Federal Register / Vol. 71, No.

227 / Monday, November 27, 2006 / Notices 68597

Wisconsin Public Service Corp., et al., New York, LLC; Nordic Electric LLC; must create and validate an
submits a notice of cancellation and a Nordic Energy Barge 1, L.L.C.; Nordic eRegistration account using the
revised service agreement cover sheet to Energy Barge 2, L.L.C. eRegistration link. Select the eFiling
terminate a Service Agreement etc., Description: Nordic Marketing of link to log on and submit the
under ER07–207. Massachusetts, LLC, et al., submits intervention or protests.
Filed Date: 11/13/2006. Second Revised Sheet 1, et al., to FERC Persons unable to file electronically
Accession Number: 20061116–0036. Rate Schedule 1 etc., under ER07–213 et should submit an original and 14 copies
Comment Date: 5 p.m. Eastern Time al. of the intervention or protest to the
on Monday, December 4, 2006. Filed Date: 11/14/2006. Federal Energy Regulatory Commission,
Docket Numbers: ER07–208–000. Accession Number: 20061116–0090. 888 First St. NE., Washington, DC
Applicants: Entergy Services Inc. Comment Date: 5 p.m. Eastern Time 20426.
Description: Entergy Services, Inc., on on Tuesday, December 5, 2006. The filings in the above proceedings
behalf Energy Arkansas, Inc., et al., Docket Numbers: ER07–219–000. are accessible in the Commission’s
submits notice of cancellation which Applicants: ISO New England Inc. eLibrary system by clicking on the
proposes to terminate the January 1, Description: ISO New England Inc., appropriate link in the above list. They
1987 Contract for Purchases of and New England Power Pool are also available for review in the
Economic Energy etc., under ER07–208. Participants Committee submits Market Commission’s Public Reference Room in
Filed Date: 11/13/2006. Rule changes to eliminate the Peaking Washington, DC. There is an
Accession Number: 20061116–0034. Unit Safe Harbor mechanism under eSubscription link on the Web site that
Comment Date: 5 p.m. Eastern Time ER07–219. enables subscribers to receive e-mail
on Monday, December 4, 2006. Filed Date: 11/14/2006. notification when a document is added
Docket Numbers: ER07–209–000. Accession Number: 20061116–0091. to a subscribed dockets(s). For
Applicants: Avista Corporation. Comment Date: 5 p.m. Eastern Time assistance with any FERC Online
Description: Avista Corporation on Tuesday, December 5, 2006. service, please e-mail
submits an Amended and Restated Take notice that the Commission FERCOnlineSupport@ferc.gov. or call
Power Transfer Agreement conformed to received the following electric securities (866) 208–3676 (toll free). For TTY, call
comply with Rule 614 with Public filings: (202) 502–8659.
Utility District 2 of Grant County Docket Numbers: ES07–8–000. Magalie R. Salas,
pursuant to Section 35.12 of FERC’s Applicants: PSEG Nuclear LLC. Secretary.
Regulations under ER07–209 et al. Description: Application of PSEG
Filed Date: 11/13/2006. [FR Doc. E6–19954 Filed 11–24–06; 8:45 am]
Energy Resources & Trade LLC, et al.,
Accession Number: 20061116–0033. for Authorization to Guarantee BILLING CODE 6717–01–P

Comment Date: 5 p.m. Eastern Time Securities under ES07–8.


