil layers
Sample taken
SPT results
Water levels
Depth of borehole/pit/sounding
1.2 Topographic survey (10 meter grids and 0.5 meter vertical intervals):
Obtain topographic survey maps
Ensure position and elevation of all works are correct
1.3 Costs for obligations, equipment or labour, although not specified, is required to complete
the Contract in terms of the specification and Statutory Requirements
1.4
Establishment of site camp and stores including site clearance for civil contractors own
requirements
1.5 Allow 1 x office and 1 x boardroom for ABB (containers to include 2 x aircondtioners, 2x
standard tables,12 x chairs,1 x mini fridge, 2x cupboard with shelves and electrical plugs
and lights)
1.6 Temporary latrines and sanitary (allowed 1x for ABB office)
1.7 Temporary fence around site establishment
1.10 Temporary gate
1.11 Temporary water connection
1.12 Temporary electricity connection/generator (20kVA)
1.13 Water usage
1.14 Electricity/petrol or diesel
1.15 Tempoary site sign board
1.16 Supervision & Labour
1.17 Health and Saftey - safety signs and PPE according to ABB specifications
1.18 Security guard (allow 1x person for day watch and 1 x person for night watch)
1.19 De-establishment of site camp and stores
B1-4.9.7.14 page 152
B02-4.6.7 page 77
Number
Item
1,000.00 $
1,000.00
Item
200.00 $
200.00
Item
50.00
50.00
1,000.00
1,000.00
30,000.00
$
$
$
$
$
$
$
$
$
$
$
150.00 $
1,000.00 $
8,000.00
400.00
500.00
500.00
4,000.00
8,000.00
500.00
8,000.00
2,400.00
1,000.00
Item
Rate
Item
30,000.00
2
1
2
1
1
1
1
1
1
1
2
1
month
8
1
1
1
1
8
8
1
8
1
8
1
$
$
$
$
$
$
$
$
$
750.00
8,000.00
200.00
500.00
500.00
500.00
1,000.00
500.00
1,000.00
Item
Item
Item
Item
Month
Month
Item
Month
Item
Month
Item
Total
m3
45.00
414,000.00
99,510.00
m2
0.80
79,608.00
2.3 Level and compact final cut layer to 95% Mod AASHTO
2.4 Rate for overhaul per m3 of spoil for a distance greater than 10km - rate per km
78,389.00
m2
1.00
Km
7.00
7.00
15,500.00
1,550.00
1,550.00
775.00
21,121.00
15,500.00
m3
m3
m3
m3
m2
m3
$
$
$
$
7.00
7.00
8.00
20.00
$
$
$
10,850.00
12,400.00
15,500.00
7.00
3,168.20
m3
7.00
22,177.40
1
3
Test
Test
$
$
200.00
200.00
$
$
200.00
600.00
1
3
3
2
2
2
2
3
Test
Test
Test
Test
Test
Test
Test
Test
$
$
$
$
$
$
$
$
200.00
200.00
200.00
100.00
100.00
100.00
100.00
200.00
$
$
$
$
$
$
$
$
200.00
600.00
600.00
200.00
200.00
200.00
200.00
600.00
Item
100.00
100.00
Item
100.00
100.00
B1-4.9.7.14 page152
Unit
9,200.00
2.2 Remove all bushes, shrubs and trees and strip 300mm of topsoil to be stockpiled on site for
later use. All material not used will be dumped at a site located by the employer within
10km from site
Quantity
10.75
m3
12
7.00
903.17
0.51
m3
12
190.00
1,167.36
5.04
m2
12
30.00
1,814.40
3.84
m2
12
25.00
1,152.00
4.84
5.60
1.96
m
m
m2
12
12
12
$
$
$
265.00
4.00
5.00
$
$
$
15,378.48
268.80
117.60
5.80
4.96
267.00
1
0.10
8
m3
m3
kg
No
m3
No
12
12
12
12
12
12
$
$
$
$
$
$
7.00
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
$
486.86
416.30
9,612.00
66.00
8.23
480.00
2.21
m3
27
7.00
417.69
0.13
m3
27
190.00
666.90
page
page
page
page
153
179
179
180
B1-4.2.1 page 66
B1-4.9.7.14 page152
B1-4.9.7.17 page 163
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M36 X 8)
3.4 132 kV Isolator
Excavation in insitu material
Blinding - 20mPa (50mm thick)
No. Description
Smooth Formwork (to be steel or sound timber)
Quantity
3.36
Unit
m2
Number
27
Rate
30.00
Total
2,721.60
2.16
m2
27
25.00
1,458.00
1.28
4.80
0.72
m
m
m2
27
27
27
$
$
$
265.00
4.00
5.00
$
$
$
9,187.02
518.40
97.20
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
0.94
m3
27
7.00
177.66
B1-4.9.7.14
B1-4.9.7.19
B1-4.9.7.19
B1-4.9.7.20
1.27
79.00
1
0.04
8
m3
kg
No
m3
No
27
27
27
27
27
$
$
$
$
$
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
240.03
6,399.00
148.50
6.80
1,080.00
3.62
0.21
4.20
2.91
2.06
6.00
1.13
1.85
m3
m3
m2
m2
m3
m
m2
m3
3
3
3
3
3
3
3
3
$
$
$
$
$
$
$
$
7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
$
$
$
$
$
$
$
$
75.95
121.27
378.00
218.25
1,640.88
72.00
16.88
38.77
1.77
207.00
1.00
0.06
8
m3
kg
No
m3
No
3
3
3
3
3
$
$
$
$
$
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
37.18
1,863.00
16.50
1.18
120.00
1.03
0.06
1.96
1.32
0.71
2.80
0.49
0.36
0.67
47.00
1
0.02
4
m3
m3
m2
m2
m3
m
m2
m3
m3
kg
No
m3
No
9
9
9
9
9
9
9
9
9
9
9
9
9
$
$
$
$
$
$
$
$
$
$
$
$
$
7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
$
$
$
$
$
$
$
$
64.80
103.46
529.20
297.00
1,683.81
100.80
22.05
22.68
42.12
1,269.00
49.50
1.54
180.00
1.03
0.06
1.96
1.32
0.71
2.80
0.49
0.36
m3
m3
m2
m2
m3
m
m2
m3
9
9
9
9
9
9
9
9
$
$
$
$
$
$
$
$
7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
$
$
$
$
$
$
$
$
64.80
103.46
529.20
297.00
1,683.81
100.80
22.05
22.68
0.67
47.00
1
0.02
4
m3
kg
No
m3
No
9
9
9
9
9
$
$
$
$
$
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
42.12
1,269.00
49.50
1.54
180.00
3.83
4.10
3.92
3.12
2.04
5.60
0.98
2.24
m3
m3
m2
m2
m3
m
m2
m3
8
8
8
8
8
8
8
8
$
$
$
$
$
$
$
$
7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
$
$
$
$
$
$
$
$
214.68
6,232.00
940.80
624.00
4,322.68
179.20
39.20
125.19
1.60
128
1
0.05
8
m3
kg
No
m3
No
8
8
8
8
8
$
$
$
$
$
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
89.49
3,072.00
44.00
2.74
320.00
1.03
0.06
m3
m3
12
12
$
$
7.00
190.00
$
$
86.39
137.94
page
page
page
page
153
179
179
180
B1-4.2.1 page 66
B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14
B1-4.9.7.14
page152
page 163
page 170
page 170
page 163
page 169
page 169
page 154
page 153
B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14
B1-4.9.7.14
page152
page 163
page 170
page 170
page 163
page 169
page 169
page 154
page 153
B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14
B1-4.9.7.14
page152
page 163
page 170
page 170
page 163
page 169
page 169
page 154
page 153
B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14
B1-4.9.7.14
page152
page 163
page 170
page 170
page 163
page 169
page 169
page 154
page 153
B1-4.9.7.14 page152
B1-4.9.7.17 page 163
Unit
m2
m2
m3
m
m2
m3
Number
12
12
12
12
12
12
$
$
$
$
$
$
Rate
30.00
25.00
265.00
4.00
5.00
7.00
$
$
$
$
$
$
m3
kg
No
m3
No
12
7.00
56.15
47.00
1
0.02
4
12
12
12
12
$
$
$
$
3.00
5.50
7.00
5.00
$
$
$
$
1,692.00
66.00
2.06
240.00
1.03
0.06
1.96
1.32
0.71
2.80
0.49
0.36
0.67
47.00
1
0.02
4
m3
m3
m2
m2
m3
m
m2
m3
m3
kg
No
m3
No
6
6
6
6
6
6
6
6
6
6
6
6
6
$
$
$
$
$
$
$
$
$
$
$
$
$
7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
$
$
$
$
$
$
$
$
43.20
68.97
352.80
198.00
1,122.54
67.20
14.70
15.12
28.08
846.00
33.00
1.03
120.00
B1-4.9.7.14 page152
B1-4.9.7.17 page 163
B1-4.9.7.17 page 170
B1-4.9.7.17 page 170
B1-4.9.7.17 page 163
B1-4.9.7.17 page 169
B1-4.9.7.17 page 169
B1-4.9.7.14 page 154
B1-4.9.7.14 page 153
B1-4.9.7.19 page 179
B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66
3.12 66 kV Gantry
Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M36 X 8)
8.83
0.42
5.04
3.48
4.29
5.60
1.96
4.52
4.31
233.00
1
0.10
8
m3
m3
m2
m2
m3
m
m2
m3
m3
kg
No
m3
No
2
2
2
2
2
2
2
2
2
2
2
2
2
$
$
$
$
$
$
$
$
$
$
$
$
$
7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
$
$
$
$
$
$
$
$
123.63
159.79
302.40
174.00
2,272.11
44.80
19.60
63.29
60.34
1,398.00
11.00
1.37
80.00
3.13 66 kV Isolator
Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 4)
6.50
0.38
10.08
3.44
3.81
14.4
2.16
2.74
3.76
210
1
0.11
24
m3
m3
m2
m2
m3
m
m2
m3
m3
kg
No
m3
No
8
8
8
8
8
8
8
8
8
8
8
8
8
$
$
$
$
$
$
$
$
$
$
$
$
$
7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
$
$
$
$
$
$
$
$
363.85
580.94
2,419.20
688.80
8,067.02
460.80
86.40
153.29
210.56
5,040.00
44.00
6.05
960.00
2.43
0.14
3.92
3.78
1.54
5.60
0.98
0.74
m3
m3
m2
m2
m3
m
m2
m3
4
4
4
4
4
4
4
4
$
$
$
$
$
$
$
$
7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
$
$
$
$
$
$
$
$
68.07
108.68
470.40
378.00
1,636.64
89.60
19.60
20.83
1.69
86.00
1
0.05
8
m3
kg
No
m3
No
4
4
4
4
4
$
$
$
$
$
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
47.24
1,032.00
22.00
1.37
160.00
page
page
page
page
page
page
page
170
170
163
169
169
154
153
B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14
B1-4.9.7.14
B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14
B1-4.9.7.14
page152
page 163
page 170
page 170
page 163
page 169
page 169
page 154
page 153
page152
page 163
page 170
page 170
page 163
page 169
page 169
page 154
page 153
B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14
B1-4.9.7.14
page152
page 163
page 170
page 170
page 163
page 169
page 169
page 154
page 153
No. Description
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 4)
Quantity
1.96
1.32
0.71
2.80
0.49
0.36
0.67
Total
705.60
396.00
2,245.08
134.40
29.40
30.24
No. Description
3.15 66 kV Current Transformer
Excavation in insitu material
Blinding - 20mPa (50mm thick)
Quantity
Unit
Number
Rate
Total
1.67
0.10
m
m3
12
12
$
$
7.00
190.00
$
$
139.94
223.44
1.96
m2
12
30.00
705.60
1.68
m2
12
25.00
504.00
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14
0.93
2.80
0.49
m
m
m2
12
12
12
$
$
$
265.00
4.00
5.00
$
$
$
2,960.58
134.40
29.40
0.64
1.03
58.00
1
m3
m3
kg
No
12
12
12
12
$
$
$
$
7.00
7.00
3.00
5.50
$
$
$
$
53.51
86.44
2,088.00
66.00
0.02
m3
12
7.00
2.06
No
12
5.00
240.00
page
page
page
page
163
169
169
154
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
B1-4.2.1 page 66
B1-4.9.7.14 page152
1.67
m3
7.00
104.96
0.10
1.96
1.68
0.93
2.80
0.49
m3
m2
m2
m3
m
m2
9
9
9
9
9
9
$
$
$
$
$
$
190.00
30.00
25.00
265.00
4.00
5.00
$
$
$
$
$
$
167.58
529.20
378.00
2,220.44
100.80
22.05
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
0.64
m3
7.00
40.13
1.03
m3
7.00
64.83
58.00
kg
3.00
1,566.00
B1-4.2.1 page 66
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
page
page
page
page
page
page
163
170
170
163
169
169
B1-4.9.7.14 page152
No
5.50
0.02
m3
7.00
1.54
No
5.00
180.00
49.50
1.67
m3
7.00
104.96
0.10
m3
190.00
167.58
1.96
30.00
1.68
m2
25.00
378.00
0.93
2.80
0.49
0.64
1.03
58.00
1
0.02
4
m3
m
m2
m3
m3
kg
No
m3
No
9
9
9
9
9
9
9
9
9
$
$
$
$
$
$
$
$
$
265.00
4.00
5.00
7.00
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
$
$
$
$
2,220.44
100.80
22.05
40.13
64.83
1,566.00
49.50
1.54
180.00
4.28
0.25
3.92
3.00
2.20
5.60
0.98
2.03
2.25
136.00
2
0.05
8
m3
m3
m2
m2
m3
m
m2
m3
m3
kg
No
m3
No
6
6
6
6
6
6
6
6
6
6
6
6
6
$
$
$
$
$
$
$
$
$
$
$
$
$
7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
$
$
$
$
$
$
$
$
179.93
287.28
705.60
450.00
3,494.82
134.40
29.40
85.26
94.67
2,448.00
66.00
2.06
240.00
B1-4.9.7.17 page
B1-4.9.7.17 page
B1-4.9.7.14 page
B1-4.9.7.14 page
B1-4.9.7.19 page
B1-4.9.7.19 page
B1-4.9.7.20 page
B1-4.2.1 page 66
169
169
154
153
179
179
180
B1-4.9.7.14 page152
B1-4.9.7.17 page 163
B1-4.9.7.17 page 170
B1-4.9.7.17 page 170
B1-4.9.7.17 page 163
B1-4.9.7.17 page 169
B1-4.9.7.17 page 169
B1-4.9.7.14 page 154
B1-4.9.7.14 page 153
B1-4.9.7.19 page 179
B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66
529.20
3.19 Auxillary
B1-4.9.7.14 page152
0.49
m3
7.00
3.43
0.10
m3
190.00
18.62
2.24
30.00
m2
25.00
0.78
5.6
1.96
m3
m
m2
1
1
1
$
$
$
265.00
4.00
5.00
$
$
$
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
0.00
m3
7.00
0.49
m3
7.00
3.43
3.92
1
0.10
4
m2
No
m3
No
1
1
1
1
$
$
$
$
3.00
5.50
7.00
5.00
$
$
$
$
11.76
5.50
0.69
20.00
67.20
207.76
22.40
9.80
No. Description
Quantity
Unit
Number
Rate
Total
0.13
m3
7.00
5.29
B1-4.9.7.17 page
B1-4.9.7.17 page
B1-4.9.7.17 page
B1-4.9.7.17 page
B1-4.9.7.17 page
B1-4.9.7.17 page
B1-4.9.7.14 page
B1-4.9.7.14 page
B1-4.9.7.19 page
B1-4.9.7.19 page
B1-4.9.7.20 page
B1-4.2.1 page 66
0.03
0.96
0
0.19
3.20
0.63
0.00
0.13
0
0
0.03
0
m3
m2
m2
m3
m
m2
m3
m3
kg
No
m3
No
6
6
6
6
6
6
6
6
6
6
6
6
$
$
$
$
$
$
$
$
$
$
$
$
