Sei sulla pagina 1di 23

High Technology

CATV and Communication


Products

CATV

ELITE

PTC04-II
EPON Access Hardware Installation Manual

Operation Manual

Chengdu KT Electronic Hi-Tech Co., Ltd.

WARNING
Please read this manual before using the products.
Caution: To prevent from electric shock, do not remove the cover. There are no
parts inside that user can repair, please refer to qualified service personnel for
repair.

The mark reminds the user that there is enough


electric energy to cause electric shock.

The mark reminds the user concerning


important components and safe operation.

The mark reminds user that avoid the laser light


radiating eye directly. That may injure your eye.

The mark reminds user that the device


must be grounded reliably.

Safety

This equipment is the class equipment, and with a great safety inarching function, and only

the equipment with this symbol it can inarching the grounds.

There are two types of power supply of the device: AC 180~250V and AC 60V, please use the

equipment within the proper range. If user want to customize the products, please refer to
specifications and related information.

Please inarching the metal covers and the connected metallic conductor to the earth, in order

to ensure the safety of the products and network.

Let the professional staff to do the modifying the commissioning-debugging. In order to

forbidden the electric shocking accident.


Installation

Please install the equipment according to the latest standards of the related project regulars.

Do not install the equipment on the high temperature place or where always vibrates.

The picture is just indicating the position of the component; the installment method is just

used for reference.

Winding up the bolt after the installment in order to protect the water-proof function.

Repack

Retain the original carton and packing materials of this device for safe transport in the future.

Content

Content
Chapter 1 PTC04-II Introduction ........................................................................................................................ 1
1.1 The shape description of the standard configuration ........................................................................... 1
1.2 Rear-panel description of PTC04-II...................................................................................................... 3
1.3 The system characteristics and parameters of PTC04-II ..................................................................... 3
1.4 ROHS description ................................................................................................................................ 5
Chapter 2 Preparation for installation ................................................................................................................. 6
2.1 Usage notes......................................................................................................................................... 6
2.2 Safety recommendation ....................................................................................................................... 6
2.2.1 Based on the following principles to ensure safety ................................................................... 6
2.2.2 Safety warning.......................................................................................................................... 6
2.2.3 Safety principle of hot-line work................................................................................................ 7
2.2.4 Precautions of ESD damage .................................................................................................... 8
2.3 Environment requirement..................................................................................................................... 8
2.3.1 Environment ............................................................................................................................. 8
2.3.2 Precautions of configure workplace.......................................................................................... 8
2.3.3 Rack configuration .................................................................................................................... 9
2.3.4 Power supply ............................................................................................................................ 9
2.4 Installation tools and devices ............................................................................................................... 9
Chapter 3 Install PTC04-II................................................................................................................................ 10
3.1 PTC04-II installation process ............................................................................................................. 10
3.2 PTC04-II chassis installation...............................................................................................................11
3.2.1 Install chassis on table.............................................................................................................11
3.2.2 Install chassis on rack..............................................................................................................11
3.3 Connection ports.................................................................................................................................11
3.3.1 Connection monitoring port......................................................................................................11
3.3.2 Connect EPON SFP port ........................................................................................................ 13
3.3.3 Connect Gigabit Ethernet optical port ..................................................................................... 14
3.3.4 Connect Gigabit Ethernet port ................................................................................................ 15
3.4 Post-installation review ...................................................................................................................... 16
Chapter 4 PTC04-II Maintenance..................................................................................................................... 17
4.1 Open chassis ..................................................................................................................................... 17
4.2 Close the chassis............................................................................................................................... 18
Chapter 5 Hardware Failure Analysis............................................................................................................... 19
5.1 Failure isolation.................................................................................................................................. 19
5.1.1 Power supply check................................................................................................................ 19
5.1.2 Port, cable and connection failure .......................................................................................... 19
5.2 Indicator lights.................................................................................................................................... 19

-I-

PTC04-II EPON Access Equipment Hardware Installation Manual

Chapter 1 PTC04-II Introduction


This section is the introduction of the overall aspects of the characteristic and
parameter about PTC04-II.

