Project :
Tender No.
Tender No.
Zone
Circle
Division
Nagpur Urban
Nagpur Rural
Katol
Description of Activity
Civil Works
Employer's
Estimated
Cost(UNTOUCH WORKS)
(Rs. Lakhs)
165.3205
a.
1808.92
b.
551.72
2525.97
The Taxes chargable to Employer will be paid as per the rates given below
1
0.00
I/ we hereby offer to complete the above described Works contained in the Schedules 2 and 3 together, for the Price of:
________ % ( _____________________ percent) above / below the total tendercost of the Employer's Estimate for a total amount of: Rs. __________________ Lakhs
(Rupees ______________________________________________________________________________ only), excluding the cost of MVAT & Service Tax.
Signature of Bidder:
Name & Designation:
Company:
Notes :-
1) The bidder should quote his % rate on the total tender estimated cost. Separate rates should not be quoted against Civil, Material & Services Components.
Schedule 1
Page 1 of 40
2) The quoted rate and price must be exclusive of MVAT and Service Tax.
3) Any deviation from the instructions contained in these notes shall make the offer of the bidder as non-responsive.
Schedule 1
Page 2 of 40
Mahavitaran InfraPlan II
Zone:
Nagpur Urban
Circle :
Nagpur Rural
Division Katol
Description of Activity
Unit
Quantity
(1)
(2)
(3)
(4)
Employer's Estimate
Unit
Total
Rate
Cost
(Rs. Lakhs)
(Rs. Lakhs)
(5)
(6) = (4) x (5)
0101
Supply, Erection, Testing and Commissioning of 33/11 KV, 1X5 MVA SubStation (Outdoor Type).
Nos
52.8260089674
158.47802690232
0301D/New
Nos
6.84251
6.84
165.3205
Mahavitaran InfraPlan II
Zone
Nagpur Urban
Tender No.
Circle
Nagpur Rural
Tender No.
Division
Katol
Cost of
Material+
Services
Activity
Number
Description of Activity
Unit
Quantity
(1)
(2)
(3)
(4)
(5)
Nos.
71.1816
21.7104
92.8920
213.54
65.13
278.68
Nos.
37.0788
11.3090
48.3878
37.08
11.31
48.39
0301D/new
Supply, Erection, Testing and Commissioning of 33/11 KV, 1x5 MVA Additional
Power T/F ( Outdoor) with Gantry structure for 33 KV bus (with required Civil
Nos.
work)
65.89
20.0957
85.9832
65.89
20.10
85.98
0601B
Nos.
9.23
2.8153
12.0459
9.23
2.82
12.05
0702
Kms.
32
7.0876
2.1617
9.2493
226.80
69.17
295.98
0708
Kms.
0.5
20.28
6.1839
26.4590
10.14
3.09
13.23
709
Kms.
6.86
2.0921
8.9515
6.86
2.09
8.95
0711
Nos.
0.6879
0.2098
0.8978
5.50
1.68
7.18
0906
Kms.
30
5.2094
1.5889
6.7982
156.28
47.67
203.95
0908
Kms.
45
2.7683
0.8443
3.6127
124.58
38.00
162.57
11.69
3.5643
15.2507
23.37
7.13
30.50
45
0.5976
0.1823
0.7799
26.89
8.20
35.09
125
1.84
0.5620
2.4046
230.33
70.25
300.58
Total Cost of
Material +
Services in Rs
Lakhs
(10) = (8) + (9)
CAPITAL WORKS
0101
0201
0914
0921
1213
Supply, Erection, Testing and Commissioning of 33/11 KV, 1X5 MVA SubStation (Outdoor Type).
Supply, Erection, Testing and Commissioning of
Augmentation of 33/11 KV, 1x3.15 MVA to 1x5 MVA Power T/F ( Outdoor)
associated switch gears available]
[if
1401
306
1.6827
0.5132
2.1959
514.90
157.04
671.94
8.5
1.1646
0.3552
1.5198
9.90
3.02
12.92
27
27
2.2912
3.1768
0.0000
0.6988
0.9689
0.0000
2.9900
4.1458
0.00
61.86
85.77
0.00
18.87
26.16
0.00
80.73
111.94
1808.92
551.72
2360.65
1808.92
551.72
2360.65
1501
Mahavitaran InfraPlan II
Zone
Circle
Division
Nagpur Urban
Nagpur Rural
Katol
Payment Period
Estimated Percent
Estimated Amount
(Rs. Lakhs)
Cumulative %
Milestone %
1st Quarter
2nd Quarter
3rd Quarter
4th Quarter
Totals
Note: While giving the requirement the bidder should consider the quoted price + (plus) Estimated amount of MVAT / Service Tax
Signature of Bidder:
Name & Designation:
Company:
Discreption
Supply, Erection, Testing and Commissioning of 33/11
KV, 1X5 MVA Sub-Station (Outdoor Type).
Unit
Rate
Qty.
Amount
No
92.892
278.68
Rate/Unit
Rs.
Description
Unit
Qty.
A
1
2
3
33 KV SIDE
33 KV Lightning Arrestors (Station type)
33 KV Isolators with EB (800 A)
33 KV Isolators without EB (800 Amp.)
Set
Set
Set
2
1
3
11496.72
50840.30
46480.47
22993.44
50840.30
139441.40
33 KV Post Insulator
Nos
907.50
2722.50
Nos
105865.97
105865.97
Nos
18
200.75
3613.57
ACSR Panther
MTR
200
133.69
26737.19
8
9
10
Nos
Set
No
6
1
1
671.43
4028.58
232594.00 232594.00
3707880.00 3707880.00
11
12
33 KV P.T.
33 kV C. T. (400-200/1-1-1)
Nos
Nos
3
3
18245.67
25825.91
54737.01
77477.74
13
14
15
Set
No
Nos
1
1
6
188046.82
63721.77
687.96
188046.82
63721.77
4127.75
16
17
No
KG
1
150
43594.00
73.00
43594.00
10950.00
11 KV SIDE
18
Set
1181212.59 1181212.59
19
Set
1056.41
1056.41
20
No.
