Federal Register / Vol. 71, No.

215 / Tuesday, November 7, 2006 / Notices 65137

NUCLEAR REGULATORY NUCLEAR REGULATORY the main steam pathway leakage


COMMISSION COMMISSION contributions from the sum of the
leakage rates from Type B and Type C
[Docket No. 50–298]
[Docket No. 40–8968–ML]
tests.
The main steam leakage effluent has
Nebraska Public Power District,
Notice of Appointment of Adjudicatory a different pathway to the environment,
Cooper Nuclear Station; Exemption
Employees when compared to a typical
1.0 Background containment penetration. It is not
Commissioners: Dale E. Klein, directed into the secondary containment
Nebraska Public Power District (NPPD
Chairman; Edward McGaffigan, Jr.; and filtered through the standby gas
or the licensee) are the holders of
treatment system as is other
Jeffrey S. Merrifield; Gregory B. Facility Operating License No. DPR–46
containment leakage. Instead, the main
Jaczko; Peter B. Lyons. which authorizes operation of the
steam isolation valve (MSIV) leakage is
In the Matter of Hydro Resources, Inc. Cooper Nuclear Station (CNS). The
directed through the main steam drain
(P.O. Box 777, Crownpoint, NM license provides, among other things,
piping into the condenser and is
87313) that the facility is subject to all rules, released into the environment as an
regulations, and orders of the Nuclear unfiltered ground level effluent.
Pursuant to 10 CFR 2.4, notice is Regulatory Commission (NRC, the In summary, the licensee analyzed the
hereby given that Mr. Jon Peckinpaugh, Commission) now or hereafter in effect. MSIV leakage pathway and the
Commission employee of the Office of The facility consists of a boiling-water containment leakage pathways
Nuclear Material Safety and Safeguards, reactor located in Nemaha County, separately in a dose consequences
Division of Waste Management and Nebraska. analysis. The calculated radiological
Environmental Protection, and Mr. 2.0 Request/Action consequences of the combined leakage
Bruce Watson, Commission employee of were found to be within the criteria of
the Office of Federal and State Materials Title 10 of the Code of Federal 10 CFR part 100 and General Design
and Environmental Management Regulations (10 CFR), section 50.54(o), Criterion (GDC) 19. The NRC staff
Programs, Decommissioning and requires primary reactor containments reviewed the licensee’s analyses and
for water-cooled power reactors to be found them acceptable as described in
Uranium Recovery Licensing
subject to the requirements of Appendix a safety evaluation dated September 1,
Directorate, have been appointed as
J to 10 CFR part 50. Appendix J specifies 2004. By separating the MSIV leakage
Commission adjudicatory employees
the leakage test requirements, acceptance criteria from the overall
within the meaning of Section 2.4, to schedules, and acceptance criteria for
advise the Commission regarding issues integrated leak rate test criterion, and
tests of the leak-tight integrity of the from the Type B and C leakage sum
related to the pending Commission primary reactor containment, and
review of LBP–06–19. Messrs. limitation, the CNS containment leakage
systems and components that penetrate testing will be made more consistent
Peckinpaugh and Watson have not the containment. Option B of Appendix
previously performed any investigative with the limiting assumptions used in
J is titled, ‘‘Performance-Based the associated accident consequences
or litigating function in connection with Requirements.’’ Option B, Section III.A.,
this or any related proceeding. Until analyses.
‘‘Type A Test,’’ requires, among other
such time as a final decision is issued things, that the overall integrated 3.0 Discussion
in this matter, interested persons leakage rate must not exceed the Pursuant to 10 CFR 50.12, the
outside the agency and agency allowable leakage rate (La) with margin, Commission may, upon application by
employees performing investigative or as specified in the Technical any interested person or upon its own
litigating functions in this proceeding Specifications (TSs). The overall initiative, grant exemptions from the
are required to observe the restrictions integrated leak rate, is defined in 10 requirements of 10 CFR part 50 when (1)
of 10 CFR 2.780 and 2.781 1 in their CFR part 50, Appendix J as ‘‘the total the exemptions are authorized by law,
communications with Messrs. leakage rate through all tested leakage will not present an undue risk to public
Peckinpaugh and Watson. paths, including containment welds, health and safety, and are consistent
valves, fittings, and components that with the common defense and security,
It is so ordered.
penetrate the containment system.’’ This and (2) when special circumstances are
Dated at Rockville, Maryland this 1st day includes the contribution from MSIV present. Special circumstances are
of November 2006. leakage. The licensee has requested present whenever, according to 10 CFR
For the Commission. exemption from Option B, Section III.A 50.12(a)(2):
Annette L. Vietti-Cook, requirements to permit exclusion of (i) Application of the regulation in the
Secretary of the Commission.
MSIV leakage from the overall particular circumstances conflicts with
integrated leak rate test measurement. other rules or requirements of the
[FR Doc. E6–18715 Filed 11–6–06; 8:45 am]
Main steam leakage includes leakage Commission; or
BILLING CODE 7590–01–P through all four main steam lines and (ii) Application of the regulation in
the main steam drain line. the particular circumstances would not
Option B, Section III.B of 10 CFR part serve the underlying purpose of the rule
50, Appendix J, ‘‘Type B and C Tests,’’ or is not necessary to achieve the
requires, among other things, that the underlying purpose of the rule; or
1 These rule designations are from our former Part
sum of the leakage rates at accident (iii) Compliance would result in
2, which has been revised and renumbered. See pressure of Type B tests and pathway undue hardship or other costs that are
ycherry on PROD1PC64 with NOTICES