1.1

The shape description of the standard configuration


The standard ports of PTC04-II include 4 EPON SFP ports, two Gigabit optical /
Electrical Combo ports, 2 Gigabit RJ45 Electrical ports, 2 Gigabit SFP ports,1 console
port and 1 ETH Gigabit network management port, more features as follow:
Table 1 Characteristics of Standard installation port
Name of port

Characeristics
EPON port, SFP interface, with LINK, ACT
indicator

EPON port

Electrical port: Rate 1000M, cable MDI / MDIX


self-recognition, UTP (RJ45) interface, with the

Gigabit Ethernet optical / Electricalal port

LINK / ACT indicator.


SFP interface: with LINK/ACT indicator.
Electrical port: Rate 100M, with LINK.ACT
indicator.

ETH
Console port

Rate 9600bps, RJ45 interface.

Besides, there are two power supply outlets on rear panel of PTC04-II.

Fig 0-1 Front-panel of PTC04-II

Table 1-2 Description of front-panel components


No.
1

English name
M/S

SYS

Chinese name

Description
Primary station light is on, secondary
station is turn off
Indicator light constant on, system
start.

Indicator light blinking, system work


properly.

-1-

PTC04-II EPON Access Equipment Hardware Installation Manual

P2

PWR2 work, indicator light on .

P1

PWR1 work, indicator light on.

Console

Console

Realize local management for EPON.

MGMT

Realize system upgrate for EPON.

G1G2

Combo

Realize the re-transmission for 1000M


Ethernet optical signal

G1G2

Combo

Realize the re-transmission for 1000M


Ethernet optical signal

G2 Link/ACT

Indicator light constant on, port LINK


work.
G2

Indicator light blinking, the port has


data transmission and receiving.
Indicator light constant on, port LINK
work.

10

G1Link/ACT

G1

11

G3,G4

SFP

Indicator light blinking, the port has


data transmission and receiving.
Realize the re-transmission for 1000M
Ethernet optical signal
Indicator light constant on, port LINK

12

G3 Link/ACT

work.
G3

Indicator light constant on, port LINK


work.

13

G4 Link/ACT

G4

14

G5,G6

RJ45

15

16

17

G5 Link/ACT

G6 Link/ACT

Indicator light blinking, the port has


data transmission and receiving.
Realize the re-transmission for 1000M
Ethernet optical signal
Indicator light constant on, port LINK
work.

G5

Indicator light blinking, the port has


data transmission and receiving.
Indicator light constant on, port LINK
work.

G6

PON1,PON2,
PON3,PON4

Indicator light blinking, the port has


data transmission and receiving.

OLT PON

Indicator light blinking, the port has


data transmission and receiving.
Realize the access of EPON ONU
device

-2-

PTC04-II EPON Access Equipment Hardware Installation Manual


18

PON2 LINK

PON2 LINK

Light on: there are ONU devices


connected

19

PON2 ACT

PON2 ACT

Blinking: there are data transmission


and receiving

20

PON1 LINK

PON1 LINK

Light on: there are ONU devices


connected

21

PON1 ACT

PON1 ACT

Blinking: there are data transmission


and receiving

22

PON4 LINK

PON4 LINK

Light on: there are ONU devices


connected

23

PON4 ACT

PON4 ACT

Blinking: there are data transmission


and receiving

24

PON3 LINK

PON3 LINK

Light on: there are ONU devices


connected

25

PON3 ACT

PON3 ACT

Blinking: there are data transmission


and receiving

Fig 1-2 Rear-panel diagram of PTC04-II

1.2 Rear-panel description of PTC04-II


No.

English
name

Chinese name

Description

AC power
outlet

AC100240V

Power
switch

ON is open, OFF is off.

Ground
column

To be well grounded.

Backup
power
switch

Backup
AC power
outlet

ON is open, OFF is off. Used for


backup power.

AC100 240V. Used for backup


power.

