ANEXO N 01

DISEO HIDRAULICO
COMUNIDAD: Tantarpata
SECTOR: Tantarpata

PROVINCIA: La Mar
DISTRITO: Chungui
Dimetro nominal

TUBERIA PVC

C = 150

Espesor
Dimetro interior
(mm)

Pulg.
mm
mm
Clase-15
Clase-10
Clase-7.5
Clase-5

1/2
21

17.4

3/4
26.5

22.9

1
33

29.4

REGION: Ayacucho

1 1/2
48

2
63

2 1/2
75

3
90

43.4
44.4

54.20
57.00
58.40
59.80

64.40
67.80
69.40
71.20

77.40
81.40
83.40
85.60

CALCULO HIDRAULICO DE LA RED DE DISTRIBUCION


CLASE *
LONG.HORIZ.LONG. INCL COTA TRAMO CAUDAL
DIM. TUB.
TRAMO
(m)
(m)
INICIAL FINAL
(l/s) Nom. (Pulg.Int. (mm)
ZONA MILLPOCCATA-CAP. TUB. 8"
3.52
CT-01
H-003
34.93
35.29
3435.00 3430.00 0.66
1 1/2
44.40
C-7.5
H-003
H-002
34.21
39.13
3430.00 3411.00 0.44
1
29.40
C-10.0
H-002
H-001
181.60
181.70 3411.00 3417.00 0.22
1
29.40
C-10.0
CT-01
CR-01
100.00
111.00 3435.00 3386.83 2.20
2
58.40
C-7.5
CR-01
D-01
28.72
31.88
3386.83 3373.00 2.20
2
58.40
C-7.5
D-01
H-004
61.40
66.29
3373.00 3348.00 0.22
1
29.40
C-10.0
D-01
H-005
29.97
30.24
3373.00 3369.00 0.22
1
29.40
C-10.0
D-01
H-006
64.62
70.83
3373.00 3344.00 1.76
2
58.40
C-7.5
H-006
CR-02
60.00
68.26
3344.00 3311.46 1.54
2
58.40
C-7.5
CR-02
D-02
22.98
26.14
3311.46 3299.00 1.54
2
58.40
C-7.5
D-02
H-011
102.06
107.26 3299.00 3266.00 0.22
1
29.40
C-10.0
D-02
H-010
139.50
139.86 3299.00 3289.00 1.32
2
58.40
C-7.5
H-010
H-013
60.80
71.17
3289.00 3252.00 1.10
2
58.40
C-7.5

DN
(m)
5.00
19.00
-6.00
48.17
13.83
25.00
4.00
29.00
32.54
12.46
33.00
10.00
37.00

4
110
94.60
99.40
102.00
104.60

VELOC.PRD. CARGA (m)


(m/s) J (m/m) Hf (m)
0.43
0.65
0.32
0.82
0.82
0.32
0.32
0.66
0.57
0.57
0.32
0.49
0.41

0.00
0.02
0.00
0.01
0.01
0.00
0.00
0.01
0.01
0.01
0.00
0.00
0.00

0.17
0.65
0.89
1.18
0.34
0.32
0.15
0.51
0.39
0.15
0.53
0.61
0.22

CLASE *
LONG.HORIZ.LONG. INCL COTA TRAMO CAUDAL
DIM. TUB.
(m)
(m)
INICIAL FINAL
(l/s) Nom. (Pulg.Int. (mm)
H-012
55.44
56.17
3252.00 3243.00 0.22
1
29.40
C-10.0
CR-03
23.00
25.97
3252.00 3239.95 0.88
1 1/2
44.40
C-7.5
H-014
41.90
47.30
3239.95 3218.00 0.88
1 1/2
44.40
C-7.5
H-015
39.70
41.77
3218.00 3231.00 0.22
1
29.40
C-10.0
H-016
42.43
46.49
3218.00 3199.00 0.44
1
29.40
C-10.0
H-017
72.10
80.15
3199.00 3164.00 0.22
1
29.40
C-10.0
H-007
42.49
53.19
3435.00 3403.00 0.66
1 1/2
44.40
C-7.5
H-008
40.61
40.92
3403.00 3398.00 0.44
1
29.40
C-10.0
H-009
57.28
64.20
3398.00 3369.00 0.22
1
29.40
C-10.0
MILLPOCCATA-CAP. TUB. 8"
7.48
H-018
41.59
42.78
3429.00 3419.00 0.22
1
29.40
C-10.0
H-019
62.13
62.64
3429.00 3421.00 1.76
2
58.40
C-7.5
H-020
94.54
98.32
3421.00 3394.00 0.66
1 1/2
44.40
C-7.5
H-021
41.44
51.75
3394.00 3363.00 0.22
1
29.40
C-10.0
H-022
75.24
82.98
3394.00 3359.00 0.22
1
29.40
C-10.0
H-023
91.76
101.34 3421.00 3378.00 0.88
1 1/2
44.40
C-7.5
H-024
53.60
56.54
3378.00 3360.00 0.22
1
29.40
C-10.0
CR-04
25.00
27.75
3378.00 3365.95 0.44
1
29.40
C-10.0
H-025
26.87
29.83
3365.95 3353.00 0.44
1
29.40
C-10.0
H-026
62.26
70.94
3353.00 3319.00 0.22
1
29.40
C-10.0
CR-05
150.00
164.83 3429.00 3360.68 5.50
3
83.40
C-7.5
H-027
30.04
33.01
3360.68 3347.00 5.50
3
83.40
C-7.5
H-028
44.28
44.29
3347.00 3346.00 0.44
1
29.40
C-10.0
H-030
29.15
31.92
3346.00 3333.00 0.22
1
29.40
C-10.0
H-029
31.30
36.62
3347.00 3328.00 4.84
3
83.40
C-7.5
D-03A
47.42
50.05
3328.00 3312.00 4.62
3
83.40
C-7.5
H-031
54.33
58.62
3312.00 3290.00 0.44
1
29.40
C-10.0
H-032
0.50
0.50
3290.00 3290.00 0.22
1
29.40
C-10.0
H-033
98.95
99.94
3312.00 3298.00 3.08
2
58.40
C-7.5
H-034
61.81
61.81
3298.00 3298.00 1.32
1 1/2
44.40
C-7.5
H-035
55.01
58.20
3298.00 3279.00 1.10
1 1/2
44.40
C-7.5

TRAMO
H-013
H-013
CR-03
H-014
H-014
H-016
CT-01
H-007
H-008
ZONA
CT-02
CT-02
H-019
H-020
H-020
H-019
H-023
H-023
CR-04
H-025
CT-02
CR-05
H-027
H-028
H-027
H-029
D-03A
H-031
D-03A
H-033
H-034

DN
(m)
9.00
12.05
21.95
-13.00
19.00
35.00
32.00
5.00
29.00
10.00
8.00
27.00
31.00
35.00
43.00
18.00
12.05
12.95
34.00
68.32
13.68
1.00
13.00
19.00
16.00
22.00
0.00
14.00
0.00
19.00

VELOC.PRD. CARGA (m)


(m/s) J (m/m) Hf (m)
0.32
0.00
0.28
0.57
0.01
0.20
0.57
0.01
0.37
0.32
0.00
0.20
0.65
0.02
0.77
0.32
0.00
0.39
0.43
0.00
0.25
0.65
0.02
0.68
0.32
0.00
0.31
0.32
0.66
0.43
0.32
0.32
0.57
0.32
0.65
0.65
0.32
1.01
1.01
0.65
0.32
0.89
0.85
0.65
0.32
1.15
0.85
0.71

0.00
0.01
0.00
0.00
0.00
0.01
0.00
0.02
0.02
0.00
0.01
0.01
0.02
0.00
0.01
0.01
0.02
0.00
0.02
0.02
0.01

0.21
0.45
0.47
0.25
0.41
0.80
0.28
0.46
0.49
0.35
1.93
0.39
0.73
0.16
0.34
0.42
0.97
0.00
1.92
0.99
0.68

CLASE *
LONG.HORIZ.LONG. INCL COTA TRAMO CAUDAL
DIM. TUB.
(m)
(m)
INICIAL FINAL
(l/s) Nom. (Pulg.Int. (mm)
H-036
26.40
30.36
3279.00 3294.00 0.88
1 1/2
44.40
C-7.5
H-037
18.44
19.72
3294.00 3301.00 0.22
1
29.40
C-10.0
H-038
33.42
41.74
3294.00 3269.00 0.44
1
29.40
C-10.0
H-039
50.01
57.31
3269.00 3241.00 0.22
1
29.40
C-10.0
H-040
21.02
21.02
3298.00 3298.00 1.54
1 1/2
44.40
C-7.5
CR-06
40.00
44.68
3298.00 3278.10 1.32
1 1/2
44.40
C-7.5
H-041
36.38
40.63
3278.10 3260.00 1.32
1 1/2
44.40
C-7.5
H-043
61.10
63.42
3260.00 3243.00 0.22
1
29.40
C-10.0
H-042
25.50
26.73
3260.00 3252.00 0.88
1 1/2
44.40
C-7.5
CR-07
20.00
21.59
3252.00 3243.87 0.66
1 1/2
44.40
C-7.5
H-044
26.75
28.87
3243.87 3233.00 0.66
1 1/2
44.40
C-7.5
H-045
68.18
76.64
3233.00 3198.00 0.44
1
29.40
C-10.0
H-046
29.21
31.58
3198.00 3186.00 0.22
1
29.40
C-10.0
D-03
92.11
102.08 3312.00 3268.00 1.10
2
58.40
C-7.5
H-047
46.87
51.36
3268.00 3247.00 0.22
1
29.40
C-10.0
H-048
46.32
49.34
3268.00 3251.00 0.44
1
29.40
C-10.0
H-049
23.32
26.70
3251.00 3238.00 0.22
1
29.40
C-10.0
CR-08
80.00
88.61
3268.00 3229.91 0.44
1
29.40
C-10.0
H-050
71.24
78.90
3229.91 3196.00 0.44
1
29.40
C-10.0
H-051
27.66
35.34
3196.00 3174.00 0.22
1
29.40
C-10.0
PICOTA-CAP. TUB. 8"
1.54
D-04
73.80
89.71
3413.00 3362.00 1.54
1 1/2
44.40
C-7.5
H-052
35.13
35.14
3362.00 3363.00 0.88
1 1/2
44.40
C-7.5
H-053
71.18
71.88
3363.00 3353.00 0.22
1
29.40
C-10.0
H-054
48.17
54.27
3363.00 3338.00 0.44
1
29.40
C-10.0
H-055
41.34
45.92
3338.00 3318.00 0.22
1
29.40
C-10.0
H-056
41.39
45.54
3362.00 3343.00 0.66
1 1/2
44.40
C-7.5
CR-09
50.00
54.77
3343.00 3320.64 0.44
1
29.40
C-10.0
D-05
66.29
72.61
3320.64 3291.00 0.44
1
29.40
C-10.0
H-057
38.29
43.67
3291.00 3270.00 0.22
1
29.40
C-10.0
H-058
74.22
78.32
3291.00 3266.00 0.22
1
29.40
C-10.0

TRAMO
H-035
H-036
H-036
H-038
H-033
H-040
CR-06
H-041
H-041
H-042
CR-07
H-044
H-045
D-03A
D-03
D-03
H-048
D-03
CR-08
H-050
ZONA
CT-03
D-04
H-052
H-052
H-054
D-04
H-056
CR-09
D-05
D-05

DN
(m)
-15.00
-7.00
25.00
28.00
0.00
19.90
18.10
17.00
8.00
8.13
10.87
35.00
12.00
44.00
21.00
17.00
13.00
38.09
33.91
22.00
51.00
-1.00
10.00
25.00
20.00
19.00
22.36
29.64
21.00
25.00

VELOC.PRD. CARGA (m)


(m/s) J (m/m) Hf (m)
0.57
0.01
0.24
0.32
0.00
0.10
0.65
0.02
0.69
0.32
0.00
0.28
0.99
0.02
0.44
0.85
0.02
0.71
0.85
0.02
0.65
0.32
0.00
0.31
0.57
0.01
0.21
0.43
0.00
0.10
0.43
0.00
0.14
0.65
0.02
1.27
0.32
0.00
0.15
0.41
0.00
0.32
0.32
0.00
0.25
0.65
0.02
0.82
0.32
0.00
0.13
0.65
0.02
1.46
0.65
0.02
1.30
0.32
0.00
0.17
0.99
0.57
0.32
0.65
0.32
0.43
0.65
0.65
0.32
0.32

0.02
0.01
0.00
0.02
0.00
0.00
0.02
0.02
0.00
0.00

1.88
0.28
0.35
0.90
0.22
0.22
0.91
1.20
0.21
0.38

CLASE *
LONG.HORIZ.LONG. INCL COTA TRAMO CAUDAL
DIM. TUB.
(m)
(m)
INICIAL FINAL
(l/s) Nom. (Pulg.Int. (mm)
CHACCATO PUQUIO
0.44
D-06
221.33
223.35 3125.00 3095.00 0.44
1 1/2
44.40
C-7.5
H-059
106.01
106.58 3095.00 3084.00 0.22
1
29.40
C-10.0
H-060
104.27
117.89 3095.00 3040.00 0.22
1
29.40
C-10.0
FINAL CANAL ENTUBADO-CAP. TUB. 8"
3.96
H-063
191.18
200.98 3399.00 3337.00 0.66
1 1/2
44.40
C-7.5
H-062
46.06
46.93
3337.00 3328.00 0.44
1 1/2
44.40
C-7.5
H-061
87.13
92.15
3328.00 3298.00 0.22
1
29.40
C-10.0
H-064
401.64
406.71 3399.00 3335.00 3.30
2
58.40
C-7.5
CR-10
40.00
43.44
3335.00 3318.05 3.08
2
58.40
C-7.5
H-066
106.33
115.48 3318.05 3273.00 3.08
2
58.40
C-7.5
H-065
50.45
53.24
3273.00 3290.00 0.22
1
29.40
C-10.0
H-067
23.43
23.62
3273.00 3270.00 2.64
2
58.40
C-7.5
D-07
29.07
29.09
3270.00 3271.00 2.42
2
58.40
C-7.5
H-068
28.32
36.48
3271.00 3248.00 0.66
1
29.40
C-10.0
H-069
0.50
0.50
3248.00 3248.00 0.44
1
29.40
C-10.0
H-070
56.92
57.35
3248.00 3241.00 0.22
1
29.40
C-10.0
D-08
23.67
24.42
3271.00 3265.00 1.76
1 1/2
44.40
C-7.5
H-071
76.67
76.90
3265.00 3271.00 0.44
1
29.40
C-10.0
CR-11
20.00
27.23
3271.00 3252.52 0.22
1
29.40
C-10.0
H-072
55.74
75.90
3252.52 3201.00 0.22
1
29.40
C-10.0
CR-12
30.00
31.87
3265.00 3254.24 1.32
1 1/2
44.40
C-7.5
D-09
34.13
36.26
3254.24 3242.00 1.32
1 1/2
44.40
C-7.5
H-073
33.24
33.48
3242.00 3238.00 0.22
1
29.40
C-10.0
H-074
107.00
110.60 3242.00 3214.00 1.10
1 1/2
44.40
C-7.5
H-078
48.00
52.39
3214.00 3193.00 0.22
1
29.40
C-10.0
H-075
83.10
83.25
3214.00 3209.00 0.66
1 1/2
44.40
C-7.5
H-076
21.93
25.49
3209.00 3196.00 0.44
1
29.40
C-10.0
H-077
32.25
36.46
3196.00 3179.00 0.22
1
29.40
C-10.0
PUQUIAL VISTA ALEGRE
0.22
H-079
324.05
325.44 3454.00 3424.00 0.22
1
29.40
C-10.0

TRAMO
ZONA
CC-01
D-06
D-06
ZONA
CT-04
H-063
H-062
CT-04
H-064
CR-10
H-066
H-066
H-067
D-07
H-068
H-069
D-07
D-08
H-071
CR-11
D-08
CR-12
D-09
D-09
H-074
H-074
H-075
H-076
ZONA
CC-02

DN
(m)

VELOC.PRD. CARGA (m)


(m/s) J (m/m) Hf (m)

30.00
11.00
55.00

0.28
0.32
0.32

0.00
0.00
0.00

0.52
0.52
0.58

62.00
9.00
30.00
64.00
16.95
45.05
-17.00
3.00
-1.00
23.00
0.00
7.00
6.00
-6.00
18.48
51.52
10.76
12.24
4.00
28.00
21.00
5.00
13.00
17.00

0.43
0.28
0.32
1.23
1.15
1.15
0.32
0.99
0.90
0.97
0.65
0.32
1.14
0.65
0.32
0.32
0.85
0.85
0.32
0.71
0.32
0.43
0.65
0.32

0.00
0.00
0.00
0.02
0.02
0.02
0.00
0.01
0.01
0.03
0.02
0.00
0.03
0.02
0.00
0.00
0.02
0.02
0.00
0.01
0.00
0.00
0.02
0.00

0.95
0.11
0.45
8.82
0.83
2.22
0.26
0.35
0.37
1.23
0.01
0.28
0.65
1.27
0.13
0.37
0.51
0.58
0.16
1.28
0.26
0.39
0.42
0.18

30.00

0.32

0.00

1.59

CLASE *
LONG.HORIZ.LONG. INCL COTA TRAMO CAUDAL
DIM. TUB.
(m)
(m)
INICIAL FINAL
(l/s) Nom. (Pulg.Int. (mm)
RIACHUELO TACCEPA
0.22
H-080
179.17
182.37 2981.00 2947.00 0.22
1
29.40
C-10.0
PUQUIAL SECCSES
0.22
H-106
26.02
29.55
3254.00 3240.00 0.22
1
29.40
C-10.0
PUQUIAL PUCAPUQUIO
0.22
H-081
215.41
219.09 3349.00 3309.00 0.22
1
29.40
C-10.0
HATUN MARCO - CAP. TUB. 1"
0.66
H-082
69.72
69.75
3357.00 3359.00 0.22
1
29.40
C-10.0
H-083
0.00
2.00
3357.00 3355.00 0.44
1
29.40
C-10.0
H-084
36.12
38.06
3355.00 3343.00 0.22
1
29.40
C-10.0
HATUN MARCO - CAP. TUB. 1"
0.22
H-085
30.08
31.13
3350.00 3342.00 0.22
1
29.40
C-10.0
HATUN MARCO - CAP. TUB. "
0.22
H-086
63.80
64.92
3301.00 3289.00 0.22
3/4
22.90
C-10.0
HATUN MARCO - CAP. TUB. 1"
0.44
H-087
7.21
8.25
3291.00 3287.00 0.44
1
29.40
C-10.0
H-088
20.81
21.19
3287.00 3283.00 0.22
1
29.40
C-10.0
HATUN MARCO - CAP. TUB. 1"
0.22
H-089
29.83
31.46
3290.00 3280.00 0.22
1
29.40
C-10.0
HATUN MARCO - CAP. TUB. 1"
0.88
H-091
0.00
0.00
3376.00 3376.00 0.22
1
29.40
C-10.0
H-090
0.00
0.00
3374.00 3374.00 0.66
1
29.40
C-10.0
H-092
22.63
25.61
3374.00 3362.00 0.44
1
29.40
C-10.0
H-093
119.81
131.83 3362.00 3307.00 0.22
1
29.40
C-10.0
UCHUY MARCO CANAL ENTUBADO-CAP. TUB. 6"
2.64
D-10
42.05
48.92
3484.00 3459.00 2.64
2
58.40
C-7.5
H-105
44.69
44.87
3459.00 3455.00 0.22
1
29.40
C-10.0
CR-13
40.00
47.67
3459.00 3433.06 2.42
2
58.40
C-7.5
D-11
20.13
24.00
3433.06 3420.00 2.42
2
58.40
C-7.5
H-104
90.00
90.55
3420.00 3410.00 0.44
1
29.40
C-10.0
H-103
37.44
43.43
3410.00 3388.00 0.22
1
29.40
C-10.0

TRAMO
ZONA
CC-03
ZONA
CC-04
ZONA
CC-05
ZONA
CT-05
CT-05
H-083
ZONA
CT-06
ZONA
CT-07
ZONA
CT-08
H-087
ZONA
CT-09
ZONA
CT-10
CT-10
H-090
H-092
ZONA
CT-11
D-10
D-10
CR-13
D-11
H-104

DN
(m)

VELOC.PRD. CARGA (m)


(m/s) J (m/m) Hf (m)

34.00

0.32

0.00

0.89

14.00

0.32

0.00

0.14

40.00

0.32

0.00

1.07

-2.00
2.00
12.00

0.32
0.65
0.32

0.00
0.02
0.00

0.34
0.03
0.19

8.00

0.32

0.00

0.15

12.00

0.53

0.02

1.04

4.00
4.00

0.65
0.32

0.02
0.00

0.14
0.10

10.00

0.32

0.00

0.15

0.00
0.00
12.00
55.00

0.32
0.97
0.65
0.32

0.00
0.03
0.02
0.00

0.00
0.00
0.42
0.65

25.00
4.00
25.94
13.06
10.00
22.00

0.99
0.32
0.90
0.90
0.65
0.32

0.01
0.00
0.01
0.01
0.02
0.00

0.72
0.22
0.60
0.30
1.50
0.21

CLASE *
LONG.HORIZ.LONG. INCL COTA TRAMO CAUDAL
DIM. TUB.
(m)
(m)
INICIAL FINAL
(l/s) Nom. (Pulg.Int. (mm)
D-12
15.14
17.61
3420.00 3411.00 1.98
2
58.40
C-7.5
CR-14
70.00
77.64
3411.00 3377.41 0.44
1
29.40
C-10.0
D-15
38.38
42.57
3377.41 3359.00 0.44
1
29.40
C-10.0
H-102
20.02
20.12
3359.00 3357.00 0.22
1
29.40
C-10.0
H-101
116.68
126.55 3359.00 3310.00 0.22
1
29.40
C-10.0
H-100
125.44
126.22 3411.00 3397.00 1.54
1 1/2
44.40
C-7.5
D-13
119.69
119.69 3397.00 3397.00 1.32
1 1/2
44.40
C-7.5
H-099
32.80
41.85
3397.00 3371.00 0.22
1
29.40
C-10.0
D-14
99.01
99.19
3397.00 3391.00 1.10
1 1/2
44.40
C-7.5
CR-15
50.00
60.02
3391.00 3357.80 0.44
1
29.40
C-10.0
H-097
84.04
100.88 3357.80 3302.00 0.44
1
29.40
C-10.0
H-098
53.60
56.54
3302.00 3284.00 0.22
1
29.40
C-10.0
H-095
54.08
55.00
3391.00 3381.00 0.66
1 1/2
44.40
C-7.5
H-096
64.29
76.25
3381.00 3340.00 0.22
1
29.40
C-10.0
H-094
128.41
128.41 3381.00 3381.00 0.22
1
29.40
C-10.0
TOTAL=
8445.62
9024.97

TRAMO
D-11
D-12
CR-14
D-15
D-15
D-12
H-100
D-13
D-13
D-14
CR-15
H-097
D-14
H-095
H-095

CANTIDAD TOTAL DE TUBERIAS


1
3/4
5111.77 m
64.92

1 1/2
2023.45 m

DN
(m)
9.00
33.59
18.41
2.00
49.00
14.00
0.00
26.00
6.00
33.20
55.80
18.00
10.00
41.00
0.00

LINEA DE CONDUCCION - RED DE DISTRIBUCION


2
3
4
1540.33 m
284.50 m
0.00 m

VELOC.PRD. CARGA (m)


(m/s) J (m/m) Hf (m)
0.74
0.01
0.16
0.65
0.02
1.28
0.65
0.02
0.70
0.32
0.00
0.10
0.32
0.00
0.62
0.99
0.02
2.65
0.85
0.02
1.91
0.32
0.00
0.21
0.71
0.01
1.15
0.65
0.02
0.99
0.65
0.02
1.67
0.32
0.00
0.28
0.43
0.00
0.26
0.32
0.00
0.37
0.32
0.00
0.63

6
0.00 m

8
0.00

CLASE *
LONG.HORIZ.LONG. INCL COTA TRAMO CAUDAL
DIM. TUB.
DN
VELOC.PRD. CARGA (m)
(m)
(m)
INICIAL FINAL
(l/s) Nom. (Pulg.Int. (mm)
(m)
(m/s) J (m/m) Hf (m)
Cantidad de tubera por clases y dimetros
Cantidad de tubera por clases
Descripcin
Clase

Longitud
Tuberias
C-5.0
0.00
m
Tubo PVC SAP
C-5
6
0.00 m
0
C-7.5
3848.28
m
Tubo PVC SAP
C-5
4
0.00 m
0
C-10.0
5176.69
m
Tubo PVC SAP
C-7.5
4
0.00 m
0
C-15.0
0.00
m
Tubo PVC SAP
C-10
4
0.00 m
0
Total 9024.97
m
Tubo PVC SAP
C-5
3
0.00 m
0
Tubo PVC SAP
C-7.5
3
284.50 m
57
Tubo PVC SAP
C-10
3
0.00 m
0
Tubo PVC SAP
C-5
2
0.00 m
0
Tubo PVC SAP
C-7.5
2
1540.33 m
308
Tubo PVC SAP
C-7.5
1 1/2
2023.45 m
405
Tubo PVC SAP
C-10
2
0.00 m
0
Tubo PVC SAP
C-10
1
5111.77 m
1022
Tubo PVC SAP
C-10
3/4
64.92 m
13
Total
9024.97 m
TRAMO

NEXO N 01

O HIDRAULICO

6
160
137.60
144.60
148.40
152.00

PRESION
(m)
4.83
23.19
16.30
46.99
13.49
38.17
17.34
41.98
74.13
12.31
44.79
21.70
58.48

LINEA DE GRADIENTE HIDRAULICA

PRESION
(m)
67.20
70.32
21.58
8.37
39.81
74.42
31.75
36.07
64.76
9.79
7.55
34.08
64.83
68.68
49.75
67.48
61.34
12.46
46.11
66.39
13.29
13.56
26.41
31.96
47.53
68.56
68.56
44.04
43.05
61.37

LINEA DE GRADIENTE HIDRAULICA

PRESION
(m)
46.13
39.04
70.44
98.16
43.59
62.78
17.45
34.14
41.93
49.96
10.73
44.47
56.31
43.68
64.43
80.61
93.48
92.94
32.61
54.43
49.12
47.84
57.49
71.95
91.72
67.90
89.36
28.44
49.23
53.06

LINEA DE GRADIENTE HIDRAULICA

PRESION
(m)
29.48
39.96
83.90
61.05
69.94
99.49
55.18
71.29
42.83
25.57
45.48
44.12
65.89
65.88
72.60
49.47
42.20
60.55
51.15
59.72
11.66
15.50
38.38
59.12
42.98
55.56
72.38
28.41

LINEA DE GRADIENTE HIDRAULICA

PRESION
(m)
33.11
13.86
38.93
22.66
26.97
38.78
32.85
35.96
28.86
32.76
34.85
25.00
25.00
36.58
90.93
24.28
28.06
49.62
12.76
21.26
43.05

LINEA DE GRADIENTE HIDRAULICA

PRESION
(m)
21.60
53.91
17.71
19.61
66.09
32.96
31.04
56.84
35.89
63.25
54.13
71.86
45.63
86.25
45.00

8
m

LINEA DE GRADIENTE HIDRAULICA

PRESION
(m)

LINEA DE GRADIENTE HIDRAULICA

ANEXO N 02
HOJA DE METRADOS
Proyecto

ITEM
1.
1.1
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2

1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2

1.1.
1.1.1.
1.1.1.1.
1.1.1.2.
1.1.1.3.
1.1.1.4.
1.1.1.5.

1.1.1.6.
1.1.1.7.
1.1.1.8.
1.1.1.9.
1.1.1.10.
1.1.1.11.
1.1.1.12.
1.1.1.13.
1.1.1.14.
1.1.1.15.
1.1.1.16.
1.1.1.17.
1.1.1.18.
1.1.1.19.
1.1.1.20.
1.1.1.21.
1.1.1.22.
1.1.1.23.
1.1.1.24.
1.1.1.25.
1.1.1.26.
1.1.1.27.
1.1.1.28.
1.1.1.29.
1.1.1.30.
1.1.1.31.
1.1.1.32.
1.1.1.33.
1.1.1.34.
1.1.1.35.
1.1.1.36.
1.1.2.
1.1.2.1.
1.1.2.1.1.
1.1.2.1.2.
1.1.2.1.3.
1.1.2.1.4.
1.1.2.1.5.
1.1.2.2.
1.1.2.2.1.
1.1.2.3.
1.1.2.3.1.
1.1.2.3.2.
1.1.2.3.3.
1.1.2.3.4.
1.1.2.4.
1.1.2.5.
1.1.2.6.
1.1.2.7.
1.1.3.
1.1.3.1.
1.2.
1.2.1.
1.3.

1.3.1.
1.3.2.
1.3.3.
1.4.
1.4.1.
1.4.2.
1.5.
1.5.1.
1.5.2.
1.6.
1.6.1.
1.7.
1.7.1.
1.8.
1.8.1.
2.
2.1.
2.2.
2.2.1.
2.2.2.
2.3.
3.
3.1.
3.2.
4.
4.1.
4.2.
4.3.
4.4.
4.5.

ANEXO N 02
HOJA DE METRADOS

PROGRAMA PRESUPUESTAL: "ACCESO DE HOGARES RURALES CON ECONOMIA DE SUBSISTENCIA A MERCA

DESCRIPCION

PRODUCTO 1: Hogares rurales con economas de subsistencia reciben


asistencia tcnica y capacitacin para el desarrollo de capacidades
productivas.

