Sei sulla pagina 1di 145

CHINTH

Reference
B1-3.6.2.15 page 49

B1-3.6.2.14 page 47

B1-4.9.7.14 page 152

No. Description
1 P & G's
1.1 Geotechnical report (bore logs, trial pits, sounding logs) and to
Actual ground level
Description and limits of various soil layers
Sample taken
SPT results
Water levels
Depth of borehole/pit/sounding
1.2 Topographic survey (10 meter grids and 0.5 meter vertical inte
Obtain topographic survey maps
Ensure position and elevation of all works are correct
1.3 Costs
for obligations,
equipment
or labour,
although
not specifi
Establishment
of site camp
and stores
including
site clearance
Contract
in
terms
of
the
specification
and
Statutory
Requireme
1.4 requirements
standard tables,12 x chairs,1 x mini fridge, 2x cupboard with s
1.5 lights)
1.6 Temporary latrines and sanitary (allowed 1x for ABB office)
1.7 Temporary fence around site establishment
1.10 Temporary gate
1.11 Temporary water connection
1.12 Temporary electricity connection/generator (20kVA)
1.13 Water usage
1.14 Electricity/petrol or diesel
1.15 Tempoary site sign board
1.16 Supervision & Labour
1.17 Health and Saftey - safety signs and PPE according to ABB spec
1.18 Security guard (allow 1x person for day watch and 1 x person f
1.19 De-establishment of site camp and stores

2 SITE WORKS - PLATFORM


2.1 Remove all bushes, shrubs and trees and strip 200mm of topso
later use. All material not used will be dumped at a site located
from site

2.2 Rate for overhaul per m3 of spoil for a distance greater than 1
2.3 Dig up and remove concrete foundation
2.4 Remove yard stone and to be stored for later use
2.5 Re-instate yard stone
B02-4.6.7 page 77

3 TESTS (shall be performed for each 500m3 of fill)


Analyzing the ingredients of the water used for performance of
Gravity of soil
Bearing capacity of soil for static load
Brain size analysis of soils, if "Replacement of Material" is requ
Density of soil in place of sandcone method for each second la
replacement
of material and/or roadwork"
Cement
Aggregate

CHINTH
Reference

No. Description
Sand
Fillers
Concrete cubes
3.1 Keeping all foundations free of water
3.2 Risk of collapse to sides of all excavations

B1-4.9.7.14 page152

3.3 132 kV Circuit Breaker


Excavation in insitu material

B1-4.9.7.17 page 163

Blinding - 20mPa (50mm thick)

B1-4.9.7.17 page 170

Smooth Formwork (to be steel or sound timber)

B1-4.9.7.17 page 170

Rough formwork (to be steel or sound timber)

B1-4.9.7.17 page 163


B1-4.9.7.17 page 169
B1-4.9.7.17 page 169

Concrete - 35mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

B1-4.9.7.14 page 154

Backfill with excavated insitu material in depths of 150mm to 9

B1-4.9.7.14 page 153

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M24 X 8)

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14 page152

3.4 132 kV Isolator


Excavation in insitu material

B1-4.9.7.17 page 163

Blinding - 20mPa (50mm thick)

B1-4.9.7.17 page 170

Smooth Formwork (to be steel or sound timber)

B1-4.9.7.17 page 170

Rough formwork (to be steel or sound timber)

B1-4.9.7.17 page 163


B1-4.9.7.17 page 169
B1-4.9.7.17 page 169

Concrete - 35mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

B1-4.9.7.14 page 154

Backfill with excavated insitu material in depths of 150mm to 9

B1-4.9.7.14 page 153

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M24X 8)

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14 page152

3.5 132 kV Current Transformer


Excavation in insitu material

B1-4.9.7.17 page 163

Blinding - 20mPa (50mm thick)

B1-4.9.7.17 page 170

Smooth Formwork (to be steel or sound timber)

B1-4.9.7.17 page 170

Rough formwork (to be steel or sound timber)

CHINTH
Reference
B1-4.9.7.17 page 163
B1-4.9.7.17 page 169
B1-4.9.7.17 page 169

No. Description
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

B1-4.9.7.14 page 154

Backfill with excavated insitu material in depths of 150mm to 9

B1-4.9.7.14 page 153

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 4)

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

3.6 132 kV Voltage Transformer

CHINTH
Reference
B1-4.9.7.14 page152
B1-4.9.7.17 page 163
B1-4.9.7.17 page 170
B1-4.9.7.17 page 170
B1-4.9.7.17 page 163
B1-4.9.7.17 page 169
B1-4.9.7.17 page 169
B1-4.9.7.14 page 154
B1-4.9.7.14 page 153
B1-4.9.7.19 page 179
B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17

page152
page 163
page 170
page 170
page 163

B1-4.9.7.17 page 169


B1-4.9.7.17 page 169

No. Description
Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150mm to 9
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 4)
3.7 132 kV Surge Arrestor
Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

B1-4.9.7.14 page 154

Backfill with excavated insitu material in depths of 150mm to 9

B1-4.9.7.14 page 153

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 4)

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14 page152

3.8 132 kV Low Post Insulator


Excavation in insitu material

B1-4.9.7.17 page 163

Blinding - 20mPa (50mm thick)

B1-4.9.7.17 page 170

Smooth Formwork (to be steel or sound timber)

B1-4.9.7.17 page 170

Rough formwork (to be steel or sound timber)

B1-4.9.7.17 page 163


B1-4.9.7.17 page 169
B1-4.9.7.17 page 169

Concrete - 35mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

B1-4.9.7.14 page 154

Backfill with excavated insitu material in depths of 150mm to 9

B1-4.9.7.14 page 153

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 4)

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

CHINTH
Reference

B1-4.9.7.14 page152

No. Description
3.9 132 kV Cable Sealing End
Excavation in insitu material

B1-4.9.7.17 page 163

Blinding - 20mPa (50mm thick)

B1-4.9.7.17 page 170

Smooth Formwork (to be steel or sound timber)

B1-4.9.7.17 page 170


B1-4.9.7.17 page 163
B1-4.9.7.17 page 169
B1-4.9.7.17 page 169

Rough formwork (to be steel or sound timber)


Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

B1-4.9.7.14 page 154

Backfill with excavated insitu material in depths of 150mm to 9

B1-4.9.7.14 page 153

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 4)

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14 page152

3.10 66 kV Circuit Breaker


Excavation in insitu material

B1-4.9.7.17 page 163

Blinding - 20mPa (50mm thick)

B1-4.9.7.17 page 170

Smooth Formwork (to be steel or sound timber)

B1-4.9.7.17 page 170

Rough formwork (to be steel or sound timber)

B1-4.9.7.17 page 163


B1-4.9.7.17 page 169
B1-4.9.7.17 page 169

Concrete - 35mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

B1-4.9.7.14 page 154

Backfill with excavated insitu material in depths of 150mm to 9

B1-4.9.7.14 page 153

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M24 X 8)

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14 page152

3.11 33 kV Circuit Breaker


Excavation in insitu material

B1-4.9.7.17 page 163

Blinding - 20mPa (50mm thick)

B1-4.9.7.17 page 170

Smooth Formwork (to be steel or sound timber)

B1-4.9.7.17 page 170

Rough formwork (to be steel or sound timber)

B1-4.9.7.17 page 163


B1-4.9.7.17 page 169
B1-4.9.7.17 page 169

Concrete - 35mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

B1-4.9.7.14 page 154

Backfill with excavated insitu material in depths of 150mm to 9

B1-4.9.7.14 page 153

Stock pile insitu surplus material (for carting away)

CHINTH
Reference
B1-4.9.7.19 page 179
B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14 page152

No. Description
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 6)
3.12 33 kV Current Transformer
Excavation in insitu material

B1-4.9.7.17 page 163

Blinding - 20mPa (50mm thick)

B1-4.9.7.17 page 170

Smooth Formwork (to be steel or sound timber)

B1-4.9.7.17 page 170

Rough formwork (to be steel or sound timber)

B1-4.9.7.17 page 163


B1-4.9.7.17 page 169
B1-4.9.7.17 page 169

Concrete - 35mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

B1-4.9.7.14 page 154

Backfill with excavated insitu material in depths of 150mm to 9

B1-4.9.7.14 page 153

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 4)

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14 page152

3.13 11 kV Auto Recloser


Excavation in insitu material

B1-4.9.7.17 page 163

Concrete - 35mPa, 19mm Stone

B1-4.9.7.14 page 153

Stock pile insitu surplus material (for carting away)

B1-4.9.7.14 page152

3.14 11 kV Isolator
Excavation in insitu material

B1-4.9.7.17 page 163

Concrete - 35mPa, 19mm Stone

B1-4.9.7.14 page 153

Stock pile insitu surplus material (for carting away)

B1-4.9.7.14 page152

3.15 Auxillary
Excavation in insitu material

B1-4.9.7.17 page 163

Blinding - 20mPa (50mm thick)

B1-4.9.7.17 page 170

Smooth Formwork (to be steel or sound timber)

B1-4.9.7.17 page 170

Rough formwork (to be steel or sound timber)

B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14
B1-4.9.7.14

Concrete - 35mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150mm to 9

page
page
page
page
page

163
169
169
154
153

B1-4.9.7.19 page 179

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only

CHINTH
Reference
B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14
B1-4.9.7.14

page152
page 163
page 170
page 170
page 163
page 169
page 169
page 154
page 153

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

No. Description
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts

3.16 Yard Marshalling Kiosk


Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150mm to 9
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts
4 CABLE TRENCH (refer to drawing no. ZZZ 824-200-CHE)
4.1 Excavation in insitu material
4.2 Backill with 50mm sifted clean sand and compact to 98% Mod

4.3 Backill with sifted clean sand in depth of 150mm and compact
4.4
Backfill with excavated insitu material in depths of 150mm and

B1-4.9.7.17 page 171

4.5 Cast insitu concerte block (100m x 0.225 x 0.050m)


4.6 PVC marker tape
4.7 Cast insitu cable route marker with recess for brass plaque
5 YARD WORKS
5.1 The complete, supply and installation of a security fence, inclu
gates etc. 2m High diamond mesh plastic coated galvanised st
razor wire on the overhang fence and consists of a vertical pos
the apex, fence to be fixed on a ring-beam foundation

B1-4.9.7.14 page 155

5.2 Prepare and comply with an approved weed control and spread

B1-4.9.7.14 page 156

5.3 Supply and application of 10 to 30mm stone, 200mm deep,inc


compact the stone layer.

CHINTHECHE 132/66/33kV Substation


Quantity

Unit

al pits, sounding logs) and to include:


soil layers

ds and 0.5 meter vertical intervals):


s
all works are correct
or
labour,
although
not specified,
is required
to complete
the
ores
including
site clearance
for civil
contractors
own
ion
and
Statutory
Requirements
ni fridge, 2x cupboard with shelves and electrical plugs and

allowed 1x for ABB office)


blishment

generator (20kVA)

nd PPE according to ABB specifications


or day watch and 1 x person for night watch)

ees and strip 200mm of topsoil to be stockpiled on site for


l be dumped at a site located by the employer within 10km

for a distance greater than 10km - rate per km

ed for later use

each 500m3 of fill)


ater used for performance of the work

oad
lacement of Material" is required
e method for each second layer of "Backfilling and/or
adwork"

Item

Item

1
1
1
2
1
2
1
1
1
1
1
1
1
2
1

Item
Item
Item
month
Item
Item
Item
Item
Month
Month
Item
Month
Item
Month
Item

104

m2

Km

No

104
104

m2
m2

1
3
1
3
3
2
2

Test
Test
Test
Test
Test
Test
Test

CHINTHECHE 132/66/33kV Substation

ter

Quantity
2
2
3

Unit
Test
Test
Test

1
1

Item
Item

3.62

m3

0.21

m3

sound timber)

4.20

m2

und timber)

2.91

m2

olumn stub

2.06
6.00
1.13

m3
m
m2

erial in depths of 150mm to 97% Mod AASHTO

1.85

m3

1.77
207.00
1.00
0.06
8

m3
kg
No
m3
No

2.21

m3

0.13

m3

sound timber)

3.36

m2

und timber)

2.16

m2

olumn stub

1.28
4.80
0.72

m3
m
m2

erial in depths of 150mm to 97% Mod AASHTO

0.94

m3

1.27
79.00
1
0.04
8

m3
kg
No
m3
No

1.03

m3

0.06

m3

sound timber)

1.96

m2

und timber)

1.32

m2

for carting away)

on (ABB to supply bolts)

for carting away)

on (ABB to supply bolts)

CHINTHECHE 132/66/33kV Substation

olumn stub

erial in depths of 150mm to 97% Mod AASHTO

for carting away)

on (ABB to supply bolts)

Quantity
0.71
2.80
0.49

Unit
m3
m
m2

0.36

m3

0.67
47.00
1
0.02
4

m3
kg
No
m3
No

CHINTHECHE 132/66/33kV Substation

sound timber)
und timber)

olumn stub

erial in depths of 150mm to 97% Mod AASHTO


for carting away)

on (ABB to supply bolts)

Quantity
1.03
0.06
1.96
1.32
0.71
2.80
0.49
0.36
0.67
47.00
1
0.02
4

Unit
m3
m3
m2
m2
m3
m
m2
m3
m3
kg
No
m3
No

1.03
0.06
1.96
1.32
0.71
2.80
0.49

m3
m3
m2
m2
m3
m
m2

0.36

m3

0.67
47.00
1
0.02
4

m3
kg
No
m3
No

1.03

m3

0.06

m3

sound timber)

1.96

m2

und timber)

1.32

m2

olumn stub

0.71
2.80
0.49

m3
m
m2

erial in depths of 150mm to 97% Mod AASHTO

0.36

m3

0.67
47.00
1
0.02
4

m3
kg
No
m3
No

sound timber)
und timber)

olumn stub

erial in depths of 150mm to 97% Mod AASHTO

for carting away)

on (ABB to supply bolts)

for carting away)

on (ABB to supply bolts)

CHINTHECHE 132/66/33kV Substation


Quantity

Unit

0.67

m3

0.06

m3

sound timber)

0.20

m2

und timber)

0.36
0.56
2.80
0.49

m2
m3
m
m2

0.14

m3

0.52
38.00
4
0.02
4

m3
kg
No
m3
No

2.43

m3

0.14

m3

sound timber)

3.92

m2

und timber)

3.78

m2

olumn stub

1.54
5.60
0.98

m3
m
m2

erial in depths of 150mm to 97% Mod AASHTO

0.74

m3

1.69
86.00
1
0.05
8

m3
kg
No
m3
No

1.23

m3

0.14

m3

2.04

m2

olumn stub

erial in depths of 150mm to 97% Mod AASHTO

for carting away)

on (ABB to supply bolts)

for carting away)

on (ABB to supply bolts)

sound timber)

und timber)

olumn stub

erial in depths of 150mm to 97% Mod AASHTO

for carting away)

1.64
6.80
2.73
1.23

m2
m3
m
m2
m3
m3

CHINTHECHE 132/66/33kV Substation

on (ABB to supply bolts)

Quantity
103.00
1.00
0.14
6.00

Unit
kg
No
m3
No

0.85

m3

0.05

m3

sound timber)

1.96

m2

und timber)

1.20

m2

olumn stub

0.64
2.80
0.49

m3
m
m2

erial in depths of 150mm to 97% Mod AASHTO

0.26

m3

0.59
40.00
1.00
0.02
4.00

m3
kg
No
m3
No

1.20

m3

1.20

m3

1.20

m3

1.20

m3

1.20

m3

1.20

m3

for carting away)

on (ABB to supply bolts)

for carting away)

for carting away)

0.49

m3

0.10

m3

2.24

m2

m2

erial in depths of 150mm to 97% Mod AASHTO

0.78
5.6
1.96
0.00

m3
m
m2
m3

for carting away)

0.49

m3

3.92

m2

sound timber)

und timber)

olumn stub

CHINTHECHE 132/66/33kV Substation

on (ABB to supply bolts)

sound timber)
und timber)

olumn stub

erial in depths of 150mm to 97% Mod AASHTO

for carting away)

on (ABB to supply bolts)

Quantity
1
0.10
4

Unit
No
m3
No

0.13
0.03
0.96
0
0.19
3.20
0.63
0.00

m3
m3
m2
m2
m3
m
m2
m3

0.13
0
0
0.03
0

m3
kg
No
m3
No

ng no. ZZZ 824-200-CHE)

nd and compact to 98% Mod AASHTO

epth of 150mm and compact to 98% Mod AASHTO

erial in depths of 150mm and compact to 97% Mod AASHTO

x 0.225 x 0.050m)

h recess for brass plaque

tion of a security fence, including earthing of all metal parts,


h plastic coated galvanised steel wire and 300mmflat wrap
and consists of a vertical post with 45 degree inclination at
ng-beam foundation

ved weed control and spread over cable sealing end yard

0mm stone, 200mm deep,including levelling and rolling to

66.00

m3

30.00

m3

150.00

m3

46.88

m3

100
100
3

m
m
No

42

104.00

m2

104.00

m2
Subtotal
Vat 16%
Final Total

Number

Rate

Total

1,000.00

1,000.00

200.00

200.00

1
1
1
6
1
1
1
1
6
6
1
6
1
6
1

$
$
$
$
$
$
$
$
$
$
$
$

50.00
1,000.00
30,000.00
750.00
8,000.00
200.00
500.00
500.00
500.00
1,000.00
500.00
1,000.00

$
$

$
$
$
$
$
$
$
$
$
$
$
$
$
150.00 $
1,000.00 $

50.00
1,000.00
30,000.00
9,000.00
8,000.00
400.00
500.00
500.00
3,000.00
6,000.00
500.00
6,000.00
1,800.00
1,000.00

0.80 $

83.20

20.00

20.00 $
45.00 $

225.00

$
$

0.80 $
1.50 $

83.20
156.00

$
$
$
$
$
$
$

200.00
200.00
200.00
200.00
200.00
100.00
100.00

$
$
$
$
$
$
$

200.00
600.00
200.00
600.00
600.00
200.00
200.00

Number
$
$
$

Rate
100.00 $
100.00 $
200.00 $

Total
200.00
200.00
600.00

$
$

100.00 $
100.00 $

100.00
100.00

7.00

25.32

190.00

40.42

30.00

126.00

25.00

72.75

1
1
1

$
$
$

265.00
4.00
5.00

$
$
$

546.96
24.00
5.63

7.00

12.92

1
1
1
1
1

$
$
$
$
$

7.00
3.00
5.50
7.00
5.00

$
$
$
$
$

12.39
621.00
5.50
0.39
40.00

7.00

139.23

190.00

222.30

30.00

907.20

25.00

486.00

9
9
9

$
$
$

265.00
4.00
5.00

$
$
$

3,062.34
172.80
32.40

7.00

59.22

9
9
9
9
9

$
$
$
$
$

7.00
3.00
5.50
7.00
5.00

$
$
$
$
$

80.01
2,133.00
49.50
2.27
360.00

7.00

21.60

190.00

34.49

30.00

176.40

25.00

99.00

Number
3
3
3

$
$
$

Rate
265.00
4.00
5.00

$
$
$

Total
561.27
33.60
7.35

7.00

7.56

3
3
3
3
3

$
$
$
$
$

7.00
3.00
5.50
7.00
5.00

$
$
$
$
$

14.04
423.00
16.50
0.51
60.00

Number
3
3
3
3
3
3
3
3
3
3
3
3
3

$
$
$
$
$
$
$
$
$
$
$
$
$

Rate
7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
7.00
3.00
5.50
7.00
5.00

$
$
$
$
$
$
$
$
$
$
$
$
$

21.60
34.49
176.40
99.00
561.27
33.60
7.35
7.56
14.04
423.00
16.50
0.51
60.00

6
6
6
6
6
6
6

$
$
$
$
$
$
$

7.00
190.00
30.00
25.00
265.00
4.00
5.00

$
$
$
$
$
$
$

43.20
68.97
352.80
198.00
1,122.54
67.20
14.70

7.00

15.12

6
6
6
6
6

$
$
$
$
$

7.00
3.00
5.50
7.00
5.00

$
$
$
$
$

28.08
846.00
33.00
1.03
120.00

7.00

36.00

190.00

57.48

30.00

294.00

25.00

165.00

5
5
5

$
$
$

265.00
4.00
5.00

$
$
$

935.45
56.00
12.25

7.00

12.60

5
5
5
5
5

$
$
$
$
$

7.00
3.00
5.50
7.00
5.00

$
$
$
$
$

23.40
705.00
27.50
0.86
100.00

Total

Number

Rate

Total

7.00

27.95

190.00

68.97

30.00

35.28

6
6
6
6

$
$
$
$

25.00
265.00
4.00
5.00

$
$
$
$

54.45
888.81
67.20
14.70

7.00

6.05

6
6
6
6
6

$
$
$
$
$

7.00
3.00
5.50
7.00
5.00

$
$
$
$
$

21.90
684.00
132.00
1.03
120.00

7.00

34.03

190.00

54.34

30.00

235.20

25.00

189.00

2
2
2

$
$
$

265.00
4.00
5.00

$
$
$

818.32
44.80
9.80

7.00

10.42

2
2
2
2
2

$
$
$
$
$

7.00
3.00
5.50
7.00
5.00

$
$
$
$
$

23.62
516.00
11.00
0.69
80.00

7.00

8.60

190.00

25.94

30.00

61.20

25.00

1
1
1

$
$
$

265.00
4.00
5.00

$
$

434.07
27.20

13.65

7.00

7.00

8.61

Number
1
1
1
1

$
$
$
$

Rate
3.00
5.50
7.00
5.00

$
$

Total
309.00
5.50

$
$

0.96
30.00

7.00

17.85

190.00

28.50

30.00

176.40

25.00

90.00

3
3
3

$
$
$

265.00
4.00
5.00

$
$
$

511.19
33.60
7.35

7.00

5.46

3
3
3
3
3

$
$
$
$
$

7.00
3.00
5.50
7.00
5.00

$
$
$
$
$

12.39
360.00
16.50
0.51
60.00

7.00

42.00

265.00

1,590.00

7.00

42.00

7.00

50.40

265.00

1,908.00

7.00

50.40

7.00

3.43

190.00

18.62

30.00

67.20

25.00

1
1
1
1

$
$
$
$

265.00
4.00
5.00
7.00

$
$
$
$

207.76
22.40
9.80
-

7.00

3.43

3.00

11.76

nal Total

Number
1
1
1

$
$
$

Rate
5.50
7.00
5.00

$
$
$

5.50
0.69
20.00

1
1
1
1
1
1
1
1

$
$
$
$
$
$
$
$

7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00

$
$
$
$
$
$
$
$

0.88
5.99
28.80
50.09
12.80
3.15
-

1
1
1
1
1

$
$
$
$
$

7.00
3.00
5.50
7.00
5.00

$
$
$
$
$

0.91
0.22
-

7.00 $

462.00

7.00

Total

$
$
$
$

328.13
-

200.00 $

8,400.00

1.00 $

104.00

1,560.00

$
$
$

112,208.12
17,953.30
130,161.41

15.00

LU
Reference
B1-3.6.2.15 page 49

B1-3.6.2.14 page 47

No. Description
1 P & G's
1.1 Geotechnical report (bore logs, trial pits, sounding logs)
Actual ground level
Description and limits of various soil layers
Sample taken
SPT results
Water levels
Depth of borehole/pit/sounding
1.2 Topographic survey (10 meter grids and 0.5 meter vertic
Obtain topographic survey maps
Ensure position and elevation of all works are correct
1.3 Establishment
Costs
forx obligations,
equipment
or for
labour,
although
nott
site1 camp
and stores
including
site clea
Allow 1
officeof
and
x boardroom
ABB
(containers
complete
the
Contract
in
terms
of
the
specification
and
1.4 requirements
standard tables,12 x chairs,1 x mini fridge, 2x cupboardS

1.5 plugs and lights)


1.6 Temporary latrines and sanitary (allowed 1x for ABB offic
1.7 Temporary fence around site establishment

1.10 Temporary gate


1.11 Temporary water connection
1.12 Temporary electricity connection/generator (20kVA)
1.13 Water usage
1.14 Electricity/petrol or diesel
1.15 Tempoary site sign board
1.16 Supervision & Labour
1.17 Health and Saftey - safety signs and PPE according to AB
1.18 Security guard (allow 1x person for day watch and 1 x p
1.19 De-establishment of site camp and stores
B1-4.9.7.14 page 152

2 SITE WORKS
2.1 Remove all bushes, shrubs and trees and strip 150mm o
for later use. All material not used will be dumped at a s
within 10km from site
2.2 Breaking up and removing concrete foundations

2.3 Rate for overhaul per m3 of spoil for a distance greater


2.4 Bulk excavations (cut) in insitu material

2.5 Extra over bulk exavations in clay and black cotton


2.6 Extra bulk excavations in intermediate material
2.7 Extra over bulk excavations in hard rock
2.8 Level and compact final cut layer to 95% Mod AASHTO
2.9 Backfill (fill) with insitu material and compact the ground
compacting to 95% Mod AASHTO density
B1-4.9.7.14 page 155

2.10 Backfill with imported G5 material and compact the grou


compacting to 95% Mod AASHTO density

LU
Reference

No. Description
3 TESTS (shall be performed for each 500m3 of fill)
Analyzing the ingredients of the water used for performa
Gravity of soil
Bearing capacity of soil for static load
Brain size analysis of soils, if "Replacement of Material"
Density of soil in place of sandcone method for each sec
replacement
of material and/or roadwork"
Cement
Aggregate
Sand
Fillers
Concrete cubes
3.1 Keeping all foundations free of water
3.2 Risk of collapse to sides of all excavations

B1-4.9.7.14 page152

3.3 132 kV Gantry


Excavation in insitu material

B1-4.9.7.17 page 163

Blinding - 20mPa (50mm thick)

B1-4.9.7.17 page 170

Smooth Formwork (to be steel or sound timber)

B1-4.9.7.17 page 170

Rough formwork (to be steel or sound timber)

B1-4.9.7.17 page 163


B1-4.9.7.17 page 169
B1-4.9.7.17 page 169

Concrete - 35mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

B1-4.9.7.14 page 154

Backfill with excavated insitu material in depths of 150m

B1-4.9.7.14 page 153

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts
Grout - 35mPa to top of stub
Greasing of HD Bolts (M36 X 8)

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14 page152

3.4 132 kV Isolator


Excavation in insitu material

B1-4.9.7.17 page 163

Blinding - 20mPa (50mm thick)

B1-4.9.7.17 page 170

Smooth Formwork (to be steel or sound timber)

B1-4.9.7.17 page 170

Rough formwork (to be steel or sound timber)

B1-4.9.7.17 page 163


B1-4.9.7.17 page 169
B1-4.9.7.17 page 169

Concrete - 35mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

B1-4.9.7.14 page 154

Backfill with excavated insitu material in depths of 150m

B1-4.9.7.14 page 153

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179

LU
Reference
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14 page152

No. Description
Grout - 35mPa to top of stub
Greasing of HD Bolts (M24X 8)
3.5 132 kV Circuit Breaker
Excavation in insitu material

B1-4.9.7.17 page 163

Blinding - 20mPa (50mm thick)

B1-4.9.7.17 page 170

Smooth Formwork (to be steel or sound timber)

B1-4.9.7.17 page 170

Rough formwork (to be steel or sound timber)

B1-4.9.7.17 page 163


B1-4.9.7.17 page 169
B1-4.9.7.17 page 169

Concrete - 35mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

B1-4.9.7.14 page 154

Backfill with excavated insitu material in depths of 150m

B1-4.9.7.14 page 153

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts
Grout - 35mPa to top of stub
Greasing of HD Bolts (M24 X 8)

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

3.6 132 kV Current Transformer

LU
Reference
B1-4.9.7.14 page152

No. Description
Excavation in insitu material

B1-4.9.7.17 page 163

Blinding - 20mPa (50mm thick)

B1-4.9.7.17 page 170

Smooth Formwork (to be steel or sound timber)

B1-4.9.7.17 page 170

Rough formwork (to be steel or sound timber)

B1-4.9.7.17 page 163


B1-4.9.7.17 page 169
B1-4.9.7.17 page 169

Concrete - 35mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

B1-4.9.7.14 page 154

Backfill with excavated insitu material in depths of 150m

B1-4.9.7.14 page 153

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 4)

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14 page152

3.7 132 kV Voltage Transformer


Excavation in insitu material

B1-4.9.7.17 page 163

Blinding - 20mPa (50mm thick)

B1-4.9.7.17 page 170

Smooth Formwork (to be steel or sound timber)

B1-4.9.7.17 page 170

Rough formwork (to be steel or sound timber)

B1-4.9.7.17 page 163

Concrete - 35mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

B1-4.9.7.17 page 169


B1-4.9.7.17 page 169
B1-4.9.7.14 page 154
B1-4.9.7.14 page
B1-4.9.7.19 page
B1-4.9.7.19 page
B1-4.9.7.20 page
B1-4.2.1 page 66

153
179
179
180

B1-4.9.7.14 page152
B1-4.9.7.17 page 163

Backfill with excavated insitu material in depths of 150m


Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 4)
3.8 132 kV High Post Insulator
Excavation in insitu material

B1-4.9.7.17 page 169


B1-4.9.7.17 page 169

Blinding - 20mPa (50mm thick)


Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

B1-4.9.7.14 page 154

Backfill with excavated insitu material in depths of 150m

B1-4.9.7.14 page 153

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts
Grout - 35mPa to top of stub

B1-4.9.7.17 page 170


B1-4.9.7.17 page 170
B1-4.9.7.17 page 163

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179
B1-4.9.7.20 page 180

LU
Reference
B1-4.2.1 page 66

B1-4.9.7.14 page152

No. Description
Greasing of HD Bolts (M24 X 8)
3.9 132 kV Low Post Insulator
Excavation in insitu material

B1-4.9.7.17 page 163

Blinding - 20mPa (50mm thick)

B1-4.9.7.17 page 170

Smooth Formwork (to be steel or sound timber)

B1-4.9.7.17 page 170

Rough formwork (to be steel or sound timber)

B1-4.9.7.17 page 163


B1-4.9.7.17 page 169
B1-4.9.7.17 page 169

Concrete - 35mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

B1-4.9.7.14 page 154

Backfill with excavated insitu material in depths of 150m

B1-4.9.7.14 page 153

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 4)

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14
B1-4.9.7.14

page152
page 163
page 170
page 170
page 163
page 169
page 169
page 154
page 153

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14
B1-4.9.7.14

page152
page 163
page 170
page 170
page 163
page 169
page 169
page 154
page 153

B1-4.9.7.19 page 179

3.10 132 kV Surge Arrestor


Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150m

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 4)

3.11 33 kV Gantry
Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150m
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only

LU
Reference
B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14
B1-4.9.7.14

page152
page 163
page 170
page 170
page 163
page 169
page 169
page 154
page 153

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14
B1-4.9.7.14

page152
page 163
page 170
page 170
page 163
page 169
page 169
page 154
page 153

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14

page152
page 163
page 170
page 170
page 163
page 169
page 169
page 154

No. Description
HD Bolts - Template and installation (ABB to supply bolts
Grout - 35mPa to top of stub
Greasing of HD Bolts (M36 X 8)

3.12 33 kV Circuit Breaker


Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150m

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 6)

3.13 33 kV Current Transformer


Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150m

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 4)

3.14 33 kV Voltage Transformer


Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150m

LU
Reference
B1-4.9.7.14 page 153
B1-4.9.7.19 page 179
B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14
B1-4.9.7.14

page152
page 163
page 170
page 170
page 163
page 169
page 169
page 154
page 153

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14
B1-4.9.7.14

page152
page 163
page 170
page 170
page 163
page 169
page 169
page 154
page 153

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14 page 152

No. Description
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 4)

3.15 33 kV Surge Arrestor


Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150m

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 4)

3.16 33 kV Disconnetor
Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150m

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts
Grout - 35mPa to top of stub
Greasing of HD Bolts (M24 X 4)
3.17 Transformer Plinth (2)
Excavations in insitu material:
Strip excavations
Sump excavations
Plinth
Surface bed

LU
Reference
B1-4.9.7.14 page 154

No. Description
Backfill with excavated insitu material in depths of 150m
Stock pile insitu surplus material (for carting away)

B1-4.9.7.17 page 163

B1-4.9.7.17 page 163

B1-4.9.7.17 page 170

B1-4.9.7.17 page 170


B1-4.9.7.17 page 170

B1-4.9.7.19 page 179

B1-4.9.7.22 page 181


B1-4.9.7.22 page 184
B1-4.9.7.17 page 165

Blinding - 20mPa (50mm thick):

