Sei sulla pagina 1di 2

10748 Federal Register / Vol. 72, No.

46 / Friday, March 9, 2007 / Notices

ENVIRONMENTAL PROTECTION Conservation Plan, Management of Resource Management Plans, for


AGENCY Monument Resources, Programs and Arapaho-Roosevelt, Pike-San Isabel,
Visitors for the next 15 years, Adams, Grand Mesa-Uncompahgre-Gunnison,
[ER–FRL–6684–8] Benton. Franklin and Grant Counties, San Juan, Rio Grande and Medicine
WA. Bow-Routt National Forests,
Environmental Impact Statements and
Summary: EPA does not object to the Implementation, CO and WY.
Regulations; Availability of EPA
Comments proposed action. Rating LO. Summary: EPA expressed
EIS No. 20060518, ERP No. D–FHW– environmental concerns about the
Availability of EPA comments F40438–IN, I–69 Evansville to preferred alternative has the most
prepared pursuant to the Environmental Indianapolis Project, I–69 Tier 2 potential of the action alternatives to
Review Process (ERP), under section Section 1: Evansville to Oakland City, adversely effect water quality from
309 of the Clean Air Act and Section from 1–64 to IN–64, Gibson and erosion and sedimentation, impact
102(2)(c) of the National Environmental Warrick Counties, IN wildlife and vegetation and cause
Policy Act as amended. Requests for Summary: EPA does not object to the fragmentation of critical lynx habitat. In
copies of EPA comments can be directed proposed action, but requests addition, the final EIS should expand
to the Office of Federal Activities at clarification of mitigation measures and the analysis of cumulative impacts.
202–564–7167. An explanation of the their implementation. Rating LO. Rating EC2.
ratings assigned to draft environmental EIS No. 20060535, ERP No. D–FHW–
impact statements (EISs) was published Final EISs
L40232–ID, US–95 Garwood to Sagle
in FR dated April 7, 2006 (71 FR 17845). (from MP–438.4 to MP 469.75) EIS No. 20060533, ERP No. F–FHW–
Transportation Improvements to D40310–VA, I–73 Location Study,
Draft EISs
Present and Future Traffic Demand, between Roanoke and the North
EIS No. 20060462, ERP No. D–COE– Carolina State Line Commonwealth of
Funding, NPDES Permit and U.S.
K59006–CA, Cajon, Third Main Track, Virginia, Construction and Operation,
Army COE Section 404 Permit,
Construction from Summit to Cities of Roanoke and Martinsville,
Kootenai and Bonner Counties, ID.
Keenbrook, Special Use Permit and Counties of Bedford, Botetourt,
U.S. Army COE 404 Permit, San Summary: EPA expressed
Franklin, Henry, and Roanoke, VA.
Bernardino County, CA. environmental concerns about potential
impacts to aquatic resources, wildlife Summary: EPA continues to have
Summary: EPA expressed habitat, and prime farmland. EPA environmental concerns about forest
environmental concerns about air recommended mitigation for air quality habitat impacts, and requested
quality impacts and water-related impacts during construction, and mitigation to reduce those impacts.
issues. Rating EC2. requested more information regarding EIS No. 20060538, ERP No. F–FRC–
EIS No. 20060467, ERP No. D–FHW– groundwater/sole source aquifer E03016–MS, Casotte Landing
K40262–CA, Interstate 5 (Santa Ana impacts, surface water quality and Liquefied Natural Gas (LNG) Import
Freeway) Project, Improvement from TMDL implementation, riparian and and Interstate Natural Gas
State Route 91 in Orange County to floodplain impacts and avoidance. Transmission Facilities, Construction
Interstate 605 in Los Angeles County, Rating EC2. and Operation, U.S. Army COE
CA. EIS No. 20070001, ERP No. D–AFS– Section 404 Permit, (FERC/EIS–
Summary: EPA expressed K65325–CA, Turntable Bay Marina 0193D), near the City of Pascagoula,
environmental concerns about the Master Development Plan, To Build Jackson County, MS.
potential for project segmentation, a and Operate a Resort Marina, Special- Summary: EPA supports the selected
lack of analysis for mobile source air Use-Permit, Shasta-Trinity National preferred alternative for the proposed
toxics (MSATs) hotspots, and the Forest, Shasta Lake at Turntable Bay, project with the FERC staff’s mitigation
inconsistent reporting of environmental Shasta and Trinity Counties, CA. measures identified in the final EIS.
justice impacts. EPA recommends Summary: While EPA does not object EPA requested that FERC and the
quantifying the construction and to the Preferred Alternative, but applicant give further consideration to
operational emissions for MSATs, requested clarification on project goals addressing the remaining outstanding
conducting dispersion modeling of the and timing of construction to minimize issues including air quality, risk
most significant MSATs, and identifying air quality impacts. Rating LO. analysis, and wetland impacts.
hotspots and appropriate avoidance, EIS No. 20070011, ERP No. D–FHW– EIS No. 20070000, ERP No. F–AFS–
minimization, and/or mitigation F40402–MI, I–94 Jackson Freeway L65455–ID, Clearwater National
opportunities. Rating EC2. Modernization Project, Improvements Forest, Proposes to Approve Plans-of-
EIS No. 20060498, ERP No. D–COE– between Michigan State Route-60 Operation for Small-Scale Suction
K60037–CA, Rio del Oro Specific Plan (MI–60) and Sargent Road, Funding Dredging in Lolo Creek and Moose
Project, To Establish a Development and NPDES and US Army COE Creek, Clearwater National Forest,
Framework for Land Use, Resource Section 404 Permits Issuance, Jackson North Fork Ranger District, Clearwater
Protection, Circulation, Public County, MI. and Idaho Counties, ID.
Utilities and Services, City of Rancho Summary: EPA’s previous concerns Summary: The final EIS adequately
Cordova, Sacramento County, CA. have been resolved; therefore, EPA does addressed EPA’s major concerns with
Summary: EPA expressed not object to the proposed action. Rating water quality, especially by using
environmental concerns about wetland LO. monitoring, timing and location
impacts, and requested additional EIS No. 20060477, ERP No. DS–AFS– provisions and adaptive management to
jlentini on PROD1PC65 with NOTICES