250893.05
250893.05
21
No.
12
124.14
1489.62
22
23
24
25
No.
No.
No.
No.
1
1
1
1
204139.98
197958.65
182314.84
56421.53
204139.98
197958.65
182314.84
56421.53
26
No.
190939.29
190939.29
27
No.
85447.48
85447.48
28
No.
26914.24
26914.24
0.00
Cost of material
Services @ 30.5 %
7118159.71
2171038.71
9289198.42
Sheet No.1
Cost data for 33 KV Gantry M.S.Structure/Steel Section for 1x5 MVA S/S
Sr.No.
Unit
Qty.
RT/U Rs.
Amt.Rs.
Description of Material
MT
1.984
42245.00
83814.08
MT
0.522
42245.00
22051.89
Total:
105865.97
Sheet No.2
Cost data for Earthing Work at 1x 5 MVA at 33/11 KV S/S
Sr.No.
Unit
Qty.
RT/U Rs.
Amt.Rs.
M.S.Flat 50 x 6 mm
Description of Material
Kg.
1500
44.66
66990.00
No.
22
6655.00
146410.00
Coal
Kg.
1310
6.00
7860.00
Salt
Kg.
1310
4.00
5240.00
No.
22
242.00
5324.00
Sundries
L.S.
770.00
770.00
Total:
232594.00
Sheet No.3
Cost data of Structure for 33 KV CT & PT at 1x5 MVA 33/11 KV S/Stn.
Sr.No.
Description of Material
Unit
Qty.
RT/U Rs.
Amt.Rs.
Structure for 33 KV PT
Kg.
315
47.05
14820.75
Structure for 33 KV CT
Kg.
360
47.05
16938.00
Kg.
155
47.05
7292.75
Kg.
50
47.05
2352.50
G.I.Nut Bolts
Kg.
30
73.00
2190.00
Total:
43594.00
Sheet No :
4
Cost data for Take off structure for 11 KV Feeders 3 outlets at 1x5 MVA,33/11 KV Sub Stn. (Outdoor)
Sr.No.
Unit
Qty.
Rate
Amount
Description of material
Nos.
8461.22
50767.30
MS Channel 100x50x6 mm
Kg.
1610
47.05
75750.50
MS angle 50x50x6 mm
Kg.
100
47.05
4705.00
MS Flat 75x10 mm
Kg.
80
44.06
3524.80
Nos.
11484.80
34454.40
Nos.
36
200.75
7227.13
Nos.
36
354.72
12769.94
Nos.
124.14
1117.22
Sets
319.59
958.78
10
Sets
1056.41
3169.23
11
ACSR Dog
Rmt.
150
55.83
8374.75
12
Kg.
40
57.05
2282.00
13
G.I.Nut Bolts
Kg.
50
73.00
3650.00
14
Cmt.
3518.00
14072.00
15
Wedge Connectors
a)
DOG TO DOG
Nos.
18
770.00
13860.00
b)
Nos.
18
770.00
13860.00
16
Miscelleneous material
LS
350.00
350.00
Total:
250893.05
Rate
Amount
Sheet No.
5
Cost data for Clamps & Connectors at 1x 5 MVA, 3311 kv sub stn. (Outdoor)
Sr.No.
Description of material
Unit
Qty.
DOG TO DOG
Nos.
30
770.00
23100.00
Nos.
30
3520.00
105600.00
Nos.
24
1071.40
25713.60
Nos.
3899.17
23395.02
Nos.
1497.10
8982.60
Wedge Connectors
a)
b)
Nos.
1497.10
4491.30
Nos.
2142.91
12857.46
Total:
204139.98
Sheet No.6
Cost data for Structure of 11 KV Main Bus at 1x5MVA, 33/11 KV Sub-Station (Outdoor)
Sr.No.
Unit
Qty.
RT/U Rs.
Amt. Rs.
Description of Material
Nos.
8461.22
50767.30
MS Channel 100x50x6 mm
Kg.
1610
47.05
75750.50
MS angle 50x50x6 mm
Kg.
100
47.05
4705.00
MS Flat 75x10 mm
Kg.
80
44.06
3524.80
Nos.
36
200.75
7227.13
Nos.
36
354.72
12769.94
Nos.
124.14
1117.22
Sets
319.59
958.78
Sets
1056.41
3169.23
10
ACSR Dog
Rmt.
150
55.83
8374.75
11
Kg.
40
57.05
2282.00
12
G.I.Nut Bolts
Kg.
50
73.00
3650.00
13
Cmt.
3518.00
14072.00
14
Nos.
12
770.00
9240.00
15
Miscelleneous material
LS
350.00
350.00
Total:
197958.65
Sheet No.7
Cost data for Yard Lighting of 1 x 5 MVA , 33/11 KV S/S
Sr.No.
Description of Material
Unit
Qty.
RT/U Rs.
Amt. Rs.
No.
12
3388.00
40656.00
No.
12
5056.20
60674.40
Mtr.
250
190.23
47558.50
Mtr.
100
43.47
4346.70
Cmt
3518.00
24626.00
Red Bricks
No.
1000
2.42
2420.00
Sand
Cmt
210.54
1263.24
Sundries
L.S.
770.00
770.00
Total:
182314.84
Sheet No.
8
Cost data for 100 KVA, 11/0.43 KV Station Transformer for 1x5 MVA S/S. (Outdoor)
Sr.No.
Unit
Qty.