Strip Footing concrete


Sump Concrete
Plinth
Surface bed
Concrete - 35mPa, 19mm Stone:
Strip Footing concrete
Sump Concrete
Plinth
Surface bed
Part of the road
Formwork:
Smooth Formwork:
Sump walls
Plinth
Rough Formwork:
Strip footing
25 x 25mm Chamfer to sides of plinth
Concrete finish woodfloat:
Surface bed
Plinth
Reinforcing (MESH ref 617):
Surface bed
Plinth
Sundries:
Sump frame - 30 x 30 x 5Lg cast in and galvanised. 25 x
weld
angle Diameter
(5mm fillet)
at 500mm
c/c.
To fit in the ope
75 to to
100mm
gravel
to fill oil
drain
with 30 x 4.5mm bearer bars, and 40 x 40mm openings
Brickwork (including stairs)
Brickforce 120mm wide (every second layer)

Construction/expansion joints between concrete and bric


50 x 3 flat copper bend to suit connection on transforme
One set of rails on tranformer plinth
Benching the inside of the sump with 20mm benching re
Paint x 2 layers of bitumen to surface
3.18 CONTROL BUILDING
Removal of Existing Work
Taking out and removing doors, windows, etc from brick
Steel single door and frame
Steel double door and frame
Glazed steel window

LU
Reference

No. Description

Hacking up/off and removing cermaic tiles including rem


from concrete or brickwork and preparing surfaces for ne

Internal plaster from walls and columns


External plaster from walls and columns
Making Good to Existing Work
Concrete roof to be repaired with approved sealant and
Concrete floor slab
New Work
Trench
6mm Thick checkered plate over internal trench complet
600 x 500mm deep internal concrete trench. Trench wal
thick
Aluminium Frames:
Windows:
Type W1: 2700 x 1090mm Frame including 4mm double
Type W2: 900 x 900mm Frame including 4mm double gla
Steel Frames:
Doors:
Type D3: 885 x 2500mm Frame and door including all iro
Type D1: 1720 x 2500mm Frame and door including all i
Type D2: 1720 x 2500mmFrame and door including all ir
Internal wall finishes:
Walls to be plastered and painted to match existing
External wall finish:
500mm strip to be plastered and painted to match exist
3.19 GUARD HOUSE
Removal of Existing Work
Taking out and removing doors, windows, etc from brick
Steel single door and frame

Hacking up/off and removing cermaic tiles including rem


from concrete or brickwork and preparing surfaces for ne

Internal plaster from walls and columns


External plaster from walls and columns
New Work
Steel Frames:
Doors:
Type D3: 885 x 2500mm Frame and steel door including
complete (external)

Type D3: 885 x 2100mm Frame and door including all iro
Internal wall finishes:
Walls to be plastered and painted to match existing
External wall finish:

LU
Reference

B1-4.9.7.14 page 152


B1-4.9.7.14 page 154

B1-4.9.7.18 page 178

No. Description
500mm strip to be plastered and painted to match exist

4 EARTH MAT
4.1 Excavate 300mm (width) x 1000mm (depth) for earth gr
4.2 Backfilling to earthing grid and compact the ground surf
compacting to 95% Mod AASHTO density

5 CABLE TRENCH (refer to drawing no. ZZZ 824-200


5.1 The excavation in insitu material for construction of 100
insitu reinforced concrete trenches including bends and
diameter PVC drain pipe at 4m centres at the bottom of

B1-4.9.7.18 page 178

5.2 Concrete trench cover for 1000mm wide trench (with ma

B1-4.9.7.18 page 178

5.3 The excavation in insitu material for construction of 500


insitu reinforced concrete trenches including bends and
diameter PVC drain pipe at 4m centres at the bottom of

B1-4.9.7.18 page 178

5.4 Concrete trench cover for 500mm wide trench (with max

B1-3.6.2.12 page 46

6 DRAINAGE
6.1

Subsoil Drain
Supply, lay and joint 2 x 160mm diameter pr
1100mm below NGL in trench which is to be lined with g
A6) and backfill with 50 to 75mm diameter stone, includ
support of sides, keeping excavations dry, complete (ref
6.2 Construct cast insitu concrete manhole with lid and incl
material, temporary support of sides, keeping excavatio
drawing no. ZZZ 824-200)

6.3 Supply, lay, joint and bed 300mm diameter class 50D sp
sewer pipes including necessary bends and tees from tra
separator

6.4 Supply, lay, joint and bed 450mm diameter class 50D sp
sewer pipes including necessary bends and tees

6.5 Supply, lay, joint and bed 110mm Diameter PVC pipe inc
tees
6.7 Oil trap (refer to drawing no. ZZZ 824-200)
Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)

LU
Reference

B1-4.9.7.14
B1-4.9.7.15
B1-4.9.7.15
B1-4.9.7.15

B1-4.9.7.14
B1-4.9.7.15
B1-4.9.7.15
B1-4.9.7.15
B1-4.9.7.15

No. Description
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of concrete to fit covers
100mm Diameter concrete cut out
Wood float top of concrete slab
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
16mm Diameter galvanised iron steps 1650mm long
Heavy duty manhole covers
200mm Diameter steel pipe
100mm Diameter ventilator PVC pipe with bend
100mm lay,
Diameter
concrete
pipe Diameter uPVC pipe in
Supply,
joint and
bed 160mm
tees
Paint x 2 layers of bitumen to internal surfaces of separa

page
page
page
page

page
page
page
page
page

152
156
156
158

152
156
156
158
156

B1-4.9.7.15 page 159

B1-4.9.7.10 page 146

B1-4.9.7.17 page 171

7 ROAD
7.1 Access road
Excavation in insitu material

Sub-Base of G5 material compacted to 98% MOD AASHT


Wet-mix road base of G6 material Compacted to 98% MO
40mm Thick wearing course of bitumen macadam grade

7.2 Internal road


Excavation in insitu material

Sub-Base of G5 material compacted to 98% MOD AASHT


Wet-mix road base of G6 material Compacted to 98% MO
Wearing course of bitumen macadam grade 60/70 penet

7.3 Road crossing over 5m wide road for cable trench.Precas


900 x 600mm and the internal walls to be 100mm thick)
7.4 Segmented paving - Supply and lay 80 mm interlocking
mm sand bed (max 30 mm); edge restraint and cutting o
Strength: 25 Mpa
7.5 Kerbing including bends and end pieces
7.6 Road markings:
Stop sign
Yield sign
Painting of parking lines

8 YARD WORKS
8.1 The complete, supply and installation of a security fence
parts, gates etc. 2m High diamond mesh plastic coated g
300mm flat wrap razor wire on the overhang fence and c
45 degree inclination at the apex, fence to be fixed on a

LU
Reference
B1-4.9.7.17 page 171
B1-4.9.7.17 page 171
B1-4.9.7.14 page 155

No. Description
8.2 5m Wide motorised electric fence, with a frame height th
8.3 1m Wide pedestrian gate with a frame height that match
8.4 Prepare and comply with an approved weed control and

B1-4.9.7.14 page 156

8.5 Supply and application of 25mm stone, 200mm deep, to


including levelling and rolling to compact the stone laye

B1-4.9.7.2 page 137

8.6 Construct a fire equipment bricwork kiosk

B1-3.6.2.13 page 46

8.7 Landscaping - Planting of medium-high growing plants a


Employer)

LUWINGA 132/66/33kV Substation


Quantity

Unit

Number

Item

Item

1
1
1
2
1
2
1
1
1
1
1
1
1
2
1

Item
Item
Item
month

1
1
1
8
1
1
1
1
8
8
1
8
1
8
1

al pits, sounding logs) and to include:


soil layers

ds and 0.5 meter vertical intervals):


s
all works are correct
or
labour,
although
nottospecified,
isx required
to own
ores
including
site clearance
for2civil
contractors
m
for
ABB
(containers
include
aircondtioners,
2x
the
specification
and
Statutory
Requirements
ni fridge, 2x cupboard with shelves and electrical

allowed 1x for ABB office)

blishment

generator (20kVA)

nd PPE according to ABB specifications


or day watch and 1 x person for night watch)

ees and strip 150mm of topsoil to be stockpiled on site


will be dumped at a site located by the employer

te foundations
for a distance greater than 10km - rate per km

aterial
and black cotton

diate material

to 95% Mod AASHTO


nd compact the ground surface in depths of 300mm
density

and compact the ground surface in depths of 300mm


density

Item
Item
Item
Item
Month
Month
Item
Month
Item
Month
Item

4,423.60

m2

10.00

No

1.00

Km

1,500.00

m3

150.00

m3

150.00
75.00

m3
m3

1,500.00

m3

663.54

m3

LUWINGA 132/66/33kV Substation


Quantity

each 500m of fill)


ater used for performance of the work

Unit

Number

1.00
3.00
1.00
3.00
3.00
2.00
2.00
2.00
2.00
3.00

Test
Test
Test
Test
Test
Test
Test
Test
Test
Test

1.00
1.00

Item
Item

10.75

m3

0.51

m3

sound timber)

5.04

und timber)

3.84

olumn stub

4.84
5.60
1.96

m3
m
m2

9
9
9

erial in depths of 150mm to 97% Mod AASHTO

5.80

m3

4.96
267.00
1
0.10
8

m
kg
No
m3
No

9
9
9
9
9

2.21

m3

33

0.13

33

sound timber)

3.36

33

und timber)

2.16

m2

33

olumn stub

1.28
4.80
0.72

m3
m
m2

33
33
33

erial in depths of 150mm to 97% Mod AASHTO

0.94

m3

33

1.27
79.00
1

m3
kg
No

33
33
33

oad
lacement of Material" is required
e method for each second layer of "Backfilling and/or
adwork"

ter

for carting away)

on (ABB to supply bolts)

for carting away)

on (ABB to supply bolts)

LUWINGA 132/66/33kV Substation


Unit
m3
No

Number
33
33

3.62

m3

0.21

m3

sound timber)

4.20

und timber)

2.91

olumn stub

2.06
6.00
1.13

m3
m
m2

4
4
4

erial in depths of 150mm to 97% Mod AASHTO

1.85

m3

1.77
207.00
1.00
0.06
8

m
kg
No
m3
No

4
4
4
4
4

for carting away)

on (ABB to supply bolts)

Quantity
0.04
8

LUWINGA 132/66/33kV Substation


Unit
m3

Number
12

0.06

m3

12

sound timber)

1.96

12

und timber)

1.32

m2

12

olumn stub

0.71
2.80
0.49

m
m
m2

12
12
12

erial in depths of 150mm to 97% Mod AASHTO

0.36

m3

12

0.67
47.00
1
0.02
4

m3
kg
No
m3
No

12
12
12
12
12

1.03

m3

12

0.06

12

sound timber)

1.96

m2

12

und timber)

1.32

12

0.71
2.80
0.49

m
m
m2

12
12
12

0.36
0.67
47.00
1
0.02
4

m3
m3
kg
No
m3
No

12
12
12
12
12
12

3.83

m3

10

4.10
3.92
3.12
2.04
5.60
0.98

m3
m2
m2
m3
m
m2

10
10
10
10
10
10

erial in depths of 150mm to 97% Mod AASHTO

2.24

m3

10

for carting away)

1.60
128
1
0.05

m
kg
No
m3

10
10
10
10

for carting away)

on (ABB to supply bolts)

olumn stub

erial in depths of 150mm to 97% Mod AASHTO


for carting away)

on (ABB to supply bolts)

sound timber)
und timber)

olumn stub

on (ABB to supply bolts)

Quantity
1.03

LUWINGA 132/66/33kV Substation


Unit
No

Number
10

1.03

m3

17

0.06

17

sound timber)

1.96

m2

17

und timber)

1.32

17

olumn stub

0.71
2.80
0.49

m
m
m2

17
17
17

erial in depths of 150mm to 97% Mod AASHTO

0.36

m3

17

0.67
47.00
1
0.02
4

m
kg
No
m3
No

17
17
17
17
17

1.03
0.06
1.96
1.32
0.71
2.80
0.49
0.36

m3
m3
m2
m2
m3
m
m2
m3

9
9
9
9
9
9
9
9

0.67
47.00
1.00
0.02
4.00

m3
kg
No
m3
No

9
9
9
9
9

5.08
0.24
5.04
2.64
3.22
5.60
1.96
1.62

m3
m3
m2
m2
m3
m
m2
m3

7
7
7
7
7
7
7
7

3.46
188.00

m3
kg

7
7

for carting away)

on (ABB to supply bolts)

sound timber)
und timber)

olumn stub

erial in depths of 150mm to 97% Mod AASHTO

for carting away)

on (ABB to supply bolts)

sound timber)
und timber)

olumn stub

erial in depths of 150mm to 97% Mod AASHTO

for carting away)

Quantity
8

LUWINGA 132/66/33kV Substation

on (ABB to supply bolts)

sound timber)
und timber)

olumn stub

erial in depths of 150mm to 97% Mod AASHTO

for carting away)

on (ABB to supply bolts)

sound timber)
und timber)

olumn stub

erial in depths of 150mm to 97% Mod AASHTO

for carting away)

on (ABB to supply bolts)

sound timber)
und timber)

olumn stub

erial in depths of 150mm to 97% Mod AASHTO

Quantity
1.00
0.10
8.00

Unit
No
m3
No

Number
7
7
7

1.23
0.14
2.04
1.64
6.80
2.73
-

m3
m3
m2
m2
m3
m
m2
m3

2
2
2
2
2
2
2
2

1.23
103.00
1.00
0.14
6.00

m3
kg
No
m3
No

2
2
2
2
2

0.85
0.05
1.96
1.20
0.64
2.80
0.49
0.26

m3
m3
m2
m2
m3
m
m2
m3

0
0
0
0
0
0
0
0

0.59
40.00
1.00
0.02
4.00

m3
kg
No
m3
No

0
0
0
0
0

0.85
0.05
1.96
1.20
0.64
2.80
0.49
0.26

m3
m3
m2
m2
m3
m
m2
m3

2
2
2
2
2
2
2
2

LUWINGA 132/66/33kV Substation

for carting away)

on (ABB to supply bolts)

sound timber)
und timber)

olumn stub

erial in depths of 150mm to 97% Mod AASHTO

for carting away)

on (ABB to supply bolts)

sound timber)
und timber)

olumn stub

erial in depths of 150mm to 97% Mod AASHTO

for carting away)

on (ABB to supply bolts)

Quantity
0.59
40.00
1.00
0.02
4.00

Unit
m3
kg
No
m3
No

Number
2
2
2
2
2

0.85
0.05
1.96
1.20
0.64
2.80
0.49
0.26

m3
m3
m2
m2
m3
m
m2
m3

2
2
2
2
2
2
2
2

0.59
40.00
1.00
0.02
4.00

m3
kg
No
m3
No

2
2
2
2
2

1.78
0.10
3.36
1.80
1.13
4.80
0.72
0.69

m3
m3
m2
m2
m3
m
m2
m3

5
5
5
5
5
5
5
5

1.09
83.00
1.00
0.04
4.00

m3
kg
No
m3
No

5
5
5
5
5

8.32
0.58
7.35
9.07

m3
m3
m3
m3

LUWINGA 132/66/33kV Substation

erial in depths of 150mm to 97% Mod AASHTO

for carting away)

n and galvanised. 25 x 5mm flat x 100Lg fishtail lugs


mm
c/c.
To fit in the open grid which is 1600mm wide
fill oil
drain
40 x 40mm openings (fully banded)

cond layer)

ween concrete and brick


nnection on transformer points

with 20mm benching render

Quantity
4.54

Unit
m3

20.78

m3

0.76
0.03
1.05
2.27

m3
m3
m3
m3

3.02
0.33
12.60
4.54
4.41

m3
m3
m3
m3
m3

2.24
11.40

m2
m2

13.46
19

m2
m

45.36
21

m2
m2

45.36
42

m2
m2

45.36

m2

4.54

m3
m2

31.28

m2

125.12
2.22
8.00
20.10
1
50

m2
m
m
Item
m2

1.00
3.00
11.00

No
No
No

indows, etc from brick to demolished:

Number

LUWINGA 132/66/33kV Substation


Quantity

Unit

maic tiles including removing mortar bed or adhesive


eparing surfaces for new screed, plaster tiles finish:

approved sealant and bitumen

nternal trench complete


ete trench. Trench walls and bottom to be 100mm

ncluding 4mm double glass complete


luding 4mm double glass complete

nd door including all ironmongery complete


and door including all ironmongery complete
nd door including all ironmongery complete

to match existing

painted to match existing

297.07
14.73

m2
m2

210.00
210.00

m2
m2

30.4
38

m2
m

7.00
4.00

No
No

1.00
1.00
2.00

No
No
No

297.07

m2

14.73

m2

2.00

No

70.71
36.00

m2
m2

1.00

No

1.00

No

70.71

m2

indows, etc from brick to demolished:

maic tiles including removing mortar bed or adhesive


eparing surfaces for new screed, plaster tiles finish:

nd steel door including stainless steel ironmongery

nd door including all ironmongery complete

to match existing

Number

LUWINGA 132/66/33kV Substation

painted to match existing

Quantity
36.00

mm (depth) for earth grids

600.00

m3

600.00

m3

177.00

590.00

No

mpact the ground surface in depths of 300mm


density

ng no. ZZZ 824-200)


or construction of 1000mm wide x 500mm deep cast
s including bends and junctions to include 100mm
ntres at the bottom of the trench

m wide trench (with maximal weight of 50 kg each)

or construction of 500mm wide x 500mm deep cast


s including bends and junctions to include 100mm
ntres at the bottom of the trench

Unit
m2

41

137.00

No

84

No

diameter class 50D spigot and socket ended concrete


bends and tees from transformer to oil/ water

12

diameter class 50D spigot and socket ended concrete


bends and tees

35

45

97.00
3.45
235.00

m3
m3
m2

wide trench (with maximal weight of 50 kg each)

x 160mm diameter preferated uPVC pipe to be laid


ch is to be lined with geofabric material (bidem gade
diameter stone, including excavation, temporary
ons dry, complete (refer to drawing no. ZZZ 824-200)
nhole with lid and including excavation in insitu
des, keeping excavations dry, complete (refer to

Diameter PVC pipe including necessary bends and

ZZZ 824-200)

sound timber)

Number

LUWINGA 132/66/33kV Substation

oncrete to fit covers

for carting away)

teps 1650mm long

pipe with bend


Diameter uPVC pipe including necessary bends and

rnal surfaces of separator

ed to 98% MOD AASHTO


Compacted to 98% MOD AASHTO
umen macadam grade 60/70 penetration

ed to 98% MOD AASHTO


Compacted to 98% MOD AASHTO
dam grade 60/70 penetration

Quantity
45.00
12.80
2.00
46.13
97.00
7520.00
8.00
4.00
1.00
1.00
0.50
46
259.98

81
40.5
36.00
8.4

Unit
m3
m
No
m2
m3
Kg
No
No
m
No
m
m
m2

m3
m3
m3
m3

226.80
113.40
97.20
21.60

m3
m3
m3
m3

for cable trench.Precast concrete culvet (size 1200 x


lls to be 100mm thick)
ay 80 mm interlocking concrete pavers including 20
restraint and cutting of units where required:

10.00

No

110.00

m2

pieces

234.00

tion of a security fence, including earthing of all metal


d mesh plastic coated galvanised steel wire and
e overhang fence and consists of a vertical post with
fence to be fixed on a ring-beam foundation

3
1
50

481.72

Item
Item
m

Number

LUWINGA 132/66/33kV Substation

, with a frame height that match the fence.


ame height that matches the fence
ved weed control and spread over substation

tone, 200mm deep, to one meter beyond fences,


ompact the stone layer.

rk kiosk

-high growing plants and grass (Subject to approval of

Quantity
1.00
1.00

Unit
No
No

6,218.36

m2

6,218.36

m2

1.00
621.84

Item
m2
Subtotal
Vat 16%
Final Total

Number

Rate

Total

1,000.00 $

1,000.00

200.00 $

200.00

$
$
$
$
$
$
$
$
$
$
$
$
$
$

50.00
1,000.00
30,000.00
750.00
8,000.00
200.00
500.00
500.00
500.00
1,000.00
500.00
1,000.00

$
$
$
$

50.00
1,000.00
30,000.00
12,000.00

$
$
$
$
$
$
$
$
$
150.00 $
1,000.00 $

8,000.00
400.00
500.00
500.00
4,000.00
8,000.00
500.00
8,000.00
2,400.00
1,000.00

0.80
$

3,538.88
450.00

45.00 $
20.00 $

7.00 $

10,500.00

7.00 $

1,050.00

$
$

8.00 $
20.00 $

1,200.00
1,500.00

7.00 $

10,500.00

7.00

20.00

4,644.78

Rate

Total

$
$
$
$
$
$
$
$
$
$

200.00
200.00
200.00
200.00
200.00
100.00
100.00
100.00
100.00
200.00

$
$
$
$
$
$
$
$
$
$

200.00
600.00
200.00
600.00
600.00
200.00
200.00
200.00
200.00
600.00

$
$

100.00 $
100.00 $

100.00
100.00

7.00 $

677.38

190.00 $

875.52

30.00 $

1,360.80

25.00 $

864.00

$
$
$

265.00 $
4.00 $
5.00 $

11,533.86
201.60
88.20

7.00 $

365.15

$
$
$
$
$

7.00
3.00
5.50
7.00
5.00

$
$
$
$
$

312.23
7,209.00
49.50
6.17
360.00

7.00 $

510.51

190.00 $

815.10

30.00 $

3,326.40

25.00 $

1,782.00

$
$
$

265.00 $
4.00 $
5.00 $

11,228.58
633.60
118.80

7.00 $

217.14

$
$
$

7.00 $
3.00 $
5.50 $

293.37
7,821.00
181.50

Rate

Total

$
$

7.00 $
5.00 $

8.32
1,320.00

7.00 $

101.27

190.00 $

161.69

30.00 $

504.00

25.00 $

291.00

$
$
$

265.00 $
4.00 $
5.00 $

2,187.84
96.00
22.50

7.00 $

51.70

$
$
$
$
$

7.00
3.00
5.50
7.00
5.00

$
$
$
$
$

49.57
2,484.00
22.00
1.58
160.00

Rate

Total

7.00 $

86.39

190.00 $

137.94

30.00 $

705.60

25.00 $

396.00

$
$
$

265.00 $
4.00 $
5.00 $

2,245.08
134.40
29.40

7.00 $

30.24

$
$
$
$
$

7.00
3.00
5.50
7.00
5.00

$
$
$
$
$

56.15
1,692.00
66.00
2.06
240.00

7.00 $

86.39

190.00 $

137.94

30.00 $

705.60

25.00 $

396.00

$
$
$

265.00 $
4.00 $
5.00 $

2,245.08
134.40
29.40

$
$
$
$
$
$

7.00
7.00
3.00
5.50
7.00
5.00

$
$
$
$
$
$

30.24
56.15
1,692.00
66.00
2.06
240.00

7.00 $

268.35

$
$
$
$
$
$

190.00
30.00
25.00
265.00
4.00
5.00

$
$
$
$
$
$

7,790.00
1,176.00
780.00
5,403.35
224.00
49.00

7.00 $

156.49

$
$
$
$

7.00
3.00
5.50
7.00

$
$
$
$

111.86
3,840.00
55.00
3.43

Rate

Total

5.00 $

400.00

7.00 $

122.39

190.00 $

195.42

30.00 $

999.60

25.00 $

561.00

$
$
$

265.00 $
4.00 $
5.00 $

3,180.53
190.40
41.65

7.00 $

42.84

$
$
$
$
$

7.00
3.00
5.50
7.00
5.00

$
$
$
$
$

79.55
2,397.00
93.50
2.92
340.00

$
$
$
$
$
$
$
$

7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00

$
$
$
$
$
$
$
$

64.80
103.46
529.20
297.00
1,683.81
100.80
22.05
22.68

$
$
$
$
$

7.00
3.00
5.50
7.00
5.00

$
$
$
$
$

42.12
1,269.00
49.50
1.54
180.00

$
$
$
$
$
$
$
$

7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00

$
$
$
$
$
$
$
$

249.02
321.86
1,058.40
462.00
5,965.68
156.80
68.60
79.38

7.00 $
3.00 $

169.54
3,948.00

$
$

Rate
$
$
$

Total
5.50 $
7.00 $
5.00 $

38.50
4.80
280.00

$
$
$
$
$
$
$
$

7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00

$
$
$
$
$
$
$
$

17.20
51.87
122.40
868.14
54.40
27.30
-

$
$
$
$
$

7.00
3.00
5.50
7.00
5.00

$
$
$
$
$

17.22
618.00
11.00
1.91
60.00

$
$
$
$
$
$
$
$

7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00

$
$
$
$
$
$
$
$

$
$
$
$
$

7.00
3.00
5.50
7.00
5.00

$
$
$
$
$

$
$
$
$
$
$
$
$

7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00

$
$
$
$
$
$
$
$

11.90
19.00
117.60
60.00
340.79
22.40
4.90
3.64

Rate

Total

$
$
$
$
$

7.00
3.00
5.50
7.00
5.00

$
$
$
$
$

8.26
240.00
11.00
0.34
40.00

$
$
$
$
$
$
$
$

7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00

$
$
$
$
$
$
$
$

11.90
19.00
117.60
60.00
340.79
22.40
4.90
3.64

$
$
$
$
$

7.00
3.00
5.50
7.00
5.00

$
$
$
$
$

8.26
240.00
11.00
0.34
40.00

$
$
$
$
$
$
$
$

7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00

$
$
$
$
$
$
$
$

62.18
99.28
504.00
225.00
1,498.58
96.00
18.00
23.98

$
$
$
$
$

7.00
3.00
5.50
7.00
5.00

$
$
$
$
$

38.20
1,245.00
27.50
1.26
100.00

$
$
$
$

7.00
7.00
7.00
7.00

$
$
$
$

58.21
4.03
51.45
63.50

Rate

Total

7.00 $

31.75

7.00 $

145.45

$
$
$
$

190.00
190.00
190.00
190.00

$
$
$
$

143.64
6.08
199.50
430.92

$
$
$
$
$

260.00
260.00
260.00
260.00
260.00

$
$
$
$

786.24
85.02
3,276.00
1,179.36

$
$

20.00 $
20.00 $

44.80
228.00

$
$

20.00 $
20.00 $

269.28
380.00

$
$

8.00 $
8.00 $

362.88
168.00

$
$

8.00 $
8.00 $

362.88
336.00

40.00 $

1,814.40

$
$

19.00 $
1.00 $

86.18
31.28

1.00 $

125.12

$
$
$
$
$

100.00
150.00
150.00
500.00
10.00

10
10
10

$
$
$
$
$

222.00
1,200.00
3,015.00
500.00
500.00

$
$
$

10.00
30.00
110.00

Rate

Total

2
2

$
$

594.14
29.46

30
25

$
$

6,300.00
5,250.00

0
0

$
$

$
$

890.00 $
265.00 $

6,230.00
1,060.00

$
$
$

100.00 $
120.00 $
120.00 $

100.00
120.00
240.00

9.00 $

2,673.63

9.00 $

132.57

20.00

$
$

2.00 $
2.00 $

141.41
72.00

100.00 $

100.00

100.00 $

100.00

9.00 $

636.35

10

Rate

Total

9.00 $

324.00

7.00 $

4,200.00

7.00

4,200.00

10.00 $

1,770.00

60.00 $

35,400.00

10.00 $

410.00

60.00 $

8,220.00

100.00 $

8,400.00

265.00 $

1,060.00

15.00 $

180.00

100.00 $

3,500.00

18.00 $

810.00

$
$
$

7.00 $
190.00 $
33.00 $

679.00
656.26
7,755.00

$
$
$
$
$
$
$
$
$
$
$
$
$

Rate
190.00
1.00
20.00
5.30
6.00
2.50
225.00
120.00
45.00
20.00
20.00
6.00
5.00

Total
$
$
$
$
$
$
$
$
$
$
$
$
$

8,550.00
12.80
40.00
244.49
582.00
18,800.00
1,800.00
480.00
45.00
20.00
10.00
276.00
1,299.90

$
$
$
$

7.00
25.00
20.00
19.00

$
$
$
$

567.00
1,012.50
720.00
159.60

$
$
$
$

7.00
25.00
20.00
19.00

$
$
$
$

1,587.60
2,835.00
1,944.00
410.40

30.00 $

300.00

500.00 $

55,000.00

2.00 $

468.00

$
$
$

10.00 $
10.00 $
2.00 $

30.00
10.00
100.00

200.00 $

96,344.00

$
$

Rate
500.00 $
100.00 $

1.00 $

6,218.36

15.00 $

93,275.40

1,000.00 $

1,000.00

1,000.00 $

621,836.00

1,272,108.78

1,272,108.78

Total
500.00
100.00

NEW BWENGU 132/66/33kV Substation


Reference
B1-3.6.2.15 page 49

B1-3.6.2.14 page 47

No. Description
1 P & G's
1.1 Geotechnical report (bore logs, trial pits, sounding logs) and to include:
Actual ground level
Description and limits of various soil layers
Sample taken
SPT results
Water levels
Depth of borehole/pit/sounding
1.2 Topographic survey (10 meter grids and 0.5 meter vertical intervals):
Obtain topographic survey maps
Ensure position and elevation of all works are correct
1.3 Costs for obligations, equipment or labour, although not specified, is required to complete
the Contract in terms of the specification and Statutory Requirements
1.4

Establishment of site camp and stores including site clearance for civil contractors own
requirements
1.5 Allow 1 x office and 1 x boardroom for ABB (containers to include 2 x aircondtioners, 2x
standard tables,12 x chairs,1 x mini fridge, 2x cupboard with shelves and electrical plugs
and lights)
1.6 Temporary latrines and sanitary (allowed 1x for ABB office)
1.7 Temporary fence around site establishment
1.10 Temporary gate
1.11 Temporary water connection
1.12 Temporary electricity connection/generator (20kVA)
1.13 Water usage
1.14 Electricity/petrol or diesel
1.15 Tempoary site sign board
1.16 Supervision & Labour
1.17 Health and Saftey - safety signs and PPE according to ABB specifications
1.18 Security guard (allow 1x person for day watch and 1 x person for night watch)
1.19 De-establishment of site camp and stores
B1-4.9.7.14 page 152

2 SITE WORKS - PLATFORM


2.1 Remove and treat anthills

B02-4.6.7 page 77

Number

Item

1,000.00 $

1,000.00

Item

200.00 $

200.00

Item

50.00

50.00

1,000.00

1,000.00

30,000.00

$
$

$
$
$
$
$
$
$
$
$
150.00 $
1,000.00 $

8,000.00
400.00
500.00
500.00
4,000.00
8,000.00
500.00
8,000.00
2,400.00
1,000.00

Item

Rate

Item

30,000.00

2
1
2
1
1
1
1
1
1
1
2
1

month

8
1
1
1
1
8
8
1
8
1
8
1

$
$
$
$
$
$
$
$
$

750.00
8,000.00
200.00
500.00
500.00
500.00
1,000.00
500.00
1,000.00

Item
Item
Item
Item
Month
Month
Item
Month
Item
Month
Item

Total

m3

45.00

414,000.00

99,510.00

m2

0.80

79,608.00

2.3 Level and compact final cut layer to 95% Mod AASHTO
2.4 Rate for overhaul per m3 of spoil for a distance greater than 10km - rate per km

78,389.00

m2

1.00

Km

7.00

7.00

2.5 Bulk excavations (cut) in insitu material

15,500.00
1,550.00
1,550.00
775.00
21,121.00
15,500.00

m3
m3
m3
m3
m2
m3

$
$
$
$

7.00
7.00
8.00
20.00

$
$
$

10,850.00
12,400.00
15,500.00

7.00

3,168.20

m3

7.00

22,177.40

2.6 Extra over bulk excavations in clay and black cotton


2.7 Extra bulk excavations in intermediate material
2.8 Extra over bulk excavations in hard rock
2.9 Level and compact final cut layer to 95% Mod AASHTO
2.10 Backfill (fill) with insitu material and compact the ground surface in depths of 300mm
to 95% Mod AASHTO density
2.11 compacting
Backfill with imported G5 material and compact the ground surface in depths of 300mm
compacting to 95% Mod AASHTO density
3 TESTS (shall be performed for each 500m3 of fill)
Analyzing the ingredients of the water used for performance of the work
Gravity of soil

