Sei sulla pagina 1di 2

Federal Register / Vol. 71, No.

217 / Thursday, November 9, 2006 / Notices 65811

by other appropriate means, such as on The ICR provides a detailed Review Process (ERP), under section
the related collection instrument or explanation of this estimate, which is 309 of the Clean Air Act and Section
form, if applicable. The display of OMB only briefly summarized here: 102(2)(c) of the National Environmental
control numbers in certain EPA Estimated total number of potential Policy Act as amended. Requests for
regulations is consolidated in 40 CFR respondents: 28. copies of EPA comments can be directed
part 9. Frequency of response: On occasion to the Office of Federal Activities at
Abstract: Certain employees of (one time only per individual employee 202–564–7167.
companies working under contract to needing TSCA CBI clearance). An explanation of the ratings assigned
EPA require access to TSCA CBI Estimated total average number of to draft environmental impact
collected under the authority of TSCA responses for each respondent: 10. statements (EISs) was published in the
in order to perform their official duties. Estimated total annual burden hours: FR dated April 7, 2006 (71 FR 17845).
The Office of Pollution Prevention and 446 hours.
Estimated total annual costs: $20,466. Draft EISs
Toxics (OPPT), which is responsible for
maintaining the security of TSCA This includes an estimated burden cost EIS No. 20060366, ERP No. D1–COE–
confidential business information, of $20,466 and an estimated cost of $0 D39028–00, Mid-Chesapeake Bay Island
requires that all individuals desiring for capital investment or maintenance Ecosystem Restoration Integrated
access to TSCA CBI obtain and annually and operational costs. Feasibility Study, Using
renew official clearance to TSCA CBI. Uncontaminated Dredged Material from
IV. Are There Changes in the Estimates
As part of the process for obtaining the Upper Chesapeake Bay Approach
from the Last Approval?
TSCA CBI clearance, OPPT requires Channels to the Port of Baltimore to
There is an increase of 31 hours in the Restore and Protect Island Habitat in the
certain information about the
total estimated respondent burden Middle Portion of Chesapeake Bay,
contracting company and about each
compared with that identified in the ICR Dorchester County, MD.
contractor employee requesting TSCA
currently approved by OMB. This Summary: EPA does not object to the
CBI clearance, primarily the name,
increase reflects an increase in the proposed action.
social security number and EPA
number of contractor employees Rating LO. EIS No. 20060284, ERP No.
identification badge number of the
needing TSCA CBI clearance. This D–FHW–E40808–KY, I–66 Somerset to
employee, the type of TSCA CBI
change is an adjustment. London Project, Construction from the
clearance requested and the justification
Vicinity of the Northern Bypass (I–66)
for such clearance, and the signature of V. What is the Next Step in the Process
in Somerset, KY to I–75 between
the employee to an agreement with for this ICR?
London and Corbin Cities, Pulaski, U.S.
respect to access to and use of TSCA EPA will consider the comments Army COE Section 404 Permit,
CBI. received and amend the ICR as Rockcastle and Laurel Counties, KY.
Responses to the collection of appropriate. The final ICR package will Summary: EPA expressed
information are voluntary, but failure to then be submitted to OMB for review environmental concerns about impacts
provide the requested information will and approval pursuant to 5 CFR to wetlands, karst features and
prevent a contractor employee from 1320.12. EPA will issue another Federal associated water resources, stream and
obtaining clearance to TSCA CBI. EPA Register notice pursuant to 5 CFR river crossings, and potential
will observe strict confidentiality 1320.5(a)(1)(iv) to announce the construction-related impacts to the
precautions with respect to the submission of the ICR to OMB and the Daniel Boone National Forest. Rating
information collected on individual opportunity to submit additional EC2.
employees, based on the Privacy Act of comments to OMB. If you have any EIS No. 20060356, ERP No. D–COE–
1974, as outlined in the ICR and in the questions about this ICR or the approval F32198–00, Lock and Dam 3 Mississippi
collection instrument. process, please contact the technical River Navigation Safety and
Burden statement: The annual public person listed under FOR FURTHER Embankments, To Reduce Related
reporting and recordkeeping burden for INFORMATION CONTACT. Navigation Safety and Embankment
this collection of information is Problems, Upper Mississippi River,
estimated to average 1.6 hours per List of Subjects
Goodhue County, MN and Pierce
response. Burden means the total time, Environmental protection, Reporting County, WI.
effort, or financial resources expended and recordkeeping requirements. Summary: EPA expressed
by persons to generate, maintain, retain, environmental concerns about the
or disclose or provide information to or Dated: November 1, 2006. proposed mitigation for impacts to
for a Federal Agency. This includes the James B. Gulliford, forested floodplains and water quality,
time needed to review instructions; Assistant Administrator, Office of Prevention, and requested additional information
develop, acquire, install, and utilize Pesticides and Toxic Substances. regarding the analysis of cumulative
technology and systems for the purposes [FR Doc. E6–19014 Filed 11–8–06; 8:45 am] impacts. Rating EC2.
of collecting, validating, and verifying BILLING CODE 6560–50–S
EIS No. 20060358, ERP No. D–AFS–
information, processing and K39101–CA, Lake Davis Pike
maintaining information, and disclosing Eradication Project, To Eradicate Pike
and providing information; adjust the ENVIRONMENTAL PROTECTION and Re-Establish Trout Fishery in the
existing ways to comply with any AGENCY Tributaries, Special-Use-Permit, Plumas
previously applicable instructions and National Forest, Plumas County, CA.
requirements which have subsequently [ER–FRL–6681–1] Summary: EPA expressed
changed; train personnel to be able to environmental concerns about drinking
sroberts on PROD1PC70 with NOTICES