-3-

PTC04-II EPON Access Equipment Hardware Installation Manual

1.3

The system characteristics and parameters of PTC04-II


IEEE 802.1d Spanning Tree Protocol
IEEE 802.1p Class of Service
IEEE 802.1q tagged VLAN
Protocol standard

IEEE 802.3x Flow control


IEEE 802.3ad Link aggregation
IEEE 802.3ah Ethernet in the First Mile Task Force
RFC 1058 RIP

IP routing protocol
standard

RFC 1723 RIP v2


RFC 1583 OSPF v2
RFC 1157 SNMP v1/v2

Network management
standard

RFC 1213 MIB II


RFC 1757 RMON 1,2,3,9

Memory

EPROM512 Bytes
Flash Memory8M Bytes
SDRAM128MBytes

Standard configuration

1 console port
1 Gigabit network management port
2 Gigabit optical and Electrical Combo ports
2 Gigabit Electrical ports
2 Gigabit optical ports
4 Gigabit PON ports

Dimension
Working
temperature/humidity
Store temperature/
Humidity
AC-DC power supply

482.6*315*44MM

06010%85%, without condensation


-40805%95% without condensation
Input voltage: AC100-240v, Input frequency:47-63Hz
Input current: 1A/230V

Power consumption

Max. 48W

-4-

PTC04-II EPON Access Equipment Hardware Installation Manual

1.4

ROHS description

-5-

PTC04-II EPON Access Equipment Hardware Installation Manual

Chapter 2

Preparation for installation

2.1 Usage notes


Similar as the other electronic products, open and close the power supply rapidly and
frequently maybe lead to the semiconductor chip damage. Need to re-open the
PTC04-II, please turn off the power 3 to 5 seconds and then turn on the power switch.
Do not violently collide or drop PTC04-II from the height, such operations may damage
the internal hardware of EPON access device.
Please use the correct external connection port to connect with PTC04-II. Do not insert
the Ethernet cable interface into the monitor port (RJ45 eight-line socket); also do not
insert the monitor port into the Ethernet cable interface (RJ45 eight-line socket); above
operations and other wrong operations may damage components and parts of port
internal.
Warning:
1)

Keep the level direction of power socket to plug power line!

2) When the product was end of life, please do not throw it away, to deal with
according to the relevant state laws and regulations, or to sent it to our company, for
fear to pollute the environment!

2.2 Safety recommendation


2.2.1 Based on the following principles to ensure safety

Keep dustless and clean during the chassis installation and after installation;

Put the cover into a safe place;

Put the tools into the place that not easily be touched down;

Do not wear loose clothing to avoid tripping the chassis, fasten your tie or scarf
and roll up your sleeves;

If that environment maybe damage the eyes, please be sure to wear protective
glasses;

Do not carry out the operations that may cause personal injury or damage to
device.

2.2.2 Safety warning


The security warning message appears in this section refers to: if the operation is
improper, may cause personal injury.

-6-

PTC04-II EPON Access Equipment Hardware Installation Manual

Read the installation guide carefully before operating the system;

Only the qualified personnel can install or replace the EPON access device;

Before operating on chassis or working near the power supply, please unplug
the AC power plug and disconnect the DC connection;

The final configuration of the products must comply with all applicable state laws
and regulations.

2.2.3 Safety principle of hot-line work


When hot-line work, obey the following principles:

Before the operation of electrical device, remove the jewelry (such as: rings,
necklaces, watches, bracelets etc.). If the metal goods contact with "Power" and
"land", it may cause a short circuit to damage components and parts;

Before operating on chassis or working near the power supply, please unplug
the AC power plug and disconnect the DC power supply;

When the device connected to power, do not touch the power, beware of
Electrical shock;

The wrong connection between the device and power outlet may cause
dangerous situation;

Only the training of qualified personnel can operate and maintain the device;

Before the system connect the power, please read the installation guide
carefully.