Rate
Amount
MS Channel 100x50x6 mm
Description of material
Kg.
290
47.05
13644.50
M.S.Channel 75x40x6 mm
Kg.
15
47.05
705.75
MS Flat 75x10 mm
Kg.
20
44.06
No.
94217.37
94217.37
No
20436.09
20436.09
Set
11484.80
11484.80
11KV H.G.Fuses
Nos.
1879.47
1879.47
Set
1056.41
1056.41
Nos.
124.14
744.81
10
Rmt.
10
179.74
1797.44
7204.87
881.20
11
Rmt.
50
144.10
12
Nos.
319.59
958.78
13
Kg.
40
57.05
2282.00
14
Coal
Kg.
200
6.00
1200.00
15
Salt
Kg.
200
4.00
16
Cmt.
5.6
4818.00
26980.80
17
Nos.
30
95.00
2850.00
18
L.S
1815.00
Total:
800.00
1815.00
190939.29
Sheet No 9
Cost data for Control cable 1 X 5 MVA S/Stn
Sr.No.
Unit
Qty.
Rate
Amount
Description of material
Rmt
125
337.16
42144.83
Rmt
130
223.73
29085.06
Rmt
55
75.51
4153.10
Rmt
50
43.47
2173.35
RMT
100
74.91
7491.15
Misc
L.S
400.00
400.00
TOTAL
85447.48
Sr.No.
Description
Amount
Land development
342420.00
Electrification
100000.00
Approach Rood
307362.50
850171.32
Metal spreading
202750.00
530744.00
10
61205.00
11
80623.00
12
13
1339442.75
435920.87
325543.27
706418.18
Total=
5282600.90
Note:- Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc. for eathing with
sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The cost of Bentonite powder is to be
considered in the cost of sundries only no seperate payment will be given.
Discreption
Unit
Rate
Qty.
Amount
0201
No
48.39
48.39
Description
Unit
Qty.
Rate/Unit
Rs.
No
3707880
3707880
Cost of material
Services @ 30.5 %
3707880
1130903.40
4838783.40
Note :-Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc. for eathing
with sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The cost of Bentonite powder is to
be considered in the cost of sundries only no seperate payment will be given.
0301D
Unit
Rate
Qty.
Amount
No
85.98
85.98
Rate/Unit
Rs.
Description
Unit
Qty.
A
1
33 KV SIDE
33 KV Lightning Arrestors (Station type)
Set
11496.7201 22993.44029
2
3
4
Set
Set
Nos
1
3
3
50840.3033 50840.30325
46480.4668 139441.4005
907.5
2722.5
5
6
Nos
MTR
18
200
200.753612 3613.565016
133.685928 26737.1856
7
8
Nos
Set
6
1
671.429652 4028.577912
232594.00
232594
9
10
No
Nos
1
3
3707880
3707880
25825.9123 77477.73688
11
Set
188046.82 188046.8196
12
No
63721.7717 63721.77174
13
No
28773.25
28773.25
14
Nos
105865.97
105865.97
15
Nos
16
17
G.I.Nut Bolts
Fire Extinguisher with stand
KG
Set
100
L.S
11 KV SIDE
18
Set
1181212.59 1181212.59
19
20
No
Set
12
1
124.135328 1489.623936
1056.40872 1056.40872
21
No.
250893.05 250893.0473
22
No.
199648.68
199648.68
23
No.
197958.65
197958.651
24
D
No.
85487.48
85487.48395
6588750.752
Services @ 30.5 %
687.957808 4127.746848
73
4840
7300
4840
0
2009568.98
8598319.732
Sheet No.1
Cost data for Earthing Work at 1x 5 MVA at 33/11 KV S/S
Sr.No.
Description of Material
Unit
Qty.
RT/U Rs.
Amt.Rs.
M.S.Flat 50 x 6 mm
Kg.
1500
44.66
66990.00
No.
22
6655.00
146410.00
Coal
Kg.
1310
6.00
7860.00
Salt
Kg.
1310
4.00
5240.00
No.
22
242.00
5324.00
Sundries
L.S.
770.00
770.00
Total:
232594.00
Sheet No.2
Cost data of Structure for 33 KV CT & LA at 1x5 MVA 33/11 KV S/Stn.
Sr.No.
Description of Material
Unit
Qty.
RT/U Rs.
Amt.Rs.
Structure for 33 KV CT
Kg.
360
47.05
16938.00
Kg.
155
47.05
7292.75
Kg.
50
47.05
2352.50
G.I.Nut Bolts
Kg.
30
73.00
2190.00
Total:
28773.25
Sheet No :
3
Cost data for Take off structure for 11 KV Feeders 3 outlets at 1x 5 MVA,33/11 KV Sub Stn. (Outdoor)
Sr.No.
Description of material
Unit
Qty.
Rate
Amount
Nos.
8461.22
50767.30
MS Channel 100x50x6 mm
Kg.
1610
47.05
75750.50
MS angle 50x50x6 mm
Kg.
100
47.05
4705.00
MS Flat 75x10 mm
Kg.
80
44.06
3524.80
Nos.
11484.80
34454.40
Nos.
36
200.75
7227.13
Nos.
36
354.72
12769.94
Nos.
124.14
1117.22
Sets
319.59
958.78
10
Sets
1056.41
3169.23
11
ACSR Dog
Rmt.
150
55.83
8374.75
12
Kg.
40
57.05
2282.00
13
G.I.Nut Bolts
14
15
Wedge Connectors
a)
Kg.
50
73.00
3650.00
Cmt.
3518.00
14072.00
DOG TO DOG
Nos.
18
770.00
13860.00
b)
Nos.
18
770.00
13860.00
16
Miscelleneous material
LS
350.00
350.00
Total:
250893.05
Sheet No.
