6 Wasatch Front Focus, January 2010

Walking the tightrope with your new construction project?


Let’s face it, walking a tightrope with- blame for most bank failures. Whether you harmed by protecting you. age the project, but becomes a document
out a safety net can be messy. It is uncon- are a bank, a private individual, a large A few years ago a homeowner’s asso- that is pretty to look at and tells the owner
scionable for a steel erector or exterior skin corporation or a small corporation looking ciation ventured out on a worthy project to what he wants to hear. Owners need the
installer to do their work without the at a new construction project, you need to upgrade their condominiums. The associa- “hard facts” so they are able to participate
proper tie-offs and safety procedures. An make sure that your safety net is in place tion (owner) relied upon the traditional in the solution instead of inheriting prob-
owner does not face the same physical by either: (1) hiring full time staff with approach and hired an architect and a con- lems that they most likely did not create.
danger as the contractors working in the experience and time who are dedicated to tractor to assist their in the development Again, the owner needs to retain someone
field, but the owner does inherit great getting in the details of managing your process. After much dispute, cost overruns who has the skills to develop and maintain
financial and market risk when project or (2) procuring and schedule delays, the owner decided to the schedule, whether that be with in-
they venture out on a new con- an independent project/ retain staff that was experienced and able house experienced staff or an outside,
struction project. In general, own- construction manager to bring control back to their project. Prior objective third party firm.
ers choose to walk the tightrope that has experience in to this, they were at the whim and mercy of • Procurement controls —
on their projects with few to no representing you as the the architect and the contractor. Once the Competitive/Qualified Procurement and
safety nets. Contractors and owner. association took back the control of their Contract Development – Owners will often
designers are skilled and knowl- Traditionally, owners project, they were able to successfully fin- rely upon design and construction relation-
edgeable in their respective areas. will turn their manage- ish the work within budget. They were also ships to buy-out their projects. If your
They know how to limit their ment over to the archi- able to avoid a costly lawsuit. representatives are not fostering a com-
risks by shifting those risks to tect, engineer or contrac- The following are a few “safety nets” petitive procurement process that also
someone else as much as possi- Ryan Johnson tor. When a project includes an objective pre-qualification
owners need to implement in order to limit
ble. Owners are usually not as enters that “trouble risk: procedure, then significant dollars and
familiar with how they can con- phase,” it is usually • Cost controls — Accurate Third quality are being compromised on your
trol their risks, and will often turn their because a member of the team is not per- Party Cost Estimates (no conflicts of inter- project.
project management over to those that may forming. If that “nonperforming” entity is est) – Owners that turn cost estimating • Change order controls — Claims
not have the time, experience or their best the architect, engineer or contractor, then over to their design and construction team Management and Change Order Review/
interest in mind. the owner is in trouble. It is not likely that will often miss critical details that affect Control – The owner’s staff needs to dedi-
The failure in the financial market is a the owner will get the protection that he is their bottom line. The owner needs to pro- cate the appropriate resources to review all
good example of what happens when own- looking for, if the people who are holding cure an objective estimate, whether that be claims. The traditional approach will often
ers do not pay attention to the details by the safety net are part of the problem. This with in-house experienced staff or an out- have the design team review costs for
providing the proper safety nets. The own- is certainly a recipe for failure. This is not side, objective third party firm. approval. This is certainly appropriate,
ers in the financial market (banks) relied to say that these entities are unethical or • Schedule controls — Accurate and since they are the author of the contract
upon less-than-quality management proce- dishonest, but it certainly puts players of Complete “Master Schedule” (covering documents. However, the design team typ-
dures to protect themselves and their inves- your team in an uncomfortable and con- owner’s interests) – When the owner devel- ically does not have the time or the fee to
tors. As more banks go under, it’s useful to flicting situation. It is important for an ops and maintains a critical path schedule, spend in reviewing and sometimes hag-
take a look at some of the FDIC Inspector owner to provide for his own safety net by they ensure the schedule incorporates gling with the contractor regarding costs.
General’s post-mortem reports of recently having someone whose sole concern is to owner issues and is used as a tool through- Furthermore, the contractor and designer
failed institutions (www.fdicoig.gov/MLR. represent the owner’s interest. You do not out the design and construction process. may also be contracted based upon a per-
shtml). These “material loss reviews” want someone dropping their corner of the Too often the schedule is not used to man-
underscore how poor management is to safety net if they see that they will be see TIGHTROPE page 17
Wasatch Front Focus, January 2010 17
TIGHTROPE Construction Management