Warning:
1)

Check the potential danger carefully: the wet floors, ungrounded power
extension cord, worn power cord;

2)

Put the emergency switch in the workplace, in order to quickly cut off the power
when the accident happens;

3)

Before installing/unloading the chassis or working near the power supply, must
disconnect the power switch of EPON access device, and unplug the power
cord;

4)

If there is potential danger, please do not work alone;

5)

Before checking, be sure to disconnect the power supply;

6)

If there is an accident, take the following measures:


A. Turn off the system power supply;
B. Alarm;

C. To determine whether the victims of artificial respiration, then take the


appropriate measures;

-7-

PTC04-II EPON Access Equipment Hardware Installation Manual

D. If possible, send someone to seek medical help; otherwise, to estimate the


injury and for help.

2.2.4 Precautions of ESD damage


Electro-static discharge (ESD)may damage the devices and circuits, if not handle
properly, will result in EPON access device complete or intermittent failure.
Move or place device in accordance with the measure of precaution electro-static
discharge (ESD), to ensure that the chassis connected to the ground. One of measure
is to wear anti-static wrist strap, keep wrist strap well contact with the skin, and
efficiently use the anti-static wrist strap. If you do not have wrist strap, you can use a
clamp of metal cable clamped the metal part of unpainted chassis, then discharge
electro-static into the ground through the metal cable. In the case without these tools
you can make yourself well contact with the ground, and then touch the metal parts of
the unpainted chassis, the electro-static were discharged into the ground through your
body.

2.3 Environment requirement


This section discusses the environment requirement of safe installation and usage, to
ensure the place is ready before installation.

2.3.1Environment
PTC04-II can be installed in desktop or rack. Chassis placement, rack layout and room
layout are very important for normal system operation. Equipment too close, bad
ventilation and difficult to access control panel, will cause maintenance problems or
system failure and broken.
When planning place layout and equipment placement, we should remember to
discuss preventive measure "prevention of workplace configuration." If the device is
often crashed or error, these preventive information can help you isolate the
breakdown to prevent recurrence of the problems.

2.3.2Precautions of configure workplace

Ensure that the workplace ventilation, Electrical device has a good heat
dissipation; If do not have enough air circulation, it can not provide a good
cooling environment for the device;

In accordance with procedures of ESD protection to avoid damage the device.


ESD can cause immediate or intermittent failure of the system;

The placement of the chassis is best to let the cold air often blow chassis.
Ensure that the seal of chassis is closed, the open chassis will destroy the air
circulation within the chassis, which will interrupt the air flow or divert the flow of
cold air that has cooled the internal heat components.

-8-

PTC04-II EPON Access Equipment Hardware Installation Manual

2.3.3Rack configuration

Each device on the rack will be hot work, so the closed rack must have vents
and cooling fans, and device can not put too dense to ensure good ventilation;

Install the chassis on an open rack, attention that the framework of rack does not
block the ventilation hole of EPON access device chassis. Therefore, after
installing the chassis, please check the location of the chassis carefully to
prevent above happening;

Make sure that you have already provided effective ventilation for the equipment
at the bottom of rack;

Clapboard can help separate the exhaust and intake air, while helping the cold
air flow in the box, the best position of clapboard depends on the airflow pattern
within the rack. This position can be measured by the different way.

2.3.4Power supply
Check the power supply to ensure power system is grounded well; the input power of
PTC04-II is stable and reliable, if necessary it can install the voltage to regulate the
device. Protection measures of building short-circuit should ensure that there is a 240V,
10A fuse or circuit breaker in the phase line.
Warning:
If the power supply system is not grounded well, or the input power jitter is too large,
also is over-pulse, will lead to increase the BER of communications equipment, and
even hardware damage!

2.4Installation tools and devices


The tools and devices required by installation of PTC04-II do not include in the
standard configuration of PTC04-II. Therefore, the subscribers need provide by
themself. The tools and devices are as following:

Screw

ESD protection wrist strap

Fixed screw

Ethernet cable

Other Ethernet terminal device

Control terminal

-9-

PTC04-II EPON Access Equipment Hardware Installation Manual

Chapter 3 Install PTC04-II


Warning:
Only the qualified person could install or change the equipment.