Environmental Impact Statements and


respond to a collection of information; water impacts, the possible presence of
Regulations; Availability of EPA
search data sources; complete and toxic blue-green algae, discharge permit
Comments
review the collection of information; requirements, neutralization options,
and transmit or otherwise disclose the Availability of EPA comments and the overall effectiveness of the
information. prepared pursuant to the Environmental eradication project. Rating EC2.

VerDate Aug<31>2005 16:26 Nov 08, 2006 Jkt 211001 PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 E:\FR\FM\09NON1.SGM 09NON1
65812 Federal Register / Vol. 71, No. 217 / Thursday, November 9, 2006 / Notices

EIS No. 20060368, ERP No. D–NSF– MC6441) Renewal of Operating License ENVIRONMENTAL PROTECTION
K99036–HI, Advanced Technology DRP–22 for Additional 20-Years of AGENCY
Solar Telescope Project, Construction of Operation, Mississippi River, City of
Site at the University of Hawaii Institute Monticello, Wright County, MN. [ER–FRL–6680–9]
for Astronomy, Haleakala High Altitude Summary: EPA’s previous concerns
Observatory (HO) Site, Island of Maui, have been resolved; therefore, EPA does Environmental Impacts Statements;
HI. not object to the proposed action. Notice of Availability
Summary: EPA expressed EIS No. 20060393, ERP No. F–COE– AGENCY: Office of Federal Activities,
environmental concerns about impacts H36111–00, Kansas City’s Levees, General Information (202) 564–7167 or
to cultural resources, Native Hawaiians, Missouri and Kansas Flood Damage http://www.epa.gov/compliance/nepa/.
Haleakala National Park, and Reduction Study, Improvements to the Weekly receipt of Environmental Impact
endangered species. Rating EC2. Existing Line of Protection, Statements filed 10/30/2006 through
EIS No. 20060337, ERP No. DS–COE– Birmingham, Jackson, Clay Counties, 11/03/2006 pursuant to 40 CFR
E39051–FL, Lake Okeechobee MO and Wyandotte County, KS. 1506.9
Regulation Schedule Study, Updated Summary: No formal comment letter EIS No. 20060452, Draft EIS, AFS, WA,
Information on Operational Changes to was sent to the preparing agency. Natapoc Ridge Restoration Project, To
the Current Water Control Plan, EIS No. 20060397, ERP No. F–NAS– Improve Forest Health and
Caloosahatchee and St. Lucie River A12044–00, Programmatic— Sustainability, and Reduce Wildfire
Estuaries, Lake Okeechobee, FL. Development of Advanced Radioisotope and Hazardous Fuels, Wenatchee
Summary: EPA commented that the Power Systems, Two New Advanced River Ranger District, Okanogan-
interim schedule will need to be re- RPS’s: Multi-Mission Radioisotope Wenatchee National Forest, Chelan
evaluated in 2010 when additional Thermoelectric Generator (MMRTG) and County, WA, Comment Period Ends:
storage areas are in place, and requested Stirling Radioisotope Generator (SRG). 12/26/2006, Contact: Steve Willet
clarification regarding the existing Summary: EPA does not object to the 509–548–6977.
conditions of Lake Okeechobee and proposed action. EIS No. 20060453, Final EIS, FHW, CA,
estuaries, as well as the potential effects EIS No. 20060404, ERP No. F–SFW– Willits Freeway Bypass Project,
of the proposed new schedule on Total L64052–AK, Kodiak National Wildlife Construction and Operation of a New
Maximum Daily Load (TMDL) goals. Refuge, Draft Revised; Comprehensive Segment of U.S. 101, COE Section 404
Rating EC1. Conservation Plan, Implementation, AK. Permit, NPDES Permit and
Summary: EPA does not object to the Endangered Species Act (Incidental
Final EISs
proposed action. Take Permit), City of Willits,
EIS No. 20060381, ERP No. F–AFS– EIS No. 20060240, ERP No. FS–AFS–
