76644 Federal Register / Vol. 71, No.

245 / Thursday, December 21, 2006 / Notices

control numbers in certain EPA Estimated Total Annual Cost: Environmental Protection Agency,
regulations is consolidated in 40 CFR $582,000 for operating and maintenance Region 5, 77 W. Jackson Boulevard (AR–
part 9. costs. There are no capital/startup costs 18J), Chicago, Illinois 60604. Anyone
Abstract: The Environmental associated with this ICR. who wishes to review the EAB decision
Protection Agency (EPA) is required Change in Estimates: There is a can obtain it at http://www.epa.gov/
under section 111 of the Clean Air Act, decrease in hours in the total estimated eab/.
as amended, to collect data. The burden currently identified in the OMB SUPPLEMENTARY INFORMATION:
information will be used by Agency Inventory of Approved ICR Burdens.
enforcement personnel to (1) Identify This decrease is not due to any program Notification of EAB Final Decision
existing sources subject to these changes. Over the past three years, the The IEPA, acting under authority of a
standards; (2) ensure that Best respondents completed those activities PSD delegation agreement, issued a PSD
Demonstrated Technology is being required to achieve initial compliance. permit to the City of Springfield on
properly applied; and (3) ensure that the Such activities are more burdensome August 10, 2006, granting approval to
emission control devise is being than the burden associated with the rule construct a new 250 megawatt coal-fired
properly operated and maintained on a requirements for continuing compliance electric generating unit at the City of
continuous basis. In addition, records as addressed by this ICR. Hence, there Springfield’s existing power plant in
and reports are necessary to enable the is a decrease in burden. Sangamon County, Illinois. On
EPA to identify those site remediation Dated: December 13, 2006. September 12, 2006, the Sierra Club
facilities that may not be in compliance filed a petition for review of the
Oscar Morales,
with these standards. Based on reported conditions of the Prevention of
information, the EPA can decide which Director, Collection Strategies Division.
Significant Deterioration Permit No.
facilities should be inspected and what [FR Doc. E6–21892 Filed 12–20–06; 8:45 am] 167120AAO (Application No. 041
records or processes should be BILLING CODE 6560–50–P 10050) which was issued to the City of
inspected at the facilities. The records Springfield, lllinois. On November 17,
that site remediation facilities maintain 2006, the Sierra Club voluntarily
would indicate to the EPA whether the ENVIRONMENTAL PROTECTION
withdrew its petition for review in this
personnel are operating and maintaining AGENCY
matter and requested that the EAB enter
control equipment properly. The type of [IL229–2; FRL–8259–4] an order dismissing its petition for
data required is principally emissions review in this matter with prejudice.
data (through parametric monitoring) Notice of Prevention of Significant The Sierra Club requested dismissal
and would not be confidential. If any Deterioration Final Determination for because the parties had reached an
information is submitted to the EPA for City of Springfield agreement that obviated the need for
which a claim of confidentiality is further litigation. On November 22,
AGENCY: Environmental Protection
made, the information would be 2006, the EAB granted the Sierra Club’s
Agency (EPA).
safeguarded according to the Agency motion and the petition for review was
ACTION: Notice of final action.
policies set forth in 40 CFR, chapter 1, dismissed with prejudice.
part 2, subpart B. SUMMARY: This notice announces that on
Burden Statement: The annual public Dated: December 12, 2006.
November 22, 2006, the Environmental Bharat Mathur,
reporting and record keeping burden for Appeals Board (EAB) of the EPA
this collection of information is Deputy Regional Administrator, Region 5.
dismissed with predjudice a petition for
estimated to average 219 hours per [FR Doc. E6–21888 Filed 12–20–06; 8:45 am]
review of a federal Prevention of
response. Burden means the total time, Significant Deterioration (PSD) permit BILLING CODE 6560–50–P
effort, or financial resources expended issued to City of Springfield, Illinois, by
by persons to generate, maintain, retain, the Illinois Environmental Protection
or disclose or provide information to or ENVIRONMENTAL PROTECTION
Agency (IEPA). AGENCY
for a Federal agency. This includes the DATES: The effective date for the EAB’s
time needed to review instructions; decision is November 22, 2006. [EPA–HQ–OW–2004–0032; FRL–8259–1]
develop, acquire, install, and utilize Pursuant to Section 307(b)(1) of the
technology and systems for the purposes RIN 2040–AE76
Clean Air Act, 42 U.S.C. 7607(b)(1),
of collecting, validating, and verifying judicial review of this permit decision, Notice of Availability of Final 2006
information, processing and to the extent it is available, may be Effluent Guidelines Program Plan
maintaining information, and disclosing sought by filing a petition for review in
and providing information; adjust the AGENCY: Environmental Protection
the United States Court of Appeals for
existing ways to comply with any Agency (EPA).
the Seventh Circuit within 60 days of
previously applicable instructions and December 21, 2006. ACTION: Notice of Final 2006 Effluent
requirements; train personnel to Guidelines Program Plan.
ADDRESSES: The documents relevant to
respond to a collection of information;
search data sources; complete and the above action are available for public SUMMARY: EPA establishes national
review the collection of information; inspection during normal business technology-based regulations known as
and transmit or otherwise disclose the hours at the following address: effluent guidelines and pretreatment
information. Environmental Protection Agency, standards to reduce pollutant discharges
Respondents/Affected Entities: Site Region 5, 77 West Jackson Boulevard from categories of industry discharging
remediation facilities. (AR–18J), Chicago, Illinois 60604. To directly to waters of the United States or
Estimated Number of Respondents: arrange viewing of these documents, discharging indirectly through Publicly
sroberts on PROD1PC70 with NOTICES

286. call Constantine Blathras at (312) 886– Owned Treatment Works (POTWs). The
Frequency of Response: On occasion 0671. Clean Water Act (CWA) sections 301(d),
and semiannually. FOR FURTHER INFORMATION CONTACT: 304(b), 304(g), and 307(b) require EPA
Estimated Total Annual Hour Burden: Constantine Blathras, Air and Radiation to annually review these effluent
125,027. Division, Air Programs Branch, guidelines and pretreatment standards.