3.1PTC04-II installation process

3.2 PTC04-II chassis installation


Install EPON accession equipment on table, fixed to chassis or other platform, as
following:

Put chassis on table

Put chassis on rack

- 10 -

PTC04-II EPON Access Equipment Hardware Installation Manual

3.2.1Install chassis on table


PTC04-II could be put on smooth, flat and safe table.
Remark:
Dont put goods4.5kg on PTC04-II top

3.2.2Install chassis on rack


Fix PTC04-II to rack via bracket. The operation as following:

Fig 0-1 PTC04-II bracket fixing picture

And then put PTC04-II to rack, as following picture:

Fig 0-2

3.3Connection ports
3.3.1Connection monitoring port
PTC04-II has one monitoring port (Console port).
Data rate 1200bps~115200bps, RJ45. Connect to PC via monitoring cable, use
terminal emulation software (e.g., Windows supper terminal) to configure and monitor
PTC04-II. Cable is provided with host. Terminal serial port communication parameters
setting as: data rate -9600bps, eight-bit, one stop bit, no parity and no fluid control.

- 11 -

PTC04-II EPON Access Equipment Hardware Installation Manual

RJ-45 connector used at Console port as following, RJ45 socket correspond to RJ45
plug, the order from left to right is 1 to 8.

Fig 0-3 Connector for Console port

Fig 0-4 PTC04-II Console and PC connection

Table 0-1 Console Pin Definition


Pin No.

Chinese Name

English
Name

Remark

CD

No connect

RXD

Input

DSR

No connect

TXD

Output

RTS

No connect

- 12 -

PTC04-II EPON Access Equipment Hardware Installation Manual

CTS

No connect

DTR

No connect

SG

GND

Remark:
PTC04-II Console doesnt support fluid control, Data fluid control should be set as No
when manage PTC04-II via supper terminal.
The cable is used to connect PTC04-II Console port and external monitoring terminal
equipment. One side is RJ45 eight-core socket, another side is DB9. RJ45 port
connects to Console socket of PTC04-II. Inside connection of the cable is as following.
The number of the cable is RLC0301.

Fig 0-5 Console port connection

3.3.2Connect EPON SFP port


PTC04-II provides 4 EPON SFP ports. Indicator is at the right side for port Link and
ACT. In the service, PTC04-II could be connected to other ONU equipment.
When PTC04-II is interconnected with other ONU equipment, it could adopt
single-mode SC fiber and one EPON optical module.

- 13 -

PTC04-II EPON Access Equipment Hardware Installation Manual

Fig 0-6 EPON port connects with other ONU or splitter

3.3.3Connect Gigabit Ethernet optical port


PTC04-II provides 4 Gigabit optical SFP port, each port corresponds with one indicator,
which is for LINK/ACT status. Constant on, LINK is working; Twinkling, there is data
receiving and sending. When use optical port, please connect SFP module to the port,
and connect with other Ethernet terminal equipment via fiber, and to Ethernet terminal
equipment via fiber.

Fig 0-8 Gigabit optical port and other switch connection

- 14 -

PTC04-II EPON Access Equipment Hardware Installation Manual

3.3.4Connect Gigabit Ethernet port


PTC04-II provides 4 fixed Gigabit optical/electronic in one Ethernet port. Indicator at
right, its LINK/ACT lights.
Connect SFP optical module to the port when use optical port, and connect to other
Ethernet terminal equipment via fiber, and then the corresponding electronic port could
not be used.

Fig 0-10 Gigabit electronic port and other equipment connection


When use electronic port, PTC04-II UPT could connect with other Ethernet terminal
equipment via cable (straight or cross), and then the corresponding optical port could
not be used. UTP Pin No. order and Console port (monitoring port) are the same.