‘‘Changes to Adjudicatory Process,’’ 69 FR 2182


leakage rates from Type C tests be less significantly in excess of those
(Jan. 14, 2004). For cases such as this one, docketed
prior to February 13, 2004, the previous procedural
than the performance criterion (La) with contemplated when the regulation was
rules, including 10 CFR 2.780 and 2.781, continue margin, as specified in the TSs. The adopted, or that are significantly in
to apply. Substantially equivalent rules now appear licensee also requests exemption from excess of those incurred by others
at 10 CFR 2.347 and 2.348. this requirement, to permit exclusion of similarly situated; or

VerDate Aug<31>2005 14:44 Nov 06, 2006 Jkt 211001 PO 00000 Frm 00071 Fmt 4703 Sfmt 4703 E:\FR\FM\07NON1.SGM 07NON1
65138 Federal Register / Vol. 71, No. 215 / Tuesday, November 7, 2006 / Notices

(iv) The exemption would result in the common defense and security is not Thursday, November 9, 2006
benefit to the public health and safety impacted by this exemption. 9:25 a.m. Affirmation Session (Public
that compensates for any decrease in Based on the foregoing, the separation
Meeting) (Tentative). a. Pacific Gas
safety that may result from the grant of of the main steam pathways from the
& Electric Co. (Diablo Canyon
the exemption; or other containment leakage pathways is
ISFSI), Docket No. 72–26–ISFSI,
(v) The exemption would provide warranted because a separate
‘‘Motion by San Luis Obispo
only temporary relief from the radiological consequence term has been
Mothers for Peace, Sierra Club, and
applicable regulation and the licensee or provided for these pathways. The
Peg Pinard for Partial
applicant has made good faith efforts to revised design-basis radiological
Reconsideration of CLI–06–23’’
comply with the regulation; or consequences analyses address these
(vi) There is present any other (Tentative). b. System Energy
pathways as individual factors,
material circumstance not considered Resources, Inc. (Early Site Permit
exclusive of the primary containment
when the regulation was adopted for for Grand Gulf ESP) (Tentative).
leakage. Therefore, the NRC staff finds
which it would be in the public interest 9:30 a.m. Briefing on Draft Final
the proposed exemption from Appendix
to grant an exemption. If such condition Rule—Part 52 (Early Site permits/
J to be acceptable.
is relied on exclusively for satisfying Standard Design Certification/
paragraph (a)(2) of this section, the 4.0 Conclusion Combined Licenses) (Public
exemption may not be granted until the Accordingly, the Commission has Meeting) (Contact: Dave Matthews,
Executive Director for Operations has determined that, pursuant to 10 CFR 301–415–1199).
consulted with the Commission. 50.12, the exemption is authorized by This meeting will be Webcast live at
The licensee’s exemption request was law, will not present an undue risk to the Web address—http://www.nrc.gov.
submitted in conjunction with a TS the public health and safety, and is 1:30 p.m. Continuation of 10/24/06
amendment application to increase the consistent with the common defense Briefing on Transshipment and
allowable leak rate for the MSIVs. The and security. Also, special Domestic Shipment Security of
proposed amendment will be issued circumstances are present. Therefore, Radioactive Material Quantities of
concurrently with this exemption. The the Commission hereby grants NPPD an Concern (RAMQC) (Closed—Ex. 3 &
exemption and amendment together exemption from the requirements of 9).
would implement the recommendations Sections III.A and III.B of Option B of Week of November 13, 2006—Tentative
of Topical Report NEDC–31858, ‘‘BWR Appendix J to 10 CFR part 50 for CNS.