190.00
30.00
25.00
265.00
4.00
5.00
7.00
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
$
$
$
$
$
$
$
35.91
172.80
300.51
76.80
18.90
5.46
1.32
-
6.01
0.58
2.94
4.39
1.69
12.23
m3
m3
m3
m3
m3
m3
$
$
$
$
$
$
7.00
7.00
7.00
7.00
7.00
7.00
$
$
$
$
$
$
42.07
4.03
20.58
30.76
11.83
85.61
0.55
0.03
0.42
1.10
m3
m3
m3
m3
$
$
$
$
190.00
190.00
190.00
190.00
$
$
$
$
103.80
6.08
79.80
208.72
2.19
0.37
5.04
2.20
m3
m3
m3
m3
$
$
$
$
260.00
260.00
260.00
260.00
$
$
$
$
568.15
95.94
1,310.40
571.22
1.82
7.08
m2
m2
$
$
2.00
2.00
$
$
3.64
14.16
9.71
11.80
m2
m
$
$
20.00
20.00
$
$
194.24
236.00
21.97
8.40
m2
m2
$
$
8.00
8.00
$
$
175.76
67.20
21.97
16.8
m2
m2
$
$
8.00
8.00
$
$
175.76
134.40
21.97
m2
40.00
878.80
m3
m2
m2
m
m
Item
m2
$
$
$
$
19.00
1.00
1.00
100.00
150
500
10
$
$
$
$
$
$
$
41.74
160.86
68.94
2,218.00
900.00
500.00
303.69
163
170
170
163
169
169
154
153
179
179
180
B1-4.9.7.14 page152
B1-4.9.7.17page 170
B1-4.9.7.17page 169
2.20
160.86
68.94
22.18
6
1
30.37
No. Description
B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.22
B1-4.9.7.17
page152
page 163
page 163
page 170
page 163
page 163
page 181
page 170
B1-4.9.7.14
B1-4.9.7.14
B1-4.9.7.19
B1-4.9.7.20
page
page
page
page
154
153
179
180
Quantity
Unit
Number
Rate
Total
8.32
0.58
7.35
9.07
4.54
20.78
m3
m3
m3
m3
m3
m3
$
$
$
$
$
$
7.00
7.00
7.00
7.00
7.00
7.00
$
$
$
$
$
$
58.21
4.03
51.45
63.50
31.75
145.45
0.76
0.03
1.05
2.27
m3
m3
m3
m3
$
$
$
$
190.00
190.00
190.00
190.00
$
$
$
$
143.64
6.08
199.50
430.92
3.02
0.33
12.60
4.54
4.41
m3
m3
m3
m3
m3
$
$
$
$
$
260.00
260.00
260.00
260.00
260.00
$
$
$
$
$
786.24
85.02
3,276.00
1,179.36
1,146.60
2.24
11.40
m2
m2
$
$
20.00 $
20.00 $
44.80
228.00
13.46
19
m2
m
$
$
20.00 $
20.00 $
269.28
380.00
45.36
21
m2
m2
$
$
8.00 $
8.00 $
362.88
168.00
45.36
42
m2
m2
$
$
8.00 $
8.00 $
362.88
336.00
45.36
m2
40.00 $
1,814.40
31.28
125.12
2.22
8.00
20.10
1
50
m3
m2
m2
m2
m
m
Item
m2
$
$
$
$
$
$
$
$
19.00
1.00
1.00
100.00
150.00
150.00
500.00
10.00
$
$
$
$
$
$
$
$
86.18
31.28
125.12
222.00
1,200.00
3,015.00
500.00
500.00
17.11
0.63
4.37
26.66
3.80
11.56
114.00
4.33
9.94
8.30
8.81
12.67
0.50
m3
m3
m3
m2
m3
m3
m2
m2
m
m3
m3
m2
m3
$
$
$
$
$
$
$
$
$
$
$
$
$
7.00
190.00
265.00
30.00
265.00
265.00
10.00
5.00
10.00
10.00
6.00
9.00
190.00
$
$
$
$
$
$
$
$
$
$
$
$
$
239.50
240.77
2,318.01
1,599.84
2,014.85
6,128.50
2,280.00
43.30
198.80
165.97
105.71
228.10
188.86
4.54
2
2
2
2
2
2
2
2
2
2
2
2
2
No. Description
3.24 Control Building
Excavations in insitu material:
Strip foundation
Prepare and spary with an approved anti-termite control under building
Stock pile insitu surplus material (for carting away)
Formwork:
Rough formwork (to be steel or sound timber) to sides of foundations
Smooth formwork (to be steel or sound timber) to sides of beams
Smooth formwork (to be steel or sound timber) to sides of columns
Concrete:
Blinding - 20mPa (50mm thick)
Reinforced concrete - 35mPa, 19mm Stone to surface bed
Reinforced concrete - 35mPa, 19mm Stone to foundations
Reinforced concrete - 35mPa, 19mm Stone to columns
Reinforced concrete - 35mPa, 19mm Stone to beams
Quantity
Unit
Number
Rate
Total
56.35
m3
6.00
338.08
337.53
m2
1.10
371.28
56.35
m3
6.00
338.08
148.62
74.31
102
m
m2
m2
$
$
$
25.00
33.00
33.00
$
$
$
3,715.50
2,452.23
3,366.00
3.98
m3
250.00
996.10
67.51
m3
300.00
20,251.84
31.88
m3
300.00
9,562.56
7.65
m3
300.00
2,295.00
10.25
300.00
3,073.68
46.72
15.00
700.80
337.53
1870
m2
kg
$
$
9.00
2.50
$
$
3,037.78
4,675.00
256.52
m2
35.00
8,978.17
114.97
459.88
15.63
337.53
m2
m2
m2
m2
$
$
$
$
21.00
3.00 $
1.00 $
1.20 $
1,379.64
15.63
405.04
Reinforcing:
Reinforcing mesh ref. 395
page
page
page
page
page
181
184
183
183
170
337.53
m2
5.00
Floor Finishes:
Epoxy screed (trowel applied minimum 5 mm thick) and epoxy seal coat - switchgear and
battery charger rooms
26.48
m2
10.00
264.80
Glazed non-slip fully vitrified ceramic tiles - rest room, toilets, kitchen, messroom
37.16
m2
40.00
1,486.27
16.64
m2
20.00
332.88
23.28
m2
50.00
1,163.97
Heavy duty PVC sheeting on false floor - control room, relay rooms, electrical equipment
1,687.65
24.82
m2
100.00
2,481.53
137.46
m2
40.00
5,498.41
15.00
m2
40.00
600.00
15.00
m2
10.00
150.00
15.00
60.00
900.00
3 mm Self leveling epoxy screed with non-slip granule finish - stores workshop, mechanical
work room and store room
36.11
m2
100.00
3,611.36
80.40
30.4
m2
m2
$
$
40.00
30.00
$
$
3,216.13
912.00
600 x 500mm deep internal concrete trench. Trench walls and bottom to be 100mm thick
38
10
6.00
60.00
122.18
40.00
4,887.20
638.4
100.05
104.78
23.28
523.75
m
m2
m2
m2
m2
$
$
$
$
$
10.00
5.00
60.00
100.00
4.00
$
$
$
$
$
6,384.00
500.25
6,286.80
2,328.00
2,095.00
231.37
m2
7.00
1,619.59
$
890.00 $
265.00 $
$
$
7,120.00
1,325.00
-
Skirtings:
Heavy duty PVC sheet - to painted walls
Internal Wall Finishes:
Plaster to brickwork and concrete
Fair face blockwork,cement wash, paint - storage and workshop
Glazed ceramic tiles 2.3m high, plaster and paint - kitchen, messroom
Acid/lye resistant tiles 1.2m high - battery room
Paint brickwork and concrete (weatherproof)
External Wall Finish:
Paint on plaster (weatherproof)
Aluminium Frames:
Windows:
Type W1: 2700 x 1090mm Frame including 4mm double glaze complete
Type W2: 900 x 900mm Frame including 4mm double glaze complete
Doors:
Single
Type D3: 885 x 2500mm Frame and steel doors door including all stainless steel
ironmongery complete (external)
8
5
No
No
$
$
No
100.00
200.00
Double
Type D1: 1750 x 2500mm Frame and steel door including all stainless steel ironmongery
complete (external)
No
150.00
300.00
Type D2: 1750 x 2500mm Frame and steel door including all stainless steel ironmongery
complete (external)
No
150.00
600.00
No
100.00
600.00
No
150.00
450.00
No
480.00
960.00
2
4
2
No
No
No
$
$
$
480.00
265.00
550.00
$
$
$
960.00
1,060.00
1,100.00
Steel:
Doors:
Single
Type D4: 885 x 2100mm Frame and timber doors door including all ironmongery complete
(internal)
Double
Type D2: 1750 x 2500mm Frame and steel door including all ironmongery complete (internal)
4.9.7.3 page 139
Furniture:
B1-4.9.7.23page 191
B1-4.9.7.23page 188
No. Description
Cupboards (two door cupboard with dividing shelves )
Airconditioner central unit in control building
Allow one double door cupboard with shelves underneath sink for kitchen
Two plate electric cooker
Roof:
Corrugated approved roof sheeting - 0.6mm gauge to be fitted inculding all necessary
fittings complete
Welded roof trusses of 30 degrees angle rafters, tie beams, rails, struts, braces, cleats,
purlins, etc and flat bearer, gusset and connection plates, bolted to steel with an overall
lenghth of 12.69m and height of 3.66m (There are 9 trusses)
Quantity
2
1
8
1
Unit
No
Item
No
Item
Number
$
$
$
$
Rate
1,700.00
15.00
612.00
130.00
$
$
$
$
Total
3,400.00
15.00
4,896.00
130.00
427.82
m2
20.00
8,556.46
No
288.00
2,592.00
29.31
B1-3.6.2.12 page 46
Pre-painted aluminium 150 x 150mm box gutters including necessary collared and sealed
expansion joints
58.36
100.00
5,836.00
B1-3.6.2.12 page 46
Pre-painted aluminium 100 x100mm down pipes, including holderbats, brackets etc
16
100.00
1,600.00
m2
15.00
4,229.94
m2
Item
$
$
20.00
120.00
120.00
2
1
No
190.00
380.00
No
145.00
145.00
No
100.00
200.00
1
2
No
No
$
$
120.00
50.00
$
$
120.00
100.00
8
2
No
No
$
$
260.00
650.00
$
$
2,080.00
1,300.00
4.51
28.03
4.51
m3
m2
m3
$
$
$
6.00
1.10
6.00
$
$
$
27.04
30.83
27.04
15.02
11.75
10.00
m2
m2
m2
$
$
$
25.00
33.00
33.00
$
$
$
375.56
387.64
330.00
1.40
m3
250.00
350.33
4.51
m3
300.00
1,352.02
5.61
m3
300.00
1,681.59
0.6
m3
300.00
180.00
1.13
m3
300.00
338.00
10.26
15.00
153.90
28.03
270
m2
kg
$
$
9.00
2.50
$
$
252.24
675.00
51.44
m2
35.00
1,800.55
13.19
329
3.76
28.03
28.03
m2
m
m2
m2
m2
$
$
$
$
$
21.00
3.00
1.00
1.20
5.00
$
$
$
$
$
276.95
987.00
3.76
33.63
140.13
18
m2
40.00
730.90
18.15
40.00
726.00
70.71
57.80
12.90
m
m2
m2
$
$
$
10.00
10.00
40.00
$
$
$
707.06
578.03
516.12
46.21
m2
5.00
231.06
No
560.00
1,120.00
No
265.00
265.00
No
100.00
200.00
No
100.00
200.00
Ceiling:
Suspended ceiling champered and grooved acoustic panels on concealed suspension grid
including hangers etc
Supply and install approved roof insulation
External steel ladder with safety cage to access roof
Plumbing:
WC with all necessary connections, fittings and piping complete and toilet paper holder
Urinal with all necessary connections, fittings and piping complete
Basin with all necessary connections, fittings and piping complete with soap dispenser and
mirror
Sink with all necessary connections, fittings, gulley and piping complete
Shower with all necessary connections, fittings and piping complete
Extras
Supply and install fire 9kg CO2 extinguisher with sign
Supply and install fire alarm
282.00
282.00
1.00
Reinforcing:
Reinforcing mesh ref. 395
Reinforcing - Supply & Fix only
Cavity wall - inner skin to be hollow blockwork with insulation and outer skin to be clay
brickwork
B1-4.9.7.22
B1-4.9.7.22
B1-4.9.7.22
B1-4.9.7.17
page
page
page
page
184
183
183
170
Glazed non-slip fully vitrified ceramic tiles - bedroom, toilets, checking room
Skirtings:
Heavy duty PVC sheet - to painted walls
Internal Wall Finishes:
Plaster to brickwork and concrete
Paint on plaster (weatherproof)
Glazed ceramic tiles 2.3m high, plaster and paint - kitchen, messroom
External Wall Finish:
Paint on plaster (weatherproof)
Aluminium Frames:
Windows:
Type W1: 1860 x 1090mm Frame including 4mm double glaze complete
Type W2: 900 x 900mm including Frame 4mm double glaze complete
Doors:
Single
Type D3: 885 x 2100mm Frame and steel door including stainless steel ironmongery
complete (external)
Steel Frames:
Doors:
Single
Type D3: 885 x 2100mm Frame and timber door including all ironmongery complete
(internal)
No. Description
Roof:
Corrugated approved roof sheeting - 0.6mm gauge to be fitted including all necessary
fittings complete
Welded roof trusses of 30 degrees angle rafters, tie beams, rails, struts, braces, cleats,
purlins, etc and flat bearer, gusset and connection plates, bolted to steel with an oveall
lenghth of 4.2m and height of 1.76m (There are 3 trusses)
Quantity
Unit
Number
Rate
Total
$
40.01
m2
20.00
800.28
No
288.00
864.00
B1-3.6.2.12 page 46
Pre-painted aluminium 150 x 150mm box gutters including necessary collared and sealed
expansion joints
11.40
10.00
114.00
B1-3.6.2.12 page 46
Pre-painted aluminium 100 x100mm down pipes, including holderbats, brackets etc
16
10.00
160.00
14
Ceiling:
Suspended ceiling champered and grooved acoustic panels on concealed suspension grid
including hangers etc
Supply and install approved roof insulation
Supply and install 12 000 BTU airconditioner
Plumbing:
WC with all necessary connections, fittings and piping complete and toilet paper holder
$
20.21
20.21
1.00
1
m2
15.00
m2
Item
$
$
20.00
450.00
No
No
303.08
$
$
$
190.00 $
404.20
450.00
190.00
100.00
100.00
Basin with all necessary connections, fittings and piping complete with soap dispenser and
mirror
Extras
No
260.00
260.00
No
650.00
650.00
735
m3
7.00
5,145.00
735
m3
7.00
5,145.00
132
10.00
1,320.00
5.2 Concrete trench cover for 1000mm wide trench (with maximal weight of 50 kg each)
440
No
60.00
26,400.00
5.3 The excavation in insitu material for construction of 500mm wide x 500mm deep cast insitu
reinforced concrete trenches including bends and junctions to include 100mm diameter PVC
drain pipe at 4m centres at the bottom of the trench
42.26
10.00
422.60
141
No
60.00
8,460.00
160
100.00
16,000.00
No
265.00
1,590.00
No
1,800.00
1,800.00
No
1,100.00
1,100.00
4 EARTH MAT
4.1 Excavate 300mm (width) x 1000mm (depth) for earth grids