on Monday, December 4, 2006. Filed Date: 11/09/2006.
DEPARTMENT OF ENERGY
Docket Numbers: ER07–210–000. Accession Number: 20061109–5019.
Applicants: Northeast Utilities. Comment Date: 5 p.m. Eastern Time Federal Energy Regulatory
Description: Northeast Utilities on Thursday, November 30, 2006. Commission
Service Co., on behalf of the Any person desiring to intervene or to
Connecticut Light and Power Co., [Docket Nos. CP06–54–000, Docket No.
protest in any of the above proceedings
submits a Notice of Termination to CP06–055–000]
must file in accordance with Rules 211
cancel First Revised Rate Schedule and 214 of the Commission’s Rules of Broadwater Energy LLC, Broadwater
FERC 554 under ER07–210. Practice and Procedure (18 CFR 385.211 Pipeline LLC; Notice of Availability of
Filed Date: 11/13/2006. and 385.214) on or before 5 p.m. Eastern the Draft Environmental Impact
Accession Number: 20061116–0083. time on the specified comment date. It Statement for the Proposed
Comment Date: 5 p.m. Eastern Time is not necessary to separately intervene Broadwater LNG Project
on Monday, December 4, 2006. again in a subdocket related to a
Docket Numbers: ER07–212–000; compliance filing if you have previously November 17, 2006.
ER01–1558–004. intervened in the same docket. Protests The staff of the Federal Energy
Applicants: Wayzata California Power will be considered by the Commission Regulatory Commission (FERC or
Holdings, LLC; NEO California Power in determining the appropriate action to Commission) in cooperation with the
LLC. be taken, but will not serve to make U.S. Coast Guard (Coast Guard); U.S.
Description: Notice of Non-Material protestants parties to the proceeding. Environmental Protection Agency; U.S.
Change in Status, Notice of Succession, Anyone filing a motion to intervene or Army Corps of Engineers (COE);
and request for expedited review of protest must serve a copy of that National Oceanic and Atmospheric
NEO California Power, LLC and document on the Applicant. In reference Administration, National Marine
Wayzata California Power Holdings, to filings initiating a new proceeding, Fisheries Service; and the New York
LLC under ER01–1588 et al. interventions or protests submitted on Department of State has prepared a draft
Filed Date: 11/13/2006. or before the comment deadline need Environmental Impact Statement (EIS)
Accession Number: 20061116–0088. not be served on persons other than the for a liquefied natural gas (LNG) import
Comment Date: 5 p.m. Eastern Time Applicant. terminal and natural gas pipeline
on Monday, December 4, 2006. The Commission encourages (referred to as the Broadwater LNG
Docket Numbers: ER07–213–000; electronic submission of protests and Project) proposed by Broadwater Energy
ER07–214–000; ER07–215–000; ER07– interventions in lieu of paper, using the LLC and Broadwater Pipeline LLC
sroberts on PROD1PC70 with NOTICES

216–000; ER07–217–000; ER07–218– FERC Online links at http:// (jointly referred to as Broadwater) in the
000. www.ferc.gov. To facilitate electronic above-referenced dockets. Broadwater
Applicants: Nordic Marketing of service, persons with Internet access Energy LLC is jointly owned by TCPL
Massachusetts, L.L.C.; Nordic Marketing who will eFile a document and/or be USA LNG, Inc. (a subsidiary of
of New Jersey, LLC; Nordic Marketing of listed as a contact for an intervenor TransCanada Corporation) and Shell

VerDate Aug<31>2005 16:58 Nov 24, 2006 Jkt 211001 PO 00000 Frm 00069 Fmt 4703 Sfmt 4703 E:\FR\FM\27NON1.SGM 27NON1
68598 Federal Register / Vol. 71, No. 227 / Monday, November 27, 2006 / Notices