1
3

Test
Test

$
$

200.00
200.00

$
$

200.00
600.00

1
3
3
2
2
2
2
3

Test
Test
Test
Test
Test
Test
Test
Test

$
$
$
$
$
$
$
$

200.00
200.00
200.00
100.00
100.00
100.00
100.00
200.00

$
$
$
$
$
$
$
$

200.00
600.00
600.00
200.00
200.00
200.00
200.00
600.00

3.1 Keeping all foundations free of water

Item

100.00

100.00

3.2 Risk of collapse to sides of all excavations

Item

100.00

100.00

Bearing capacity of soil for static load


Grain size analysis of soils, if "Replacement of Material" is required
Density of soil in place of sandcone method for each second layer of "Backfilling and/or
replacement
of material and/or roadwork"
Cement
Aggregate
Sand
Fillers
Concrete cubes

B1-4.9.7.14 page152

Unit

9,200.00

2.2 Remove all bushes, shrubs and trees and strip 300mm of topsoil to be stockpiled on site for
later use. All material not used will be dumped at a site located by the employer within
10km from site

B1-4.9.7.14 page 155

Quantity

3.3 132 kV Gantry


Excavation in insitu material

10.75

m3

12

7.00

903.17

B1-4.9.7.17 page 163

Blinding - 20mPa (50mm thick)

0.51

m3

12

190.00

1,167.36

B1-4.9.7.17 page 170

Smooth Formwork (to be steel or sound timber)

5.04

m2

12

30.00

1,814.40

B1-4.9.7.17 page 170

Rough formwork (to be steel or sound timber)

3.84

m2

12

25.00

1,152.00

B1-4.9.7.17 page 163

Concrete - 35mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

4.84
5.60
1.96

m
m
m2

12
12
12

$
$
$

265.00
4.00
5.00

$
$
$

15,378.48
268.80
117.60

5.80
4.96
267.00
1
0.10
8

m3
m3
kg
No
m3
No

12
12
12
12
12
12

$
$
$
$
$
$

7.00
7.00
3.00
5.50
7.00
5.00

$
$
$
$
$
$

486.86
416.30
9,612.00
66.00
8.23
480.00

2.21

m3

27

7.00

417.69

0.13

m3

27

190.00

666.90

B1-4.9.7.17 page 169


B1-4.9.7.17 page 169
B1-4.9.7.14 page 154
B1-4.9.7.14
B1-4.9.7.19
B1-4.9.7.19
B1-4.9.7.20

page
page
page
page

153
179
179
180

B1-4.2.1 page 66

B1-4.9.7.14 page152
B1-4.9.7.17 page 163

Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M36 X 8)
3.4 132 kV Isolator
Excavation in insitu material
Blinding - 20mPa (50mm thick)

NEW BWENGU 132/66/33kV Substation


Reference
B1-4.9.7.17 page 170

No. Description
Smooth Formwork (to be steel or sound timber)

Quantity
3.36

Unit
m2

Number
27

Rate
30.00

Total
2,721.60

B1-4.9.7.17 page 170

Rough formwork (to be steel or sound timber)

2.16

m2

27

25.00

1,458.00

B1-4.9.7.17 page 163


B1-4.9.7.17 page 169
B1-4.9.7.17 page 169

Concrete - 35mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

1.28
4.80
0.72

m
m
m2

27
27
27

$
$
$

265.00
4.00
5.00

$
$
$

9,187.02
518.40
97.20

B1-4.9.7.14 page 154

Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO

0.94

m3

27

7.00

177.66

B1-4.9.7.14
B1-4.9.7.19
B1-4.9.7.19
B1-4.9.7.20

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M24X 8)

1.27
79.00
1
0.04
8

m3
kg
No
m3
No

27
27
27
27
27

$
$
$
$
$

7.00
3.00
5.50
7.00
5.00

$
$
$
$
$

240.03
6,399.00
148.50
6.80
1,080.00

3.62
0.21
4.20
2.91
2.06
6.00
1.13
1.85

m3
m3
m2
m2
m3
m
m2
m3

3
3
3
3
3
3
3
3

$
$
$
$
$
$
$
$

7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00

$
$
$
$
$
$
$
$

75.95
121.27
378.00
218.25
1,640.88
72.00
16.88
38.77

1.77
207.00
1.00
0.06
8

m3
kg
No
m3
No

3
3
3
3
3

$
$
$
$
$

7.00
3.00
5.50
7.00
5.00

$
$
$
$
$

37.18
1,863.00
16.50
1.18
120.00

3.6 132 kV Current Transformer


Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 4)

1.03
0.06
1.96
1.32
0.71
2.80
0.49
0.36
0.67
47.00
1
0.02
4

m3
m3
m2
m2
m3
m
m2
m3
m3
kg
No
m3
No

9
9
9
9
9
9
9
9
9
9
9
9
9

$
$
$
$
$
$
$
$
$
$
$
$
$

7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
7.00
3.00
5.50
7.00
5.00

$
$
$
$
$
$
$
$
$
$
$
$
$

64.80
103.46
529.20
297.00
1,683.81
100.80
22.05
22.68
42.12
1,269.00
49.50
1.54
180.00

3.7 132 kV Voltage Transformer


Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO

1.03
0.06
1.96
1.32
0.71
2.80
0.49
0.36

m3
m3
m2
m2
m3
m
m2
m3

9
9
9
9
9
9
9
9

$
$
$
$
$
$
$
$

7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00

$
$
$
$
$
$
$
$

64.80
103.46
529.20
297.00
1,683.81
100.80
22.05
22.68

0.67
47.00
1
0.02
4

m3
kg
No
m3
No

9
9
9
9
9

$
$
$
$
$

7.00
3.00
5.50
7.00
5.00

$
$
$
$
$

42.12
1,269.00
49.50
1.54
180.00

3.83
4.10
3.92
3.12
2.04
5.60
0.98
2.24

m3
m3
m2
m2
m3
m
m2
m3

8
8
8
8
8
8
8
8

$
$
$
$
$
$
$
$

7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00

$
$
$
$
$
$
$
$

214.68
6,232.00
940.80
624.00
4,322.68
179.20
39.20
125.19

1.60
128
1
0.05
8

m3
kg
No
m3
No

8
8
8
8
8

$
$
$
$
$

7.00
3.00
5.50
7.00
5.00

$
$
$
$
$

89.49
3,072.00
44.00
2.74
320.00

1.03
0.06

m3
m3

12
12

$
$

7.00
190.00

$
$

86.39
137.94

page
page
page
page

153
179
179
180

B1-4.2.1 page 66

B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14
B1-4.9.7.14

page152
page 163
page 170
page 170
page 163
page 169
page 169
page 154
page 153

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14
B1-4.9.7.14

page152
page 163
page 170
page 170
page 163
page 169
page 169
page 154
page 153

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14
B1-4.9.7.14

page152
page 163
page 170
page 170
page 163
page 169
page 169
page 154
page 153

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14
B1-4.9.7.14

page152
page 163
page 170
page 170
page 163
page 169
page 169
page 154
page 153

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14 page152
B1-4.9.7.17 page 163

3.5 132 kV Circuit Breaker


Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M24 X 8)

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 4)
3.8 132 kV High Post Insulator
Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M24 X 8)
3.9 132 kV Low Post Insulator
Excavation in insitu material
Blinding - 20mPa (50mm thick)

NEW BWENGU 132/66/33kV Substation


Reference
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14
B1-4.9.7.14

Unit
m2
m2
m3
m
m2
m3

Number
12
12
12
12
12
12

$
$
$
$
$
$

Rate
30.00
25.00
265.00
4.00
5.00
7.00

$
$
$
$
$
$

m3
kg
No
m3
No

12

7.00

56.15

47.00
1
0.02
4

12
12
12
12

$
$
$
$

3.00
5.50
7.00
5.00

$
$
$
$

1,692.00
66.00
2.06
240.00

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

3.10 132 kV Surge Arrestor


Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 4)

1.03
0.06
1.96
1.32
0.71
2.80
0.49
0.36
0.67
47.00
1
0.02
4

m3
m3
m2
m2
m3
m
m2
m3
m3
kg
No
m3
No

6
6
6
6
6
6
6
6
6
6
6
6
6

$
$
$
$
$
$
$
$
$
$
$
$
$

7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
7.00
3.00
5.50
7.00
5.00

$
$
$
$
$
$
$
$
$
$
$
$
$

43.20
68.97
352.80
198.00
1,122.54
67.20
14.70
15.12
28.08
846.00
33.00
1.03
120.00

B1-4.9.7.14 page152
B1-4.9.7.17 page 163
B1-4.9.7.17 page 170
B1-4.9.7.17 page 170
B1-4.9.7.17 page 163
B1-4.9.7.17 page 169
B1-4.9.7.17 page 169
B1-4.9.7.14 page 154
B1-4.9.7.14 page 153
B1-4.9.7.19 page 179
B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

3.12 66 kV Gantry
Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M36 X 8)

8.83
0.42
5.04
3.48
4.29
5.60
1.96
4.52
4.31
233.00
1
0.10
8

m3
m3
m2
m2
m3
m
m2
m3
m3
kg
No
m3
No

2
2
2
2
2
2
2
2
2
2
2
2
2

$
$
$
$
$
$
$
$
$
$
$
$
$

7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
7.00
3.00
5.50
7.00
5.00

$
$
$
$
$
$
$
$
$
$
$
$
$

123.63
159.79
302.40
174.00
2,272.11
44.80
19.60
63.29
60.34
1,398.00
11.00
1.37
80.00

3.13 66 kV Isolator
Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 4)

6.50
0.38
10.08
3.44
3.81
14.4
2.16
2.74
3.76
210
1
0.11
24

m3
m3
m2
m2
m3
m
m2
m3
m3
kg
No
m3
No

8
8
8
8
8
8
8
8
8
8
8
8
8

$
$
$
$
$
$
$
$
$
$
$
$
$

7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
7.00
3.00
5.50
7.00
5.00

$
$
$
$
$
$
$
$
$
$
$
$
$

363.85
580.94
2,419.20
688.80
8,067.02
460.80
86.40
153.29
210.56
5,040.00
44.00
6.05
960.00

3.14 66 kV Circuit Breaker


Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO

2.43
0.14
3.92
3.78
1.54
5.60
0.98
0.74

m3
m3
m2
m2
m3
m
m2
m3

4
4
4
4
4
4
4
4

$
$
$
$
$
$
$
$

7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00

$
$
$
$
$
$
$
$

68.07
108.68
470.40
378.00
1,636.64
89.60
19.60
20.83

1.69
86.00
1
0.05
8

m3
kg
No
m3
No

4
4
4
4
4

$
$
$
$
$

7.00
3.00
5.50
7.00
5.00

$
$
$
$
$

47.24
1,032.00
22.00
1.37
160.00

page
page
page
page
page
page
page

170
170
163
169
169
154
153

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14
B1-4.9.7.14

B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14
B1-4.9.7.14

page152
page 163
page 170
page 170
page 163
page 169
page 169
page 154
page 153

page152
page 163
page 170
page 170
page 163
page 169
page 169
page 154
page 153

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14
B1-4.9.7.14

page152
page 163
page 170
page 170
page 163
page 169
page 169
page 154
page 153

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

No. Description
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 4)

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M24 X 8)

Quantity
1.96
1.32
0.71
2.80
0.49
0.36
0.67

Total
705.60
396.00
2,245.08
134.40
29.40
30.24

NEW BWENGU 132/66/33kV Substation


Reference
B1-4.9.7.14 page152
B1-4.9.7.17 page 163
B1-4.9.7.17 page 170

No. Description
3.15 66 kV Current Transformer
Excavation in insitu material
Blinding - 20mPa (50mm thick)

Quantity

Unit

Number

Rate

Total

1.67
0.10

m
m3

12
12

$
$

7.00
190.00

$
$

139.94
223.44

Smooth Formwork (to be steel or sound timber)

1.96

m2

12

30.00

705.60

B1-4.9.7.17 page 170

Rough formwork (to be steel or sound timber)

1.68

m2

12

25.00

504.00

B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.14

Concrete - 35mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

0.93
2.80
0.49

m
m
m2

12
12
12

$
$
$

265.00
4.00
5.00

$
$
$

2,960.58
134.40
29.40

0.64
1.03
58.00
1

m3
m3
kg
No

12
12
12
12

$
$
$
$

7.00
7.00
3.00
5.50

$
$
$
$

53.51
86.44
2,088.00
66.00

0.02

m3

12

7.00

2.06

No

12

5.00

240.00

page
page
page
page

163
169
169
154

B1-4.9.7.14 page 153


B1-4.9.7.19 page 179
B1-4.9.7.19 page 179

Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)

B1-4.9.7.20 page 180

Grout - 35mPa to top of stub

B1-4.2.1 page 66

Greasing of HD Bolts (M20 X 4)

B1-4.9.7.14 page152

3.16 66 kV Voltage Transformer


Excavation in insitu material

1.67

m3

7.00

104.96

Blinding - 20mPa (50mm thick)


Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

0.10
1.96
1.68
0.93
2.80
0.49

m3
m2
m2
m3
m
m2

9
9
9
9
9
9

$
$
$
$
$
$

190.00
30.00
25.00
265.00
4.00
5.00

$
$
$
$
$
$

167.58
529.20
378.00
2,220.44
100.80
22.05

B1-4.9.7.14 page 154

Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO

0.64

m3

7.00

40.13

B1-4.9.7.14 page 153

Stock pile insitu surplus material (for carting away)

1.03

m3

7.00

64.83

B1-4.9.7.19 page 179

Reinforcing - Supply & Fix only

58.00

kg

3.00

1,566.00

B1-4.9.7.19 page 179

HD Bolts - Template and installation (ABB to supply bolts)

B1-4.9.7.20 page 180

Grout - 35mPa to top of stub

B1-4.2.1 page 66

Greasing of HD Bolts (M20 X 4)

B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17

page
page
page
page
page
page

163
170
170
163
169
169

B1-4.9.7.14 page152

3.17 66 kV Surge Arrestor


Excavation in insitu material

No

5.50

0.02

m3

7.00

1.54

No

5.00

180.00

49.50

1.67

m3

7.00

104.96

B1-4.9.7.17 page 163

Blinding - 20mPa (50mm thick)

0.10

m3

190.00

167.58

B1-4.9.7.17 page 170

Smooth Formwork (to be steel or sound timber)

1.96

30.00

B1-4.9.7.17 page 170


B1-4.9.7.17 page 163

Rough formwork (to be steel or sound timber)

1.68

m2

25.00

378.00

Concrete - 35mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 4)

0.93
2.80
0.49
0.64
1.03
58.00
1
0.02
4

m3
m
m2
m3
m3
kg
No
m3
No

9
9
9
9
9
9
9
9
9

$
$
$
$
$
$
$
$
$

265.00
4.00
5.00
7.00
7.00
3.00
5.50
7.00
5.00

$
$
$
$
$
$
$
$
$

2,220.44
100.80
22.05
40.13
64.83
1,566.00
49.50
1.54
180.00

3.18 66 kV High Post Insulator


Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M24 X 8)

4.28
0.25
3.92
3.00
2.20
5.60
0.98
2.03
2.25
136.00
2
0.05
8

m3
m3
m2
m2
m3
m
m2
m3
m3
kg
No
m3
No

6
6
6
6
6
6
6
6
6
6
6
6
6

$
$
$
$
$
$
$
$
$
$
$
$
$

7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
7.00
3.00
5.50
7.00
5.00

$
$
$
$
$
$
$
$
$
$
$
$
$

179.93
287.28
705.60
450.00
3,494.82
134.40
29.40
85.26
94.67
2,448.00
66.00
2.06
240.00

B1-4.9.7.17 page
B1-4.9.7.17 page
B1-4.9.7.14 page
B1-4.9.7.14 page
B1-4.9.7.19 page
B1-4.9.7.19 page
B1-4.9.7.20 page
B1-4.2.1 page 66

169
169
154
153
179
179
180

B1-4.9.7.14 page152
B1-4.9.7.17 page 163
B1-4.9.7.17 page 170
B1-4.9.7.17 page 170
B1-4.9.7.17 page 163
B1-4.9.7.17 page 169
B1-4.9.7.17 page 169
B1-4.9.7.14 page 154
B1-4.9.7.14 page 153
B1-4.9.7.19 page 179
B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

529.20

3.19 Auxillary
B1-4.9.7.14 page152

Excavation in insitu material

0.49

m3

7.00

3.43

B1-4.9.7.17 page 163

Blinding - 20mPa (50mm thick)

0.10

m3

190.00

18.62

B1-4.9.7.17 page 170

Smooth Formwork (to be steel or sound timber)

2.24

30.00

B1-4.9.7.17 page 170

Rough formwork (to be steel or sound timber)

m2

25.00

B1-4.9.7.17 page 163


B1-4.9.7.17 page 169
B1-4.9.7.17 page 169

Concrete - 35mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

0.78
5.6
1.96

m3
m
m2

1
1
1

$
$
$

265.00
4.00
5.00

$
$
$

B1-4.9.7.14 page 154


B1-4.9.7.14 page 153

Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO

0.00

m3

7.00

Stock pile insitu surplus material (for carting away)

0.49

m3

7.00

3.43

B1-4.9.7.19 page 179

Reinforcing - Supply & Fix only


HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts

3.92
1
0.10
4

m2
No
m3
No

1
1
1
1

$
$
$
$

3.00
5.50
7.00
5.00

$
$
$
$

11.76
5.50
0.69
20.00

B1-4.9.7.19 page 179


B1-4.9.7.20 page 180
B1-4.2.1 page 66

67.20
207.76
22.40
9.80

NEW BWENGU 132/66/33kV Substation


Reference

No. Description

Quantity

Unit

Number

Rate

Total

3.20 Yard Marshalling Kiosk


B1-4.9.7.14 page152

Excavation in insitu material

0.13

m3

7.00

5.29

B1-4.9.7.17 page
B1-4.9.7.17 page
B1-4.9.7.17 page
B1-4.9.7.17 page
B1-4.9.7.17 page
B1-4.9.7.17 page
B1-4.9.7.14 page
B1-4.9.7.14 page
B1-4.9.7.19 page
B1-4.9.7.19 page
B1-4.9.7.20 page
B1-4.2.1 page 66

Blinding - 20mPa (50mm thick)


Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts

0.03
0.96
0
0.19
3.20
0.63
0.00
0.13
0
0
0.03
0

m3
m2
m2
m3
m
m2
m3
m3
kg
No
m3
No

6
6
6
6
6
6
6
6
6
6
6
6

$
$
$
$
$
$
$
$
$
$
$
$

190.00
30.00
25.00
265.00
4.00
5.00
7.00
7.00
3.00
5.50
7.00
5.00

$
$
$
$
$
$
$
$
$
$
$
$

35.91
172.80
300.51
76.80
18.90
5.46
1.32
-

6.01
0.58
2.94
4.39
1.69
12.23

m3
m3
m3
m3
m3
m3

$
$
$
$
$
$

7.00
7.00
7.00
7.00
7.00
7.00

$
$
$
$
$
$

42.07
4.03
20.58
30.76
11.83
85.61

0.55
0.03
0.42
1.10

m3
m3
m3
m3

$
$
$
$

190.00
190.00
190.00
190.00

$
$
$
$

103.80
6.08
79.80
208.72

2.19
0.37
5.04
2.20

m3
m3
m3
m3

$
$
$
$

260.00
260.00
260.00
260.00

$
$
$
$

568.15
95.94
1,310.40
571.22

1.82
7.08

m2
m2

$
$

2.00
2.00

$
$

3.64
14.16

9.71
11.80

m2
m

$
$

20.00
20.00

$
$

194.24
236.00

21.97
8.40

m2
m2

$
$

8.00
8.00

$
$

175.76
67.20

21.97
16.8

m2
m2

$
$

8.00
8.00

$
$

175.76
134.40

21.97

m2

40.00

878.80

m3
m2
m2
m
m
Item
m2

$
$
$
$

19.00
1.00
1.00
100.00
150
500
10

$
$
$
$
$
$
$

41.74
160.86
68.94
2,218.00
900.00
500.00
303.69

163
170
170
163
169
169
154
153
179
179
180

B1-4.9.7.14 page152

B1-4.9.7.14 page 154


B1-4.9.7.17 page 163

B1-4.9.7.17 page 163

B1-4.9.7.17 page 170

B1-4.9.7.17page 170
B1-4.9.7.17page 169

B1-4.9.7.19 page 179

3.21 Transformer Plinth (1)


Excavations in insitu material:
Strip excavations
Sump excavations
Plinth
Surface bed
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
Stock pile insitu surplus material (for carting away)
Blinding - 20mPa (50mm thick):
Strip Footing concrete
Sump Concrete
Plinth
Surface bed
Concrete - 35mPa, 19mm Stone:
Strip Footing concrete
Sump Concrete
Plinth
Surface bed
Formwork:
Smooth Formwork:
Sump walls
Plinth
Rough Formwork:
Strip footing
25 x 25mm Chamfer to sides of plinth
Concrete finish wood float:
Surface bed
Plinth
Reinforcing (MESH ref 617):
Surface bed
Plinth
Sundries:
Sump frame - 30 x 30 x 5Lg cast in and galvanised. 25 x 5mm flat x 100Lg fishtail lugs weld
to angle (5mm fillet) at 500mm c/c. To fit in the open grid which is 1600mm wide with 30 x
4.5mm bearer bars, and 40 x 40mm openings (fully banded)
75 to 100mm Diameter gravel to fill oil drain

B1-4.9.7.22 page 181


B1-4.9.7.22 page 184
B1-4.9.7.17 page 165

Brickwork (including stairs)


Brickforce 120mm wide (every second layer)
Construction/expansion joints between concrete and brick
50 x 3 flat copper bend to suit connection on transformer points
Benching the inside of the sump with 20mm benching render
Paint x 2 layers of bitumen to surface

2.20
160.86
68.94
22.18
6
1
30.37

NEW BWENGU 132/66/33kV Substation


Reference

No. Description

B1-4.9.7.14 page 152

B1-4.9.7.14 page 154


B1-4.9.7.17 page 163

B1-4.9.7.17 page 163

B1-4.9.7.17 page 170

B1-4.9.7.17 page 170


B1-4.9.7.17 page 170

B1-4.9.7.19 page 179

B1-4.9.7.22 page 181


B1-4.9.7.22 page 184
B1-4.9.7.17 page 165

B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.22
B1-4.9.7.17

page152
page 163
page 163
page 170
page 163
page 163
page 181
page 170

B1-4.9.7.14
B1-4.9.7.14
B1-4.9.7.19
B1-4.9.7.20

page
page
page
page

154
153
179
180

3.22 Transformer Plinth (2)


Excavations in insitu material:
Strip excavations
Sump excavations
Plinth
Surface bed
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
Stock pile insitu surplus material (for carting away)
Blinding - 20mPa (50mm thick):
Strip Footing concrete
Sump Concrete
Plinth
Surface bed
Concrete - 35mPa, 19mm Stone:
Strip Footing concrete
Sump Concrete
Plinth
Surface bed
Part of the road
Formwork:
Smooth Formwork:
Sump walls
Plinth
Rough Formwork:
Strip footing
25 x 25mm Chamfer to sides of plinth
Concrete finish woodfloat:
Surface bed
Plinth
Reinforcing (MESH ref 617):
Surface bed
Plinth
Sundries:
Sump frame - 30 x 30 x 5Lg cast in and galvanised. 25 x 5mm flat x 100Lg fishtail lugs weld
to angle (5mm fillet) at 500mm c/c. To fit in the open grid which is 1600mm wide with 30 x
4.5mm bearer bars, and 40 x 40mm openings (fully banded)
75 to 100mm Diameter gravel to fill oil drain
Brickwork (including stairs)
Brickforce 120mm wide (every second layer)
Construction/expansion joints between concrete and brick
50 x 3 flat copper bend to suit connection on transformer points
One set of rails on tranformer plinth
Benching the inside of the sump with 20mm benching render
Paint x 2 layers of bitumen to surface
3.23 Fire Wall
Excavation in insitu material
Blinding - 20mPa (50mm thick)
Foundation wall (35MPa concrete)
Rough formwork
Concrete foundation slab - 35mPa, 19mm Stone
Cavity concrete wall (35MPa)
110mm brickwall
Wood float top of concrete foundation
Precast concrete copings
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
Stock pile insitu surplus material (for carting away)
Reinforcing - mesh
Grout - 25mPa to top of stub

Quantity

Unit

Number

Rate

Total

8.32
0.58
7.35
9.07
4.54
20.78

m3
m3
m3
m3
m3
m3

$
$
$
$
$
$

7.00
7.00
7.00
7.00
7.00
7.00

$
$
$
$
$
$

58.21
4.03
51.45
63.50
31.75
145.45

0.76
0.03
1.05
2.27

m3
m3
m3
m3

$
$
$
$

190.00
190.00
190.00
190.00

$
$
$
$

143.64
6.08
199.50
430.92

3.02
0.33
12.60
4.54
4.41

m3
m3
m3
m3
m3

$
$
$
$
$

260.00
260.00
260.00
260.00
260.00

$
$
$
$
$

786.24
85.02
3,276.00
1,179.36
1,146.60

2.24
11.40

m2
m2

$
$

20.00 $
20.00 $

44.80
228.00

13.46
19

m2
m

$
$

20.00 $
20.00 $

269.28
380.00

45.36
21

m2
m2

$
$

8.00 $
8.00 $

362.88
168.00

45.36
42

m2
m2

$
$

8.00 $
8.00 $

362.88
336.00

45.36

m2

40.00 $

1,814.40

31.28
125.12
2.22
8.00
20.10
1
50

m3
m2
m2
m2
m
m
Item
m2

$
$
$
$
$
$
$
$

19.00
1.00
1.00
100.00
150.00
150.00
500.00
10.00

$
$
$
$
$
$
$
$

86.18
31.28
125.12
222.00
1,200.00
3,015.00
500.00
500.00

17.11
0.63
4.37
26.66
3.80
11.56
114.00
4.33
9.94
8.30
8.81
12.67
0.50

m3
m3
m3
m2
m3
m3
m2
m2
m
m3
m3
m2
m3

$
$
$
$
$
$
$
$
$
$
$
$
$

7.00
190.00
265.00
30.00
265.00
265.00
10.00
5.00
10.00
10.00
6.00
9.00
190.00

$
$
$
$
$
$
$
$
$
$
$
$
$

239.50
240.77
2,318.01
1,599.84
2,014.85
6,128.50
2,280.00
43.30
198.80
165.97
105.71
228.10
188.86

4.54

2
2
2
2
2
2
2
2
2
2
2
2
2

NEW BWENGU 132/66/33kV Substation


Reference
B1-4.9.7.3 page 138

B1-4.9.7.14 page 155


B1-4.9.7.17 page 170

B1-4.9.7.17 page 163

No. Description
3.24 Control Building
Excavations in insitu material:
Strip foundation
Prepare and spary with an approved anti-termite control under building
Stock pile insitu surplus material (for carting away)
Formwork:
Rough formwork (to be steel or sound timber) to sides of foundations
Smooth formwork (to be steel or sound timber) to sides of beams
Smooth formwork (to be steel or sound timber) to sides of columns
Concrete:
Blinding - 20mPa (50mm thick)
Reinforced concrete - 35mPa, 19mm Stone to surface bed
Reinforced concrete - 35mPa, 19mm Stone to foundations
Reinforced concrete - 35mPa, 19mm Stone to columns
Reinforced concrete - 35mPa, 19mm Stone to beams

Quantity

Unit

Number

Rate

Total

56.35

m3

6.00

338.08

337.53

m2

1.10

371.28

56.35

m3

6.00

338.08

148.62
74.31
102

m
m2
m2

$
$
$

25.00
33.00
33.00

$
$
$

3,715.50
2,452.23
3,366.00

3.98

m3

250.00

996.10

67.51

m3

300.00

20,251.84

31.88

m3

300.00

9,562.56

7.65

m3

300.00

2,295.00

10.25

300.00

3,073.68

46.72

15.00

700.80

337.53
1870

m2
kg

$
$

9.00
2.50

$
$

3,037.78
4,675.00

256.52

m2

35.00

8,978.17

114.97
459.88
15.63
337.53

m2
m2
m2
m2

$
$
$
$

21.00
3.00 $
1.00 $
1.20 $

1,379.64
15.63
405.04

Prestressed fabricated concrete lintels:


In lengths not exceeding 3m
B1-4.9.7.19 page 179

Reinforcing:
Reinforcing mesh ref. 395

B1-4.9.7.22 page 181


B1-4.9.7.22
B1-4.9.7.22
B1-4.9.7.22
B1-4.9.7.22
B1-4.9.7.17

page
page
page
page
page

181
184
183
183
170

Reinforcing - Supply & Fix only


Cavity wall - inner skin to be hollow blockwork with insulation and outer skin to be clay
brickwork
200mm Thick blockwork
Brickforce 120mm wide (every second layer)
DPC (Damp proof course)
DPM (Damp proof membrame)

337.53

m2

5.00

Floor Finishes:
Epoxy screed (trowel applied minimum 5 mm thick) and epoxy seal coat - switchgear and
battery charger rooms

26.48

m2

10.00

264.80

Glazed non-slip fully vitrified ceramic tiles - rest room, toilets, kitchen, messroom

37.16

m2

40.00

1,486.27

Heavy duty PVC sheeting - offices


9 mm Non-slip fully vitrified ceramic tiles (floor tiles with epoxy grout) - corridors, stairs,
landings

16.64

m2

20.00

332.88

B1-4.9.7.21 page 180

23.28

m2

50.00

1,163.97

B1-4.9.7.21 page 180

Acid resistant ceramic tiles - battery rooms

B1-4.9.7.21 page 180


B1-4.9.7.21 page 180
B1-4.9.7.21 page 180

B1-4.9.7.21 page 180

Wood float top of concrete

Heavy duty PVC sheeting on false floor - control room, relay rooms, electrical equipment

1,687.65

24.82

m2

100.00

2,481.53

137.46

m2

40.00

5,498.41

B1-4.9.7.21 page 180

Carborundum - A/C plant rooms

15.00

m2

40.00

600.00

B1-4.9.7.21 page 180

Heavy duty PVC / rubber backed tiles - instrument/electrical workrooms

15.00

m2

10.00

150.00

B1-4.9.7.21 page 180

Carborundum and non-slip 3 mm self leveling epoxy screed - basements

15.00

60.00

900.00

B1-4.9.7.21 page 180

3 mm Self leveling epoxy screed with non-slip granule finish - stores workshop, mechanical
work room and store room

36.11

m2

100.00

3,611.36

B1-4.9.7.21 page 180

Dust-proof hard-wearing epoxy coating - transformer pits


6mm Thick checkered plate over internal trench complete

80.40
30.4

m2
m2

$
$

40.00
30.00

$
$

3,216.13
912.00

600 x 500mm deep internal concrete trench. Trench walls and bottom to be 100mm thick

38

Supply, lay, joint and bed 160mm Diameter PVC pipe

10

6.00

60.00

122.18

40.00

4,887.20

638.4

100.05
104.78
23.28
523.75

m
m2
m2
m2
m2

$
$
$
$
$

10.00
5.00
60.00
100.00
4.00

$
$
$
$
$

6,384.00
500.25
6,286.80
2,328.00
2,095.00

231.37

m2

7.00

1,619.59

$
890.00 $
265.00 $
$
$

7,120.00
1,325.00
-

B1-4.9.7.18 page 178

B1-4.9.7.3 page 138


B1-4.9.7.21 page 180

B1-4.9.7.21 page 180


B1-4.9.7.23 page 188

Skirtings:
Heavy duty PVC sheet - to painted walls
Internal Wall Finishes:
Plaster to brickwork and concrete
Fair face blockwork,cement wash, paint - storage and workshop
Glazed ceramic tiles 2.3m high, plaster and paint - kitchen, messroom
Acid/lye resistant tiles 1.2m high - battery room
Paint brickwork and concrete (weatherproof)
External Wall Finish:
Paint on plaster (weatherproof)
Aluminium Frames:
Windows:
Type W1: 2700 x 1090mm Frame including 4mm double glaze complete
Type W2: 900 x 900mm Frame including 4mm double glaze complete
Doors:
Single
Type D3: 885 x 2500mm Frame and steel doors door including all stainless steel
ironmongery complete (external)

8
5

No
No

$
$

No

100.00

200.00

Double
Type D1: 1750 x 2500mm Frame and steel door including all stainless steel ironmongery
complete (external)

No

150.00

300.00

Type D2: 1750 x 2500mm Frame and steel door including all stainless steel ironmongery
complete (external)

No

150.00

600.00

No

100.00

600.00

No

150.00

450.00

Desks (size 1500 x 700mm with drawers)