4.2 Backfilling to earthing grid and compact the ground surface in depths of 300mm compacting
to 95% Mod AASHTO density
5.4 Concrete trench cover for 500mm wide trench (with maximal weight of 50 kg each)
B1-3.6.2.12 page 46
6 DRAINAGE
6.1
Subsoil Drain
Supply, lay and joint 2 x 160mm diameter preferated uPVC pipe to be laid 1100mm
below NGL in trench which is to be lined with geofabric material (bidem gade A6) and
backfill with 50 to 75mm diameter stone, including excavation, temporary support of sides,
keeping excavations dry, complete (refer to drawing no. ZZZ 824-200)
6.2 Construct cast insitu concrete manhole with lid and including excavation in insitu material,
temporary support of sides, keeping excavations dry, complete (refer to drawing no. ZZZ
824-200)
6.3 Construct cast insitu septic tank overall size 2250 X 1950 X 2150mm with lid and including
excavation, temporary support of sides, keeping excavations dry, complete (refer to drawing
no. ZZZ 824-207)
6.4 Construct cast insitu soak pit overall size 2000 x 2000 x 1500mm hole to be filled with 100
to 150mm rock, including excavtion and backfilling (refer to drawing no. ZZZ 824-207)
6.5
B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
page
page
page
page
page
152
163
170
163
169
Headwall - concrete to fit 450mm diameter concrete pipe (refer to drawing no. ZZZ 824-200)
6.6 Supply, lay, joint and bed 300mm diameter class 50D spigot and socket ended concrete
sewer pipes including necessary bends and tees from transformer to oil/ water separator
No
100.00
100.00
84
15.00
1,260.00
6.7 Supply, lay, joint and bed 450mm diameter class 50D spigot and socket ended concrete
sewer pipes including necessary bends and tees
90
18.00
1,620.00
45
4.00
180.00
356.00
100.00
35,600.00
97.00
3.45
235.00
45.00
12.80
2.00
46.13
97.00
7520.00
8.00
4.00
1.00
m3
m3
m2
m3
m
No
m2
m3
Kg
No
No
m
$
$
$
$
$
$
$
$
$
$
$
$
7.00
190.00
33.00
190.00
1.00
20.00
5.30
6.00
2.50
225.00
120.00
45.00
$
$
$
$
$
$
$
$
$
$
$
$
679.00
656.26
7,755.00
8,550.00
12.80
40.00
244.49
582.00
18,800.00
1,800.00
480.00
45.00
6.8
B1-4.9.7.15 page 156
$
$
Supply, lay, joint and bed 110mm Diameter PVC pipe including necessary bends and tees
6.10 Construct concerte v-drain with a top width of 800mm and bottom width of 100mm including
excavation, temporary support of sides, keeping excavations dry, complete (refer to drawing
no. ZZZ 824-200)
No. Description
100mm Diameter ventilator PVC pipe with bend
100mm Diameter concrete pipe
Supply, lay, joint and bed 160mm Diameter uPVC pipe including necessary bends and tees
Paint x 2 layers of bitumen to internal surfaces of separator
7 WATER SUPPLY
7.1 Supply and install 2000L conservancy tank to Control Building above ground including
excavation,backfilling, pipework and fittings to sit on a concrete foundation complete (refer
to drawing no. ZZZ 824-208 & ZZZ 824 - 205)
7.2 Supply and install 250L conservancy tank under the roof of the Control Building including a
motor pump that will be controlled by water level controlled switch in the smaller tank
Hot water dispenser capacity 80L
Quantity
1.00
0.50
Unit
No
m
Number
$
$
Rate
20.00
20.00
$
$
Total
20.00
10.00
2.10
6.00
12.60
259.98
m2
5.00
1,299.90
Item
6,000.00
6,000.00
Item
5,000.00
5,000.00
Item
50
2.00
100.00
40
0.50
20.00
35
0.50
17.50
6750
3375
3174.30
733.2
m3
m3
m3
m3
$
$
$
$
7.00
25.00
20.00
19.00
$
$
$
$
47,250.00
84,375.00
63,486.00
13,930.80
398.4
199.2
174.30
33.2
m3
m3
m3
m3
$
$
$
$
7.00
25.00
20.00
19.00
$
$
$
$
2,788.80
4,980.00
3,486.00
630.80
No
1,000.00
2,000.00
No
30.00
150.00
110
m2
500.00
55,000.00
No
350.00
1,750.00
699.00
2.00
1,398.00
Item
Item
m
$
$
$
10.00
10.00
2.00
$
$
$
30.00
10.00
100.00
B1-4.9.7.14
B1-4.9.7.15
B1-4.9.7.15
B1-4.9.7.15
page
page
page
page
152
156
156
158
B1-4.9.7.14
B1-4.9.7.15
B1-4.9.7.15
B1-4.9.7.15
page
page
page
page
152
156
156
158
8.6 Insitu reinforced concrete ramps to be constructed in front of control building doors to be
about 1800mm wide
B02-4.7.9 page 81
B1-4.9.7.10 page 146
9.2 The complete, supply and installation of a security fence, including earthing of all metal
parts, gates etc. 2m High diamond mesh plastic coated galvanised steel wire and 300mmflat
wrap razor wire on the overhang fence and consists of a vertical post with 45 degree
inclination at the apex, fence to be fixed on a ring-beam foundation
9.3
9.4 1m Wide pedestrian gate with a frame height that matches the fence
9.5 Prepare and comply with an approved weed control and spread over substation
9.6 Supply and application of 10 to 30mm stone, 200mm deep, to one meter beyond fences,
including levelling and rolling to compact the stone layer.
5m Wide motorised electric fence, with a frame height that match the fence.
B1-3.6.2.13 page 46
9.8 Landscaping - Planting of medium-high growing plants and grass (Subject to approval of
Employer)
3
1
50
1054
678.00
No
No
14,784.70
m2
14,784.70
m2
2.00
78,389.00
200.00
500.00
100.00
1.00
15.00
135,600.00
500.00
100.00
14,784.70
221,770.50
Item
1,000.00
2,000.00
m2
1,000.00
78,389,000.00
80,199,658.39
80,199,658.39
Subtotal
Vat 16%
Final Total
BUNDA
Reference
B1-3.6.2.15 page 49
B1-3.6.2.14 page 47
No.
Description
1 P & G's
1.1 Geotechnical report (bore logs, trial pits, sounding logs) and to i
Actual ground level
Description and limits of various soil layers
Sample taken
SPT results
Water levels
Depth of borehole/pit/sounding
1.2 Topographic survey (10 meter grids and 0.5 meter vertical inter
Obtain topographic survey maps
Ensure position and elevation of all works are correct
1.3 Costs for obligations, equipment or labour, although not specifie
Contract in terms of the specification and Statutory Requiremen
BUNDA
Reference
No.
Description
2.7 Demolish and remove concrete v-drain (900mm wide and 400m
2.8 Take down and store on site - steel structures
2.10 Remove yard stone and to be stored for later use on site
2.11 Re-instate yard stone
2.13 Rate for overhaul per m3 of spoil for a distance greater than 10
2.14 Bulk excavations (cut) in insitu material
2.15 Extra over bulk excavations in clay and black cotton
2.16 Extra bulk excavations in intermediate material
2.17 Extra over bulk excavations in hard rock
2.19 Backfill with imported G6 material and compact the ground surf
compacting to 95% Mod AASHTO density
B1-4.9.7.14 page 155
B02-4.6.7 page 77
2.20 Backfill with imported G5 material and compact the ground surf
compacting to 95% Mod AASHTO density
B1-4.9.7.14 page152
BUNDA
Reference
B1-4.9.7.17 page 163
No.
Description
Blinding - 20mPa (50mm thick)
BUNDA
Reference
B1-4.9.7.14 page152
No.
Description
3.4 132 kV Isolator
Excavation in insitu material
B1-4.9.7.14 page152
B1-4.9.7.14 page152
BUNDA
Reference
B1-4.9.7.19 page 179
B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66
B1-4.9.7.14 page152
No.
Description
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 4)
3.7 132 kV Voltage Transformer
Excavation in insitu material
153
179
179
180
B1-4.9.7.14 page152
B1-4.9.7.17 page 163
B1-4.9.7.14 page152
BUNDA
Reference
B1-4.9.7.17 page 169
No.
Description
Wood float top of concrete foundation
B1-4.9.7.14 page152
B1-4.9.7.14 page152
3.12 66 kV Gantry
Excavation in insitu material
B1-4.9.7.14 page152
B1-4.9.7.17 page 163
3.13 66 kV Isolator
Excavation in insitu material
Blinding - 20mPa (50mm thick)
BUNDA
Reference
B1-4.9.7.17 page
B1-4.9.7.17 page
B1-4.9.7.17 page
B1-4.9.7.17 page
B1-4.9.7.17 page
B1-4.9.7.14 page
B1-4.9.7.14 page
B1-4.9.7.19 page
B1-4.9.7.19 page
B1-4.9.7.20 page
B1-4.2.1 page 66
No.
170
170
163
169
169
154
153
179
179
180
Description
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150mm to 97
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 4)
B1-4.9.7.14 page152
B1-4.9.7.17 page 163
B1-4.9.7.17 page 170
B1-4.9.7.17 page 170
B1-4.9.7.17 page 163
B1-4.9.7.17 page 169
B1-4.9.7.17 page 169
B1-4.9.7.14 page 154
B1-4.9.7.14 page 153
B1-4.9.7.19 page 179
B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66
B1-4.9.7.14 page152
B1-4.9.7.17 page 163
B1-4.9.7.17 page 170
B1-4.9.7.17 page 170
B1-4.9.7.17 page 163
B1-4.9.7.17 page 169
B1-4.9.7.17 page 169
B1-4.9.7.14 page 154
B1-4.9.7.14 page 153
B1-4.9.7.19 page 179
B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66
B1-4.9.7.14 page152
BUNDA
Reference
B1-4.9.7.17 page
B1-4.9.7.17 page
B1-4.9.7.17 page
B1-4.9.7.17 page
B1-4.9.7.17 page
B1-4.9.7.17 page
B1-4.9.7.14 page
B1-4.9.7.14 page
B1-4.9.7.19 page
B1-4.9.7.19 page
B1-4.9.7.20 page
B1-4.2.1 page 66
No.
163
170
170
163
169
169
154
153
179
179
180
Description
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150mm to 97
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 4)
B1-4.9.7.14 page152
B1-4.9.7.17 page 163
B1-4.9.7.17 page 170
B1-4.9.7.17 page 170
B1-4.9.7.17 page 163
B1-4.9.7.17 page 169
B1-4.9.7.17 page 169
B1-4.9.7.14 page 154
B1-4.9.7.14 page 153
B1-4.9.7.19 page 179
B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66
B1-4.9.7.14 page152
B1-4.9.7.17 page 163
B1-4.9.7.17 page 170
B1-4.9.7.17 page 170
B1-4.9.7.17 page 163
B1-4.9.7.17 page 169
B1-4.9.7.17 page 169
B1-4.9.7.14 page 154
B1-4.9.7.14 page 153
B1-4.9.7.19 page 179
B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66
BUNDA
Reference
B1-4.9.7.14 page152
B1-4.9.7.17 page 163
B1-4.9.7.17 page 170
B1-4.9.7.17 page 170
B1-4.9.7.17 page 163
B1-4.9.7.17 page 169
B1-4.9.7.17 page 169
B1-4.9.7.14 page 154
B1-4.9.7.14 page 153
B1-4.9.7.19 page 179
B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66
B1-4.9.7.14 page152
B1-4.9.7.17 page 163
B1-4.9.7.17 page 170
B1-4.9.7.17 page 170
B1-4.9.7.17 page 163
B1-4.9.7.17 page 169
B1-4.9.7.17 page 169
B1-4.9.7.14 page 154
B1-4.9.7.14 page 153
B1-4.9.7.19 page 179
B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66
B1-4.9.7.14 page152
No.
Description
Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150mm to 97
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts
BUNDA
Reference
B1-4.9.7.17page 170
B1-4.9.7.17page 169
No.
Description
Strip Footing concrete
Sump Concrete
Plinth
Surface bed
Formwork:
Smooth Formwork:
Sump walls
Plinth
Rough Formwork:
Strip footing
25 x 25mm Chamfer to sides of plinth
Concrete finish wood float:
Surface bed
Plinth
Reinforcing (MESH ref 617):
Surface bed
Plinth
Sundries:
Sump frame - 30 x 30 x 5Lg cast in and galvanised. 25 x 5mm fl
angle
(5mm fillet)
at 500mm
the open grid which is
75 to 100mm
Diameter
gravelc/c.
to To
fill fit
oilin
drain
BUNDA
Reference
No.
Description
Plinth
Surface bed
Part of the road
Formwork:
Smooth Formwork:
Sump walls
Plinth
Rough Formwork:
Strip footing
25 x 25mm Chamfer to sides of plinth
Concrete finish woodfloat:
Surface bed
Plinth
Reinforcing (MESH ref 617):
Surface bed
Plinth
Sundries:
Sump frame - 30 x 30 x 5Lg cast in and galvanised. 25 x 5mm fl
angle (5mm fillet) at 500mm c/c. To fit in the open grid which is
bearer bars, and 40 x 40mm openings (fully banded)
75 to 100mm Diameter gravel to fill oil drain
B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.22
B1-4.9.7.17
page152
page 163
page 163
page 170
page 163
page 163
page 181
page 170
BUNDA
Reference
B1-4.9.7.20 page 180
B1-4.9.7.3 page 138
No.
Description
Grout - 25mPa to top of stub
3.24 Control Building
Excavations in insitu material:
Strip foundation
Prepare and spary with an approved anti-termite control under b
B1-4.9.7.22
B1-4.9.7.22
B1-4.9.7.22
B1-4.9.7.22
B1-4.9.7.17
page
page
page
page
page
181
184
183
183
170
Heavy duty PVC sheeting on false floor - control room, relay room
BUNDA
Reference
B1-4.9.7.21 page 180
B1-4.9.7.21 page 180
B1-4.9.7.18 page 178
No.