Broadwater Holdings LLC (a subsidiary • A berthing facility at the FSRU for the LOR. The LOR will not be issued
of Shell Oil Company). Broadwater receiving LNG ships with capacities up until after the NEPA process has been
Pipeline LLC is owned by Broadwater to 250,000 cubic meters; completed.
Energy LLC. • A YMS embedded in the seafloor to The draft EIS also evaluates
The proposed LNG terminal would be moor the FSRU; alternatives to the proposal, including
located in New York State waters of • Approximately 2 to 3 LNG carriers alternative energy sources, system
Long Island Sound, approximately 9 per week that would call at the FSRU; alternatives, alternative sites for the
• LNG carriers that would transit LNG import terminal, alternative
miles from the nearest shoreline of Long
through waters subject to federal designs, pipeline alternatives, and
Island, and about 11 miles from the
jurisdiction as well as waters under the alternatives to the Coast Guard LOR
nearest shoreline in Connecticut. The jurisdiction of the state of New York,
terminal would be a floating storage and action. Based on the analysis included
and in some cases, may transit waters in the draft EIS, the FERC staff
regasification unit (FSRU) that would be under the jurisdiction of the states of
attached to a yoke mooring system concludes that approval of the proposed
Rhode Island and Connecticut; Project with appropriate mitigating
(YMS) that includes a mooring tower • Approximately 21.7 miles of 30-
embedded in the seafloor. The FSRU measures as recommended, would have
inch-diameter natural gas pipeline, a pig limited adverse environmental impacts.
would look like a marine vessel and launcher and receiver facility, and a
would remain moored in place for the meter station at the interconnect with Comment Procedures and Public
duration of the Project (expected to be the IGTS pipeline; and Meetings
30 years or more). The YMS would • Onshore facilities at either Any person wishing to comment on
allow the FSRU to pivot or Greenport or Port Jefferson, New York, the draft EIS may do so. To ensure
‘‘weathervane’’ around the YMS, including administrative offices, a consideration prior to a Commission
enabling the FSRU to orient in response warehouse, guardhouse, and an existing decision on the proposal, it is important
to the prevailing wind, tide, and current commercial pier. that we receive your comments before
conditions. Broadwater proposes to construct the the date specified below. Please
LNG would be delivered to the FSRU Project in two phases. The first phase carefully follow these instructions to
by LNG carriers, temporarily stored, would include installation of the subsea ensure that your comments on the draft
vaporized (regasified), and then pipeline between October 2009 and EIS are received in time and properly
transported in a new subsea natural gas April 2010. The second phase would recorded:
pipeline that would extend from the include installation of the YMS, hookup • Send an original and two copies of
seafloor beneath the FSRU of the FSRU, and connection of the your comments to: Magalie R. Salas,
approximately 21.7 miles to an offshore project components between September Secretary, Federal Energy Regulatory
connection with the existing Iroquois and December 2010. Broadwater Commission, 888 First St., NE., Room
Gas Transmission System (IGTS) anticipates that the Project would be in 1A, Washington, DC 20426.
pipeline in Long Island Sound. service by the end of December 2010. • Label one copy of the comments for
Natural gas would be routed from the As part of this evaluation, FERC staff the attention of Gas 3, PJ–11.3;
FSRU to the subsea pipeline and into has prepared a draft EIS to assess the • Reference Docket No. CP06–54–000
the IGTS pipeline for delivery at an environmental impacts of the Project. and CP06–55–000;
average flow rate of about 1.0 billion The draft EIS was prepared to satisfy the • Mail your comments so that they
cubic feet per day. LNG would be requirements of the National will be received in Washington, DC on
delivered to the FSRU by 2 to 3 LNG Environmental Policy Act (NEPA). or before January 23, 2007.
carriers per week to meet the Project’s The Coast Guard has assessed In addition to or in lieu of sending
planned send-out volumes of natural potential risks to navigation safety and written comments, we invite you to
gas. LNG carriers would transit from the port security associated with the attend the public comment meetings
Atlantic Ocean to either the Point Judith proposed Project. The Coast Guard’s that we will conduct in the Project area
Pilot Station (northeast of Block Island) safety and security assessment is in January 2007. The locations and
or the Montauk Pilot Station (southwest documented in the Captain of the Port times of these meetings will be provided
of Block Island). From the Point Judith Long Island Sound’s Waterways in a separate notice. These meetings will
Pilot Station, carriers would transit Suitability Report (WSR). The draft EIS be posted on the Commission’s calendar
Block Island Sound north of Block includes an analysis of the located at http:/www.ferc.gov/
Island, head generally west to enter environmental impacts related to the EventCalendar/EventsList.aspx along
Long Island Sound at its eastern end (an Coast Guard’s Letter of with other relevant information. The
area known as the Race), and then Recommendation (LOR) regarding the Coast Guard will participate in these
proceed to the FSRU. From the Montauk suitability of the involved waterways for public meetings. The public meetings
Pilot Station, carriers would head LNG carrier operations. will also support the review of
The Coast Guard Captain of the Port Broadwater’s permit application that is
generally northwest to approach the
Long Island Sound will issue an LOR to before the COE. Interested groups and
Race, then proceed to the FSRU.
Broadwater Energy and the appropriate individuals are encouraged to attend the
The draft EIS addresses the potential federal, state and local agencies, in public comment meetings and present
environmental effects of the accordance with 33 CFR 127.009. The oral comments on the draft EIS. A
construction and operation of the LOR, which will be based on the Coast transcript of the meetings will be
following LNG and natural gas pipeline Guard’s WSR, is an official prepared and submitted to the docket
facilities: determination regarding the suitability for public review.
• A double-hulled FSRU or unsuitability of Long Island Sound to After comments on the draft EIS are
sroberts on PROD1PC70 with NOTICES