1.1) PROMOCION Y CONFORMACION DE N.E Y NEC


a) Conformar los NE y NEC
1.2) DISEO DEL PROYECTO DE ASISTENCIA TECNICA Y CAPACITACION
a) Elaborar del expediente tcnico - ET
Honorarios del Proyectista
Gastos del NEC para gestion de la elaboracin del ET
Gastos Bancarios para elaboracin del ET
1.3) IMPLEMENTACION DE AT y CAPACITACION Y ENTREGA DE ACTIVOS
a) Coordinar y gestionar la ejecucin de los proyectos del NEC
Honorarios del Coordinador del NEC
Movilidad del Coordinador del NEC
Seguro del Coordinador del NEC
b) Difusin del Proyecto
Cartel del Proyecto
c) Capacitacin de Campesino a Campesino 1/
c.1) Capacitar Campesino a Campesino - 1er Ao
Honorarios del Yachachiq al 1er Ao
Movilidad de yachachiq 1er ao
Seguro del Yachachiq al 1er Ao
c.2) Capacitar Campesino a Campesino - 2do Ao
Honorarios del Yachachiq al 2do Ao
Movilidad de yachachiq 2do ao
Seguro del Yachachiq al 2do ao
c.3) Capacitar Campesino a Campesino - 3er ao
Honorarios del Yachachiq al 3er ao
Movilidad de yachachiq 3er ao
Seguro del Yachachiq al 3er ao
c.4) Capacitar en las tecnologas
Materiales de Capacitacion en Tecnologias Productivas 1er y 2 do ao
d) Pasantias o talleres de capacitacion de yachachiq
Alojamiento para pasantias de especializacion de yachachiq
Movilidad para pasantias de especializacion de yachachiq
Alimentacin para pasantias de especializacion de yachachiq
e) Implementar Tecnologias Productivas Familiares
Instalacin de tecnologas productivas
f) Capacitacin para mejorar las condiciones del predio Rural
Materiales y premios para mejoramiento de espacios para la
produccion (CM, RS, AS)
g) Realizar Concursos intra NE
Premios por concurso intra NE
h) Rendir Cuentas/ Gastos
Servicio de apoyo contable para la rendicion de cuentas
i) Traslado de Insumos
Flete para insumos
j) Gastos de Seguimiento del NEC
j.1) Seguimiento participativo

Servicio de recojo y registro de informacion


j.2) Elaboracin periodica y memoria anual de gestin NEC
Gastos Generales para elaboracion de informes.
j.3) Elaboracin de Video editado de la implementacin de proyectos
Servicio de difusin de resultados

PRODUCTO 2: Grupos de hogares rurales con economas de


subsistencia reciben asistencia tcnica, capacitacin y dotacin de
activos para la gestin de emprendimientos rurales

2.1) DESARROLLO DE LOS CONCURSOS PARA LA EVALUACION Y ASIGNACION DE


RECURSOS
a) Promocion y difusion del concurso.
Materiales de promocin y difusin (banner, afiches, talleres, etc)
b) Desarrollar concursos para la seleccin de emprendimientos (CLAR)
Gastos Generales para el desarrollo de concursos
2.2) IMPLEMENTACION DE LA A.T. Y CAPACITACION ESPECIALIZADA Y ENTREGA
DE ACTIVOS PARA LA PUESTA EN MARCHA DE EMPRENDIMIENTOS
a) Desarrollar emprendimientos
Asistencia tecnica a emprendimientos
Activos para emprendimientos
b) Promocionar el ahorro formal y de otros productos financieros
b.1) Adquirir materiales de capacitacion financiera
Material de capacitacin en educacin financiera por usuarios
b.2) Capacitar y apoyar tecnicamente en educacion financiera
Honorarios del Facilitador Financiero del NEC
b.3) Capacitar Campesino a Campesino - educacin financiera
Movilidad, alimentacin y materiales yachachiq financiero
c) Gastos generales del NEC
Alquiler de Local y Servicios
Material para la gestin de ejecucin del NEC
Gastos generales del NEC (Presidente y Tesorero)
Movilidad del NEC durante la ejecucin del proyecto (Presidente y
Tesorero)
Gastos de Cuentas Bancarias del NEC para la ejecucin del Proyecto
2.3) PROMOCION DE ESPACIOS DE INTERCAMBIO COMERCIAL LOCAL (P.E.
FERIAS)
a) Organizar y Participar en ferias locales
Alojamiento para participantes
Alimentacion para participantes
Movilidad para participantes
Gastos Generales para participacion en ferias locales

Implementacin de Tecnologas
Instalacin de riego tecnificado
Cmara de carga (0,22 - 0,44 l/s) de 0,6*0,6*0,6 m
Instalacin de collarn de captacin de 25 mm * "
Instalacin de collarn de captacin de 150 mm * 2"
Instalacin de collarn de captacin de 200 mm * 1"
Cmara rompe presin (0,22 - 0,88 l/s) de 0,7*0,7*0,7 m

Cmara rompe presin (1,32 - 3,08 l/s) de 1,10*1,10*1,10 m


Cmara rompe presin (5,50 l/s) de 1,50*1,50*1,50 m
Instalacin de Codo PVC de 45 - 1"
Instalacin de Codo PVC de 45 - 1"
Instalacin de Codo PVC de 45 - 2"
Instalacin de Codo PVC de 45 - 3"
Instalacin de Codo PVC de 90 - 1"
Instalacin de Codo PVC de 90 - 1"
Instalacin de Codo PVC de 90 - 2"
Instalacin de Tee PVC de 1"
Instalacin de Tee PVC de 1"
Instalacin de Tee PVC de 2"
Instalacin de Tee PVC de 3"
Instalacin de Reduccin PVC de 1" - 1"
Instalacin de Reduccin PVC de 2" - 1"
Instalacin de Reduccin PVC de 2" - 1"
Instalacin de Reduccin PVC de 3" - 2"
Instalacin de Llave de paso de 1"
Instalacin de Llave de paso de 1"
Instalacin de Llave de paso de 2"
Construccin de Caja de llave de paso
Instalacin de collarines para hidrantes de 25 mm * "
Instalacin de collarines para hidrantes de 38 mm * "
Instalacin de collarines para hidrantes de 50 mm * "
Instalacin de collarines para hidrantes de 75 mm * "
Instalacin de Tubera PVC SAP C-10, ="
Instalacin de Tubera PVC SAP C-10, =1"
Instalacin de Tubera PVC SAP C-7.5, =1"
Instalacin de Tubera PVC SAP C-7.5, =2"
Instalacin de Tubera PVC SAP C-7.5, =3"
Instalacin de sistema mvil
Produc. de actividades agropec. orientas al Mcdo.
Huerto fijo de hortalizas a campo abierto
Produccin de zanahoria
Produccin de cebolla
Produccin de betarraga
Produccin de coliflor
Produccin de acelga
Parcela de pastos asociados
Parcela produccin de alfalfa
Miniparcelas para la produccin granos andinos
Produccin de quinua
Produccin de papa blanca
Produccin de frejol canario
Produccin de arveja
Agroforestera
Mdulo de produccin de abono orgnico - compost
Mdulo de crianza de gallinas
Mdulo de crianza de cuyes
Flete y transporte de materiales e insumos
Flete - transporte de materiales e insumos
Materiales de Capacitacin para las tecnologas
Materiales de capacitacin para las tecnologas
Capacitacin de campesino a campesino

Contratacin de Yachachiq (primer ao)


Contratacin de Yachachiq (segundo ao)
Contratacin de Yachachiq (tercer ao)
Seguro bsico de Yachachiq
Seguro bsico de Yachachiq (primer ao)
Seguro bsico de Yachachiq (segundo y tercer ao)
Movilidad de Yachachiq
Movilidad de Yachachiq para capacitacin (primer ao)
Movilidad de Yachachiq para capacitacin (2do. Y 3er ao)
Concursos entre Ncleos Ejecutores - NE
Concursos en la aplicacin y mejora de tecnologas
Participacin en Ferias Locales
Participacin en Ferias Locales
Pasantas Yachachiq
Pasantas Yachachiq
Implementacin y mejora de la vivienda saludable
Instalacin de cocina mejorada
Capacitacin en prcticas adecuadas mejora de vivienda, salud y nutricin familiar
Capacitacin en prcticas adecuadas de mejora de vivienda
Capacitacin en salud y nutricin familiar
Agua segura
Promocin de Negocios Rurales Inclusivos
Asistencia tcnica para articulacin al mercado
Concursos de Planes de negocios 3/.
Fomento de capacidades financieras
Promocin, convocatoria y concursos
Materiales de capacitacin
Honorarios facilitador financiero
Honorarios yachachiq financiero
Viticos y apoyo logstico facilitador financiero

XO N 02

E METRADOS

IA DE SUBSISTENCIA A MERCADOS LOCALES"

NUMERO
CANTID
DE
AD
VECES

DIMENSIONES
ALTO
LARGO ANCHO

PARCIAL TOTAL

Unid
Unid
Unid
Unid
Unid

1.00
1.00
1.00
1.00
1.00

5.00
7.00
3.00
2.00
8.00

5.00
7.00
3.00
2.00
8.00

25.00
49.00
9.00
4.00
64.00

25.00
49.00
9.00
4.00
64.00

36.00
1.00
2,601.00
1,156.00
100.00
1.00
225.00
36.00
36.00
49.00
225.00
324.00
36.00
625.00
100.00
256.00
9.00
2,704.00
4.00
16.00
3,364.00
5,329.00
529.00
64.00
4.00
64.92
5,111.77
2,023.45
1,540.33
284.50
###

36.00
1.00
2,601.00
1,156.00
100.00
1.00
225.00
36.00
36.00
49.00
225.00
324.00
36.00
625.00
100.00
256.00
9.00
2,704.00
4.00
16.00
3,364.00
5,329.00
529.00
64.00
4.00
64.92
5,111.77
2,023.45
1,540.33
284.50
###

0.212
0.212
0.212
0.212
0.212

0.212
0.212
0.212
0.212
0.212

1.27
1.27
1.27
1.27
1.27

1.00

5.300

5.300

5.30

ha
ha
ha
ha
Familia
Mdulo
Mdulo
Mdulo

2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00

2.120
2.120
2.120
2.120
106.000
106.000
106.000
106.000

2.120
2.120
2.120
2.120
106.000
106.000
106.000
106.000

4.24
4.24
4.24
4.24
106.00
106.00
106.00
106.00

Glb

1.00

1.000

1.000

1.00

Glb

1.00

1.000

1.000

1.00

Unid
Unid
Unid
Unid
Unid
Unid
Unid
Unid
Unid
Unid
Unid
Unid
Unid
Unid
Unid
Unid
Unid
Unid
Unid
Unid
Unid
Unid
Unid
Unid
Unid
m
m
m
m
m
Unid

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

ha
ha
ha
ha
ha

6.00
6.00
6.00
6.00
6.00

ha

6.00
1.00
51.00
34.00
10.00
1.00
15.00
6.00
6.00
7.00
15.00
18.00
6.00
25.00
10.00
16.00
3.00
52.00
2.00
4.00
58.00
73.00
23.00
8.00
2.00
1.00
64.92
1.00 5,111.77
1.00 2,023.45
1.00 1,540.33
1.00 284.50
106.00

6.00
1.00
51.00
34.00
10.00
1.00
15.00
6.00
6.00
7.00
15.00
18.00
6.00
25.00
10.00
16.00
3.00
52.00
2.00
4.00
58.00
73.00
23.00
8.00
2.00
1.00
1.00
1.00
1.00
1.00
106.00

Mes
Mes
Mes

1.00
1.00
1.00

12.000
12.000
12.000

12.000
12.000
12.000

12.00
12.00
12.00

Ao
Ao

1.00
1.00

1.000
2.000

1.000
2.000

1.00
2.00

Mes
Mes

1.00
1.00

12.000
24.000

12.000
24.000

12.00
24.00

Concur.

1.00

20.000

20.000

20.00

Feria

1.00

2.000

2.000

2.00

Pasanta

1.00

2.000

2.000

2.00

Mdulo

1.00 106.000

106.000

106.00

Eventos
Eventos
Mdulo

3.00
1.000
3.00
1.000
1.00 106.000

1.000
1.000
106.000

3.00
3.00
106.00

Evento
Concurs.

3.00
1.00

60.000
2.000

60.000
2.000

180.00
2.00

Mes
Glb
Mes
Mes
Glb

1.00
1.00
1.00
1.00
1.00

6.000
1.000
6.000
6.000
1.000

6.000
1.000
6.000
6.000
1.000

6.00
1.00
6.00
6.00
1.00

CUADROS N 01
ANALISIS DE COSTOS UNITARIOS
1.1.1.

Instalacin de riego tecnificado

1.1.1.1. Cmara de carga (0,22 - 0,44 l/s) de 0,6*0,6*0,6 m


N
1.

DESCRIPCIN

UNID.

MATERIALES E INSUMOS
Arena hormign
m
Cemento Portland tipo I / 42,50 kg
Bolsa
Fierro corrugado de
m
Juego de panel reforzado (0,6*0,6*0,6 m3) Unid
Tubera PVC SAP, C-7,50, 3 x 5m
m
Tee PVC, 3
Unid
Malla mosquitero verde
m
Alambre galvanizado N 16
kg
Reduccin PVC, 3" - 1
Unid
UPR PVC Adaptador de 1
Unid
Llave de paso de 1
Unid
Tubera PVC SAP, C-7,50, 2 x 5m
m
UPR PVC Adaptador de 2
Unid
Codo PVC, 90 - 2"
Unid
Pegamento OATEY x galn
Unid
Cinta tefln
Unid
Lija N 40
Unid

2.

3.

CANT.
0.300
1.200
40.000
0.250
1.000
1.000
0.500
0.050
1.000
2.000
1.000
8.000
2.000
1.000
0.125
1.000
0.250

MANO DE OBRA
Mano de obra no calificada

Jornal

5.000

EQUIPOS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

1.1.1.2. Instalacin de collarn de captacin de 25 mm * "


N
1.
1.1.

1.2.

DESCRIPCIN

UNID.

MATERIALES E INSUMOS
Caja de concreto de Proteccin
Arena hormign
m
Cemento Portland tipo I / 42,50 kg
Bolsa
Tapa metlica con seguro de 35x35 cm
Unid
Accesorios para instalacin de Collarn
Collarn HDPE de "
Unid
Tubera PVC SAP, C-10, x 5m
m
Codo PVC 45,
unid
Vlvula doble Universal de bola de "
Unid
UPR PVC Adaptador de
Unid
Cinta tefln
Unid

CANT.

0.030
0.110
1.000
1.000
1.000
1.000
1.000
3.000
2.000

Pegamento OATEY x galn


2.

3.

ANALISIS DE COSTOS UNITARIOS


Unid
0.050

MANO DE OBRA
Mano de obra no calificada

Jornal

1.000

EQUIPOS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

1.1.1.3. Instalacin de collarn de captacin de 150 mm * 2"


N
1.
1.1.

1.2.

2.

3.

DESCRIPCIN

UNID.

MATERIALES E INSUMOS
Caja de concreto de Proteccin
Arena hormign
m
Cemento Portland tipo I / 42,50 kg
Bolsa
Tapa metlica con seguro de 35x35 cm
Unid
Accesorios para instalacin de Collarn
Collarn HDPE de 150 mm X 2"
Unid
Tubera PVC SAP, C-7,50, 2 x 5m
m
Codo PVC 45, 2"
unid
Vlvula doble Universal de bola de 2"
Unid
UPR PVC Adaptador de 2
Unid
Cinta tefln
Unid
Pegamento OATEY x galn
Unid

CANT.

0.030
0.110
1.000
1.000
1.000
1.000
1.000
3.000
2.000
0.050

MANO DE OBRA
Mano de obra no calificada

Jornal

1.000

EQUIPOS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

1.1.1.4. Instalacin de collarn de captacin de 200 mm * 1"


N
1.
1.1.

1.2.

DESCRIPCIN

UNID.

MATERIALES E INSUMOS
Caja de concreto de Proteccin
Arena hormign
m
Cemento Portland tipo I / 42,50 kg
Bolsa
Tapa metlica con seguro de 35x35 cm
Unid
Accesorios para instalacin de Collarn
Collarn HDPE de 200 mm X 1"
Unid
Tubera PVC SAP, C-7,50, 1" x 5m
m
Codo PVC 45, 1"
unid
Vlvula doble Universal de bola de 1"
Unid
UPR PVC Adaptador de 1
Unid

CANT.

0.030
0.110
1.000
1.000
1.000
1.000
1.000
3.000

Cinta tefln
Pegamento OATEY x galn
2.

3.

ANALISIS DE COSTOS UNITARIOS


Unid
2.000
Unid
0.050

MANO DE OBRA
Mano de obra no calificada

Jornal

1.000

EQUIPOS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

1.1.1.5. Cmara rompe presin (0,22 - 0,88 l/s) de 0,7*0,7*0,7 m


N
1.

DESCRIPCIN

UNID.

MATERIALES E INSUMOS
Arena hormign
m
Cemento Portland tipo I / 42,50 kg
Bolsa
Fierro corrugado de "
m
Juego de panel reforzado (0,7*0,7*0,7 m3) Unid
Tubera PVC SAP, C-7,50, 3 x 5m
m
Tee PVC, 3
Unid
Malla mosquitero verde
m
Alambre galvanizado N 16
kg
Reduccin PVC, 3" - 1
Unid
Llave de paso de 1"
Unid
UPR PVC Adaptador de 1
Unid
Tubera PVC SAP, C-7,50, 2 x 5m
m
UPR PVC Adaptador de 2
Unid
Codo PVC, 90 - 2"
Unid
Pegamento OATEY x galn
Unid
Cinta tefln
Unid
Lija N 40
Unid

2.

3.

CANT.
0.400
1.600
54.000
0.250
1.000
1.000
0.500
0.050
1.000
1.000
2.000
8.000
2.000
1.000
0.125
1.000
0.250

MANO DE OBRA
Mano de obra no calificada

Jornal

5.000

EQUIPOS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

1.1.1.6. Cmara rompe presin (1,32 - 3,08 l/s) de 1,10*1,10*1,10 m


N
1.

DESCRIPCIN
MATERIALES E INSUMOS
Arena hormign
Cemento Portland tipo I / 42,50 kg
Fierro corrugado de 8 mm
Juego de panel reforzado (1,10*1,10*1,10

UNID.
m
Bolsa
m
Unid

CANT.
0.900
3.600
86.000
0.250

Tubera PVC SAP, C-7,50, 3 x 5m


Tee PVC, 3
Malla mosquitero verde
Alambre galvanizado N 16
Reduccin PVC, 3" - 2
Llave de paso de 2"
UPR PVC Adaptador de 2
Tubera PVC SAP, C-7,50, 2 x 5m
UPR PVC Adaptador de 2
Codo PVC, 90 - 2"
Pegamento OATEY x galn
Cinta tefln
Lija N 40
2.

3.

ANALISIS DE COSTOS UNITARIOS


m
1.000
Unid
1.000
m
0.500
kg
0.050
Unid
1.000
Unid
1.000
Unid
2.000
m
8.000
Unid
2.000
Unid
1.000
Unid
0.125
Unid
1.000
Unid
0.250

MANO DE OBRA
Mano de obra no calificada

Jornal

5.000

EQUIPOS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

1.1.1.7. Cmara rompe presin (5,50 l/s) de 1,50*1,50*1,50 m


N
1.

2.

3.

DESCRIPCIN

UNID.

CANT.

MATERIALES E INSUMOS
Arena hormign
Cemento Portland tipo I / 42,50 kg
Fierro corrugado de
Juego de panel reforzado (1,50*1,50*1,50
Tubera PVC SAP, C-7,50, 3 x 5m
Tee PVC, 3
Malla mosquitero verde
Alambre galvanizado N 16
Reduccin PVC, 3" - 2
Llave de paso de 2"
UPR PVC Adaptador de 2
Tubera PVC SAP, C-7,50, 2 x 5m
UPR PVC Adaptador de 2
Codo PVC, 90 - 2"
Pegamento OATEY x galn
Cinta tefln
Lija N 40

m
Bolsa
m
Unid
m
Unid
m
kg
Unid
Unid
Unid
m
Unid
Unid
Unid
Unid
Unid

1.700
6.800
125.000
0.250
1.000
1.000
0.500
0.050
1.000
1.000
2.000
8.000
2.000
1.000
0.125
1.000
0.250

MANO DE OBRA
Mano de obra no calificada

Jornal

5.000

EQUIPOS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

ANALISIS DE COSTOS UNITARIOS


1.1.1.8. Instalacin de Codo PVC de 45 - 1"
N
1.

2.

3.

DESCRIPCIN

UNID.

CANT.

MATERIALES E INSUMOS
Codo PVC 45, 1
Pegamento OATEY x galn
Lija N 40

Unid
Unid
Unid

1.000
0.010
0.063

MANO DE OBRA
Mano de obra no calificada

Jornal

0.030

EQUIPOS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

1.1.1.9. Instalacin de Codo PVC de 45 - 1"


N
1.

2.

3.

DESCRIPCIN

UNID.

CANT.

MATERIALES E INSUMOS
Codo PVC 45, 1"
Pegamento OATEY x galn
Lija N 40

Unid
Unid
Unid

1.000
0.015
0.060

MANO DE OBRA
Mano de obra no calificada

Jornal

0.030

EQUIPOS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

1.1.1.10.Instalacin de Codo PVC de 45 - 2"


N
1.

2.

3.

DESCRIPCIN

UNID.

CANT.

MATERIALES E INSUMOS
Codo PVC, 45 - 2"
Pegamento OATEY x galn
Lija N 40

Unid
Unid
Unid

1.000
0.020
0.063

MANO DE OBRA
Mano de obra no calificada

Jornal

0.030

EQUIPOS
Herramientas (5,00 % MONC)

0.050

ANALISIS DE COSTOS UNITARIOS


COSTO TOTAL

1.1.1.11.Instalacin de Codo PVC de 45 - 3"


N
1.

2.

3.

DESCRIPCIN

UNID.

CANT.

MATERIALES E INSUMOS
Codo PVC, 45 - 3"
Pegamento OATEY x galn
Lija N 40

Unid
Unid
Unid

1.000
0.025
0.063

MANO DE OBRA
Mano de obra no calificada

Jornal

0.030

EQUIPOS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

1.1.1.12.Instalacin de Codo PVC de 90 - 1"


N
1.

2.

3.

DESCRIPCIN

UNID.

CANT.

MATERIALES E INSUMOS
Codo PVC 90, 1
Pegamento OATEY x galn
Lija N 40

Unid
Unid
Unid

1.000
0.010
0.063

MANO DE OBRA
Mano de obra no calificada

Jornal

0.030

EQUIPOS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

1.1.1.13.Instalacin de Codo PVC de 90 - 1"


N
1.

2.

3.

DESCRIPCIN

UNID.

CANT.

MATERIALES E INSUMOS
Codo PVC 90, 1"
Pegamento OATEY x galn
Lija N 40

Unid
Unid
Unid

1.000
0.015
0.063

MANO DE OBRA
Mano de obra no calificada

Jornal

0.030

EQUIPOS
Herramientas (5,00 % MONC)

0.050

ANALISIS DE COSTOS UNITARIOS


COSTO TOTAL

1.1.1.14.Instalacin de Codo PVC de 90 - 2"


N
1.

2.

3.

DESCRIPCIN

UNID.

CANT.

MATERIALES E INSUMOS
Codo PVC 90, 2
Pegamento OATEY x galn
Lija N 40

Unid
Unid
Unid

1.000
0.020
0.063

MANO DE OBRA
Mano de obra no calificada

Jornal

0.030

EQUIPOS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

1.1.1.15.Instalacin de Tee PVC de 1"


N
1.

2.

3.

DESCRIPCIN

UNID.

CANT.

MATERIALES E INSUMOS
Tee PVC, 1
Pegamento OATEY x galn
Lija N 40

Unid
Unid
Unid

1.000
0.020
0.063

MANO DE OBRA
Mano de obra no calificada

Jornal

0.030

EQUIPOS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

1.1.1.16.Instalacin de Tee PVC de 1"


N
1.

2.

3.

DESCRIPCIN

UNID.

CANT.

MATERIALES E INSUMOS
Tee PVC, 1
Pegamento OATEY x galn
Lija N 40

Unid
Unid
Unid

1.000
0.030
0.063

MANO DE OBRA
Mano de obra no calificada

Jornal

0.030

EQUIPOS

Herramientas (5,00 % MONC)

ANALISIS DE COSTOS UNITARIOS


%
0.050

COSTO TOTAL

1.1.1.17.Instalacin de Tee PVC de 2"


N
1.

2.

3.

DESCRIPCIN

UNID.

CANT.

MATERIALES E INSUMOS
Tee PVC, 2
Pegamento OATEY x galn
Lija N 40

Unid
Unid
Unid

1.000
0.040
0.063

MANO DE OBRA
Mano de obra no calificada

Jornal

0.030

EQUIPOS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

1.1.1.18.Instalacin de Tee PVC de 3"


N
1.

2.

3.

DESCRIPCIN

UNID.

CANT.

MATERIALES E INSUMOS
Tee PVC, 3
Pegamento OATEY x galn
Lija N 40

Unid
Unid
Unid

1.000
0.050
0.063

MANO DE OBRA
Mano de obra no calificada

Jornal

0.030

EQUIPOS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

1.1.1.19.Instalacin de Reduccin PVC de 1" - 1"


N
1.

2.

DESCRIPCIN

UNID.

CANT.

MATERIALES E INSUMOS
Reduccin PVC, 1" - 1
Pegamento OATEY x galn
Lija N 40

Unid
Unid
Unid

1.000
0.030
0.063

MANO DE OBRA
Mano de obra no calificada

Jornal

0.030

ANALISIS DE COSTOS UNITARIOS


3.

EQUIPOS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

1.1.1.20.Instalacin de Reduccin PVC de 2" - 1"


N
1.

2.

3.

DESCRIPCIN

UNID.

CANT.

MATERIALES E INSUMOS
Reduccin PVC, 2" - 1"
Pegamento OATEY x galn
Lija N 40

Unid
Unid
Unid

1.000
0.050
0.063

MANO DE OBRA
Mano de obra no calificada

Jornal

0.030

EQUIPOS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

1.1.1.21.Instalacin de Reduccin PVC de 2" - 1"


N
1.

2.

3.

DESCRIPCIN

UNID.

CANT.

MATERIALES E INSUMOS
Reduccin PVC, 2" - 1"
Pegamento OATEY x galn
Lija N 40

Unid
Unid
Unid

1.000
0.050
0.063

MANO DE OBRA
Mano de obra no calificada

Jornal

0.030

EQUIPOS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

1.1.1.22.Instalacin de Reduccin PVC de 3" - 2"


N
1.

2.

DESCRIPCIN

UNID.

CANT.

MATERIALES E INSUMOS
Reduccin PVC, 3" - 2
Pegamento OATEY x galn
Lija N 40

Unid
Unid
Unid

1.000
0.060
0.063

MANO DE OBRA
Mano de obra no calificada

Jornal

0.030

ANALISIS DE COSTOS UNITARIOS


3.

EQUIPOS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

1.1.1.23.Instalacin de Llave de paso de 1"


N
1.

2.

3.

DESCRIPCIN

UNID.

CANT.

MATERIALES E INSUMOS
Llave de paso de 1"
UPR PVC Adaptador de 1
Pegamento OATEY x galn
Lija N 40

Unid
Unid
Unid
Unid

1.000
2.000
0.020
0.063

MANO DE OBRA
Mano de obra no calificada

Jornal

0.030

EQUIPOS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

1.1.1.24.Instalacin de Llave de paso de 1"


N
1.

2.

3.

DESCRIPCIN

UNID.

CANT.

MATERIALES E INSUMOS
Llave de paso de 1"
UPR PVC Adaptador de 1
Pegamento OATEY x galn
Lija N 40

Unid
Unid
Unid
Unid

1.000
2.000
0.030
0.063

MANO DE OBRA
Mano de obra no calificada

Jornal

0.030

EQUIPOS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

1.1.1.25.Instalacin de Llave de paso de 2"


N
1.

DESCRIPCIN
MATERIALES E INSUMOS
Llave de paso de 2"
UPR PVC Adaptador de 2
Pegamento OATEY x galn

UNID.
Unid
Unid
Unid

CANT.
1.000
2.000
0.040

ANALISIS DE COSTOS UNITARIOS


Unid
0.063

Lija N 40
2.

3.

MANO DE OBRA
Mano de obra no calificada

Jornal

0.030

EQUIPOS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

1.1.1.26.Construccin de Caja de llave de paso


N
1.

2.

3.

DESCRIPCIN

UNID.

CANT.

MATERIALES E INSUMOS
Arena hormign
Cemento Portland tipo I / 42,50 kg
Tapa metlica con seguro de 35x35 cm

m
Bolsa
Unid

0.030
0.120
1.000

MANO DE OBRA
Mano de obra no calificada

Jornal

0.030

EQUIPOS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

1.1.1.27.Instalacin de collarines para hidrantes de 25 mm * "


N
1.
1.1.

1.2.

2.

3.

DESCRIPCIN

UNID.

MATERIALES E INSUMOS
Caja de concreto de Proteccin
Arena hormign
m
Cemento Portland tipo I / 42,50 kg
Bolsa
Tapa metlica con seguro de 35x35 cm
Unid
Accesorios para instalacin del hidrante
Collarn HDPE de 25 mm X "
Unid
Niple de "
Unid
Llave de paso de "
Unid
Vlvula de acople rpido de "
Unid
Cinta tefln
Unid
Pegamento OATEY x galn
Unid

CANT.

0.030
0.110
1.000
1.000
1.000
1.000
1.000
2.000
0.050

MANO DE OBRA
Mano de obra no calificada

Jornal

1.000

EQUIPOS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

ANALISIS DE COSTOS UNITARIOS


1.1.1.28.Instalacin de collarines para hidrantes de 38 mm * "
N
1.
1.1.

1.2.

2.

3.

DESCRIPCIN

UNID.

MATERIALES E INSUMOS
Caja de concreto de Proteccin
Arena hormign
m
Cemento Portland tipo I / 42,50 kg
Bolsa
Tapa metlica con seguro de 35x35 cm
Unid
Accesorios para instalacin de Collarn
Collarn HDPE de 38 mm X "
Unid
Niple de "
Unid
Llave de paso de "
Unid
Vlvula de acople rpido de "
Unid
Cinta tefln
Unid
Pegamento OATEY x galn
Unid

CANT.

0.030
0.110
1.000
1.000
1.000
1.000
1.000
2.000
0.050

MANO DE OBRA
Mano de obra no calificada

Jornal

1.000

EQUIPOS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

1.1.1.29.Instalacin de collarines para hidrantes de 50 mm * "


N
1.
1.1.

1.2.

2.

3.

DESCRIPCIN

UNID.

MATERIALES E INSUMOS
Caja de concreto de Proteccin
Arena hormign
m
Cemento Portland tipo I / 42,50 kg
Bolsa
Tapa metlica con seguro de 35x35 cm
Unid
Accesorios para instalacin de Collarn
Collarn HDPE de 50 mm X "
Unid
Niple de "
Unid
Llave de paso de "
Unid
Vlvula de acople rpido de "
Unid
Cinta tefln
Unid
Pegamento OATEY x galn
Unid

CANT.