information regarding compliance with J65403–00, Southern Rockies Canada minimize impacts from projects.
the Clean Water Act. Rating EC2. Lynx Amendment, Updated Therefore, EPA does not object to the
EIS No. 20060509, ERP No. D–SFW– Information, Incorporating proposed project.
L61233–WA, Hanford Reach National Management Direction for Canada EIS No. 20070010, ERP No. F–FHW–
Monument Comprehensive Lynx Habitat by Amending Land and G40187–LA, East-West Corridor

VerDate Aug<31>2005 21:24 Mar 08, 2007 Jkt 211001 PO 00000 Frm 00119 Fmt 4703 Sfmt 4703 E:\FR\FM\09MRN1.SGM 09MRN1
Federal Register / Vol. 72, No. 46 / Friday, March 9, 2007 / Notices 10749

Highway Component, from I–130 to Weekly receipt of Environmental Impact EIS No. 20070079, Draft Supplement,
Louis Armstrong International Statements AFS, WA,. School Fire Salvage
Airport, to Central Business District Filed 02/26/2007 through 03/02/2007 Recovery Project, To Clarify
(CBD), Jefferson, Orleans and St. pursuant to 40 CFR 1506.9. Definitions of Live and Dead Trees,
Charles Parishes, LA. EIS No. 20070072, Second Draft Implementation, Pomeroy Ranger
Summary: No formal comment letter Supplement, FHW, NC, NC 12 District, Umatilla National Forest,
was sent to the preparing agency. Replacement of Herbert C. Bonner Columbia and Garfield Counties, WA,
EIS No. 20070013, ERP No. F–DOE– Bridge (Bridge No. 11 ) Revisions and Comment Period Ends: 04/23/2007,
E01016–FL, Orlando Gasification Additions, over Oregon Inlet Contact: Dean R. Millett 509–843–
Project (DOE/EIS–0383), To Provide Construction, Funding, U.S. Coast 4644.
Cost-Shared Funding for Guard Permit, Special-Use-Permit, EIS No. 20070080, Draft EIS, NIG, CA,
Construction, Design, and Operation a Right-of-Way Permit, U.S. Army COE Graton Rancheria Casino and Hotel
Section 10 and 404 Permit, Dare Project, Transfer of Land into Trust,
New Plant, Orlando, FL.
County, NC , Comment Period Ends: Implementation, Federated Indians of
Summary: EPA continues to have Graton Rancheria (Tribe), Sonoma
environmental concerns about impacts 04/23/2007, Contact: John F. Sullivan
919–856–4346. County, CA, Comment Period Ends:
to air quality and wetlands, and 04/23/2007, Contact: Brad Meharry
requested that additional mitigation EIS No. 20070073, Draft EIS, IBR, CO,
Colorado River Interim Guidelines for 202–632–7003.
measures be implemented. EIS No. 20070081, Final EIS, JUS, TX,
EIS No. 20070020, ERP No. F–AFS– Lower Basin Shortages and and
Laredo Detention Facility, Proposed
L65474–AK, Tuxekan Island Timber Coordinated Operations for Lake
Contractor-Owned/Contractor-
Sale(s) Project, Timber Harvesting, Powell and Lake Mead, Operated Detention Facility,
Implementation, Coast Guard Bridge Implementation, Colorado River, CO, Implementation, Webb County, TX,
Permit, U.S. Army COE Section 10 Comment Period Ends: 04/30/2007, Wait Period Ends: 04/09/2007,
and 404 Permits, Tongass National Contact: Nan Yoder 702–293–8500. Contact: Scott P. Stermer 202–353–
Forest, Thorne Bay Ranger District, EIS No. 20070074, Final EIS, SFW, CA, 4601.
Thorne Bay, AK. East Contra Costa County Habitat EIS No. 20070082, Final EIS, GSA, VA,
Conservation Plan and Natural Federal Bureau of Investigation (FBI)
Summary: EPA’s previous
Community Conservation Plan, Central Records Complex, Alternative
environmental concerns about impacts
Implementation, Incidental Take 4—Sempeles Site, Winchester,
to water quality, fisheries, wetlands, and
Permit, Cities of Brentwood, Clayton, Frederick County, VA, Wait Period
wildlife habitat have been addressed;