4
Cost data for Clamps & Connectors at 1x 5 MVA, 3311 kv sub stn. (Outdoor)
Sr.No.
Description of material
Unit
Qty.
Rate
Amount
a) DOG TO DOG
Nos.
30
770.00
23100.00
Nos.
30
3520.00
105600.00
Wedge Connectors
Nos.
24
1071.40
25713.60
Nos.
3899.17
23395.02
Nos.
1497.10
8982.60
Nos.
2142.91
Total:
12857.46
199648.68
Sheet No.5
Cost data for Structure of 11 KV Main Bus at 1x 5 MVA, 33/11 KV Sub-Station (Outdoor)
Sr.No.
Unit
Qty.
RT/U Rs.
Amt. Rs.
Description of Material
Nos.
8461.22
50767.30
MS Channel 100x50x6 mm
Kg.
1610
47.05
75750.50
MS angle 50x50x6 mm
Kg.
100
47.05
4705.00
MS Flat 75x10 mm
Kg.
80
44.06
3524.80
Nos.
36
200.75
7227.13
Nos.
36
354.72
12769.94
Nos.
124.14
1117.22
Sets
319.59
958.78
Sets
1056.41
3169.23
10
ACSR Dog
Rmt.
150
55.83
8374.75
11
Kg.
40
57.05
2282.00
12
G.I.Nut Bolts
Kg.
50
73.00
3650.00
13
Cmt.
3518.00
14072.00
14
Nos.
12
770.00
9240.00
15
Miscelleneous material
LS
350.00
350.00
Total:
197958.65
Sheet No.6
Cost data for Control cable 1 X 5 MVA S/Stn
Sr.No.
Description of material
Unit
Qty.
Rate
Amount
Rmt
125
337.16
42144.83
Rmt
130
223.73
29085.06
Rmt
55
75.51
4153.10
Rmt
50
43.47
2173.35
RMT
100
74.91
7491.15
Misc
L.S
440.00
440.00
TOTAL
85487.48
Sheet No.7
Cost data for 33 KV Gantry M.S. Structure/Steel Section for 1x 5 MVA &1x10 MVA 33/11 kv S/S (Outdoor)
Cost data for 33 KV Gantry M.S. Structure/Steel Section for 1x 5 MVA &1x10 MVA 33/11 kv S/S (Outdoor)
Sr.No.
Description of Material
Unit
Qty.
RT/U Rs.
Amt.Rs.
MT
1.984
42245.00
83814.08
MT
0.522
42245.00
22051.89
Total:
105865.97
C
Sr.No.
1
Amount
28605
2
3
4
5
6
Electrification (LS)
Approach Rood (WBM road) (as per table D)
7
8
10
11
12
13
0
92862.00
530744
32040
Model estimate for Land Development for Switch Yard area at for 33 & 22 KV S/Stn.
Size of Plot considered 480 sqm.
Table A
Item No
1
Particulars
Qty
Unit
Rate
Amount
480
Sqm
2.5
1200
50
Cum
120
6000
35
Cum
567
19845
35
Cum
24
840
15
Cum
48
720
TOTAL
28605
Removing Grass
and Vegetation
trees,bushes
Supplying
and stacking,
stone ,small
dust brought
from
etc including
removing
the same
from root,disposing
outside
source
of approved
quality
including all
off the same
removed
material
outside the
labour
charges
required
for spreading
in premises
line and
of
sub
station
etc
complete
as
directed
by
Engr
In
level in switch yard area of sub station
with
Charge.
watering and compaction as directed by Engr In
Charge.
Qty
Unit
Rate
Amount
480.00
Sqm
5.00
2400.00
23.00
Cum
1018.00
23414.00
30.00
Cum
1193.00
35790.00
16.00
Cum
1543.00
24688.00
125.00
Rmt
42.00
5250.00
30.00
Cum
32.00
960.00
15.00
Cum
24.00
360.00
Supplying andstacking
12/20 mm machine
crushed metal brought from outside source of
approved quality including all labour charges
required for spreading in line and level in switch
yard area of sub station as directed by Engr In
Charge.
Providing anf fixing Brick on Edge lining of approved
quality bricks including excavation,all labour
charges ,fixing in neat line and level as directed by
Engr In Charge including two coats of white or
colour washing to the bricks.
6
Spreading of machine crushed 40 mm metal in line
and level in switch yard area including labour lead
and lifts as directed by engineer in charge.
7
TOTAL
92862.00
Particulars
2
3
4
Qty
Unit
Rate
Amount
20
Rmt
165
3300
35
Rmt
188
6580
40
18
Rmt
Nos
235
175
9400
3150
Nos
675
675
1
9
Nos
Nos
835
900
835
8100
6
7
TOTAL
32040
Note :-Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc. for eathing
with sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The cost of Bentonite powder is to
be considered in the cost of sundries only no seperate payment will be given.
Discreption
Unit
Rate
Qty.
Amount
0601B
Nos
12.05
12.05
Rate
11496.72
50840.303
46480.467
188046.82
18245.668
24200
96224.475
5445
Description of Material
33 KV Lightning Arrestors (Station type)
33 KV Isolators with EB (800 A)
33 KV Isolators without EB (800 Amp.)
33 KV VCB complete 1600 Amp (O.D.)
33 KV P.T.
CT 200-100/1-1 A , 33 KV
C&R panel for 33 KV for feeder breaker
Marshalling Box
Unit
Set
Set
Set
No
No
No
Set
No
Qty.
1
1
2
1
3
3
1
1
LS
338194.47 338194.47
10
LS
12512.20 12512.20
Cost of material
Amount
11496.72
50840.30
92960.93
188046.82
54737.01
72600.00
96224.47
5445.00
923057.92
Services @ 30.5 %
281532.67
1204590.59
11 KV Feeder bay (Structure, Foundation, Bus bar material, Cable , Earthing Materials & Painting)
Sr.No.