0.030
0.110
1.000
1.000
1.000
1.000
1.000
2.000
0.050

MANO DE OBRA
Mano de obra no calificada

Jornal

1.000

EQUIPOS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

ANALISIS DE COSTOS UNITARIOS


1.1.1.30.Instalacin de collarines para hidrantes de 75 mm * "
N
1.
1.1.

1.2.

2.

3.

DESCRIPCIN

UNID.

MATERIALES E INSUMOS
Caja de concreto de Proteccin
Arena hormign
m
Cemento Portland tipo I / 42,50 kg
Bolsa
Tapa metlica con seguro de 35x35 cm
Unid
Accesorios para instalacin de Collarn
Collarn HDPE de 75 mm X "
Unid
Niple de "
Unid
Llave de paso de "
Unid
Vlvula de acople rpido de "
Unid
Cinta tefln
Unid
Pegamento OATEY x galn
Unid

CANT.

0.030
0.110
1.000
1.000
1.000
1.000
1.000
2.000
0.050

MANO DE OBRA
Mano de obra no calificada

Jornal

1.000

EQUIPOS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

1.1.1.31.Instalacin de Tubera PVC SAP C-10, ="


N
1.

2.

3.

DESCRIPCIN

UNID.

CANT.

MATERIALES E INSUMOS
Tubera PVC SAP, C-10, 1 x 5m
Pegamento OATEY x galn
Sierra metlica
Lija N 40

m
Unid
Unid
Unid

1.000
0.005
0.002
0.008

MANO DE OBRA
Mano de obra no calificada

Jornal

0.100

EQUIPOS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

1.1.1.32.Instalacin de Tubera PVC SAP C-10, =1"


N
1.

DESCRIPCIN
MATERIALES E INSUMOS
Tubera PVC SAP, C-10, 1 x 5m
Pegamento OATEY x galn

UNID.
m
Unid

CANT.
1.000
0.005

Sierra metlica
Lija N 40
2.

3.

ANALISIS DE COSTOS UNITARIOS


Unid
0.002
Unid
0.008

MANO DE OBRA
Mano de obra no calificada

Jornal

0.100

EQUIPOS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

1.1.1.33.Instalacin de Tubera PVC SAP C-7.5, =1"


N
1.

2.

3.

DESCRIPCIN

UNID.

CANT.

MATERIALES E INSUMOS
Tubera PVC SAP, C-7,50, 1" x 5m
Pegamento OATEY x galn
Sierra metlica
Lija N 40

m
Unid
Unid
Unid

1.000
0.008
0.002
0.008

MANO DE OBRA
Mano de obra no calificada

Jornal

0.100

EQUIPOS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

1.1.1.34.Instalacin de Tubera PVC SAP C-7.5, =2"


N
1.

2.

3.

DESCRIPCIN

UNID.

CANT.

MATERIALES E INSUMOS
Tubera PVC SAP, C-7,50, 2 x 5m
Pegamento OATEY x galn
Sierra metlica
Lija N 40

m
Unid
Unid
Unid

1.000
0.010
0.003
0.008

MANO DE OBRA
Mano de obra no calificada

Jornal

0.100

EQUIPOS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

1.1.1.35.Instalacin de Tubera PVC SAP C-7.5, =3"


N

DESCRIPCIN

UNID.

CANT.

N
1.

2.

3.

DESCRIPCIN

ANALISIS DE COSTOS UNITARIOS


UNID.
CANT.

MATERIALES E INSUMOS
Tubera PVC SAP, C-7,50, 3 x 5m
Pegamento OATEY x galn
Sierra metlica
Lija N 40

m
Unid
Unid
Unid

1.000
0.010
0.003
0.008

MANO DE OBRA
Mano de obra no calificada

Jornal

0.100

EQUIPOS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

ANALISIS DE COSTOS UNITARIOS


1.1.1.36.Instalacin de sistema mvil
N
1.

DESCRIPCIN

UNID.

MATERIALES
Llave bayoneta de
Unid
Codo HDPE de 25 mm x R/H
Unid
Manguera PEDB de 25 mm, C-4
m
Niple PVC de x 1,20 m (Elevador)
Unid
Unin roscada HDPE de
Unid
Aspersor VYR 60 - " / sectorial (bronce) Unid
Trpode metal x 1,10 m c/abraz. A presin
Unid
Cinta tefln
Unid

2.

3.

CANT.
1.000
2.000
50.000
1.000
1.000
1.000
1.000
1.000

MANO DE OBRA
Mano de obra no calificada

Jornal

0.250

EQUIPOS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

1.1.2. Produc. de actividades agropec. orientas al Mcdo.


1.1.2.1. Huerto fijo de hortalizas a campo abierto
1.1.2.1.1Produccin de zanahoria
VARIEDAD
"Senimis"
NIVEL TECNICO
Baja
RDTO (kg/ha)
7,500.00
PRECIO (S/./kg)
0.50
N
1.

2.

3.

DESCRIPCIN

UNID.

INSUMOS
Semillas de Zanahoria
Guano de corral

kg
Saco

MANO DE OBRA
Preparacin de terreno
Siembra
Labores culturales
Riegos
Cosecha

Jornal
Jornal
Jornal
Jornal
Jornal

HERRAMIENTAS
Herramientas (5,00 % MONC)

CANT.
4.000
200.000

15.000
12.000
24.000
8.000
15.000

0.050

COSTO TOTAL

1.1.2.1.2Produccin de cebolla
VARIEDAD
NIVEL TECNICO
RDTO (kg/ha)

"Roja Arequipea"
Baja
11,000.00

PRECIO (S/./kg)
N
1.

2.

3.

ANALISIS DE COSTOS UNITARIOS


1.50

DESCRIPCIN

UNID.

INSUMOS
Semillas de cebolla
Guano de corral

kg
Saco

MANO DE OBRA
Preparacin de terreno
Siembra
Labores culturales
Riegos
Cosecha

Jornal
Jornal
Jornal
Jornal
Jornal

HERRAMIENTAS
Herramientas (5,00 % MONC)

CANT.
4.000
200.000

8.000
10.000
10.000
8.000
10.000

0.050

COSTO TOTAL

1.1.2.1.3Produccin de betarraga
VARIEDAD
NIVEL TECNICO
RDTO (kg/ha)
PRECIO (S/./kg)
N
1.

2.

3.

"Viroflay"
Baja
6,500.00
0.60

DESCRIPCIN

UNID.

INSUMOS
Semillas de betarraga
Guano de corral

kg
Saco

MANO DE OBRA
Preparacin de terreno
Siembra
Labores culturales
Riegos
Cosecha

Jornal
Jornal
Jornal
Jornal
Jornal

HERRAMIENTAS
Herramientas (5% M.O.)

CANT.
12.000
200.000

8.000
8.000
8.000
8.000
10.000

0.050

COSTO TOTAL

1.1.2.1.4Produccin de coliflor
VARIEDAD
NIVEL TECNICO
RDTO (kg/ha)
PRECIO (S/./kg)
N
1.

DESCRIPCIN
INSUMOS
Semillas de coliflor

"Snowball"
Baja
6,000.00
1.00
UNID.
kg

CANT.
2.500

Guano de corral
2.

3.

ANALISIS DE COSTOS UNITARIOS


Saco
200.000

MANO DE OBRA
Preparacin de terreno
Siembra
Labores culturales
Riegos
Cosecha

Jornal
Jornal
Jornal
Jornal
Jornal

HERRAMIENTAS
Herramientas (5% M.O.)

8.000
8.000
8.000
8.000
10.000

0.050

COSTO TOTAL

1.1.2.1.5Produccin de acelga
VARIEDAD
NIVEL TECNICO
RDTO (kg/ha)
PRECIO (S/./kg)
N
1.

2.

3.

"Blanca Lucullus"
Baja
5,000.00
0.70

DESCRIPCIN

UNID.

INSUMOS
Semillas de acelga
Guano de corral

kg
Saco

MANO DE OBRA
Preparacin de terreno
Siembra
Labores culturales
Riegos
Cosecha

Jornal
Jornal
Jornal
Jornal
Jornal

HERRAMIENTAS
Herramientas (5,00 % MONC)

CANT.
5.000
200.000

15.000
12.000
24.000
8.000
15.000

0.050

COSTO TOTAL

1.1.2.2. Parcela de pastos asociados


1.1.2.2.1Parcela produccin de alfalfa
VARIEDAD
NIVEL TECNICO
RDTO (kg/ha)
PRECIO (S/./kg)
N
1.

2.

DESCRIPCIN

Super Alabama 550 PL


Baja
60,000.00
0.25
UNID.

INSUMOS
Semilla de Alfalfa Super Alabama 550 PL
Guano de corral

kg
Saco

MANO DE OBRA
Preparacin de terreno

Jornal

CANT.
25.000
200.000

35.000

Siembra
Labores culturales
Riegos
Cosecha
3.

HERRAMIENTAS
Herramientas (5,00 % MONC)

ANALISIS DE COSTOS UNITARIOS


Jornal
28.000
Jornal
35.000
Jornal
10.000
Jornal
35.000

0.050

COSTO TOTAL

1.1.2.3. Miniparcelas para la produccin granos andinos


1.1.2.3.1Produccin de quinua
VARIEDAD
Media
NIVEL TECNICO
1,800.00
RDTO (kg/ha)
3.50
PRECIO (S/./kg)
N
1.

2.

3.

4.

DESCRIPCIN
MANO DE OBRA
1.1. PREPARACION DEL TERRENO
Limpieza de terreno
1.2. SIEMBRA
Aplicacin del primer abonamiento
Siembra chorro continuo por surcos
Tapado de semilla
Riego de machaco y remojo
1.3. LABORES CULTURALES
Primer deshierbe y aporque
Segundo abonamiento
Segundo aporque
Segundo deshierbo
1.4. COSECHA
Corte
Traslado, amontonado y secado
Trillado
Venteo
Ensacado y cocido
Almacenamiento
TRACCION ANIMAL
2.1. PREPARACION DEL TERRENO
Barbecho o Arado o roturacin
Cruza o desterronado
Surcado
INSUMOS
3.1. SEMILLA
Semilla de quinua
3.2. FERTILIZANTES
Guano de corral
HERRAMIENTAS

UNID.

CANT.

Jornal

2.000

Jornal
Jornal
Jornal
Jornal

4.000
4.000
2.000
2.000

Jornal
Jornal
Jornal
Jornal

20.000
4.000
15.000
5.000

Jornal
Jornal
Jornal
Jornal
Jornal
Jornal

15.000
5.000
14.000
4.000
2.000
2.000

Yunta
Yunta
Yunta

5.000
4.000
2.000

kg
Saco

15.000
130.000

Herramientas (5,00 % MONC)

ANALISIS DE COSTOS UNITARIOS


%
0.050

COSTO TOTAL

1.1.2.3.2Produccin de papa blanca


VARIEDAD
NIVEL TECNICO
RDTO (kg/ha)
PRECIO (S/./kg)
N
1.

2.

3.

4.

Canchn
Media
26,000.00
0.60

DESCRIPCIN
MANO DE OBRA
1.1. PREPARACION DEL TERRENO
Limpieza y quema de rastrojo
Riego de remojo o machaco
1.2. SIEMBRA
Reseleccion de semilla
Mezcla y abonamiento
Distribucion de semillas
1.3. LABORES CULTURALES
Primer aporque
Segundo aporque
1.4. COSECHA
Escarbe de surcos
Recojo manual
Traslado y amontonamiento
Seleccin y clasificacion
Ensacado y cosido
Almacenado
TRACCION ANIMAL
2.1. PREPARACION DEL TERRENO
Barbecho o Arado o roturacion
Cruza o desterronado
2.2. SIEMBRA
Surqueo o melgueo
Tapado de semilla
INSUMOS
3.1. SEMILLA
Semilla de papa
3.2. FERTILIZANTES
Guano de corral
HERRAMIENTAS
Herramientas (5,00 % MONC)

UNID.

CANT.

Jornal
Jornal

1.000
1.000

Jornal
Jornal
Jornal

2.000
3.000
8.000

Jornal
Jornal

15.000
15.000

Jornal
Jornal
Jornal
Jornal
Jornal
Jornal

25.000
20.000
9.000
15.000
5.000
5.000

Yunta
Yunta

5.000
3.000

Yunta
Yunta

1.000
1.000

kg

1,500.000

Saco

COSTO TOTAL

1.1.2.3.3Produccin de frejol canario


VARIEDAD

Frejol canario

150.000

0.050

NIVEL TECNICO
RDTO (kg/ha)
PRECIO (S/./kg)
N
1.

DESCRIPCIN
MANO DE OBRA
1.1. PREPARACION DEL TERRENO
Limpieza de terreno
1.2. SIEMBRA
Reseleccin y desinfeccin
Mezcla y primer abonamiento
Distribucin de semilla
1.3. LABORES CULTURALES
Primer deshierbe a mano
Primer control fitosanitario
Primer aporque
Segundo control fitosanitario
1.4. COSECHA
Corte o siega
Traslado, amontonado
Trilla
Despaje y venteo
Ensacado y cosido
Almacenamiento

2.

TRACCION ANIMAL
2.1. PREPARACION DEL TERRENO
Barbecho o Arado o roturacin
Cruza o desterronado
2.2. SIEMBRA
Surcado
Tapado de semilla

3.

INSUMOS
3.1. SEMILLA
Semilla de frejol canario
3.2. FERTILIZANTES
Guano de corral

4.

ANALISIS DE COSTOS UNITARIOS


Media
800.00
3.00

HERRAMIENTAS
Herramientas (5,00 % MONC)

UNID.

CANT.

Jornal

2.000

Jornal
Jornal
Jornal

1.000
2.000
3.000

Jornal
Jornal
Jornal
Jornal

8.000
2.000
16.000
2.000

Jornal
Jornal
Jornal
Jornal
Jornal
Jornal

8.000
6.000
8.000
2.000
2.000
2.000

Yunta
Yunta

4.000
2.000

Yunta
Yunta

2.000
2.000

kg
Saco

60.000
140.000

0.050

COSTO TOTAL

1.1.2.3.4Produccin de arveja
VARIEDAD
NIVEL TECNICO
RDTO (kg/ha)
PRECIO (S/./kg)
N
1.

DESCRIPCIN
MANO DE OBRA

Blanca
Medio
2,000.00
1.40

UNID.

CANT.

ANALISIS DE COSTOS UNITARIOS


1.1. PREPARACION DEL TERRENO
Limpieza de terreno
1.2. SIEMBRA
Reselec. Y desinfeccin de semilla
Mezcla y primer abonamiento
Distribucin de semilla
1.3. LABORES CULTURALES
Primer deshierbe a mano
Primer aporque
1.4. COSECHA
Corte a mano con hoz
Traslado de gavilla a la era
Trilla con garrote
Venteo
Ensacado y cocido
Traslado y almacenamiento

2.

Jornal

1.000

Jornal
Jornal
Jornal

1.000
2.000
3.000

Jornal
Jornal

8.000
16.000

Jornal
Jornal
Jornal
Jornal
Jornal
Jornal

8.000
4.000
8.000
2.000
2.000
2.000

Yunta
Yunta

4.000
2.000

Yunta
Yunta

2.000
2.000

TRACCION ANIMAL
2.1. PREPARACION DEL TERRENO
Barbecho o Arado o roturacin
Cruza o desterronado o Rastra
1.2. SIEMBRA
Surcado
Tapado de semilla

3.

INSUMOS
3.1. SEMILLA
Semilla de arveja
3.2. FERTILIZANTES
Guano de corral

4.

kg

60.000

Saco

120.000

HERRAMIENTAS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

1.1.2.4. Agroforestera
N
1.

2.

3.

DESCRIPCIN

UNID.

CANT.

MATERIALES
Plantones de pino

Unid.

20.000

MANO DE OBRA
Mano de obra no calificada

Jornal

2.000

HERRAMIENTAS
Herramientas (5,00 % MONC)

0.050

TOTAL COSTOS DIRECTOS (S/.)

ANALISIS DE COSTOS UNITARIOS


1.1.2.5. Mdulo de produccin de abono orgnico - compost
produc. = 20 sacos/familia - sacos=S/. 15,00
N
1.

DESCRIPCIN

UNID.

MANO DE OBRA
1.1. PREPARACION DE LA POZA
Perforacion de 02 pozas (1 x 8 x 0,5 m)
Jornal
1.2. RECOLECCION DE MALEZAS Y GUANO CORRAL
Recoleccin de malezas (mala hierba etc.) Jornal
Recoleccin de guano (fresco y/o seco)
Jornal
1.3. LABORES CULTURALES
Secado de malezas
Jornal
Mezcla de malezas y guano
Jornal
Primera inundacin de la poza
Jornal
Primer volteo de la mezcla
Jornal
Segunda inundacin de la mezcla
Jornal
Segundo volteo de la mezcla
Jornal
1.4. OBTENCION DEL COMPOST
Remocin del compost
Jornal
Ensacado del compost
Jornal

2.

3.

CANT.

1.000
1.000
1.000
0.300
0.300
0.300
0.300
0.300
0.300
0.300
0.300

INSUMOS
2.1. MALLA ARPILLERA
Malla arpillera
Ceniza
Rollizos de eucalipto =2 x 2,20 m

m
kg
Unid

5.000
6.000
2.000

HERRAMIENTAS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

1.1.2.6. Mdulo de crianza de gallinas


N

DESCRIPCIN

UNID.

CANT.

1.

IMPLEMENTACIN DE JAULAS Y COMPRA DE POLLOS


Malla gallinero
m
4.000
Instalaciones (construccin de jaulas)
Gbl
1.000
Alambre negro N 16
kg
1.500
Clavos de 4
kg
0.500
Gallinas criollas de doble propsito
Unid
4.000

2.

ALIMENTO DE GALLINAS
Alimento balanceado

3.

4.

kg

4.000

BOTIQUN VETERINARIO
Antibitico (Biomycin Sper x 20 g)
Unid
Antiparasitario ext. (Fipecto Frasco de 1,00Fco.

0.500
0.020

TRANSPORTE
Transporte semovientes

4.000

Cbza

ANALISIS DE COSTOS UNITARIOS


5.

5.

MANO DE OBRA
Mano de obra no calificada

Jornal

1.000

HERRAMIENTAS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

1.1.2.7. Mdulo de crianza de cuyes


N
1.

2.

3.

4.

5.

6.

DESCRIPCIN

UNID.

CANT.

IMPLEMENTACIN DE POZAS
Rollizos de eucalipto =2 x 2,20 m
Malla gallinero
Clavos de 2
Clavos de 4

Unid
m
kg
kg

5.000
4.000
0.500
0.500

AQUISICIN DE REPRODUCTORES
Cuyes reproductores (macho)
Cuyes reproductores (hembras)

Unid
Unid

1.000
8.000

BOTIQUN VETERINARIO
Tintura de Yodo al 2% x 1,00 l
Fco.
Algodn paquete de 50,00 g
Pqte.
Antibitico (Enropro al 20% - Frasco de 0,50
Fco.
Antiparasitario ext. (Fipecto Frasco de 1,00Fco.

0.015
1.000
0.020
0.010

TRANSPORTE
Transporte semovientes

Cbza

9.000

MANO DE OBRA
Mano de obra no calificada

Jornal

1.000

HERRAMIENTAS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

1.2.
1.2.1.
N
1.

Materiales de Capacitacin para las tecnologas


Materiales de capacitacin para las tecnologas
DESCRIPCIN
MATERIALES E INSUMOS
Cuaderno de 100 hojas T-A4
Lapiceros punta fina
Papelgrafo cuadriculado
Plumones para papel N 47
Manual en riego (15 hojas /manual)

UNID.
Unid
Unid
Ciento
Unid
Unid

CANT.
110.000
220.000
3.600
216.000
115.000

ANALISIS DE COSTOS UNITARIOS


Manual en produccin agrcola y pecuaria Unid
115.000
Manual en cocinas mejoradas y agua segurUnid
115.000
COSTO TOTAL

1.3.
1.3.1.
N

Capacitacin de campesino a campesino


Contratacin de Yachachiq (primer ao)
DESCRIPCIN

1.

MATERIALES E INSUMOS

2.

MANO DE OBRA CALIFICADA


Contratacin de Yachachiq (3 Yachachiq)

UNID.

Honorar.

CANT.

3.000

COSTO TOTAL

1.3.2.
N

Contratacin de Yachachiq (segundo ao)


DESCRIPCIN

1.

MATERIALES E INSUMOS

2.

MANO DE OBRA CALIFICADA


Contratacin de Yachachiq (1 Yachachiq)

UNID.

Honorar.

CANT.

1.000

COSTO TOTAL

1.3.3.
N

Contratacin de Yachachiq (tercer ao)


DESCRIPCIN

1.

MATERIALES E INSUMOS

2.

MANO DE OBRA CALIFICADA


Contratacin de Yachachiq (1 Yachachiq)

UNID.

Honorar.

CANT.

1.000

COSTO TOTAL

1.4.
1.4.1.
N
1.

Seguro bsico de Yachachiq


Seguro bsico de Yachachiq (primer ao)
DESCRIPCIN
MATERIALES E INSUMOS
Seguro de Yachachiq
COSTO TOTAL

UNID.
Seguro

CANT.
3.000

ANALISIS DE COSTOS UNITARIOS


1.4.2.
N
1.

Seguro bsico de Yachachiq (segundo y tercer ao)


DESCRIPCIN
MATERIALES E INSUMOS
Seguro de Yachachiq

UNID.

CANT.

Seguro

1.000

COSTO TOTAL

1.5.
1.5.1.
N
1.

Movilidad de Yachachiq
Movilidad de Yachachiq para capacitacin (primer ao)
DESCRIPCIN

UNID.

CANT.

MATERIALES E INSUMOS
Movilidad Yachachiq para capacitacin (3 YMovil.

3.000

COSTO TOTAL

1.5.2.
N
1.

Movilidad de Yachachiq para capacitacin (2do. Y 3er ao)


DESCRIPCIN

UNID.

MATERIALES E INSUMOS
Movilidad Yachachiq para capacitacin (1 YMovil.

CANT.
1.000

COSTO TOTAL

1.6.
1.6.1.
N
1.

Concursos entre Ncleos Ejecutores - NE


Concursos en la aplicacin y mejora de tecnologas
DESCRIPCIN
MATERIALES E INSUMOS
Premios Primer Puesto
Premios Segundo Puesto

UNID.
Premio
Premio

CANT.
1.000
1.000

COSTO TOTAL

1.7.
1.7.1.
N
1.

Participacin en Ferias Locales


Participacin en Ferias Locales
DESCRIPCIN
MATERIALES E INSUMOS
Banner 0,80 x 1,20 m
Trpticos
Malla arpillera

UNID.
Unid
Millar
m

CANT.
1.000
1.000
100.000

ANALISIS DE COSTOS UNITARIOS


2.

3.

MOVILIDAD
Movilidad de participantes

Pasaje

188.000

ALIMENTACIN
Alimentacin de participantes

Racin

94.000

COSTO TOTAL

1.8.
1.8.1.
N
1.

2.

3.

Pasantas Yachachiq
Pasantas Yachachiq
DESCRIPCIN

UNID.

CANT.

MOVILIDAD
Movilidad de Chungui - Vinchos (viceversa)Pasaje
Movilidad local
Da

3.000
2.000

ALIMENTACIN
Alimentacin pasantes

Da

3.000

ALOJAMIENTO
Alojamiento de pasantes

Noche

2.000

COSTO TOTAL

2.
2.1.
N
1.
1.1.

1.2.

1.3.

1.4.

Implementacin y mejora de la vivienda saludable


Instalacin de cocina mejorada
DESCRIPCIN

UNID.

MATERIALES E INSUMOS
Cmara de combustin
Ladrillos de pared (artesanal)
Unid
Alambre negro N 16
kg
Fierro corrugado x (rejilla cenicero)
m
Construccin de la losa y hornillas
Cemento Portland tipo I / 42,50 kg
Bolsa
Malla electrosoldada de
m
Arena de asentar
m
Fierro corrugado de
m
Construccin de la chimenea
Ladrillos de pared (artesanal)
Unid
Alambre negro N 08
kg
Chimenea de =0,12 x 1,20 m x 0,60 mm Unid
Sombrero capucha 0,18 x 07,00 cm con peUnid
Otros materiales
Fibraforte transparente de 1,80 x 0,80 x Unid
Adobe
Unid
Ceniza
kg
Arena fina
m

CANT.

20.000
0.040
3.000
0.180
0.500
0.020
2.000
40.000
0.020
1.000
1.000
1.000
40.000
60.000
0.080

Tierra de chacra
2.

3.

ANALISIS DE COSTOS UNITARIOS


m
0.080

MANO DE OBRA
Construccin de la cocina

Jornal

1.500

HERRAMIENTAS
Herramientas (5,00 % MONC)

0.050

COSTO TOTAL

2.2.
2.2.1.
2.2.2.

Capacitacin en prcticas adecuadas mejora de vivienda, salud y nutricin familiar


Capacitacin en prcticas adecuadas de mejora de vivienda
Capacitacin en salud y nutricin familiar

2.3.

Agua segura

N
1.

DESCRIPCIN
MATERIALES
Balde con cao x 12 litros
Vaso de vidrio x 7 onz

UNID.
Unidad
Unidad

CANT.
1.000
3.000

COSTO TOTAL

3.
3.1.
N

Promocin de Negocios Rurales Inclusivos


Asistencia tcnica para articulacin al mercado
DESCRIPCIN

1.

MATERIALES E INSUMOS

2.

MANO DE OBRA CALIFICADA


Asistente Tcnico articulador

UNID.

Evento

CANT.

1.000

COSTO TOTAL

3.2.
N
1.

Concursos de Planes de negocios 3/.


DESCRIPCIN
MATERIALES E INSUMOS
Premio a la idea del negocio ganador

UNID.
Premio

CANT.
1.000

COSTO TOTAL

4.
4.1.
N

Fomento de capacidades financieras


Promocin, convocatoria y concursos
DESCRIPCIN

UNID.

CANT.

N
1.

DESCRIPCIN

ANALISIS DE COSTOS UNITARIOS


UNID.
CANT.

MATERIALES E INSUMOS
Convocatorias
Movilidad para convocatoria

Unid
Glb

94.000
1.000

COSTO TOTAL

4.2.

Materiales de capacitacin

N
1.
1.1.

DESCRIPCIN

UNID.

MATERIALES E INSUMOS
Para el desarrollo del mdulo con los
usuarios

Incentivos para concursos (15 usuarios del NE)


Glb
Edicin de video (durac. 15 min)- temas central moduUnid
Edicin e impresin de guas de mdulo para yachahUnid
Edicin e impresin de guas de mdulo para lderes Unid
Edicin e impresin de cuadernos de mdulos para uUnid
Papel craf
Unid
Papelgrafo cuadriculado
Ciento
Plumones para pizarra acrlica
Unid
Cartulinas de colores ecolgicos
Unid
Cuadernos A-5 (para notas de usuarios)
Unid
Cuadernos A-4 (para actas del grupo)
Unid
Lapiceros
Unid
Papel bond A-4
Millar
Chinchotes
Caja
Clavos de cemento de 2"
Docena

1.2.

1.670
10.000
10.000
10.000
10.000
0.170
0.330
0.330
0.330
0.330
0.670
0.330
0.330
0.330
0.330

Equipos
Linterna

COSTO TOTAL

4.3.

15.000
6.000
10.000
6.000
5.000
192.000
2.000
64.000
128.000
94.000
3.000
94.000
3.000
6.000
6.000

Para el uso del facilitador financiero


Edicin e impresin de guas de mdulos para facilit.Unid
Diseo de lminas
Unid
Servicios de arte grfico
Unid
Impresin de lminas plastificadas A-3
Unid
Impresin de lminas plastificadas 8x30 cm
Unid
Impresin de billetes y monedas plastificadas
Millar
Banner para recepcin de imagen (con ojales) 2x1,5 Unid
Banner en blanco de 2x1,20 m (con ojales)
Unid
Banner (con imp. De logotipo y nombre del Pyto.) 2, Unid
Pasador o cuerda sinttica (grosor 50 mm)
Unid
Ganchos de plstico
Docena
Puntero graduable
Unid
Tijeras punta roma medianas
Unid
Cuchilla corta papel (cutter)
Unid
Maletn porta meteriales
Unid

1.3.

CANT.

Honorarios facilitador financiero

Unid

0.330

ANALISIS DE COSTOS UNITARIOS


N

DESCRIPCIN

1.

MATERIALES E INSUMOS

2.

MANO DE OBRA CALIFICADA


Facilitador financiero

UNID.

CANT.

Honorar.

1.000

COSTO TOTAL

4.4.
N

Honorarios yachachiq financiero


DESCRIPCIN

1.

MATERIALES E INSUMOS

2.

MANO DE OBRA CALIFICADA


Yachachiq financiero

UNID.

CANT.

Honorar.

1.000

COSTO TOTAL

4.5.
N
1.

Viticos y apoyo logstico facilitador financiero


DESCRIPCIN

UNID.

CANT.

MATERIALES E INSUMOS
Combustible - facilitador financiero
Gln
Viticos facilitador (hospedaje, alimentacin y pasajeDa

2.

10.000
1.250

MANO DE OBRA CALIFICADA


COSTO TOTAL

B.
1.
1.1.
N

COSTO INDIRECTO
Gastos Generales del Ncleo Ejecutor Central - NEC
Movillidad del Presidente y Tesorero del NEC
DESCRIPCIN

1.

MATERIALES Y EQUIPOS

2.

MOVILIDAD DEL NEC


Movilidad del Presidente y Tesorero del NEC

UNID.

Mes

CANT.

1.000

COSTO TOTAL

1.2.
N

Pago de revisor de cuentas


DESCRIPCIN

UNID.

CANT.

ANALISIS DE COSTOS UNITARIOS


1.

MATERIALES E INSUMOS

2.

MANO DE OBRA CALIFICADA


Revisor

Honorar.

1.000

COSTO TOTAL

1.3.
N
1.

Cartel del NE e implementacin del NEC


DESCRIPCIN

UNID.

CANT.