D65032–WV, Programmatic— Mendocino County, CA, Wait Period
L65400–ID, West Gold Creek Project,
Monongahela National Forest Plan Ends: 12/11/2006, Contact: Maiser
Updated Information, Forest
Revision, Proposes to Revise Land and Khaled 916–498–5020.
Management Activities Plan,
Resource Management Plan, Barbour, EIS No. 20060454, Final EIS, SFW, CA,
Implementation, Idaho Panhandle
Grant, Greenbrier, Nicholas, Pendleton, Orange County Southern Subregion
National Forests, Sandpoints Ranger
Pocahontab, Preston, Randolph, Tucker Habitat Conservation Plan (HCP),
District, Bonner County, ID.
and Webster Counties, WV. Implementation, Application for and
Summary: EPA does not object to the
Summary: EPA continues to have Incidental Take Permit, Orange
proposed action.
environment concerns about impacts County, CA, Wait Period Ends: 12/11/
EIS No. 20060386, ERP No. FS–AFS–
caused by commercial/recreational 2006, Contact: Vicki Campbell 916–
F65034–WI, Northwest Howell
activities and fragmentation from 414–6464.
Vegetation Management Project, New
roadways. EIS No. 20060455, Draft EIS, WPA, AZ,
Information to Address Inadequate
EIS No. 20060382, ERP No. F–BLM– San Luis Rio Colorado Project,
Disclosure of the Cumulative Effects
K65291–00, Lake Havasu Field Office Construct, Operate, Maintain, and
Analysis for Six Animal and Two Plant
Resource Management Plan, Connect a Double-Circuited 500,000-
Species, Eagle River-Florence Ranger
Implementation, Colorado River, Davis volt Electric Transmission Line,
District, Chequamegon-Nicole National
Dam in the north and south to Park Right-of-Way Grant and Presidential
Forest, Florence and Forest Counties,
Dam, CA and AZ. Permit, (DOE/EIS–0395) Yuma
WI.
Summary: EPA does not object to the County, AZ, Comment Period Ends:
Summary: EPA does not object to the
project as proposed. 12/26/2006, Contact: Mark J. Wieringa
proposed action.
EIS No. 20060387, ERP No. F–AFS– EIS No. 20060424, ERP No. FS–FRC– 720–962–7263.
J65451–UT, West Fork Blacks Fork C05146–00, Northeast (NE)–07 Project, EIS No. 20060456, Final EIS, IBR, CA,
Allotment Management Plan, Proposes Construction and Operation of a Natural Contra Costa Water District
to Authorize Continued Livestock Gas Pipeline Facilities, Millennium Alternative Intake Project, To Protect
Grazing, Township 1 North, Range 11 Pipeline Project—Phase I, U.S. Army and Improve the Quality of Water
East, Salt Lake Principle Meridan, COE Section 10 and 404 Permits, several Delivery to Untreated and Treated-
Evanston Ranger District, Wasatch- counties, NY, Morris County, NJ; Water Customers, Contra Costra
Cache National Forest, Summit County, Fairfield and New Haven Counties, CT. County, CA, Wait Period Ends: 12/11/
UT. Summary: EPA does not object to the 2006, Contact: Katrina Chow 916–
Summary: EPA’s previous concerns proposed action. 978–5067.
have been resolved; therefore, EPA does EIS No. 20060457, Draft EIS, COE, TX,
not object to the proposed action. Dated: November 6, 2006. Brazos Harbor Navigation District
sroberts on PROD1PC70 with NOTICES

EIS No. 20060391, ERP No. F–NRC– Robert W. Hargrove, Project, Proposed Port Freeport
F06028–MN, Generic—License Renewal Director, NEPA Compliance Division, Office Channel Widening to the Entrance
of Nuclear Plants, Supplement 26 to of Federal Activities. and Jetty Reach of the Freeport Harbor
NUREG 1437, Regarding Monticello [FR Doc. E6–19022 Filed 11–8–06; 8:45 am] Jetty Channel and Entrance, Brazoria
Nuclear Generating Plant (TAC NO. BILLING CODE 6560–50–P County, TX, Comment Period Ends:

VerDate Aug<31>2005 16:26 Nov 08, 2006 Jkt 211001 PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 E:\FR\FM\09NON1.SGM 09NON1

Potrebbero piacerti anche