Report for Increasing MSIV Leakage Pursuant to 10 CFR 51.32, the There are no meetings scheduled for
Rate Limits and Elimination of Leakage Commission has determined that the the Week of November 13, 2006.
Control Systems.’’ The topical report granting of this exemption will have no Week of November 20, 2006—Tentative
was evaluated by the NRC staff and significant impact on the quality of the
accepted in a safety evaluation dated human environment (71 FR 61074). There are no meetings scheduled for
March 3, 1999. The special This exemption is effective upon the Week of November 20, 2006.
circumstances associated with MSIV issuance. Week of November 27, 2006—Tentative
leakage testing are fully described in the Dated at Rockville, Maryland, this 30th day
topical report. These circumstances There are no meetings scheduled for
of October 2006.
relate to the monetary costs and the Week of November 27, 2006.
For the Nuclear Regulatory Commission.
personnel radiation exposure involved Week of December 4, 2006—Tentative
Catherine Haney,
with maintaining MSIV leakage limits
more restrictive than necessary to meet Director, Division of Operating Reactor Thursday, December 7, 2006
Licensing, Office of Nuclear Reactor
offsite dose criteria and control room 9:30 a.m. Discussion of Security Issues
Regulation.
habitability criteria. (Closed—Ex. 2 & 3).
The underlying purpose of the rule [FR Doc. E6–18711 Filed 11–6–06; 8:45 am]
which implements Appendix J (i.e., 10 BILLING CODE 7590–01–P Week of December 11, 2006—Tentative
CFR 50.54(o)) is to assure that Monday, December 11, 2006
containment leak tight integrity is
maintained (a) as tight as reasonably NUCLEAR REGULATORY 1:30 p.m. Briefing on Status of
achievable and (b) sufficiently tight so COMMISSION Decommissioning Activities (Public
as to limit effluent release to values Meeting) (Contact: Keith
Notice of Sunshine Act Meeting McConnell, 301–415–7295).
bounded by the analyses of radiological
consequences of design-basis accidents. DATES: Weeks of November 6, 13, 20, 27, This meeting will be Webcast live at
Based on the above, no new accident December 4, 11, 2006. the Web address—http://www.nrc.gov.
precursors are created by the exemption, PLACE: Commissioners’ Conference Tuesday, December 12, 2006
thus, the probability of postulated Room, 11555 Rockville Pike, Rockville,
accidents is not increased. Also, based Maryland. 9:30 a.m. Briefing on Threat
on the above, the consequences of Environment Assessment (Closed—
STATUS: Public and closed.
postulated accidents are not increased. Ex. 1).
MATTERS TO BE CONSIDERED: 1:30 p.m. Discussion of Security Issues
As such, the NRC staff has determined
that the intent of the rule is not Week of November 6, 2006 (Closed—Ex. 1 & 3).
compromised by the proposed Wednesday, December 13, 2006
Wednesday, November 8, 2006
exemption.
The proposed exemption would 9:30 a.m. Briefing on Digital 9:30 a.m. Briefing on Status of Equal
ycherry on PROD1PC64 with NOTICES

permit exclusion of the main steam Instrumentation and Control (Public Employment Opportunity (EEO)
pathway leakage contributions from the Meeting) (Contact: Paul Rebstock, Programs (Public Meeting) (Contact:
overall integrated leakage rate Type A 301–415–3295). Barbara Williams, 301–415–7388).
test measurement. This change has no This meeting will be Webcast live at This meeting will be Webcast live at
relation to security issues. Therefore, the Web address—http://www.nrc.gov. the Web address—http://www.nrc.gov.

VerDate Aug<31>2005 14:44 Nov 06, 2006 Jkt 211001 PO 00000 Frm 00072 Fmt 4703 Sfmt 4703 E:\FR\FM\07NON1.SGM 07NON1

Potrebbero piacerti anche