MATERIALES Y EQUIPOS
Cartel de obra
Adquisicin de muebles de cmputo con silla
Adquisicn de mesa de trabajo
Adquiscin de sillas de plstico
Engrapador + grapas
Perforador de papel
Cuchillas corta papel
Goma de papel
Cuaderno de Obra
Lapiceros de colores
Regla de 30 cm
Pizarra acrlica
Mota para pizarra acrlica
Tijeras

Unid
Unid
Unid
Docena
Unid
Unid
Unid
l
Unid
Caja
Unid
Unid
Unid
Unid

1.000
0.500
0.330
0.500
0.500
0.500
3.000
0.500
2.000
1.000
3.000
1.000
1.000
3.000

COSTO TOTAL

1.4.
N

Gastos Bancarios del NEC


DESCRIPCIN

1.

MATERIALES Y EQUIPOS

2.

GASTOS BANCARIOS
Gastos bancarios del NEC

UNID.

Mes

CANT.

1.000

COSTO TOTAL

1.5.
N
1.

Otros gastos del NEC (materiales, servicios)


DESCRIPCIN

CANT.

EQUIPO DE COMPUTO
Alquiler de computadoras con impresora

2.

UNID.
Unid

0.333

Unid
Millar

0.500
2.000

TILES DE ESCRITORIO E INSUMOS


Tner de la impresora
Papel bond A-4

ANALISIS DE COSTOS UNITARIOS


Folder manila A-4 con fstener
Papelgrafos
Plumones para pizarra acrlica

Plumones para papel N 47


3.

Ciento
Ciento
Unid
Unid

0.500
0.333
3.000
6.000

Mes
Mes
Mes

0.333
0.333
0.333

ALQUILER DE OFICINA Y SERVICIOS


Alquiler de oficina
Servicio de energa
Servicio de agua potable

COSTO TOTAL

2.
2.1.

Gastos de elaboracin de expediente tcnico


Elaboracin de expediente tcnico

DESCRIPCIN

1.

MATERIALES E INSUMOS

2.

MANO DE OBRA CALIFICADA


Proyectista

UNID.

Exp. Tco.

CANT.

1.000

COSTO TOTAL

2.2.
N

Gastos bancarios pago de proyectista


DESCRIPCIN

1.

MATERIALES Y EQUIPOS

2.

GASTOS BANCARIOS
Gastos bancarios del NEC

UNID.

Pyto.

CANT.

1.000

COSTO TOTAL

2.3.
N

Movillidad del Presidente y Tesorero del NEC pago proyectista


DESCRIPCIN

1.

MATERIALES Y EQUIPOS

2.

MOVILIDAD DEL NEC


Movilidad del Presidente y Tesorero del NEC

UNID.

Pyto.

CANT.

1.000

COSTO TOTAL

3.
3.1.

Gastos de ejecucin del proyecto


Administracin del proyecto (contratacin del Coord. Tco. del NEC)

ANALISIS DE COSTOS UNITARIOS


N

DESCRIPCIN

1.

MATERIALES E INSUMOS

2.

MANO DE OBRA CALIFICADA


Coordinador Tcnico

UNID.

Honorar.

CANT.

1.000

COSTO TOTAL

3.2.
N
1.

Seguro de Coordinador Tcnico


DESCRIPCIN

UNID.

CANT.

MATERIALES E INSUMOS
Seguro de Coordinador Tcnico

Seguro

0.330

COSTO TOTAL

3.3.
N

Movilidad de Coordinador Tcnico


DESCRIPCIN

UNID.

1.

MATERIALES E INSUMOS

2.

MOVILIDAD DEL COORDINADOR TCNICO


Movilidad del coordinador tcnico

Movil.

CANT.

1.000

COSTO TOTAL

4.
4.1.
N
1.

Gastos de seguimiento del NEC


Fotografas de seguimiento de proyectos
DESCRIPCIN

UNID.

CANT.

MATERIALES E INSUMOS
Fotografas de seguimiento de proyectos

2.

Seguim.

1.000

MANO DE OBRA CALIFICADA


COSTO TOTAL

4.2.
N
1.

Elaboracin de informes de gestin del NEC


DESCRIPCIN

CANT.

MATERIALES E INSUMOS
Informe de gestin del NEC

2.

UNID.

MANO DE OBRA CALIFICADA

Informe

1.000

ANALISIS DE COSTOS UNITARIOS


COSTO TOTAL

4.3.
N
1.

Elaboracin de vdeo de implementacin de proyectos


DESCRIPCIN

UNID.

MATERIALES E INSUMOS
Elaboracin de vdeo de implementacin de proyectoVideo

2.

CANT.

MANO DE OBRA CALIFICADA

COSTO TOTAL

1.000

ADROS N 01
COSTOS UNITARIOS

PRECIO
UNITAR.
70.000
22.000
0.720
75.000
12.600
12.000
6.000
9.000
9.000
4.500
9.000
6.000
6.500
8.000
26.000
1.200
2.800

COSTO/Unid
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
224.150
224.150
0.000
0.000
21.000
21.000
26.400
26.400
28.800
28.800
18.750
18.750
12.600
12.600
12.000
12.000
3.000
3.000
0.450
0.450
9.000
9.000
9.000
9.000
9.000
9.000
48.000
48.000
13.000
13.000
8.000
8.000
3.250
3.250
1.200
1.200
0.700
0.700
125.000
125.000

0.000

0.000

25.000

125.000
125.000

0.000

0.000

125.000

6.250
6.250

6.250
6.250

355.400

224.150

0.000

131.250

PRECIO
UNITAR.

COSTO/Unid
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
134.720
134.720
0.000
0.000

70.000
22.000
90.000

2.100
2.420
90.000

2.100
2.420
90.000

9.000
2.000
2.500
17.000
2.000
1.200

9.000
2.000
2.500
17.000
6.000
2.400

9.000
2.000
2.500
17.000
6.000
2.400

COSTOS UNITARIOS
26.000

1.300

1.300

25.000
25.000

0.000

0.000

25.000

25.000
25.000

1.250
1.250

0.000

0.000

25.000

1.250
1.250

160.970

134.720

0.000

26.250

PRECIO
UNITAR.

COSTO/Unid
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
227.720
227.720
0.000
0.000

70.000
22.000
90.000

2.100
2.420
90.000

2.100
2.420
90.000

75.000
6.000
8.000
21.000
6.500
1.200
26.000

75.000
6.000
8.000
21.000
19.500
2.400
1.300

75.000
6.000
8.000
21.000
19.500
2.400
1.300

25.000
25.000

0.000

0.000

25.000

25.000
25.000

1.250
1.250

0.000

0.000

25.000

1.250
1.250

253.970

227.720

0.000

26.250

PRECIO
UNITAR.

COSTO/Unid
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
232.720
232.720
0.000
0.000

70.000
22.000
90.000

2.100
2.420
90.000

2.100
2.420
90.000

95.000
4.000
5.000
17.000
4.500

95.000
4.000
5.000
17.000
13.500

95.000
4.000
5.000
17.000
13.500

COSTOS UNITARIOS
1.200
26.000

2.400
1.300

2.400
1.300

25.000
25.000

0.000

0.000

25.000

25.000
25.000

1.250
1.250

0.000

0.000

25.000

1.250
1.250

258.970

232.720

0.000

26.250

PRECIO
UNITAR.
70.000
22.000
0.720
80.000
12.600
12.000
6.000
9.000
9.000
9.000
4.500
6.000
6.500
8.000
26.000
1.200
2.800

COSTO/Unid
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
251.280
251.280
0.000
0.000
28.000
28.000
35.200
35.200
38.880
38.880
20.000
20.000
12.600
12.600
12.000
12.000
3.000
3.000
0.450
0.450
9.000
9.000
9.000
9.000
9.000
9.000
48.000
48.000
13.000
13.000
8.000
8.000
3.250
3.250
1.200
1.200
0.700
0.700
125.000
125.000

0.000

0.000

25.000

125.000
125.000

6.250
6.250

0.000

0.000

125.000

6.250
6.250

382.530

251.280

0.000

131.250

PRECIO
UNITAR.
70.000
22.000
1.280
115.000

COSTO/Unid
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
418.230
418.230
0.000
0.000
63.000
63.000
79.200
79.200
110.080
110.080
28.750
28.750

COSTOS UNITARIOS
12.600
12.000
6.000
9.000
9.000
12.000
6.500
6.000
6.500
8.000
26.000
1.200
2.800

12.600
12.000
3.000
0.450
10.000
12.000
13.000
48.000
13.000
8.000
3.250
1.200
0.700

12.600
12.000
3.000
0.450
10.000
12.000
13.000
48.000
13.000
8.000
3.250
1.200
0.700

125.000
125.000

0.000

0.000

25.000

125.000
125.000

0.000

0.000

125.000

6.250
6.250

6.250
6.250

549.480

418.230

0.000

131.250

PRECIO
UNITAR.
70.000
22.000
1.720
145.000
12.600
12.000
6.000
9.000
9.000
12.000
6.500
6.000
6.500
8.000
26.000
1.200
2.800

COSTO/Unid
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
656.050
656.050
0.000
0.000
119.000
119.000
149.600
149.600
215.000
215.000
36.250
36.250
12.600
12.600
12.000
12.000
3.000
3.000
0.450
0.450
9.000
9.000
12.000
12.000
13.000
13.000
48.000
48.000
13.000
13.000
8.000
8.000
3.250
3.250
1.200
1.200
0.700
0.700
125.000
125.000

0.000

0.000

25.000

125.000
125.000

6.250
6.250

0.000

0.000

125.000

6.250
6.250

787.300

656.050

0.000

131.250

COSTOS UNITARIOS

PRECIO
UNITAR.

COSTO/Unid
FINANCIAMIENTO
FONCODE
GOB.
USUARIO
S
LOCAL
2.936
0.000
0.000
2.500
0.260
0.176

2.500
26.000
2.800

PRECIO
TOTAL
2.936
2.500
0.260
0.176
0.750
0.750

0.000

0.000

25.000

0.750
0.750

0.038
0.038

0.000

0.000

0.750

0.038
0.038

3.724

2.936

0.000

0.788

PRECIO
UNITAR.
5.000
26.000
2.800

COSTO/Unid
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
5.566
5.566
0.000
0.000
5.000
5.000
0.390
0.390
0.176
0.176
0.750
0.750

0.000

0.000

25.000

0.750
0.750

0.038
0.038

0.000

0.000

0.750

0.038
0.038

6.354

5.566

0.000

0.788

PRECIO
UNITAR.
8.000
26.000
2.800

COSTO/Unid
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
8.696
8.696
0.000
0.000
8.000
8.000
0.520
0.520
0.176
0.176
0.000

0.000

25.000

0.750
0.750

0.750
0.750

0.000

0.000

0.750

0.038
0.038

0.038
0.038

COSTOS UNITARIOS
9.484

PRECIO
UNITAR.

8.696

0.000

0.788

COSTO/Unid
FINANCIAMIENTO
FONCODE
GOB.
USUARIO
S
LOCAL
12.326
0.000
0.000
11.500
0.650
0.176

11.500
26.000
2.800

PRECIO
TOTAL
12.326
11.500
0.650
0.176

0.000

0.000

25.000

0.750
0.750

0.750
0.750

0.000

0.000

0.750

0.038
0.038

0.038
0.038

13.114

12.326

0.000

0.788

PRECIO
UNITAR.

COSTO/Unid
FINANCIAMIENTO
FONCODE
GOB.
USUARIO
S
LOCAL
2.936
0.000
0.000
2.500
0.260
0.176

2.500
26.000
2.800

PRECIO
TOTAL
2.936
2.500
0.260
0.176
0.750
0.750

0.000

0.000

25.000

0.750
0.750

0.000

0.000

0.750

0.038
0.038

0.038
0.038

3.724

2.936

0.000

0.788

PRECIO
UNITAR.
5.000
26.000
2.800

COSTO/Unid
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
5.566
5.566
0.000
0.000
5.000
5.000
0.390
0.390
0.176
0.176
0.750
0.750

0.000

0.000

25.000

0.750
0.750

0.038
0.038

0.000

0.000

0.750

0.038
0.038

COSTOS UNITARIOS
6.354

PRECIO
UNITAR.
8.000
26.000
2.800

5.566

0.000

0.788

COSTO/Unid
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
8.696
8.696
0.000
0.000
8.000
8.000
0.520
0.520
0.176
0.176
0.750
0.750

0.000

0.000

25.000

0.750
0.750

0.038
0.038

0.000

0.000

0.750

0.038
0.038

9.484

8.696

0.000

0.788

PRECIO
UNITAR.
6.000
26.000
2.800

COSTO/Unid
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
6.696
6.696
0.000
0.000
6.000
6.000
0.520
0.520
0.176
0.176
0.000

0.000

25.000

0.750
0.750

0.750
0.750

0.038
0.038

0.000

0.000

0.750

0.038
0.038

7.484

6.696

0.000

0.788

PRECIO
UNITAR.

COSTO/Unid
FINANCIAMIENTO
FONCODE
GOB.
USUARIO
S
LOCAL
8.956
0.000
0.000
8.000
0.780
0.176

8.000
26.000
2.800

PRECIO
TOTAL
8.956
8.000
0.780
0.176
0.750
0.750

0.000

0.000

25.000

0.750
0.750

0.038

0.000

0.000

0.038

COSTOS UNITARIOS
0.750

0.038
9.744

PRECIO
UNITAR.

0.038
8.956

0.000

0.788

COSTO/Unid
FINANCIAMIENTO
FONCODE
GOB.
USUARIO
S
LOCAL
10.216
0.000
0.000
9.000
1.040
0.176

9.000
26.000
2.800

PRECIO
TOTAL
10.216
9.000
1.040
0.176
0.750
0.750

0.000

0.000

25.000

0.750
0.750

0.000

0.000

0.750

0.038
0.038

0.038
0.038

11.004

10.216

0.000

0.788

PRECIO
UNITAR.
12.000
26.000
2.800

COSTO/Unid
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
13.476
13.476
0.000
0.000
12.000
12.000
1.300
1.300
0.176
0.176
0.750
0.750

0.000

0.000

25.000

0.750
0.750

0.038
0.038

0.000

0.000

0.750

0.038
0.038

14.264

13.476

0.000

0.788

PRECIO
UNITAR.
6.000
26.000
2.800

25.000

COSTO/Unid
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
6.956
6.956
0.000
0.000
6.000
6.000
0.780
0.780
0.176
0.176
0.750
0.750

0.000

0.000

0.750
0.750

COSTOS UNITARIOS
0.750

PRECIO
UNITAR.
5.000
26.000
2.800

0.038
0.038

0.000

0.000

0.038
0.038

7.744

6.956

0.000

0.788

COSTO/Unid
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
6.476
6.476
0.000
0.000
5.000
5.000
1.300
1.300
0.176
0.176
0.000

0.000

25.000

0.750
0.750

0.750
0.750

0.038
0.038

0.000

0.000

0.750

0.038
0.038

7.264

6.476

0.000

0.788

PRECIO
UNITAR.

COSTO/Unid
FINANCIAMIENTO
FONCODE
GOB.
USUARIO
S
LOCAL
7.976
0.000
0.000
6.500
1.300
0.176

6.500
26.000
2.800

PRECIO
TOTAL
7.976
6.500
1.300
0.176

0.000

0.000

25.000

0.750
0.750

0.750
0.750

0.000

0.000

0.750

0.038
0.038

0.038
0.038

8.764

7.976

0.000

0.788

PRECIO
UNITAR.
9.000
26.000
2.800

25.000

COSTO/Unid
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
10.736
10.736
0.000
0.000
9.000
9.000
1.560
1.560
0.176
0.176
0.750
0.750

0.000

0.000

0.750
0.750

COSTOS UNITARIOS
0.750

PRECIO
UNITAR.
6.200
2.000
26.000
2.800

0.038
0.038

0.000

0.000

0.038
0.038

11.524

10.736

0.000

0.788

COSTO/Unid
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
10.896
10.896
0.000
0.000
6.200
6.200
4.000
4.000
0.520
0.520
0.176
0.176
0.000

0.000

25.000

0.750
0.750

0.750
0.750

0.000

0.000

0.750

0.038
0.038

0.038
0.038

11.684

10.896

0.000

0.788

PRECIO
UNITAR.

COSTO/Unid
FINANCIAMIENTO
FONCODE
GOB.
USUARIO
S
LOCAL
18.956
0.000
0.000
9.000
9.000
0.780
0.176

9.000
4.500
26.000
2.800

PRECIO
TOTAL
18.956
9.000
9.000
0.780
0.176

0.000

0.000

25.000

0.750
0.750

0.750
0.750

0.000

0.000

0.750

0.038
0.038

0.038
0.038

19.744

18.956

0.000

0.788

PRECIO
UNITAR.
12.000
6.500
26.000

PRECIO
TOTAL
26.216
12.000
13.000
1.040

COSTO/Unid
FINANCIAMIENTO
FONCODE
GOB.
USUARIO
S
LOCAL
26.216
0.000
0.000
12.000
13.000
1.040

COSTOS UNITARIOS
2.800

0.176

0.176

0.750
0.750

0.000

0.000

25.000

0.750
0.750

0.038
0.038

0.000

0.000

0.750

0.038
0.038

27.004

26.216

0.000

0.788

PRECIO
UNITAR.

COSTO/Unid
FINANCIAMIENTO
FONCODE
GOB.
USUARIO
S
LOCAL
94.740
0.000
0.000
2.100
2.640
90.000

70.000
22.000
90.000

PRECIO
TOTAL
94.740
2.100
2.640
90.000

0.000

0.000

25.000

0.750
0.750

0.750
0.750

0.000

0.000

0.750

0.038
0.038

0.038
0.038

95.528

94.740

0.000

0.788

PRECIO
UNITAR.

COSTO/Unid
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
138.020
138.020
0.000
0.000

70.000
22.000
90.000

2.100
2.420
90.000

2.100
2.420
90.000

9.000
4.000
4.800
22.000
1.200
26.000

9.000
4.000
4.800
22.000
2.400
1.300

9.000
4.000
4.800
22.000
2.400
1.300

25.000
25.000

0.000

0.000

25.000

25.000
25.000

1.250
1.250

0.000

0.000

25.000

1.250
1.250

164.270

138.020

0.000

26.250

COSTOS UNITARIOS

PRECIO
UNITAR.

COSTO/Unid
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
140.020
140.020
0.000
0.000

70.000
22.000
90.000

2.100
2.420
90.000

2.100
2.420
90.000

11.000
4.000
4.800
22.000
1.200
26.000

11.000
4.000
4.800
22.000
2.400
1.300

11.000
4.000
4.800
22.000
2.400
1.300

25.000
25.000

0.000

0.000

25.000

25.000
25.000

1.250
1.250

0.000

0.000

25.000

1.250
1.250

166.270

140.020

0.000

26.250

PRECIO
UNITAR.

COSTO/Unid
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
141.020
141.020
0.000
0.000

70.000
22.000
90.000

2.100
2.420
90.000

2.100
2.420
90.000

12.000
4.000
4.800
22.000
1.200
26.000

12.000
4.000
4.800
22.000
2.400
1.300

12.000
4.000
4.800
22.000
2.400
1.300

25.000
25.000

0.000

0.000

25.000

25.000
25.000

1.250
1.250

0.000

0.000

25.000

1.250
1.250

167.270

141.020

0.000

26.250

COSTOS UNITARIOS

PRECIO
UNITAR.

COSTO/Unid
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
148.020
148.020
0.000
0.000

70.000
22.000
90.000

2.100
2.420
90.000

2.100
2.420
90.000

19.000
4.000
4.800
22.000
1.200
26.000

19.000
4.000
4.800
22.000
2.400
1.300

19.000
4.000
4.800
22.000
2.400
1.300

25.000
25.000

0.000

0.000

25.000

25.000
25.000

1.250
1.250

0.000

0.000

25.000

1.250
1.250

174.270

148.020

0.000

26.250

PRECIO
UNITAR.
2.000
26.000
5.000
2.800

COSTO/m
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
2.162
2.162
0.000
0.000
2.000
2.000
0.130
0.130
0.010
0.010
0.022
0.022
2.500
2.500

0.000

0.000

25.000

2.500
2.500

0.125
0.125

0.000

0.000

2.500

0.125
0.125

4.787

2.162

0.000

2.625

PRECIO
UNITAR.
2.800
26.000

COSTO/m
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
2.962
2.962
0.000
0.000
2.800
2.800
0.130
0.130

COSTOS UNITARIOS
5.000
2.800

0.010
0.022

0.010
0.022

2.500
2.500

0.000

0.000

25.000

2.500
2.500

0.125
0.125

0.000

0.000

2.500

0.125
0.125

5.587

2.962

0.000

2.625

PRECIO
UNITAR.
4.000
26.000
5.000
2.800

COSTO/m
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
4.240
4.240
0.000
0.000
4.000
4.000
0.208
0.208
0.010
0.010
0.022
0.022
2.500
2.500

0.000

0.000

25.000

2.500
2.500

0.000

0.000

2.500

0.125
0.125

0.125
0.125

6.865

4.240

0.000

2.625

PRECIO
UNITAR.
6.000
26.000
5.000
2.800

COSTO/m
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
6.297
6.297
0.000
0.000
6.000
6.000
0.260
0.260
0.015
0.015
0.022
0.022
2.500
2.500

0.000

0.000

25.000

2.500
2.500

0.000

0.000

2.500

0.125
0.125

0.125
0.125

8.922

6.297

0.000

2.625

PRECIO
UNITAR.

PRECIO
TOTAL

COSTO/m
FINANCIAMIENTO

COSTOS UNITARIOS
PRECIO
UNITAR.
12.600
26.000
5.000
2.800

PRECIO
FONCODE
TOTAL
S
12.897
12.897
12.600
12.600
0.260
0.260
0.015
0.015
0.022
0.022

GOB.
USUARIO
LOCAL
0.000
0.000

0.000

0.000

25.000

2.500
2.500

2.500
2.500

0.125
0.125

0.000

0.000

2.500

0.125
0.125

15.522

12.897

0.000

2.625

COSTOS UNITARIOS

PRECIO
UNITAR.
12.000
10.000
1.100
9.000
3.000
85.000
35.000
1.200

COSTO/Unid
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
220.200
220.200
0.000
0.000
12.000
12.000
20.000
20.000
55.000
55.000
9.000
9.000
3.000
3.000
85.000
85.000
35.000
35.000
1.200
1.200
6.250
6.250

0.000

0.000

25.000

6.250
6.250

0.000

0.000

6.250

0.313
0.313

0.313
0.313

226.763

220.200

0.000

6.563

COSTO/ha
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
2,360.000
360.000
0.000
###
90.000
360.000
360.000
10.000 2,000.000
2,000.000

PRECIO
UNITAR.

0.000

0.000

25.000
25.000
25.000
25.000
25.000

1,850.000
375.000
300.000
600.000
200.000
375.000

###
375.000
300.000
600.000
200.000
375.000

92.500
92.500

0.000

0.000

1,850.000

92.500
92.500

4,302.500

360.000

0.000

###

COSTOS UNITARIOS
COSTO/ha
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
2,472.000
472.000
0.000
###
118.000
472.000
472.000
10.000 2,000.000
2,000.000

PRECIO
UNITAR.

0.000

0.000

25.000
25.000
25.000
25.000
25.000

1,150.000
200.000
250.000
250.000
200.000
250.000

###
200.000
250.000
250.000
200.000
250.000

57.500
57.500

0.000

0.000

1,150.000

57.500
57.500

3,679.500

472.000

0.000

###

COSTO/ha
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
2,900.000
900.000
0.000
###
75.000
900.000
900.000
10.000 2,000.000
2,000.000

PRECIO
UNITAR.

0.000

0.000

25.000
25.000
25.000
25.000
25.000

1,050.000
200.000
200.000
200.000
200.000
250.000

###
200.000
200.000
200.000
200.000
250.000

52.500
52.500

0.000

0.000

1,050.000

52.500
52.500

4,002.500

900.000

0.000

###

COSTO/ha
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
2,425.000
425.000
0.000
###
170.000
425.000
425.000

PRECIO
UNITAR.

COSTOS UNITARIOS
10.000

2,000.000
1,050.000
200.000
200.000
200.000
200.000
250.000

0.000

0.000

25.000
25.000
25.000
25.000
25.000

###
200.000
200.000
200.000
200.000
250.000

0.000

0.000

1,050.000

52.500
52.500

52.500
52.500

3,527.500

425.000

0.000

###

2,000.000

COSTO/ha
FINANCIAMIENTO
PRECIO
PRECIO
FONCODE
GOB.
UNITAR.
TOTAL
USUARIO
S
LOCAL
2,400.000
400.000
0.000
###
80.000
400.000
400.000
10.000 2,000.000
2,000.000
1,850.000
375.000
300.000
600.000
200.000
375.000

0.000

0.000

25.000
25.000
25.000
25.000
25.000

###
375.000
300.000
600.000
200.000
375.000

0.000

0.000

1,850.000

92.500
92.500

92.500
92.500

4,342.500

400.000

0.000

###

ama 550 PL

COSTO/ha
FINANCIAMIENTO
PRECIO
PRECIO
FONCODE
GOB.
UNITAR.
TOTAL
USUARIO
S
LOCAL
3,050.000 1,050.000
0.000
###
42.000 1,050.000 1,050.000
10.000 2,000.000
2,000.000

25.000

3,575.000
875.000

0.000

0.000

###
875.000

COSTOS UNITARIOS
25.000
25.000
25.000
25.000

700.000
875.000
250.000
875.000

3,575.000

178.750
178.750

PRECIO
UNITAR.

700.000
875.000
250.000
875.000
0.000

0.000

178.750
178.750

6,803.750 1,050.000

0.000

###

COSTO/ha
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
2,500.000
0.000
0.000
###

25.000

50.000

50.000

25.000
25.000
25.000
25.000

100.000
100.000
50.000
50.000

100.000
100.000
50.000
50.000

25.000
25.000
25.000
25.000

500.000
100.000
375.000
125.000

500.000
100.000
375.000
125.000

25.000
25.000
25.000
25.000
25.000
25.000

375.000
125.000
350.000
100.000
50.000
50.000

375.000
125.000
350.000
100.000
50.000
50.000

385.000
35.000
35.000
35.000

0.000

0.000

175.000
140.000
70.000

175.000
140.000
70.000

1,447.450

147.450

9.830

147.450

147.450

10.000

1,300.000
125.000

385.000

0.000

###

1,300.000
0.000

0.000

125.000

COSTOS UNITARIOS
2,500.000

125.000
4,457.450

PRECIO
UNITAR.

125.000
147.450

0.000

###

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
3,100.000
0.000
0.000
###

25.000
25.000

25.000
25.000

25.000
25.000

25.000
25.000
25.000

50.000
75.000
200.000

50.000
75.000
200.000

25.000
25.000

375.000
375.000

375.000
375.000

25.000
25.000
25.000
25.000
25.000
25.000

625.000
500.000
225.000
375.000
125.000
125.000

625.000
500.000
225.000
375.000
125.000
125.000

350.000

0.000

0.000

350.000

35.000
35.000

175.000
105.000

175.000
105.000

35.000
35.000

35.000
35.000

35.000
35.000

6,750.000 5,250.000
3.500

5,250.000

10.000

1,500.000

3,100.000

155.000
155.000

0.000

###

5,250.000
1,500.000
0.000

0.000

155.000
155.000

### 5,250.000

0.000

###

COSTOS UNITARIOS

PRECIO
UNITAR.

COSTO/ha
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
1,600.000
0.000
0.000
###

25.000

50.000

50.000

25.000
25.000
25.000

25.000
50.000
75.000

25.000
50.000
75.000

25.000
25.000
25.000
25.000

200.000
50.000
400.000
50.000

200.000
50.000
400.000
50.000

25.000
25.000
25.000
25.000
25.000
25.000

200.000
150.000
200.000
50.000
50.000
50.000

200.000
150.000
200.000
50.000
50.000
50.000

350.000

0.000

0.000

350.000

35.000
35.000

140.000
70.000

140.000
70.000

35.000
35.000

70.000
70.000

70.000
70.000

1,790.000

390.000

0.000

###

6.500

390.000

390.000

10.000

1,400.000
0.000

0.000

1,600.000

80.000
80.000

80.000
80.000

3,820.000

390.000

0.000

###

1,400.000

COSTO/ha

PRECIO
UNITAR.

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
1,425.000
0.000
0.000
###

COSTOS UNITARIOS
25.000

25.000

25.000

25.000
25.000
25.000

25.000
50.000
75.000

25.000
50.000
75.000

25.000
25.000

200.000
400.000

200.000
400.000

25.000
25.000
25.000
25.000
25.000
25.000

200.000
100.000
200.000
50.000
50.000
50.000

200.000
100.000
200.000
50.000
50.000
50.000

350.000

0.000

0.000

350.000

35.000
35.000

140.000
70.000

140.000
70.000

35.000
35.000

70.000
70.000

70.000
70.000

1,554.000

354.000

5.900

354.000

354.000

10.000

1,200.000

71.250
1,425.000

1.500

###

1,200.000

0.000

0.000

71.250

3,400.250

PRECIO
UNITAR.

0.000

71.250
71.250

354.000

0.000

###

COSTO/Familia
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
30.000
30.000
0.000
0.000
30.000
30.000
0.000

0.000

25.000

50.000
50.000

50.000
50.000

0.000

0.000

50.000

2.500
2.500

2.500
2.500

82.500

30.000

0.000

52.500

COSTOS UNITARIOS

PRECIO
UNITAR.