Fig 0-11 RJ45 connector for Console port

For four 1000Base-T port of PTC04-II support MDI/MDIX self-recongnition, it could be


interconnected with other Ethernet terminal via five-line straight cable or five-line cross
cable.
Table 0-3 Gigabit RJ45 Pin Definition
Pin No.
1

Chinese Pin Name

English Pin
Name
TXD1+

Remark
Output

- 15 -

PTC04-II EPON Access Equipment Hardware Installation Manual


2

TXD1-

Output

RXD1+

Input

TXD2+

Output

TXD2-

Output

RXD1-

Input

RXD2+

Input

RXD1-

Input

Support straight/cross cable self-recongnition, it could be interconnected with other


Ethernet terminal via five-line straight cable or five-line cross cable.

3.4Post-installation review
When finish installation, make following check before power start:

If EPON connects on rack, please check whether install angle iron is stable; If
connects on table, please check whether there is enough space for heat
dissipation and stable.

Whether the power line complies with EPON power requirement.

Whether the ground wire is correct.

Whether PTC04-II is well connection with other equipment such as configuration


terminal.

- 16 -

PTC04-II EPON Access Equipment Hardware Installation Manual

Chapter4 PTC04-II Maintenance


Warning:
1)

Make sure you have release all static before open the cover, and turn off the
power supply. Before you execute any step of Appendix B, please read Safety
Suggest;

2)

When operate near power supply or chassis, please turn off power supply switch
and un-plug power supply cord.

4.1Open chassis
This part describes how to open equipment cover, tools and operation methods.
Warning:
Do not touch power supply when the power supply cord is connected.
When open the chassis, you may need the following tools which are not included in
standard configuration:

Cross Screwdriver

ESD wrist strap

Steps:
(1)

Turn off PTC04-II power supply switch;

(2)

Un-plug all cable on rear panel;

(3)

Remove screws which fix chassis.

Remark:
Chassis consists with cover and bottom.
(4)

Remove the cover as following;

(5)

You can see the system main board when remove the cover.

Remark:

- 17 -

PTC04-II EPON Access Equipment Hardware Installation Manual

Put the cover stable, in case of extrusion and collide. Otherwise, its hard to re-install
the cover.

4.2Close the chassis


Please close the chassis as following steps:
(1)

Put cover and bottom as the following picture;

(2)

Close the bottom and cover like the above picture;

(3)

When the cover and bottom is clung, slide the chassis to the slot;

(4)

Fit the former screws, fix them;

(5)

Put PTC04-II chassis back to rack or table;

(6)

Connect all cable, and then finish.

- 18 -

PTC04-II EPON Access Equipment Hardware Installation Manual

Chapter 5 Hardware Failure Analysis


5.1Failure isolation
The key to resolve system failure is separating the failure from the system. Compare
the system to check what should do and whats the system doing. During the process,
consider the following sub-system:

Power supplypower supply;

Port, cable and connectionports on front panel of PTC04-II and cables


connected with the ports.

5.1.1Power supply check

Check environment condition, dont over heat. Check whether the intake and
vent are clean. Review Average Environment Requirement. PTC04-II working
temperature requires -40 to 85.

If PTC04-II can not start and indicator dimmed, please check the power supply.

5.1.2Port, cable and connection failure


For separation, check the following item:

If PTC04-II port could not LINK, check whether cable connection is correct and
peer connection is normal;

If Console port does not work when system start, please confirm Console port is
9600 baud rate, 8 data bit, no parity check bits, 1 stop bit, no fluid control.

5.2Indicator lights
LED indicator lights indicate PTC04-II operation:
No.

English
Name

Chinese Name

Remark

PWR

PTC04-II power on, light on

SYS

Light on, system is starting;

- 19 -

PTC04-II EPON Access Equipment Hardware Installation Manual


Light blink, system operates well

No

Light constant on, LINK of this port is


normal;

Light blink, theres data transmission and


receiving

Chengdu KT Electronic Hi-Tech Co., Ltd.


rd

Address: 9#,3 Wuke East Road, Wuhou District, Chengdu, Sichuan Province ,P.R. of China, 610045
Tel86-28-85360759

Emailoversea@ktcatv.com

Fax86-28-85367323

Http://www.ktcatv.com

- 20 -