Sei sulla pagina 1di 2

Federal Register / Vol. 71, No.

116 / Friday, June 16, 2006 / Notices 34905

www.ferc.gov using the ‘‘eLibrary’’ link. Secretary of the Commission, as soon as DEPARTMENT OF ENERGY
Enter the docket number excluding the possible, an original and two copies of
last three digits in the docket number comments in support of or in opposition Federal Energy Regulatory
field to access the document. For to this project. The Commission will Commission
assistance, contact FERC at consider these comments in [Project No. 10395–032]
FERCOnlineSupport@gerc.gov or call determining the appropriate action to be
toll-free, (886) 208–3676 or TYY, (202) taken, but the filing of a comment alone Electric Plant Board of the City of
502–8659. will not serve to make the filer a party Augusta, KY; Notice of Withdrawal of
Specifically, EPNG proposes to Reconsideration and Limited Stay of
to the proceeding. The Commission’s
convey to WTG, approximately 236 Order Terminating License
rules require that persons filing
miles of various-sized pipeline supply
laterals and appurtenant facilities comments in opposition to the project June 9, 2006.
located in the Permian Basin area in provide copies of their protests only to On March 31, 2006, the City of
various counties in West Texas. EPNG the party or parties directly involved in Hamilton, Ohio, filed a request for
has agreed to sell the two pipeline the protest. reconsideration and limited stay of the
systems for approximately $300,000 and Persons who wish to comment only Commission’s March 1, 2006 order
the assumption by WTG of certain on the environmental review of this terminating license for the Meldahl
liabilities. Upon receipt of the project, or in support of or in opposition Project No. 10395.
authorizations requested herein and the to this project, should submit an On May 12, 2006, the City of
transfer of the pipelines, WTG intends original and two copies of their Hamilton, Ohio, filed a notice of
to operate the Snyder Pipeline as an comments to the Secretary of the withdrawal of its request for
intrastate pipeline subject to the Commission. Environmental reconsideration and limited stay. No
jurisdiction of the Texas Railroad commenters will be placed on the one filed a motion in opposition to the
Commission, and the Sonora Pipeline as withdrawal, and the Commission took
Commission’s environmental mailing
a non-jurisdictional gathering facility. no action to disallow it. Accordingly,
list, will receive copies of the
Based on the future use of the pipelines, pursuant to Rule 216 of the
WTG requests the Commission to environmental documents, and will be
Commission’s Rules of Practice and
determine that the future operation and notified of meetings associated with the
Procedure, 18 CFR 385.216 (2006), the
services rendered through these Commission’s environmental review
withdrawal of the pleadings became
facilities will be exempt from the process. Environmental commenters
effective on May 27, 2006.
Commission’s jurisdiction under the will not be required to serve copies of
NGA. filed documents on all other parties. Magalie R. Salas,
Any questions concerning this The Commission’s rules require that Secretary.
application may be directed to Richard persons filing comments in opposition [FR Doc. E6–9391 Filed 6–15–06; 8:45 am]
Derryberry, Director, Regulatory Affairs, to the project provide copies of their BILLING CODE 6717–01–P
El Paso Natural Gas Company, P.O. Box protests only to the applicant. However,
1087, Colorado Springs, Colorado the non-party commenters will not
80944, at (719) 520–3782 or fax (719) receive copies of all documents filed by DEPARTMENT OF ENERGY
667–7534. other parties or issued by the
There are two ways to become Federal Energy Regulatory
Commission (except for the mailing of
involved in the Commission’s review of Commission
environmental documents issued by the
this project. First, any person wishing to [Docket Nos. ER06–822–001; EL06–48–001]
Commission) and will not have the right
obtain legal status by becoming a party
to seek court review of the
to the proceedings for this project Fore River Development, LLC;
should, on or before the comment date, Commission’s final order.
Braintree Electric Light Department;
file with the Federal Energy Regulatory The Commission strongly encourages Notice of Filing
Commission, 888 First Street, NE., electronic filings of comments, protests,
Washington, DC 20426, a motion to and interventions via the internet in lieu June 9, 2006.
intervene in accordance with the of paper. See 18 CFR 385.2001(a)(1)(iii) Take notice that on May 30, 2006, ISO
requirements of the Commission’s Rules and the instructions on the New England Inc. submitted for filing
of Practice and Procedure (18 CFR Commission’s Web site (http:// the above-referenced generating units
385.214 or 385.211) and the Regulations www.ferc.gov) under the ‘‘e-Filing’’ link. are no longer deemed to be needed for
under the NGA (18 CFR 157.10). A reliability must agreements.
Comment Date: June 30, 2006. Any person desiring to intervene or to
person obtaining party status will be
placed on the service list maintained by Magalie R. Salas, protest this filing must file in
the Secretary of the Commission and Secretary. accordance with Rules 211 and 214 of
will receive copies of all documents the Commission’s Rules of Practice and
[FR Doc. E6–9388 Filed 6–15–06; 8:45 am]
filed by the applicant and by all other Procedure (18 CFR 385.211, 385.214).
BILLING CODE 6717–01–P
parties. A party must submit 14 copies Protests will be considered by the
of filings made with the Commission Commission in determining the
and must mail a copy to the applicant appropriate action to be taken, but will
and to every other party in the not serve to make protestants parties to
proceeding. Only parties to the the proceeding. Any person wishing to
proceeding can ask for court review of become a party must file a notice of
wwhite on PROD1PC61 with NOTICES