COSTO/Mdulo
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
135.000
0.000
0.000 135.000

25.000

25.000

25.000

25.000
25.000

25.000
25.000

25.000
25.000

25.000
25.000
25.000
25.000
25.000
25.000

7.500
7.500
7.500
7.500
7.500
7.500

7.500
7.500
7.500
7.500
7.500
7.500

25.000
25.000

7.500
7.500

7.500
7.500

18.200

9.000

1.800
0.200
4.000

9.000
1.200
8.000

9.000

6.750
6.750

0.000

0.000

135.000

6.750
6.750

159.950

9.000

0.000

150.950

PRECIO
UNITAR.
2.800
50.000
5.000
5.000
8.000

0.000

9.200

1.200
8.000

COSTO/Mdulo
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
103.200
53.200
0.000
50.000
11.200
11.200
50.000
50.000
7.500
7.500
2.500
2.500
32.000
32.000
8.800
8.800

0.000

0.000

2.200

8.800
8.800

4.200
1.400
2.800

0.000

0.000

2.800
140.000

4.200
1.400
2.800
2.000
2.000

2.000
2.000

0.000

0.000

0.500

COSTOS UNITARIOS
0.000

0.000

25.000

25.000
25.000

25.000
25.000

0.000

0.000

25.000

1.250
1.250

1.250
1.250

144.450

68.200

0.000

76.250

PRECIO
UNITAR.
4.000
2.800
5.000
5.000

COSTO/Mdulo
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
36.200
16.200
0.000
20.000
20.000
20.000
11.200
11.200
2.500
2.500
2.500
2.500
184.000
24.000
160.000

0.000

0.000

24.000
20.000

184.000
24.000
160.000
6.355
0.975
3.000
0.980
1.400

6.355
0.975
3.000
0.980
1.400

0.000

0.000

65.000
3.000
49.000
140.000

4.500
4.500

4.500
4.500

0.000

0.000

0.500

0.000

0.000

25.000

25.000
25.000

25.000
25.000

0.000

0.000

25.000

1.250
1.250

1.250
1.250

257.305

211.055

0.000

46.250

PRECIO
UNITAR.
5.000
1.000
40.000
2.500
5.000

COSTO/Glb
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
3,179.000 3,179.000
0.000
0.000
550.000
550.000
220.000
220.000
144.000
144.000
540.000
540.000
575.000
575.000

COSTOS UNITARIOS
5.000
5.000

575.000
575.000

575.000
575.000

3,179.000 3,179.000

PRECIO
UNITAR.

1,000.000

PRECIO
UNITAR.

PRECIO
TOTAL

0.000

0.000

COSTO/Mes
FINANCIAMIENTO
FONCODE
GOB.
USUARIO
S
LOCAL

3,000.000 3,000.000
3,000.000 3,000.000

0.000

0.000

3,000.000 3,000.000

0.000

0.000

PRECIO
TOTAL

COSTO/Mes
FINANCIAMIENTO
FONCODE
GOB.
USUARIO
S
LOCAL

1,000.000
1,000.000 1,000.000

500.000
500.000

500.000
500.000

0.000

1,000.000

500.000

500.000

0.000

PRECIO
UNITAR.

1,000.000

PRECIO
TOTAL

COSTO/Mes
FINANCIAMIENTO
FONCODE
GOB.
USUARIO
S
LOCAL

1,000.000
1,000.000

0.000

###
1,000.000

0.000

1,000.000

0.000

###

0.000

COSTO/Ao
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
1,455.480 1,455.480
0.000
0.000
485.160 1,455.480 1,455.480

PRECIO
UNITAR.

1,455.480 1,455.480

0.000

0.000

COSTOS UNITARIOS

PRECIO
UNITAR.
485.160

COSTO/Ao
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
485.160
121.290 363.870
0.000
485.160
121.290
363.870
485.160

PRECIO
UNITAR.
200.000

100.000

200.000
100.000

120.000
650.000
1.800

600.000

0.000

0.000

25.000

75.000

0.000

COSTO/Concurso
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
300.000
300.000
0.000
0.000
200.000
200.000
100.000
100.000
300.000

PRECIO
UNITAR.

0.000

COSTO/Mes
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
100.000
25.000
75.000
0.000
100.000
25.000
75.000
100.000

PRECIO
UNITAR.

363.870

COSTO/Mes
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
600.000
600.000
0.000
0.000
600.000
600.000
600.000

PRECIO
UNITAR.

121.290

300.000

0.000

0.000

COSTO/Feria
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
950.000
950.000
0.000
0.000
120.000
120.000
650.000
650.000
180.000
180.000

COSTOS UNITARIOS
940.000
940.000

0.000

0.000

5.000

940.000
940.000

752.000
752.000

0.000

0.000

8.000

752.000
752.000

2,642.000 2,642.000

0.000

0.000

COSTO/Pasanta
FINANCIAMIENTO
PRECIO
PRECIO
FONCODE
GOB.
UNITAR.
TOTAL
USUARIO
S
LOCAL
470.000
470.000
0.000
0.000
90.000
270.000
270.000
100.000
200.000
200.000
225.000
225.000

225.000
225.000

0.000

0.000

75.000

270.000
270.000

270.000
270.000

0.000

0.000

135.000

965.000

965.000

0.000

0.000

PRECIO
UNITAR.

COSTO/Mdulo
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
161.760
139.760
0.000
22.000

0.600
5.000
1.720

12.000
0.200
5.160

12.000
0.200
5.160

22.000
4.000
70.000
4.670

3.960
2.000
1.400
9.340

3.960
2.000
1.400
9.340

0.600
5.000
36.000
10.000

24.000
0.100
36.000
10.000

24.000
0.100
36.000
10.000

28.000
0.250
0.200
85.000

28.000
10.000
12.000
6.800

28.000
10.000
12.000
6.800

COSTOS UNITARIOS
10.000

0.800

0.800

37.500
37.500

0.000

0.000

25.000

37.500
37.500

1.875
1.875

0.000

0.000

37.500

1.875
1.875

201.135

139.760

0.000

61.375

nda, salud y nutricin familiar


(ACU_Cap.(V.S. Formato de capacitacin FONCODES)
(ACU_Cap.(V.S. Formato de capacitacin FONCODES)

PRECIO
UNITAR.
14.000
2.500

COSTO/Mdulo
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
21.500
21.500
0.000
0.000
14.000
14.000
7.500
7.500
21.500

PRECIO
UNITAR.

50.000

PRECIO
TOTAL

21.500

0.000

0.000

COSTO/Evento
FINANCIAMIENTO
FONCODE
GOB.
USUARIO
S
LOCAL

50.000
50.000

50.000
50.000

0.000

0.000

50.000

50.000

0.000

0.000

COSTO/Concurso
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
###
###
0.000
0.000
23,475.000 23,475.000 23,475.000
PRECIO
UNITAR.

###

###

0.000

COSTO/Mes

PRECIO
UNITAR.

PRECIO
TOTAL

FINANCIAMIENTO

0.000

COSTOS UNITARIOS
PRECIO
UNITAR.
0.500
30.000

PRECIO
FONCODE
TOTAL
S
77.000
77.000
47.000
30.000

47.000
30.000

77.000

77.000

MIDIS
0.000

GOB.
LOCAL
0.000

0.000

0.000

COSTO/Glb

PRECIO
UNITAR.

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
MIDIS
S
LOCAL
3,705.200 3,705.200
0.000
0.000

140.000
25.000
10.000
5.000
6.000
0.400
40.000
3.000
0.600
1.000
5.000
0.500
23.000
7.000
2.500

2,100.000
150.000
100.000
30.000
30.000
76.800
80.000
192.000
76.800
94.000
15.000
47.000
69.000
42.000
15.000

2,100.000
150.000
100.000
30.000
30.000
76.800
80.000
192.000
76.800
94.000
15.000
47.000
69.000
42.000
15.000

10.000
10.000
15.000
15.000
2.000
280.000
50.000
50.000
70.000
30.000
1.000
10.000
5.000
1.000
80.000

16.700
100.000
150.000
150.000
20.000
47.600
16.500
16.500
23.100
9.900
0.670
3.300
1.650
0.330
26.400

16.700
100.000
150.000
150.000
20.000
47.600
16.500
16.500
23.100
9.900
0.670
3.300
1.650
0.330
26.400

15.000

4.950

4.950

3,705.200 3,705.200

COSTO/Mes

0.000

0.000

COSTOS UNITARIOS
PRECIO
UNITAR.

PRECIO
TOTAL

FINANCIAMIENTO
FONCODE
GOB.
USUARIO
S
LOCAL

1,500.000 1,500.000
1,500.000

1,500.000

0.000

0.000

0.000

0.000

1,500.000

1,500.000 1,500.000

COSTO/Mes

PRECIO
UNITAR.

PRECIO
TOTAL

FINANCIAMIENTO
FONCODE
GOB.
USUARIO
S
LOCAL

1,000.000 1,000.000
1,000.000

1,000.000

0.000

0.000

0.000

0.000

1,000.000

1,000.000 1,000.000

COSTO/Glb

PRECIO
UNITAR.
15.000
240.000

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
450.000
450.000
0.000
0.000
150.000
300.000

150.000
300.000

450.000

450.000

0.000

0.000

COSTO/Mes

PRECIO
UNITAR.

83.330

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
83.330
83.330
0.000
0.000

83.330

83.330

83.330

83.330

0.000

0.000

COSTO/Trimestre

PRECIO
UNITAR.

PRECIO
TOTAL

FINANCIAMIENTO
FONCODE
GOB.
USUARIO
S
LOCAL

COSTOS UNITARIOS

300.000

300.000

300.000

300.000

300.000

300.000

300.000

0.000

0.000

0.000

0.000

COSTO/Glb

PRECIO
UNITAR.
600.000
300.000
250.000
480.000
90.000
90.000
3.500
10.000
35.000
50.000
4.000
180.000
3.000
5.000

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
1,508.000 1,508.000
0.000
0.000
600.000
150.000
82.500
240.000
45.000
45.000
10.500
5.000
70.000
50.000
12.000
180.000
3.000
15.000

600.000
150.000
82.500
240.000
45.000
45.000
10.500
5.000
70.000
50.000
12.000
180.000
3.000
15.000

1,508.000 1,508.000

0.000

0.000

COSTO/Mes

PRECIO
UNITAR.

6.000

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
6.000
6.000
0.000
0.000

6.000

6.000

6.000

6.000

0.000

0.000

COSTO/Mes

PRECIO
UNITAR.
150.000

180.000
23.000

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
49.950
49.950
0.000
0.000
49.950

49.950

193.320

193.320

90.000
46.000

90.000
46.000

0.000

0.000

COSTOS UNITARIOS
40.000
40.000
3.000
2.500

50.000
80.000
20.000

20.000
13.320
9.000
15.000

20.000
13.320
9.000
15.000

49.950

0.000

16.650
26.640
6.660

293.220

49.950

0.000

16.650
26.640
6.660

243.270

49.950

0.000

COSTO/Pyto.

PRECIO
UNITAR.

12,000.000

PRECIO
TOTAL

FINANCIAMIENTO
FONCODE
GOB.
USUARIO
S
LOCAL

###

###

12,000.000

12,000.000

###

###

0.000

0.000

0.000

0.000

COSTO/Pyto.

PRECIO
UNITAR.

32.000

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
32.000
32.000
0.000
0.000

32.000

32.000

32.000

32.000

0.000

0.000

go proyectista
COSTO/Pyto.

PRECIO
UNITAR.

250.000

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
250.000
250.000
0.000
0.000

250.000

250.000

250.000

250.000

oord. Tco. del NEC)


COSTO/Mes

0.000

0.000

COSTOS UNITARIOS
PRECIO
UNITAR.

PRECIO
TOTAL

FINANCIAMIENTO
FONCODE
GOB.
USUARIO
S
LOCAL

1,500.000 1,500.000
1,500.000

1,500.000

0.000

0.000

0.000

0.000

1,500.000

1,500.000 1,500.000

COSTO/Ao

PRECIO
UNITAR.
1,200.000

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
396.000
396.000
0.000
0.000
396.000

396.000

396.000

396.000

0.000

0.000

COSTO/Mes

PRECIO
UNITAR.

200.000

PRECIO
TOTAL

FINANCIAMIENTO
FONCODE
GOB.
USUARIO
S
LOCAL

200.000

200.000

200.000

200.000

200.000

200.000

0.000

0.000

0.000

0.000

COSTO/Informe

PRECIO
UNITAR.
70.000

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
70.000
70.000
0.000
0.000
70.000

70.000

0.000

0.000

0.000

0.000

70.000

70.000

0.000

0.000

COSTO/Informe

PRECIO
UNITAR.
125.000

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
125.000
125.000
0.000
0.000
125.000

125.000

0.000

0.000

0.000

0.000

COSTOS UNITARIOS
125.000

125.000

0.000

0.000

COSTO/Vdeo

PRECIO
UNITAR.
450.000

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
USUARIO
S
LOCAL
450.000
450.000
0.000
0.000
450.000

450.000

0.000

0.000

0.000

0.000

450.000

450.000

0.000

0.000

CUADRO N 02
FORMATO FONCODES

EVENTOS DE CAPACITACIN - MEJORA DE VIVIENDA SALUDABLE

PROGRAMA PRESUPUESTAL: "ACCESO DE HOGARES RURALES CON ECONOMIA DE SUBSISTENCIA A MERCADOS LOCAL
EXPEDIENTE N 202013005

CAPACITACIN EN PRCTICAS ADECUADAS MEJORA DE VIVIENDA, SALUD Y NUTRICI


Cantidad de Grupos
N de Veces del Servicio
Duracin de Cada Sesin (Horas)
Total de sesiones
Total de Horas x Grupo
Total de Horas x Localidad

VARIABLES DE CAPACITACIN
3
Sesiones x Grupo
1
Horas x Sesin
3
Total de Sesiones
3
Total de Horas x Grupo
3
Total de Horas x Localidad
9
94

N de Capacitados

Usuarios

Capacitacin (S/.)
RUBROS

I.-

COSTOS FIJOS

1.1

ORGANIZACIN Y COORDINACIN
Alquiler de Equipo multimedia
INFORMES
CD

1.2

Impresin de fotografas digitales


1.3

II.2.3

2.4
2.5

MATERIALES DE APOYO - UTILES DE


ESCRITORIO
Lapiceros
Plumones de papel
Plumones de pizarra acrlica/tiza
Papel Bond 75 g
Papelgrafo
Cuaderno A4 de 100 hojas
Cinta Masking tape
Chinches
Mota
Cartulina de Colores
Folders A4 con fasteners
TOTAL COSTO FIJO

Cantidad

Unidad

Sesin

Unidad

Fotos

32
3
6.00
0.20
20
32
1
0.5
0
10
3

Unidad
Unidad
Unidad
Millar
Unidad
Unidad
Unidad
Cajas
Unidad
Pliego
Unidad

35

Unidad
Unidad

Unidad

COSTOS VARIABLES
MATERIALES DIDACTICO
PARA SER
ENTREGADOS
Gua de capacitacin
Triptico / Folleto
EXPERTO EN PRACTICAS ADECUADAS DE
MEJORA DE VIVIENDA
REFRIGERIO PARA LOS PARTICIPANTES

Refrigerios
TOTAL COSTOS VARIABLES
COSTO TOTAL FIJO + VARIABLES

32

Refrigerios

NDA SALUDABLE

ENCIA A MERCADOS LOCALES"

A, SALUD Y NUTRICIN FAMILIAR

32

PERSONAS X
GRUPO

Capacitacin (S/.)
Costo Unitario

Costo Total

256.70

1.00

50.00
50.00
5.50
1.00

0.50

4.50

50.00

201.20
0.50
2.50
3.00
25.00
0.50
4.00
2.00
1.20
3.00
0.50
0.70

16.00
7.50
18.00
12.00
10.00
128.00
2.00
0.60
0.00
5.00
2.10
256.70
530.00
70.00

2.00

70.00
0.00

100.00

300.00
160.00

5.00

160.00
530.00
786.70

ANALISIS DE COSTOS UNITARIOS


1.1.1.

Instalacin de riego tecnificado

1.1.1.1.

Cmara de carga (0,22 - 0,44 l/s) de 0,6*0,6*0,6 m

N
1.

2.

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS

COSTO/Unid
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
224.15
224.15
0.00

Arena hormign

0.3000

70.00

21.00

21.00

Cemento Portland tipo I / 42,50 kg

Bolsa

1.2000

22.00

26.40

26.40

Fierro corrugado de

40.0000

0.72

28.80

28.80

Juego de panel reforzado (0,6*0,6*0,6 m3) Unid

0.2500

75.00

18.75

18.75

Tubera PVC C-7,5, 3, 5 m

1.0000

12.60

12.60

12.60

Tee PVC, 3

Unid

1.0000

12.00

12.00

12.00

Malla mosquitero verde

0.5000

6.00

3.00

3.00

Alambre galvanizado N 16

kg

0.0500

9.00

0.45

0.45

Reduccin PVC, 3" - 1

Unid

1.0000

9.00

9.00

9.00

UPR PVC Adaptador de 1

Unid

2.0000

4.50

9.00

9.00

Llave de paso de 1

Unid

1.0000

9.00

9.00

9.00

Tubera PVC SAP, C-7,50, 2 x 5m

8.0000

6.00

48.00

48.00

UPR PVC Adaptador de 2

Unid

2.0000

6.50

13.00

13.00

Codo PVC, 90 - 2"

Unid

1.0000

8.00

8.00

8.00

Pegamento OATEY x galn

Unid

0.1250

26.00

3.25

3.25

Cinta tefln

Unid

1.0000

1.20

1.20

1.20

Lija N 40

Unid

0.2500

2.80

0.70

0.70

125.00

0.00

MANO DE OBRA
Mano de obra no calificada

Jornal

5.0000

25.00

125.00

0.00

3.

EQUIPOS

6.25

Herramientas (5,00 % MONC)

0.0500

125.00

COSTO TOTAL

1.1.1.2.

0.00

0.00

224.15

0.00

6.25
355.40

Instalacin de collarn de captacin de 25 mm * "


COSTO/Unid

DESCRIPCIN

1.

MATERIALES E INSUMOS

1.1.

Caja de concreto de Proteccin

1.2.

2.

UNID.

CANT.

PRECIO
UNITAR.

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
134.72
134.72
0.00

Arena hormign

0.0300

70.00

2.10

2.10

Cemento Portland tipo I / 42,50 kg

Bolsa

0.1100

22.00

2.42

2.42

Tapa metlica con seguro de 35x35 cm

Unid

1.0000

90.00

90.00

90.00

Accesorios para instalacin de Collarn


Collarn HDPE de "

Unid

1.0000

9.00

9.00

9.00

Tubera PVC SAP, C-10, x 5m

1.0000

2.00

2.00

2.00

Codo PVC 45,

unid

1.0000

2.50

2.50

2.50

Vlvula doble Universal de bola de "

Unid

1.0000

17.00

17.00

17.00

UPR PVC Adaptador de

Unid

3.0000

2.00

6.00

6.00

Cinta tefln

Unid

2.0000

1.20

2.40

2.40

Pegamento OATEY x galn

Unid

0.0500

26.00

1.30

1.30

25.00

0.00

MANO DE OBRA
Mano de obra no calificada

Jornal

1.0000

25.00

25.00

0.00

3.

EQUIPOS

1.25

Herramientas (5,00 % MONC)

0.0500

25.00

COSTO TOTAL

1.1.1.3.

0.00

0.00

134.72

0.00

1.25
160.97

Instalacin de collarn de captacin de 150 mm * 2"


COSTO/Unid

DESCRIPCIN

1.

MATERIALES E INSUMOS

1.1.

Caja de concreto de Proteccin

1.2.

2.

CANT.

PRECIO
UNITAR.

FINANCIAMIENTO
PRECIO
GOB.
TOTAL FONCODE
S
LOCAL
228.52
228.52
0.00

Arena hormign

0.0300

70.00

2.10

2.10

Cemento Portland tipo I / 42,50 kg

Bolsa

0.1100

22.00

2.42

2.42

Tapa metlica con seguro de 35x35 cm

Unid

1.0000

90.00

90.00

90.00

Accesorios para instalacin de Collarn


Collarn HDPE de 150 mm X 2"

Unid

1.0000

75.00

75.00

75.00

Tubera PVC SAP, C-10, 2" x 5m

1.0000

6.80

6.80

6.80

Codo PVC 45, 2"

unid

1.0000

8.00

8.00

8.00

Vlvula doble Universal de bola de 2"

Unid

1.0000

21.00

21.00

21.00

UPR PVC Adaptador de 2

Unid

3.0000

6.50

19.50

19.50

Cinta tefln

Unid

2.0000

1.20

2.40

2.40

Pegamento OATEY x galn

Unid

0.0500

26.00

1.30

1.30

25.00

0.00

0.00

0.00

0.00

MANO DE OBRA
Mano de obra no calificada

3.

UNID.

EQUIPOS

Jornal

1.0000

25.00

25.00
1.25

Herramientas (5,00 % MONC)

0.0500

25.00

COSTO TOTAL

1.1.1.4.

1.25
254.77

228.52

0.00

Instalacin de collarn de captacin de 200 mm * 1"


COSTO/Unid

DESCRIPCIN

1.

MATERIALES E INSUMOS

1.1.

Caja de concreto de Proteccin

1.2.

2.

CANT.

PRECIO
UNITAR.

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
232.72
232.72
0.00

Arena hormign

0.0300

70.00

2.10

2.10

Cemento Portland tipo I / 42,50 kg

Bolsa

0.1100

22.00

2.42

2.42

Tapa metlica con seguro de 35x35 cm

Unid

1.0000

90.00

90.00

90.00

Accesorios para instalacin de Collarn


Collarn HDPE de 200 mm X 1"

Unid

1.0000

95.00

95.00

95.00

Tubera PVC SAP, C-7,50, 1" x 5m

1.0000

4.00

4.00

4.00

Codo PVC 45, 1"

unid

1.0000

5.00

5.00

5.00

Vlvula doble Universal de bola de 1"

Unid

1.0000

17.00

17.00

17.00

UPR PVC Adaptador de 1

Unid

3.0000

4.50

13.50

13.50

Cinta tefln

Unid

2.0000

1.20

2.40

2.40

Pegamento OATEY x galn

Unid

0.0500

26.00

1.30

1.30

25.00

0.00

0.00

0.00

0.00

MANO DE OBRA
Mano de obra no calificada

3.

UNID.

Jornal

1.0000

25.00

EQUIPOS
Herramientas (5,00 % MONC)

25.00
1.25

0.0500

25.00

1.25

COSTO TOTAL

1.1.1.5.

2.

232.72

0.00

Cmara rompe presin (0,22 - 0,88 l/s) de 0,7*0,7*0,7 m

N
1.

258.97

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS

COSTO/Unid
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
251.28
251.28
0.00

Arena hormign

0.4000

70.00

28.00

28.00

Cemento Portland tipo I / 42,50 kg

Bolsa

1.6000

22.00

35.20

35.20

Fierro corrugado de "

54.0000

0.72

38.88

38.88

Juego de panel reforzado (0,7*0,7*0,7 m3) Unid

0.2500

80.00

20.00

20.00

Tubera PVC C-7,5, 3, 5 m

1.0000

12.60

12.60

12.60

Tee PVC, 3

Unid

1.0000

12.00

12.00

12.00

Malla mosquitero verde

0.5000

6.00

3.00

3.00

Alambre galvanizado N 16

kg

0.0500

9.00

0.45

0.45

Reduccin PVC, 3" - 1

Unid

1.0000

9.00

9.00

9.00

Llave de paso de 1"

Unid

1.0000

9.00

9.00

9.00

UPR PVC Adaptador de 1

Unid

2.0000

4.50

9.00

9.00

Tubera PVC SAP, C-7,50, 2 x 5m

8.0000

6.00

48.00

48.00

UPR PVC Adaptador de 2

Unid

2.0000

6.50

13.00

13.00

Codo PVC, 90 - 2"

Unid

1.0000

8.00

8.00

8.00

Pegamento OATEY x galn

Unid

0.1250

26.00

3.25

3.25

Cinta tefln

Unid

1.0000

1.20

1.20

1.20

Lija N 40

Unid

0.2500

2.80

0.70

0.70

125.00

0.00

MANO DE OBRA

0.00

Mano de obra no calificada


3.

Jornal

5.0000

25.00

EQUIPOS

6.25

Herramientas (5,00 % MONC)

0.0500

125.00

COSTO TOTAL

1.1.1.6.

0.00

0.00

251.28

0.00

6.25
382.53

Cmara rompe presin (1,32 - 3,08 l/s) de 1,10*1,10*1,10 m

N
1.

125.00

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS

COSTO/Unid
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
418.23
418.23
0.00

Arena hormign

0.9000

70.00

63.00

63.00

Cemento Portland tipo I / 42,50 kg

Bolsa

3.6000

22.00

79.20

79.20

Fierro corrugado de 8 mm

86.0000

1.28

110.08

110.08

Juego de panel reforzado (1,10*1,10*1,10 Unid

0.2500

115.00

28.75

28.75

Tubera PVC C-7,5, 3, 5 m

1.0000

12.60

12.60

12.60

Tee PVC, 3

Unid

1.0000

12.00

12.00

12.00

Malla mosquitero verde

0.5000

6.00

3.00

3.00

Alambre galvanizado N 16

kg

0.0500

9.00

0.45

0.45

Reduccin PVC, 3" - 2

Unid

1.0000

10.00

10.00

10.00

Llave de paso de 2"

Unid

1.0000

12.00

12.00

12.00

UPR PVC Adaptador de 2

Unid

2.0000

6.50

13.00

13.00

Tubera PVC SAP, C-7,50, 2 x 5m

8.0000

6.00

48.00

48.00

UPR PVC Adaptador de 2

Unid

2.0000

6.50

13.00

13.00

Codo PVC, 90 - 2"

Unid

1.0000

8.00

8.00

8.00

Pegamento OATEY x galn

Unid

0.1250

26.00

3.25

3.25

2.

Cinta tefln

Unid

1.0000

1.20

1.20

1.20

Lija N 40

Unid

0.2500

2.80

0.70

0.70

125.00

0.00

0.00

0.00

0.00

418.23

0.00

MANO DE OBRA
Mano de obra no calificada

3.

Jornal

5.0000

25.00

EQUIPOS

6.25

Herramientas (5,00 % MONC)

0.0500

125.00

COSTO TOTAL

1.1.1.7.

6.25
549.48

Cmara rompe presin (5,50 l/s) de 1,50*1,50*1,50 m

N
1.

125.00

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS

COSTO/Unid
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
657.05
657.05
0.00

Arena hormign

1.7000

70.00

119.00

119.00

Cemento Portland tipo I / 42,50 kg

Bolsa

6.8000

22.00

149.60

149.60

Fierro corrugado de

125.0000

1.72

215.00

215.00

Juego de panel reforzado (1,50*1,50*1,50 Unid

0.2500

145.00

36.25

36.25

Tubera PVC C-7,5, 3, 5 m

1.0000

12.60

12.60

12.60

Tee PVC, 3

Unid

1.0000

12.00

12.00

12.00

Malla mosquitero verde

0.5000

6.00

3.00

3.00

Alambre galvanizado N 16

kg

0.0500

9.00

0.45

0.45

Reduccin PVC, 3" - 2

Unid

1.0000

10.00

10.00

10.00

Llave de paso de 2"

Unid

1.0000

12.00

12.00

12.00

UPR PVC Adaptador de 2

Unid

2.0000

6.50

13.00

13.00

2.

Tubera PVC SAP, C-7,50, 2 x 5m

8.0000

6.00

48.00

48.00

UPR PVC Adaptador de 2

Unid

2.0000

6.50

13.00

13.00

Codo PVC, 90 - 2"

Unid

1.0000

8.00

8.00

8.00

Pegamento OATEY x galn

Unid

0.1250

26.00

3.25

3.25

Cinta tefln

Unid

1.0000

1.20

1.20

1.20

Lija N 40

Unid

0.2500

2.80

0.70

0.70

125.00

0.00

0.00

0.00

0.00

657.05

0.00

MANO DE OBRA
Mano de obra no calificada

3.

Jornal

5.0000

25.00

EQUIPOS

6.25

Herramientas (5,00 % MONC)

0.0500

125.00

COSTO TOTAL

1.1.1.8.

125.00

6.25
788.30

Instalacin de Codo PVC de 45 - 1"


COSTO/Unid

N
1.

2.

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS

FINANCIAMIENTO
PRECIO
GOB.
TOTAL FONCODE
S
LOCAL
2.94
2.94
0.00

Codo PVC 45, 1

Unid

1.0000

2.50

2.50

2.50

Pegamento OATEY x galn

Unid

0.0100

26.00

0.26

0.26

Lija N 40

Unid

0.0630

2.80

0.18

0.18

0.78

0.00

MANO DE OBRA
Mano de obra no calificada

Jornal

0.0310

25.00

0.78

0.00

3.

EQUIPOS

0.04

Herramientas (5,00 % MONC)

0.0500

0.78

COSTO TOTAL

1.1.1.9.

0.00

0.00

2.94

0.00

0.04
3.76

Instalacin de Codo PVC de 45 - 1"


COSTO/Unid

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS

1.

2.

Codo PVC 45, 1"

Unid

1.0000

5.00

5.00

5.00

Pegamento OATEY x galn

Unid

0.0150

26.00

0.39

0.39

Lija N 40

Unid

0.0630

2.80

0.18

0.18

0.78

0.00

0.00

0.00

0.00

5.57

0.00

MANO DE OBRA
Mano de obra no calificada

3.

Jornal

0.0310

25.00

EQUIPOS

0.78
0.04

Herramientas (5,00 % MONC)

0.0500

0.78

COSTO TOTAL

1.1.1.10.

FINANCIAMIENTO
PRECIO
GOB.
TOTAL FONCODE
S
LOCAL
5.57
5.57
0.00

0.04
6.39

Instalacin de Codo PVC de 45 - 2"


COSTO/Unid

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL

MATERIALES E INSUMOS

1.

2.

0.00

Unid

1.0000

8.00

8.00

8.00

Pegamento OATEY x galn

Unid

0.0200

26.00

0.52

0.52

Lija N 40

Unid

0.0630

2.80

0.18

0.18

0.78

0.00

0.00

0.00

0.00

8.70

0.00

Mano de obra no calificada

Jornal

0.0310

25.00

EQUIPOS

0.78
0.04

Herramientas (5,00 % MONC)

0.0500

0.78

COSTO TOTAL

1.1.1.11.

8.70

Codo PVC, 45 - 2"

MANO DE OBRA

3.

8.70

0.04
9.52

Instalacin de Codo PVC de 45 - 3"


COSTO/Unid

N
1.

2.

DESCRIPCIN

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
12.33
12.33
0.00

Codo PVC, 45 - 3"

Unid

1.0000

11.50

11.50

11.50

Pegamento OATEY x galn

Unid

0.0250

26.00

0.65

0.65

Lija N 40

Unid

0.0630

2.80

0.18

0.18

0.78

0.00

0.00

0.00

0.00

MANO DE OBRA
Mano de obra no calificada

3.

UNID.

Jornal

0.0310

25.00

EQUIPOS
Herramientas (5,00 % MONC)

0.78
0.04

0.0500

0.78

0.04

COSTO TOTAL

1.1.1.12.

13.15

12.33

0.00

Instalacin de Codo PVC de 90 - 1"


COSTO/Unid

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS

1.

2.