Oakley and Pittsburg, Contra Costa Ends: 04/09/2007, Contact: Katrina
therefore, EPA does not object to the
County, CA, Wait Period Ends: 04/09/ Scarpato 215–446–4651.
proposed action.
2007, Contact: Lori Rinek 916–444– EIS No. 20070083, Draft EIS, SFW/COE,
EIS No. 20070034, ERP No. F–SFW– 6600.
J65447–WY, Bison and Elk CA, PROGRAMMATIC—South Bay
EIS No. 20070075, Draft Supplement, Salt Pond Restoration Project,
Management Plan, Implementation, APH, 00, Importation of Solid Wood
National Elk Refuge/Grand Teton Restored Tidal Marsh, Managed
Packing Material, To Reevaluate and Ponds, Flood Control Measures and
National Park/John D. Rockefeller, Jr. Refine Estimates of Methyl Bromide
Memorial Parkway, Teton County, Public Access Features, Don Edward
Usage in the Treatment, San Francisco Bay National Wildlife
WY. Implementation, United States, Refuge, Alameda, Santa Clara and San
Summary: No formal comment letter Comment Period Ends: 04/23/2007, Mateo Counties, CA, Comment Period
was sent to the preparing agency. Contact: David A. Bergston 301–734– Ends: 04/23/2007, Contact: Clyde
EIS No. 20070054, ERP No. F–NPS– 6103. Morris 510–792–0222 (SFW); and
J61110–UT, Utah Museum of Natural EIS No. 20070076, Final EIS, AFS, WI, Yvonne LeTellier, 415–503–6744
History, Construction and Operation, Boulder Project, Timber Harvesting, (COE).
New Museum Facility at University of Vegetation and Road Management, EIS No. 20070084, Draft EIS, BPA, WA,
Utah, Salt Lake City, UT. U.S. Army COE Section 404 Permit, Port Angeles—Juan de Fuca
Summary: No formal comment letter Chequamegon-Nicolet National Transmission Project, Construct a
was sent to the preparing agency. Forest, Lakewood-Laona Ranger 550-Megawatt Direct Current Cable
Dated: March 6, 2007. District, Oconto and Langlade from Victoria, British Columbia,
Robert W. Hargrove, Counties, WI, Wait Period Ends: 04/ across the Strait of Juan de Fuca to
Director, NEPA Compliance Division, Office 09/2007, Contact: Paul Sweeney 715– Port Angeles, Presidential Permit,
of Federal Activities. 276–6333. Clallam County, WA, Comment
[FR Doc. E7–4246 Filed 3–8–07; 8:45 am] EIS No. 20070077, Draft EIS, AFS, SD, Period Ends: 04/24/2007, Contact:
BILLING CODE 6560–50–P
Mitchell Project Area, To Implement Stacy Mason 503–230–5455.
Multiple Resource Management EIS No. 20070085, Draft EIS, USN, GU,
Actions, Mystic Ranger District, Black Kilo Wharf Extension (MILCON P–
ENVIRONMENTAL PROTECTION Hills National Forest, Pennington 52), To Provide Adequate Berthing
AGENCY County, SD, Comment Period Ends: Facilities for Multi-Purpose Dry
04/23/2007, Contact: Roberts. J. Cargo/Ammunition Ship (the T–AKE),
[ER–FRL–6684–7] Thompson 605–343–1567. Apra Harbor Naval Complex, Mariana
EIS No. 20070078, Draft EIS, NPS, NY, Island, GU, Comment Period Ends:
Environmental Impacts Statements;
Sagamore Hill National Historic Site, 04/23/2007, Contact: Nora Macariola
Notice of Availability
jlentini on PROD1PC65 with NOTICES

General Management Plan, 808–472–1402.


Responsible Agency: Office of Federal Implementation, Oyster Bay, Nassau EIS No. 20070086, Final EIS, USA, VA,
Activities, General Information (202) County, NY, Comment Period Ends: Fort Lee, Virginia and Fort A. P. Hill,
564–7167 or http://www.epa.gov/ 05/08/2007, Contact: Greg A. Marshall Virginia Project, Implementation of
compliance/nepa/. 516–922–4452. Base Closure and Realignment (BRAC)

VerDate Aug<31>2005 21:24 Mar 08, 2007 Jkt 211001 PO 00000 Frm 00120 Fmt 4703 Sfmt 4703 E:\FR\FM\09MRN1.SGM 09MRN1

Potrebbero piacerti anche