Commission orders in the proceeding. intervention or motion to intervene, as


However, a person does not have to appropriate. Such notices, motions, or
intervene in order to have comments protests must be filed on or before the
considered. The second way to comment date. Anyone filing a motion
participate is by filing with the to intervene or protest must serve a copy

VerDate Aug<31>2005 18:25 Jun 15, 2006 Jkt 208001 PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 E:\FR\FM\16JNN1.SGM 16JNN1
34906 Federal Register / Vol. 71, No. 116 / Friday, June 16, 2006 / Notices

of that document on the Applicant and The Commission encourages to intervene or protest must serve a copy
all the parties in this proceeding. electronic submission of protests and of that document on the Applicant and
The Commission encourages interventions in lieu of paper using the all the parties in this proceeding.
electronic submission of protests and ‘‘eFiling’’ link at http://www.ferc.gov. The Commission encourages
interventions in lieu of paper using the Persons unable to file electronically electronic submission of protests and
‘‘eFiling’’ link at http://www.ferc.gov. should submit an original and 14 copies interventions in lieu of paper using the
Persons unable to file electronically of the protest or intervention to the ‘‘eFiling’’ link at http://www.ferc.gov.
should submit an original and 14 copies Federal Energy Regulatory Commission, Persons unable to file electronically
of the protest or intervention to the 888 First Street, NE., Washington, DC should submit an original and 14 copies
Federal Energy Regulatory Commission, 20426. of the protest or intervention to the
888 First Street, NE., Washington, DC This filing is accessible on-line at Federal Energy Regulatory Commission,
20426. http://www.ferc.gov, using the 888 First Street, NE., Washington, DC
This filing is accessible on-line at ‘‘eLibrary’’ link and is available for 20426.
http://www.ferc.gov, using the review in the Commission’s Public This filing is accessible on-line at
‘‘eLibrary’’ link and is available for Reference Room in Washington, DC. http://www.ferc.gov, using the
review in the Commission’s Public There is an ‘‘eSubscription’’ link on the ‘‘eLibrary’’ link and is available for
Reference Room in Washington, DC. Web site that enables subscribers to review in the Commission’s Public
There is an ‘‘eSubscription’’ link on the receive e-mail notification when a Reference Room in Washington, DC.
Web site that enables subscribers to document is added to a subscribed There is an ‘‘eSubscription’’ link on the
receive e-mail notification when a docket(s). For assistance with any FERC Web site that enables subscribers to
document is added to a subscribed Online service, please e-mail receive e-mail notification when a
docket(s). For assistance with any FERC FERCOnlineSupport@ferc.gov, or call document is added to a subscribed
Online service, please e-mail (866) 208–3676 (toll free). For TTY, call docket(s). For assistance with any FERC
FERCOnlineSupport@ferc.gov, or call (202) 502–8659. Online service, please e-mail
(866) 208–3676 (toll free). For TTY, call Comment Date: 5 p.m. Eastern Time FERCOnlineSupport@ferc.gov, or call
(202) 502–8659. on June 22, 2006. (866) 208–3676 (toll free). For TTY, call
Comment Date: 5 p.m. Eastern Time (202) 502–8659.
Magalie R. Salas,
on June 20, 2006. Comment Date: 5 p.m. Eastern Time
Secretary.
Magalie R. Salas, on June 16, 2006.
[FR Doc. E6–9378 Filed 6–15–06; 8:45 am]
Secretary. BILLING CODE 6717–01–P Magalie R. Salas,
[FR Doc. E6–9389 Filed 6–15–06; 8:45 am] Secretary.
BILLING CODE 6717–01–P [FR Doc. E6–9384 Filed 6–15–06; 8:45 am]
DEPARTMENT OF ENERGY BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY Federal Energy Regulatory