Association of America has the fol- BIM that this increased up-front cost can be recouped
from page 6 multiple times in reduced construction sched-
lowing counsel when it comes to from page 11
ule, reduced construction waste and the large
retaining professional help: reduction of costly mistakes that can slow down
cent of the final construction cost,
“a professional construction It should be noted that BIM is not without or even derail the project.
which leaves them little motivation
manager (CM) acts as an extension its difficulties. To be successful in utilizing
to reduce the cost for the owner, For many reasons, the design-build pro-
of the owner and manages the entire BIM tools and creating accurate models, the
since they will also be reducing their curement method for projects is advantageously
project with … management exper- BIM architect/engineer/contractor has to have
fee. suited for BIM. There remains some disconnect
tise that can assure the best possible the following key characteristics:
• Accountability controls — between the designers and constructors of BIM
project outcome no matter what type
Commitment and Accountability
of project delivery method used. A • A knowledgeable and experienced engi- projects. With design-build, the designer and
Control (owner’s perspective) – neer/designer/architect. constructor are under the same roof, and what is
construction manager is NOT a gen-
Meeting minute documentation is • Contractor-level, detailed experience with to be placed in the model can be more accu-
eral contractor. Few owners main-
critical to the success of a project.
tain the staff resources necessary to the means and methods of construction. rately represented in the BIM model earlier in
Owners need to dedicate their
pay close, continuing attention to • A high level of computer technical exper- the overall process.
resources to retain experienced repre-
every detail – yet these details can tise. BIM is the now and the future of modern
sentatives to conduct and document
make or break a project.” building design and construction. It is the now
regular owner/designer/contractor Like a three-legged stool with one leg
coordination meetings. Countless If you are contemplating a new missing, a BIM user will not be able to stand if because it currently holds many advantages and
commitments are made during these construction project, don’t go down can greatly enhance the success of any project,
they are lacking in one of these areas. For
meetings. If these commitments are the slippery slope without proper big and small. It is still in the growing stages,
example, an experienced engineer who is com-
not documented and followed up on, safety nets and controls in place. Ben
puter savvy but lacks in hands-on electrical and all parties involved should recognize both
then obligations are often not met. Franklin said, “An ounce of preven-
construction techniques may find that he or she the advantages and pitfalls of BIM. It is also the
The task of meeting minutes is fre- tion is worth a pound of cure.”
Owners that shore up their staff with is unable to correctly model how electrical con- future. As BIM becomes more adopted and the
quently turned over to the construc- software tools become more powerful, the
tion or design firm; this could be a expert managers are on stable ground duit is to be installed. In the same way, an expe-
and will amplify their return on rienced CAD operator, who may have installa- changes will continue to occur and the process
major mistake since the owner is now
investment. Don’t allow your project tion experience but has no design experience, will continue to improve for years to come.
relying upon these firms to hold
themselves accountable for commit- to be the next casualty in the con- may fall short in understanding the calculations
ments made. Yet again, you are ask- struction market; the time is now to required for a successful design. A successful Darrin Sanders is a licensed professional engi-
ing someone to hold the “safety net” prevent the project pitfalls and shore BIM user understands and recognizes their neer with Hunt Electric, a full-service, design-
that might be part of the problem. It up your project management arm. weaknesses and teams with others to achieve build electrical contractor based in Salt Lake
is not likely that they will protect the success. City. He has worked as both an independent
owner’s interests, if it puts them at
Ryan Johnson, is vice president and In addition, project owners should under- engineering consultant and currently as an in-
risk. We live in a litigious society. It
project director at Project Control stand that this level of expertise and experience house engineer. His 15 years of experience in
is essential that accurate minutes are
taken and cover the owners’ issues.
Inc., a Salt Lake City-based project can require an increased upfront cost, as it may the electrical construction industry includes
management, estimating, scheduling, require more design time and more expensive health care, K-12 and higher education, resort/
Once more, it is vital that the bank oversight and construction con-
owner makes sure that he is protected hardware and software to create a BIM model hospitality, telecommunications, industrial,
sulting firm. He can be reached at
with competent personnel who will (801) 262-9315 or rjohnson@project- versus traditional 2D project drawings. When it renewable energy and BIM projects throughout
represent his interests. The control-inc.com. is done correctly, though, it has been proven the Intermountain region.

HONNEN
EQUIPMENT
(formerly Scott Machinery)

PARTS - SALES - SERVICE - RENTALS

10 Locations in the Rocky Mountain Region

24/7 Emergency Parts & Service

Family Owned and Operated Since 1963

SALT LAKE CITY OGDEN


4055 S. 500 West 3400 S. Midland Dr.
Salt Lake City, UT 84123 West Haven, UT 84401
801-262-7441 801-627-0049

www.honnen.com 1-800-646-6636