Codo PVC 90, 1

Unid

1.0000

2.50

2.50

2.50

Pegamento OATEY x galn

Unid

0.0100

26.00

0.26

0.26

Lija N 40

Unid

0.0630

2.80

0.18

0.18

0.78

0.00

0.00

0.00

0.00

2.94

0.00

MANO DE OBRA
Mano de obra no calificada

3.

Jornal

0.0310

25.00

EQUIPOS

0.78
0.04

Herramientas (5,00 % MONC)

0.0500

0.78

COSTO TOTAL

1.1.1.13.

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
2.94
2.94
0.00

0.04
3.76

Instalacin de Codo PVC de 90 - 1"


COSTO/Unid

N
1.

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS
Codo PVC 90, 1"

Unid

1.0000

5.00

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
5.57
5.57
0.00
5.00

5.00

2.

Pegamento OATEY x galn

Unid

0.0150

26.00

0.39

0.39

Lija N 40

Unid

0.0630

2.80

0.18

0.18

0.78

0.00

0.00

0.00

0.00

5.57

0.00

MANO DE OBRA
Mano de obra no calificada

3.

Jornal

0.0310

25.00

EQUIPOS

0.04

Herramientas (5,00 % MONC)

0.0500

0.78

COSTO TOTAL

1.1.1.14.

0.78

0.04
6.39

Instalacin de Codo PVC de 90 - 2"


COSTO/Unid

N
1.

2.

DESCRIPCIN

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
8.70
8.70
0.00

Codo PVC 90, 2

Unid

1.0000

8.00

8.00

8.00

Pegamento OATEY x galn

Unid

0.0200

26.00

0.52

0.52

Lija N 40

Unid

0.0630

2.80

0.18

0.18

0.78

0.00

0.00

0.00

0.00

8.70

0.00

MANO DE OBRA
Mano de obra no calificada

3.

UNID.

Jornal

0.0310

25.00

EQUIPOS
Herramientas (5,00 % MONC)
COSTO TOTAL

0.78
0.04

0.0500

0.78

0.04
9.52

1.1.1.15.

Instalacin de Tee PVC de 1"


COSTO/Unid

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS

1.

2.

Tee PVC, 1

Unid

1.0000

6.00

6.00

6.00

Pegamento OATEY x galn

Unid

0.0200

26.00

0.52

0.52

Lija N 40

Unid

0.0630

2.80

0.18

0.18

0.78

0.00

0.00

0.00

0.00

6.70

0.00

MANO DE OBRA
Mano de obra no calificada

3.

Jornal

0.0310

25.00

EQUIPOS

0.78
0.04

Herramientas (5,00 % MONC)

0.0500

0.78

COSTO TOTAL

1.1.1.16.

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
6.70
6.70
0.00

0.04
7.52

Instalacin de Tee PVC de 1"


COSTO/Unid

N
1.

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
8.96
8.96
0.00

Tee PVC, 1

Unid

1.0000

8.00

8.00

8.00

Pegamento OATEY x galn

Unid

0.0300

26.00

0.78

0.78

Lija N 40

Unid

0.0630

2.80

0.18

0.18

2.

MANO DE OBRA
Mano de obra no calificada

3.

0.78
Jornal

0.0310

25.00

EQUIPOS
%

0.0500

0.78

COSTO TOTAL

1.1.1.17.

0.00

0.00

0.00

8.96

0.00

0.78
0.04

Herramientas (5,00 % MONC)

0.00

0.04
9.78

Instalacin de Tee PVC de 2"


COSTO/Unid

N
1.

2.

DESCRIPCIN

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
10.22
10.22
0.00

Tee PVC, 2

Unid

1.0000

9.00

9.00

9.00

Pegamento OATEY x galn

Unid

0.0400

26.00

1.04

1.04

Lija N 40

Unid

0.0630

2.80

0.18

0.18

0.78

0.00

0.00

0.00

0.00

10.22

0.00

MANO DE OBRA
Mano de obra no calificada

3.

UNID.

Jornal

0.0310

25.00

EQUIPOS
Herramientas (5,00 % MONC)
COSTO TOTAL

0.78
0.04

0.0500

0.78

0.04
11.04

1.1.1.18.

Instalacin de Tee PVC de 3"


COSTO/Unid

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS

1.

2.

Tee PVC, 3

Unid

1.0000

12.50

12.50

12.50

Pegamento OATEY x galn

Unid

0.0500

26.00

1.30

1.30

Lija N 40

Unid

0.0630

2.80

0.18

0.18

0.78

0.00

0.00

0.00

0.00

13.98

0.00

MANO DE OBRA
Mano de obra no calificada

3.

Jornal

0.0310

25.00

EQUIPOS

0.78
0.04

Herramientas (5,00 % MONC)

0.0500

0.78

COSTO TOTAL

1.1.1.19.

FINANCIAMIENTO
PRECIO
GOB.
TOTAL FONCODE
S
LOCAL
13.98
13.98
0.00

0.04
14.80

Instalacin de Reduccin PVC de 1" - 1"


COSTO/Unid

N
1.

2.

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
6.96
6.96
0.00

Reduccin PVC, 1" - 1

Unid

1.0000

6.00

6.00

6.00

Pegamento OATEY x galn

Unid

0.0300

26.00

0.78

0.78

Lija N 40

Unid

0.0630

2.80

0.18

0.18

0.78

0.00

MANO DE OBRA

0.00

Mano de obra no calificada


3.

Jornal

0.0310

25.00

EQUIPOS

0.04

Herramientas (5,00 % MONC)

0.0500

0.78

COSTO TOTAL

1.1.1.20.

0.78
0.00

0.00

6.96

0.00

0.04
7.78

Instalacin de Reduccin PVC de 2" - 1"


COSTO/Unid

N
1.

2.

DESCRIPCIN

PRECIO
UNITAR.

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
6.48
6.48
0.00

Reduccin PVC, 2" - 1"

Unid

1.0000

5.00

5.00

5.00

Pegamento OATEY x galn

Unid

0.0500

26.00

1.30

1.30

Lija N 40

Unid

0.0630

2.80

0.18

0.18

0.78

0.00

0.00

0.00

0.00

6.48

0.00

MANO DE OBRA
Jornal

0.0310

25.00

EQUIPOS
Herramientas (5,00 % MONC)
COSTO TOTAL

1.1.1.21.

CANT.

MATERIALES E INSUMOS

Mano de obra no calificada


3.

UNID.

0.78
0.04

0.0500

0.78

0.04
7.30

Instalacin de Reduccin PVC de 2" - 1"


COSTO/Unid

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS

1.

2.

Reduccin PVC, 2" - 1"

Unid

1.0000

6.50

6.50

6.50

Pegamento OATEY x galn

Unid

0.0500

26.00

1.30

1.30

Lija N 40

Unid

0.0630

2.80

0.18

0.18

0.78

0.00

0.00

0.00

0.00

7.98

0.00

MANO DE OBRA
Mano de obra no calificada

3.

Jornal

0.0310

25.00

EQUIPOS

0.78
0.04

Herramientas (5,00 % MONC)

0.0500

0.78

COSTO TOTAL

1.1.1.22.

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
7.98
7.98
0.00

0.04
8.80

Instalacin de Reduccin PVC de 3" - 2"


COSTO/Unid

N
1.

2.

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS

FINANCIAMIENTO
PRECIO
GOB.
TOTAL FONCODE
S
LOCAL
10.24
10.24
0.00

Reduccin PVC, 3" - 2"

Unid

1.0000

8.50

8.50

8.50

Pegamento OATEY x galn

Unid

0.0600

26.00

1.56

1.56

Lija N 40

Unid

0.0630

2.80

0.18

0.18

0.78

0.00

MANO DE OBRA
Mano de obra no calificada

Jornal

0.0310

25.00

0.78

0.00

3.

EQUIPOS

0.04

Herramientas (5,00 % MONC)

0.0500

0.78

COSTO TOTAL

1.1.1.24.

0.00

0.00

10.24

0.00

0.04
11.06

Instalacin de Llave de paso de 1"


COSTO/Unid

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS

1.

2.

Llave de paso de 1"

Unid

1.0000

9.00

9.00

9.00

UPR PVC Adaptador de 1

Unid

2.0000

4.50

9.00

9.00

Pegamento OATEY x galn

Unid

0.0300

26.00

0.78

0.78

Lija N 40

Unid

0.0630

2.80

0.18

0.18

0.78

0.00

0.00

0.00

0.00

18.96

0.00

MANO DE OBRA
Mano de obra no calificada

3.

Jornal

0.0310

25.00

EQUIPOS

0.78
0.04

Herramientas (5,00 % MONC)

0.0500

0.78

COSTO TOTAL

1.1.1.25.

FINANCIAMIENTO
PRECIO
GOB.
TOTAL FONCODE
S
LOCAL
18.96
18.96
0.00

0.04
19.78

Instalacin de Llave de paso de 2"


COSTO/Unid

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

PRECIO
TOTAL

FINANCIAMIENTO

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS

1.

2.

Unid

1.0000

12.00

12.00

12.00

UPR PVC Adaptador de 2

Unid

2.0000

6.50

13.00

13.00

Pegamento OATEY x galn

Unid

0.0400

26.00

1.04

1.04

Lija N 40

Unid

0.0630

2.80

0.18

0.18

0.78

0.00

0.00

0.00

0.00

26.22

0.00

Mano de obra no calificada

Jornal

0.0310

25.00

EQUIPOS

0.78
0.04

Herramientas (5,00 % MONC)

0.0500

0.78

COSTO TOTAL

1.1.1.26.

GOB.
LOCAL
0.00

Llave de paso de 2"

MANO DE OBRA

3.

PRECIO
TOTAL FONCODE
S
26.22
26.22

0.04
27.04

Construccin de Caja de llave de paso


COSTO/Unid

N
1.

2.

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS

FINANCIAMIENTO
PRECIO
GOB.
TOTAL FONCODE
S
LOCAL
94.74
94.74
0.00

Arena hormign

0.0300

70.00

2.10

2.10

Cemento Portland tipo I / 42,50 kg

Bolsa

0.1200

22.00

2.64

2.64

Tapa metlica con seguro de 35x35 cm

Unid

1.0000

90.00

90.00

90.00

0.63

0.00

MANO DE OBRA
Mano de obra no calificada

Jornal

0.0250

25.00

0.63

0.00

3.

EQUIPOS

0.03

Herramientas (5,00 % MONC)

0.0500

0.63

COSTO TOTAL

1.1.1.27.

0.00

0.00

94.74

0.00

0.03
95.40

Instalacin de collarines para hidrantes de 25 mm * "


COSTO/Unid

DESCRIPCIN

1.

MATERIALES E INSUMOS

1.1.

Caja de concreto de Proteccin

1.2.

2.

CANT.

PRECIO
UNITAR.

FINANCIAMIENTO
PRECIO
GOB.
TOTAL FONCODE
S
LOCAL
138.02
138.02
0.00

Arena hormign

0.0300

70.00

2.10

2.10

Cemento Portland tipo I / 42,50 kg

Bolsa

0.1100

22.00

2.42

2.42

Tapa metlica con seguro de 35x35 cm

Unid

1.0000

90.00

90.00

90.00

Accesorios para instalacin del hidrante


Collarn HDPE de 25 mm X "

Unid

1.0000

9.00

9.00

9.00

Niple de "

Unid

1.0000

4.00

4.00

4.00

Llave de paso de "

Unid

1.0000

4.80

4.80

4.80

Vlvula de acople rpido de "

Unid

1.0000

22.00

22.00

22.00

Cinta tefln

Unid

2.0000

1.20

2.40

2.40

Pegamento OATEY x galn

Unid

0.0500

26.00

1.30

1.30

25.00

0.00

0.00

0.00

0.00

MANO DE OBRA
Mano de obra no calificada

3.

UNID.

Jornal

1.0000

25.00

EQUIPOS
Herramientas (5,00 % MONC)

25.00
1.25

0.0500

25.00

1.25

COSTO TOTAL

1.1.1.28.

164.27

138.02

0.00

Instalacin de collarines para hidrantes de 38 mm * "


COSTO/Unid

DESCRIPCIN

1.

MATERIALES E INSUMOS

1.1.

Caja de concreto de Proteccin

1.2.

2.

CANT.

PRECIO
UNITAR.

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
140.02
140.02
0.00

Arena hormign

0.0300

70.00

2.10

2.10

Cemento Portland tipo I / 42,50 kg

Bolsa

0.1100

22.00

2.42

2.42

Tapa metlica con seguro de 35x35 cm

Unid

1.0000

90.00

90.00

90.00

Accesorios para instalacin de Collarn


Collarn HDPE de 38 mm X "

Unid

1.0000

11.00

11.00

11.00

Niple de "

Unid

1.0000

4.00

4.00

4.00

Llave de paso de "

Unid

1.0000

4.80

4.80

4.80

Vlvula de acople rpido de "

Unid

1.0000

22.00

22.00

22.00

Cinta tefln

Unid

2.0000

1.20

2.40

2.40

Pegamento OATEY x galn

Unid

0.0500

26.00

1.30

1.30

25.00

0.00

0.00

0.00

0.00

140.02

0.00

MANO DE OBRA
Mano de obra no calificada

3.

UNID.

Jornal

1.0000

25.00

EQUIPOS
Herramientas (5,00 % MONC)
COSTO TOTAL

25.00
1.25

0.0500

25.00

1.25
166.27

1.1.1.29.

Instalacin de collarines para hidrantes de 50 mm * "


COSTO/Unid

DESCRIPCIN

1.

MATERIALES E INSUMOS

1.1.

Caja de concreto de Proteccin

1.2.

2.

CANT.

PRECIO
UNITAR.

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
141.02
141.02
0.00

Arena hormign

0.0300

70.00

2.10

2.10

Cemento Portland tipo I / 42,50 kg

Bolsa

0.1100

22.00

2.42

2.42

Tapa metlica con seguro de 35x35 cm

Unid

1.0000

90.00

90.00

90.00

Accesorios para instalacin de Collarn


Collarn HDPE de 50 mm X "

Unid

1.0000

12.00

12.00

12.00

Niple de "

Unid

1.0000

4.00

4.00

4.00

Llave de paso de "

Unid

1.0000

4.80

4.80

4.80

Vlvula de acople rpido de "

Unid

1.0000

22.00

22.00

22.00

Cinta tefln

Unid

2.0000

1.20

2.40

2.40

Pegamento OATEY x galn

Unid

0.0500

26.00

1.30

1.30

25.00

0.00

0.00

0.00

0.00

141.02

0.00

MANO DE OBRA
Mano de obra no calificada

3.

UNID.

Jornal

1.0000

25.00

EQUIPOS
Herramientas (5,00 % MONC)
COSTO TOTAL

25.00
1.25

0.0500

25.00

1.25
167.27

1.1.1.30.

Instalacin de collarines para hidrantes de 75 mm * "


COSTO/Unid

DESCRIPCIN

1.

MATERIALES E INSUMOS

1.1.

Caja de concreto de Proteccin

1.2.

2.

PRECIO
UNITAR.

FINANCIAMIENTO
PRECIO
GOB.
TOTAL FONCODE
S
LOCAL
148.02
148.02
0.00

0.0300

70.00

2.10

2.10

Cemento Portland tipo I / 42,50 kg

Bolsa

0.1100

22.00

2.42

2.42

Tapa metlica con seguro de 35x35 cm

Unid

1.0000

90.00

90.00

90.00

Accesorios para instalacin de Collarn


Collarn HDPE de 75 mm X "

Unid

1.0000

19.00

19.00

19.00

Niple de "

Unid

1.0000

4.00

4.00

4.00

Llave de paso de "

Unid

1.0000

4.80

4.80

4.80

Vlvula de acople rpido de "

Unid

1.0000

22.00

22.00

22.00

Cinta tefln

Unid

2.0000

1.20

2.40

2.40

Pegamento OATEY x galn

Unid

0.0500

26.00

1.30

1.30

25.00

0.00

0.00

0.00

0.00

148.02

0.00

MANO DE OBRA
Jornal

1.0000

25.00

EQUIPOS
Herramientas (5,00 % MONC)

25.00
1.25

COSTO TOTAL

1.1.1.31.

CANT.

Arena hormign

Mano de obra no calificada


3.

UNID.

0.0500

25.00

1.25
174.27

Instalacin de Tubera PVC SAP C-10, ="


COSTO/m

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS

1.

2.

Tubera PVC SAP, C-10, 1 x 5m

1.0000

2.00

2.00

2.00

Pegamento OATEY x galn

Unid

0.0050

26.00

0.13

0.13

Sierra metlica

Unid

0.0020

5.00

0.01

0.01

Lija N 40

Unid

0.0080

2.80

0.02

0.02

2.50

0.00

0.00

0.00

0.00

2.16

0.00

MANO DE OBRA
Mano de obra no calificada

3.

Jornal

0.1000

25.00

EQUIPOS

2.50
0.13

Herramientas (5,00 % MONC)

0.0500

2.50

COSTO TOTAL

1.1.1.32.

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
2.16
2.16
0.00

0.13
4.79

Instalacin de Tubera PVC SAP C-10, =1"


COSTO/m

N
1.

2.

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
2.96
2.96
0.00

Tubera PVC SAP, C-10, 1 x 5m

1.0000

2.80

2.80

2.80

Pegamento OATEY x galn

Unid

0.0050

26.00

0.13

0.13

Sierra metlica

Unid

0.0020

5.00

0.01

0.01

Lija N 40

Unid

0.0080

2.80

0.02

0.02

2.50

0.00

MANO DE OBRA

0.00

Mano de obra no calificada


3.

Jornal

0.1000

25.00

EQUIPOS

0.13

Herramientas (5,00 % MONC)

0.0500

2.50

COSTO TOTAL

1.1.1.33.

2.50
0.00

0.00

2.96

0.00

0.13
5.59

Instalacin de Tubera PVC SAP C-7.5, =1"


COSTO/m

N
1.

2.

DESCRIPCIN

PRECIO
UNITAR.

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
4.24
4.24
0.00

Tubera PVC SAP, C-7,50, 1" x 5m

1.0000

4.00

4.00

4.00

Pegamento OATEY x galn

Unid

0.0080

26.00

0.21

0.21

Sierra metlica

Unid

0.0020

5.00

0.01

0.01

Lija N 40

Unid

0.0080

2.80

0.02

0.02

2.50

0.00

0.00

0.00

0.00

4.24

0.00

MANO DE OBRA
Jornal

0.1000

25.00

EQUIPOS
Herramientas (5,00 % MONC)

2.50
0.13

COSTO TOTAL

1.1.1.34.

CANT.

MATERIALES E INSUMOS

Mano de obra no calificada


3.

UNID.

Instalacin de Tubera PVC SAP C-7.5, =2"

0.0500

2.50

0.13
6.87

COSTO/m
N

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS

1.

2.

Tubera PVC SAP, C-7,50, 2 x 5m

1.0000

6.00

6.00

6.00

Pegamento OATEY x galn

Unid

0.0100

26.00

0.26

0.26

Sierra metlica

Unid

0.0030

5.00

0.02

0.02

Lija N 40

Unid

0.0080

2.80

0.02

0.02

2.50

0.00

0.00

0.00

0.00

6.30

0.00

MANO DE OBRA
Mano de obra no calificada

3.

Jornal

0.1000

25.00

EQUIPOS

2.50
0.13

Herramientas (5,00 % MONC)

0.0500

2.50

COSTO TOTAL

1.1.1.35.

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
6.30
6.30
0.00

0.13
8.93

Instalacin de Tubera PVC SAP C-7.5, =3"


COSTO/m

N
1.

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
12.90
12.90
0.00

Tubera PVC SAP, C-7,50, 3 x 5m

1.0000

12.60

12.60

12.60

Pegamento OATEY x galn

Unid

0.0100

26.00

0.26

0.26

Sierra metlica

Unid

0.0030

5.00

0.02

0.02

Lija N 40

Unid

0.0080

2.80

0.02

0.02

2.

MANO DE OBRA
Mano de obra no calificada

3.

2.50
Jornal

0.1000

25.00

EQUIPOS
%

0.0500

2.50

COSTO TOTAL

1.1.1.36.

0.00

0.00

0.00

12.90

0.00

2.50
0.13

Herramientas (5,00 % MONC)

0.00

0.13
15.53

Instalacin de sistema mvil


COSTO/Unid

N
1.

2.

DESCRIPCIN

CANT.

PRECIO
UNITAR.

MATERIALES

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
220.20
220.20
0.00

Llave bayoneta de

Unid

1.0000

12.00

12.00

12.00

Codo HDPE de 25 mm x R/H

Unid

2.0000

10.00

20.00

20.00

Manguera PEDB de 25 mm, C-4

50.0000

1.10

55.00

55.00

Niple PVC de x 1,20 m (Elevador)

Unid

1.0000

9.00

9.00

9.00

Unin roscada HDPE de

Unid

1.0000

3.00

3.00

3.00

Aspersor VYR 60 - " / sectorial (bronce) Unid

1.0000

85.00

85.00

85.00

Trpode metal x 1,10 m c/abraz. A presin


Unid

1.0000

35.00

35.00

35.00

Cinta tefln

1.0000

1.20

1.20

1.20

6.25

0.00

0.00

0.00

0.00

Unid

MANO DE OBRA
Mano de obra no calificada

3.

UNID.

Jornal

0.2500

25.00

EQUIPOS
Herramientas (5,00 % MONC)

6.25
0.31

0.0500

6.25

0.31

COSTO TOTAL

226.76

1.1.2.

Produc. de actividades agropec. orientas al Mcdo.

1.1.2.1.

Huerto fijo de hortalizas a campo abierto

1.1.2.1.1.

Produccin de zanahoria
VARIEDAD

"Senimis"

NIVEL TECNICO

Baja

RDTO (kg/ha)

1.

2.

3.

0.50

DESCRIPCIN

UNID.

COSTO/ha
CANT.

PRECIO
UNITAR.

INSUMOS
Semillas de Zanahoria

kg

Guano de corral

Saco

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
2,360.00
360.00
0.00

4.0000

90.00

360.00

200.0000

10.00

2,000.00

MANO DE OBRA

1,850.00

Preparacin de terreno

Jornal

15.0000

25.00

375.00

Siembra

Jornal

12.0000

25.00

300.00

Labores culturales

Jornal

24.0000

25.00

600.00

Riegos

Jornal

8.0000

25.00

200.00

Cosecha

Jornal

15.0000

25.00

375.00

HERRAMIENTAS
Herramientas (5,00 % MONC)
COSTO TOTAL

0.00

7,500.00

PRECIO (S/./kg)
N

220.20

92.50
%

0.0500

1,850.00

360.00

0.00

0.00

0.00

0.00

360.00

0.00

92.50
4,302.50

1.1.2.1.2.

Produccin de cebolla
VARIEDAD

"Roja Arequipea"

NIVEL TECNICO

Baja

RDTO (kg/ha)

11,000.00

PRECIO (S/./kg)
N
1.

2.

3.

1.50

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

INSUMOS
Semillas de cebolla

kg

Guano de corral

Saco

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
2,472.00
472.00
0.00

4.0000

118.00

472.00

200.0000

10.00

2,000.00

MANO DE OBRA

1,150.00

Preparacin de terreno

Jornal

8.0000

25.00

200.00

Siembra

Jornal

10.0000

25.00

250.00

Labores culturales

Jornal

10.0000

25.00

250.00

Riegos

Jornal

8.0000

25.00

200.00

Cosecha

Jornal

10.0000

25.00

250.00

HERRAMIENTAS
Herramientas (5,00 % MONC)

57.50
%

COSTO TOTAL

1.1.2.1.3.

COSTO/ha

Produccin de betarraga
VARIEDAD

0.0500

1,150.00

0.00

0.00

0.00

0.00

472.00

0.00

57.50
3,679.50

"Viroflay"

472.00

NIVEL TECNICO

Baja

RDTO (kg/ha)

6,500.00

PRECIO (S/./kg)
N
1.

0.60

DESCRIPCIN

UNID.

COSTO/ha
CANT.

PRECIO
UNITAR.

INSUMOS

2.

Semillas de betarraga

kg

Guano de corral

Saco

12.0000

75.00

900.00

200.0000

10.00

2,000.00

MANO DE OBRA

3.

1,050.00

Preparacin de terreno

Jornal

8.0000

25.00

200.00

Siembra

Jornal

8.0000

25.00

200.00

Labores culturales

Jornal

8.0000

25.00

200.00

Riegos

Jornal

8.0000

25.00

200.00

Cosecha

Jornal

10.0000

25.00

250.00

HERRAMIENTAS
Herramientas (5% M.O.)

52.50
%

0.0500

1,050.00

COSTO TOTAL

1.1.2.1.4.

"Snowball"

NIVEL TECNICO

Baja

PRECIO (S/./kg)
DESCRIPCIN

900.00

0.00

0.00

0.00

0.00

900.00

0.00

52.50
4,002.50

Produccin de coliflor
VARIEDAD
RDTO (kg/ha)

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
2,900.00
900.00
0.00

6,000.00
1.00
UNID.

COSTO/ha
CANT.

PRECIO
UNITAR.

PRECIO
TOTAL

FINANCIAMIENTO

N
1.

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

INSUMOS

2.

Semillas de coliflor

kg

Guano de corral

Saco

2.5000

170.00

425.00

200.0000

10.00

2,000.00

MANO DE OBRA

3.

1,050.00

Preparacin de terreno

Jornal

8.0000

25.00

200.00

Siembra

Jornal

8.0000

25.00

200.00

Labores culturales

Jornal

8.0000

25.00

200.00

Riegos

Jornal

8.0000

25.00

200.00

Cosecha

Jornal

10.0000

25.00

250.00

HERRAMIENTAS
Herramientas (5% M.O.)

52.50
%

0.0500

1,050.00

COSTO TOTAL

1.1.2.1.5.

"Blanca Lucullus"

NIVEL TECNICO

Baja

DESCRIPCIN

425.00

0.00

0.00

0.00

0.00

425.00

0.00

5,000.00

PRECIO (S/./kg)
N

GOB.
LOCAL
0.00

52.50
3,527.50

Produccin de acelga
VARIEDAD
RDTO (kg/ha)

1.

PRECIO
TOTAL FONCODE
S
2,425.00
425.00

0.70
UNID.

COSTO/ha
CANT.

PRECIO
UNITAR.

INSUMOS
Semillas de acelga

kg

Guano de corral

Saco

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
2,400.00
400.00
0.00

5.0000

80.00

400.00

200.0000

10.00

2,000.00

400.00

2.

MANO DE OBRA

3.

1,850.00

Preparacin de terreno

Jornal

15.0000

25.00

375.00

Siembra

Jornal

12.0000

25.00

300.00

Labores culturales

Jornal

24.0000

25.00

600.00

Riegos

Jornal

8.0000

25.00

200.00

Cosecha

Jornal

15.0000

25.00

375.00

HERRAMIENTAS
Herramientas (5,00 % MONC)

92.50
%

0.0500

1,850.00

COSTO TOTAL

1.1.2.2.

Parcela de pastos asociados

1.1.2.2.1.

Parcela produccin de alfalfa


VARIEDAD
NIVEL TECNICO
RDTO (kg/ha)

1.

2.

DESCRIPCIN

0.00

0.00

400.00

0.00

Super Alabama 550 PL


Baja
60,000.00
0.25
UNID.

COSTO/ha
CANT.

PRECIO
UNITAR.

INSUMOS
Semilla de Alfalfa Super Alabama 550 PL

kg

Guano de corral

Saco

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
3,050.00 1,050.00
0.00

25.0000

42.00

1,050.00

200.0000

10.00

2,000.00

MANO DE OBRA
Preparacin de terreno

0.00

92.50
4,342.50

PRECIO (S/./kg)
N

0.00

3,575.00
Jornal

35.0000

25.00

875.00

1,050.00

0.00

0.00

3.

Siembra

Jornal

28.0000

25.00

700.00

Labores culturales

Jornal

35.0000

25.00

875.00

Riegos

Jornal

10.0000

25.00

250.00

Cosecha

Jornal

35.0000

25.00

875.00

HERRAMIENTAS
Herramientas (5,00 % MONC)

178.75
%

0.0500

3,575.00

COSTO TOTAL

1.1.2.3.

Miniparcelas para la produccin granos andinos

1.1.2.3.1.

Produccin de quinua
VARIEDAD
NIVEL TECNICO
RDTO (kg/ha)

1.

DESCRIPCIN

0.00

6,803.75 1,050.00

0.00

178.75

Media
1,800.00

PRECIO (S/./kg)
N

0.00

COSTO/ha

3.50
UNID.

CANT.

PRECIO
UNITAR.

MANO DE OBRA

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
2,500.00
0.00
0.00

1.1. PREPARACION DEL TERRENO


Limpieza de terreno

Jornal

2.0000

25.00

50.00

Aplicacin del primer abonamiento

Jornal

4.0000

25.00

100.00

Siembra chorro continuo por surcos

Jornal

4.0000

25.00

100.00

Tapado de semilla

Jornal

2.0000

25.00

50.00

Riego de machaco y remojo

Jornal

2.0000

25.00

50.00

1.2. SIEMBRA

1.3. LABORES CULTURALES

Primer deshierbe y aporque

Jornal

20.0000

25.00

500.00

Segundo abonamiento

Jornal

4.0000

25.00

100.00

Segundo aporque

Jornal

15.0000

25.00

375.00

Segundo deshierbo

Jornal

5.0000

25.00

125.00

Corte

Jornal

15.0000

25.00

375.00

Traslado, amontonado y secado

Jornal

5.0000

25.00

125.00

Trillado

Jornal

14.0000

25.00

350.00

Venteo

Jornal

4.0000

25.00

100.00

Ensacado y cocido

Jornal

2.0000

25.00

50.00

Almacenamiento

Jornal

2.0000

25.00

50.00

1.4. COSECHA

2.

TRACCION ANIMAL

385.00

0.00

0.00

1,447.45

147.45

0.00

147.45

2.1. PREPARACION DEL TERRENO

3.

Barbecho o Arado o roturacin

Yunta

5.0000

35.00

175.00

Cruza o desterronado

Yunta

4.0000

35.00

140.00

Surcado

Yunta

2.0000

35.00

70.00

INSUMOS
3.1. SEMILLA
Semilla de quinua

kg

15.0000

9.83

147.45

130.0000

10.00

1,300.00

3.2. FERTILIZANTES
Guano de corral
4.

Saco

HERRAMIENTAS
Herramientas (5,00 % MONC)
COSTO TOTAL

125.00
%

0.0500

2,500.00

0.00

0.00

147.45

0.00

125.00
4,457.45

1.1.2.3.2.