Description
Skirtings:
Heavy duty PVC sheet - to painted walls
Internal Wall Finishes:
Plaster to brickwork and concrete
Fair face blockwork,cement wash, paint - storage and workshop
Glazed ceramic tiles 2.3m high, plaster and paint - kitchen, mes
Acid/lye resistant tiles 1.2m high - battery room
Paint brickwork and concrete (weatherproof)
External Wall Finish:
Paint on plaster (weatherproof)
Aluminium Frames:
Windows:
Type W2: 900 x 900mm Frame including 4mm double glaze com
Doors:
Single
Type D3: 885 x 2500mm Frame and steel doors door including a
complete (external)
Double
Type D1: 1750 x 2500mm Frame and steel door including all sta
complete
(external)
Type D2: 1750
x 2500mm Frame and steel door including all sta
complete (external)
Steel:
Doors:
Single
Type D4: 885 x 2100mm Frame and timber doors door including
(internal)
Double
Type D2: 1750 x 2500mm Frame and steel door including all iron
Furniture:
Desks (size 1500 x 700mm with drawers)
Tables (size 2000 x 1000mm)
Swivel chairs
Visitors' chairs (to be plastic)
Cupboards (two door cupboard with dividing shelves )
Airconditioner central unit in control building
BUNDA
Reference
B1-4.9.7.23page 191
B1-4.9.7.23page 188
B1-3.6.2.12 page 46
B1-3.6.2.12 page 46
No.
Description
Allow one double door cupboard with shelves underneath sink fo
Two plate electric cooker
Roof:
Corrugated approved roof sheeting - 0.6mm gauge to be fitted i
complete
Welded roof trusses of 30 degrees angle rafters, tie beams, rails
etc and flat bearer, gusset and connection plates, bolted to stee
12.69m and height of 3.66m (There are 9 trusses)
Urinal with
with all
all necessary
necessary connections,
connections, fittings
fittings and
and piping
piping comple
comple
Basin
mirror
Sink with all necessary connections, fittings, gulley and piping c
Shower with all necessary connections, fittings and piping comp
Extras
Supply and install fire 9kg CO2 extinguisher with sign
Supply and install fire alarm
BUNDA
Reference
B1-4.9.7.19 page 179
No.
Description
Reinforcing:
Reinforcing mesh ref. 395
Reinforcing - Supply & Fix only
BUNDA
Reference
B1-4.9.7.22 page 181
No.
Description
Glazed ceramic tiles 2.3m high, plaster and paint - kitchen, mes
External Wall Finish:
Paint on plaster (weatherproof)
Aluminium Frames:
Windows:
Doors:
Single
Type D3: 885 x 2100mm Frame and steel door including stainles
(external)
Steel Frames:
Doors:
Single
Type D3: 885 x 2100mm Frame and timber door including all iro
Roof:
Corrugated approved roof sheeting - 0.6mm gauge to be fitted i
complete
Welded roof trusses of 30 degrees angle rafters, tie beams, rails
etc and flat bearer, gusset and connection plates, bolted to stee
and height of 1.76m (There are 3 trusses)
B1-3.6.2.12 page 46
B1-3.6.2.12 page 46
BUNDA
Reference
No.
Description
WC with all necessary connections, fittings and piping complete
4 EARTH MAT
4.1 Excavate 300mm (width) x 1000mm (depth) for earth grids
4.2
Backfilling to earthing grid and compact the ground surface in d
95% Mod AASHTO density
5.2 Concrete trench cover for 1000mm wide trench (with maximal w
BUNDA
Reference
B1-3.6.2.12 page 46
No.
Description
6 DRAINAGE
6.1
Subsoil Drain
Supply, lay and joint 2 x 160mm diameter preferated uPVC p
NGL in trench which is to be lined with geofabric material (bidem
to 75mm diameter stone, including excavation, temporary supp
dry, complete (refer to drawing no. ZZZ 824-200)
6.2 Construct cast insitu concrete manhole with lid and including ex
temporary support of sides, keeping excavations dry, complete
200)
6.3 Construct cast insitu septic tank overall size 2250 X 1950 X 215
excavation, temporary support of sides, keeping excavations dry
ZZZ 824-207)
6.4 Construct cast insitu soak pit overall size 2000 x 2000 x 1500mm
150mm rock, including excavtion and backfilling (refer to drawin
6.5
6.7 Supply, lay, joint and bed 450mm diameter class 50D spigot and
pipes including necessary bends and tees
6.8
B1-4.9.7.15 page 156
B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
page
page
page
page
page
152
163
170
163
169
Supply, lay, joint and bed 110mm Diameter PVC pipe including
6.9 Construct concerte v-drain with a top width of 800mm and botto
excavation, temporary support of sides, keeping excavations dry
ZZZ 824-200)
BUNDA
Reference
No.
Description
Supply, lay, joint and bed 160mm Diameter uPVC pipe including
Paint x 2 layers of bitumen to internal surfaces of separator
7 WATER SUPPLY
7.1 Supply and install 2000L conservancy tank to Control Building a
excavation,backfilling, pipework and fittings to sit on a concrete
drawing no. ZZZ 824-208 & ZZZ 824 - 205)
7.2 Supply and install 250L conservancy tank under the roof of the
motor pump that will be controlled by water level controlled swi
Hot water dispenser capacity 80L
B1-4.9.7.14
B1-4.9.7.15
B1-4.9.7.15
B1-4.9.7.15
B1-4.9.7.14
B1-4.9.7.15
B1-4.9.7.15
B1-4.9.7.15
B1-4.9.7.15
page
page
page
page
page
page
page
page
page
152
156
156
158
152
156
156
158
156
8.3 Road crossing over 5m wide road for cable trench.Precast concre
600mm and the internal walls to be 100mm thick)
8.4 Segmented paving - Supply and lay 80 mm interlocking concret
bed (max 30 mm); edge restraint and cutting of units where req
B02-4.7.9 page 81
B1-4.9.7.10 page 146
BUNDA
Reference
B1-4.9.7.17 page 171
No.
Description
9.1 The complete, supply and installation of a security fence, includ
gates etc. 2m High diamond mesh plastic coated galvanised ste
razor wire on the overhang fence and consists of a vertical post
apex, fence to be fixed on a ring-beam foundation
9.2 5m Wide motorised electric fence, with a frame height that mat
9.3 5m Wide fence, with a frame height that match the fence.
9.4 1m Wide pedestrian gate with a frame height that matches the
9.5 Prepare and comply with an approved weed control and spread
9.6 Supply and application of 10 to 30mm stone, 200mm deep, to o
including levelling and rolling to compact the stone layer.
Unit
Number
Item
Item
Item
are correct
lthough not specified, is required to complete the
atutory Requirements
Item
Item
month
Item
Item
Item
Item
Month
Month
Item
Month
Item
Month
Item
13
1
2
1
1
1
1
1
1
1
2
1
oundations
grubbing up of foundations (size 1.8 x 1.8m wide)
40
Item
Item
Item
Item
Item
Item
1
1
1
1
13
13
1
13
1
13
1
s
use on site
d AASHTO
t the ground surface in depths of 300mm
m3 of fill)
or performance of the work
f Material" is required
or each second layer of "Backfilling and/or
Unit
Item
40
2500
2500
Item
m2
m2
2,490.00
m2
1.00
Km
200.00
20.00
20.00
10.00
2,490.00
m3
m3
m3
m3
m2
200.00
m3
300.00
m3
780.00
m3
1
3
1
3
Test
Test
Test
Test
Test
2
2
2
2
3
Test
Test
Test
Test
Test
1
1
Item
Item
10.75
m3
Number
away)
supply bolts)
Quantity
Unit
0.51
m3
Number
5
5.04
m2
3.84
4.84
5.60
1.96
m3
m
m2
5
5
5
5.80
m3
4.96
267.00
1
0.10
8
m
kg
No
m3
No
5
5
5
5
5
Unit
Number
2.21
m3
24
0.13
m3
24
3.36
24
2.16
24
1.28
4.80
0.72
m3
m
m2
24
24
24
0.94
m3
24
1.27
79.00
1
0.04
8
m
kg
No
m3
No
24
24
24
24
24
3.62
m3
0.21
m3
4.20
2.91
m2
2.06
6.00
1.13
m3
m
m2
3
3
3
1.85
m3
1.77
207.00
1.00
0.06
8
m
kg
No
m3
No
3
3
3
3
3
1.03
m3
12
0.06
12
1.96
12
1.32
m2
12
0.71
2.80
0.49
m
m
m2
12
12
12
0.36
m3
12
away)
0.67
m3
12
away)
supply bolts)
away)
supply bolts)
supply bolts)
Quantity
Unit
47.00
kg
1
No
0.02
m3
4
No
Number
12
12
12
12
1.03
m3
0.06
1.96
1.32
m2
0.71
2.80
m
m
9
9
0.49
m2
0.36
0.67
47.00
1
0.02
4
m3
m3
kg
No
m3
No
9
9
9
9
9
9
3.83
m3
4.10
3.92
3.12
2.04
5.60
0.98
m3
m2
m2
m3
m
m2
8
8
8
8
8
8
2.24
m3
away)
1.60
128
1
0.05
8
m
kg
No
m3
No
8
8
8
8
8
1.03
m3
10
0.06
10
1.96
10
1.32
m2
10
0.71
2.80
m
m
10
10
supply bolts)
supply bolts)
away)
supply bolts)
away)
supply bolts)
away)
supply bolts)
Quantity
Unit
0.49
m2
Number
10
0.36
m3
10
0.67
47.00
1
0.02
4
m
kg
No
m3
No
10
10
10
10
10
1.03
m3
0.06
1.96
1.32
m2
0.71
2.80
0.49
m
m
m2
6
6
6
0.36
m3
0.67
47.00
1
0.02
4
m3
kg
No
m3
No
6
6
6
6
6
8.83
m3
0.42
5.04
m2
3.48
4.29
5.60
1.96
m
m
m2
5
5
5
4.52
m3
4.31
233.00
1
0.10
8
m
kg
No
m3
No
5
5
5
5
5
6.50
m3
12
0.38
m3
12
supply bolts)
supply bolts)
supply bolts)
Quantity
Unit
10.08
m2
3.44
m2
3.81
m3
14.4
m
2.16
m2
2.74
m3
3.76
m3
210
kg
1
No
0.11
m3
24
No
Number
12
12
12
12
12
12
12
12
12
12
12
2.43
0.14
3.92
3.78
1.54
5.60
0.98
0.74
1.69
86.00
1
0.05
8
m3
m3
m2
m2
m3
m
m2
m3
m3
kg
No
m3
No
6
6
6
6
6
6
6
6
6
6
6
6
6
1.67
0.10
1.96
1.68
0.93
2.80
0.49
0.64
1.03
58.00
1
0.02
4
m3
m3
m2
m2
m3
m
m2
m3
m3
kg
No
m3
No
18
18
18
18
18
18
18
18
18
18
18
18
18
1.67
m3
15
supply bolts)
supply bolts)
supply bolts)
Quantity
Unit
0.10
m3
1.96
m2
1.68
m2
0.93
m3
2.80
m
0.49
m2
0.64
m3
1.03
m3
58.00
kg
1
No
0.02
m3
4
No
Number
15
15
15
15
15
15
15
15
15
15
15
15
1.67
0.10
1.96
1.68
0.93
2.80
0.49
0.64
1.03
58.00
1
0.02
4
m3
m3
m2
m2
m3
m
m2
m3
m3
kg
No
m3
No
15
15
15
15
15
15
15
15
15
15
15
15
15
4.28
0.25
3.92
3.00
2.20
5.60
0.98
2.03
2.25
136.00
2
0.05
8
m3
m3
m2
m2
m3
m
m2
m3
m3
kg
No
m3
No
7
7
7
7
7
7
7
7
7
7
7
7
7
supply bolts)
supply bolts)
Quantity
Unit
0.49
m3
0.10
m3
2.24
m2
0
m2
0.78
m3
5.6
m
1.96
m2
0.00
m3
0.49
m3
3.92
m2
1
No
0.10
m3
4
No
0.13
0.03
0.96
0
0.19
3.20
0.63
0.00
0.13
0
0
0.03
0
m3
m3
m2
m2
m3
m
m2
m3
m3
kg
No
m3
No
6.01
0.58
2.94
4.39
1.69
12.23
m3
m3
m3
m3
m3
m3
0.55
0.03
0.42
1.10
m3
m3
m3
m3
Number
1
1
1
1
1
1
1
1
1
1
1
1
1
9
9
9
9
9
9
9
9
9
9
9
9
9
Quantity
Unit
2.19
m3
0.37
m3
5.04
m3
2.20
m3
1.82
7.08
m2
m2
9.71
11.80
m2
m
21.97
8.40
m2
m2
21.97
16.8
m2
m2
21.97
2.20
160.86
68.94
22.18
6
1
30.37
m2
m3
m2
m2
m
m
Item
m2
8.32
0.58
7.35
9.07
4.54
20.78
m3
m3
m3
m3
m3
m3
0.76
0.03
1.05
2.27
m3
m3
m3
m3
3.02
0.33
m3
m3
Number
benching render
Quantity
Unit
m3
12.60
4.54
4.41
m3
m3
2.24
11.40
m2
m2
13.46
19
m2
m
45.36
21
m2
m2
45.36
42
m2
m2
45.36
m2
4.54
31.28
125.12
2.22
8.00
20.10
1
50
m3
m2
m2
m2
m
m
Item
m2
17.11
0.63
4.37
26.66
3.80
11.56
114.00
4.33
9.94
8.30
8.81
12.67
m3
m3
m3
m2
m3
m3
m2
m2
m
m3
m3
m2
Number
2
2
2
2
2
2
2
2
2
2
2
2
Unit
0.50
m3
56.35
337.53
m3
m2
56.35
m3
148.62
74.31
102
m2
m2
m2
3.98
67.51
31.88
7.65
10.25
m3
m3
m3
m3
m3
46.72
337.53
1870
m2
kg
256.52
m2
114.97
459.88
15.63
337.53
337.53
m2
m2
m2
m2
m2
26.48
m2
37.16
m2
16.64
m2
23.28
24.82
m2
m2
137.46
m2
15.00
15.00
15.00
m2
m2
m2
away)
) to sides of foundations
er) to sides of beams
er) to sides of columns
o
o
o
o
surface bed
foundations
columns
beams
ment/electrical workrooms
g epoxy screed - basements
Number
2
Unit
36.11
m2
80.40
m2
30.4
m2
38
10
122.18
638.4
100.05
104.78
23.28
523.75
m2
m2
m2
m2
m2
231.37
m2
No
No
No
No
No
No
No
2
2
4
2
2
1
No
No
No
No
No
Item
sformer pits
nch complete
Trench walls and bottom to be 100mm thick
PVC pipe
Number
8
1
427.82
m2
No
29.31
58.36
16
m
m
m
Unit
No
Item
m2
m2
Item
2
1
2
1
2
No
No
No
No
No
8
2
No
No
4.51
m3
28.03
4.51
m2
m3
) to sides of foundations
er) to sides of beams
und timber)
15.02
11.75