approximately 1,215 feet long and 200 support the proposed FSRU and reviewed, any significant new issues are
feet wide, with a closed-loop shell-and- associated LNG marine traffic. The investigated, and modifications are
tube vaporization system and a total Coast Guard intends to adopt all or made to the draft EIS, a final EIS will
storage capacity of 350,000 cubic meters portions of the EIS being prepared by be published and distributed by FERC
(approximately 8 billion cubic feet); FERC to serve as the NEPA analysis for staff. The final EIS will contain the

VerDate Aug<31>2005 16:58 Nov 24, 2006 Jkt 211001 PO 00000 Frm 00070 Fmt 4703 Sfmt 4703 E:\FR\FM\27NON1.SGM 27NON1
Federal Register / Vol. 71, No. 227 / Monday, November 27, 2006 / Notices 68599

staff’s responses to timely comments the documents. Go to the eSubscription • Vaporizers and associated systems;
received on the draft EIS. link on the FERC Internet Web site. and
Comments will be considered by the • One construction dock.
Magalie R. Salas, These facilities would be additional to
Commission but will not serve to make Secretary. the previously certificated Cameron
the commentor a party to the [FR Doc. E6–19940 Filed 11–24–06; 8:45 am] LNG Terminal (Docket No. CP02–378–
proceeding. Any person seeking to BILLING CODE 6717–01–P 000). Construction of the proposed
become a party to the proceeding must
facilities for the Terminal Expansion
file a motion to intervene pursuant to
Project would be within Cameron LNG’s
Rule 214 of the Commission’s Rules of DEPARTMENT OF ENERGY import, storage, and vaporization
Practice and Procedures (18 CFR terminal site (located about 2.25 miles
385.214). Anyone may intervene in this Federal Energy Regulatory north of Hackberry, Louisiana).
proceeding based on this draft EIS. You Commission The purpose of the Terminal
must file your request to intervene as [Docket No. CP06–422–000] Expansion Project is to: Provide the
specified above. You do not need facilities necessary for Cameron to
intervenor status to have your Cameron LNG L.L.C.; Notice of deliver up to 1.15 billion standard cubic
comments considered. Availability of the Environmental feet per day of additional natural gas for
The draft EIS has been placed in the Assessment for the Proposed domestic consumption; accommodate
public files of the FERC and is available Cameron Terminal Expansion Project short term demand fluctuations with the
for distribution and public inspection addition of an LNG storage tank;
November 17, 2006.
at: Federal Energy Regulatory provide a technological alternative for
The staff of the Federal Energy ensuring that sendout gas from different
Commission, Public Reference Room,
Regulatory Commission (Commission or LNG sources can be processed to meet
888 First Street, NE., Room 2A,
FERC) has prepared this Environmental uniform pipeline quality gas
Washington, DC 20426, (202) 502–8371.
Assessment (EA) for the construction specifications; and allow the
CD–ROM copies of the draft EIS have and operation of the expansion of the
been mailed to Federal, State, and local simultaneous berthing and unloading of
Cameron liquified natural gas (LNG) two ships, increasing the number of
agencies; public interest groups; and import terminal (referred to as the
individuals who requested a copy of the ships that could be handled and the
Terminal Expansion Project) as volume of LNG that could be offloaded
draft EIS or provided comments during proposed by Cameron LNG L.L.C. over any given time.
scoping; libraries and newspapers in the (Cameron) in the above-referenced The EA has been placed in the public
Project area; and parties to this docket. files of the FERC. A limited number of
proceeding. Hard copy versions of the The EA was prepared to satisfy the copies of the EA are available for