No

480.00

960.00

Tables (size 2000 x 1000mm)


Swivel chairs
Visitors' chairs (to be plastic)

2
4
2

No
No
No

$
$
$

480.00
265.00
550.00

$
$
$

960.00
1,060.00
1,100.00

Steel:
Doors:
Single
Type D4: 885 x 2100mm Frame and timber doors door including all ironmongery complete
(internal)
Double
Type D2: 1750 x 2500mm Frame and steel door including all ironmongery complete (internal)
4.9.7.3 page 139

Furniture:

NEW BWENGU 132/66/33kV Substation


Reference

B1-4.9.7.23page 191
B1-4.9.7.23page 188

No. Description
Cupboards (two door cupboard with dividing shelves )
Airconditioner central unit in control building
Allow one double door cupboard with shelves underneath sink for kitchen
Two plate electric cooker
Roof:
Corrugated approved roof sheeting - 0.6mm gauge to be fitted inculding all necessary
fittings complete
Welded roof trusses of 30 degrees angle rafters, tie beams, rails, struts, braces, cleats,
purlins, etc and flat bearer, gusset and connection plates, bolted to steel with an overall
lenghth of 12.69m and height of 3.66m (There are 9 trusses)

Quantity
2
1
8
1

Unit
No
Item
No
Item

Number
$
$
$
$

Rate
1,700.00
15.00
612.00
130.00

$
$
$
$

Total
3,400.00
15.00
4,896.00
130.00

427.82

m2

20.00

8,556.46

No

288.00

2,592.00

225 x 15mm ABS cement barge board

29.31

B1-3.6.2.12 page 46

Pre-painted aluminium 150 x 150mm box gutters including necessary collared and sealed
expansion joints

58.36

100.00

5,836.00

B1-3.6.2.12 page 46

Pre-painted aluminium 100 x100mm down pipes, including holderbats, brackets etc

16

100.00

1,600.00

m2

15.00

4,229.94

m2
Item

$
$

20.00
120.00

120.00

2
1

No

190.00

380.00

No

145.00

145.00

No

100.00

200.00

1
2

No
No

$
$

120.00
50.00

$
$

120.00
100.00

8
2

No
No

$
$

260.00
650.00

$
$

2,080.00
1,300.00

4.51
28.03
4.51

m3
m2
m3

$
$
$

6.00
1.10
6.00

$
$
$

27.04
30.83
27.04

15.02
11.75
10.00

m2
m2
m2

$
$
$

25.00
33.00
33.00

$
$
$

375.56
387.64
330.00

1.40

m3

250.00

350.33

4.51

m3

300.00

1,352.02

5.61

m3

300.00

1,681.59

0.6

m3

300.00

180.00

1.13

m3

300.00

338.00

10.26

15.00

153.90

28.03
270

m2
kg

$
$

9.00
2.50

$
$

252.24
675.00

51.44

m2

35.00

1,800.55

13.19
329
3.76
28.03
28.03

m2
m
m2
m2
m2

$
$
$
$
$

21.00
3.00
1.00
1.20
5.00

$
$
$
$
$

276.95
987.00
3.76
33.63
140.13

18

m2

40.00

730.90

18.15

40.00

726.00

70.71
57.80
12.90

m
m2
m2

$
$
$

10.00
10.00
40.00

$
$
$

707.06
578.03
516.12

46.21

m2

5.00

231.06

No

560.00

1,120.00

No

265.00

265.00

No

100.00

200.00

No

100.00

200.00

Ceiling:

B1-4.9.4.1 page 131


B1-4.9.7.4 page 139
B1-9.7.10 page145

Suspended ceiling champered and grooved acoustic panels on concealed suspension grid
including hangers etc
Supply and install approved roof insulation
External steel ladder with safety cage to access roof
Plumbing:
WC with all necessary connections, fittings and piping complete and toilet paper holder
Urinal with all necessary connections, fittings and piping complete

B1-4.9.7.2 page 137

Basin with all necessary connections, fittings and piping complete with soap dispenser and
mirror
Sink with all necessary connections, fittings, gulley and piping complete
Shower with all necessary connections, fittings and piping complete
Extras
Supply and install fire 9kg CO2 extinguisher with sign
Supply and install fire alarm

B1-4.9.7.4 page 139

B1-4.9.7.14 page 155


B1-4.9.7.17 page 170

B1-4.9.7.17 page 163

3.25 Guard House


Excavations in insitu material:
Strip foundation
Prepare and spary with an approved anti-termite control under building
Stock pile insitu surplus material (for carting away)
Formwork:
Rough formwork (to be steel or sound timber) to sides of foundations
Smooth formwork (to be steel or sound timber) to sides of beams
Smooth of sides of columns (to be steel or sound timber)
Concrete:
Blinding - 20mPa (50mm thick)
Reinforced concrete - 35mPa, 19mm Stone to foundations
Reinforced concrete - 35mPa, 19mm Stone to surface bed
Reinforced concrete - 35mPa, 19mm Stone to columns
Reinforced concrete - 35mPa, 19mm Stone to beams

282.00
282.00
1.00

Prestressed fabricated concrete lintels:


In lengths not exceeding 3m
B1-4.9.7.19 page 179

Reinforcing:
Reinforcing mesh ref. 395
Reinforcing - Supply & Fix only

B1-4.9.7.22 page 181

Cavity wall - inner skin to be hollow blockwork with insulation and outer skin to be clay
brickwork

B1-4.9.7.22 page 181

200mm thick block work


Brickforce 120mm wide (every second layer)
DPC (Damp proof course)
DPM (Damp proof membrame)
Wood float top of concrete
Floor Finishes:

B1-4.9.7.22
B1-4.9.7.22
B1-4.9.7.22
B1-4.9.7.17

page
page
page
page

184
183
183
170

B1-4.9.7.21 page 180

Glazed non-slip fully vitrified ceramic tiles - bedroom, toilets, checking room

B1-4.9.7.3 page 138

Skirtings:
Heavy duty PVC sheet - to painted walls
Internal Wall Finishes:
Plaster to brickwork and concrete
Paint on plaster (weatherproof)

B1-4.9.7.21 page 180

B1-4.9.7.21 page 180


B1-4.9.7.23 page 188

Glazed ceramic tiles 2.3m high, plaster and paint - kitchen, messroom
External Wall Finish:
Paint on plaster (weatherproof)
Aluminium Frames:
Windows:
Type W1: 1860 x 1090mm Frame including 4mm double glaze complete
Type W2: 900 x 900mm including Frame 4mm double glaze complete
Doors:
Single
Type D3: 885 x 2100mm Frame and steel door including stainless steel ironmongery
complete (external)

B1-4.9.7.3 page 138

Steel Frames:
Doors:
Single
Type D3: 885 x 2100mm Frame and timber door including all ironmongery complete
(internal)

NEW BWENGU 132/66/33kV Substation


Reference
B1-4.9.7.23 page 188

No. Description
Roof:
Corrugated approved roof sheeting - 0.6mm gauge to be fitted including all necessary
fittings complete
Welded roof trusses of 30 degrees angle rafters, tie beams, rails, struts, braces, cleats,
purlins, etc and flat bearer, gusset and connection plates, bolted to steel with an oveall
lenghth of 4.2m and height of 1.76m (There are 3 trusses)

Quantity

Unit

Number

Rate

Total
$

40.01

m2

20.00

800.28

No

288.00

864.00

B1-3.6.2.12 page 46

Pre-painted aluminium 150 x 150mm box gutters including necessary collared and sealed
expansion joints

11.40

10.00

114.00

B1-3.6.2.12 page 46

Pre-painted aluminium 100 x100mm down pipes, including holderbats, brackets etc

16

10.00

160.00

225 x 15mm ABS cement barge board

14

Ceiling:
Suspended ceiling champered and grooved acoustic panels on concealed suspension grid
including hangers etc
Supply and install approved roof insulation
Supply and install 12 000 BTU airconditioner
Plumbing:
WC with all necessary connections, fittings and piping complete and toilet paper holder

B1-4.9.4.1 page 131


B1-9.7.10 page 145

$
20.21
20.21
1.00
1

m2

15.00

m2
Item

$
$

20.00
450.00

No
No

303.08

$
$
$
190.00 $

404.20
450.00
190.00

100.00

100.00

Basin with all necessary connections, fittings and piping complete with soap dispenser and
mirror
Extras

Supply and install fire 9kg CO2 extinguisher with sign

No

260.00

260.00

Supply and install fire alarm

No

650.00

650.00

735

m3

7.00

5,145.00

735

m3

7.00

5,145.00

5 CABLE TRENCH (refer to drawing no. ZZZ 824-200)


5.1 The excavation in insitu material for construction of 1000mm wide x 500mm deep cast insitu
reinforced concrete trenches including bends and junctions to include 100mm diameter PVC
drain pipe at 4m centres at the bottom of the trench

132

10.00

1,320.00

B1-4.9.7.18 page 178

5.2 Concrete trench cover for 1000mm wide trench (with maximal weight of 50 kg each)

440

No

60.00

26,400.00

B1-4.9.7.18 page 178

5.3 The excavation in insitu material for construction of 500mm wide x 500mm deep cast insitu
reinforced concrete trenches including bends and junctions to include 100mm diameter PVC
drain pipe at 4m centres at the bottom of the trench

42.26

10.00

422.60

141

No

60.00

8,460.00

160

100.00

16,000.00

No

265.00

1,590.00

No

1,800.00

1,800.00

No

1,100.00

1,100.00

B1-4.9.7.2 page 137

B1-4.9.7.14 page 152


B1-4.9.7.14 page 154

B1-4.9.7.18 page 178

4 EARTH MAT
4.1 Excavate 300mm (width) x 1000mm (depth) for earth grids
4.2 Backfilling to earthing grid and compact the ground surface in depths of 300mm compacting
to 95% Mod AASHTO density

B1-4.9.7.18 page 178

5.4 Concrete trench cover for 500mm wide trench (with maximal weight of 50 kg each)

B1-3.6.2.12 page 46

6 DRAINAGE
6.1
Subsoil Drain
Supply, lay and joint 2 x 160mm diameter preferated uPVC pipe to be laid 1100mm
below NGL in trench which is to be lined with geofabric material (bidem gade A6) and
backfill with 50 to 75mm diameter stone, including excavation, temporary support of sides,
keeping excavations dry, complete (refer to drawing no. ZZZ 824-200)
6.2 Construct cast insitu concrete manhole with lid and including excavation in insitu material,
temporary support of sides, keeping excavations dry, complete (refer to drawing no. ZZZ
824-200)
6.3 Construct cast insitu septic tank overall size 2250 X 1950 X 2150mm with lid and including
excavation, temporary support of sides, keeping excavations dry, complete (refer to drawing
no. ZZZ 824-207)
6.4 Construct cast insitu soak pit overall size 2000 x 2000 x 1500mm hole to be filled with 100
to 150mm rock, including excavtion and backfilling (refer to drawing no. ZZZ 824-207)
6.5

B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17

page
page
page
page
page

152
163
170
163
169

B1-4.9.7.17 page 170

Headwall - concrete to fit 450mm diameter concrete pipe (refer to drawing no. ZZZ 824-200)
6.6 Supply, lay, joint and bed 300mm diameter class 50D spigot and socket ended concrete
sewer pipes including necessary bends and tees from transformer to oil/ water separator

No

100.00

100.00

84

15.00

1,260.00

6.7 Supply, lay, joint and bed 450mm diameter class 50D spigot and socket ended concrete
sewer pipes including necessary bends and tees

90

18.00

1,620.00

45

4.00

180.00

356.00

100.00

35,600.00

97.00
3.45
235.00
45.00
12.80
2.00
46.13
97.00
7520.00
8.00
4.00
1.00

m3
m3
m2
m3
m
No
m2
m3
Kg
No
No
m

$
$
$
$
$
$
$
$
$
$
$
$

7.00
190.00
33.00
190.00
1.00
20.00
5.30
6.00
2.50
225.00
120.00
45.00

$
$
$
$
$
$
$
$
$
$
$
$

679.00
656.26
7,755.00
8,550.00
12.80
40.00
244.49
582.00
18,800.00
1,800.00
480.00
45.00

6.8
B1-4.9.7.15 page 156

$
$

Supply, lay, joint and bed 110mm Diameter PVC pipe including necessary bends and tees
6.10 Construct concerte v-drain with a top width of 800mm and bottom width of 100mm including
excavation, temporary support of sides, keeping excavations dry, complete (refer to drawing
no. ZZZ 824-200)

6.11 Oil/ water separator (refer to drawing no. ZZZ 824-200)


Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of concrete to fit covers
100mm Diameter concrete cut out
Wood float top of concrete slab
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
16mm Diameter galvanised iron steps 1650mm long
Heavy duty manhole covers
200mm Diameter steel pipe

NEW BWENGU 132/66/33kV Substation


Reference

No. Description
100mm Diameter ventilator PVC pipe with bend
100mm Diameter concrete pipe
Supply, lay, joint and bed 160mm Diameter uPVC pipe including necessary bends and tees
Paint x 2 layers of bitumen to internal surfaces of separator

B1-4.9.7.23 page 189

B1-4.9.7.23 page 189

7 WATER SUPPLY
7.1 Supply and install 2000L conservancy tank to Control Building above ground including
excavation,backfilling, pipework and fittings to sit on a concrete foundation complete (refer
to drawing no. ZZZ 824-208 & ZZZ 824 - 205)
7.2 Supply and install 250L conservancy tank under the roof of the Control Building including a
motor pump that will be controlled by water level controlled switch in the smaller tank
Hot water dispenser capacity 80L

Quantity
1.00
0.50

Unit
No
m

Number
$
$

Rate
20.00
20.00

$
$

Total
20.00
10.00

2.10

6.00

12.60

259.98

m2

5.00

1,299.90

Item

6,000.00

6,000.00

Item

5,000.00

5,000.00

Item

B1-4.9.7.23 page 189

7.3 50mm Diameter PVC pipe

50

2.00

100.00

B1-4.9.7.23 page 189

7.4 25mm Diameter PVC pipe

40

0.50

20.00

B1-4.9.7.23 page 189

7.5 15mm Diameter PVC pipe

35

0.50

17.50

6750
3375
3174.30
733.2

m3
m3
m3
m3

$
$
$
$

7.00
25.00
20.00
19.00

$
$
$
$

47,250.00
84,375.00
63,486.00
13,930.80

398.4
199.2
174.30
33.2

m3
m3
m3
m3

$
$
$
$

7.00
25.00
20.00
19.00

$
$
$
$

2,788.80
4,980.00
3,486.00
630.80

No

1,000.00

2,000.00

No

30.00

150.00

110

m2

500.00

55,000.00

No

350.00

1,750.00

699.00

2.00

1,398.00

Item
Item
m

$
$
$

10.00
10.00
2.00

$
$
$

30.00
10.00
100.00

B1-4.9.7.14
B1-4.9.7.15
B1-4.9.7.15
B1-4.9.7.15

page
page
page
page

152
156
156
158

B1-4.9.7.14
B1-4.9.7.15
B1-4.9.7.15
B1-4.9.7.15

page
page
page
page

152
156
156
158

B1-4.9.7.15 page 156


B1-4.9.7.15 page 159

8 ROAD - ACCESS AND INTERNAL


8.1 Access road
Excavation in insitu material
Sub-Base of G5 material compacted to 98% MOD AASHTO
Wet-mix road base of G6 material Compacted to 98% MOD AASHTO
40mm Thick wearing course of bitumen macadam grade 60/70 penetration
8.2 Internal road
Excavation in insitu material
Sub-Base of G5 material compacted to 98% MOD AASHTO
Wet-mix road base of G6 material Compacted to 98% MOD AASHTO
40mm Thick wearing course of bitumen macadam grade 60/70 penetration
8.3 Insitu reinforced concrete ramps to be constructed at the end of the internal road to about
6000mm wide
8.4 Road crossing over 5m wide road for cable trench.Precast concrete culvet (size 1200 x 900 x
600mm and the internal walls to be 100mm thick)
8.5 Segmented paving - Supply and lay 80 mm interlocking concrete pavers including 50 mm
sand bed (max 30 mm); edge restraint and cutting of units where required: Strength: 25 Mpa

B1-4.9.7.3 page 139

8.6 Insitu reinforced concrete ramps to be constructed in front of control building doors to be
about 1800mm wide

B02-4.7.9 page 81
B1-4.9.7.10 page 146

8.7 Kerbing including bends and end pieces


8.8 Road markings:
Stop sign
Yield sign
Painting of parking lines
9 YARD WORKS
9.1 Cattle fence - 4 barbed galvanised wire fence with steel posts spaced at 5m including corner
posts and all necessay fixing

B1-4.9.7.17 page 171

9.2 The complete, supply and installation of a security fence, including earthing of all metal
parts, gates etc. 2m High diamond mesh plastic coated galvanised steel wire and 300mmflat
wrap razor wire on the overhang fence and consists of a vertical post with 45 degree
inclination at the apex, fence to be fixed on a ring-beam foundation

B1-4.9.7.17 page 171

9.3

B1-4.9.7.17 page 171

9.4 1m Wide pedestrian gate with a frame height that matches the fence

B1-4.9.7.14 page 155

9.5 Prepare and comply with an approved weed control and spread over substation

B1-4.9.7.14 page 156

9.6 Supply and application of 10 to 30mm stone, 200mm deep, to one meter beyond fences,
including levelling and rolling to compact the stone layer.

5m Wide motorised electric fence, with a frame height that match the fence.

B1-4.9.7.2 page 137

9.7 Construct a fire equipment brickwork kiosk

B1-3.6.2.13 page 46

9.8 Landscaping - Planting of medium-high growing plants and grass (Subject to approval of
Employer)

3
1
50

1054

678.00

No

No

14,784.70

m2

14,784.70

m2

2.00
78,389.00

200.00

500.00
100.00
1.00
15.00

135,600.00

500.00

100.00

14,784.70

221,770.50

Item

1,000.00

2,000.00

m2

1,000.00

78,389,000.00

80,199,658.39

80,199,658.39

Subtotal
Vat 16%
Final Total

BUNDA
Reference
B1-3.6.2.15 page 49

B1-3.6.2.14 page 47

No.

Description
1 P & G's
1.1 Geotechnical report (bore logs, trial pits, sounding logs) and to i
Actual ground level
Description and limits of various soil layers
Sample taken
SPT results
Water levels
Depth of borehole/pit/sounding
1.2 Topographic survey (10 meter grids and 0.5 meter vertical inter
Obtain topographic survey maps
Ensure position and elevation of all works are correct
1.3 Costs for obligations, equipment or labour, although not specifie
Contract in terms of the specification and Statutory Requiremen

1.4 Establishment of site camp and stores including site clearance f


requirements
1.5
Allow 1 x office and 1 x boardroom for ABB (containers to includ
standard tables,12 x chairs,1 x mini fridge, 2x cupboard with sh
lights)
1.6 Temporary latrines and sanitary (allowed 1x for ABB office)

1.7 Temporary fence around site establishment


1.10 Temporary gate
1.11 Temporary water connection
1.12 Temporary electricity connection/generator (20kVA)
1.13 Water usage
1.14 Electricity/petrol or diesel
1.15 Tempoary site sign board
1.16 Supervision & Labour
1.17 Health and Saftey - safety signs and PPE according to ABB speci
1.18 Security guard (allow 1x person for day watch and 1 x person fo
1.19 De-establishment of site camp and stores
B1-4.9.7.13 page 151

2 SITE WORKS - DEMOLISHING


2.1 Demolish and remove equipment concrete foundations

2.2 Demolish and remove guard house including grubbing up of fou

2.3 Demolish and remove existing control building including grubbi


x 7m wide)

2.4 Demolish and remove existing house including grubbing up of fo


wide)

2.5 Demolish and remove existing house including grubbing up of fo


wide)

2.6 Demolish and remove boundary brick wall including grudding up


high x 200m length)

BUNDA
Reference

No.

Description
2.7 Demolish and remove concrete v-drain (900mm wide and 400m
2.8 Take down and store on site - steel structures
2.10 Remove yard stone and to be stored for later use on site
2.11 Re-instate yard stone

B1-4.9.7.14 page 152

SITE WORKS - PLATFORM


2.12 Remove all bushes, shrubs and trees and strip 300mm of topsoi
later use. All material not used will be dumped at a site located
from site

B1-4.9.7.14 page 153

2.13 Rate for overhaul per m3 of spoil for a distance greater than 10
2.14 Bulk excavations (cut) in insitu material
2.15 Extra over bulk excavations in clay and black cotton
2.16 Extra bulk excavations in intermediate material
2.17 Extra over bulk excavations in hard rock

Level and compact final cut layer to 95% Mod AASHTO


2.18 Backfill (fill) with insitu material and compact the ground surfac
compacting to 95% Mod AASHTO density

2.19 Backfill with imported G6 material and compact the ground surf
compacting to 95% Mod AASHTO density
B1-4.9.7.14 page 155

B02-4.6.7 page 77

2.20 Backfill with imported G5 material and compact the ground surf
compacting to 95% Mod AASHTO density

3 TESTS (shall be performed for each 500m 3 of fill)


Analyzing the ingredients of the water used for performance of
Gravity of soil
Bearing capacity of soil for static load
Brain size analysis of soils, if "Replacement of Material" is requir
Density of soil in place of sandcone method for each second lay
replacement of material and/or roadwork"
Cement
Aggregate
Sand
Fillers
Concrete cubes
3.1 Keeping all foundations free of water
3.2 Risk of collapse to sides of all excavations

B1-4.9.7.14 page152

3.3 132 kV Gantry


Excavation in insitu material

BUNDA
Reference
B1-4.9.7.17 page 163

No.

Description
Blinding - 20mPa (50mm thick)

B1-4.9.7.17 page 170

Smooth Formwork (to be steel or sound timber)

B1-4.9.7.17 page 170

Rough formwork (to be steel or sound timber)

B1-4.9.7.17 page 163


B1-4.9.7.17 page 169
B1-4.9.7.17 page 169

Concrete - 35mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

B1-4.9.7.14 page 154

Backfill with excavated insitu material in depths of 150mm to 97

B1-4.9.7.14 page 153

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M36 X 8)

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

BUNDA
Reference

B1-4.9.7.14 page152

No.

Description
3.4 132 kV Isolator
Excavation in insitu material

B1-4.9.7.17 page 163

Blinding - 20mPa (50mm thick)

B1-4.9.7.17 page 170

Smooth Formwork (to be steel or sound timber)

B1-4.9.7.17 page 170

Rough formwork (to be steel or sound timber)

B1-4.9.7.17 page 163


B1-4.9.7.17 page 169
B1-4.9.7.17 page 169

Concrete - 35mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

B1-4.9.7.14 page 154

Backfill with excavated insitu material in depths of 150mm to 97

B1-4.9.7.14 page 153

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M24X 8)

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14 page152

3.5 132 kV Circuit Breaker


Excavation in insitu material

B1-4.9.7.17 page 163

Blinding - 20mPa (50mm thick)

B1-4.9.7.17 page 170

Smooth Formwork (to be steel or sound timber)

B1-4.9.7.17 page 170

Rough formwork (to be steel or sound timber)

B1-4.9.7.17 page 163


B1-4.9.7.17 page 169
B1-4.9.7.17 page 169

Concrete - 35mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

B1-4.9.7.14 page 154

Backfill with excavated insitu material in depths of 150mm to 97

B1-4.9.7.14 page 153

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M24 X 8)

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14 page152

3.6 132 kV Current Transformer


Excavation in insitu material

B1-4.9.7.17 page 163

Blinding - 20mPa (50mm thick)

B1-4.9.7.17 page 170

Smooth Formwork (to be steel or sound timber)

B1-4.9.7.17 page 170

Rough formwork (to be steel or sound timber)

B1-4.9.7.17 page 163


B1-4.9.7.17 page 169
B1-4.9.7.17 page 169

Concrete - 35mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

B1-4.9.7.14 page 154

Backfill with excavated insitu material in depths of 150mm to 97

B1-4.9.7.14 page 153

Stock pile insitu surplus material (for carting away)

BUNDA
Reference
B1-4.9.7.19 page 179
B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14 page152

No.

Description
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 4)
3.7 132 kV Voltage Transformer
Excavation in insitu material

B1-4.9.7.17 page 163

Blinding - 20mPa (50mm thick)

B1-4.9.7.17 page 170

Smooth Formwork (to be steel or sound timber)

B1-4.9.7.17 page 170

Rough formwork (to be steel or sound timber)

B1-4.9.7.17 page 163

Concrete - 35mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub

B1-4.9.7.17 page 169


B1-4.9.7.17 page 169
B1-4.9.7.14 page 154
B1-4.9.7.14 page
B1-4.9.7.19 page
B1-4.9.7.19 page
B1-4.9.7.20 page
B1-4.2.1 page 66

153
179
179
180

B1-4.9.7.14 page152
B1-4.9.7.17 page 163

Wood float top of concrete foundation

Backfill with excavated insitu material in depths of 150mm to 97


Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 4)
3.8 132 kV High Post Insulator
Excavation in insitu material

B1-4.9.7.17 page 169


B1-4.9.7.17 page 169

Blinding - 20mPa (50mm thick)


Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

B1-4.9.7.14 page 154

Backfill with excavated insitu material in depths of 150mm to 97

B1-4.9.7.14 page 153

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M24 X 8)

B1-4.9.7.17 page 170


B1-4.9.7.17 page 170
B1-4.9.7.17 page 163

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14 page152

3.9 132 kV Low Post Insulator


Excavation in insitu material

B1-4.9.7.17 page 163

Blinding - 20mPa (50mm thick)

B1-4.9.7.17 page 170

Smooth Formwork (to be steel or sound timber)

B1-4.9.7.17 page 170

Rough formwork (to be steel or sound timber)

B1-4.9.7.17 page 163

Concrete - 35mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub

B1-4.9.7.17 page 169

BUNDA
Reference
B1-4.9.7.17 page 169

No.

Description
Wood float top of concrete foundation

B1-4.9.7.14 page 154

Backfill with excavated insitu material in depths of 150mm to 97

B1-4.9.7.14 page 153

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 4)

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14 page152

3.10 132 kV Surge Arrestor


Excavation in insitu material

B1-4.9.7.17 page 163

Blinding - 20mPa (50mm thick)

B1-4.9.7.17 page 170

Smooth Formwork (to be steel or sound timber)

B1-4.9.7.17 page 170

Rough formwork (to be steel or sound timber)

B1-4.9.7.17 page 163


B1-4.9.7.17 page 169
B1-4.9.7.17 page 169

Concrete - 35mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

B1-4.9.7.14 page 154

Backfill with excavated insitu material in depths of 150mm to 97

B1-4.9.7.14 page 153

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 4)

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14 page152

3.12 66 kV Gantry
Excavation in insitu material

B1-4.9.7.17 page 163

Blinding - 20mPa (50mm thick)

B1-4.9.7.17 page 170

Smooth Formwork (to be steel or sound timber)

B1-4.9.7.17 page 170

Rough formwork (to be steel or sound timber)

B1-4.9.7.17 page 163


B1-4.9.7.17 page 169
B1-4.9.7.17 page 169

Concrete - 35mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

B1-4.9.7.14 page 154

Backfill with excavated insitu material in depths of 150mm to 97

B1-4.9.7.14 page 153

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M36 X 8)

B1-4.9.7.19 page 179


B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14 page152
B1-4.9.7.17 page 163

3.13 66 kV Isolator
Excavation in insitu material
Blinding - 20mPa (50mm thick)

BUNDA
Reference
B1-4.9.7.17 page
B1-4.9.7.17 page
B1-4.9.7.17 page
B1-4.9.7.17 page
B1-4.9.7.17 page
B1-4.9.7.14 page
B1-4.9.7.14 page
B1-4.9.7.19 page
B1-4.9.7.19 page
B1-4.9.7.20 page
B1-4.2.1 page 66

No.
170
170
163
169
169
154
153
179
179
180

Description
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150mm to 97
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 4)

B1-4.9.7.14 page152
B1-4.9.7.17 page 163
B1-4.9.7.17 page 170
B1-4.9.7.17 page 170
B1-4.9.7.17 page 163
B1-4.9.7.17 page 169
B1-4.9.7.17 page 169
B1-4.9.7.14 page 154
B1-4.9.7.14 page 153
B1-4.9.7.19 page 179
B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

3.14 66 kV Circuit Breaker


Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150mm to 97
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M24 X 8)

B1-4.9.7.14 page152
B1-4.9.7.17 page 163
B1-4.9.7.17 page 170
B1-4.9.7.17 page 170
B1-4.9.7.17 page 163
B1-4.9.7.17 page 169
B1-4.9.7.17 page 169
B1-4.9.7.14 page 154
B1-4.9.7.14 page 153
B1-4.9.7.19 page 179
B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

3.15 66 kV Current Transformer


Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150mm to 97
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 4)

B1-4.9.7.14 page152

3.16 66 kV Voltage Transformer


Excavation in insitu material

BUNDA
Reference
B1-4.9.7.17 page
B1-4.9.7.17 page
B1-4.9.7.17 page
B1-4.9.7.17 page
B1-4.9.7.17 page
B1-4.9.7.17 page
B1-4.9.7.14 page
B1-4.9.7.14 page
B1-4.9.7.19 page
B1-4.9.7.19 page
B1-4.9.7.20 page
B1-4.2.1 page 66

No.
163
170
170
163
169
169
154
153
179
179
180

Description
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150mm to 97
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 4)

B1-4.9.7.14 page152
B1-4.9.7.17 page 163
B1-4.9.7.17 page 170
B1-4.9.7.17 page 170
B1-4.9.7.17 page 163
B1-4.9.7.17 page 169
B1-4.9.7.17 page 169
B1-4.9.7.14 page 154
B1-4.9.7.14 page 153
B1-4.9.7.19 page 179
B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

3.17 66 kV Surge Arrestor


Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150mm to 97
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M20 X 4)

B1-4.9.7.14 page152
B1-4.9.7.17 page 163
B1-4.9.7.17 page 170
B1-4.9.7.17 page 170
B1-4.9.7.17 page 163
B1-4.9.7.17 page 169
B1-4.9.7.17 page 169
B1-4.9.7.14 page 154
B1-4.9.7.14 page 153
B1-4.9.7.19 page 179
B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

3.18 66 kV High Post Insulator


Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150mm to 97
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts (M24 X 8)
Auxillary

BUNDA
Reference
B1-4.9.7.14 page152
B1-4.9.7.17 page 163
B1-4.9.7.17 page 170
B1-4.9.7.17 page 170
B1-4.9.7.17 page 163
B1-4.9.7.17 page 169
B1-4.9.7.17 page 169
B1-4.9.7.14 page 154
B1-4.9.7.14 page 153
B1-4.9.7.19 page 179
B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14 page152
B1-4.9.7.17 page 163
B1-4.9.7.17 page 170
B1-4.9.7.17 page 170
B1-4.9.7.17 page 163
B1-4.9.7.17 page 169
B1-4.9.7.17 page 169
B1-4.9.7.14 page 154
B1-4.9.7.14 page 153
B1-4.9.7.19 page 179
B1-4.9.7.19 page 179
B1-4.9.7.20 page 180
B1-4.2.1 page 66

B1-4.9.7.14 page152

B1-4.9.7.14 page 154


B1-4.9.7.17 page 163

B1-4.9.7.17 page 163

No.

Description
Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150mm to 97
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts

3.20 Yard Marshalling Kiosk


Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Rough formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation
Backfill with excavated insitu material in depths of 150mm to 97
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub
Greasing of HD Bolts

3.21 Transformer Plinth (1)


Excavations in insitu material:
Strip excavations
Sump excavations
Plinth
Surface bed
Backfill with excavated insitu material in depths of 150mm to 97
Stock pile insitu surplus material (for carting away)
Blinding - 20mPa (50mm thick):
Strip Footing concrete
Sump Concrete
Plinth
Surface bed
Concrete - 35mPa, 19mm Stone:

BUNDA
Reference

B1-4.9.7.17 page 170

B1-4.9.7.17page 170
B1-4.9.7.17page 169

B1-4.9.7.19 page 179

B1-4.9.7.22 page 181


B1-4.9.7.22 page 184
B1-4.9.7.17 page 165

B1-4.9.7.14 page 152

B1-4.9.7.14 page 154


B1-4.9.7.17 page 163

B1-4.9.7.17 page 163

No.