Commission DEPARTMENT OF ENERGY
Federal Energy Regulatory
[Docket No. TS04–249–002]
Commission Federal Energy Regulatory
[Docket No. ID–4902–000] Kinder Morgan Pipelines; Notice of Commission
Compliance Filing [Docket Nos. ER00–2268–018; EL05–10–
Hoolihan, James J.; Notice of Filing 000; ER99–4124–015; EL05–11–000; ER00–
June 9, 2006.
June 8, 2006. 3312–016; EL05–12–000; ER99–4122–019;
Take notice that on May 18, 2005, the
EL05–13–000]
Take notice that on May 11, 2006, Kinder Morgan Pipelines (KM Pipelines)
James J. Hoolihan filed an application submitted a filing in compliance with a Pinnacle West Capital Corporation;
for authorization to hold interlocking Commission Order issued April 19, Arizona Public Service Company;
positions pursuant to section 305(b) of 2005. KM Pipelines states this is to Pinnacle West Energy Corporation;
the Federal Power Act, part 45 of the further describe and explain the APS Energy Services Company, Inc.;
Commission’s Rules of Practice and information requested by the April 19 Notice of Filing
Procedure and Order No. 664. Order as it relates to their affiliated
Any person desiring to intervene or to intrastate storage management, system June 8, 2006.
protest this filing must file in design, project management, operations, Take notice that on May 17, 2006,
accordance with Rules 211 and 214 of gas control and engineering. pursuant to the Commission’s Order
the Commission’s Rules of Practice and Any person desiring to intervene or to issued on April 17, 2006, in the above-
Procedure (18 CFR 385.211, 385.214). protest this filing must file in captioned proceeding, Arizona Public
Protests will be considered by the accordance with Rules 211 and 214 of Service Company (APS) filed an offer of
Commission in determining the the Commission’s Rules of Practice and settlement, settlement agreement and
appropriate action to be taken, but will Procedure (18 CFR 385.211, 385.214). explanatory statement in support of the
not serve to make protestants parties to Protests will be considered by the offer of settlement, intended to resolve
the proceeding. Any person wishing to Commission in determining the all outstanding issues between APS and
become a party must file a notice of appropriate action to be taken, but will the Town of Wickenburg.
intervention or motion to intervene, as not serve to make protestants parties to Any person desiring to intervene or to
appropriate. Such notices, motions, or the proceeding. Any person wishing to protest this filing must file in
wwhite on PROD1PC61 with NOTICES

protests must be filed on or before the become a party must file a notice of accordance with Rules 211 and 214 of
comment date. On or before the intervention or motion to intervene, as the Commission’s Rules of Practice and
comment date, it is not necessary to appropriate. Such notices, motions, or Procedure (18 CFR 385.211, 385.214).
serve motions to intervene or protests protests must be filed on or before the Protests will be considered by the
on persons other than the Applicant. comment date. Anyone filing a motion Commission in determining the

VerDate Aug<31>2005 18:25 Jun 15, 2006 Jkt 208001 PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 E:\FR\FM\16JNN1.SGM 16JNN1

Potrebbero piacerti anche