Produccin de papa blanca


VARIEDAD

Canchn

NIVEL TECNICO

Media

RDTO (kg/ha)

26,000.00

PRECIO (S/./kg)
N
1.

DESCRIPCIN

0.60
UNID.

CANT.

PRECIO
UNITAR.

MANO DE OBRA

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
3,100.00
0.00
0.00

1.1. PREPARACION DEL TERRENO


Limpieza y quema de rastrojo

Jornal

1.0000

25.00

25.00

Riego de remojo o machaco

Jornal

1.0000

25.00

25.00

Reseleccion de semilla

Jornal

2.0000

25.00

50.00

Mezcla y abonamiento

Jornal

3.0000

25.00

75.00

Distribucion de semillas

Jornal

8.0000

25.00

200.00

Primer aporque

Jornal

15.0000

25.00

375.00

Segundo aporque

Jornal

15.0000

25.00

375.00

Escarbe de surcos

Jornal

25.0000

25.00

625.00

Recojo manual

Jornal

20.0000

25.00

500.00

Traslado y amontonamiento

Jornal

9.0000

25.00

225.00

Seleccin y clasificacion

Jornal

15.0000

25.00

375.00

Ensacado y cosido

Jornal

5.0000

25.00

125.00

Almacenado

Jornal

5.0000

25.00

125.00

1.2. SIEMBRA

1.3. LABORES CULTURALES

1.4. COSECHA

2.

TRACCION ANIMAL

350.00

0.00

0.00

6,750.00 5,250.00

0.00

2.1. PREPARACION DEL TERRENO


Barbecho o Arado o roturacion

Yunta

5.0000

35.00

175.00

Cruza o desterronado

Yunta

3.0000

35.00

105.00

Surqueo o melgueo

Yunta

1.0000

35.00

35.00

Tapado de semilla

Yunta

1.0000

35.00

35.00

2.2. SIEMBRA

3.

INSUMOS
3.1. SEMILLA
Semilla de papa

kg

###

3.50

5,250.00

150.0000

10.00

1,500.00

5,250.00

3.2. FERTILIZANTES
Guano de corral
4.

Saco

HERRAMIENTAS
Herramientas (5,00 % MONC)

155.00
%

0.0500

3,100.00

COSTO TOTAL

1.1.2.3.3.

Produccin de frejol canario


VARIEDAD

Frejol canario

NIVEL TECNICO

Media

RDTO (kg/ha)
PRECIO (S/./kg)
N
1.

DESCRIPCIN
MANO DE OBRA

0.00

0.00

### 5,250.00

0.00

155.00

800.00
COSTO/ha

3.00
UNID.

CANT.

PRECIO
UNITAR.

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
1,600.00
0.00
0.00

1.1. PREPARACION DEL TERRENO


Limpieza de terreno

Jornal

2.0000

25.00

50.00

Reseleccin y desinfeccin

Jornal

1.0000

25.00

25.00

Mezcla y primer abonamiento

Jornal

2.0000

25.00

50.00

Distribucin de semilla

Jornal

3.0000

25.00

75.00

Primer deshierbe a mano

Jornal

8.0000

25.00

200.00

Primer control fitosanitario

Jornal

2.0000

25.00

50.00

Primer aporque

Jornal

16.0000

25.00

400.00

Segundo control fitosanitario

Jornal

2.0000

25.00

50.00

Corte o siega

Jornal

8.0000

25.00

200.00

Traslado, amontonado

Jornal

6.0000

25.00

150.00

Trilla

Jornal

8.0000

25.00

200.00

Despaje y venteo

Jornal

2.0000

25.00

50.00

Ensacado y cosido

Jornal

2.0000

25.00

50.00

Almacenamiento

Jornal

2.0000

25.00

50.00

1.2. SIEMBRA

1.3. LABORES CULTURALES

1.4. COSECHA

2.

TRACCION ANIMAL

350.00

0.00

0.00

390.00

0.00

2.1. PREPARACION DEL TERRENO


Barbecho o Arado o roturacin

Yunta

4.0000

35.00

140.00

Cruza o desterronado

Yunta

2.0000

35.00

70.00

Surcado

Yunta

2.0000

35.00

70.00

Tapado de semilla

Yunta

2.0000

35.00

70.00

2.2. SIEMBRA

3.

INSUMOS

1,790.00

3.1. SEMILLA
Semilla de frejol canario

kg

60.0000

6.50

390.00

140.0000

10.00

1,400.00

390.00

3.2. FERTILIZANTES
Guano de corral
4.

Saco

HERRAMIENTAS
Herramientas (5,00 % MONC)

80.00
%

0.0500

1,600.00

COSTO TOTAL

1.1.2.3.4.

Blanca

NIVEL TECNICO

Medio

RDTO (kg/ha)

1.

DESCRIPCIN

0.00

COSTO/ha

1.40

UNID.

CANT.

PRECIO
UNITAR.

MANO DE OBRA

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
1,425.00
0.00
0.00

1.1. PREPARACION DEL TERRENO


Limpieza de terreno

390.00

2,000.00

PRECIO (S/./kg)
N

0.00

80.00
3,820.00

Produccin de arveja
VARIEDAD

0.00

Jornal

1.0000

25.00

25.00

Reselec. Y desinfeccin de semilla

Jornal

1.0000

25.00

25.00

Mezcla y primer abonamiento

Jornal

2.0000

25.00

50.00

Distribucin de semilla

Jornal

3.0000

25.00

75.00

Primer deshierbe a mano

Jornal

8.0000

25.00

200.00

Primer aporque

Jornal

16.0000

25.00

400.00

1.2. SIEMBRA

1.3. LABORES CULTURALES

1.4. COSECHA

2.

Corte a mano con hoz

Jornal

8.0000

25.00

200.00

Traslado de gavilla a la era

Jornal

4.0000

25.00

100.00

Trilla con garrote

Jornal

8.0000

25.00

200.00

Venteo

Jornal

2.0000

25.00

50.00

Ensacado y cocido

Jornal

2.0000

25.00

50.00

Traslado y almacenamiento

Jornal

2.0000

25.00

50.00

TRACCION ANIMAL

350.00

0.00

0.00

1,554.00

354.00

0.00

354.00

2.1. PREPARACION DEL TERRENO


Barbecho o Arado o roturacin

Yunta

4.0000

35.00

140.00

Cruza o desterronado o Rastra

Yunta

2.0000

35.00

70.00

Surcado

Yunta

2.0000

35.00

70.00

Tapado de semilla

Yunta

2.0000

35.00

70.00

1.2. SIEMBRA

3.

INSUMOS
3.1. SEMILLA
Semilla de arveja

kg

60.0000

5.90

354.00

120.0000

10.00

1,200.00

3.2. FERTILIZANTES
Guano de corral

4.

Saco

HERRAMIENTAS
Herramientas (5,00 % MONC)

COSTO TOTAL

71.25
%

0.0500

1,425.00

0.00

0.00

354.00

0.00

71.25

3,400.25

1.1.2.4.

Agroforestera
COSTO/Familia

N
1.

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

MATERIALES
Plantones de pino

2.

Unid.

20.0000

1.50

MANO DE OBRA
Mano de obra no calificada

3.

Jornal

2.0000

25.00

HERRAMIENTAS
Herramientas (5,00 % MONC)

30.00

30.00

50.00

0.00

0.00

0.00

0.00

30.00

0.00

50.00
2.50

0.0500

50.00

TOTAL COSTOS DIRECTOS (S/.)

1.1.2.5.

FINANCIAMIENTO
PRECIO
GOB.
TOTAL FONCODE
S
LOCAL
30.00
30.00
0.00

2.50
82.50

Mdulo de produccin de abono orgnico - compost


COSTO/Mdulo

produc. = 20 sacos/familia - sacos=S/. 15,00


N
1.

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

MANO DE OBRA

FINANCIAMIENTO
PRECIO
GOB.
TOTAL FONCODE
S
LOCAL
135.00
0.00
0.00

1.1. PREPARACION DE LA POZA


Perforacion de 02 pozas (1 x 8 x 0,5 m)

Jornal

1.0000

25.00

25.00

Recoleccin de malezas (mala hierba etc.) Jornal

1.0000

25.00

25.00

Recoleccin de guano (fresco y/o seco)

Jornal

1.0000

25.00

25.00

Jornal

0.3000

25.00

7.50

1.2. RECOLECCION DE MALEZAS Y GUANO CORRAL

1.3. LABORES CULTURALES


Secado de malezas

Mezcla de malezas y guano

Jornal

0.3000

25.00

7.50

Primera inundacin de la poza

Jornal

0.3000

25.00

7.50

Primer volteo de la mezcla

Jornal

0.3000

25.00

7.50

Segunda inundacin de la mezcla

Jornal

0.3000

25.00

7.50

Segundo volteo de la mezcla

Jornal

0.3000

25.00

7.50

Remocin del compost

Jornal

0.3000

25.00

7.50

Ensacado del compost

Jornal

0.3000

25.00

7.50

1.4. OBTENCION DEL COMPOST

2.

INSUMOS

18.20

9.00
9.00

0.00

2.1. MALLA ARPILLERA

3.

Malla arpillera

5.0000

1.80

9.00

Ceniza

kg

6.0000

0.20

1.20

Rollizos de eucalipto =2 x 2,20 m

Unid

2.0000

4.00

8.00

HERRAMIENTAS
Herramientas (5,00 % MONC)

6.75
%

0.0500

135.00

COSTO TOTAL

1.1.2.6.

0.00

0.00

9.00

0.00

6.75
159.95

Mdulo de crianza de gallinas


COSTO/Mdulo

N
1.

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

IMPLEMENTACIN DE JAULAS Y COMPRA DE POLLOS

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
103.20
53.20
0.00

Malla gallinero

4.0000

2.80

11.20

Instalaciones (construccin de jaulas)

Gbl

1.0000

50.00

50.00

11.20

2.

Alambre negro N 16

kg

1.5000

5.00

7.50

7.50

Clavos de 4

kg

0.5000

5.00

2.50

2.50

Gallinas criollas de doble propsito

Unid

4.0000

8.00

32.00

32.00

8.80

8.80

8.80

8.80

4.20

4.20

ALIMENTO DE GALLINAS
Alimento balanceado

3.

kg

4.0000

2.20

BOTIQUN VETERINARIO
Antibitico (Biomycin Sper x 20 g)

4.

0.5000

2.80

1.40

1.40

Antiparasitario ext. (Fipecto Frasco de 1,00Fco.

0.0200

140.00

2.80

2.80

2.00

2.00

2.00

2.00

25.00

0.00

0.00

0.00

0.00

68.20

0.00

Transporte semovientes

Cbza

4.0000

0.50

MANO DE OBRA
Mano de obra no calificada

5.

Jornal

1.0000

25.00

HERRAMIENTAS
Herramientas (5,00 % MONC)

0.0500

25.00

0.00

25.00
1.25

COSTO TOTAL

1.1.2.7.

0.00

Unid

TRANSPORTE

5.

0.00

1.25
144.45

Mdulo de crianza de cuyes


COSTO/Mdulo

N
1.

DESCRIPCIN
IMPLEMENTACIN DE POZAS

UNID.

CANT.

PRECIO
UNITAR.

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
36.20
16.20
0.00

2.

3.

4.

Rollizos de eucalipto =2 x 2,20 m

Unid

4.0000

5.00

20.00

Malla gallinero

4.0000

2.80

11.20

11.20

Clavos de 2

kg

0.5000

5.00

2.50

2.50

Clavos de 4

kg

0.5000

5.00

2.50

2.50

184.00

184.00

AQUISICIN DE REPRODUCTORES
Cuyes reproductores (macho)

Unid

1.0000

24.00

24.00

24.00

Cuyes reproductores (hembras)

Unid

8.0000

20.00

160.00

160.00

6.36

6.36

BOTIQUN VETERINARIO
Fco.

0.0150

65.00

0.98

0.98

Algodn paquete de 50,00 g

Pqte.

1.0000

3.00

3.00

3.00

Antibitico (Enropro al 20% - Frasco de 0,50


Fco.

0.0200

49.00

0.98

0.98

Antiparasitario ext. (Fipecto Frasco de 1,00Fco.

0.0100

140.00

1.40

1.40

4.50

4.50

4.50

4.50

25.00

0.00

0.00

0.00

0.00

211.06

0.00

TRANSPORTE
Cbza

0.50

Jornal

1.0000

25.00

HERRAMIENTAS
Herramientas (5,00 % MONC)

Materiales de Capacitacin para las tecnologas

0.0500

25.00

0.00

25.00
1.25

COSTO TOTAL

1.2.

9.0000

MANO DE OBRA
Mano de obra no calificada

6.

0.00

Tintura de Yodo al 2% x 1,00 l

Transporte semovientes
5.

0.00

1.25
257.31

1.2.1.

Materiales de capacitacin para las tecnologas


COSTO/Glb
N

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS

1.

FINANCIAMIENTO
PRECIO
GOB.
TOTAL FONCODE
S
LOCAL
3,179.00 3,179.00
0.00

Cuaderno de 100 hojas T-A4

Unid

110.0000

5.00

550.00

550.00

Lapiceros punta fina

Unid

220.0000

1.00

220.00

220.00

Papelgrafo cuadriculado

Ciento

3.6000

40.00

144.00

144.00

Plumones para papel N 47

Unid

216.0000

2.50

540.00

540.00

Manual en riego (15 hojas /manual)

Unid

115.0000

5.00

575.00

575.00

Manual en produccin agrcola y pecuaria Unid

115.0000

5.00

575.00

575.00

Manual en cocinas mejoradas y agua segurUnid

115.0000

5.00

575.00

575.00

COSTO TOTAL

3,179.00 3,179.00

1.3.

Capacitacin de campesino a campesino

1.3.1.

Contratacin de Yachachiq (primer ao)

0.00

COSTO/Mes
N

DESCRIPCIN

1.

MATERIALES E INSUMOS

2.

MANO DE OBRA CALIFICADA


Contratacin de Yachachiq (3 Yachachiq)
COSTO TOTAL

UNID.

CANT.

PRECIO
UNITAR.

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL

3,000.00 3,000.00
Honorar.

3.0000

1,000.00

3,000.00

0.00

3,000.00

3,000.00 3,000.00

0.00

1.3.2.

Contratacin de Yachachiq (segundo ao)


COSTO/Mes
N

DESCRIPCIN

1.

MATERIALES E INSUMOS

2.

MANO DE OBRA CALIFICADA


Contratacin de Yachachiq (1 Yachachiq)

UNID.

CANT.

PRECIO
UNITAR.

1,000.00 1,000.00
Honorar.

1.0000

1,000.00

COSTO TOTAL

1.3.3.

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL

1,000.00

0.00

1,000.00

1,000.00 1,000.00

0.00

Contratacin de Yachachiq (tercer ao)


COSTO/Mes
N

DESCRIPCIN

1.

MATERIALES E INSUMOS

2.

MANO DE OBRA CALIFICADA


Contratacin de Yachachiq (1 Yachachiq)
COSTO TOTAL

1.4.

Seguro bsico de Yachachiq

1.4.1.

Seguro bsico de Yachachiq (primer ao)

UNID.

Honorar.

CANT.

1.0000

PRECIO
UNITAR.

1,000.00

FINANCIAMIENTO
PRECIO
GOB.
TOTAL FONCODE
S
LOCAL

1,000.00

0.00 1,000.00

1,000.00

1,000.00

1,000.00

0.00 1,000.00

COSTO/Ao

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS

1.

Seguro de Yachachiq

Seguro

3.0000

485.16

COSTO TOTAL

1.4.2.

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
1,455.48 1,455.48
0.00
1,455.48

1,455.48

1,455.48 1,455.48

0.00

Seguro bsico de Yachachiq (segundo y tercer ao)


COSTO/Ao
N

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS

1.

Seguro de Yachachiq

Seguro

1.0000

485.16

COSTO TOTAL

1.5.

Movilidad de Yachachiq

1.5.1.

Movilidad de Yachachiq para capacitacin (primer ao)

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
485.16
485.16
0.00
485.16

485.16

485.16

485.16

0.00

COSTO/Mes
N
1.

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS
Movilidad Yachachiq para capacitacin (3 YMovil.
COSTO TOTAL

3.0000

200.00

FINANCIAMIENTO
PRECIO
GOB.
TOTAL FONCODE
S
LOCAL
600.00
600.00
0.00
600.00

600.00

600.00

600.00

0.00

1.5.2.

Movilidad de Yachachiq para capacitacin (2do. Y 3er ao)


COSTO/Mes
N

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS

1.

Movilidad Yachachiq para capacitacin (1 YMovil.

1.0000

200.00

COSTO TOTAL

1.6.

Concursos entre Ncleos Ejecutores - NE

1.6.1.

Concursos en la aplicacin y mejora de tecnologas

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS

1.

200.00

200.00

200.00

200.00

Premio

1.0000

200.00

200.00

200.00

Premios Segundo Puesto

Premio

1.0000

100.00

100.00

100.00

300.00

300.00

1.7.

Participacin en Ferias Locales

1.7.1.

Participacin en Ferias Locales

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

0.00

COSTO/Concurso
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
300.00
300.00
0.00

Premios Primer Puesto

COSTO TOTAL

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
200.00
200.00
0.00

0.00

COSTO/Feria
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL

MATERIALES E INSUMOS

1.

2.

950.00

Banner 0,80 x 1,20 m

Unid

1.0000

120.00

120.00

120.00

Trpticos

Millar

1.0000

650.00

650.00

650.00

Malla arpillera

100.0000

1.80

180.00

180.00

940.00

940.00

940.00

940.00

752.00

752.00

752.00

752.00

MOVILIDAD
Movilidad de participantes

3.

950.00

Pasaje

188.0000

5.00

ALIMENTACIN
Alimentacin de participantes

Racin

94.0000

8.00

COSTO TOTAL

1.8.

Pasantas Yachachiq

1.8.1.

Pasantas Yachachiq

2,642.00 2,642.00

0.00

0.00

0.00

0.00

COSTO/Pasanta
N
1.

2.

DESCRIPCIN

CANT.

PRECIO
UNITAR.

MOVILIDAD

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
470.00
470.00
0.00

Movilidad de Chungui - Vinchos (viceversa)Pasaje

3.0000

90.00

270.00

270.00

Movilidad local

2.0000

100.00

200.00

200.00

225.00

225.00

225.00

225.00

90.00

90.00

90.00

90.00

Da

ALIMENTACIN
Alimentacin pasantes

3.

UNID.

Da

3.0000

75.00

ALOJAMIENTO
Alojamiento de pasantes

Noche

2.0000

45.00

0.00

0.00

COSTO TOTAL

785.00

2.

Implementacin y mejora de la vivienda saludable

2.1.

Instalacin de cocina mejorada

785.00

0.00

COSTO/Mdulo
N

DESCRIPCIN

1.

MATERIALES E INSUMOS

1.1.

Cmara de combustin

1.2.

1.3.

1.4.

UNID.

Ladrillos de pared (artesanal)

Unid

Alambre negro N 16
Fierro corrugado x (rejilla cenicero)

CANT.

PRECIO
UNITAR.

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
161.76
138.96
0.00

20.0000

0.60

12.00

12.00

kg

0.0400

5.00

0.20

0.20

3.0000

1.72

5.16

5.16

Cemento Portland tipo I / 42,50 kg

Bolsa

0.1800

22.00

3.96

3.96

Malla electrosoldada de

0.5000

4.00

2.00

2.00

Arena de asentar

0.0200

70.00

1.40

1.40

Fierro corrugado de

2.0000

4.67

9.34

9.34

40.0000

0.60

24.00

24.00

0.0200

5.00

0.10

0.10

Chimenea de =0,12 x 1,20 m x 0,60 mm Unid

1.0000

36.00

36.00

36.00

Sombrero capucha 0,18 x 07,00 cm con peUnid

1.0000

10.00

10.00

10.00
28.00

Construccin de la losa y hornillas

Construccin de la chimenea
Ladrillos de pared (artesanal)

Unid

Alambre negro N 08

kg

Otros materiales
Fibraforte transparente de 1,80 x 0,80 x

Unid

1.0000

28.00

28.00

Adobe

Unid

40.0000

0.25

10.00

Ceniza

kg

60.0000

0.20

12.00

2.

Arena fina

0.0800

85.00

6.80

Tierra de chacra

0.0800

10.00

0.80

MANO DE OBRA
Construccin de la cocina

3.

37.50
Jornal

1.5000

25.00

1.88
%

0.0500

37.50

COSTO TOTAL

0.00

0.00

0.00

0.00

138.96

0.00

37.50

HERRAMIENTAS
Herramientas (5,00 % MONC)

6.80

1.88
201.14

2.2.

Capacitacin en prcticas adecuadas mejora de vivienda, salud y nutricin familiar

2.2.1.

Capacitacin en prcticas adecuadas de mejora de vivienda

(ACU_Cap.(V.S. Formato de capacitacin FONCODES)

2.2.2.

Capacitacin en salud y nutricin familiar

(ACU_Cap.(V.S. Formato de capacitacin FONCODES)

2.3.

Agua segura
COSTO/Mdulo
N

1.

DESCRIPCIN

UNID.

PRECIO
UNITAR.

MATERIALES

FINANCIAMIENTO
PRECIO
GOB.
TOTAL FONCODE
S
LOCAL
21.50
21.50
0.00

Balde con cao x 12 litros

Unidad

1.0000

14.00

14.00

14.00

Vaso de vidrio x 7 onz

Unidad

3.0000

2.50

7.50

7.50

21.50

21.50

COSTO TOTAL

3.

CANT.

Promocin de Negocios Rurales Inclusivos

0.00

3.1.

Asistencia tcnica para articulacin al mercado

DESCRIPCIN

1.

MATERIALES E INSUMOS

2.

MANO DE OBRA CALIFICADA


Asistente Tcnico articulador

UNID.

Evento

CANT.

1.0000

PRECIO
UNITAR.

50.00

COSTO TOTAL

3.2.

COSTO/Evento
FINANCIAMIENTO
PRECIO
GOB.
TOTAL FONCODE
S
LOCAL

50.00

50.00

50.00

50.00

50.00

50.00

0.00

0.00

Concursos de Planes de negocios 3/.

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS

1.

Premio a la idea del negocio ganador

Premio

1.0000 23,684.86 23,684.86 23,684.86

COSTO TOTAL

4.

Fomento de capacidades financieras

4.1.

Promocin, convocatoria y concursos

COSTO/Concurso
FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
###
###
0.00

###

###

0.00

COSTO/Mes

N
1.

DESCRIPCIN
MATERIALES E INSUMOS

UNID.

CANT.

PRECIO
UNITAR.

FINANCIAMIENTO
PRECIO
FONCODE
TOTAL
MIDIS
S
77.00
77.00
0.00

Convocatorias

Unid

94.0000

0.50

47.00

47.00

Movilidad para convocatoria

Glb

1.0000

30.00

30.00

30.00

77.00

77.00

COSTO TOTAL

4.2.

0.00

Materiales de capacitacin
COSTO/Glb

N
1.
1.1.

DESCRIPCIN

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS
Para el desarrollo del mdulo con los
usuarios
Incentivos para concursos (15 usuarios del NE)

1.2.

UNID.

Glb

FINANCIAMIENTO
PRECIO
TOTAL FONCODE MIDIS
S
3,705.20 3,705.20
0.00

15.0000

140.00

2,100.00

2,100.00

Edicin de video (durac. 15 min)- temas central moduUnid

6.0000

25.00

150.00

150.00

Edicin e impresin de guas de mdulo para yachahUnid

10.0000

10.00

100.00

100.00

Edicin e impresin de guas de mdulo para lderes Unid

6.0000

5.00

30.00

30.00

Edicin e impresin de cuadernos de mdulos para uUnid

5.0000

6.00

30.00

30.00

192.0000

0.40

76.80

76.80

2.0000

40.00

80.00

80.00

Papel craf

Unid

Papelgrafo cuadriculado

Ciento

Plumones para pizarra acrlica

Unid

64.0000

3.00

192.00

192.00

Cartulinas de colores ecolgicos

Unid

128.0000

0.60

76.80

76.80

Cuadernos A-5 (para notas de usuarios)

Unid

94.0000

1.00

94.00

94.00

Cuadernos A-4 (para actas del grupo)

Unid

3.0000

5.00

15.00

15.00

Lapiceros

Unid

94.0000

0.50

47.00

47.00

Papel bond A-4

Millar

3.0000

23.00

69.00

69.00

Chinchotes

Caja

6.0000

7.00

42.00

42.00

Clavos de cemento de 2"

Docena

6.0000

2.50

15.00

15.00

Para el uso del facilitador financiero

Edicin e impresin de guas de mdulos para facilit.Unid

1.6700

10.00

16.70

16.70

Diseo de lminas

Unid

10.0000

10.00

100.00

100.00

Servicios de arte grfico

Unid

10.0000

15.00

150.00

150.00

Impresin de lminas plastificadas A-3

Unid

10.0000

15.00

150.00

150.00

Impresin de lminas plastificadas 8x30 cm

Unid

10.0000

2.00

20.00

20.00

Impresin de billetes y monedas plastificadas

Millar

0.1700

280.00

47.60

47.60

Banner para recepcin de imagen (con ojales) 2x1,5 Unid

0.3300

50.00

16.50

16.50

Banner en blanco de 2x1,20 m (con ojales)

Unid

0.3300

50.00

16.50

16.50

Banner (con imp. De logotipo y nombre del Pyto.) 2, Unid

0.3300

70.00

23.10

23.10

Pasador o cuerda sinttica (grosor 50 mm)

Unid

0.3300

30.00

9.90

9.90

Ganchos de plstico

Docena

0.6700

1.00

0.67

0.67

Puntero graduable

Unid

0.3300

10.00

3.30

3.30

Tijeras punta roma medianas

Unid

0.3300

5.00

1.65

1.65

Cuchilla corta papel (cutter)

Unid

0.3300

1.00

0.33

0.33

Maletn porta meteriales

Unid

0.3300

80.00

26.40

26.40

Unid

0.3300

15.00

4.95

4.95

Equipos

1.3.

Linterna

COSTO TOTAL

4.3.

3,705.20 3,705.20

0.00

Honorarios facilitador financiero


COSTO/Mes

DESCRIPCIN

1.

MATERIALES E INSUMOS

2.

MANO DE OBRA CALIFICADA

UNID.

CANT.

PRECIO
UNITAR.

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL

1,500.00 1,500.00

0.00

Facilitador financiero

Honorar.

1.0000

1,500.00

COSTO TOTAL

4.4.

1,500.00

1,500.00

1,500.00 1,500.00

0.00

Honorarios yachachiq financiero


COSTO/Mes

DESCRIPCIN

1.

MATERIALES E INSUMOS

2.

MANO DE OBRA CALIFICADA


Yachachiq financiero

UNID.

CANT.

PRECIO
UNITAR.

1,000.00 1,000.00
Honorar.

1.0000

1,000.00

COSTO TOTAL

4.5.

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL

1,000.00

0.00

1,000.00

1,000.00 1,000.00

0.00

Viticos y apoyo logstico facilitador financiero


COSTO/Glb

N
1.

DESCRIPCIN

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS
Combustible - facilitador financiero

2.

UNID.

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
450.00
450.00
0.00

Gln

10.0000

15.00

150.00

150.00

Viticos facilitador (hospedaje, alimentacin y pasajeDa

1.2500

240.00

300.00

300.00

450.00

450.00

MANO DE OBRA CALIFICADA


COSTO TOTAL

0.00

B.

COSTO INDIRECTO

1.

Gastos Generales del Ncleo Ejecutor Central - NEC

1.1.

Movillidad del Presidente y Tesorero del NEC


COSTO/Mes

DESCRIPCIN

1.

MATERIALES Y EQUIPOS

2.

MOVILIDAD DEL NEC


Movilidad del Presidente y Tesorero del NEC

UNID.

Mes

CANT.

1.0000

PRECIO
UNITAR.

83.33

COSTO TOTAL

1.2.

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
83.33
83.33
0.00

83.33

83.33

83.33

83.33

0.00

Pago de revisor de cuentas


COSTO/Trimestre

DESCRIPCIN

1.

MATERIALES E INSUMOS

2.

MANO DE OBRA CALIFICADA


Revisor

COSTO TOTAL

UNID.

Honorar.

CANT.

1.0000

PRECIO
UNITAR.

300.00

FINANCIAMIENTO
PRECIO
GOB.
TOTAL FONCODE
S
LOCAL

300.00

300.00

300.00

300.00

300.00

300.00

0.00

0.00

1.3.

Cartel del NE e implementacin del NEC


COSTO/Glb

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

MATERIALES Y EQUIPOS

1.

Cartel de obra

Unid

1.0000

600.00

600.00

600.00

Adquisicin de muebles de cmputo con silla

Unid

0.5000

300.00

150.00

150.00

Adquisicn de mesa de trabajo

Unid

0.3300

250.00

82.50

82.50

Adquiscin de sillas de plstico

Docena

0.5000

480.00

240.00

240.00

Engrapador + grapas

Unid

0.5000

90.00

45.00

45.00

Perforador de papel

Unid

0.5000

90.00

45.00

45.00

Cuchillas corta papel

Unid

3.0000

3.50

10.50

10.50

Goma de papel

0.5000

10.00

5.00

5.00

Cuaderno de Obra

Unid

2.0000

35.00

70.00

70.00

Lapiceros de colores

Caja

1.0000

50.00

50.00

50.00

Regla de 30 cm

Unid

3.0000

4.00

12.00

12.00

Pizarra acrlica

Unid

1.0000

180.00

180.00

180.00

Mota para pizarra acrlica

Unid

1.0000

3.00

3.00

3.00

Tijeras

Unid

3.0000

5.00

15.00

15.00

COSTO TOTAL

1.4.

FINANCIAMIENTO
PRECIO
GOB.
TOTAL FONCODE
S
LOCAL
1,508.00 1,508.00
0.00

1,508.00 1,508.00

0.00

Gastos Bancarios del NEC


COSTO/Mes

N
1.

DESCRIPCIN
MATERIALES Y EQUIPOS

UNID.

CANT.

PRECIO
UNITAR.

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
6.00
6.00
0.00

2.

GASTOS BANCARIOS
Gastos bancarios del NEC

Mes

1.0000

6.00

COSTO TOTAL

1.5.