Description
Strip Footing concrete
Sump Concrete
Plinth
Surface bed
Formwork:
Smooth Formwork:
Sump walls
Plinth
Rough Formwork:
Strip footing
25 x 25mm Chamfer to sides of plinth
Concrete finish wood float:
Surface bed
Plinth
Reinforcing (MESH ref 617):
Surface bed
Plinth
Sundries:
Sump frame - 30 x 30 x 5Lg cast in and galvanised. 25 x 5mm fl
angle
(5mm fillet)
at 500mm
the open grid which is
75 to 100mm
Diameter
gravelc/c.
to To
fill fit
oilin
drain

Brickwork (including stairs)


Brickforce 120mm wide (every second layer)
Construction/expansion joints between concrete and brick
50 x 3 flat copper bend to suit connection on transformer points
Benching the inside of the sump with 20mm benching render
Paint x 2 layers of bitumen to surface

3.22 Transformer Plinth (2)


Excavations in insitu material:
Strip excavations
Sump excavations
Plinth
Surface bed
Backfill with excavated insitu material in depths of 150mm to 97
Stock pile insitu surplus material (for carting away)
Blinding - 20mPa (50mm thick):
Strip Footing concrete
Sump Concrete
Plinth
Surface bed
Concrete - 35mPa, 19mm Stone:
Strip Footing concrete
Sump Concrete

BUNDA
Reference

No.

B1-4.9.7.17 page 170

B1-4.9.7.17 page 170


B1-4.9.7.17 page 170

B1-4.9.7.19 page 179

Description
Plinth

Surface bed
Part of the road
Formwork:
Smooth Formwork:
Sump walls
Plinth
Rough Formwork:
Strip footing
25 x 25mm Chamfer to sides of plinth
Concrete finish woodfloat:
Surface bed
Plinth
Reinforcing (MESH ref 617):
Surface bed
Plinth
Sundries:
Sump frame - 30 x 30 x 5Lg cast in and galvanised. 25 x 5mm fl
angle (5mm fillet) at 500mm c/c. To fit in the open grid which is
bearer bars, and 40 x 40mm openings (fully banded)
75 to 100mm Diameter gravel to fill oil drain

B1-4.9.7.22 page 181


B1-4.9.7.22 page 184
B1-4.9.7.17 page 165

B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.22
B1-4.9.7.17

page152
page 163
page 163
page 170
page 163
page 163
page 181
page 170

B1-4.9.7.14 page 154


B1-4.9.7.14 page 153
B1-4.9.7.19 page 179

Brickwork (including stairs)


Brickforce 120mm wide (every second layer)
Construction/expansion joints between concrete and brick
50 x 3 flat copper bend to suit connection on transformer points
One set of rails on tranformer plinth
Benching the inside of the sump with 20mm benching render
Paint x 2 layers of bitumen to surface

3.23 Fire Wall


Excavation in insitu material
Blinding - 20mPa (50mm thick)
Foundation wall (35MPa concrete)
Rough formwork
Concrete foundation slab - 35mPa, 19mm Stone
Cavity concrete wall (35MPa)
110mm brickwall
Wood float top of concrete foundation
Precast concrete copings
Backfill with excavated insitu material in depths of 150mm to 97
Stock pile insitu surplus material (for carting away)
Reinforcing - mesh

BUNDA
Reference
B1-4.9.7.20 page 180
B1-4.9.7.3 page 138

B1-4.9.7.14 page 155


B1-4.9.7.17 page 170

B1-4.9.7.17 page 163

B1-4.9.7.19 page 179

No.

Description
Grout - 25mPa to top of stub
3.24 Control Building
Excavations in insitu material:

Strip foundation
Prepare and spary with an approved anti-termite control under b

Stock pile insitu surplus material (for carting away)


Formwork:
Rough formwork (to be steel or sound timber) to sides of founda
Smooth formwork (to be steel or sound timber) to sides of beam
Smooth formwork (to be steel or sound timber) to sides of colum
Concrete:
Blinding - 20mPa (50mm thick)
Reinforced concrete - 35mPa, 19mm Stone to surface bed
Reinforced concrete - 35mPa, 19mm Stone to foundations
Reinforced concrete - 35mPa, 19mm Stone to columns
Reinforced concrete - 35mPa, 19mm Stone to beams
Prestressed fabricated concrete lintels:
In lengths not exceeding 3m
Reinforcing:
Reinforcing mesh ref. 395
Reinforcing - Supply & Fix only

B1-4.9.7.22 page 181

Cavity wall - inner skin to be hollow blockwork with insulation an


brickwork

B1-4.9.7.22
B1-4.9.7.22
B1-4.9.7.22
B1-4.9.7.22
B1-4.9.7.17

200mm Thick blockwork


Brickforce 120mm wide (every second layer)
DPC (Damp proof course)
DPM (Damp proof membrame)
Wood float top of concrete
Floor Finishes:
Epoxy screed (trowel applied minimum 5 mm thick) and epoxy s
battery charger rooms

page
page
page
page
page

181
184
183
183
170

B1-4.9.7.21 page 180


B1-4.9.7.21 page 180
B1-4.9.7.21 page 180
B1-4.9.7.21 page 180
B1-4.9.7.21 page 180
B1-4.9.7.21 page 180
B1-4.9.7.21 page 180
B1-4.9.7.21 page 180
B1-4.9.7.21 page 180

Glazed non-slip fully vitrified ceramic tiles - rest room, toilets, ki


Heavy duty PVC sheeting - offices
9 mm Non-slip fully vitrified ceramic tiles (floor tiles with epoxy
landings
Acid
resistant ceramic tiles - battery rooms

Heavy duty PVC sheeting on false floor - control room, relay room

Carborundum - A/C plant rooms


Heavy duty PVC / rubber backed tiles - instrument/electrical wor
Carborundum and non-slip 3 mm self leveling epoxy screed - ba

BUNDA
Reference
B1-4.9.7.21 page 180
B1-4.9.7.21 page 180
B1-4.9.7.18 page 178

No.

Description

3 mm Self leveling epoxy screed with non-slip granule finish - st


room and store room
Dust-proof hard-wearing epoxy coating - transformer pits
6mm Thick checkered plate over internal trench complete

600 x 500mm deep internal concrete trench. Trench walls and b


Supply, lay, joint and bed 160mm Diameter PVC pipe
B1-4.9.7.3 page 138
B1-4.9.7.21 page 180

Skirtings:
Heavy duty PVC sheet - to painted walls
Internal Wall Finishes:
Plaster to brickwork and concrete
Fair face blockwork,cement wash, paint - storage and workshop

B1-4.9.7.21 page 180

Glazed ceramic tiles 2.3m high, plaster and paint - kitchen, mes
Acid/lye resistant tiles 1.2m high - battery room
Paint brickwork and concrete (weatherproof)
External Wall Finish:
Paint on plaster (weatherproof)
Aluminium Frames:
Windows:

B1-4.9.7.23 page 188

Type W1: 2700 x 1090mm Frame including 4mm double glaze c

Type W2: 900 x 900mm Frame including 4mm double glaze com
Doors:

Single
Type D3: 885 x 2500mm Frame and steel doors door including a
complete (external)
Double

Type D1: 1750 x 2500mm Frame and steel door including all sta
complete
(external)
Type D2: 1750
x 2500mm Frame and steel door including all sta
complete (external)
Steel:
Doors:
Single

4.9.7.3 page 139

Type D4: 885 x 2100mm Frame and timber doors door including
(internal)
Double
Type D2: 1750 x 2500mm Frame and steel door including all iron
Furniture:
Desks (size 1500 x 700mm with drawers)
Tables (size 2000 x 1000mm)
Swivel chairs
Visitors' chairs (to be plastic)
Cupboards (two door cupboard with dividing shelves )
Airconditioner central unit in control building

BUNDA
Reference
B1-4.9.7.23page 191
B1-4.9.7.23page 188

B1-3.6.2.12 page 46
B1-3.6.2.12 page 46

B1-4.9.4.1 page 131


B1-4.9.7.4 page 139
B1-9.7.10 page145

B1-4.9.7.2 page 137

No.

Description
Allow one double door cupboard with shelves underneath sink fo
Two plate electric cooker
Roof:
Corrugated approved roof sheeting - 0.6mm gauge to be fitted i
complete
Welded roof trusses of 30 degrees angle rafters, tie beams, rails
etc and flat bearer, gusset and connection plates, bolted to stee
12.69m and height of 3.66m (There are 9 trusses)

225 x 15mm ABS cement barge board


Pre-painted aluminium 150 x 150mm box gutters including nece
expansion
Pre-paintedjoints
aluminium 100 x100mm down pipes, including hold
Ceiling:

Suspended ceiling champered and grooved acoustic panels on c


including hangers etc
Supply and install approved roof insulation
External steel ladder with safety cage to access roof
Plumbing:
WC with all necessary connections, fittings and piping complete

Urinal with
with all
all necessary
necessary connections,
connections, fittings
fittings and
and piping
piping comple
comple
Basin
mirror
Sink with all necessary connections, fittings, gulley and piping c
Shower with all necessary connections, fittings and piping comp
Extras
Supply and install fire 9kg CO2 extinguisher with sign
Supply and install fire alarm

B1-4.9.7.4 page 139

3.25 Guard House


Excavations in insitu material:
Strip foundation

B1-4.9.7.14 page 155


B1-4.9.7.17 page 170

B1-4.9.7.17 page 163

Prepare and spary with an approved anti-termite control under b


Stock pile insitu surplus material (for carting away)
Formwork:
Rough formwork (to be steel or sound timber) to sides of founda
Smooth formwork (to be steel or sound timber) to sides of beam
Smooth of sides of columns (to be steel or sound timber)
Concrete:
Blinding - 20mPa (50mm thick)
Reinforced concrete - 35mPa, 19mm Stone to foundations
Reinforced concrete - 35mPa, 19mm Stone to surface bed
Reinforced concrete - 35mPa, 19mm Stone to columns
Reinforced concrete - 35mPa, 19mm Stone to beams
Prestressed fabricated concrete lintels:
In lengths not exceeding 3m

BUNDA
Reference
B1-4.9.7.19 page 179

No.

Description
Reinforcing:
Reinforcing mesh ref. 395
Reinforcing - Supply & Fix only

BUNDA
Reference
B1-4.9.7.22 page 181

No.

Description

Cavity wall - inner skin to be hollow blockwork with insulation an


brickwork

B1-4.9.7.22 page 181


B1-4.9.7.22 page 184
B1-4.9.7.22 page 183

200mm thick block work


Brickforce 120mm wide (every second layer)
DPC (Damp proof course)

B1-4.9.7.22 page 183

DPM (Damp proof membrame)

B1-4.9.7.17 page 170

Wood float top of concrete


Floor Finishes:

B1-4.9.7.21 page 180


B1-4.9.7.3 page 138
B1-4.9.7.21 page 180

B1-4.9.7.21 page 180


B1-4.9.7.23 page 188

Glazed non-slip fully vitrified ceramic tiles - bedroom, toilets, ch


Skirtings:
Heavy duty PVC sheet - to painted walls
Internal Wall Finishes:
Plaster to brickwork and concrete
Paint on plaster (weatherproof)

Glazed ceramic tiles 2.3m high, plaster and paint - kitchen, mes
External Wall Finish:
Paint on plaster (weatherproof)
Aluminium Frames:
Windows:

Type W1: 1860 x 1090mm Frame including 4mm double glaze c


Type W2: 900 x 900mm including Frame 4mm double glaze com

B1-4.9.7.3 page 138

B1-4.9.7.23 page 188

Doors:
Single
Type D3: 885 x 2100mm Frame and steel door including stainles
(external)
Steel Frames:
Doors:
Single
Type D3: 885 x 2100mm Frame and timber door including all iro
Roof:
Corrugated approved roof sheeting - 0.6mm gauge to be fitted i
complete
Welded roof trusses of 30 degrees angle rafters, tie beams, rails
etc and flat bearer, gusset and connection plates, bolted to stee
and height of 1.76m (There are 3 trusses)

B1-3.6.2.12 page 46

Pre-painted aluminium 150 x 150mm box gutters including nece


expansion joints

B1-3.6.2.12 page 46

Pre-painted aluminium 100 x100mm down pipes, including hold


225 x 15mm ABS cement barge board
Ceiling:

B1-4.9.4.1 page 131

Suspended ceiling champered and grooved acoustic panels on c


including hangers etc
Supply and install approved roof insulation

B1-9.7.10 page 145

Supply and install 12 000 BTU airconditioner


Plumbing:

BUNDA
Reference

B1-4.9.7.2 page 137

No.

Description
WC with all necessary connections, fittings and piping complete

Basin with all necessary connections, fittings and piping comple


mirror
Extras
Supply and install fire 9kg CO 2 extinguisher with sign
Supply and install fire alarm

B1-4.9.7.14 page 152


B1-4.9.7.14 page 154

B1-4.9.7.18 page 178

B1-4.9.7.18 page 178

4 EARTH MAT
4.1 Excavate 300mm (width) x 1000mm (depth) for earth grids
4.2
Backfilling to earthing grid and compact the ground surface in d
95% Mod AASHTO density

5 CABLE TRENCH (refer to drawing no. ZZZ 824-200)


5.1 The excavation in insitu material for construction of 1000mm wi
reinforced concrete trenches including bends and junctions to in
drain pipe at 4m centres at the bottom of the trench

5.2 Concrete trench cover for 1000mm wide trench (with maximal w

BUNDA
Reference
B1-3.6.2.12 page 46

No.

Description
6 DRAINAGE
6.1

Subsoil Drain
Supply, lay and joint 2 x 160mm diameter preferated uPVC p
NGL in trench which is to be lined with geofabric material (bidem
to 75mm diameter stone, including excavation, temporary supp
dry, complete (refer to drawing no. ZZZ 824-200)
6.2 Construct cast insitu concrete manhole with lid and including ex
temporary support of sides, keeping excavations dry, complete
200)

6.3 Construct cast insitu septic tank overall size 2250 X 1950 X 215
excavation, temporary support of sides, keeping excavations dry
ZZZ 824-207)

6.4 Construct cast insitu soak pit overall size 2000 x 2000 x 1500mm
150mm rock, including excavtion and backfilling (refer to drawin
6.5

Headwall - concrete to fit 450mm diameter concrete pipe (refer


6.6 Supply, lay, joint and bed 300mm diameter class 50D spigot and
pipes including necessary bends and tees from transformer to o

6.7 Supply, lay, joint and bed 450mm diameter class 50D spigot and
pipes including necessary bends and tees
6.8
B1-4.9.7.15 page 156

B1-4.9.7.14
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17
B1-4.9.7.17

page
page
page
page
page

152
163
170
163
169

B1-4.9.7.17 page 170

Supply, lay, joint and bed 110mm Diameter PVC pipe including
6.9 Construct concerte v-drain with a top width of 800mm and botto
excavation, temporary support of sides, keeping excavations dry
ZZZ 824-200)

6.10 Oil/ water separator (refer to drawing no. ZZZ 824-200)


Excavation in insitu material
Blinding - 20mPa (50mm thick)
Smooth Formwork (to be steel or sound timber)
Concrete - 35mPa, 19mm Stone
25 x 25mm Chamfer to sides of concrete to fit covers
100mm Diameter concrete cut out
Wood float top of concrete slab
Stock pile insitu surplus material (for carting away)
Reinforcing - Supply & Fix only
16mm Diameter galvanised iron steps 1650mm long
Heavy duty manhole covers
200mm Diameter steel pipe
100mm Diameter ventilator PVC pipe with bend
100mm Diameter concrete pipe

BUNDA
Reference

No.

B1-4.9.7.23 page 189

B1-4.9.7.23 page 189

Description
Supply, lay, joint and bed 160mm Diameter uPVC pipe including
Paint x 2 layers of bitumen to internal surfaces of separator

7 WATER SUPPLY
7.1 Supply and install 2000L conservancy tank to Control Building a
excavation,backfilling, pipework and fittings to sit on a concrete
drawing no. ZZZ 824-208 & ZZZ 824 - 205)

7.2 Supply and install 250L conservancy tank under the roof of the
motor pump that will be controlled by water level controlled swi
Hot water dispenser capacity 80L

B1-4.9.7.23 page 189


B1-4.9.7.23 page 189
B1-4.9.7.23 page 189

B1-4.9.7.14
B1-4.9.7.15
B1-4.9.7.15
B1-4.9.7.15

B1-4.9.7.14
B1-4.9.7.15
B1-4.9.7.15
B1-4.9.7.15
B1-4.9.7.15

page
page
page
page

page
page
page
page
page

152
156
156
158

152
156
156
158
156

B1-4.9.7.15 page 159

7.3 50mm Diameter PVC pipe


7.4 25mm Diameter PVC pipe
7.5 15mm Diameter PVC pipe
8 ROAD
8.1 Access road
Excavation in insitu material

Sub-Base of G5 material compacted to 98% MOD AASHTO


Wet-mix road base of G6 material Compacted to 98% MOD AASH
40mm Thick wearing course of bitumen macadam grade 60/70
8.2 Internal road
Excavation in insitu material

Sub-Base of G5 material compacted to 98% MOD AASHTO


Wet-mix road base of G6 material Compacted to 98% MOD AASH
40mm Thick wearing course of bitumen macadam grade 60/70

8.3 Road crossing over 5m wide road for cable trench.Precast concre
600mm and the internal walls to be 100mm thick)
8.4 Segmented paving - Supply and lay 80 mm interlocking concret
bed (max 30 mm); edge restraint and cutting of units where req

B1-4.9.7.3 page 139

8.5 Insitu reinforced concrete ramps to be constructed in front of co


1800mm wide

B02-4.7.9 page 81
B1-4.9.7.10 page 146

8.6 Kerbing including bends and end pieces


8.7 Road markings:
Stop sign
Yield sign
Painting of parking lines
9 YARD WORKS

BUNDA
Reference
B1-4.9.7.17 page 171

B1-4.9.7.17 page 171


B1-4.9.7.17 page 171
B1-4.9.7.14 page 155
B1-4.9.7.14 page 156
B1-4.9.7.2 page 137
B1-3.6.2.13 page 46

No.

Description
9.1 The complete, supply and installation of a security fence, includ
gates etc. 2m High diamond mesh plastic coated galvanised ste
razor wire on the overhang fence and consists of a vertical post
apex, fence to be fixed on a ring-beam foundation

9.2 5m Wide motorised electric fence, with a frame height that mat
9.3 5m Wide fence, with a frame height that match the fence.
9.4 1m Wide pedestrian gate with a frame height that matches the
9.5 Prepare and comply with an approved weed control and spread
9.6 Supply and application of 10 to 30mm stone, 200mm deep, to o
including levelling and rolling to compact the stone layer.

9.7 Construct a fire equipment brickwork kiosk


9.8 Landscaping - Planting of medium-high growing plants and gras
Employer)

BUNDA-T 132/66/33kV Substation


Quantity

Unit

Number

nding logs) and to include:

Item

Item

Item

meter vertical intervals):

are correct
lthough not specified, is required to complete the
atutory Requirements

ing site clearance for civil contractors own

Item

containers to include 2 x aircondtioners, 2x


x cupboard with shelves and electrical plugs and

Item

for ABB office)

month
Item
Item
Item
Item
Month
Month
Item
Month
Item
Month
Item

13

1
2
1
1
1
1
1
1
1
2
1

ording to ABB specifications


h and 1 x person for night watch)

oundations
grubbing up of foundations (size 1.8 x 1.8m wide)

ng including grubbing up of foundations (size 11m

ng grubbing up of foundations (size 9.6m x 6.8m

ng grubbing up of foundations (size 18m x 16.5m

cluding grudding up of concrete foundations (4.6m

40

Item

Item

Item

Item

Item

Item

1
1
1
1
13
13
1
13
1
13
1

BUNDA-T 132/66/33kV Substation


Quantity

mm wide and 400mm high for a length of 50m)

s
use on site

p 300mm of topsoil to be stockpiled on site for


ed at a site located by the employer within 10km

nce greater than 10km - rate per km

d AASHTO
t the ground surface in depths of 300mm

act the ground surface in depths of 300mm

act the ground surface in depths of 300mm

m3 of fill)
or performance of the work

f Material" is required
or each second layer of "Backfilling and/or

Unit

Item

40
2500
2500

Item
m2
m2

2,490.00

m2

1.00

Km

200.00
20.00
20.00
10.00
2,490.00

m3
m3
m3
m3
m2

200.00

m3

300.00

m3

780.00

m3

1
3
1
3

Test
Test
Test
Test

Test

2
2
2
2
3

Test
Test
Test
Test
Test

1
1

Item
Item

10.75

m3

Number

BUNDA-T 132/66/33kV Substation

ths of 150mm to 97% Mod AASHTO

away)

supply bolts)

Quantity

Unit
0.51
m3

Number
5

5.04

m2

3.84

4.84
5.60
1.96

m3
m
m2

5
5
5

5.80

m3

4.96
267.00
1
0.10
8

m
kg
No
m3
No

5
5
5
5
5

BUNDA-T 132/66/33kV Substation


Quantity

Unit

Number

2.21

m3

24

0.13

m3

24

3.36

24

2.16

24

1.28
4.80
0.72

m3
m
m2

24
24
24

0.94

m3

24

1.27
79.00
1
0.04
8

m
kg
No
m3
No

24
24
24
24
24

3.62

m3

0.21

m3

4.20

2.91

m2

2.06
6.00
1.13

m3
m
m2

3
3
3

1.85

m3

1.77
207.00
1.00
0.06
8

m
kg
No
m3
No

3
3
3
3
3

1.03

m3

12

0.06

12

1.96

12

1.32

m2

12

0.71
2.80
0.49

m
m
m2

12
12
12

ths of 150mm to 97% Mod AASHTO

0.36

m3

12

away)

0.67

m3

12

ths of 150mm to 97% Mod AASHTO

away)

supply bolts)

ths of 150mm to 97% Mod AASHTO

away)

supply bolts)

BUNDA-T 132/66/33kV Substation

supply bolts)

Quantity
Unit
47.00
kg
1
No
0.02
m3
4
No

Number
12
12
12
12

1.03

m3

0.06

1.96

1.32

m2

0.71
2.80

m
m

9
9

0.49

m2

0.36
0.67
47.00
1
0.02
4

m3
m3
kg
No
m3
No

9
9
9
9
9
9

3.83

m3

4.10
3.92
3.12
2.04
5.60
0.98

m3
m2
m2
m3
m
m2

8
8
8
8
8
8

ths of 150mm to 97% Mod AASHTO

2.24

m3

away)

1.60
128
1
0.05
8

m
kg
No
m3
No

8
8
8
8
8

1.03

m3

10

0.06

10

1.96

10

1.32

m2

10

0.71
2.80

m
m

10
10

ths of 150mm to 97% Mod AASHTO


away)

supply bolts)

supply bolts)

BUNDA-T 132/66/33kV Substation

ths of 150mm to 97% Mod AASHTO

away)

supply bolts)

ths of 150mm to 97% Mod AASHTO

away)

supply bolts)

ths of 150mm to 97% Mod AASHTO

away)

supply bolts)

Quantity

Unit
0.49
m2

Number
10

0.36

m3

10

0.67
47.00
1
0.02
4

m
kg
No
m3
No

10
10
10
10
10

1.03

m3

0.06

1.96

1.32

m2

0.71
2.80
0.49

m
m
m2

6
6
6

0.36

m3

0.67
47.00
1
0.02
4

m3
kg
No
m3
No

6
6
6
6
6

8.83

m3

0.42

5.04

m2

3.48

4.29
5.60
1.96

m
m
m2

5
5
5

4.52

m3

4.31
233.00
1
0.10
8

m
kg
No
m3
No

5
5
5
5
5

6.50

m3

12

0.38

m3

12

BUNDA-T 132/66/33kV Substation

ths of 150mm to 97% Mod AASHTO


away)

supply bolts)

ths of 150mm to 97% Mod AASHTO


away)

supply bolts)

ths of 150mm to 97% Mod AASHTO


away)

supply bolts)

Quantity
Unit
10.08
m2
3.44
m2
3.81
m3
14.4
m
2.16
m2
2.74
m3
3.76
m3
210
kg
1
No
0.11
m3
24
No

Number
12
12
12
12
12
12
12
12
12
12
12

2.43
0.14
3.92
3.78
1.54
5.60
0.98
0.74
1.69
86.00
1
0.05
8

m3
m3
m2
m2
m3
m
m2
m3
m3
kg
No
m3
No

6
6
6
6
6
6
6
6
6
6
6
6
6

1.67
0.10
1.96
1.68
0.93
2.80
0.49
0.64
1.03
58.00
1
0.02
4

m3
m3
m2
m2
m3
m
m2
m3
m3
kg
No
m3
No

18
18
18
18
18
18
18
18
18
18
18
18
18

1.67

m3

15

BUNDA-T 132/66/33kV Substation

ths of 150mm to 97% Mod AASHTO


away)

supply bolts)

ths of 150mm to 97% Mod AASHTO


away)

supply bolts)

ths of 150mm to 97% Mod AASHTO


away)

supply bolts)

Quantity

Unit
0.10
m3
1.96
m2
1.68
m2
0.93
m3
2.80
m
0.49
m2
0.64
m3
1.03
m3
58.00
kg
1
No
0.02
m3
4
No

Number
15
15
15
15
15
15
15
15
15
15
15
15

1.67
0.10
1.96
1.68
0.93
2.80
0.49
0.64
1.03
58.00
1
0.02
4

m3
m3
m2
m2
m3
m
m2
m3
m3
kg
No
m3
No

15
15
15
15
15
15
15
15
15
15
15
15
15

4.28
0.25
3.92
3.00
2.20
5.60
0.98
2.03
2.25
136.00
2
0.05
8

m3
m3
m2
m2
m3
m
m2
m3
m3
kg
No
m3
No

7
7
7
7
7
7
7
7
7
7
7
7
7

BUNDA-T 132/66/33kV Substation

ths of 150mm to 97% Mod AASHTO


away)

supply bolts)

ths of 150mm to 97% Mod AASHTO


away)

supply bolts)

ths of 150mm to 97% Mod AASHTO


away)

Quantity

Unit
0.49
m3
0.10
m3
2.24
m2
0
m2
0.78
m3
5.6
m
1.96
m2
0.00
m3
0.49
m3
3.92
m2
1
No
0.10
m3
4
No

0.13
0.03
0.96
0
0.19
3.20
0.63
0.00
0.13
0
0
0.03
0

m3
m3
m2
m2
m3
m
m2
m3
m3
kg
No
m3
No

6.01
0.58
2.94
4.39
1.69
12.23

m3
m3
m3
m3
m3
m3

0.55
0.03
0.42
1.10

m3
m3
m3
m3

Number
1
1
1
1
1
1
1
1
1
1
1
1
1

9
9
9
9
9
9
9
9
9
9
9
9
9

BUNDA-T 132/66/33kV Substation

anised. 25 x 5mm flat x 100Lg fishtail lugs weld to


open grid which is 1600mm wide with 30 x 4.5mm

ete and brick


transformer points
benching render

ths of 150mm to 97% Mod AASHTO


away)

Quantity

Unit
2.19
m3
0.37
m3
5.04
m3
2.20
m3

1.82
7.08

m2
m2

9.71
11.80

m2
m

21.97
8.40

m2
m2

21.97
16.8

m2
m2

21.97
2.20
160.86
68.94
22.18
6
1
30.37

m2
m3
m2
m2
m
m
Item
m2

8.32
0.58
7.35
9.07
4.54
20.78

m3
m3
m3
m3
m3
m3

0.76
0.03
1.05
2.27

m3
m3
m3
m3

3.02
0.33

m3
m3

Number

BUNDA-T 132/66/33kV Substation

anised. 25 x 5mm flat x 100Lg fishtail lugs weld to


open grid which is 1600mm wide with 30 x 4.5mm
banded)

ete and brick


transformer points

benching render

ths of 150mm to 97% Mod AASHTO


away)

Quantity

Unit
m3
12.60
4.54
4.41

m3
m3

2.24
11.40

m2
m2

13.46
19

m2
m

45.36
21

m2
m2

45.36
42

m2
m2

45.36

m2

4.54
31.28
125.12
2.22
8.00
20.10
1
50

m3
m2
m2
m2
m
m
Item
m2

17.11
0.63
4.37
26.66
3.80
11.56
114.00
4.33
9.94
8.30
8.81
12.67

m3
m3
m3
m2
m3
m3
m2
m2
m
m3
m3
m2

Number

2
2
2
2
2
2
2
2
2
2
2
2

BUNDA-T 132/66/33kV Substation


Quantity

Unit
0.50
m3

56.35
337.53

m3
m2

56.35

m3

148.62
74.31
102

m2
m2
m2

3.98
67.51
31.88
7.65
10.25

m3
m3
m3
m3
m3

46.72

337.53
1870

m2
kg

256.52

m2

114.97
459.88
15.63
337.53
337.53

m2
m2
m2
m2
m2

26.48

m2

37.16

m2

16.64

m2

or tiles with epoxy grout) - corridors, stairs,

23.28
24.82

m2
m2

trol room, relay rooms, electrical equipment

137.46

m2

15.00
15.00
15.00

m2
m2
m2

mite control under building

away)

) to sides of foundations
er) to sides of beams
er) to sides of columns

o
o
o
o

surface bed
foundations
columns
beams

k with insulation and outer skin to be clay

m thick) and epoxy seal coat - switchgear and

est room, toilets, kitchen, messroom

ment/electrical workrooms
g epoxy screed - basements

Number
2

BUNDA-T 132/66/33kV Substation


Quantity

p granule finish - stores workshop, mechanical work

Unit

36.11

m2

80.40

m2

30.4

m2

38

10

122.18

638.4
100.05
104.78
23.28
523.75

m2
m2
m2
m2
m2

231.37

m2

mm double glaze complete

No

m double glaze complete

No

No

oor including all stainless steel ironmongery

No

oor including all stainless steel ironmongery

No

oors door including all ironmongery complete

No

oor including all ironmongery complete (internal)

No

2
2
4
2
2
1

No
No
No
No
No
Item

sformer pits

nch complete
Trench walls and bottom to be 100mm thick

PVC pipe

rage and workshop

paint - kitchen, messroom

ors door including all stainless steel ironmongery

Number

BUNDA-T 132/66/33kV Substation


Quantity

s underneath sink for kitchen

gauge to be fitted inculding all necessary fittings


ers, tie beams, rails, struts, braces, cleats, purlins,
ates, bolted to steel with an overall lenghth of
usses)

tters including necessary collared and sealed


pes, including holderbats, brackets etc

8
1
427.82

m2

No

29.31
58.36
16

m
m
m

acoustic panels on concealed suspension grid


282.00
282.00
1.00

nd piping complete and toilet paper holder

Unit
No
Item

m2
m2
Item

2
1
2
1
2

No
No
No
No
No

8
2

No
No

4.51

m3

mite control under building


away)

28.03
4.51

m2
m3

) to sides of foundations
er) to sides of beams
und timber)

15.02
11.75
10.00

m2
m2
m2

1.40
4.51
5.61
0.6
1.13

m3
m3
m3
m3
m3

10.26

s and
and piping
piping complete
complete with soap dispenser and

gulley and piping complete


gs and piping complete

o
o
o
o

foundations
surface bed
columns
beams

Number

BUNDA-T 132/66/33kV Substation


Quantity
28.03
270

Unit
m2
kg

Number

BUNDA-T 132/66/33kV Substation

k with insulation and outer skin to be clay

Quantity

Unit

51.44

m2

13.19
329
3.76

m2
m
m2

28.03

m2

28.03

m2

18

m2

18.15

70.71
57.80
12.90

m2
m2
m2

46.21

m2

mm double glaze complete


m double glaze complete

2
1

No
No

or including stainless steel ironmongery complete

No

oor including all ironmongery complete (internal)

No

40.01

m2

No

11.40

16

14

bedroom, toilets, checking room

paint - kitchen, messroom

gauge to be fitted including all necessary fittings


ers, tie beams, rails, struts, braces, cleats, purlins,
ates, bolted to steel with an oveall lenghth of 4.2m

tters including necessary collared and sealed

pes, including holderbats, brackets etc

acoustic panels on concealed suspension grid


20.21
20.21
1.00

m2
m2
Item

Number

BUNDA-T 132/66/33kV Substation


Quantity

Unit

nd piping complete and toilet paper holder


1
and piping complete with soap dispenser and
1

for earth grids

ground surface in depths of 300mm compacting to

Z 824-200)
ction of 1000mm wide x 500mm deep cast insitu
and junctions to include 100mm diameter PVC
e trench

ch (with maximal weight of 50 kg each)

No
No

1
1

No
No

495

m3

495

m3

116

396

No

Number

BUNDA-T 132/66/33kV Substation


Quantity

Unit

91

No

2250 X 1950 X 2150mm with lid and including


ping excavations dry, complete (refer to drawing no.

