Sei sulla pagina 1di 16

Obra

Ubicacin
Contratista
Entidad
Fecha Presupuesto Base
Area Geogrfica

:
:
:
:
:
:

PISTAS Y VEREDAS DE LA CALLE XXX


AMARILIS - HUANUCO - HUANUCO
CONSORCIO GMG-MECH-SETCON ASOCIADOS
MUNICIPALIDAD DISTRITAL DE AMARILIS
JULIO-1992
03

PRESUPUESTO
Partida
Item
1.00
1.01
1.02
1.03
2.00
2.01
3.00
3.01
3.02
4.00
4.01

Descripcin de
Partidas
MOVIMIENTO DE TIERRAS
Corte y Relleno Compensado
Relleno con Material de Prestamo
Eliminacin de Material Excedente
AFIRMADO
Afirmado de e=4" para veredas
PAVIMENTACION
Vereda de e=4" de C f'c=140 kg/cm2.
Pistas de C de e=6", f'c=210 kg/cm2.
SARDINELES
Sardineles de C de f'c=175 kg/cm2.

RESUPUESTO
Unidad

Metrado

Costo
Unitario

Costo
Parcial

Sub-Total
32,744.04

m3.
m2.
m3.

2,250.00
3,360.00
1,242.00

3.10
2.45
14.12

6,975.00
8,232.00
17,537.04
1,178.60

m2.

355.00

3.32

m2.
m2.

355.00
1,064.00

15.28
17.47

1,178.60
24,012.48
5,424.40
18,588.08
3,963.60

ml.

270.00

14.68

3,963.60
Sub-Total
Gastos Generales (15%)
Utilidad (10%)
TOTAL

61,898.72
9,284.81
6,189.87
S/. 77,373.40

Obra
Ubicacin
Contratista
Entidad
Fecha Presupuesto Base
Area Geogrfica

:
:
:
:
:
:

PISTAS Y VEREDAS DE LA CALLE XXX


AMARILIS - HUANUCO - HUANUCO
CONSORCIO GMG-MECH-SETCON ASOCIADOS
MUNICIPALIDAD DISTRITAL DE AMARILIS
JULIO-1992
03

I. ANALISIS DE COSTOS UN
1.00
1.01

MOVIMIENTO DE TIERRAS
Corte y Relleno Compensado
Mano de Obra
Capataz
Pen
Equipo y Herramientas
Tractor D6D
Herramientas Manuales

1.02

Relleno con Material de Prstamo para Plataforma


Mano de Obra
Capataz
Pen
Materiales
Material de Relleno
Equipo y Herramientas
Herramientas Manuales

1.03

Eliminacin de Material Excedente


Mano de Obra
Capataz
Pen
Equipo y Herramientas
Volquete 6m3
Herramientas Manuales

2.00
2.01

AFIRMADO
Afirmado de e=4" para Veredas
Mano de Obra
Capataz
Operario

Oficial
Pen
Materiales
Afirmado
Equipo y Herramientas
Compactador Vibratorio
Herramientas Manuales

3.00
3.01

PAVIMENTACION
Veredas de e=4", C de f'c=140 kg/cm2.
Mano de Obra
Capataz
Operario
Oficial
Pen
Materiales
Cemento Portland Tipo I
Arena Gruesa
Arena Fina
Piedra Chancada de 1/2"
Madera Tornillo
Clavos 3"
Equipo y Herramientas
Mezcladora de 11p3
Herramientas Manuales

3.02

Pistas de C de e=6", f'c=210 kg/cm2.


Mano de Obra
Capataz
Operario
Oficial
Pen
Materiales
Cemento Portland Tipo I
Arena Gruesa
Piedra Chancada de 1/2"
Asfalto en fro para Pistas
Regla
Equipo y Herramientas
Mezclador de 11p3
Vibrador de 4"

Herramientas Manuales

4.00
4.01

SARDINELES
Sardinel de Concreto
Mano de Obra
Capataz
Operario
Oficial
Pen
Materiales
Cemento Portland Tipo I
Arena Fina
Arena Gruesa
Piedra Chancada de 1/2"
Madera Tornillo
Clavos de 3"
Equipo y Herramientas
Mezcladora de 11p3
Herramientas Manuales

E COSTOS UNITARIOS
m3.
hh.
hh.

Cantidad

C.U

0.01
0.08

Parcial
3.73
2.65

Sub-Total
0.25

IU
47
47

0.04
0.21
2.85

hm.
%M.O.

m2.
hh.
hh.

0.04
0.03

Cantidad

70.95
0.25

C.U

0.02
0.17

2.84
0.01
Total
Parcial

3.73
2.65

49
37
3.10
Sub-Total
0.52

0.07
0.45

IU
47
47

1.91
m3.

0.15

12.76

1.91

%M.O.

0.03

0.52

0.02
Total

05
0.02

m3.
hh.
hh.

Cantidad

C.U

0.13
1.33

Parcial
3.73
2.65

37
2.45

Sub-Total
4.00

IU
47
47

0.48
3.52
10.12

hm.
%M.O.

m2.
hh.
hh.

1.00
0.03

Cantidad
0.084
0.040

10.00
4.00

C.U

10.00
0.12
Total

Parcial
3.73
3.24

0.31
0.13

48
37
14.12

Sub-Total
1.41

IU
47
47

hh.
hh.

0.040
0.320

2.96
2.65

47
47

0.12
0.85
1.66

m3.

0.130

12.76

38

1.66
0.25

hm.
%M.O.

m2.

0.040
0.030

Cantidad

5.34
1.41

C.U

0.21
0.04
Total

Parcial

hh.
hh.
hh.
hh.