10.00
m2
m2
m2
1.40
4.51
5.61
0.6
1.13
m3
m3
m3
m3
m3
10.26
s and
and piping
piping complete
complete with soap dispenser and
o
o
o
o
foundations
surface bed
columns
beams
Number
Unit
m2
kg
Number
Quantity
Unit
51.44
m2
13.19
329
3.76
m2
m
m2
28.03
m2
28.03
m2
18
m2
18.15
70.71
57.80
12.90
m2
m2
m2
46.21
m2
2
1
No
No
No
No
40.01
m2
No
11.40
16
14
m2
m2
Item
Number
Unit
Z 824-200)
ction of 1000mm wide x 500mm deep cast insitu
and junctions to include 100mm diameter PVC
e trench
No
No
1
1
No
No
495
m3
495
m3
116
396
No
Number
Unit
91
No
No
No
No
25
90
29
110.00
97.00
3.45
235.00
45.00
12.80
2.00
46.13
97.00
7520.00
8.00
4.00
1.00
1.00
0.50
m3
m3
m2
m3
m
No
m2
m3
Kg
No
No
m
No
m
o. ZZZ 824-200)
end
Number
Quantity
16
259.98
Unit
m
m2
Item
Item
Item
50
40
35
m
m
m
MOD AASHTO
d to 98% MOD AASHTO
adam grade 60/70 penetration
81
40.5
36.00
8.4
m3
m3
m3
m3
MOD AASHTO
d to 98% MOD AASHTO
adam grade 60/70 penetration
148.27
74.14
64.87
12.36
m3
m3
m3
m3
No
227.28
m2
No
303.00
3
1
25
Item
Item
m
Number
Quantity
Unit
267
1
1
1
1,602.00
No
No
No
m2
1,602.00
m2
2.00
160.20
Number
Item
m2
Subtotal
Vat 16%
Final Total
Rate
Total
1,000.00 $
1,000.00
200.00 $
200.00
50.00 $
50.00
1,000.00 $
1,000.00
30,000.00 $
30,000.00
750.00 $
19,500.00
$
$
$
$
$
$
$
$
8,000.00
200.00
500.00
500.00
500.00
1,000.00
500.00
1,000.00
$
$
$
$
$
$
$
$
$
$
$
150.00 $
1,000.00 $
8,000.00
400.00
500.00
500.00
6,500.00
13,000.00
500.00
13,000.00
3,900.00
1,000.00
45.00 $
1,800.00
500.00 $
500.00
120.00 $
120.00
120.00 $
120.00
$
$
250.00
250.00
Rate
$
Total
100.00
$
50.00 $
100.00
2,000.00
$
$
0.80 $
1.50 $
2,000.00
3,750.00
0.80 $
1,992.00
20.00 $
20.00
$
$
$
$
7.00
7.00 $
8.00 $
20.00 $
140.00
160.00
200.00
7.00 $
1,400.00
20.00 $
6,000.00
5,460.00
7.00
$
$
$
$
200.00
200.00
200.00
200.00
$
$
$
$
200.00
600.00
200.00
600.00
200.00 $
600.00
$
$
$
$
$
100.00
100.00
100.00
100.00
200.00
$
$
$
$
$
200.00
200.00
200.00
200.00
600.00
$
$
100.00 $
100.00 $
100.00
100.00
7.00 $
376.32
Rate
$
Total
190.00 $
30.00 $
756.00
25.00 $
480.00
$
$
$
265.00 $
4.00 $
5.00 $
6,407.70
112.00
49.00
7.00 $
202.86
$
$
$
$
$
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
173.46
4,005.00
27.50
3.43
200.00
Rate
Total
7.00 $
371.28
190.00 $
592.80
30.00 $
2,419.20
25.00 $
1,296.00
$
$
$
265.00 $
4.00 $
5.00 $
8,166.24
460.80
86.40
7.00 $
157.92
$
$
$
$
$
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
213.36
5,688.00
132.00
6.05
960.00
7.00 $
75.95
190.00 $
121.27
30.00 $
378.00
25.00 $
218.25
$
$
$
265.00 $
4.00 $
5.00 $
1,640.88
72.00
16.88
7.00 $
38.77
$
$
$
$
$
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
37.18
1,863.00
16.50
1.18
120.00
7.00 $
86.39
190.00 $
137.94
30.00 $
705.60
25.00 $
396.00
$
$
$
265.00 $
4.00 $
5.00 $
2,245.08
134.40
29.40
7.00 $
30.24
7.00 $
56.15
Rate
$
$
$
$
3.00
5.50
7.00
5.00
Total
$
$
$
$
1,692.00
66.00
2.06
240.00
7.00 $
64.80
190.00 $
103.46
30.00 $
529.20
25.00 $
297.00
$
$
265.00 $
4.00 $
1,683.81
100.80
5.00 $
22.05
$
$
$
$
$
$
7.00
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
$
22.68
42.12
1,269.00
49.50
1.54
180.00
7.00 $
214.68
$
$
$
$
$
$
190.00
30.00
25.00
265.00
4.00
5.00
$
$
$
$
$
$
6,232.00
940.80
624.00
4,322.68
179.20
39.20
7.00 $
125.19
$
$
$
$
$
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
89.49
3,072.00
44.00
2.74
320.00
7.00 $
72.00
190.00 $
114.95
30.00 $
588.00
25.00 $
330.00
$
$
265.00 $
4.00 $
1,870.90
112.00
Rate
$
Total
5.00 $
24.50
7.00 $
25.20
$
$
$
$
$
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
46.80
1,410.00
55.00
1.72
200.00
7.00 $
43.20
190.00 $
68.97
30.00 $
352.80
25.00 $
198.00
$
$
$
265.00 $
4.00 $
5.00 $
1,122.54
67.20
14.70
7.00 $
15.12
$
$
$
$
$
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
28.08
846.00
33.00
1.03
120.00
7.00 $
309.07
190.00 $
399.48
30.00 $
756.00
25.00 $
435.00
$
$
$
265.00 $
4.00 $
5.00 $
5,680.28
112.00
49.00
7.00 $
158.22
$
$
$
$
$
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
150.85
3,495.00
27.50
3.43
200.00
7.00 $
545.78
190.00 $
871.42
Rate
$
$
$
$
$
$
$
$
$
$
$
30.00
25.00
265.00
4.00
5.00
7.00
7.00
3.00
5.50
7.00
5.00
Total
$
$
$
$
$
$
$
$
$
$
$
3,628.80
1,033.20
12,100.54
691.20
129.60
229.94
315.84
7,560.00
66.00
9.07
1,440.00
$
$
$
$
$
$
$
$
$
$
$
$
$
7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
$
$
$
$
$
$
$
$
102.10
163.02
705.60
567.00
2,454.96
134.40
29.40
31.25
70.85
1,548.00
33.00
2.06
240.00
$
$
$
$
$
$
$
$
$
$
$
$
$
7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
$
$
$
$
$
$
$
$
209.92
335.16
1,058.40
756.00
4,440.87
201.60
44.10
80.26
129.65
3,132.00
99.00
3.09
360.00
7.00 $
174.93
Rate
$
$
$
$
$
$
$
$
$
$
$
$
190.00
30.00
25.00
265.00
4.00
5.00
7.00
7.00
3.00
5.50
7.00
5.00
Total
$
$
$
$
$
$
$
$
$
$
$
$
279.30
882.00
630.00
3,700.73
168.00
36.75
66.89
108.05
2,610.00
82.50
2.57
300.00
$
$
$
$
$
$
$
$
$
$
$
$
$
7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
$
$
$
$
$
$
$
$
174.93
279.30
882.00
630.00
3,700.73
168.00
36.75
66.89
108.05
2,610.00
82.50
2.57
300.00
$
$
$
$
$
$
$
$
$
$
$
$
$
7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
$
$
$
$
$
$
$
$
209.92
335.16
823.20
525.00
4,077.29
156.80
34.30
99.47
110.45
2,856.00
77.00
2.40
280.00
Rate
$
$
$
$
$
$
$
$
$
$
$
$
$
7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
7.00
3.00
5.50
7.00
5.00
Total
$
$
$
$
$
$
$
$
$
$
$
$
$
3.43
18.62
67.20
207.76
22.40
9.80
3.43
11.76
5.50
0.69
20.00
$
$
$
$
$
$
$
$
$
$
$
$
$
7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
7.00
3.00
5.50
7.00
5.00
$
$
$
$
$
$
$
$
$
$
$
$
$
7.94
53.87
259.20
450.77
115.20
28.35
8.19
1.98
-
$
$
$
$
$
$
7.00
7.00
7.00
7.00
7.00
7.00
$
$
$
$
$
$
42.07
4.03
20.58
30.76
11.83
85.61
$
$
$
$
190.00
190.00
190.00
190.00
$
$
$
$
103.80
6.08
79.80
208.72
Rate
$
$
$
$
260.00
260.00
260.00
260.00
Total
$
$
$
$
568.15
95.94
1,310.40
571.22
$
$
2.00 $
2.00 $
3.64
14.16
$
$
20.00 $
20.00 $
194.24
236.00
$
$
8.00 $
8.00 $
175.76
67.20
$
$
8.00 $
8.00 $
175.76
134.40
$
$
$
$
$
40.00
19.00
1.00
1.00
100.00
150
500
10
$
$
$
$
$
$
$
$
878.80
41.74
160.86
68.94
2,218.00
900.00
500.00
303.69
$
$
$
$
$
$
7.00
7.00
7.00
7.00
7.00
7.00
$
$
$
$
$
$
58.21
4.03
51.45
63.50
31.75
145.45
$
$
$
$
190.00
190.00
190.00
190.00
$
$
$
$
143.64
6.08
199.50
430.92
$
$
260.00 $
260.00 $
786.24
85.02
Rate
$
Total
260.00 $
3,276.00
$
$
260.00 $
260.00 $
1,179.36
1,146.60
$
$
20.00 $
20.00 $
44.80
228.00
$
$
20.00 $
20.00 $
269.28
380.00
$
$
8.00 $
8.00 $
362.88
168.00
$
$
8.00 $
8.00 $
362.88
336.00
40.00 $
1,814.40
$
$
$
$
$
$
$
$
19.00
1.00
1.00
100.00
150.00
150.00
500.00
10.00
$
$
$
$
$
$
$
$
86.18
31.28
125.12
222.00
1,200.00
3,015.00
500.00
500.00
$
$
$
$
$
$
$
$
$
$
$
$
7.00
190.00
265.00
30.00
265.00
265.00
10.00
5.00
10.00
10.00
6.00
9.00
$
$
$
$
$
$
$
$
$
$
$
$
239.50
240.77
2,318.01
1,599.84
2,014.85
6,128.50
2,280.00
43.30
198.80
165.97
105.71
228.10
Rate
$
Total
190.00 $
188.86
$
$
6.00 $
1.10 $
338.08
371.28
6.00 $
338.08
$
$
$
25.00 $
33.00 $
33.00 $
3,715.50
2,452.23
3,366.00
$
$
$
$
$
250.00
300.00
300.00
300.00
300.00
$
$
$
$
$
996.10
20,251.84
9,562.56
2,295.00
3,073.68
15.00 $
700.80
$
$
9.00 $
2.50 $
3,037.78
4,675.00
35.00 $
8,978.17
$
$
$
$
$
21.00
3.00
1.00
1.20
5.00
$
$
$
$
1,379.64
15.63
405.04
1,687.65
10.00 $
264.80
40.00 $
1,486.27
20.00 $
332.88
$
$
50.00 $
100.00 $
1,163.97
2,481.53
40.00 $
5,498.41
$
$
$
40.00 $
10.00 $
60.00 $
600.00
150.00
900.00
Rate
Total
100.00 $
3,611.36
40.00 $
3,216.13
30.00 $
912.00
6.00 $
60.00
40.00 $
4,887.20
$
$
$
$
$
$
10.00
5.00
60.00
100.00
4.00
$
$
$
$
$
6,384.00
500.25
6,286.80
2,328.00
2,095.00
7.00 $
1,619.59
890.00 $
7,120.00
265.00 $
1,325.00
100.00 $
150.00
150.00
200.00
100.00
150.00
$
$
$
$
$
$
480.00
480.00
265.00
550.00
1,700.00
15.00
$
$
$
$
$
$
960.00
960.00
1,060.00
1,100.00
3,400.00
15.00
Rate
$
$
Total
612.00 $
130.00 $
4,896.00
130.00
20.00 $
8,556.46
288.00 $
2,592.00
$
$
$
100.00 $
100.00 $
5,836.00
1,600.00
15.00 $
4,229.94
$
$
20.00 $
120.00 $
5,640.00
120.00
$
$
$
$
$
190.00
145.00
100.00
120.00
50.00
$
$
$
$
$
$
$
$
260.00 $
650.00 $
380.00
145.00
200.00
120.00
100.00
2,080.00
1,300.00
6.00 $
27.04
$
$
1.10 $
6.00 $
30.83
27.04
$
$
$
25.00 $
33.00 $
33.00 $
375.56
387.64
330.00
$
$
$
$
$
$
250.00
300.00
300.00
300.00
300.00
$
$
$
$
$
350.33
1,352.02
1,681.59
180.00
338.00
15.00 $
153.90
Rate
$
$
Total
9.00 $
2.50 $
252.24
675.00
Rate
Total
35.00 $
1,800.55
$
$
$
21.00 $
3.00 $
1.00 $
276.95
987.00
3.76
1.20 $
33.63
5.00 $
140.13
40.00 $
730.90
40.00 $
726.00
$
$
$
10.00 $
10.00 $
40.00 $
707.06
578.03
516.12
5.00 $
231.06
$
$
560.00 $
265.00 $
1,120.00
265.00
100.00 $
200.00
100.00 $
200.00
20.00 $
800.28
288.00 $
864.00
10.00 $
114.00
10.00 $
160.00
15.00 $
303.08
20.00 $
404.20
450.00 $
$
450.00
-
Rate
Total
190.00 $
190.00
100.00 $
100.00
$
$
260.00 $
650.00 $
260.00
650.00
7.00 $
3,465.00
3,465.00
7.00
10.00 $
1,160.00
60.00 $
23,760.00
Rate
Total
100.00 $
9,100.00
265.00 $
1,855.00
1,800.00 $
1,800.00
1,100.00 $
1,100.00
100.00 $
100.00
15.00 $
375.00
18.00 $
1,620.00
4.00 $
116.00
100.00 $
11,000.00
$
$
$
$
$
$
$
$
$
$
$
$
$
$
7.00
190.00
33.00
190.00
1.00
20.00
5.30
6.00
2.50
225.00
120.00
45.00
20.00
20.00
679.00
656.26
7,755.00
8,550.00
12.80
40.00
244.49
582.00
18,800.00
1,800.00
480.00
45.00
20.00
10.00
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Rate
$
$
Total
6.00 $
5.00 $
96.00
1,299.90
6,000.00 $
6,000.00
5,000.00 $
5,000.00
$
$
$
2.00 $
0.50 $
0.50 $
100.00
20.00
17.50
$
$
$
$
7.00
25.00
20.00
19.00
$
$
$
$
567.00
1,012.50
720.00
159.60
$
$
$
$
7.00
25.00
20.00
19.00
$
$
$
$
1,037.90
1,853.40
1,297.38
234.76
30.00 $
150.00
500.00 $
113,640.00
350.00 $
1,750.00
2.00 $
606.00
$
$
$
10.00 $
10.00 $
2.00 $
30.00
10.00
50.00
Rate
Total
200.00 $
53,400.00
500.00 $
$
100.00 $
1.00 $
500.00
100.00
1,602.00
$
15.00
1,000.00 $
24,030.00
1,000.00 $
160,200.00
991,004.44
991,004.44
2,000.00
MATAMBO
No. Description
1.0 P & G's
CIVIL SUB CONTRACTORS OWN REQUIRMENTS
Quantity
Unit
Number
Rate in $
Total in MK
1.0
1.00
Item
0.00
1.1
Supervision & Labour FOR Civil Sub Contractor, own requiremnts for the duration of the Contract 6 Months
1.00
Month
0.00
1.00
Item
0.00
1.00
Item
0.00
1.00
Item
0.00
1.00
Item
0.00
1.00
1.00
1.00
2.00
Item
Item
Item
Item
1
1
1
1
0.00
0.00
0.00
0.00
1.4 Temporary Site Office (Duration of Civil Contract 6 Months) for Employer & ABB- Consisting of:
- Two Rooms (3 by 3 m)
- One Toilet Room
- One Kitchen Room
- Tables, Chairs, a desk, filing cabinets, air conditioning for both Rooms (Heating & cooling)
Temporary Accommodation for Employer - 4 by Client Personal & 1 by ABB Personal - At Site
Consiting of:
- Two Rooms (4 by 3 m)
- FOR ABOVE ROOMS - New Beds for 4 People, 2 in each Room, Wardrobe Cabinet, Tables
Chairs, Air conditioning for both Rooms (Heating & cooling) ext.