No

00 x 2000 x 1500mm hole to be filled with 100 to


ling (refer to drawing no. ZZZ 824-207)

No

No

25

90

29

110.00

97.00
3.45
235.00
45.00
12.80
2.00
46.13
97.00
7520.00
8.00
4.00
1.00
1.00
0.50

m3
m3
m2
m3
m
No
m2
m3
Kg
No
No
m
No
m

r preferated uPVC pipe to be laid 1100mm below


bric material (bidem gade A6) and backfill with 50
on, temporary support of sides, keeping excavations
200)
lid and including excavation in insitu material,
ions dry, complete (refer to drawing no. ZZZ 824-

concrete pipe (refer to drawing no. ZZZ 824-200)


class 50D spigot and socket ended concrete sewer
om transformer to oil/ water separator

class 50D spigot and socket ended concrete sewer

PVC pipe including necessary bends and tees


of 800mm and bottom width of 100mm including
ping excavations dry, complete (refer to drawing no.

o. ZZZ 824-200)

end

Number

BUNDA-T 132/66/33kV Substation

uPVC pipe including necessary bends and tees


es of separator

Quantity
16
259.98

Unit
m
m2

o Control Building above ground including


to sit on a concrete foundation complete (refer to

Item

der the roof of the Control Building including a


level controlled switch in the smaller tank

Item

Item

50
40
35

m
m
m

MOD AASHTO
d to 98% MOD AASHTO
adam grade 60/70 penetration

81
40.5
36.00
8.4

m3
m3
m3
m3

MOD AASHTO
d to 98% MOD AASHTO
adam grade 60/70 penetration

148.27
74.14
64.87
12.36

m3
m3
m3
m3

No

227.28

m2

No

303.00

ench.Precast concrete culvet (size 1200 x 900 x


thick)
nterlocking concrete pavers including 50 mm sand
g of units where required: Strength: 25 Mpa

ucted in front of control building doors to be about

3
1
25

Item
Item
m

Number

BUNDA-T 132/66/33kV Substation

curity fence, including earthing of all metal parts,


ated galvanised steel wire and 300mmflat wrap
ts of a vertical post with 45 degree inclination at the
dation

me height that match the fence.


tch the fence.
t that matches the fence
control and spread over substation
200mm deep, to one meter beyond fences,
stone layer.

ing plants and grass (Subject to approval of

Quantity

Unit

267

1
1
1
1,602.00

No
No
No
m2

1,602.00

m2

2.00
160.20

Number

Item
m2
Subtotal
Vat 16%
Final Total

Rate

Total

1,000.00 $

1,000.00

200.00 $

200.00

50.00 $

50.00

1,000.00 $

1,000.00

30,000.00 $

30,000.00

750.00 $

19,500.00

$
$
$
$
$
$
$
$

8,000.00
200.00
500.00
500.00
500.00
1,000.00
500.00
1,000.00

$
$

$
$
$
$
$
$
$
$
$
150.00 $
1,000.00 $

8,000.00
400.00
500.00
500.00
6,500.00
13,000.00
500.00
13,000.00
3,900.00
1,000.00

45.00 $

1,800.00

500.00 $

500.00

120.00 $

120.00

120.00 $

120.00

$
$

250.00

250.00

Rate
$

Total
100.00

$
50.00 $

100.00
2,000.00

$
$

0.80 $
1.50 $

2,000.00
3,750.00

0.80 $

1,992.00

20.00 $

20.00

$
$
$
$

7.00
7.00 $
8.00 $
20.00 $

140.00
160.00
200.00

7.00 $

1,400.00

20.00 $

6,000.00

5,460.00

7.00

$
$
$
$

200.00
200.00
200.00
200.00

$
$
$
$

200.00
600.00
200.00
600.00

200.00 $

600.00

$
$
$
$
$

100.00
100.00
100.00
100.00
200.00

$
$
$
$
$

200.00
200.00
200.00
200.00
600.00

$
$

100.00 $
100.00 $

100.00
100.00

7.00 $

376.32

Rate
$

Total
190.00 $

30.00 $

756.00

25.00 $

480.00

$
$
$

265.00 $
4.00 $
5.00 $

6,407.70
112.00
49.00

7.00 $

202.86

$
$
$
$
$

7.00
3.00
5.50
7.00
5.00

$
$
$
$
$

173.46
4,005.00
27.50
3.43
200.00

Rate

Total

7.00 $

371.28

190.00 $

592.80

30.00 $

2,419.20

25.00 $

1,296.00

$
$
$

265.00 $
4.00 $
5.00 $

8,166.24
460.80
86.40

7.00 $

157.92

$
$
$
$
$

7.00
3.00
5.50
7.00
5.00

$
$
$
$
$

213.36
5,688.00
132.00
6.05
960.00

7.00 $

75.95

190.00 $

121.27

30.00 $

378.00

25.00 $

218.25

$
$
$

265.00 $
4.00 $
5.00 $

1,640.88
72.00
16.88

7.00 $

38.77

$
$
$
$
$

7.00
3.00
5.50
7.00
5.00

$
$
$
$
$

37.18
1,863.00
16.50
1.18
120.00

7.00 $

86.39

190.00 $

137.94

30.00 $

705.60

25.00 $

396.00

$
$
$

265.00 $
4.00 $
5.00 $

2,245.08
134.40
29.40

7.00 $

30.24

7.00 $

56.15

Rate
$
$
$
$

3.00
5.50
7.00
5.00

Total
$
$
$
$

1,692.00
66.00
2.06
240.00

7.00 $

64.80

190.00 $

103.46

30.00 $

529.20

25.00 $

297.00

$
$

265.00 $
4.00 $

1,683.81
100.80

5.00 $

22.05

$
$
$
$
$
$

7.00
7.00
3.00
5.50
7.00
5.00

$
$
$
$
$
$

22.68
42.12
1,269.00
49.50
1.54
180.00

7.00 $

214.68

$
$
$
$
$
$

190.00
30.00
25.00
265.00
4.00
5.00

$
$
$
$
$
$

6,232.00
940.80
624.00
4,322.68
179.20
39.20

7.00 $

125.19

$
$
$
$
$

7.00
3.00
5.50
7.00
5.00

$
$
$
$
$

89.49
3,072.00
44.00
2.74
320.00

7.00 $

72.00

190.00 $

114.95

30.00 $

588.00

25.00 $

330.00

$
$

265.00 $
4.00 $

1,870.90
112.00

Rate
$

Total
5.00 $

24.50

7.00 $

25.20

$
$
$
$
$

7.00
3.00
5.50
7.00
5.00

$
$
$
$
$

46.80
1,410.00
55.00
1.72
200.00

7.00 $

43.20

190.00 $

68.97

30.00 $

352.80

25.00 $

198.00

$
$
$

265.00 $
4.00 $
5.00 $

1,122.54
67.20
14.70

7.00 $

15.12

$
$
$
$
$

7.00
3.00
5.50
7.00
5.00

$
$
$
$
$

28.08
846.00
33.00
1.03
120.00

7.00 $

309.07

190.00 $

399.48

30.00 $

756.00

25.00 $

435.00

$
$
$

265.00 $
4.00 $
5.00 $

5,680.28
112.00
49.00

7.00 $

158.22

$
$
$
$
$

7.00
3.00
5.50
7.00
5.00

$
$
$
$
$

150.85
3,495.00
27.50
3.43
200.00

7.00 $

545.78

190.00 $

871.42

Rate
$
$
$
$
$
$
$
$
$
$
$

30.00
25.00
265.00
4.00
5.00
7.00
7.00
3.00
5.50
7.00
5.00

Total
$
$
$
$
$
$
$
$
$
$
$

3,628.80
1,033.20
12,100.54
691.20
129.60
229.94
315.84
7,560.00
66.00
9.07
1,440.00

$
$
$
$
$
$
$
$
$
$
$
$
$

7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
7.00
3.00
5.50
7.00
5.00

$
$
$
$
$
$
$
$
$
$
$
$
$

102.10
163.02
705.60
567.00
2,454.96
134.40
29.40
31.25
70.85
1,548.00
33.00
2.06
240.00

$
$
$
$
$
$
$
$
$
$
$
$
$

7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
7.00
3.00
5.50
7.00
5.00

$
$
$
$
$
$
$
$
$
$
$
$
$

209.92
335.16
1,058.40
756.00
4,440.87
201.60
44.10
80.26
129.65
3,132.00
99.00
3.09
360.00

7.00 $

174.93

Rate
$
$
$
$
$
$
$
$
$
$
$
$

190.00
30.00
25.00
265.00
4.00
5.00
7.00
7.00
3.00
5.50
7.00
5.00

Total
$
$
$
$
$
$
$
$
$
$
$
$

279.30
882.00
630.00
3,700.73
168.00
36.75
66.89
108.05
2,610.00
82.50
2.57
300.00

$
$
$
$
$
$
$
$
$
$
$
$
$

7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
7.00
3.00
5.50
7.00
5.00

$
$
$
$
$
$
$
$
$
$
$
$
$

174.93
279.30
882.00
630.00
3,700.73
168.00
36.75
66.89
108.05
2,610.00
82.50
2.57
300.00

$
$
$
$
$
$
$
$
$
$
$
$
$

7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
7.00
3.00
5.50
7.00
5.00

$
$
$
$
$
$
$
$
$
$
$
$
$

209.92
335.16
823.20
525.00
4,077.29
156.80
34.30
99.47
110.45
2,856.00
77.00
2.40
280.00

Rate
$
$
$
$
$
$
$
$
$
$
$
$
$

7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
7.00
3.00
5.50
7.00
5.00

Total
$
$
$
$
$
$
$
$
$
$
$
$
$

3.43
18.62
67.20
207.76
22.40
9.80
3.43
11.76
5.50
0.69
20.00

$
$
$
$
$
$
$
$
$
$
$
$
$

7.00
190.00
30.00
25.00
265.00
4.00
5.00
7.00
7.00
3.00
5.50
7.00
5.00

$
$
$
$
$
$
$
$
$
$
$
$
$

7.94
53.87
259.20
450.77
115.20
28.35
8.19
1.98
-

$
$
$
$
$
$

7.00
7.00
7.00
7.00
7.00
7.00

$
$
$
$
$
$

42.07
4.03
20.58
30.76
11.83
85.61

$
$
$
$

190.00
190.00
190.00
190.00

$
$
$
$

103.80
6.08
79.80
208.72

Rate
$
$
$
$

260.00
260.00
260.00
260.00

Total
$
$
$
$

568.15
95.94
1,310.40
571.22

$
$

2.00 $
2.00 $

3.64
14.16

$
$

20.00 $
20.00 $

194.24
236.00

$
$

8.00 $
8.00 $

175.76
67.20

$
$

8.00 $
8.00 $

175.76
134.40

$
$
$
$
$

40.00
19.00
1.00
1.00
100.00
150
500
10

$
$
$
$
$
$
$
$

878.80
41.74
160.86
68.94
2,218.00
900.00
500.00
303.69

$
$
$
$
$
$

7.00
7.00
7.00
7.00
7.00
7.00

$
$
$
$
$
$

58.21
4.03
51.45
63.50
31.75
145.45

$
$
$
$

190.00
190.00
190.00
190.00

$
$
$
$

143.64
6.08
199.50
430.92

$
$

260.00 $
260.00 $

786.24
85.02

Rate
$

Total
260.00 $

3,276.00

$
$

260.00 $
260.00 $

1,179.36
1,146.60

$
$

20.00 $
20.00 $

44.80
228.00

$
$

20.00 $
20.00 $

269.28
380.00

$
$

8.00 $
8.00 $

362.88
168.00

$
$

8.00 $
8.00 $

362.88
336.00

40.00 $

1,814.40

$
$
$
$
$
$
$
$

19.00
1.00
1.00
100.00
150.00
150.00
500.00
10.00

$
$
$
$
$
$
$
$

86.18
31.28
125.12
222.00
1,200.00
3,015.00
500.00
500.00

$
$
$
$
$
$
$
$
$
$
$
$

7.00
190.00
265.00
30.00
265.00
265.00
10.00
5.00
10.00
10.00
6.00
9.00

$
$
$
$
$
$
$
$
$
$
$
$

239.50
240.77
2,318.01
1,599.84
2,014.85
6,128.50
2,280.00
43.30
198.80
165.97
105.71
228.10

Rate
$

Total
190.00 $

188.86

$
$

6.00 $
1.10 $

338.08
371.28

6.00 $

338.08

$
$
$

25.00 $
33.00 $
33.00 $

3,715.50
2,452.23
3,366.00

$
$
$
$
$

250.00
300.00
300.00
300.00
300.00

$
$
$
$
$

996.10
20,251.84
9,562.56
2,295.00
3,073.68

15.00 $

700.80

$
$

9.00 $
2.50 $

3,037.78
4,675.00

35.00 $

8,978.17

$
$
$
$
$

21.00
3.00
1.00
1.20
5.00

$
$
$
$

1,379.64
15.63
405.04
1,687.65

10.00 $

264.80

40.00 $

1,486.27

20.00 $

332.88

$
$

50.00 $
100.00 $

1,163.97
2,481.53

40.00 $

5,498.41

$
$
$

40.00 $
10.00 $
60.00 $

600.00
150.00
900.00

Rate

Total

100.00 $

3,611.36

40.00 $

3,216.13

30.00 $

912.00

6.00 $

60.00

40.00 $

4,887.20

$
$
$
$
$
$

10.00
5.00
60.00
100.00
4.00

$
$
$
$
$

6,384.00
500.25
6,286.80
2,328.00
2,095.00

7.00 $

1,619.59

890.00 $

7,120.00

265.00 $

1,325.00

100.00 $

150.00

150.00

200.00

100.00

150.00

$
$
$
$
$
$

480.00
480.00
265.00
550.00
1,700.00
15.00

$
$
$
$
$
$

960.00
960.00
1,060.00
1,100.00
3,400.00
15.00

Rate
$
$

Total
612.00 $
130.00 $

4,896.00
130.00

20.00 $

8,556.46

288.00 $

2,592.00

$
$

$
100.00 $
100.00 $

5,836.00
1,600.00

15.00 $

4,229.94

$
$

20.00 $
120.00 $

5,640.00
120.00

$
$
$
$
$

190.00
145.00
100.00
120.00
50.00

$
$

$
$
$
$
$
$
260.00 $
650.00 $

380.00
145.00
200.00
120.00
100.00
2,080.00
1,300.00

6.00 $

27.04

$
$

1.10 $
6.00 $

30.83
27.04

$
$
$

25.00 $
33.00 $
33.00 $

375.56
387.64
330.00

$
$
$
$
$
$

250.00
300.00
300.00
300.00
300.00

$
$
$
$
$

350.33
1,352.02
1,681.59
180.00
338.00

15.00 $

153.90

Rate
$
$

Total
9.00 $
2.50 $

252.24
675.00

Rate

Total

35.00 $

1,800.55

$
$
$

21.00 $
3.00 $
1.00 $

276.95
987.00
3.76

1.20 $

33.63

5.00 $

140.13

40.00 $

730.90

40.00 $

726.00

$
$
$

10.00 $
10.00 $
40.00 $

707.06
578.03
516.12

5.00 $

231.06

$
$

560.00 $
265.00 $

1,120.00
265.00

100.00 $

200.00

100.00 $

200.00

20.00 $

800.28

288.00 $

864.00

10.00 $

114.00

10.00 $

160.00

15.00 $

303.08

20.00 $

404.20

450.00 $
$

450.00
-

Rate

Total

190.00 $

190.00

100.00 $

100.00

$
$

260.00 $
650.00 $

260.00
650.00

7.00 $

3,465.00

3,465.00

7.00

10.00 $

1,160.00

60.00 $

23,760.00

Rate

Total

100.00 $

9,100.00

265.00 $

1,855.00

1,800.00 $

1,800.00

1,100.00 $

1,100.00

100.00 $

100.00

15.00 $

375.00

18.00 $

1,620.00

4.00 $

116.00

100.00 $

11,000.00

$
$
$
$
$
$
$
$
$
$
$
$
$
$

7.00
190.00
33.00
190.00
1.00
20.00
5.30
6.00
2.50
225.00
120.00
45.00
20.00
20.00

679.00
656.26
7,755.00
8,550.00
12.80
40.00
244.49
582.00
18,800.00
1,800.00
480.00
45.00
20.00
10.00

$
$
$
$
$
$
$
$
$
$
$
$
$
$

Rate
$
$

Total
6.00 $
5.00 $

96.00
1,299.90

6,000.00 $

6,000.00

5,000.00 $

5,000.00

$
$
$

2.00 $
0.50 $
0.50 $

100.00
20.00
17.50

$
$
$
$

7.00
25.00
20.00
19.00

$
$
$
$

567.00
1,012.50
720.00
159.60

$
$
$
$

7.00
25.00
20.00
19.00

$
$
$
$

1,037.90
1,853.40
1,297.38
234.76

30.00 $

150.00

500.00 $

113,640.00

350.00 $

1,750.00

2.00 $

606.00

$
$
$

10.00 $
10.00 $
2.00 $

30.00
10.00
50.00

Rate

Total

200.00 $

53,400.00

500.00 $
$
100.00 $
1.00 $

500.00
100.00
1,602.00

$
15.00
1,000.00 $

24,030.00

1,000.00 $

160,200.00

991,004.44

991,004.44

2,000.00

MATAMBO

EXPANSION PROJECT - CONTROL ROOM BOQ

No. Description
1.0 P & G's
CIVIL SUB CONTRACTORS OWN REQUIRMENTS

Quantity

Unit

Number

Rate in $

Total in MK

1.0

MOBILIZATION FOR CIVIL SUB CONTRACTOR - OWN REQUIRMENTS -Establishment of site


camp and stores including site clearance for civil contractors own requirements

1.00

Item

0.00

1.1

Supervision & Labour FOR Civil Sub Contractor, own requiremnts for the duration of the Contract 6 Months

1.00

Month

0.00

1.00

Item

0.00

1.00

Item

0.00

1.00

Item

0.00

1.00

Item

0.00

1.00
1.00
1.00
2.00

Item
Item
Item
Item

1
1
1
1

0.00
0.00
0.00
0.00

DE MOBILIZATION FOR CIVIL SUB CONTRACTOR - OWN REQUIRMENTS - De-establishment


1.2
of site camp and stores
Costs for obligations, equipment or labour, although not specified, is required to complete the
1.3 Contract in terms of the specification and Statutory Requirements
FACILITIES FOR CUSTOMER AND ABB
The facilities shall be provided with the services necessary for their operation, such as
electrical energy, portable water supply, sewers, drainage system with soak pit, fire
extinguishing system, ext. These containers either in containerized or hard block
construction shall be installed at locations to be indicated by the Employer and the
Contractor shall maintain them throughout the project period and shall, upon request,
remove them after the completion of work. The temporary site facilities for the
Employer shall be structurally sound and compatible with the weather conditions on
site as follows:

1.4 Temporary Site Office (Duration of Civil Contract 6 Months) for Employer & ABB- Consisting of:
- Two Rooms (3 by 3 m)
- One Toilet Room
- One Kitchen Room
- Tables, Chairs, a desk, filing cabinets, air conditioning for both Rooms (Heating & cooling)
Temporary Accommodation for Employer - 4 by Client Personal & 1 by ABB Personal - At Site
Consiting of:
- Two Rooms (4 by 3 m)
- FOR ABOVE ROOMS - New Beds for 4 People, 2 in each Room, Wardrobe Cabinet, Tables
Chairs, Air conditioning for both Rooms (Heating & cooling) ext.
- One Toilet Room - (3 by 2 = 6m^2)
- One Shower Room - (3 by 2 = 6m^2)
- One Kitchen Room - (3 by 3 = 9m^2)
- FOR ABOVE KITCHEN - Refrigerator, Microwave Oven and 2 Plate Cooker
1.6 Temporary Septic Tank (Local Design)
1.7 Temporary Soak away Pit (Local Design)
1.8 Temporary fence around site establishment - 50m by 50m
1.9 Temporary gate
1.5

1.92 Temporary electricity connection/generator allow for Purchase of 7.5kVa Generator - RATE ONLY

1.00

Item

1.93 Water usage - RATE ONLY per Month for 250 Liters

1.00

1.94 Electricity/petrol or diesel - RATE PER LITER

1.00

1.95 Tempoary site sign board


1.96 Health and Saftey - safety signs and PPE according to ABB specifications
1.97 Security guard (allow 1x person for day watch and 2 x person for night watch)

1.00
1.00
1.00

Month
Rate per
Liter
Item
Item
Month

2.0 CONTROL BUILDING -E.VALE017A-IE3-2105 REV 2 SHT 1 - SHT 6


2.1 Excavations in insitu material:
Strip foundation
Prepare and spray with an approved anti-termite control under building
Stock pile insitu surplus material (for carting away)
2.2 Concrete:
Reinforced concrete - 25mPa, 19mm Stone to surface bed
Reinforced concrete - 25mPa, 19mm Stone to floor slab
Reinforced concrete - 30mPa, 19mm Stone to Columns
Reinforced concrete - 25mPa, 19mm Stone to Beam
Reinforced concrete - 25mPa, 19mm Stone to Roof slab
Reinforced concrete - 25mPa, 19mm Stone to Ramps
2.3 Prestressed fabricated concrete lintels:
In lengths not exceeding 2.5m
In lengths not exceeding 1.2m
In lengths not exceeding 0.8m for cable entry
2.4 Reinforcing:
Reinforcing mesh ref. 395 for floor slab
Reinforcing - Supply & Fix only
200mm Thick blockwork
DPC (Damp proof course)
DPM (Damp proof membrame)
Wood float top of concrete
2.5 Floor Finishes:
Epoxy screed (trowel applied minimum 5 mm thick) and epoxy seal coat - switchgear

1
1
1
6

0.00
0.00
0.00

24.39
78.00
24.39

m3
m2
m3

0.00
0.00
0.00

5.82
5.44
0.27
2.85
18.36
2.09

m3
m3
m3
m3
m3
m3

0.00
0.00
0.00
0.00
0.00
0.00

17.50
1.20
0.80

m
m
m

0.00
0.00
0.00

69.83
1,260.00
144.54

m2
kg
m2

0.00
0.00
0.00

9.53
69.83
69.83

m2
m2
m2

0.00
0.00
0.00

10

69.83

m2

0.00

Acid resistant ceramic tiles - battery room

13.90

m2

0.00

450x 600mm deep internal concrete trench. Trench walls and bottom to be 100mm thick

17.77

0.00

160.88
160.88

m2
m2

0.00
0.00

123.80

m2

0.00

2.6 Internal Wall Finishes:


Plaster to brickwork
Paint brickwork and concrete (weatherproof)
External Wall Finish:
Plaster to brickwork

Paint on plaster (weatherproof)


2.7 Wooden Frames:
Windows:
Type W1: Aluminium 2000 x 950mm Frame including 4mm double glaze complete
Type W2: Aluminium 2000 x 950mm Frame including 4mm double glaze complete
2.8 Wooden Doors:
Double
Type D1: 1750 x 2500mm Hard Wooden Frame and Wooden doors door including all ironmongery
complete (external)
Single
Type D3: 885 x 2500mm Hard Wooden Frame and Wooden doors door including all ironmongery
complete (external)
2.9 Steel Doors :
Double
Type D2: 1750 x 2500mm Frame and steel door including all stainless steel ironmongery
complete (external)
2.10 Airconditioner in control building Split Unit - 18000 BTU

123.80

m2

0.00

5.00
1.00

No
No

1.00

No

0.00

1.00

No

0.00

1.00

No

0.00

2.00

Item

0.00

0.00
0.00
0.00
0.00
0.00

2.11 Roof:
Slab Flat Roof 200 mm thick - 25Mpa Concrete - Sloping 1 : 160 As shown on the drawing
Slab to be plastered inside ceiling
2.12 Joint Sealants etc .
Cold poured polyurethane sealing compound (15% movement) including bond breaker, primer,
etc.:

190.00
69.83

m2
m2

0.00
0.00

38.00

0.00

Exterior waterproof membrane Sika Blackseal T - 140MG or similar preferable grey colour
Expansion joints with "Sondor Jointex Polyethylene" joint former between vertical concrete and
brick surfaces or SikaFlex or similar .
Extras
Supply and install fire 18kg CO2 extinguisher wheeled type with sign

101.52

m2

0.00

38.00

0.00

5.00
1.00

No
No

0.00
0.00

3.2 Excavate 450mm (width) x 450mm (depth) for earth grids

3.65

m3

0.00

Backfilling to earthing grid and compact the ground surface in depths of 300mm compacting to
3.3
95% Mod AASHTO density

1.00

m3

0.00

3.65

0.00

12.00

No

0.00

The excavation in insitu material for construction of 500mm wide x 700mm deep cast insitu
6.3 reinforced concrete trenches including bends and junctions to include 100mm diameter PVC drain
pipe at 4m centres at the bottom of the trench

220.00

0.00

6.4 Concrete trench cover for 500mm wide trench (with maximal weight of 50 kg each)

440.00

No

0.00

Supply and install fire alarm with mimic indication


3.1 EARTH MAT

6.0 CABLE TRENCH (refer to drawing no. SHT 6 )


The excavation in insitu material for construction of 450mm deep x 450mm wide cast insitu
6.1 reinforced concrete trenches including bends and junctions to include 100mm diameter PVC drain
pipe at 4m at bottom of the trench

6.2 Concrete trench cover for 450 mm wide trench - Vastrap Type 1-6mm plate 10mm thick

Subtotal
Vat
16%
Final Total - EXCLUDING VAT

$0.00
$0.00
$0.00

KATOTO 33/11kV Substation


Reference
B1-3.6.2.15 page 49

No. Description
1.0 P & G's
CIVIL SUB CONTRACTORS OWN REQUIRMENTS
1.0

MOBILIZATION FOR CIVIL SUB CONTRACTOR - OWN REQUIRMENTS -Establishment of


site camp and stores including site clearance for civil contractors own requirements

Supervision & Labour FOR Civil Sub Contractor, own requiremnts for the duration of the
1.1
Contract - 6 Months
DE MOBILIZATION FOR CIVIL SUB CONTRACTOR - OWN REQUIRMENTS - De1.2
establishment of site camp and stores
Costs for obligations, equipment or labour, although not specified, is required to complete the
1.3 Contract in terms of the specification and Statutory Requirements

Quantity

Unit

Number Rate in MK

Total in MK

1.00

Item

0.00

1.00

Month

0.00

1.00

Item

0.00

1.00

Item

0.00

1.00

Item

0.00

1.00

Item

0.00

1.00
1.00
1.00
2.00
1.00

Item
Item
Item
Item
Item

1
1
1
1
1

0.00
0.00
0.00
0.00

1.00

Item

1.00

Month
Rate per
Liter
Item
Item
Month

FACILITIES FOR CUSTOMER AND ABB


The facilities shall be provided with the services necessary for their
operation, such as electrical energy, portable water supply, sewers,
drainage system with soak pit, fire extinguishing system, ext. These
containers either in containerized or hard block construction shall be
installed at locations to be indicated by the Employer and the Contractor
shall maintain them throughout the project period and shall, upon request,
remove them after the completion of work. The temporary site facilities for
the Employer shall be structurally sound and compatible with the weather
conditions on site as follows:
B1-3.6.2.14 page 47

B1-4.9.7.14 page 152

Temporary Site Office (Duration of Civil Contract 6 Months) for Employer & ABBConsisting of:
- Two Rooms (3 by 3 m)
- One Toilet Room
- One Kitchen Room
- Tables, Chairs, a desk, filing cabinets, air conditioning for both Rooms (Heating &
cooling)
Temporary Accommodation for Employer - 4 by Client Personal & 1 by ABB Personal 1.5
At Site Consiting of:
- Two Rooms (4 by 3 m)
- FOR ABOVE ROOMS - New Beds for 4 People, 2 in each Room, Wardrobe Cabinet,
Tables Chairs, Air conditioning for both Rooms (Heating & cooling) ext.
- One Toilet Room - (3 by 2 = 6m^2)
- One Shower Room - (3 by 2 = 6m^2)
- One Kitchen Room - (3 by 3 = 9m^2)
- FOR ABOVE KITCHEN - Refrigerator, Microwave Oven and 2 Plate Cooker
1.6 Temporary Septic Tank (Local Design)
1.7 Temporary Soak away Pit (Local Design)
1.8 Temporary fence around site establishment - 50m by 50m
1.9 Temporary gate
Temporary water tank for Site Offices - Supply & Install - 250lt Tank on elevated Tank
1.10
Stand - RATE ONLY
Temporary electricity connection/generator allow for Purchase of 7.5kVa Generator 1.11
RATE ONLY
1.12 Water usage - RATE ONLY per Month for 250 Liters
1.4

1.13 Electricity/petrol or diesel - RATE PER LITER

1.00

1.14 Tempoary site sign board


1.15 Health and Saftey - safety signs and PPE according to ABB specifications
1.16 Security guard (allow 1x person for day watch and 2 x person for night watch)

1.00
1.00
1.00

2 SITE WORKS
2.1 Remove all bushes, shrubs and trees and strip 200mm of topsoil to be stockpiled on
site for later use. All material not used will be dumped at a site located by the
employer within 10km from site
2.2 Bulk excavations (cut) in insitu material
2.3 Extra over bulk excavations in clay and black cotton - RATE ONLY
2.4 Extra bulk excavations in intermediate material
2.5 Extra over bulk excavations in hard rock
2.6 Level and compact final cut layer to 95% Mod AASHTO
2.7 Rate for overhaul per m3 of spoil for a distance greater than 10km - rate per km
2.8 Backfill (fill) with insitu material and compact the ground surface in depths of
300mm compacting to 95% Mod AASHTO density

1
1
6

0.00
0.00
0.00

2,500.00

m2

0.00

1,406.56

0.00
0.00
0.00
0.00

1,250.00

m3
m3
m3
m2

1.00

Km

0.00

1,406.56

m3

0.00

0.00
140.66
70.33

0.00

2.9 Backfill with imported G5 material and compact the ground surface in depths of
300mm compacting to 95% Mod AASHTO density - RATE ONLY

0.00

3 TESTS (shall be performed for each 500m 3 of fill)


Analyzing the ingredients of the water used for performance of the work
Gravity of soil
Bearing capacity of soil for static load
Brain size analysis of soils, if "Replacement of Material" is required
Density of soil in place of sandcone method for each second layer of "Backfilling
and/or replacement of material and/or roadwork"

1.00
3.00
1.00
3.00

Test
Test
Test
Test

0.00
0.00
0.00
0.00

3.00

Test

0.00

2.00
2.00
2.00
2.00
3.00
1.00
1.00

Test
Test
Test
Test
Test
Item
Item

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Cement
Aggregate
Sand
Fillers
Concrete cubes
3.1 Keeping all foundations free of water
3.2 Risk of collapse to sides of all excavations

S9.12.1 page 144

3.3 33 kV Gantry - ZZZ-824-300.FND


Excavation in insitu material

5.08

m3

12

0.00

S9.16 page 155- 164

Blinding - 20mPa (50mm thick)

0.24

m3

12

0.00

S9.16 page 155- 164

Smooth Formwork (to be steel or sound timber)

5.04

m2

12

0.00

S9.16 page 155- 164

Rough formwork (to be steel or sound timber)

2.64

m2

12

0.00

S9.16 page 155- 164


S9.16 page 155- 164
S9.16 page 155- 164

Concrete - 30mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

3.22
5.60
1.96

m3
m
m2

12
12
12

0.00
0.00
0.00

S9.13.2 page 147

Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO

1.62

m3

12

0.00

S9.13.5 page 149


S9.20.2 page 169
S9.20.6 page 172
S9.16 page 155- 164

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 30mPa to top of stub

3.46
188.00
1.00
0.10

m3
kg
No
m3

12
12
12
12

0.00
0.00
0.00
0.00

1.23

m3

0.00

S9.12.1 page 144

3.4 33 kV Circuit Breaker - ZZZ-824-321.FND


Excavation in insitu material

S9.16 page 155- 164

Blinding - 20mPa (50mm thick)

0.14

m3

0.00

S9.16 page 155- 164

Smooth Formwork (to be steel or sound timber)

2.04

m2

0.00

S9.16 page 155- 164

Rough formwork (to be steel or sound timber)