0.05
0.48
0.08
0.64

3.73
3.24
2.96
2.65

0.19
1.56
0.24
1.70

Bls.
m3.
m3.
m3.
p2.
kg.

1.090
0.050
0.020
0.100
0.830
0.050

5.34
12.00
12.00
32.84
1.21
1.30

5.82
0.60
0.24
3.28
1.00
0.07

49
37
3.32

Sub-Total
3.69

IU
47
47
47
47

10.98
21
04
04
05
43
02
0.61
hm.
%M.O.

m3.
hh.
hh.
hh.
hh.

0.08
0.03

Cantidad
0.044
0.320
0.160
0.840

6.21
3.69

C.U

0.50
0.11
Total

Parcial
3.73
3.24
2.96
2.65

49
37
15.28

Sub-Total
3.90

0.16
1.04
0.47
2.23

IU
47
47
47
47

13.01
Bls.
m3.
m3.
est.
p2.

1.532
0.082
0.084
1.000
0.630

5.34
12.00
32.84
0.36
1.21

8.18
0.98
2.76
0.36
0.76

21
04
05
13
43
0.56

hm.
hm.

0.040
0.080

6.21
2.36

0.25
0.19

48
49

%M.O.

ml.
hh.
hh.
hh.
hh.

0.030

Cantidad
0.080
0.800
0.240
1.040

3.90

C.U

0.12
Total

Parcial
3.73
3.24
2.96
2.65

37
17.47

Sub-Total
6.36

IU
47
47
47
47

0.30
2.59
0.71
2.76
7.63

Bls.
m3.
m3.
m3.
p2.
kg.

0.650
0.010
0.040
0.070
0.900
0.150

5.34
12.00
12.00
32.84
1.21
1.30

3.47
0.12
0.48
2.30
1.09
0.20

21
04
04
05
13
43
0.69

hm.
%M.O.

0.080
0.030

6.21
6.36

0.50
0.19
Total

49
37
14.68

Obra
Ubicacin
Contratista
Entidad
Fecha Presupuesto Base
Area Geogrfica

:
:
:
:
:
:

PISTAS Y VEREDAS DE LA CALLE XXX


AMARILIS - HUANUCO - HUANUCO
CONSORCIO GMG-MECH-SETCON ASOCIADOS
MUNICIPALIDAD DISTRITAL DE AMARILIS
JULIO-1992
03

TABLA : CALCULO DE LOS COEFICIENTES DE INCIDENCI


Partida
Item
1.00
1.01
1.02
1.03
2.00
2.01
3.00
3.01
3.02
4.00
4.01
5.00
*

Descripcin de
Partidas
Movimiento de Tierras
Corte y Relleno Compensado
Relleno con Material de Prestamo
Eliminacin de Material Excedente
Afirmado
Afirmado de e=4" para veredas
Pavimentacin
Vereda de e=4" de C f'c=140 kg/cm2.
Pistas de C de e=6", f'c=210 kg/cm2.
Sardineles
Sardineles de C de f'c=175 kg/cm2.
Gastos Generales y Utilidad
Gastos Generales y Utilidad
TOTAL
Clculo de los Coeficientes de Incidencia

DE INCIDENCIA
Costo

Costo

Unitario

Parcial

Unidad

Metrado

m3.
m2.
m3.

2,250.00
3,360.00
1,242.00

3.10
2.45
14.12

m2.

355.00

3.32

m2.
m2.

355.00
1,064.00

15.28
17.47

5,424.40
18,588.08

1,309.95
4,149.60

ml.

270.00

14.68

3,963.60

1,717.20

6,975.00
8,232.00
17,537.04
1,178.60

15,474.68
S/. 77,373.40

47
562.50
1,747.20
4,968.00
500.55

14,955.00
0.193

Indices Unificados
49

37

05

6,390.00

22.50
67.20
149.04

6,417.60

48

38

21

12,420.00

74.55

14.20

589.30

202.16

39.05
127.68

1,153.75
2,904.72

177.50
266.00

2,066.10
8,703.52

51.30

612.90

135.00

936.90

6,666.71

470.97

11,088.97

12,998.50

589.30

11,706.52

0.086

0.006

0.143

0.168

0.008

0.151

s
04

43

02

13

39

Verificacin

6,975.00
8,232.00
17,537.04
1,178.60
298.20
1,042.72

355.00
808.64

24.85

162.00

294.30

54.00

5,424.40
18,588.08

383.04

3,963.60

1,502.92

1,457.94

78.85

383.04

0.019

0.019

0.001

0.005

15,474.68
15,474.68 Ok!
0.200

1.000

15,474.68

Ok!
Ok!
Ok!
Ok!
Ok!
Ok!
Ok!
Ok!

IU

Coef. Incid.

47
39

0.193
0.200

IU

Coef. Incid.

38
04
43
02
13

0.008
0.019
0.020
0.001
0.005

IU

Coef. Incid.

05
21

0.143
0.151

IU

Coef. Incid.

49
48
37

0.086
0.168
0.006

Participacin
(%)
100
100

Nomenclatura
J
GU

0.021
0.024

Participacin
(%)
100
100

Nomenclatura
A
C

0.174

(IU 43)
(IU 04)

(IU 48)

IU

Coef. Incid.

38
43
04

0.008
0.021
0.024
0.053

IU

Coef. Incid.

49
48

0.086
0.174
0.260

Participacin
(%)
15.10
39.60
45.30
100.00

Participacin
(%)
33.10
66.90
100.00

Nomenclatura

HMA

Nomenclatura

EE

Potrebbero piacerti anche