- One Toilet Room - (3 by 2 = 6m^2)
- One Shower Room - (3 by 2 = 6m^2)
- One Kitchen Room - (3 by 3 = 9m^2)
- FOR ABOVE KITCHEN - Refrigerator, Microwave Oven and 2 Plate Cooker
1.6 Temporary Septic Tank (Local Design)
1.7 Temporary Soak away Pit (Local Design)
1.8 Temporary fence around site establishment - 50m by 50m
1.9 Temporary gate
1.5
1.92 Temporary electricity connection/generator allow for Purchase of 7.5kVa Generator - RATE ONLY
1.00
Item
1.93 Water usage - RATE ONLY per Month for 250 Liters
1.00
1.00
1.00
1.00
1.00
Month
Rate per
Liter
Item
Item
Month
1
1
1
6
0.00
0.00
0.00
24.39
78.00
24.39
m3
m2
m3
0.00
0.00
0.00
5.82
5.44
0.27
2.85
18.36
2.09
m3
m3
m3
m3
m3
m3
0.00
0.00
0.00
0.00
0.00
0.00
17.50
1.20
0.80
m
m
m
0.00
0.00
0.00
69.83
1,260.00
144.54
m2
kg
m2
0.00
0.00
0.00
9.53
69.83
69.83
m2
m2
m2
0.00
0.00
0.00
10
69.83
m2
0.00
13.90
m2
0.00
450x 600mm deep internal concrete trench. Trench walls and bottom to be 100mm thick
17.77
0.00
160.88
160.88
m2
m2
0.00
0.00
123.80
m2
0.00
123.80
m2
0.00
5.00
1.00
No
No
1.00
No
0.00
1.00
No
0.00
1.00
No
0.00
2.00
Item
0.00
0.00
0.00
0.00
0.00
0.00
2.11 Roof:
Slab Flat Roof 200 mm thick - 25Mpa Concrete - Sloping 1 : 160 As shown on the drawing
Slab to be plastered inside ceiling
2.12 Joint Sealants etc .
Cold poured polyurethane sealing compound (15% movement) including bond breaker, primer,
etc.:
190.00
69.83
m2
m2
0.00
0.00
38.00
0.00
Exterior waterproof membrane Sika Blackseal T - 140MG or similar preferable grey colour
Expansion joints with "Sondor Jointex Polyethylene" joint former between vertical concrete and
brick surfaces or SikaFlex or similar .
Extras
Supply and install fire 18kg CO2 extinguisher wheeled type with sign
101.52
m2
0.00
38.00
0.00
5.00
1.00
No
No
0.00
0.00
3.65
m3
0.00
Backfilling to earthing grid and compact the ground surface in depths of 300mm compacting to
3.3
95% Mod AASHTO density
1.00
m3
0.00
3.65
0.00
12.00
No
0.00
The excavation in insitu material for construction of 500mm wide x 700mm deep cast insitu
6.3 reinforced concrete trenches including bends and junctions to include 100mm diameter PVC drain
pipe at 4m centres at the bottom of the trench
220.00
0.00
6.4 Concrete trench cover for 500mm wide trench (with maximal weight of 50 kg each)
440.00
No
0.00
6.2 Concrete trench cover for 450 mm wide trench - Vastrap Type 1-6mm plate 10mm thick
Subtotal
Vat
16%
Final Total - EXCLUDING VAT
$0.00
$0.00
$0.00
No. Description
1.0 P & G's
CIVIL SUB CONTRACTORS OWN REQUIRMENTS
1.0
Supervision & Labour FOR Civil Sub Contractor, own requiremnts for the duration of the
1.1
Contract - 6 Months
DE MOBILIZATION FOR CIVIL SUB CONTRACTOR - OWN REQUIRMENTS - De1.2
establishment of site camp and stores
Costs for obligations, equipment or labour, although not specified, is required to complete the
1.3 Contract in terms of the specification and Statutory Requirements
Quantity
Unit
Number Rate in MK
Total in MK
1.00
Item
0.00
1.00
Month
0.00
1.00
Item
0.00
1.00
Item
0.00
1.00
Item
0.00
1.00
Item
0.00
1.00
1.00
1.00
2.00
1.00
Item
Item
Item
Item
Item
1
1
1
1
1
0.00
0.00
0.00
0.00
1.00
Item
1.00
Month
Rate per
Liter
Item
Item
Month
Temporary Site Office (Duration of Civil Contract 6 Months) for Employer & ABBConsisting of:
- Two Rooms (3 by 3 m)
- One Toilet Room
- One Kitchen Room
- Tables, Chairs, a desk, filing cabinets, air conditioning for both Rooms (Heating &
cooling)
Temporary Accommodation for Employer - 4 by Client Personal & 1 by ABB Personal 1.5
At Site Consiting of:
- Two Rooms (4 by 3 m)
- FOR ABOVE ROOMS - New Beds for 4 People, 2 in each Room, Wardrobe Cabinet,
Tables Chairs, Air conditioning for both Rooms (Heating & cooling) ext.
- One Toilet Room - (3 by 2 = 6m^2)
- One Shower Room - (3 by 2 = 6m^2)
- One Kitchen Room - (3 by 3 = 9m^2)
- FOR ABOVE KITCHEN - Refrigerator, Microwave Oven and 2 Plate Cooker
1.6 Temporary Septic Tank (Local Design)
1.7 Temporary Soak away Pit (Local Design)
1.8 Temporary fence around site establishment - 50m by 50m
1.9 Temporary gate
Temporary water tank for Site Offices - Supply & Install - 250lt Tank on elevated Tank
1.10
Stand - RATE ONLY
Temporary electricity connection/generator allow for Purchase of 7.5kVa Generator 1.11
RATE ONLY
1.12 Water usage - RATE ONLY per Month for 250 Liters
1.4
1.00
1.00
1.00
1.00
2 SITE WORKS
2.1 Remove all bushes, shrubs and trees and strip 200mm of topsoil to be stockpiled on
site for later use. All material not used will be dumped at a site located by the
employer within 10km from site
2.2 Bulk excavations (cut) in insitu material
2.3 Extra over bulk excavations in clay and black cotton - RATE ONLY
2.4 Extra bulk excavations in intermediate material
2.5 Extra over bulk excavations in hard rock
2.6 Level and compact final cut layer to 95% Mod AASHTO
2.7 Rate for overhaul per m3 of spoil for a distance greater than 10km - rate per km
2.8 Backfill (fill) with insitu material and compact the ground surface in depths of
300mm compacting to 95% Mod AASHTO density
1
1
6
0.00
0.00
0.00
2,500.00
m2
0.00
1,406.56
0.00
0.00
0.00
0.00
1,250.00
m3
m3
m3
m2
1.00
Km
0.00
1,406.56
m3
0.00
0.00
140.66
70.33
0.00
2.9 Backfill with imported G5 material and compact the ground surface in depths of
300mm compacting to 95% Mod AASHTO density - RATE ONLY
0.00
1.00
3.00
1.00
3.00
Test
Test
Test
Test
0.00
0.00
0.00
0.00
3.00
Test
0.00
2.00
2.00
2.00
2.00
3.00
1.00
1.00
Test
Test
Test
Test
Test
Item
Item
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Cement
Aggregate
Sand
Fillers
Concrete cubes
3.1 Keeping all foundations free of water
3.2 Risk of collapse to sides of all excavations
5.08
m3
12
0.00
0.24
m3
12
0.00
5.04
m2
12
0.00
2.64
m2
12
0.00
3.22
5.60
1.96
m3
m
m2
12
12
12
0.00
0.00
0.00
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
1.62
m3
12
0.00
3.46
188.00
1.00
0.10
m3
kg
No
m3
12
12
12
12
0.00
0.00
0.00
0.00
1.23
m3
0.00
0.14
m3
0.00
2.04
m2
0.00
0.00
0.00
1.64
6.80
2.73
m
m
m2
3
3
3
0.00
0.00
0.00
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
0.00
m3
0.00
1.23
103.00
1.00
0.14
m3
kg
No
m3
3
3
3
3
0.00
0.00
0.00
0.00
0.85
m3
0.00
0.05
m3
0.00
1.96
m2
0.00
1.20
m2
0.00
0.64
2.80
0.49
m3
m
m2
9
9
9
0.00
0.00
0.00
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
0.26
m3
0.00
0.59
40.00
1.00
0.02
m3
kg
No
m3
9
9
9
9
0.00
0.00
0.00
0.00
0.85
m3
0.00
0.05
m3
0.00
1.96
0.00
1.20
0.00
0.64
2.80
0.49
m
m
m2
6
6
6
0.00
0.00
0.00
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
0.26
m3
0.00
0.59
40.00
1.00
0.02
m3
kg
No
m3
6
6
6
6
0.00
0.00
0.00
0.00
1.67
m3
0.00
0.10
m3
0.00
1.96
m2
0.00
1.68
m2
0.00
0.93
2.80
0.49
m3
m
m2
2
2
2
0.00
0.00
0.00
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
0.74
m3
0.00
0.93
47.00
1.00
0.02
m3
kg
No
m3
2
2
2
2
0.00
0.00
0.00
0.00
0.85
m3
0.00
0.05
m3
0.00
1.96
m2
0.00
1.20
m2
0.00
0.64
2.80
0.49
m3
m
m2
9
9
9
0.00
0.00
0.00
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
0.26
m3
0.00
0.59
40.00
1.00
0.02
m3
kg
No
m3
9
9
9
9
0.00
0.00
0.00
0.00
1.78
m3
0.00
0.10
m3
0.00
3.36
m2
0.00
1.80
0.00
1.13
4.80
0.72
m
m
m2
5
5
5
0.00
0.00
0.00
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
0.69
m3
0.00
1.09
83.00
1.00
0.04
m3
kg
No
m3
5
5
5
5
0.00
0.00
0.00
0.00
4.28
m3
0.00
0.25
m3
0.00
3.92
m2
0.00
3.00
m2
0.00
2.20
5.60
0.98
m3
m
m2
3
3
3
0.00
0.00
0.00
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
2.03
m3
0.00
2.25
136.00
m3
kg
3
3
0.00
0.00
2.00
0.05
No
m3
3
3
0.00
0.00
0.49
m3
0.00
0.10
m3
0.00
2.24
m2
0.00
0.00
m2
0.00
0.78
5.60
1.96
m3
m
m2
1
1
1
0.00
0.00
0.00
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
0.00
m3
0.00
0.49
m3
0.00
3.92
1.00
0.10
m2
No
m3
1
1
1
0.00
0.00
0.00
0.13
m3
0.00
0.03
m3
0.00
0.96
m2
0.00
0.00
m2
0.00
0.19
3.20
0.63
m3
m
m2
3
3
3
0.00
0.00
0.00
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
0.00
m3
0.00
0.13
0.00
0.00
0.03
m3
kg
No
m3
3
3
3
3
0.00
0.00
0.00
0.00
8.32
0.58
7.35
9.07
4.54
20.78
m3
m3
m3
m3
m3
m3
1
1
1
1
1
1
0.00
0.00
0.00
0.00
0.00
0.00
0.76
0.03
1.05
2.27
m3
m3
m3
m3
1
1
1
1
0.00
0.00
0.00
0.00
3.02
0.33
12.60
4.54
4.41
m3
m3
m3
m3
m3
1
1
1
1
1
0.00
0.00
0.00
0.00
0.00
2.24
11.40
m2
m2
1
1
0.00
0.00
13.46
19.00
m2
m
1
1
0.00
0.00
45.36
21.00
m2
m2
1
1
0.00
0.00
45.36
42.00
m2
m2
1
1
0.00
0.00
45.36
4.54
31.28
125.12
2.22
8.00
20.10
1.00
50.00
m2
m3
m2
m2
m2
m
m
Item
m2
1
1
1
1
1
1
1
1
1
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
47.33
119.88
47.33
m3
m2
m3
0.00
0.00
0.00
8.24
m3
0.00
S9.25page 188
23.00
0.00
119.88
270.00
216.94
15.24
119.88
119.88
m2
kg
m2
m2
m2
m2
0.00
0.00
88.00
m2
0.00
14.70
0.00
m2
0.00
9.00
0.00
0.00
0.00
600 x 500mm deep internal concrete trench. Trench walls and bottom to be 100mm
thick
Internal Wall Finishes:
Plaster to brickwork and concrete
38.00
0.00
210.08
104.78
105.30
m2
m2
m2
0.00
0.00
0.00
136.04
136.04
m2
m2
0.00
0.00
1.00
3.00
1.00
No
No
No
0.00
0.00
0.00
1.00
No
0.00
3.00
No
0.00
Steel:
Doors:
Single
Type D4: 885 x 2100mm Frame and timber doors door including all ironmongery
complete (internal)
Double
Type D2: 1750 x 2500mm Frame and steel door including all ironmongery complete
(internal)
Airconditioner in control building Split Unit - 18000 BTU
2.00
No
0.00
1.00
No
0.00
6.00
Item
0.00
Allow one double door cupboard with shelves underneath sink for kitchen
1.00
No
0.00
1.00
Item
0.00
149.04
m2
0.00
7.00
No
0.00
50.80
0.00
58.36
0.00
5.20
0.00
m2
0.00
Glazed ceramic tiles 2.3m high, plaster and paint - kitchen, messroom
Paint brickwork and concrete (weatherproof)
External Wall Finish:
Plaster to brickwork and concrete
Paint on plaster (weatherproof)
Aluminium Frames:
Windows:
Type W1: 2700 x 1090mm Frame including 4mm single glaze complete
Type W2: 900 x 900mm Frame including 4mm single glaze complete
Type W3: 600x 600mm Frame including 4mm single glaze complete
Doors:
Single
Type D3: 885 x 2500mm Frame and steel doors door including all stainless steel
ironmongery complete (external)
Double
Type D1: 1750 x 2500mm Frame and steel door including all stainless steel
ironmongery complete (external)
Roof:
Roofing to be first class red clay tiled with a size 305 x152 x 32mm in both layers to
be fitted including all necessary fittings complete.