Description of Material
Unit
Qty.
Rate
Kg.
250
47.05
11762.50
Structure for 33 KV CT
Kg.
315
47.05
14820.75
Structure for 33 KV PT
Kg.
315
47.05
14820.75
Gantry Structures
Kg.
1000
55.00
55000.00
G.I.Nut Bolts
Kg.
100
73.00
7300.00
Welding Rods
Nos.
5000
2.42
12100.00
Sub Total
115804.00
B)
FOUNDATION(Civil works)
Cmt.
1.3
4046.00
5259.80
Cmt.
1.3
4046.00
5259.80
Cmt.
1.3
4046.00
5259.80
Cmt.
1.3
3518.00
4573.40
Cmt.
1.3
4046.00
5259.80
Cmt.
1.3
4046.00
5259.80
Cmt.
2.6
3518.00
9146.80
Sub Total:
40019.20
A)
STRUCTURE
1
2
C)
BUS-BAR MATERIAL
ACSR Panther
Wedge Connectors
a) T-Connector for 200 sq mm conductor(Compression type)
Amount
Mtrs.
25
133.69
3342.25
Nos.
30
3520.00
105600.00
Breaker Clamps
Nos.
1772.35
10634.10
Nos.
12
887.60
10651.20
Nos.
1239.65
7437.90
Nos.
18
200.75
3613.57
Nos.
671.43
D)
4028.58
Sub Total:
145307.59
337.16
16857.93
CONTROL CABLE
1 a)
Rmt.
50
Rmt.
40
58.84
2353.58
Rmt.
50
77.00
3850.00
Nos.
10
302.50
3025.00
L.S.
L.S.
550.00
550.00
Kg.
20
47.05
941.00
Nos.
80
95.00
7600.00
Sand
Cmt.
210.54
842.16
Sub Total:
36019.67
2203.00
E)
EARTHING WORK
Kg.
50
44.06
M.S.Flat 25x6 mm
Kg.
20
44.06
881.20
Nos.
6655.00
6655.00
Coal
Kg.
100
6.00
600.00
Salt
Kg.
100
4.00
400.00
Welding Rods
Nos.
50
2.42
121.00
Nos.
220.00
220.00
Nos.
1432.00
1432.00
Sub Total:
12512.20
F)
PAINTING OF STRUCTURE
Ltrs.
10
56.00
Ltrs.
96.80
484.00
Sub Total:
1044.00
560.00
Note :-Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc. for eathing with
sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The cost of Bentonite powder is to be
considered in the cost of sundries only no seperate payment will be given.
Discreption
Unit
Rate
Qty.
Amount
0702
No
9.25
32
295.98
Unit
Qty.
1
2
Particulars
No.
No.
14
2
Rate
Amount
3
4
5
MS Channel 100x50x6 mm
M.S.Channel 75x40x6 mm
MS angle 50x50x6 mm
Kg.
Kg.
Kg.
495
91
203
47.05
47.05
47.05
23289.75
4281.55
9551.15
6
7
MS Flat 75x10 mm
G.I.Nut Bolts
Kg.
Kg.
89
80
44.06
73
3921.34
5840
8
9
No.
No.
153
33
200.753612 30715.30264
247.720092 8174.763036
No.
Mtrs.
18
3150
354.72052 6384.96936
55.831684 175869.8046
19101.324 267418.5366
16162.6588 32325.31762
10
11
12
13
H.T.Stay Set
G.I.Stay Wire 7/4mm(8 SWG)
No.
Kg.
6
60
14
15
16
Kg.
No.
No.
130
3
14
17
18
No.
cmt.
14
25
19
20
Kg.
Ltr.
60
6
66.090152
45.1
3965.40912
270.6
21
22
Ltr.
Ltr.
20
9
56
96.8
1120
871.2
23
24
Sundries
Wedge connectors
LS
LS
770
770
0
a)
DOG TO DOG
No
18
770
Cost of material
543.66
53.64
53.640664
121
49
3261.970351
3218.43984
6973.28632
363
686
319.594537 4474.323515
4046
101150
13860
708756.713
Services @ 30.5 %
216170.80
924927.51
Note :-Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc. for eathing
with sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The cost of Bentonite powder is to
be considered in the cost of sundries only no seperate payment will be given.
Discreption
Unit
Rate
Qty.
Amount
0708
No
26.46
0.5
13.23
Unit
Qty.
1
2
Particulars
Rmt
No
1000
30
No.
940
95
89300
No.
39930
79860
No.
20590.57
41181.14
Sand
Cmt.
250
210.54
52635
LS
990
990
2027505.839
618389.28
Rate (Rs.)
Amount
1747.7297 1747729.699
527
15810
2645895.12
Note :-Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc. for eathing
with sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The cost of Bentonite powder is to
be considered in the cost of sundries only no seperate payment will be given.
Discreption
Unit
Rate
Qty.
Amount
0709
No
8.51
8.51
Description of Material
Unit
QTY
RT/U.Rs.
Amt Rs.
1
2
No.
Kg.
4
60
19101.324 76405.29618
47.05
2823
3
4
MS Channel 100x50x6 mm
MS angle 50x50x6 mm
Kg.
kg.
100
22
5
6
7
M.S.Flat 50 x 6 mm
33 KV Isolators with EB (800 A)
33 kV Pin Insulators with G.I. Pins
kg.
Set
NO.
24
2
6
44.66
1071.84
50840.3033 101680.6065
687.957808 4127.746848
8
9
ACSR Dog
XLPE Cable 33 KV, 3 C / 300 mm sq.