0.00

0.00

S9.16 page 155- 164


S9.16 page 155- 164
S9.16 page 155- 164

Concrete - 35mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

1.64
6.80
2.73

m
m
m2

3
3
3

0.00
0.00
0.00

S9.13.2 page 147

Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO

0.00

m3

0.00

S9.13.5 page 149


S9.20.2 page 169
S9.20.6 page 172
S9.16 page 155- 164

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 30mPa to top of stub

1.23
103.00
1.00
0.14

m3
kg
No
m3

3
3
3
3

0.00
0.00
0.00
0.00

S9.12.1 page 144

3.5 33 kV Current Transformer - ZZZ-824-317.FND


Excavation in insitu material

0.85

m3

0.00

S9.16 page 155- 164

Blinding - 20mPa (50mm thick)

0.05

m3

0.00

S9.16 page 155- 164

Smooth Formwork (to be steel or sound timber)

1.96

m2

0.00

S9.16 page 155- 164

Rough formwork (to be steel or sound timber)

1.20

m2

0.00

S9.16 page 155- 164


S9.16 page 155- 164
S9.16 page 155- 164

Concrete - 35mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

0.64
2.80
0.49

m3
m
m2

9
9
9

0.00
0.00
0.00

S9.13.2 page 147

Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO

0.26

m3

0.00

S9.13.5 page 149


S9.20.2 page 169
S9.20.6 page 172
S9.16 page 155- 164

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 30mPa to top of stub

0.59
40.00
1.00
0.02

m3
kg
No
m3

9
9
9
9

0.00
0.00
0.00
0.00

S9.12.1 page 144

3.6 33 kV Voltage Transformer - ZZZ-824-318.FND


Excavation in insitu material

0.85

m3

0.00

S9.16 page 155- 164

Blinding - 20mPa (50mm thick)

0.05

m3

0.00

S9.16 page 155- 164

Smooth Formwork (to be steel or sound timber)

1.96

0.00

S9.16 page 155- 164

Rough formwork (to be steel or sound timber)

1.20

0.00

S9.16 page 155- 164


S9.16 page 155- 164
S9.16 page 155- 164

Concrete - 35mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

0.64
2.80
0.49

m
m
m2

6
6
6

0.00
0.00
0.00

S9.13.2 page 147

Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO

0.26

m3

0.00

S9.13.5 page 149


S9.20.2 page 169
S9.20.6 page 172
S9.16 page 155- 164

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 30mPa to top of stub

0.59
40.00
1.00
0.02

m3
kg
No
m3

6
6
6
6

0.00
0.00
0.00
0.00

S9.12.1 page 144

3.7 14M Lighting Mast - ZZZ-824-308.FND


Excavation in insitu material

1.67

m3

0.00

S9.16 page 155- 164

Blinding - 20mPa (50mm thick)

0.10

m3

0.00

S9.16 page 155- 164

Smooth Formwork (to be steel or sound timber)

1.96

m2

0.00

S9.16 page 155- 164

Rough formwork (to be steel or sound timber)

1.68

m2

0.00

S9.16 page 155- 164


S9.16 page 155- 164
S9.16 page 155- 164

Concrete - 30mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

0.93
2.80
0.49

m3
m
m2

2
2
2

0.00
0.00
0.00

S9.13.2 page 147

Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO

0.74

m3

0.00

S9.13.5 page 149


S9.20.2 page 169
S9.20.6 page 172
S9.16 page 155- 164

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 30mPa to top of stub

0.93
47.00
1.00
0.02

m3
kg
No
m3

2
2
2
2

0.00
0.00
0.00
0.00

S9.12.1 page 144

3.8 33 kV Surge Arrestor - ZZZ-824-319.FND


Excavation in insitu material

0.85

m3

0.00

S9.16 page 155- 164

Blinding - 20mPa (50mm thick)

0.05

m3

0.00

S9.16 page 155- 164

Smooth Formwork (to be steel or sound timber)

1.96

m2

0.00

S9.16 page 155- 164

Rough formwork (to be steel or sound timber)

1.20

m2

0.00

S9.16 page 155- 164


S9.16 page 155- 164
S9.16 page 155- 164

Concrete - 35mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

0.64
2.80
0.49

m3
m
m2

9
9
9

0.00
0.00
0.00

S9.13.2 page 147

Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO

0.26

m3

0.00

S9.13.5 page 149


S9.20.2 page 169
S9.20.6 page 172
S9.16 page 155- 164

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 30mPa to top of stub

0.59
40.00
1.00
0.02

m3
kg
No
m3

9
9
9
9

0.00
0.00
0.00
0.00

S9.12.1 page 144

3.9 33 kV Disconnetor - ZZZ-824-320.FND


Excavation in insitu material

1.78

m3

0.00

S9.16 page 155- 164

Blinding - 20mPa (50mm thick)

0.10

m3

0.00

S9.16 page 155- 164

Smooth Formwork (to be steel or sound timber)

3.36

m2

0.00

S9.16 page 155- 164

Rough formwork (to be steel or sound timber)

1.80

0.00

S9.16 page 155- 164


S9.16 page 155- 164
S9.16 page 155- 164

Concrete - 35mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

1.13
4.80
0.72

m
m
m2

5
5
5

0.00
0.00
0.00

S9.13.2 page 147

Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO

0.69

m3

0.00

1.09
83.00
1.00
0.04

m3
kg
No
m3

5
5
5
5

0.00
0.00
0.00
0.00

S9.13.5 page 149


S9.20.2 page 169
S9.20.6 page 172
S9.16 page 155- 164
S9.12.1 page 144

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 30mPa to top of stub
4.0 33 kV High Post Insulator - ZZZ-824-322.FND
Excavation in insitu material

4.28

m3

0.00

S9.16 page 155- 164

Blinding - 20mPa (50mm thick)

0.25

m3

0.00

S9.16 page 155- 164

Smooth Formwork (to be steel or sound timber)

3.92

m2

0.00

S9.16 page 155- 164

Rough formwork (to be steel or sound timber)

3.00

m2

0.00

S9.16 page 155- 164


S9.16 page 155- 164
S9.16 page 155- 164

Concrete - 30mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

2.20
5.60
0.98

m3
m
m2

3
3
3

0.00
0.00
0.00

S9.13.2 page 147

Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO

2.03

m3

0.00

S9.13.5 page 149


S9.20.2 page 169

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only

2.25
136.00

m3
kg

3
3

0.00
0.00

S9.20.6 page 172


S9.16 page 155- 164

S9.12.1 page 144

HD Bolts - Template and installation (ABB to supply bolts)


Grout - 30mPa to top of stub
4 Auxillary Transformer - ZZZ-830-323.FND
Excavation in insitu material

2.00
0.05

No
m3

3
3

0.00
0.00

0.49

m3

0.00

S9.16 page 155- 164

Blinding - 20mPa (50mm thick)

0.10

m3

0.00

S9.16 page 155- 164

Smooth Formwork (to be steel or sound timber)

2.24

m2

0.00

S9.16 page 155- 164

Rough formwork (to be steel or sound timber)

0.00

m2

0.00

S9.16 page 155- 164


S9.16 page 155- 164
S9.16 page 155- 164

Concrete - 30mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

0.78
5.60
1.96

m3
m
m2

1
1
1

0.00
0.00
0.00

S9.13.2 page 147

Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO

0.00

m3

0.00

S9.13.5 page 149

Stock pile insitu surplus material (for carting away)

0.49

m3

0.00

S9.20.2 page 169


S9.20.6 page 172
S9.16 page 155- 164

Reinforcing - Supply & Fix only


HD Bolts - Template and installation (ABB to supply bolts)
Grout - 30mPa to top of stub

3.92
1.00
0.10

m2
No
m3

1
1
1

0.00
0.00
0.00

S9.12.1 page 144

4.2 Yard Marshalling Kiosk


Excavation in insitu material

0.13

m3

0.00

S9.16 page 155- 164

Blinding - 20mPa (50mm thick)

0.03

m3

0.00

S9.16 page 155- 164

Smooth Formwork (to be steel or sound timber)

0.96

m2

0.00

S9.16 page 155- 164

Rough formwork (to be steel or sound timber)

0.00

m2

0.00

S9.16 page 155- 164


S9.16 page 155- 164
S9.16 page 155- 164

Concrete - 30mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

0.19
3.20
0.63

m3
m
m2

3
3
3

0.00
0.00
0.00

S9.13.2 page 147

Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO

0.00

m3

0.00

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 30mPa to top of stub
4.3 Transformer Plinth 33/11kv 10MVA
Excavations in insitu material:
Strip excavations
Sump excavations
Plinth
Surface bed
Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO
Stock pile insitu surplus material (for carting away)
Blinding - 20mPa (50mm thick):
Strip Footing concrete
Sump Concrete
Plinth
Surface bed
Concrete - 30mPa, 19mm Stone:
Strip Footing concrete
Sump Concrete
Plinth
Surface bed
Part of the road
Formwork:
Smooth Formwork:
Sump walls
Plinth
Rough Formwork:
Strip footing
25 x 25mm Chamfer to sides of plinth
Concrete finish woodfloat:
Surface bed
Plinth
Reinforcing (MESH ref 617):
Surface bed
Plinth
Sundries:
Sump frame - 30 x 30 x 5Lg cast in and galvanised. 25 x 5mm flat x 100Lg fishtail
lugs
to angle
(5mmgravel
fillet) to
at 500mm
c/c. To fit in the open grid which is
75 toweld
100mm
Diameter
fill oil drain
1600mm wide with 30 x 4.5mm bearer bars, and 40 x 40mm openings (fully banded)
Brickwork (including stairs)
Brickforce 120mm wide (every second layer)
Construction/expansion joints between concrete and brick
50 x 3 flat copper bend to suit connection on transformer points
One set of rails on tranformer plinth
Benching the inside of the sump with 20mm benching render
Paint x 2 layers of bitumen to surface

0.13
0.00
0.00
0.03

m3
kg
No
m3

3
3
3
3

0.00
0.00
0.00
0.00

8.32
0.58
7.35
9.07
4.54
20.78

m3
m3
m3
m3
m3
m3

1
1
1
1
1
1

0.00
0.00
0.00
0.00
0.00
0.00

0.76
0.03
1.05
2.27

m3
m3
m3
m3

1
1
1
1

0.00
0.00
0.00
0.00

3.02
0.33
12.60
4.54
4.41

m3
m3
m3
m3
m3

1
1
1
1
1

0.00
0.00
0.00
0.00
0.00

2.24
11.40

m2
m2

1
1

0.00
0.00

13.46
19.00

m2
m

1
1

0.00
0.00

45.36
21.00

m2
m2

1
1

0.00
0.00

45.36
42.00

m2
m2

1
1

0.00
0.00

45.36
4.54
31.28
125.12
2.22
8.00
20.10
1.00
50.00

m2
m3
m2
m2
m2
m
m
Item
m2

1
1
1
1
1
1
1
1
1

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

47.33
119.88
47.33

m3
m2
m3

0.00
0.00
0.00

8.24

m3

0.00

S9.13.5 page 149


S9.20.2 page 169
S9.20.6 page 172
S9.16 page 155- 164
S9.12.1 page 144

S9.13.2 page 147


S9.16 page 155- 164

S9.16 page 155- 164

S9.16 page 155- 164

S9.16 page 155- 164

S9.20.2 page 169

S9.22 page 174 - 177


S9.22 page 174 - 177

S9.12.1 page 144

S9.16 page 155- 164

S9.20.2 page 169

S9.25page 188

4.4 CONTROL BUILDING - 5084014-CONT-E1000


Excavations in insitu material:
Strip foundation
Prepare and spary with an approved anti-termite control under building
Stock pile insitu surplus material (for carting away)
Concrete:
Reinforced concrete - 30mPa, 19mm Stone to surface bed
Prestressed fabricated concrete lintels:
In lengths not exceeding 3m
Reinforcing:
Reinforcing mesh ref. 395
Reinforcing - Supply & Fix only
200mm Thick blockwork
DPC (Damp proof course)
DPM (Damp proof membrame)
Wood float top of concrete
Floor Finishes:
Epoxy screed (trowel applied minimum 5 mm thick) and epoxy seal coat - switchgear
and battery charger rooms
Glazed non-slip fully vitrified ceramic tiles - rest room, toilets, kitchen, messroom
Acid resistant ceramic tiles - battery rooms

23.00

0.00

119.88
270.00
216.94
15.24
119.88
119.88

m2
kg
m2
m2
m2
m2

0.00
0.00

88.00

m2

0.00

14.70

0.00

m2

0.00

9.00

0.00
0.00
0.00

S9.29-S9.34 page 196-200


s9.24.2page181 - 183
S9.24.4 page 184
S9.29 page 196
S9.30 page 197-201
S9.36 page 207-page 214

600 x 500mm deep internal concrete trench. Trench walls and bottom to be 100mm
thick
Internal Wall Finishes:
Plaster to brickwork and concrete

38.00

0.00

210.08
104.78
105.30

m2
m2
m2

0.00
0.00
0.00

136.04
136.04

m2
m2

0.00
0.00

1.00
3.00
1.00

No
No
No

0.00
0.00
0.00

1.00

No

0.00

3.00

No

0.00

Steel:
Doors:
Single
Type D4: 885 x 2100mm Frame and timber doors door including all ironmongery
complete (internal)
Double
Type D2: 1750 x 2500mm Frame and steel door including all ironmongery complete
(internal)
Airconditioner in control building Split Unit - 18000 BTU

2.00

No

0.00

1.00

No

0.00

6.00

Item

0.00

Allow one double door cupboard with shelves underneath sink for kitchen

1.00

No

0.00

Two plate electric cooker

1.00

Item

0.00

149.04

m2

0.00

7.00

No

0.00

50.80

0.00

58.36

0.00

5.20

0.00

m2

0.00

Glazed ceramic tiles 2.3m high, plaster and paint - kitchen, messroom
Paint brickwork and concrete (weatherproof)
External Wall Finish:
Plaster to brickwork and concrete
Paint on plaster (weatherproof)
Aluminium Frames:
Windows:
Type W1: 2700 x 1090mm Frame including 4mm single glaze complete
Type W2: 900 x 900mm Frame including 4mm single glaze complete
Type W3: 600x 600mm Frame including 4mm single glaze complete
Doors:
Single
Type D3: 885 x 2500mm Frame and steel doors door including all stainless steel
ironmongery complete (external)
Double
Type D1: 1750 x 2500mm Frame and steel door including all stainless steel
ironmongery complete (external)

S9.49 page 276

S9.23 page 178- page 185


S9.23 page 178- page 185

Roof:
Roofing to be first class red clay tiled with a size 305 x152 x 32mm in both layers to
be fitted including all necessary fittings complete.
Treated wooden roof trusses of 26 degrees angle rafters, tie beams, rails, struts,
braces, cleats, purlins, etc and flat bearer, gusset and connection plates, bolted or
gangnailed with an overall length of 4.6m and height of 1.805m (There are 7
trusses). Spacing 3m apart connected by 38 x 38 mm wooden treated battens .
Battens to be 305mm apart centre to centre and shall be placed straight and
parallell lines .
225 x 15mm ABS cement barge board
Pre-painted aluminium 150 x 150mm box gutters including necessary collared and
sealed expansion joints

S9.45 page 237

Pre-painted aluminium 100 x100mm down pipes, including holderbats, brackets etc
S9.45.3 page 258
Ceiling:
Suspended ceiling champered and grooved acoustic panels on concealed suspension
grid including hangers etc
Plumbing:
WC with all necessary connections, fittings and piping complete and toilet paper
holder

S9.48 page 275

Basin with all necessary connections, fittings and piping complete with soap
dispenser and mirror
Sink with all necessary connections, fittings, gulley and piping complete
Shower with all necessary connections, fittings and piping complete
Extras
Supply and install fire 9kg CO2 extinguisher with sign
Supply and install fire alarm
Furniture:
Desks (size 1500 x 700mm with drawers)
Tables (size 2000 x 1000mm)
Swivel chairs
Visitors' chairs (to be plastic)
Cupboards (two door cupboard with dividing shelves )

S9.12.1 page 144

119.88

No

0.00

1.00

No

0.00

1.00
1.00

No
No

0.00
0.00

5.00
1.00

No
No

2.00
2.00
4.00
2.00
2.00

No
No
No
No
No

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

4.97
16.00
4.97

m3
m2
m3

0.00
0.00
0.00

2.58

m3

0.00

11.00

0.00

16.00
50.08
5.40
28.03
28.03

m2
m2
m2
m2
m2

0.00
0.00
0.00
0.00
0.00

16.00

m2

0.00

68.90
58.55
10.35

m2
m2
m2

0.00
0.00
0.00

165.00
45.50

m2
m2

0.00
0.00

1.00
3.00
1.00

No
No
No

0.00
0.00
0.00

1.00

S9.16 page 155- 164


S9.12.1 page 144

S9.16 page 155- 164

S9.20.2 page 169

4.41 Guard House - 5084014-GUAR-E1000


Excavations in insitu material:
Strip foundation
Prepare and spary with an approved anti-termite control under building
Stock pile insitu surplus material (for carting away)
Concrete:
Reinforced concrete - 30mPa, 19mm Stone to surface bed
Prestressed fabricated concrete lintels:
In lengths not exceeding 3m
Reinforcing:
Reinforcing mesh ref. 395
200mm thick block work
DPC (Damp proof course)
DPM (Damp proof membrame)
Wood float top of concrete
Floor Finishes:
Glazed non-slip fully vitrified ceramic tiles
Internal Wall Finishes:
Plaster to brickwork and concrete
Paint on plaster (weatherproof)

S9.25page 188
S9.29 page 196
s9.24.2page181 - 183
S9.29 page 196

S9.36
S9.36
S9.36
S9.36

page
page
page
page

207-page
207-page
207-page
207-page

214
214
214
214

Glazed ceramic tiles 2.3m high, plaster and paint - kitchen, messroom
External Wall Finish:
Plaster to brickwork
Paint on plaster (weatherproof)
Aluminium Frames:
Windows:
Type W1: 1860 x 1090mm Frame including 4mm single glaze complete
Type W2: 900 x 900mm including Frame 4mm single glaze complete
Type W3: 600 x 600mm including Frame 4mm single glaze complete
Doors:
External:
Double

S9.23-1-3 PAGE 178


S9.23-1-3 PAGE 178 &
S9.23.4 page 179

Type D1: 885 x 2100mm


complete
Internal :(external)
Double
Type D2: 885 x 2100mm
complete
(external)
Single
Type D3: 885 x 2100mm
complete
(internal)
Type
D4: 885
x 2100mm
(internal)

Frame and steel door including stainless steel ironmongery

2.00

No

0.00

Frame and steel door including stainless steel ironmongery

1.00

No

0.00

Frame and steel door including stainless steel ironmongery


Frame and timber door including all ironmongery complete

1.00

No

0.00

4.00

No

0.00

20.00

m2

0.00

3.00

No

0.00

8.00

0.00

5.20

0.00

Roof:
Roofing to be first class red clay tiled with a size 305 x152 x 32mm in both layers to
be fitted including all necessary fittings complete.
Treated wooden roof trusses of 26 degrees angle rafters, tie beams, rails, struts,
braces, cleats, purlins, etc and flat bearer, gusset and connection plates, bolted or
gangnailed with an overall length of 4.6m and height of 1.805m (There are 7
trusses). Spacing 3m apart connected by 38 x 38 mm wooden treated battens .
Battens to be 305mm apart centre to centre and shall be placed straight and
parallell lines .
Pre-painted aluminium 150 x 150mm box gutters including necessary collared and
sealed
expansion
joints 100 x100mm down pipes, including holderbats, brackets etc
Pre-painted
aluminium

S9.45 page 237


S9.45.3 page 258

Ceiling:
Suspended
ceiling champered and grooved acoustic panels on concealed suspension
grid including hangers etc
Supply and install 12 000 BTU airconditioner
Plumbing:
WC with
allall
necessary
connections,
fittings
and
piping
complete
and
toilet
paper
Basin
with
necessary
connections,
fittings
and
piping
complete
with
soap
holder
dispenser
and mirror
Extras
Supply and install fire 9kg CO2 extinguisher with sign
Supply and install fire alarm

S9.12.1 page 144

S9.12.1 page 144

4 EARTH MAT
4.1 Excavate 300mm (width) x 1000mm (depth) for earth grids
4.2 Backfilling to earthing grid and compact the ground surface in depths of 300mm
compacting to 95% Mod AASHTO density
5 CABLE TRENCH (refer to drawing no. ZZZ 824-200)
5.1 The excavation in insitu material for construction of 1200mm deep x 500mm wide
cast insitu reinforced concrete trenches including bends and junctions to include
100mm diameter PVC drain pipe at 4m centres at the bottom of the trench
5.2 Concrete trench cover for 500mm wide trench (with maximal weight of 50 kg each)
5.3 The excavation in insitu material for construction of 500mm wide x 700mm deep
cast insitu reinforced concrete trenches including bends and junctions to include
100mm diameter PVC drain pipe at 4m centres at the bottom of the trench
5.4 Concrete trench cover for 500mm wide trench (with maximal weight of 50 kg each)

S9.45.1 page 237-273

6 DRAINAGE
6.1 Subsoil Drain Supply, lay and joint 2 x 160mm diameter preferated uPVC pipe to be
laid 1100mm below NGL in trench which is to be lined with geofabric material
(bidem gade A6) and backfill with 50 to 75mm diameter stone, including excavation,
temporary support of sides, keeping excavations dry, complete (refer to drawing no.
ZZZ 824-200)
6.2 Construct cast insitu concrete manhole with lid and including excavation in insitu
of sides,
keeping
excavations
complete
to
6.3 material,
Constructtemporary
cast insitu support
septic tank
overall
size 2500
X 1500 Xdry,
1500mm
with(refer
lid and
drawing
ZZZ
824-200)
including
excavation,
temporary
support
sides,
keeping
excavations
dry,
6.4 Construct
insitu
soak
overall
size of
2000
x 2000
x 1000mm
to
becomplete
filled
Headwallno.
-cast
concrete
to
fit pit
450mm
diameter
concrete
pipe
(refer
tohole
drawing
no.
ZZZ
(refer100
to drawing
no.rock,
ZZZ including
824-207) excavtion and backfilling (refer to drawing no.
with
to 150mm
6.5 824-200)
824-207)
Supply,
lay, joint and bed 450mm diameter class 50D spigot and socket ended
6.6 ZZZ
concrete sewer pipes including necessary bends and tees
6.7 Supply, lay, joint and bed 110mm Diameter PVC pipe including necessary bends and
tees
6.8 Construct concrete V-drain with a top width of 800mm and bottom width of 100mm
including excavation, temporary support of sides, keeping excavations dry, complete
(refer to drawing no. ZZZ 824-200)

S9.45.1 page 237


S9.44 page 236
S9.45.1 page 237
S9.45.1 page 237
S9.45.1 page 238

S9.12.1 page 144

S9.12.1 page 144


S9.16 page 155- 164

S9.47 page 273

7 WATER SUPPLY
7.1 Supply and install 2000L conservancy tank to Control Building above ground
including
excavation,backfilling,
pipework
and pump
fittingsthat
to sit
onbe
a controlled
concrete foundation
and
install Borehole including
a motor
will
by water
7.2 Supply
complete
(referswitch
to
drawing
ZZZ 824-208
& ZZZ 824 - 205)
controlled
in theno.
smaller
tank
7.3 level
50mm
Diameter
PVC
pipe
7.4 25mm Diameter PVC pipe
7.5 15mm Diameter PVC pipe
8 ROAD - ACCESS AND INTERNAL
Access road
8.1 Excavation in insitu material
8.2 Sub-Base of G5 material compacted to 98% MOD AASHTO
8.3 Internal road
8.4 Excavation in insitu material
8.5 Sub-Base of G5 material compacted to 98% MOD AASHTO
8.6 Insitu reinforced concrete ramps to be constructed at the end of the internal road to
8.7 about 6000mm wide
Road crossing over 5m wide road for cable trench.Precast concrete culvet (size 1200
x 900 x 600mm and the internal walls to be 100mm thick)
8.8 Segmented paving - Supply and lay 80 mm interlocking concrete pavers including 50
bed (max
30 mm);
edge
and cutting
of units
where
required:
8.9 mm
Insitusand
reinforced
concrete
ramps
torestraint
be constructed
in front
of control
building
doors
Strength:
251800mm
Mpa bends
be about
wide
9.9 to
Kerbing
including
and end pieces

0.00

1.00
1.00

No
No

1.00
1.00

No
No

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

150.00

m3

0.00

150.00

m3

0.00

20.00

0.00

66.67

No

0.00

65.00

0.00

141.00

No

0.00

53.00

0.00

2.00
1.00
1.00
1.00

No
No
No
No

0.00
0.00
0.00
0.00

25.00

0.00

20.00

0.00

100.00

0.00

Item
Item
m
m
m

0.00
0.00
0.00
0.00
0.00

4,500.00
2,250.00

m3
m3

0.00
0.00

48.00
24.00
2.00

m3
m3
No

0.00
0.00
0.00

16.00
1.00

1.00
1.00
50.00
40.00
35.00

m2
Item

5.00

No

0.00

110.00
2.00
34.00

m2
No
m

0.00
0.00
0.00

9 YARD WORKS
200.00
9.1 Palisade Fence Complete
60.00
9.2 The complete, supply and installation of a security fence, including earthing of all
parts,
gates etc.
2mwith
Higha diamond
meshthat
plastic
coated
galvanised
steel wire
1m Wide
pedestrian
gate
frame height
matches
the
fence
1.00
9.3 metal
and
300mmflat
wrap
razor
wire
on
the
overhang
fence
and
consists
of
a
vertical
post
9.4 Prepare and comply with an approved weed control and spread over substation
6,292.30
with 45 degree inclination at the apex, fence to be fixed on a ring-beam foundation
9.5 Supply and application of 76mm stone, 100mm deep, to one meter beyond fences,
629.23
levelling
and rolling
to compact
the stone
layer.
9.6 including
Landscaping
- Planting
of medium-high
growing
plants
and grass (Subject to
150.00
approval of Employer)

m
m
No
m2
m3
m2

0.00
0.00
0.00
0.00
0.00
0.00

Subtotal

0.00

Final Total - EXCLUDING VAT

0.00

ITEM 15 NOT TO BE FILLED BY CONTRACTOR


Totals in MK

15
(a)
(b)
(c )
(d)
(e )
(f)
(g)
(h)
(i)
(j)
(k)
(l)
(m)
(n)
(o)
(p)
(q)
(r )
(s)

Installation of Civil works :


Preparation of the construction area

(t)
(u)
(v)
(w)

Piping system (water, drainage, etc.) to and inside the building


Sewage system
Roads to and inside the substation area
Other necessary associated works for complete functioning. ( Guardhouse ), Auxillary Transfromer , Marshall Kiosk ) +
Total
MWK

Foundations for three phase 33 kV circuit breakers


Foundations for three phase 33 kV disconnector with/without earthing switch
Foundations for single phase 33 kV current transformers
Foundations for single phase 33 kV voltage transformers
Foundations for single phase 33 kV lightning arrestors
Foundations for single phase 33 kV post insulators
Foundations for 33 kV gantries and Bus Structures
Foundations for single phase 11 kV lightning arrestors
Cable channels incl. cover plates
Earth works for earthing system
Transformer foundation incl. oil catching pit
Foundations for fencing and gate
Fence and gate
Earth works for lighting system
Substation Bulk Earthworks (substation Platform Preparation and drainage)
Construction of the substation building (Complete)
Finishing work (including paving, stoning of Platform, water reticulation etc.)
Technical installation inside and on the building incl. earthing and lightning protection, air-conditioning, heating,
lighting, power and telephone sockets, toilet, kitchen, locking system, etc.

NEW KAUMA - 66/11kV Substation


Reference
B1-3.6.2.15 page 49

No. Description
1.0 P & G's
CIVIL SUB CONTRACTORS OWN REQUIRMENTS

Quantity

Unit

Number

Rate in MK

Total in MK

MOBILIZATION FOR CIVIL SUB CONTRACTOR - OWN REQUIRMENTS


1.0 -Establishment of site camp and stores including site clearance for civil contractors
own requirements

1.00

Item

0.00

1.1

Supervision & Labour FOR Civil Sub Contractor, own requiremnts for the duration of
the Contract - 6 Months

1.00

Month

0.00

1.2

DE MOBILIZATION FOR CIVIL SUB CONTRACTOR - OWN REQUIRMENTS - Deestablishment of site camp and stores

1.00

Item

0.00

1.00

Item

0.00

1.00

Item

0.00

1.00

Item

0.00

1.00
1.00
1.00
2.00
1.00

Item
Item
Item
Item
Item

1
1
1
1
1

0.00
0.00
0.00
0.00

1.00

Item

1.00

Month
Rate per
Liter
Item
Item
Month

Costs for obligations, equipment or labour, although not specified, is required to


1.3 complete the Contract in terms of the specification and Statutory Requirements
FACILITIES FOR CUSTOMER AND ABB
The facilities shall be provided with the services necessary for their
operation, such as electrical energy, portable water supply, sewers,
drainage system with soak pit, fire extinguishing system, ext. These
containers either in containerized or hard block construction shall be
installed at locations to be indicated by the Employer and the Contractor
shall maintain them throughout the project period and shall, upon request,
remove them after the completion of work. The temporary site facilities for
the Employer shall be structurally sound and compatible with the weather
conditions on site as follows:
B1-3.6.2.14 page 47

1.4

1.5

Temporary Site Office (Duration of Civil Contract 6 Months) for Employer & ABBConsisting of:
- Two Rooms (3 by 3 m)
- One Toilet Room
- One Kitchen Room
- Tables, Chairs, a desk, filing cabinets, air conditioning for both Rooms (Heating &
cooling)
Temporary Accommodation for Employer - 4 by Client Personal & 1 by ABB Personal At Site Consiting of:
- Two Rooms (4 by 3 m)
- FOR ABOVE ROOMS - New Beds for 4 People, 2 in each Room, Wardrobe Cabinet,
Tables Chairs, Air conditioning for both Rooms (Heating & cooling) ext.