Treated wooden roof trusses of 26 degrees angle rafters, tie beams, rails, struts,
braces, cleats, purlins, etc and flat bearer, gusset and connection plates, bolted or
gangnailed with an overall length of 4.6m and height of 1.805m (There are 7
trusses). Spacing 3m apart connected by 38 x 38 mm wooden treated battens .
Battens to be 305mm apart centre to centre and shall be placed straight and
parallell lines .
225 x 15mm ABS cement barge board
Pre-painted aluminium 150 x 150mm box gutters including necessary collared and
sealed expansion joints
Pre-painted aluminium 100 x100mm down pipes, including holderbats, brackets etc
S9.45.3 page 258
Ceiling:
Suspended ceiling champered and grooved acoustic panels on concealed suspension
grid including hangers etc
Plumbing:
WC with all necessary connections, fittings and piping complete and toilet paper
holder
Basin with all necessary connections, fittings and piping complete with soap
dispenser and mirror
Sink with all necessary connections, fittings, gulley and piping complete
Shower with all necessary connections, fittings and piping complete
Extras
Supply and install fire 9kg CO2 extinguisher with sign
Supply and install fire alarm
Furniture:
Desks (size 1500 x 700mm with drawers)
Tables (size 2000 x 1000mm)
Swivel chairs
Visitors' chairs (to be plastic)
Cupboards (two door cupboard with dividing shelves )
119.88
No
0.00
1.00
No
0.00
1.00
1.00
No
No
0.00
0.00
5.00
1.00
No
No
2.00
2.00
4.00
2.00
2.00
No
No
No
No
No
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.97
16.00
4.97
m3
m2
m3
0.00
0.00
0.00
2.58
m3
0.00
11.00
0.00
16.00
50.08
5.40
28.03
28.03
m2
m2
m2
m2
m2
0.00
0.00
0.00
0.00
0.00
16.00
m2
0.00
68.90
58.55
10.35
m2
m2
m2
0.00
0.00
0.00
165.00
45.50
m2
m2
0.00
0.00
1.00
3.00
1.00
No
No
No
0.00
0.00
0.00
1.00
S9.25page 188
S9.29 page 196
s9.24.2page181 - 183
S9.29 page 196
S9.36
S9.36
S9.36
S9.36
page
page
page
page
207-page
207-page
207-page
207-page
214
214
214
214
Glazed ceramic tiles 2.3m high, plaster and paint - kitchen, messroom
External Wall Finish:
Plaster to brickwork
Paint on plaster (weatherproof)
Aluminium Frames:
Windows:
Type W1: 1860 x 1090mm Frame including 4mm single glaze complete
Type W2: 900 x 900mm including Frame 4mm single glaze complete
Type W3: 600 x 600mm including Frame 4mm single glaze complete
Doors:
External:
Double
2.00
No
0.00
1.00
No
0.00
1.00
No
0.00
4.00
No
0.00
20.00
m2
0.00
3.00
No
0.00
8.00
0.00
5.20
0.00
Roof:
Roofing to be first class red clay tiled with a size 305 x152 x 32mm in both layers to
be fitted including all necessary fittings complete.
Treated wooden roof trusses of 26 degrees angle rafters, tie beams, rails, struts,
braces, cleats, purlins, etc and flat bearer, gusset and connection plates, bolted or
gangnailed with an overall length of 4.6m and height of 1.805m (There are 7
trusses). Spacing 3m apart connected by 38 x 38 mm wooden treated battens .
Battens to be 305mm apart centre to centre and shall be placed straight and
parallell lines .
Pre-painted aluminium 150 x 150mm box gutters including necessary collared and
sealed
expansion
joints 100 x100mm down pipes, including holderbats, brackets etc
Pre-painted
aluminium
Ceiling:
Suspended
ceiling champered and grooved acoustic panels on concealed suspension
grid including hangers etc
Supply and install 12 000 BTU airconditioner
Plumbing:
WC with
allall
necessary
connections,
fittings
and
piping
complete
and
toilet
paper
Basin
with
necessary
connections,
fittings
and
piping
complete
with
soap
holder
dispenser
and mirror
Extras
Supply and install fire 9kg CO2 extinguisher with sign
Supply and install fire alarm
4 EARTH MAT
4.1 Excavate 300mm (width) x 1000mm (depth) for earth grids
4.2 Backfilling to earthing grid and compact the ground surface in depths of 300mm
compacting to 95% Mod AASHTO density
5 CABLE TRENCH (refer to drawing no. ZZZ 824-200)
5.1 The excavation in insitu material for construction of 1200mm deep x 500mm wide
cast insitu reinforced concrete trenches including bends and junctions to include
100mm diameter PVC drain pipe at 4m centres at the bottom of the trench
5.2 Concrete trench cover for 500mm wide trench (with maximal weight of 50 kg each)
5.3 The excavation in insitu material for construction of 500mm wide x 700mm deep
cast insitu reinforced concrete trenches including bends and junctions to include
100mm diameter PVC drain pipe at 4m centres at the bottom of the trench
5.4 Concrete trench cover for 500mm wide trench (with maximal weight of 50 kg each)
6 DRAINAGE
6.1 Subsoil Drain Supply, lay and joint 2 x 160mm diameter preferated uPVC pipe to be
laid 1100mm below NGL in trench which is to be lined with geofabric material
(bidem gade A6) and backfill with 50 to 75mm diameter stone, including excavation,
temporary support of sides, keeping excavations dry, complete (refer to drawing no.
ZZZ 824-200)
6.2 Construct cast insitu concrete manhole with lid and including excavation in insitu
of sides,
keeping
excavations
complete
to
6.3 material,
Constructtemporary
cast insitu support
septic tank
overall
size 2500
X 1500 Xdry,
1500mm
with(refer
lid and
drawing
ZZZ
824-200)
including
excavation,
temporary
support
sides,
keeping
excavations
dry,
6.4 Construct
insitu
soak
overall
size of
2000
x 2000
x 1000mm
to
becomplete
filled
Headwallno.
-cast
concrete
to
fit pit
450mm
diameter
concrete
pipe
(refer
tohole
drawing
no.
ZZZ
(refer100
to drawing
no.rock,
ZZZ including
824-207) excavtion and backfilling (refer to drawing no.
with
to 150mm
6.5 824-200)
824-207)
Supply,
lay, joint and bed 450mm diameter class 50D spigot and socket ended
6.6 ZZZ
concrete sewer pipes including necessary bends and tees
6.7 Supply, lay, joint and bed 110mm Diameter PVC pipe including necessary bends and
tees
6.8 Construct concrete V-drain with a top width of 800mm and bottom width of 100mm
including excavation, temporary support of sides, keeping excavations dry, complete
(refer to drawing no. ZZZ 824-200)
7 WATER SUPPLY
7.1 Supply and install 2000L conservancy tank to Control Building above ground
including
excavation,backfilling,
pipework
and pump
fittingsthat
to sit
onbe
a controlled
concrete foundation
and
install Borehole including
a motor
will
by water
7.2 Supply
complete
(referswitch
to
drawing
ZZZ 824-208
& ZZZ 824 - 205)
controlled
in theno.
smaller
tank
7.3 level
50mm
Diameter
PVC
pipe
7.4 25mm Diameter PVC pipe
7.5 15mm Diameter PVC pipe
8 ROAD - ACCESS AND INTERNAL
Access road
8.1 Excavation in insitu material
8.2 Sub-Base of G5 material compacted to 98% MOD AASHTO
8.3 Internal road
8.4 Excavation in insitu material
8.5 Sub-Base of G5 material compacted to 98% MOD AASHTO
8.6 Insitu reinforced concrete ramps to be constructed at the end of the internal road to
8.7 about 6000mm wide
Road crossing over 5m wide road for cable trench.Precast concrete culvet (size 1200
x 900 x 600mm and the internal walls to be 100mm thick)
8.8 Segmented paving - Supply and lay 80 mm interlocking concrete pavers including 50
bed (max
30 mm);
edge
and cutting
of units
where
required:
8.9 mm
Insitusand
reinforced
concrete
ramps
torestraint
be constructed
in front
of control
building
doors
Strength:
251800mm
Mpa bends
be about
wide
9.9 to
Kerbing
including
and end pieces
0.00
1.00
1.00
No
No
1.00
1.00
No
No
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
150.00
m3
0.00
150.00
m3
0.00
20.00
0.00
66.67
No
0.00
65.00
0.00
141.00
No
0.00
53.00
0.00
2.00
1.00
1.00
1.00
No
No
No
No
0.00
0.00
0.00
0.00
25.00
0.00
20.00
0.00
100.00
0.00
Item
Item
m
m
m
0.00
0.00
0.00
0.00
0.00
4,500.00
2,250.00
m3
m3
0.00
0.00
48.00
24.00
2.00
m3
m3
No
0.00
0.00
0.00
16.00
1.00
1.00
1.00
50.00
40.00
35.00
m2
Item
5.00
No
0.00
110.00
2.00
34.00
m2
No
m
0.00
0.00
0.00
9 YARD WORKS
200.00
9.1 Palisade Fence Complete
60.00
9.2 The complete, supply and installation of a security fence, including earthing of all
parts,
gates etc.
2mwith
Higha diamond
meshthat
plastic
coated
galvanised
steel wire
1m Wide
pedestrian
gate
frame height
matches
the
fence
1.00
9.3 metal
and
300mmflat
wrap
razor
wire
on
the
overhang
fence
and
consists
of
a
vertical
post
9.4 Prepare and comply with an approved weed control and spread over substation
6,292.30
with 45 degree inclination at the apex, fence to be fixed on a ring-beam foundation
9.5 Supply and application of 76mm stone, 100mm deep, to one meter beyond fences,
629.23
levelling
and rolling
to compact
the stone
layer.
9.6 including
Landscaping
- Planting
of medium-high
growing
plants
and grass (Subject to
150.00
approval of Employer)
m
m
No
m2
m3
m2
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal
0.00
0.00
15
(a)
(b)
(c )
(d)
(e )
(f)
(g)
(h)
(i)
(j)
(k)
(l)
(m)
(n)
(o)
(p)
(q)
(r )
(s)
(t)
(u)
(v)
(w)
No. Description
1.0 P & G's
CIVIL SUB CONTRACTORS OWN REQUIRMENTS
Quantity
Unit
Number
Rate in MK
Total in MK
1.00
Item
0.00
1.1
Supervision & Labour FOR Civil Sub Contractor, own requiremnts for the duration of
the Contract - 6 Months
1.00
Month
0.00
1.2
DE MOBILIZATION FOR CIVIL SUB CONTRACTOR - OWN REQUIRMENTS - Deestablishment of site camp and stores
1.00
Item
0.00
1.00
Item
0.00
1.00
Item
0.00
1.00
Item
0.00
1.00
1.00
1.00
2.00
1.00
Item
Item
Item
Item
Item
1
1
1
1
1
0.00
0.00
0.00
0.00
1.00
Item
1.00
Month
Rate per
Liter
Item
Item
Month
1.4
1.5
Temporary Site Office (Duration of Civil Contract 6 Months) for Employer & ABBConsisting of:
- Two Rooms (3 by 3 m)
- One Toilet Room
- One Kitchen Room
- Tables, Chairs, a desk, filing cabinets, air conditioning for both Rooms (Heating &
cooling)
Temporary Accommodation for Employer - 4 by Client Personal & 1 by ABB Personal At Site Consiting of:
- Two Rooms (4 by 3 m)
- FOR ABOVE ROOMS - New Beds for 4 People, 2 in each Room, Wardrobe Cabinet,
Tables Chairs, Air conditioning for both Rooms (Heating & cooling) ext.