Rmt
Rmt
100
160
55.831684
5583.1684
1747.7297 279636.7518
10
11
No
Ltr.
35
2
527
45.1
18445
90.2
12
13
Ltr.
Ltr.
6
4
56
96.8
336
387.2
14
No.
20590.57
82362.28
15
16
Sand
Misc. for XLPE U/G Cable
Cmt
LS
500
2
210.54
990
105270
1980
47.05
47.05
4705
1035.1
Cost of material
685939.1897
Services @ 30.5 %
209211.45
895150.64
Note :-Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc. for eathing
with sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The cost of Bentonite powder is to
be considered in the cost of sundries only no seperate payment will be given.
Discreption
Unit
Rate
Qty.
Amount
0711
No
0.89
7.12
Description of Material
RSJ 152x152, 13 m long
Unit
No.
QTY
2
RT/U.Rs.
Amt Rs.
19101.324 38202.64809
2
3
Kg.
Kg.
10
46
4
5
6
MS angle 50x50x6 mm
33 kv guarding channel MS100x50
33 kV Pin Insulators with G.I. Pins
Kg.
Kg.
No.
50
80
3
47.05
2352.5
47.05
3764
687.957808 2063.873424
7
8
No.
No.
6
18
354.72052 2128.32312
200.753612 3613.565016
9
10
H.T.Stay Set
Stay Wire 7/8
No.
Kg.
4
20
543.661725 2174.646901
55
1100
11
12
No
kg.
2
6
319.594537 639.1890736
53.640664 321.843984
13
14
kg.
No.
7
2
66.090152
49
462.631064
98
15
16
17
Ltr.
Ltr.
Ltr.
1
3
2
45.1
56
96.8
45.1
168
193.6
18
19
Cmt.
LS
2
1
4046
770
8092
770
44.06
47.05
440.6
2164.3
Cost of material
68794.82067
Services @ 30.5 %
20982.42
89777.24
Note :-Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc. for eathing
with sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The cost of Bentonite powder is to
be considered in the cost of sundries only no seperate payment will be given.
Discreption
Supply, Erection, Testing and Commissioning of 11 KV
Single circuit Pin type with 100sq.mm ACSR lines on
100x116 mm 10 mtr RSJ poles
Unit
Rate
Qty.
Amount
No
6.80
25
169.96
Description of Material
RSJ 116x100, 10 m long
Unit
No.
Qty.
17
RT/U Rs.
Amount
9401.35221 159822.9876
2
3
4
No.
Kg.
Kg.
2
104
122
8461.21699 16922.43398
47.05
4893.2
47.05
5740.1
5
6
MS angle 50x50x6 mm
M.S. Flats(50 X 10mm)
Kg.
Kg.
72
37
7
8
No.
No.
13
13
580.136956 7541.780422
82.5
1072.5
9
10
G.I.Nut Bolts
11 kV Pin Insulators with G.I. Pins
Kg.
No.
90
39
73
6570
124.135328 4841.277792
11
12
No.
Set
24
24
200.753612 4818.086688
354.72052 8513.29248
13
14
15
ACSR Dog
Sleve Joints
H.T.Stay Set
Rmt
No.
Set
3150
3
8
55.831684 175869.8046
121
363
543.661725 4349.293802
16
17
Kg.
Set
80
17
55
4400
319.594537 5433.107126
18
19
Kg.
No.
77
17
66.090152 5088.941704
49
833
20
21
Cmt.
Kg.
20
130
3518
53.640664
70360
6973.28632
22
23
Ltr.
Ltr.
6
20
45.1
56
270.6
1120
24
25
Ltr.
LS
9
1
96.8
770
871.2
770
26
a)
Wedge connectors
DOG TO DOG
No
24
770
0
18480
47.05
44.06
3387.6
1630.22
Cost of material
520935.713
Services @ 30.5 %
158885.39
679821.10
Note :-Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc. for eathing
with sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The cost of Bentonite powder is to
be considered in the cost of sundries only no seperate payment will be given.
Discreption
Supply, Erection, Testing and Commissioning of 11 KV
Single circuit Pin type with 55sq.mm AAAC lines on
100x116 mm 9 mtr PSC poles
Unit
Rate
Qty.
Amount
Kms
3.61
40
144.51
(A) HT Line :
Description of Material
Unit
Qty.
RT/U Rs.
Amount
1
2
No.
Kg.
18
104
2234.8404
47.05
40227.1272
4893.2
3
4
M.S.Channel 75x40x6 mm
MS angle 50x50x6 mm
Kg.
Kg.
122
72
47.05
47.05
5740.1
3387.6
5
6
7
No.
No.
Kg.
12
12
39
580.136956 6961.643467
82.5
990
44.06
1718.34
8
9
No.
No.
42
24
124.135328 5213.683776
200.753612 4818.086688
10
11
Set
Rmt
24
3150
12
13
Sleve Joints
H.T.Stay Set
No.
Set
3
8
121
363
543.661725 4349.293802
14
15
Kg.
Set
80
18
55
4400
319.594537 5752.701662
16
17
18
Kg.
No.
Cmt.
71
18
18
66.090152 4692.400792
49
882
3518
63324
19
20
Kg.
Ltr.
130
6
53.640664
45.1
6973.28632
270.6
21
22
Ltr.
Ltr.
20
9
56
96.8
1120
871.2
23
24
G.I.Nut Bolts
Sundries
Kg.
LS
90
1
73
770
6570
770
25
a)
Wedge connectors
RABIT To RABIT
157.3
0
3775.2
No
24
161.73
30.123716
3881.52
94889.7054
Cost of material
276834.6891
Services @ 30.5 %
84434.580
361269.27
Note :-Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc. for eathing
with sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The cost of Bentonite powder is to
be considered in the cost of sundries only no seperate payment will be given.