draft EIS were mailed to those requirements of the National distribution and public inspection at:
specifically requesting them. A limited Environmental Policy Act. The staff Federal Energy Regulatory Commission,
number of hard copies and CD–ROMs concludes that approval of the proposed Public Reference Room, 888 First Street
are available from the Public Reference Terminal Expansion Project, with NE., Room 2A, Washington, DC 20426,
Room identified above. appropriate mitigating measures as (202) 502–8371.
Additional information about the recommended, would not constitute a In addition, copies of the EA have
Project is available from the major federal action significantly been mailed to federal, state, and local
Commission’s Office of External Affairs, affecting the quality of the human government agencies; elected officials;
at 1–866–208–FERC or on the FERC environment. The EA evaluates Native American tribes; local libraries
Internet Web site (http://www.ferc.gov) alternatives to the proposal, including and newspapers; intervenors in the
using the eLibrary link. Click on the the no-action alternative. FERC’s proceeding; and affected
eLibrary link, click on ‘‘General Search’’ The U.S. Army Corps of Engineers landowners and individuals.
and enter the docket number excluding (COE) and the U.S. Coast Guard (Coast Any person wishing to comment on
the last three digits in the Docket Guard) are participating as cooperating the EA may do so. To ensure
Number field. Be sure you have selected agencies in the preparation of the EA. consideration prior to a Commission
an appropriate date range. For The COE would require permits decision on the proposal, it is important
assistance, please contact FERC Online pursuant to Section 404 of the Clean that we receive your comments before
Water Act (33 United States Code the date specified below. Please
Support at
(U.S.C.) 1344) and Section 10 of the carefully follow these instructions to
FERCOnlineSupport@ferc.gov or toll
Rivers and Harbors Act (33 U.S.C. 403). ensure that your comments are received
free at 1–866–208–3676, or for TTY,
The COE would adopt the EA per Title in time and properly recorded:
contact (202) 502–8659. The eLibrary
40 Code of Federal Regulations (CFR) • Send an original and two copies of
link on the FERC Internet Web site also
§ 1506.3 if, after an independent review your comments to: Secretary, Federal
provides access to the texts of formal
of the document, it concludes that its Energy Regulatory Commission, 888
documents issued by the Commission,
comments and suggestions have been First St., NE., Room 1A, Washington, DC
such as orders, notices, and
satisfied. The Coast Guard is responsible 20426.
rulemakings.
for maintining the safety and security of • Label one copy of the comments for
In addition, the Commission now port areas and navigable waterways. the attention of the Gas Branch 1;
offers a free service called eSubscription The EA addresses the potential • Reference Docket No. CP06–422–
which allows you to keep track of all environmental effects of the 000; and
formal issuances and submittals in construction and operation of the • Mail your comments so that they
sroberts on PROD1PC70 with NOTICES

specific dockets. This can reduce the proposed Terminal Expansion Project in will be received in Washington, DC on
amount of time you spend researching Cameron Parish, Louisiana, including or before December 20, 2006.
proceedings by automatically providing the construction of: The Commission strongly encourages
you with notification of these filings, • An LNG storage tank and associated electronic filing of any comments,
document summaries and direct links to systems; interventions or protests to this

VerDate Aug<31>2005 16:58 Nov 24, 2006 Jkt 211001 PO 00000 Frm 00071 Fmt 4703 Sfmt 4703 E:\FR\FM\27NON1.SGM 27NON1