B02-4.6.7 page 77
1.00
1.00
1.00
1.00
1
1
1
6
0.00
0.00
0.00
3,600.00
m2
0.00
1,081.00
-
m3
0.00
108.10
m3
3
0.00
0.00
1,800.00
m3
m2
1.00
Km
2.8 Backfill (fill) with insitu material and compact the ground surface in depths of 300mm
compacting to 95% Mod AASHTO density
1,081.00
m3
54.05
0.00
0.00
2.9 Backfill with imported G5 material and compact the ground surface in depths of
300mm compacting to 95% Mod AASHTO density - RATE ONLY
0.00
1
3
1
3
Test
Test
Test
Test
0.00
0.00
0.00
0.00
Test
0.00
2
2
2
2
3
1
1
Test
Test
Test
Test
Test
Item
Item
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Cement
Aggregate
Sand
Fillers
Concrete cubes
3.1 Keeping all foundations free of water
3.2 Risk of collapse to sides of all excavations
8.83
m3
12
0.00
0.42
m3
12
0.00
5.04
12
0.00
3.48
12
0.00
4.29
5.60
1.96
m
m
m2
12
12
12
0.00
0.00
0.00
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
4.52
m3
12
0.00
4.31
233.00
1
0.10
m3
kg
No
m3
12
12
12
12
0.00
0.00
0.00
0.00
6.50
m3
0.00
0.38
m3
0.00
10.08
m2
0.00
3.44
m2
0.00
3.81
14.4
2.16
m3
m
m2
5
5
5
0.00
0.00
0.00
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
2.74
m3
0.00
3.76
210
1
0.11
m3
kg
No
m3
5
5
5
5
0.00
0.00
0.00
0.00
2.43
m3
0.00
0.14
m3
0.00
3.92
0.00
3.78
0.00
1.54
5.60
0.98
m
m
m2
3
3
3
0.00
0.00
0.00
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
0.74
m3
0.00
1.69
86.00
1
0.05
m3
kg
No
m3
3
3
3
3
0.00
0.00
0.00
0.00
1.67
m3
0.00
0.10
m3
0.00
1.96
m2
0.00
1.68
m2
0.00
0.93
2.80
0.49
m3
m
m2
9
9
9
0.00
0.00
0.00
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
0.64
m3
0.00
1.03
58.00
1
0.02
m3
kg
No
m3
9
9
9
9
0.00
0.00
0.00
0.00
1.67
m3
0.00
0.10
m3
0.00
1.96
0.00
1.68
0.00
0.93
2.80
0.49
m
m
m2
9
9
9
0.00
0.00
0.00
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
0.64
m3
0.00
1.03
58.00
1
0.02
m3
kg
No
m3
9
9
9
9
0.00
0.00
0.00
0.00
1.67
m3
0.00
0.10
m3
0.00
1.96
m2
0.00
1.68
m2
0.00
0.93
2.80
0.49
m3
m
m2
2
2
2
0.00
0.00
0.00
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
0.74
m3
0.00
0.93
47.00
1
0.02
m3
kg
No
m3
2
2
2
2
0.00
0.00
0.00
0.00
1.67
m3
12
0.00
0.10
m3
12
0.00
1.96
12
0.00
1.68
12
0.00
0.93
2.80
0.49
m
m
m2
12
12
12
0.00
0.00
0.00
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
0.64
m3
12
0.00
1.03
58.00
1
0.02
m3
kg
No
m3
12
12
12
12
0.00
0.00
0.00
0.00
4.28
m3
0.00
0.25
m3
0.00
3.92
m2
0.00
3.00
m2
0.00
2.20
5.60
0.98
m3
m
m2
3
3
3
0.00
0.00
0.00
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
2.03
m3
0.00
2.25
136.00
2
0.05
m3
kg
No
m3
3
3
3
3
0.00
0.00
0.00
0.00
0.49
m3
0.00
0.10
m3
0.00
2.24
0.00
0.00
0.78
5.6
1.96
m
m
m2
1
1
1
0.00
0.00
0.00
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
0.00
m3
0.00
0.49
m3
0.00
3.92
1
0.10
m2
No
m3
1
1
1
0.00
0.00
0.00
0.13
m3
0.00
0.03
m3
0.00
0.96
0.00
0.00
0.19
3.20
0.63
m
m
m2
4
4
4
0.00
0.00
0.00
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
0.00
m3
0.00
0.13
0
0
0.03
m3
kg
No
m3
4
4
4
4
0.00
0.00
0.00
0.00
6.01
m3
0.00
Sump excavations
0.58
m3
0.00
Plinth
2.94
0.00
Surface bed
4.39
0.00
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
1.69
0.00
12.23
0.00
0.55
m3
0.00
Sump Concrete
0.03
m3
0.00
Plinth
0.42
m3
0.00
Surface bed
Concrete - 35mPa, 19mm Stone:
Strip Footing concrete
1.10
m3
0.00
2.19
m3
0.00
Sump Concrete
0.37
m3
0.00
Plinth
5.04
m3
0.00
Surface bed
2.20
m3
0.00
4.41
m3
0.00
1.82
m2
0.00
Plinth
Rough Formwork:
Strip footing
25 x 25mm Chamfer to sides of plinth
Concrete finish wood float:
Surface bed
7.08
m2
0.00
9.71
11.80
m2
m
0.00
0.00
21.97
m2
0.00
8.40
m2
0.00
21.97
m2
0.00
16.8
m2
0.00
21.97
m
m3
0.00
0.00
m
m
m
m
Item
m2
0.00
0.00
0.00
0.00
0.00
0.00
47.33
119.88
47.33
m3
m2
m3
0.00
0.00
0.00
8.24
m3
0.00
B1-4.9.7.17page 170
B1-4.9.7.17page 169
Plinth
Reinforcing (MESH ref 617):
Surface bed
Plinth
Sundries:
Sump frame - 30 x 30 x 5Lg cast in and galvanised. 25 x 5mm flat x 100Lg fishtail
lugs
to angle
(5mmgravel
fillet) to
at fill
500mm
c/c. To fit in the open grid which is 1600mm
75 toweld
100mm
Diameter
oil drain
wide with 30 x 4.5mm bearer bars, and 40 x 40mm openings (fully banded)
Brickwork (including stairs)
Brickforce 120mm wide (every second layer)
Construction/expansion joints between concrete and brick
50 x 3 flat copper bend to suit connection on transformer points
One set of rails on tranformer plinth
Benching the inside of the sump with 20mm benching render
Paint x 2 layers of bitumen to surface
4.4 CONTROL BUILDING - 5084014-CONT-E1000
Excavations in insitu material:
Strip foundation
Prepare and spary with an approved anti-termite control under building
Stock pile insitu surplus material (for carting away)
Concrete:
Reinforced concrete - 30mPa, 19mm Stone to surface bed
Prestressed fabricated concrete lintels:
In lengths not exceeding 3m
Reinforcing:
Reinforcing mesh ref. 395
Reinforcing - Supply & Fix only
200mm Thick blockwork
DPC (Damp proof course)
DPM (Damp proof membrame)
Wood float top of concrete
Floor Finishes:
Epoxy screed (trowel applied minimum 5 mm thick) and epoxy seal coat - switchgear
and battery charger rooms
Glazed non-slip fully vitrified ceramic tiles - rest room, toilets, kitchen, messroom
2.20
160.86
68.94
22.18
6
20.10
1
30.37
3
3
3
0.00
23.00
0.00
119.88
270.00
216.94
15.24
119.88
119.88
m2
kg
m2
m2
m2
m2
0.00
0.00
88.00
m2
0.00
14.70
m2
0.00
9.00
m2
0.00
38.00
0.00
210.08
0.00
0.00
0.00
0.00
page
page
page
page
page
page
page
page
page
page
Glazed ceramic tiles 2.3m high, plaster and paint - kitchen, messroom
Paint brickwork and concrete (weatherproof)
External Wall Finish:
Plaster to brickwork and concrete
Paint on plaster (weatherproof)
Aluminium Frames:
Windows:
Type W1: 2700 x 1090mm Frame including 4mm single glaze complete
Type W2: 900 x 900mm Frame including 4mm single glaze complete
Type W3: 600x 600mm Frame including 4mm single glaze complete
180
180
180
180
180
180
180
180
180
180
Doors:
Single
Type D3: 885 x 2500mm Frame and steel doors door including all stainless steel
ironmongery complete (external)
Double
Type D1: 1750 x 2500mm Frame and steel door including all stainless steel
ironmongery complete (external)
Steel:
Doors:
Single
Type D4: 885 x 2100mm Frame and timber doors door including all ironmongery
complete
Double (internal)
Type D2: 1750 x 2500mm Frame and steel door including all ironmongery complete
(internal)
Airconditioner in control building Split Unit - 18000 BTU
Allow one double door cupboard with shelves underneath sink for kitchen
Two plate electric cooker
Roof:
Roofing to be first class red clay tiled with a size 305 x152 x 32mm in both layers to
be fitted including all necessary fittings complete.
Treated wooden roof trusses of 26 degrees angle rafters, tie beams, rails, struts,
braces, cleats, purlins, etc and flat bearer, gusset and connection plates, bolted or
gangnailed with an overall length of 4.6m and height of 1.805m (There are 7
trusses). Spacing 3m apart connected by 38 x 38 mm wooden treated battens .
Battens to be 305mm apart centre to centre and shall be placed straight and parallell
lines .
225 x 15mm ABS cement barge board
Pre-painted aluminium 150 x 150mm box gutters including necessary collared and
sealed
expansion
joints100 x100mm down pipes, including holderbats, brackets etc
Pre-painted
aluminium
Ceiling:
Suspended
ceiling champered and grooved acoustic panels on concealed suspension
grid including hangers etc
Plumbing:
WC with all necessary connections, fittings and piping complete and toilet paper
holder
Basin with all necessary connections, fittings and piping complete with soap
dispenser and mirror
Sink with all necessary connections, fittings, gulley and piping complete
Shower with all necessary connections, fittings and piping complete
Extras
Supply and install fire 9kg CO2 extinguisher with sign
Supply and install fire alarm
Furniture:
Desks (size 1500 x 700mm with drawers)
Tables (size 2000 x 1000mm)
Swivel chairs
Visitors' chairs (to be plastic)
Cupboards (two door cupboard with dividing shelves )
Concrete:
Reinforced concrete - 30mPa, 19mm Stone to surface bed
Prestressed fabricated concrete lintels:
In lengths not exceeding 3m
Reinforcing:
Reinforcing mesh ref. 395
200mm thick block work
S9.25page 188
S9.29 page 196
s9.24.2page181 - 183
S9.29 page 196
S9.36
S9.36
S9.36
S9.36
page
page
page
page
207-page
207-page
207-page
207-page
214
214
214
214
104.78
105.30
m2
m2
0.00
0.00
136.04
136.04
m2
m2
0.00
0.00
1.00
3.00
1.00
No
No
No
0.00
0.00
0.00
1.00
No
0.00
3.00
No
0.00
2.00
No
0.00
1.00
6.00
1.00
1.00
No
Item
No
Item
0.00
0.00
0.00
0.00
149.04
m2
0.00
7.00
No
0.00
50.80
58.36
5.20
m
m
m
0.00
0.00
0.00
119.88
m2
0.00
No
0.00
1.00
No
0.00
1.00
1.00
No
No
0.00
0.00
5.00
1.00
No
No
2.00
2.00
4.00
2.00
2.00
No
No
No
No
No
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.97
16.00
4.97
m3
m2
m3
0.00
0.00
0.00
2.58
m3
0.00
11.00
0.00
16.00
50.08
m2
m2
0.00
0.00
1.00
5.40
m2
0.00
28.03
28.03
m2
m2
0.00
0.00
16.00
m2
0.00
68.90
58.55
10.35
m
m2
m2
0.00
0.00
0.00
165.00
45.50
m2
m2
0.00
0.00
1.00
2.00
2.00
No
No
No
0.00
0.00
0.00
2.00
No
0.00
1.00
No
0.00
1.00
No
0.00
4.00
No
0.00
20.00
m2
0.00
0.00
Treated wooden roof trusses of 26 degrees angle rafters, tie beams, rails, struts,
braces, cleats, purlins, etc and flat bearer, gusset and connection plates, bolted or
gangnailed with an overall length of 4.6m and height of 1.805m (There are 7
trusses). Spacing 3m apart connected by 38 x 38 mm wooden treated battens .
Battens to be 305mm apart centre to centre and shall be placed straight and parallell
lines .
Pre-painted aluminium 150 x 150mm box gutters including necessary collared and
sealed expansion joints
Pre-painted aluminium 100 x100mm down pipes, including holderbats, brackets etc
Ceiling:
Suspended ceiling champered and grooved acoustic panels on concealed suspension
grid including hangers etc
Supply and install 12 000 BTU airconditioner
Plumbing:
WC with all necessary connections, fittings and piping complete and toilet paper
holder
Basin with all necessary connections, fittings and piping complete with soap
dispenser and mirror
Extras
Supply and install fire 9kg CO2 extinguisher with sign
B1-9.7.10 page 145
5 EARTH MAT
5.1 Excavate 300mm (width) x 1000mm (depth) for earth grids
5.2 Backfilling to earthing grid and compact the ground surface in depths of 300mm
compacting to 95% Mod AASHTO density
6.2 Concrete trench cover for 500 mm wide trench (with maximal weight of 50 kg each)
6.3 The excavation in insitu material for construction of 500mm wide x 700mm deep cast
insitu reinforced concrete trenches including bends and junctions to include 100mm
diameter PVC drain pipe at 4m centres at the bottom of the trench
6.4 Concrete trench cover for 500mm wide trench (with maximal weight of 50 kg each)
7 DRAINAGE
7.1 Subsoil Drain Supply, lay and joint 2 x 160mm diameter preferated uPVC pipe to be
laid 1100mm below NGL in trench which is to be lined with geofabric material (bidem
gade A6) and backfill with 50 to 75mm diameter stone, including excavation,
temporary support of sides, keeping excavations dry, complete (refer to drawing no.
ZZZ 824-200)
7.2 Construct cast insitu concrete manhole with lid and including excavation in insitu
material, temporary support of sides, keeping excavations dry, complete (refer to
drawing no. ZZZ 824-200)
7.3 Construct cast insitu septic tank overall size 2250 X 1950 X 2150mm with lid and
temporary
support
sides,
keeping
excavations
dry,
7.4 including
Construct excavation,
insitu to
soak
overall
size of
2000
x 2000
x 1500mm
to
becomplete
filled
Headwall
-cast
concrete
fit pit
450mm
diameter
concrete
pipe
(refer
tohole
drawing
no.
ZZZ
(refer100
to drawing
no.rock,
ZZZ including
824-207) excavtion and backfilling (refer to drawing no. ZZZ
with
to 150mm
7.5 824-200)
824-207)
450mm Diameter
diameter class
50D including
spigot and
socket ended
7.6 Supply,
lay, joint and bed 110mm
PVC pipe
necessary
bends and
concrete sewer pipes including necessary bends and tees
7.7 tees
7.8 Construct concerte v-drain with a top width of 800mm and bottom width of 100mm
including excavation, temporary support of sides, keeping excavations dry, complete
to SUPPLY
drawing no. ZZZ 824-200)
WATER
8 (refer
8.1 Supply and install 2000L conservancy tank to Control Building above ground including
excavation,backfilling,
pipework
and fittings
topump
sit on that
a concrete
complete
8.2 Supply
and install Borehole
including
a motor
will be foundation
controlled by
water
(refer
to
drawingswitch
no. ZZZ
824-208
& ZZZ
controlled
in the
smaller
tank824 - 205)
8.3 level
50mm
Diameter
PVC
pipe
8.4 25mm Diameter PVC pipe
8.5 15mm Diameter PVC pipe
9 ROAD
9.1 Access road
Excavation in insitu material
Sub-Base of G5 material compacted to 98% MOD AASHTO
10 YARD WORKS
10.1 Palisade Fence complete
10.2 The complete, supply and installation of a security fence, including earthing of all
metal parts, gates etc. 2m High diamond mesh plastic coated galvanised steel wire
and 300mmflat wrap razor wire on the overhang fence and consists of a vertical post
with 45 degree inclination at the apex, fence to be fixed on a ring-beam foundation
10.3 1m Wide pedestrian gate with a frame height that matches the fence
10.4 Prepare and comply with an approved weed control and spread over substation
10.5 Supply and application of 10 to 30mm stone, 200mm deep, to one meter beyond
fences, including levelling and rolling to compact the stone layer.
10.6 Landscaping - Planting of medium-high growing plants and grass (Subject to approval
of Employer)
3.00
No
0.00
8.00
0.00
5.20
0.00
0.00
m2
0.00
Item
0.00
0.00
No
0.00
No
0.00
1.00
1.00
No
No
0.00
0.00
0.00
216
m3
0.00
216
m3
0.00
100
0.00
333
No
0.00
81
0.00
141
No
0.00
35
0.00
No
0.00
1
1
1
50
30
120
No
No
No
m
m
m
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
50.00
40.00
35.00
Item
Item
m
m
m
0.00
0.00
0.00
0.00
0.00
4500
2250
m3
m3
0.00
0.00
73.2
36.6
m3
m3
0.00
0.00
No
0.00
No
0.00
0.00
No
0.00
34.00
0.00
16.00
1.00
1.00
1.00
110
240
0.00
60
0.00
1
3,600.00
No
m2
0.00
0.00
210.00
m3
0.00
180.00
m2
0.00
Subtotal
0.00
0.00
Totals in MK
-
(d)
(e )
(f)
(g)
(h)
(i)
(j)
(k)
(l)
(m)
(n)
(o)
(p)
(q)
(r )
(s)
(t)
(u)
(v)
(w)
MWK
No
21
(a)
(b)
22
Handheld GPS
set
Sub-total, Site transport, Engineers accomodation and Commmunication, item 9.1 - 9.8
Miscellaneous and Dayworks (NB. Provide Quote Rate Only Per All Miscellaneous/Daywork Item in 4.1.4)
Rough terrain mobile crane ( 15T)
8 hour work day
per day
or pro-rata thereof
(a)
ditto
Lump Sum
(b)
(c )
per day
(d)
per day
(e )
Excavator/tractor/JCB
ditto
per day
(f)
per day
(g)
Site Manager
ditto
per day
(h)
(i)
per day
(j)
per day
(k)
Design Engineer
(l)
(m)
(n)
(expatriate)
(Head office)
ditto
ditto
ditto
per day
per day
per day
per day
per day
ditto
per day
(o)
(p)
Gang Foreman
ditto
per day
(q)
Technician//skiiled labour
ditto
per day
(r )
General/unskilled labour
ditto
per day
23
TOTAL
ditto
per day
Local
Foreign
Currency Currency
MK
USD
d driver/mechanic.
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
0.00