Discreption
Unit
Rate
Qty.
Amount
0914
Kms
15.25
30.50
Particulars
Cost Data for laying 11 KV 3x240 sq.mm XLPE under ground Cable
Unit
Qty.
Rate (Rs.)
1
2
3
Amount
Rmt
No
No.
1000
30
940
995.00198
527
94
995001.98
15810
88360
No
5723.3
11446.6
No.
2196.15
4392.3
6
7
Sand
Misc. for XLPE U/G Cable
Cmt
LS
250
1
210.54
990
52635
990
Cost of material
Services @ 30.5 %
1168635.88
356433.9434
1525069.823
Note :-Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc. for eathing
with sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The cost of Bentonite powder is to
be considered in the cost of sundries only no seperate payment will be given.
Discreption
Unit
Rate
Qty.
Amount
0921
Nos
0.780
45
35.09
Description of Material
Unit
QTY
RT/U.Rs.
Amt Rs.
1
2
3
No.
Kg.
Kg.
2
10
110
4
5
M.S.Channel 75x40x6 mm
MS angle 50x50x6 mm
Kg.
Kg.
75
50
6
7
No.
No.
6
6
354.72052 2128.32312
200.753612 1204.521672
8
9
H.T.Stay Set
Stay Wire 7/8
No.
Kg.
2
25
543.661725 1087.32345
55
1375
10
11
No
kg.
2
6
319.594537 639.1890736
53.640664 321.843984
12
13
14
kg.
No.
Ltr.
7
2
2
66.090152
49
45.1
462.631064
98
90.2
15
16
Ltr.
Ltr.
6
4
56
96.8
336
387.2
17
18
Cmt.
L.S.
2
1
3518
770
7036
770
Cost of material
16162.6588 32325.31762
44.06
440.6
47.05
5175.5
47.05
47.05
3528.75
2352.5
59758.89998
Services @ 30.5 %
18226.46
77985.36
Note :-Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc. for eathing
with sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The cost of Bentonite powder is to
be considered in the cost of sundries only no seperate payment will be given.
Unit
Rate
Qty.
Amount
Nos
2.405
125
300.58
Description of Material
Dist. Transformer 100 KVA, 11/0.43 kv
Unit
No.
QTY
1
RT/U.Rs.
94217.3656
Amt Rs.
94217.37
2
3
No
Kg.
2
100
8461.21699
47.05
16922.43
4705.00
4
5
M.S.Channel 75x40x6 mm
MS angle 50x50x6 mm
kg.
kg.
44
22
47.05
47.05
2070.20
1035.10
6
7
8
M.S.Flat 50 x 6 mm
11 kV Pin Insulators with G.I. Pins
Strain Hardware for Dog0.1 or Equ.AAAC.
kg.
NO.
No.
24
3
3
44.66
124.135328
354.72052
1071.84
372.41
1064.16
9
10
No.
Set.
1
1
17125.5292
1056.40872
17125.53
1056.41
11
12
H.T.Stay Set
G.I.Stay Wire 7/4mm(8 SWG)
No
kg.
4
25
543.661725
53.640664
2174.65
1341.02
13
14
No.
Set.
5
1
319.594537
1879.46819
1597.97
1879.47
15
No.
No.
1
2
11484.7987
49
11484.80
98.00
16
17
18
Kg.
kg.
CMT.
40
15
2
53.640664
66.090152
3518
2145.63
991.35
7036.00
19
L.S.
220
220.00
20
Sundries
L.S.
770
770.00
21
DTC Metring with Box, single core L.T. XLPE cable (70
sq.mm., 120 mtr length) and other allied material.
No.
14883.72
14883.72
1213
Discreption
Supply, Erection, Testing and Commissioning of POLE
MOUNTED DISTRIBUTION TRANSFORMER SUBSTATION 11 KV ,100 KVA Dist. Transformer centers on
9 mtrs 100 X 116 mm RSJ poles with Kit-kat Dist box.
S.N.
1
Cost of material
Services @ 30.5 %
Total cost of Material
Note
184263.047
56200.23
240463.28
*- The DTC Meter should have LT AC 3Ph 4wire CT/PT operated fully static AMR Compatible Tri-Vector
meter RS-232 port.
#- Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc. for
eathing with sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The cost of
Bentonite powder is to be considered in the cost of sundries only no seperate payment will be given.
Discreption
Unit
Rate
Qty.
1401
Kms
2.196
306
DESCRIPTION OF MATERIALS.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
a)
Wedge connectors
Ant To Ant
b)
GNAT To GNAT
Cost of material
Services @ 30.5 %
UNIT
QTY
RT/UNIT(RS)
No.
Rmt
Rmt
Kg
No
Pair
No
No.
No
No
No
Kg
No
Kg.
Kg
Kg.
Cmt
No
LS
20
3200
1100
24
72
96
4
20
6
5
8
72
8
1.5
1.5
100
2.4
57
1
1729.2204
23.584364
12.280948
44.66
9.8753204
28.730452
33
33
27.83
154.8534284
428.9151988
53.640664
9.629252
72.6
44
53.640664
3518
96.8
2750
No
32
157.3
No
24
157.3
Amount
671.94
Discreption
Unit
Rate
Qty.
1501
Kms
1.52
8.5
DESCRIPTION OF MATERIALS.
PSC Pole 8 Mtr (200 KG)
AAC Gnat
M.S.Flat 50 x 6 mm
L.T.Shackle Insulator
Aluminium Bobbins for neutral
L.T.Shackle hardware
Jointing Sleeves for AAC
PG Clamp
Earthing Sets L.T.
L.T. Stay sets
G.I.Stay Wire 7/3.15mm(10SWG)
Stay Insulators
Binding Wire
Binding Tape
G.I.Wire 8 SWG/ 6 SWG
Concreting ration 1:4:8
L.T.Spacers
Sundries such as N/B, Washers, Welding etc.