- One Toilet Room - (3 by 2 = 6m^2)


- One Shower Room - (3 by 2 = 6m^2)
- One Kitchen Room - (3 by 3 = 9m^2)
- FOR ABOVE KITCHEN - Refrigerator, Microwave Oven and 2 Plate Cooker
1.6 Temporary Septic Tank (Local Design)
1.7 Temporary Soak away Pit (Local Design)
1.8 Temporary fence around site establishment - 50m by 50m
1.9 Temporary gate
Temporary water tank for Site Offices - Supply & Install - 250lt Tank on elevated Tank
1.10
Stand - RATE ONLY
Temporary electricity connection/generator allow for Purchase of 7.5kVa Generator 1.11
RATE ONLY
1.12 Water usage - RATE ONLY per Month for 250 Liters

B1-4.9.7.14 page 152

B1-4.9.7.14 page 153

B02-4.6.7 page 77

1.13 Electricity/petrol or diesel - RATE PER LITER

1.00

1.14 Tempoary site sign board


1.15 Health and Saftey - safety signs and PPE according to ABB specifications
1.16 Security guard (allow 1x person for day watch and 2 x person for night watch)

1.00
1.00
1.00

2 SITE WORKS - PLATFORM


2.1 Remove all bushes, shrubs and trees and strip 200mm of topsoil to be stockpiled on
site for later use. All material not used will be dumped at a site located by the
employer within 10km from site
2.2 Bulk excavations (cut) in insitu material
2.3 Extra over bulk excavations in clay and black cotton - RATE ONLY
2.4 Extra bulk excavations in intermediate material

1
1
1
6

0.00
0.00
0.00

3,600.00

m2

0.00

1,081.00
-

m3

0.00

108.10

m3
3

0.00
0.00

2.5 Extra over bulk excavations in hard rock


2.6 Level and compact final cut layer to 95% Mod AASHTO
2.7 Rate for overhaul per m3 of spoil for a distance greater than 10km - rate per km

1,800.00

m3
m2

1.00

Km

2.8 Backfill (fill) with insitu material and compact the ground surface in depths of 300mm
compacting to 95% Mod AASHTO density

1,081.00

m3

54.05

0.00

0.00

2.9 Backfill with imported G5 material and compact the ground surface in depths of
300mm compacting to 95% Mod AASHTO density - RATE ONLY

0.00

3 TESTS (shall be performed for each 500m3 of fill)


Analyzing the ingredients of the water used for performance of the work
Gravity of soil
Bearing capacity of soil for static load
Brain size analysis of soils, if "Replacement of Material" is required
Density of soil in place of sandcone method for each second layer of "Backfilling
and/or replacement of material and/or roadwork"

1
3
1
3

Test
Test
Test
Test

0.00
0.00
0.00
0.00

Test

0.00

2
2
2
2
3
1
1

Test
Test
Test
Test
Test
Item
Item

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Cement
Aggregate
Sand
Fillers
Concrete cubes
3.1 Keeping all foundations free of water
3.2 Risk of collapse to sides of all excavations

3.3 66 kV Gantry - ZZZ-824-309-FND


Excavation in insitu material

8.83

m3

12

0.00

S9.16 page 155- 164

Blinding - 20mPa (50mm thick)

0.42

m3

12

0.00

S9.16 page 155- 164

Smooth Formwork (to be steel or sound timber)

5.04

12

0.00

S9.16 page 155- 164

Rough formwork (to be steel or sound timber)

3.48

12

0.00

S9.16 page 155- 164


S9.16 page 155- 164
S9.16 page 155- 164

Concrete - 35mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

4.29
5.60
1.96

m
m
m2

12
12
12

0.00
0.00
0.00

S9.13.2 page 147

Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO

4.52

m3

12

0.00

S9.13.5 page 149


S9.20.2 page 169
S9.20.6 page 172
S9.16 page 155- 164

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 30mPa to top of stub

4.31
233.00
1
0.10

m3
kg
No
m3

12
12
12
12

0.00
0.00
0.00
0.00

S9.12.1 page 144

3.4 66 kV Isolator - ZZZ - 824-309-FND

S9.12.1 page 144

Excavation in insitu material

6.50

m3

0.00

S9.16 page 155- 164

Blinding - 20mPa (50mm thick)

0.38

m3

0.00

S9.16 page 155- 164

Smooth Formwork (to be steel or sound timber)

10.08

m2

0.00

S9.16 page 155- 164

Rough formwork (to be steel or sound timber)

3.44

m2

0.00

S9.16 page 155- 164


S9.16 page 155- 164
S9.16 page 155- 164

Concrete - 35mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

3.81
14.4
2.16

m3
m
m2

5
5
5

0.00
0.00
0.00

S9.13.2 page 147

Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO

2.74

m3

0.00

S9.13.5 page 149


S9.20.2 page 169
S9.20.6 page 172
S9.16 page 155- 164

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 30mPa to top of stub

3.76
210
1
0.11

m3
kg
No
m3

5
5
5
5

0.00
0.00
0.00
0.00

S9.12.1 page 144

3.5 66 kV Circuit Breaker - ZZZ-824-314.FND


Excavation in insitu material

2.43

m3

0.00

S9.16 page 155- 164

Blinding - 20mPa (50mm thick)

0.14

m3

0.00

S9.16 page 155- 164

Smooth Formwork (to be steel or sound timber)

3.92

0.00

S9.16 page 155- 164

Rough formwork (to be steel or sound timber)

3.78

0.00

S9.16 page 155- 164


S9.16 page 155- 164
S9.16 page 155- 164

Concrete - 30mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

1.54
5.60
0.98

m
m
m2

3
3
3

0.00
0.00
0.00

S9.13.2 page 147

Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO

0.74

m3

0.00

S9.13.5 page 149


S9.20.2 page 169
S9.20.6 page 172
S9.16 page 155- 164

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 30mPa to top of stub

1.69
86.00
1
0.05

m3
kg
No
m3

3
3
3
3

0.00
0.00
0.00
0.00

S9.12.1 page 144

3.6 66 kV Current Transformer - ZZZ-824-310.FND


Excavation in insitu material

1.67

m3

0.00

S9.16 page 155- 164

Blinding - 20mPa (50mm thick)

0.10

m3

0.00

S9.16 page 155- 164

Smooth Formwork (to be steel or sound timber)

1.96

m2

0.00

S9.16 page 155- 164

Rough formwork (to be steel or sound timber)

1.68

m2

0.00

S9.16 page 155- 164


S9.16 page 155- 164
S9.16 page 155- 164

Concrete - 30mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

0.93
2.80
0.49

m3
m
m2

9
9
9

0.00
0.00
0.00

S9.13.2 page 147

Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO

0.64

m3

0.00

S9.13.5 page 149


S9.20.2 page 169
S9.20.6 page 172
S9.16 page 155- 164

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 30mPa to top of stub

1.03
58.00
1
0.02

m3
kg
No
m3

9
9
9
9

0.00
0.00
0.00
0.00

S9.12.1 page 144

3.7 66 kV Voltage Transformer - ZZZ-824-311.FND


Excavation in insitu material

1.67

m3

0.00

S9.16 page 155- 164

Blinding - 20mPa (50mm thick)

0.10

m3

0.00

S9.16 page 155- 164

Smooth Formwork (to be steel or sound timber)

1.96

0.00

S9.16 page 155- 164

Rough formwork (to be steel or sound timber)

1.68

0.00

S9.16 page 155- 164


S9.16 page 155- 164
S9.16 page 155- 164

Concrete - 30mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

0.93
2.80
0.49

m
m
m2

9
9
9

0.00
0.00
0.00

S9.13.2 page 147

Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO

0.64

m3

0.00

S9.13.5 page 149


S9.20.2 page 169
S9.20.6 page 172
S9.16 page 155- 164

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 30mPa to top of stub

1.03
58.00
1
0.02

m3
kg
No
m3

9
9
9
9

0.00
0.00
0.00
0.00

S9.12.1 page 144

3.8 14M Lighting Mast - ZZZ-824-308.FND


Excavation in insitu material

1.67

m3

0.00

S9.16 page 155- 164

Blinding - 20mPa (50mm thick)

0.10

m3

0.00

S9.16 page 155- 164

Smooth Formwork (to be steel or sound timber)

1.96

m2

0.00

S9.16 page 155- 164

Rough formwork (to be steel or sound timber)

1.68

m2

0.00

S9.16 page 155- 164


S9.16 page 155- 164
S9.16 page 155- 164

Concrete - 30mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

0.93
2.80
0.49

m3
m
m2

2
2
2

0.00
0.00
0.00

S9.13.2 page 147

Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO

0.74

m3

0.00

S9.13.5 page 149


S9.20.2 page 169
S9.20.6 page 172
S9.16 page 155- 164

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 35mPa to top of stub

0.93
47.00
1
0.02

m3
kg
No
m3

2
2
2
2

0.00
0.00
0.00
0.00

S9.12.1 page 144

3.9 66 kV Surge Arrestor - ZZZ-824-303.FND


Excavation in insitu material

1.67

m3

12

0.00

S9.16 page 155- 164

Blinding - 20mPa (50mm thick)

0.10

m3

12

0.00

S9.16 page 155- 164

Smooth Formwork (to be steel or sound timber)

1.96

12

0.00

S9.16 page 155- 164

Rough formwork (to be steel or sound timber)

1.68

12

0.00

S9.16 page 155- 164


S9.16 page 155- 164
S9.16 page 155- 164

Concrete - 30mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

0.93
2.80
0.49

m
m
m2

12
12
12

0.00
0.00
0.00

S9.13.2 page 147

Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO

0.64

m3

12

0.00

S9.13.5 page 149


S9.20.2 page 169
S9.20.6 page 172
S9.16 page 155- 164

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 30mPa to top of stub

1.03
58.00
1
0.02

m3
kg
No
m3

12
12
12
12

0.00
0.00
0.00
0.00

S9.12.1 page 144

4.0 66 kV High Post Insulator - ZZZ-824-323.FND


Excavation in insitu material

4.28

m3

0.00

S9.16 page 155- 164

Blinding - 20mPa (50mm thick)

0.25

m3

0.00

S9.16 page 155- 164

Smooth Formwork (to be steel or sound timber)

3.92

m2

0.00

S9.16 page 155- 164

Rough formwork (to be steel or sound timber)

3.00

m2

0.00

S9.16 page 155- 164


S9.16 page 155- 164
S9.16 page 155- 164

Concrete - 30mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

2.20
5.60
0.98

m3
m
m2

3
3
3

0.00
0.00
0.00

S9.13.2 page 147

Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO

2.03

m3

0.00

S9.13.5 page 149


S9.20.2 page 169
S9.20.6 page 172
S9.16 page 155- 164

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 30mPa to top of stub

2.25
136.00
2
0.05

m3
kg
No
m3

3
3
3
3

0.00
0.00
0.00
0.00

S9.12.1 page 144

4 Auxillary Transformer - ZZZ-830-323.FND


Excavation in insitu material

0.49

m3

0.00

S9.16 page 155- 164

Blinding - 20mPa (50mm thick)

0.10

m3

0.00

S9.16 page 155- 164

Smooth Formwork (to be steel or sound timber)

2.24

0.00

S9.16 page 155- 164

Rough formwork (to be steel or sound timber)

0.00

S9.16 page 155- 164


S9.16 page 155- 164
S9.16 page 155- 164

Concrete - 30mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

0.78
5.6
1.96

m
m
m2

1
1
1

0.00
0.00
0.00

S9.13.2 page 147

Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO

0.00

m3

0.00

S9.13.5 page 149

Stock pile insitu surplus material (for carting away)

0.49

m3

0.00

S9.20.2 page 169


S9.20.6 page 172
S9.16 page 155- 164

Reinforcing - Supply & Fix only


HD Bolts - Template and installation (ABB to supply bolts)
Grout - 30mPa to top of stub

3.92
1
0.10

m2
No
m3

1
1
1

0.00
0.00
0.00

S9.12.1 page 144

4.2 Yard Marshalling Kiosk


Excavation in insitu material

0.13

m3

0.00

S9.16 page 155- 164

Blinding - 20mPa (50mm thick)

0.03

m3

0.00

S9.16 page 155- 164

Smooth Formwork (to be steel or sound timber)

0.96

0.00

S9.16 page 155- 164

Rough formwork (to be steel or sound timber)

0.00

S9.16 page 155- 164


S9.16 page 155- 164
S9.16 page 155- 164

Concrete - 30mPa, 19mm Stone


25 x 25mm Chamfer to sides of column stub
Wood float top of concrete foundation

0.19
3.20
0.63

m
m
m2

4
4
4

0.00
0.00
0.00

S9.13.2 page 147

Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO

0.00

m3

0.00

S9.13.5 page 149


S9.20.2 page 169
S9.20.6 page 172
S9.16 page 155- 164

Stock pile insitu surplus material (for carting away)


Reinforcing - Supply & Fix only
HD Bolts - Template and installation (ABB to supply bolts)
Grout - 30mPa to top of stub

0.13
0
0
0.03

m3
kg
No
m3

4
4
4
4

0.00
0.00
0.00
0.00

S9.12.1 page 144

4.3 Transformer Plinth 15mva - 66 / 11kV


Excavations in insitu material:
Strip excavations

6.01

m3

0.00

Sump excavations

0.58

m3

0.00

Plinth

2.94

0.00

Surface bed

4.39

0.00

S9.13.2 page 147

Backfill with excavated insitu material in depths of 150mm to 97% Mod AASHTO

1.69

0.00

12.23

0.00

S9.16 page 155- 164

Stock pile insitu surplus material (for carting away)


Blinding - 20mPa (50mm thick):
Strip Footing concrete

0.55

m3

0.00

Sump Concrete

0.03

m3

0.00

Plinth

0.42

m3

0.00

Surface bed
Concrete - 35mPa, 19mm Stone:
Strip Footing concrete

1.10

m3

0.00

2.19

m3

0.00

Sump Concrete

0.37

m3

0.00

Plinth

5.04

m3

0.00

Surface bed

2.20

m3

0.00

Part of the road


Formwork:
Smooth Formwork:
Sump walls

4.41

m3

0.00

1.82

m2

0.00

Plinth
Rough Formwork:
Strip footing
25 x 25mm Chamfer to sides of plinth
Concrete finish wood float:
Surface bed

7.08

m2

0.00

9.71
11.80

m2
m

0.00
0.00

21.97

m2

0.00

8.40

m2

0.00

21.97

m2

0.00

16.8

m2

0.00

21.97

m
m3

0.00

0.00

m
m
m
m
Item
m2

0.00
0.00
0.00
0.00
0.00
0.00

47.33
119.88
47.33

m3
m2
m3

0.00
0.00
0.00

8.24

m3

0.00

S9.16 page 155- 164

S9.16 page 155- 164

B1-4.9.7.17page 170
B1-4.9.7.17page 169

B1-4.9.7.19 page 179

B1-4.9.7.22 page 181


B1-4.9.7.22 page 184
B1-4.9.7.17 page 165

B1-4.9.7.3 page 138

B1-4.9.7.14 page 155


B1-4.9.7.17 page 170

B1-4.9.7.17 page 163

B1-4.9.7.19 page 179

Plinth
Reinforcing (MESH ref 617):
Surface bed
Plinth
Sundries:
Sump frame - 30 x 30 x 5Lg cast in and galvanised. 25 x 5mm flat x 100Lg fishtail
lugs
to angle
(5mmgravel
fillet) to
at fill
500mm
c/c. To fit in the open grid which is 1600mm
75 toweld
100mm
Diameter
oil drain
wide with 30 x 4.5mm bearer bars, and 40 x 40mm openings (fully banded)
Brickwork (including stairs)
Brickforce 120mm wide (every second layer)
Construction/expansion joints between concrete and brick
50 x 3 flat copper bend to suit connection on transformer points
One set of rails on tranformer plinth
Benching the inside of the sump with 20mm benching render
Paint x 2 layers of bitumen to surface
4.4 CONTROL BUILDING - 5084014-CONT-E1000
Excavations in insitu material:
Strip foundation
Prepare and spary with an approved anti-termite control under building
Stock pile insitu surplus material (for carting away)
Concrete:
Reinforced concrete - 30mPa, 19mm Stone to surface bed
Prestressed fabricated concrete lintels:
In lengths not exceeding 3m
Reinforcing:
Reinforcing mesh ref. 395
Reinforcing - Supply & Fix only
200mm Thick blockwork
DPC (Damp proof course)
DPM (Damp proof membrame)
Wood float top of concrete
Floor Finishes:
Epoxy screed (trowel applied minimum 5 mm thick) and epoxy seal coat - switchgear
and battery charger rooms
Glazed non-slip fully vitrified ceramic tiles - rest room, toilets, kitchen, messroom

B1-4.9.7.22 page 181


B1-4.9.7.22 page 181
B1-4.9.7.22 page 184

Acid resistant ceramic tiles - battery rooms


600 x 500mm deep internal concrete trench. Trench walls and bottom to be 100mm
thick
Internal Wall Finishes:
Plaster to brickwork and concrete

2.20
160.86
68.94
22.18
6
20.10
1
30.37

3
3
3

0.00

23.00

0.00

119.88
270.00
216.94
15.24
119.88
119.88

m2
kg
m2
m2
m2
m2

0.00
0.00

88.00

m2

0.00

14.70

m2

0.00

9.00

m2

0.00

38.00

0.00

210.08

0.00

0.00
0.00
0.00

B1-4.9.7.22 page 183


B1-4.9.7.22 page 183
B1-4.9.7.17 page 170
B1-4.9.7.21
B1-4.9.7.21
B1-4.9.7.21
B1-4.9.7.21
B1-4.9.7.21
B1-4.9.7.21
B1-4.9.7.21
B1-4.9.7.21
B1-4.9.7.21
B1-4.9.7.21

page
page
page
page
page
page
page
page
page
page

Glazed ceramic tiles 2.3m high, plaster and paint - kitchen, messroom
Paint brickwork and concrete (weatherproof)
External Wall Finish:
Plaster to brickwork and concrete
Paint on plaster (weatherproof)
Aluminium Frames:
Windows:
Type W1: 2700 x 1090mm Frame including 4mm single glaze complete
Type W2: 900 x 900mm Frame including 4mm single glaze complete
Type W3: 600x 600mm Frame including 4mm single glaze complete

180
180
180
180
180
180
180
180
180
180

Doors:
Single
Type D3: 885 x 2500mm Frame and steel doors door including all stainless steel
ironmongery complete (external)
Double
Type D1: 1750 x 2500mm Frame and steel door including all stainless steel
ironmongery complete (external)

B1-4.9.7.21 page 180


B1-4.9.7.18 page 178

Steel:
Doors:
Single
Type D4: 885 x 2100mm Frame and timber doors door including all ironmongery
complete
Double (internal)
Type D2: 1750 x 2500mm Frame and steel door including all ironmongery complete
(internal)
Airconditioner in control building Split Unit - 18000 BTU
Allow one double door cupboard with shelves underneath sink for kitchen
Two plate electric cooker
Roof:
Roofing to be first class red clay tiled with a size 305 x152 x 32mm in both layers to
be fitted including all necessary fittings complete.

B1-4.9.7.3 page 138


B1-4.9.7.21 page 180

S9.23-1-3 PAGE 178

S9.23-1-3 PAGE 178 &


S9.23.4 page 179

Treated wooden roof trusses of 26 degrees angle rafters, tie beams, rails, struts,
braces, cleats, purlins, etc and flat bearer, gusset and connection plates, bolted or
gangnailed with an overall length of 4.6m and height of 1.805m (There are 7
trusses). Spacing 3m apart connected by 38 x 38 mm wooden treated battens .
Battens to be 305mm apart centre to centre and shall be placed straight and parallell
lines .
225 x 15mm ABS cement barge board
Pre-painted aluminium 150 x 150mm box gutters including necessary collared and
sealed
expansion
joints100 x100mm down pipes, including holderbats, brackets etc
Pre-painted
aluminium
Ceiling:
Suspended
ceiling champered and grooved acoustic panels on concealed suspension
grid including hangers etc
Plumbing:
WC with all necessary connections, fittings and piping complete and toilet paper
holder
Basin with all necessary connections, fittings and piping complete with soap
dispenser and mirror
Sink with all necessary connections, fittings, gulley and piping complete
Shower with all necessary connections, fittings and piping complete
Extras
Supply and install fire 9kg CO2 extinguisher with sign
Supply and install fire alarm
Furniture:
Desks (size 1500 x 700mm with drawers)
Tables (size 2000 x 1000mm)
Swivel chairs
Visitors' chairs (to be plastic)
Cupboards (two door cupboard with dividing shelves )

4.9.7.3 page 139

4.41 Guard House - 5084014-GUAR-E1000


Excavations in insitu material:
Strip foundation
Prepare and spary with an approved anti-termite control under building
Stock pile insitu surplus material (for carting away)

S9.12.1 page 144

S9.16 page 155- 164

Concrete:
Reinforced concrete - 30mPa, 19mm Stone to surface bed
Prestressed fabricated concrete lintels:
In lengths not exceeding 3m
Reinforcing:
Reinforcing mesh ref. 395
200mm thick block work

S9.20.2 page 169

DPC (Damp proof course)

S9.25page 188
S9.29 page 196
s9.24.2page181 - 183
S9.29 page 196

S9.36
S9.36
S9.36
S9.36

page
page
page
page

207-page
207-page
207-page
207-page

214
214
214
214

S9.23-1-3 PAGE 178


S9.23-1-3 PAGE 178 &
S9.23.4 page 179

DPM (Damp proof membrame)


Wood float top of concrete
Floor Finishes:
Glazed non-slip fully vitrified ceramic tiles
Internal Wall Finishes:
Plaster to brickwork and concrete
Paint on plaster (weatherproof)
Glazed ceramic tiles 2.3m high, plaster and paint - kitchen, messroom
External Wall Finish:
Plaster to brickwork
Paint on plaster (weatherproof)
Aluminium Frames:
Windows:
Type W1: 1860 x 1090mm Frame including 4mm single glaze complete
Type W2: 900 x 900mm including Frame 4mm single glaze complete
Type W3: 600 x 600mm including Frame 4mm single glaze complete
Doors:
External:
Double
Type D1: 885 x 2100mm Frame and steel door including stainless steel ironmongery
complete
Internal :(external)
Double
Type D2: 885 x 2100mm Frame and steel door including stainless steel ironmongery
complete
(external)
Single
Type D3: 885 x 2100mm Frame and steel door including stainless steel ironmongery
complete
(internal)
Type D4: 885
x 2100mm Frame and timber door including all ironmongery complete
(internal)
Roof:
Roofing to be first class red clay tiled with a size 305 x152 x 32mm in both layers to
be fitted including all necessary fittings complete.

104.78
105.30

m2
m2

0.00
0.00

136.04
136.04

m2
m2

0.00
0.00

1.00
3.00
1.00

No
No
No

0.00
0.00
0.00

1.00

No

0.00

3.00

No

0.00

2.00

No

0.00

1.00
6.00
1.00
1.00

No
Item
No
Item

0.00
0.00
0.00
0.00

149.04

m2

0.00

7.00

No

0.00

50.80
58.36
5.20

m
m
m

0.00
0.00
0.00

119.88

m2

0.00

No

0.00

1.00

No

0.00

1.00
1.00

No
No

0.00
0.00

5.00
1.00

No
No

2.00
2.00
4.00
2.00
2.00

No
No
No
No
No

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

4.97
16.00
4.97

m3
m2
m3

0.00
0.00
0.00

2.58

m3

0.00

11.00

0.00

16.00
50.08

m2
m2

0.00
0.00

1.00

5.40

m2

0.00

28.03
28.03

m2
m2

0.00
0.00

16.00

m2

0.00

68.90
58.55
10.35

m
m2
m2

0.00
0.00
0.00

165.00
45.50

m2
m2

0.00
0.00

1.00
2.00
2.00

No
No
No

0.00
0.00
0.00

2.00

No

0.00

1.00

No

0.00

1.00

No

0.00

4.00

No

0.00

20.00

m2

0.00
0.00

Treated wooden roof trusses of 26 degrees angle rafters, tie beams, rails, struts,
braces, cleats, purlins, etc and flat bearer, gusset and connection plates, bolted or
gangnailed with an overall length of 4.6m and height of 1.805m (There are 7
trusses). Spacing 3m apart connected by 38 x 38 mm wooden treated battens .
Battens to be 305mm apart centre to centre and shall be placed straight and parallell
lines .
Pre-painted aluminium 150 x 150mm box gutters including necessary collared and
sealed expansion joints
Pre-painted aluminium 100 x100mm down pipes, including holderbats, brackets etc
Ceiling:
Suspended ceiling champered and grooved acoustic panels on concealed suspension
grid including hangers etc
Supply and install 12 000 BTU airconditioner
Plumbing:
WC with all necessary connections, fittings and piping complete and toilet paper
holder

S9.45 page 237


S9.45.3 page 258

Basin with all necessary connections, fittings and piping complete with soap
dispenser and mirror
Extras
Supply and install fire 9kg CO2 extinguisher with sign
B1-9.7.10 page 145

Supply and install fire alarm

B1-4.9.7.14 page 152


B1-4.9.7.14 page 154

5 EARTH MAT
5.1 Excavate 300mm (width) x 1000mm (depth) for earth grids
5.2 Backfilling to earthing grid and compact the ground surface in depths of 300mm
compacting to 95% Mod AASHTO density

B1-4.9.7.18 page 178

6 CABLE TRENCH (refer to drawing no. ZZZ 824-200)


6.1 The excavation in insitu material for construction of 500mm wide x 1200mm deep
cast insitu reinforced concrete trenches including bends and junctions to include
100mm diameter PVC drain pipe at 4m centres at the bottom of the trench

B1-4.9.7.18 page 178

6.2 Concrete trench cover for 500 mm wide trench (with maximal weight of 50 kg each)
6.3 The excavation in insitu material for construction of 500mm wide x 700mm deep cast
insitu reinforced concrete trenches including bends and junctions to include 100mm
diameter PVC drain pipe at 4m centres at the bottom of the trench
6.4 Concrete trench cover for 500mm wide trench (with maximal weight of 50 kg each)

S9.45.1 page 237-273

S9.45.1 page 237


S9.44 page 236
S9.45.1 page 237
S9.45.1 page 237
S9.45.1 page 238

S9.12.1 page 144

7 DRAINAGE
7.1 Subsoil Drain Supply, lay and joint 2 x 160mm diameter preferated uPVC pipe to be
laid 1100mm below NGL in trench which is to be lined with geofabric material (bidem
gade A6) and backfill with 50 to 75mm diameter stone, including excavation,
temporary support of sides, keeping excavations dry, complete (refer to drawing no.
ZZZ 824-200)
7.2 Construct cast insitu concrete manhole with lid and including excavation in insitu
material, temporary support of sides, keeping excavations dry, complete (refer to
drawing no. ZZZ 824-200)
7.3 Construct cast insitu septic tank overall size 2250 X 1950 X 2150mm with lid and
temporary
support
sides,
keeping
excavations
dry,
7.4 including
Construct excavation,
insitu to
soak
overall
size of
2000
x 2000
x 1500mm
to
becomplete
filled
Headwall
-cast
concrete
fit pit
450mm
diameter
concrete
pipe
(refer
tohole
drawing
no.
ZZZ
(refer100
to drawing
no.rock,
ZZZ including
824-207) excavtion and backfilling (refer to drawing no. ZZZ
with
to 150mm
7.5 824-200)
824-207)
450mm Diameter
diameter class
50D including
spigot and
socket ended
7.6 Supply,
lay, joint and bed 110mm
PVC pipe
necessary
bends and
concrete sewer pipes including necessary bends and tees
7.7 tees
7.8 Construct concerte v-drain with a top width of 800mm and bottom width of 100mm
including excavation, temporary support of sides, keeping excavations dry, complete
to SUPPLY
drawing no. ZZZ 824-200)
WATER
8 (refer
8.1 Supply and install 2000L conservancy tank to Control Building above ground including
excavation,backfilling,
pipework
and fittings
topump
sit on that
a concrete
complete
8.2 Supply
and install Borehole
including
a motor
will be foundation
controlled by
water
(refer
to
drawingswitch
no. ZZZ
824-208
& ZZZ
controlled
in the
smaller
tank824 - 205)
8.3 level
50mm
Diameter
PVC
pipe
8.4 25mm Diameter PVC pipe
8.5 15mm Diameter PVC pipe
9 ROAD
9.1 Access road
Excavation in insitu material
Sub-Base of G5 material compacted to 98% MOD AASHTO

S9.12.1 page 144


S9.16 page 155- 164

9.2 Internal road


9.3 Excavation in insitu material
9.4 Sub-Base of G5 material compacted to 98% MOD AASHTO
9.5 Insitu reinforced concrete ramps to be constructed at the end of the internal road to
about 6000mm wide
9.6 Road crossing over 5m wide road for cable trench.Precast concrete culvet (size 1200 x
900 x 600mm and the internal walls to be 100mm thick)
9.7 Segmented paving - Supply and lay 80 mm interlocking concrete pavers including 50
mm sand bed (max 30 mm); edge restraint and cutting of units where required:
Strength: 25 Mpa
9.8 Insitu reinforced concrete ramps to be constructed in front of control building doors to
be about 1800mm wide
9.9 Kerbing including bends and end pieces

S9.47 page 273

10 YARD WORKS
10.1 Palisade Fence complete
10.2 The complete, supply and installation of a security fence, including earthing of all
metal parts, gates etc. 2m High diamond mesh plastic coated galvanised steel wire
and 300mmflat wrap razor wire on the overhang fence and consists of a vertical post
with 45 degree inclination at the apex, fence to be fixed on a ring-beam foundation
10.3 1m Wide pedestrian gate with a frame height that matches the fence
10.4 Prepare and comply with an approved weed control and spread over substation
10.5 Supply and application of 10 to 30mm stone, 200mm deep, to one meter beyond
fences, including levelling and rolling to compact the stone layer.
10.6 Landscaping - Planting of medium-high growing plants and grass (Subject to approval
of Employer)

ITEM 15 NOT TO BE FILLED BY CONTRACTOR


15
(a)
(b)
(c )

Installation of Civil works :


Preparation of the construction area

Foundations for three phase 66 kV circuit breakers


Foundations for three phase 66 kV disconnector with/without earthing switch

3.00

No

0.00

8.00

0.00

5.20

0.00
0.00

m2

0.00

Item

0.00
0.00

No

0.00

No

0.00

1.00
1.00

No
No

0.00
0.00
0.00

216

m3

0.00

216

m3

0.00

100

0.00

333

No

0.00

81

0.00

141

No

0.00

35

0.00

No

0.00

1
1
1
50
30
120

No
No
No
m
m
m

0.00
0.00
0.00
0.00
0.00
0.00

1.00
1.00
50.00
40.00
35.00

Item
Item
m
m
m

0.00
0.00
0.00
0.00
0.00

4500
2250

m3
m3

0.00
0.00

73.2
36.6

m3
m3

0.00
0.00

No

0.00

No

0.00

0.00

No

0.00

34.00

0.00

16.00
1.00

1.00
1.00

110

240

0.00

60

0.00

1
3,600.00

No
m2

0.00
0.00

210.00

m3

0.00

180.00

m2

0.00

Subtotal

0.00

Final Total - EXCLUDING VAT

0.00

Totals in MK
-

(d)
(e )
(f)
(g)
(h)
(i)
(j)
(k)
(l)
(m)
(n)
(o)
(p)
(q)
(r )
(s)

Foundations for single phase 66 kV current transformers


Foundations for single phase 66 kV voltage transformers
Foundations for single phase 66 kV lightning arrestors
Foundations for single phase 66 kV post insulators
Foundations for 66 kV gantries and Bus Structures
Foundations for single phase 11 kV lightning arrestors
Cable channels incl. cover plates
Earth works for earthing system
Transformer foundation incl. oil catching pit
Foundations for fencing and gate
Fence and gate
Earth works for lighting system
Substation Bulk Earthworks (substation Platform Preparation and drainage)
Construction of the substation building (Complete)
Finishing work (including paving, stoning of Platform, water reticulation etc.)
Technical installation inside and on the building incl. earthing and lightning protection, air-conditioning, heating, lighting,
power and telephone sockets, toilet, kitchen, locking system, etc.

(t)
(u)
(v)
(w)

Piping system (water, drainage, etc.) to and inside the building


Sewage system
Roads to and inside the substation area
Other necessary associated works for complete functioning. ( Guardhouse ), Auxillary Transfromer , Marshall Kiosk ) + PG
Total

MWK

ITEM No. DESCRIPTION


20
(a)
(b)
(c )
(d)

No

SITE TRANSPORT, ENGINEERS ACCOMODATION AND COMMUNICATION


Provision as per clasue 1.35, of each vehicle for the duration of the contract, including regular experienced driver/mechanic.
Vehicle type 1
each
Vehicle type 2
each
Winch attachment for vehicles type 1 & 2
per winch
Cost of communication including mobile phones as specified in Vol
lumpsum
2

21
(a)

Engineer's living accomodation


Provision of Project Area Living Accomodation for Employer and
Project Manager Personnel (remote site); up to 4 Persons on
Occassional Basis of which 2 will be longer term per Contractors
camp occupancy per its Program of Progress (work program) Refer
to cls 3.1.2.1

(b)
22

Handheld GPS
set
Sub-total, Site transport, Engineers accomodation and Commmunication, item 9.1 - 9.8
Miscellaneous and Dayworks (NB. Provide Quote Rate Only Per All Miscellaneous/Daywork Item in 4.1.4)
Rough terrain mobile crane ( 15T)
8 hour work day
per day
or pro-rata thereof

(a)

ditto

Lump Sum

(b)

Boom Crane ( Hiab type) flat bed truck (5-10T)

(c )

Flat bed Truck (7-10T)


ditto

per day

(d)

4 x 4 Front-end Loader & Backhoe


ditto

per day

(e )

Excavator/tractor/JCB
ditto

per day

(f)

Foundation gang tools and Plant


ditto

per day

(g)

Site Manager
ditto

per day

(h)

Supervising Engineer (Expatriate)

(i)

Supervising Engineer (Local)


ditto

per day

(j)

Project Manager and Above (Head office)


ditto

per day

(k)

Design Engineer

(l)

Draughtmans and ancillary staff (Head office)

(m)

Plant Vehicle driver (local)


ditto

(n)

Surveyor complete with Total station/GPS and helpers

(expatriate)

(Head office)

ditto

ditto
ditto

per day

per day

per day
per day
per day

ditto

per day

(o)

Site supervisor/General Foreman

(p)

Gang Foreman
ditto

per day

(q)

Technician//skiiled labour
ditto

per day

(r )

General/unskilled labour
ditto

per day

23

Enhanced rates for Overtime/rest day working


Percentage increase in hourly rates for rest day working

Percentage increase in hourly rate for normal overtime

Sub-total, Miscellaneous and dayworks, item 10.1 - 10.22

TOTAL

ditto

per day

Local
Foreign
Currency Currency
MK
USD

d driver/mechanic.
-

0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
-

0.00

Potrebbero piacerti anche