Wedge connectors
GNAT To GNAT
UNIT
QTY
RT/UNIT(RS)
No.
Rmt
Kg
No
No.
Pair
No
No
No
No
Kg
No
Kg.
Kg
Kg.
LS
No
LS
22
3150
60
52
26
104
3
6
5
8
96
8
2
2
100
1
63
1
1729.2204
12.280948
44.66
9.8753204
33
28.730452
33
27.83
154.8534284
428.9151988
53.640664
9.629252
72.6
44
53.640664
3518
96.8
2750
No
32
157.3
Cost of material
Services @ 30.5 %
Total cost of Material
Note :-Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc. for eathing with
sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The cost of Bentonite powder is to be
considered in the cost of sundries only no seperate payment will be given.
Amount
12.92
G)
AMT.(RS)
38042.8488
38684.9862
2679.6
513.5166608
858
2987.967008
99
166.98
774.267142
3431.3215904
5149.503744
77.034016
145.2
88
5364.0664
3518
6098.4
2750
0
5033.6
116462.2915612
35521.00
151983.29
OTA-1
Discreption
Supply, Erection, Testing & Commissioning of pole mounted
DTC Single phase,15 KVA on 10' Centers PSC double pole
structure
Unit
Rate
Qty.
Amount
Nos
2.99
35
104.65
DESCRIPTION OF MATERIALS.
UNIT
QTY
RT/UNIT(R
S)
AMT.(RS)
1
2
No.
No.
2
3
2234.8404
25826.845
4469.6808
77480.53464
3
4
Distribution box
11 KV Pin Insulator with pin
No.
No.
3
3
3276.7772
124.13533
9830.331456
372.405984
5
6
7
No.
Kg
Kg
3
142
112
190.71986
47.05
47.05
572.159592
6681.1
5269.6
8
9
Kg
Kg
18
44
47.05
44.66
846.9
1965.04
10
11
G.I.Wire 8 SWG
HT.Stay Set Complete
Kg
Kg
30
4
12
13
Kg
Km
38
0.02
55
16.34838
2090
0.3269676
14
15
Kg
No.
15
2
66.090152
49
991.35228
98
16
18
CMT
Km
3.5
0.075
3518
97550.423
12313
7316.281725
19
20
No.
No.
3
7
21
22
23
Set
Ltr
Ltr
1
2
0
82888.8
56
45.1
82888.8
112
0
24
25
Aluminium Paint
Nut & Bolt
Ltr
Kg
4
35
96.8
73
387.2
2555
26
No.
36
216
27
L.S
1000
1000
53.640664 1609.21992
543.66173 2174.6469008
1879.4682 5638.404576
319.59454 2237.1617576
Cost of material
229115.1466
Services @ 30.5 %
69880.12
298995.27
DESCRIPTION OF MATERIALS.
UNIT
QTY
RT/UNIT(R
S)
AMT.(RS)
Raw salt
Kg
280
1120
2
3
4
Bentonite Clay
Cahrcoal powder
G.I.tunnel
Kg
Kg
No
140
280
7
11
6
60
1540
1680
420
No
300
2100
Kg
1680
44.66
75028.8
Sundries
L.S
1000
Cost of material
1000
82888.8
Note :-Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc. for
eathing with sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The cost of
Bentonite powder is to be considered in the cost of sundries only no seperate payment will be given.
OTA-2
Discreption
Supply, Erection, Testing & Commissioning of pole mounted
DTC Single phase,25 KVA on 10' Centers PSC double pole
structure
Unit
Rate
Qty.
Amount
Nos
4.15
35
145.10
DESCRIPTION OF MATERIALS.
UNIT
QTY
RT/UNIT(R
S)
AMT.(RS)
1
2
No.
No.
2
3
2234.8404
4469.6808
55349.809 166049.42644
3
4
Distribution box
11 KV Pin Insulator with pin
No.
No.
3
3
3276.7772 9830.331456
124.13533 372.405984
5
6
No.
Kg
3
142
190.71986
47.05
572.159592
6681.1
7
8
Kg
Kg
112
18
47.05
47.05
5269.6
846.9
9
10
11
Kg
Kg
Kg
44
30
4
12
13
Kg
Km
38
0.02
55
16.34838
2090
0.3269676
14
15
Kg
No.
15
2
66.090152
49
991.35228
98
16
18
CMT
Km
3.5
0.075
3518
12313
97550.423 7316.281725
19
20
No.
No.
3
7
1879.4682 5638.404576
319.59454 2237.1617576
21
22
Set
Ltr
1
2
82888.8
56
82888.8
112
23
24
25
Ltr
Ltr
Kg
0
4
35
45.1
96.8
73
0
387.2
2555
26
No.
36
216
27
L.S
1000
1000
44.66
1965.04
53.640664 1609.21992
543.66173 2174.6469008
Cost of material
317684.0384
Services @ 30.5 %
96893.63
414577.67
DESCRIPTION OF MATERIALS.
UNIT
QTY
RT/UNIT(R
S)
AMT.(RS)
Raw salt
Kg
280
1120
2
3
4
Bentonite Clay
Cahrcoal powder
G.I.tunnel
Kg
Kg
No
140
280
7
11
6
60
1540
1680
420
No
300
2100
Kg
1680
44.66
75028.8
Sundries
L.S
1000
Cost of material
1000
82888.8
Note :-Wherever earthing work is required Bentonite powder is to be used instead of charcole, salt etc. for
eathing with sufficient quantity so as to maintain proper earth resistance as per I.E. rule. The cost of
Bentonite powder is to be considered in the cost of sundries only no seperate payment will be given.