6.00

6.00

6.00

6.00

0.00

Otros gastos del NEC (materiales, servicios)


COSTO/Mes

N
1.

DESCRIPCIN

3.

CANT.

PRECIO
UNITAR.

EQUIPO DE COMPUTO
Alquiler de computadoras con impresora

2.

UNID.

Unid

0.3330

150.00

TILES DE ESCRITORIO E INSUMOS

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
49.95
49.95
0.00
49.95

49.95

193.32

193.32

Tner de la impresora

Unid

0.5000

180.00

90.00

90.00

Papel bond A-4

Millar

2.0000

23.00

46.00

46.00

Folder manila A-4 con fstener

Ciento

0.5000

40.00

20.00

20.00

Papelgrafos

Ciento

0.3330

40.00

13.32

13.32

Plumones para pizarra acrlica

Unid

3.0000

3.00

9.00

9.00

Plumones para papel N 47

Unid

6.0000

2.50

15.00

15.00

49.95

33.30

ALQUILER DE OFICINA Y SERVICIOS


Alquiler de oficina

Mes

0.3330

50.00

16.65

Servicio de energa

Mes

0.3330

80.00

26.64

26.64

Servicio de agua potable

Mes

0.3330

20.00

6.66

6.66

293.22

276.57

COSTO TOTAL

0.00

16.65
16.65

16.65

2.

Gastos de elaboracin de expediente tcnico

2.1.

Elaboracin de expediente tcnico


COSTO/Pyto.

DESCRIPCIN

1.

MATERIALES E INSUMOS

2.

MANO DE OBRA CALIFICADA


Proyectista

UNID.

Exp. Tco.

CANT.

1.0000

PRECIO
UNITAR.

12,000.00

COSTO TOTAL

2.2.

FINANCIAMIENTO
PRECIO
GOB.
TOTAL FONCODE
S
LOCAL

###

###

12,000.00

12,000.00

###

###

0.00

0.00

Gastos bancarios pago de proyectista


COSTO/Pyto.

DESCRIPCIN

1.

MATERIALES Y EQUIPOS

2.

GASTOS BANCARIOS
Gastos bancarios del NEC

UNID.

Pyto.

CANT.

PRECIO
UNITAR.

1.0000

COSTO TOTAL

2.3.

Movillidad del Presidente y Tesorero del NEC pago proyectista

32.00

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
32.00
32.00
0.00

32.00

32.00

32.00

32.00

0.00

COSTO/Pyto.

DESCRIPCIN

1.

MATERIALES Y EQUIPOS

2.

MOVILIDAD DEL NEC


Movilidad del Presidente y Tesorero del NEC

UNID.

Pyto.

CANT.

1.0000

PRECIO
UNITAR.

250.00

COSTO TOTAL

3.

Gastos de ejecucin del proyecto

3.1.

Administracin del proyecto (contratacin del Coord. Tco. del NEC)

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL
250.00
250.00
0.00

250.00

250.00

250.00

250.00

0.00

COSTO/Mes

DESCRIPCIN

1.

MATERIALES E INSUMOS

2.

MANO DE OBRA CALIFICADA


Coordinador Tcnico

UNID.

CANT.

PRECIO
UNITAR.

1,500.00 1,500.00
Honorar.

1.0000

1,500.00

COSTO TOTAL

3.2.

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL

1,500.00

0.00

1,500.00

1,500.00 1,500.00

0.00

Seguro de Coordinador Tcnico


COSTO/Ao

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

FINANCIAMIENTO
PRECIO
FONCODE
GOB.
TOTAL
S
LOCAL

MATERIALES E INSUMOS

1.

Seguro de Coordinador Tcnico

Seguro

0.3300

1,200.00

COSTO TOTAL

3.3.

396.00

396.00

396.00

396.00

396.00

396.00

0.00

0.00

Movilidad de Coordinador Tcnico


COSTO/Mes

DESCRIPCIN

UNID.

1.

MATERIALES E INSUMOS

2.

MOVILIDAD DEL COORDINADOR TCNICO


Movilidad del coordinador tcnico

Movil.

CANT.

1.0000

PRECIO
UNITAR.

200.00

COSTO TOTAL

4.

Gastos de seguimiento del NEC

4.1.

Fotografas de seguimiento de proyectos

FINANCIAMIENTO
PRECIO
GOB.
TOTAL FONCODE
S
LOCAL

200.00

200.00

200.00

200.00

200.00

200.00

0.00

0.00

COSTO/Informe

N
1.

DESCRIPCIN

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS
Fotografas de seguimiento de proyectos

2.

UNID.

MANO DE OBRA CALIFICADA

Seguim.

1.0000

70.00

FINANCIAMIENTO
PRECIO
GOB.
TOTAL FONCODE
S
LOCAL
70.00
70.00
0.00
70.00

70.00

0.00

0.00

0.00

COSTO TOTAL

4.2.

70.00

70.00

0.00

Elaboracin de informes de gestin del NEC


COSTO/Informe

DESCRIPCIN

UNID.

CANT.

PRECIO
UNITAR.

MATERIALES E INSUMOS

1.

Informe de gestin del NEC

2.

Informe

1.0000

125.00

MANO DE OBRA CALIFICADA

COSTO TOTAL

4.3.

FINANCIAMIENTO
PRECIO
GOB.
TOTAL FONCODE
S
LOCAL
125.00
125.00
0.00
125.00

125.00

0.00

0.00

0.00

125.00

125.00

0.00

Elaboracin de vdeo de implementacin de proyectos


COSTO/Vdeo

N
1.

DESCRIPCIN

UNID.

PRECIO
UNITAR.

MATERIALES E INSUMOS
Elaboracin de vdeo de implementacin de proyectoVideo

2.

CANT.

MANO DE OBRA CALIFICADA

COSTO TOTAL

1.0000

450.00

FINANCIAMIENTO
PRECIO
GOB.
TOTAL FONCODE
S
LOCAL
450.00
450.00
0.00
450.00

450.00

0.00

0.00

0.00

450.00

450.00

0.00

META

COSTO/Unid
NANCIAMIENTO

CANTIDA
D

25.00

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

7.50

Tantarpata

30.00

Tantarpata

1,000.00

Tantarpata

6.25

Tantarpata

25.00

Tantarpata

25.00

Tantarpata

12.50

Tantarpata

1.25

Tantarpata

25.00

Tantarpata

50.00

Tantarpata

25.00

Tantarpata

200.00

Tantarpata

50.00

Tantarpata

25.00

Tantarpata

3.13

Tantarpata

25.00

Tantarpata

6.25

Tantarpata
125.00 Tantarpata
125.00 Tantarpata

125.00

Tantarpata
6.25 Tantarpata
6.25 Tantarpata

1.25

Tantarpata
131.25 Tantarpata
Tantarpata
Tantarpata
Tantarpata
COSTO/Unid

NANCIAMIENTO

Tan

49.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata

1.47

Tantarpata

5.39

Tantarpata

49.00

Tantarpata
Tantarpata

49.00

Tantarpata

49.00

Tantarpata

49.00

Tantarpata

49.00

Tantarpata

147.00

Tantarpata

98.00

Tantarpata

2.45

Tantarpata
25.00 Tantarpata
25.00 Tantarpata
Tantarpata

49.00

1.25 Tantarpata
1.25 Tantarpata

2.45

Tantarpata
26.25 Tantarpata
Tantarpata
Tantarpata
Tantarpata
COSTO/Unid

NANCIAMIENTO

Tan

9.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata

0.27

Tantarpata

0.99

Tantarpata

9.00

Tantarpata
Tantarpata

9.00

Tantarpata

9.00

Tantarpata

9.00

Tantarpata

9.00

Tantarpata

27.00

Tantarpata

18.00

Tantarpata

0.45

Tantarpata
25.00 Tantarpata
25.00 Tantarpata
Tantarpata
1.25 Tantarpata

9.00

1.25 Tantarpata

0.45

Tantarpata
26.25 Tantarpata
Tantarpata
Tantarpata
Tantarpata
COSTO/Unid

NANCIAMIENTO

Tan

4.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata

0.12

Tantarpata

0.44

Tantarpata

4.00

Tantarpata
Tantarpata

4.00

Tantarpata

4.00

Tantarpata

4.00

Tantarpata

4.00

Tantarpata

12.00

Tantarpata

8.00

Tantarpata

0.20

Tantarpata
25.00 Tantarpata
25.00 Tantarpata

4.00

Tantarpata
1.25 Tantarpata
1.25 Tantarpata

0.20

Tantarpata
26.25 Tantarpata
Tantarpata
Tantarpata
Tantarpata

COSTO/Unid
NANCIAMIENTO

Tan

64.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

25.60

Tantarpata

102.40

Tantarpata

3,456.00

Tantarpata

16.00

Tantarpata

64.00

Tantarpata

64.00

Tantarpata

32.00

Tantarpata

3.20

Tantarpata

64.00

Tantarpata

64.00

Tantarpata

128.00

Tantarpata

512.00

Tantarpata

128.00

Tantarpata

64.00

Tantarpata

8.00

Tantarpata

64.00

Tantarpata

16.00

Tantarpata
125.00 Tantarpata

125.00 Tantarpata

320.00

Tantarpata
6.25 Tantarpata
6.25 Tantarpata

3.20

Tantarpata
131.25 Tantarpata
Tantarpata
Tantarpata
Tantarpata

COSTO/Unid
NANCIAMIENTO

Tan

36.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

32.40

Tantarpata

129.60

Tantarpata

3,096.00

Tantarpata

9.00

Tantarpata

36.00

Tantarpata

36.00

Tantarpata

18.00

Tantarpata

1.80

Tantarpata

36.00

Tantarpata

36.00

Tantarpata

72.00

Tantarpata

288.00

Tantarpata

72.00

Tantarpata

36.00

Tantarpata

4.50

Tantarpata

36.00

Tantarpata

9.00

Tantarpata
125.00 Tantarpata
125.00 Tantarpata

180.00

Tantarpata
6.25 Tantarpata
6.25 Tantarpata

1.80

Tantarpata
131.25 Tantarpata
Tantarpata
Tantarpata
Tantarpata

COSTO/Unid
NANCIAMIENTO

Tan

1.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

1.70

Tantarpata

6.80

Tantarpata

125.00

Tantarpata

0.25

Tantarpata

1.00

Tantarpata

1.00

Tantarpata

0.50

Tantarpata

0.05

Tantarpata

1.00

Tantarpata

1.00

Tantarpata

2.00

Tantarpata

8.00

Tantarpata

2.00

Tantarpata

1.00

Tantarpata

0.13

Tantarpata

1.00

Tantarpata

0.25

Tantarpata
125.00 Tantarpata
125.00 Tantarpata

5.00

Tantarpata
6.25 Tantarpata
6.25 Tantarpata

0.05

Tantarpata
131.25 Tantarpata
Tantarpata
Tantarpata
Tantarpata
COSTO/Unid

NANCIAMIENTO

Tan

2,601.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

2,601.00

Tantarpata

26.01

Tantarpata

163.86

Tantarpata
0.78 Tantarpata
0.78 Tantarpata
Tantarpata

80.63

0.04 Tantarpata
0.04 Tantarpata

130.05

Tantarpata
0.82 Tantarpata
Tantarpata
Tantarpata
Tantarpata
COSTO/Unid

NANCIAMIENTO

Tan

1,156.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

1,156.00

Tantarpata

17.34

Tantarpata

72.83

Tantarpata
0.78 Tantarpata
0.78 Tantarpata

35.84

Tantarpata
0.04 Tantarpata
0.04 Tantarpata
Tantarpata
0.82 Tantarpata
Tantarpata
Tantarpata
Tantarpata
COSTO/Unid

NANCIAMIENTO

Tan

100.00

Tantarpata

USUARIO Tantarpata

57.80

0.00 Tantarpata
Tantarpata

100.00

Tantarpata

2.00

Tantarpata

6.30

Tantarpata
0.78 Tantarpata
0.78 Tantarpata

3.10

Tantarpata
0.04 Tantarpata
0.04 Tantarpata

5.00

Tantarpata
0.82 Tantarpata
Tantarpata
Tantarpata
Tantarpata
COSTO/Unid

NANCIAMIENTO

Tan

1.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

1.00

Tantarpata

0.03

Tantarpata

0.06

Tantarpata
0.78 Tantarpata
0.78 Tantarpata

0.03

Tantarpata
0.04 Tantarpata
0.04 Tantarpata

0.05

Tantarpata
0.82 Tantarpata
Tantarpata
Tantarpata
Tantarpata
COSTO/Unid

NANCIAMIENTO

Tan

225.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

225.00

Tantarpata

2.25

Tantarpata

14.18

Tantarpata
0.78 Tantarpata
0.78 Tantarpata

6.98

Tantarpata
0.04 Tantarpata
0.04 Tantarpata

11.25

Tantarpata
0.82 Tantarpata
Tantarpata
Tantarpata
Tantarpata
COSTO/Unid

NANCIAMIENTO

Tan

36.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

36.00

Tantarpata

0.54

Tantarpata

2.27

Tantarpata
0.78 Tantarpata
0.78 Tantarpata

1.12

Tantarpata
0.04 Tantarpata
0.04 Tantarpata

1.80

Tantarpata
0.82 Tantarpata
Tantarpata
Tantarpata
Tantarpata
COSTO/Unid

NANCIAMIENTO

Tan

36.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

36.00

Tantarpata

0.72

Tantarpata

2.27

Tantarpata
0.78 Tantarpata
0.78 Tantarpata

1.12

Tantarpata
0.04 Tantarpata
0.04 Tantarpata
Tantarpata
0.82 Tantarpata

1.80

Tantarpata
Tantarpata
Tantarpata
COSTO/Unid

NANCIAMIENTO

Tan

49.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

49.00

Tantarpata

0.98

Tantarpata

3.09

Tantarpata
0.78 Tantarpata
0.78 Tantarpata

1.52

Tantarpata
0.04 Tantarpata
0.04 Tantarpata

2.45

Tantarpata
0.82 Tantarpata
Tantarpata
Tantarpata
Tantarpata
COSTO/Unid

NANCIAMIENTO

Tan

225.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

225.00

Tantarpata

6.75

Tantarpata

14.18

Tantarpata
0.78 Tantarpata
0.78 Tantarpata

6.98

Tantarpata
0.04 Tantarpata
0.04 Tantarpata

11.25

Tantarpata
0.82 Tantarpata
Tantarpata
Tantarpata
Tantarpata
COSTO/Unid

NANCIAMIENTO

Tan

324.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

324.00

Tantarpata

12.96

Tantarpata

20.41

Tantarpata
0.78 Tantarpata
0.78 Tantarpata

10.04

Tantarpata
0.04 Tantarpata
0.04 Tantarpata
Tantarpata
0.82 Tantarpata
Tantarpata
Tantarpata

16.20

Tantarpata
COSTO/Unid

NANCIAMIENTO

Tan

36.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

36.00

Tantarpata

1.80

Tantarpata

2.27

Tantarpata
0.78 Tantarpata
0.78 Tantarpata

1.12

Tantarpata
0.04 Tantarpata
0.04 Tantarpata

1.80

Tantarpata
0.82 Tantarpata
Tantarpata
Tantarpata
Tantarpata
COSTO/Unid

NANCIAMIENTO

Tan

625.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

625.00

Tantarpata

18.75

Tantarpata

39.38

Tantarpata
0.78 Tantarpata

0.78 Tantarpata

19.38

Tantarpata
0.04 Tantarpata
0.04 Tantarpata

31.25

Tantarpata
0.82 Tantarpata
Tantarpata
Tantarpata
Tantarpata
COSTO/Unid

NANCIAMIENTO

Tan

100.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

100.00

Tantarpata

5.00

Tantarpata

6.30

Tantarpata
0.78 Tantarpata
0.78 Tantarpata

3.10

Tantarpata
0.04 Tantarpata
0.04 Tantarpata
Tantarpata
0.82 Tantarpata
Tantarpata
Tantarpata
Tantarpata
COSTO/Unid

Tan

256.00

5.00

NANCIAMIENTO

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

256.00

Tantarpata

12.80

Tantarpata

16.13

Tantarpata
0.78 Tantarpata
0.78 Tantarpata

7.94

Tantarpata
0.04 Tantarpata
0.04 Tantarpata

12.80

Tantarpata
0.82 Tantarpata
Tantarpata
Tantarpata
Tantarpata
COSTO/Unid

NANCIAMIENTO

Tan

9.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

9.00

Tantarpata

0.54

Tantarpata

0.57

Tantarpata
0.78 Tantarpata
0.78 Tantarpata
Tantarpata

0.28

0.04 Tantarpata
0.04 Tantarpata

0.45

Tantarpata
0.82 Tantarpata
Tantarpata
Tantarpata
Tantarpata
COSTO/Unid

NANCIAMIENTO

Tan

4.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

4.00

Tantarpata

8.00

Tantarpata

0.12

Tantarpata

0.25

Tantarpata
0.78 Tantarpata
0.78 Tantarpata

0.12

Tantarpata
0.04 Tantarpata
0.04 Tantarpata
Tantarpata
0.82 Tantarpata
Tantarpata
Tantarpata
Tantarpata
COSTO/Unid

NANCIAMIENTO

Tan

16.00

Tantarpata

0.20

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

16.00

Tantarpata

32.00

Tantarpata

0.64

Tantarpata

1.01

Tantarpata
0.78 Tantarpata
0.78 Tantarpata

0.50

Tantarpata
0.04 Tantarpata
0.04 Tantarpata

0.80

Tantarpata
0.82 Tantarpata
Tantarpata
Tantarpata
Tantarpata
COSTO/Unid

NANCIAMIENTO

Tan

3,364.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

100.92

Tantarpata

403.68

Tantarpata

3,364.00

Tantarpata
0.63 Tantarpata
0.63 Tantarpata
Tantarpata

84.10

0.03 Tantarpata
0.03 Tantarpata

168.20

Tantarpata
0.66 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

5,329.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata

159.87

Tantarpata

586.19

Tantarpata

5,329.00

Tantarpata
Tantarpata

5,329.00

Tantarpata

5,329.00

Tantarpata

5,329.00

Tantarpata

5,329.00

Tantarpata

10,658.00

Tantarpata

266.45

Tantarpata
25.00 Tantarpata
25.00 Tantarpata

5,329.00

Tantarpata
1.25 Tantarpata
1.25 Tantarpata

266.45

Tantarpata
26.25 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

529.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata

15.87

Tantarpata

58.19

Tantarpata

529.00

Tantarpata
Tantarpata

529.00

Tantarpata

529.00

Tantarpata

529.00

Tantarpata

529.00

Tantarpata

1,058.00

Tantarpata

26.45

Tantarpata
25.00 Tantarpata
25.00 Tantarpata

529.00

Tantarpata
1.25 Tantarpata
1.25 Tantarpata
Tantarpata
26.25 Tantarpata

26.45

Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

64.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata

1.92

Tantarpata

7.04

Tantarpata

64.00

Tantarpata
Tantarpata

64.00

Tantarpata

64.00

Tantarpata

64.00

Tantarpata

64.00

Tantarpata

128.00

Tantarpata

3.20

Tantarpata
25.00 Tantarpata
25.00 Tantarpata

64.00

Tantarpata
1.25 Tantarpata
1.25 Tantarpata
Tantarpata
26.25 Tantarpata
Tantarpata
Tantarpata

3.20

Tantarpata
Tan

NANCIAMIENTO

4.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata

0.12

Tantarpata

0.44

Tantarpata

4.00

Tantarpata
Tantarpata

4.00

Tantarpata

4.00

Tantarpata

4.00

Tantarpata

4.00

Tantarpata

8.00

Tantarpata

0.20

Tantarpata
25.00 Tantarpata
25.00 Tantarpata

4.00

Tantarpata
1.25 Tantarpata
1.25 Tantarpata
Tantarpata
26.25 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

64.92

0.20

NANCIAMIENTO

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

64.92

Tantarpata

0.32

Tantarpata

0.13

Tantarpata

0.52

Tantarpata
2.50 Tantarpata
2.50 Tantarpata

6.49

Tantarpata
0.13 Tantarpata
0.13 Tantarpata

3.25

Tantarpata
2.63 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

5,111.77

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

5,111.77

Tantarpata

25.56

Tantarpata

10.22

Tantarpata

40.89

Tantarpata
2.50 Tantarpata

2.50 Tantarpata

511.18

Tantarpata
0.13 Tantarpata
0.13 Tantarpata

255.59

Tantarpata
2.63 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

2,023.45

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

2,023.45

Tantarpata

16.19

Tantarpata

4.05

Tantarpata

16.19

Tantarpata
2.50 Tantarpata
2.50 Tantarpata

202.35

Tantarpata
0.13 Tantarpata
0.13 Tantarpata
Tantarpata
2.63 Tantarpata
Tantarpata
Tantarpata
Tantarpata

101.17

Tan

NANCIAMIENTO

1,540.33

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

1,540.33

Tantarpata

15.40

Tantarpata

4.62

Tantarpata

12.32

Tantarpata
2.50 Tantarpata
2.50 Tantarpata

154.03

Tantarpata
0.13 Tantarpata
0.13 Tantarpata

77.02

Tantarpata
2.63 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

284.50

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

284.50

Tantarpata

2.85

Tantarpata

0.85

Tantarpata

2.28

Tantarpata

2.50 Tantarpata
2.50 Tantarpata

28.45

Tantarpata
0.13 Tantarpata
0.13 Tantarpata

14.23

Tantarpata
2.63 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan 11,236.00

NANCIAMIENTO

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

11,236.00

Tantarpata

22,472.00

Tantarpata

###

Tantarpata

11,236.00

Tantarpata

11,236.00

Tantarpata

11,236.00

Tantarpata

11,236.00

Tantarpata

11,236.00

Tantarpata
6.25 Tantarpata
6.25 Tantarpata

2,809.00

Tantarpata
0.31 Tantarpata
0.31 Tantarpata

561.80

Tantarpata
6.56 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

1.27

Tantarpata

USUARIO Tantarpata
2,000.00 Tantarpata
Tantarpata

5.08

2,000.00 Tantarpata

254.00

Tantarpata
1,850.00 Tantarpata
375.00 Tantarpata

19.05

300.00 Tantarpata

15.24

600.00 Tantarpata

30.48

200.00 Tantarpata

10.16

375.00 Tantarpata

19.05

Tantarpata
92.50 Tantarpata
92.50 Tantarpata
Tantarpata
3,942.50 Tantarpata

0.06

Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

1.27

Tantarpata

USUARIO Tantarpata
2,000.00 Tantarpata
Tantarpata

5.08

2,000.00 Tantarpata

254.00

Tantarpata
1,150.00 Tantarpata
200.00 Tantarpata

10.16

250.00 Tantarpata

12.70

250.00 Tantarpata

12.70

200.00 Tantarpata

10.16

250.00 Tantarpata

12.70

Tantarpata
57.50 Tantarpata
57.50 Tantarpata
Tantarpata
3,207.50 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata

0.06

Tantarpata
Tantarpata
Tan

NANCIAMIENTO

1.27

Tantarpata

USUARIO Tantarpata
2,000.00 Tantarpata
Tantarpata

15.24

2,000.00 Tantarpata

254.00

Tantarpata
1,050.00 Tantarpata
200.00 Tantarpata

10.16

200.00 Tantarpata

10.16

200.00 Tantarpata

10.16

200.00 Tantarpata

10.16

250.00 Tantarpata

12.70

Tantarpata
52.50 Tantarpata
52.50 Tantarpata
Tantarpata
3,102.50 Tantarpata

NANCIAMIENTO

Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

1.27

Tantarpata

0.06

USUARIO Tantarpata
2,000.00 Tantarpata
Tantarpata

3.18

2,000.00 Tantarpata

254.00

Tantarpata
1,050.00 Tantarpata
200.00 Tantarpata

10.16

200.00 Tantarpata

10.16

200.00 Tantarpata

10.16

200.00 Tantarpata

10.16

250.00 Tantarpata

12.70

Tantarpata
52.50 Tantarpata
52.50 Tantarpata

0.06

Tantarpata
3,102.50 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

1.27

Tantarpata

USUARIO Tantarpata
2,000.00 Tantarpata
Tantarpata

6.35

2,000.00 Tantarpata

254.00

Tantarpata
1,850.00 Tantarpata
375.00 Tantarpata

19.05

300.00 Tantarpata

15.24

600.00 Tantarpata

30.48

200.00 Tantarpata

10.16

375.00 Tantarpata

19.05

Tantarpata
92.50 Tantarpata
92.50 Tantarpata

0.06

Tantarpata
3,942.50 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

5.30

Tantarpata

USUARIO Tantarpata
2,000.00 Tantarpata
Tantarpata

132.50

2,000.00 Tantarpata

1,060.00

Tantarpata
3,575.00 Tantarpata
875.00 Tantarpata

185.50

700.00 Tantarpata

148.40

875.00 Tantarpata

185.50

250.00 Tantarpata

53.00

875.00 Tantarpata

185.50

Tantarpata
178.75 Tantarpata
178.75 Tantarpata

0.27

Tantarpata
5,753.75 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

4.24

Tantarpata

USUARIO Tantarpata
2,500.00 Tantarpata
Tantarpata
50.00 Tantarpata

8.48

Tantarpata
100.00 Tantarpata

16.96

100.00 Tantarpata

16.96

50.00 Tantarpata

8.48

50.00 Tantarpata

8.48

Tantarpata

500.00 Tantarpata

84.80

100.00 Tantarpata

16.96

375.00 Tantarpata

63.60

125.00 Tantarpata

21.20

Tantarpata
375.00 Tantarpata

63.60

125.00 Tantarpata

21.20

350.00 Tantarpata

59.36

100.00 Tantarpata

16.96

50.00 Tantarpata

8.48

50.00 Tantarpata

8.48

Tantarpata
385.00 Tantarpata
Tantarpata
175.00 Tantarpata

21.20

140.00 Tantarpata

16.96

70.00 Tantarpata

8.48

Tantarpata
1,300.00 Tantarpata
Tantarpata
Tantarpata

63.60

Tantarpata
1,300.00 Tantarpata

551.20

Tantarpata
125.00 Tantarpata
125.00 Tantarpata
Tantarpata
4,310.00 Tantarpata

0.21

Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

4.24

Tantarpata

USUARIO Tantarpata
3,100.00 Tantarpata
Tantarpata
25.00 Tantarpata

4.24

25.00 Tantarpata

4.24

Tantarpata
50.00 Tantarpata

8.48

75.00 Tantarpata

12.72

200.00 Tantarpata

33.92

Tantarpata
375.00 Tantarpata

63.60

375.00 Tantarpata

63.60

Tantarpata
625.00 Tantarpata

106.00

500.00 Tantarpata

84.80

225.00 Tantarpata

38.16

375.00 Tantarpata

63.60

125.00 Tantarpata

21.20

125.00 Tantarpata

21.20

Tantarpata

350.00 Tantarpata
Tantarpata
175.00 Tantarpata

21.20

105.00 Tantarpata

12.72

Tantarpata
35.00 Tantarpata

4.24

35.00 Tantarpata

4.24

Tantarpata
1,500.00 Tantarpata
Tantarpata
Tantarpata

6,360.00

Tantarpata
1,500.00 Tantarpata

636.00

Tantarpata
155.00 Tantarpata
155.00 Tantarpata
Tantarpata
5,105.00 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

4.24

Tantarpata

USUARIO Tantarpata
1,600.00 Tantarpata

0.21

Tantarpata
50.00 Tantarpata

8.48

Tantarpata
25.00 Tantarpata

4.24

50.00 Tantarpata

8.48

75.00 Tantarpata

12.72

Tantarpata
200.00 Tantarpata

33.92

50.00 Tantarpata

8.48

400.00 Tantarpata

67.84

50.00 Tantarpata

8.48

Tantarpata
200.00 Tantarpata

33.92

150.00 Tantarpata

25.44

200.00 Tantarpata

33.92

50.00 Tantarpata

8.48

50.00 Tantarpata

8.48

50.00 Tantarpata

8.48

Tantarpata
350.00 Tantarpata
Tantarpata
140.00 Tantarpata

16.96

70.00 Tantarpata

8.48

Tantarpata
70.00 Tantarpata

8.48

70.00 Tantarpata

8.48

Tantarpata
1,400.00 Tantarpata

Tantarpata
Tantarpata

254.40

Tantarpata
1,400.00 Tantarpata

593.60

Tantarpata
80.00 Tantarpata
80.00 Tantarpata

0.21

Tantarpata
3,430.00 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

4.24

Tantarpata

USUARIO Tantarpata
1,425.00 Tantarpata
Tantarpata
25.00 Tantarpata

4.24

Tantarpata
25.00 Tantarpata

4.24

50.00 Tantarpata

8.48

75.00 Tantarpata

12.72

Tantarpata
200.00 Tantarpata

33.92

400.00 Tantarpata

67.84

Tantarpata
200.00 Tantarpata

33.92

100.00 Tantarpata

16.96

200.00 Tantarpata

33.92

50.00 Tantarpata

8.48

50.00 Tantarpata

8.48

50.00 Tantarpata

8.48

Tantarpata
350.00 Tantarpata
Tantarpata
140.00 Tantarpata

16.96

70.00 Tantarpata

8.48

Tantarpata
70.00 Tantarpata

8.48

70.00 Tantarpata

8.48

Tantarpata
1,200.00 Tantarpata
Tantarpata
Tantarpata

254.40

Tantarpata
1,200.00 Tantarpata

508.80

Tantarpata
71.25 Tantarpata
71.25 Tantarpata

Tantarpata
3,046.25 Tantarpata
Tantarpata
Tantarpata

0.21

Tantarpata
Tan

NANCIAMIENTO

106.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

2,120.00

Tantarpata
50.00 Tantarpata
50.00 Tantarpata

212.00

Tantarpata
2.50 Tantarpata
2.50 Tantarpata

5.30

Tantarpata
52.50 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

106.00

Tantarpata

USUARIO Tantarpata
135.00 Tantarpata
Tantarpata
25.00 Tantarpata

106.00

Tantarpata
25.00 Tantarpata

106.00

25.00 Tantarpata

106.00

Tantarpata
7.50 Tantarpata

31.80

7.50 Tantarpata

31.80

7.50 Tantarpata

31.80

7.50 Tantarpata

31.80

7.50 Tantarpata

31.80

7.50 Tantarpata

31.80

Tantarpata
7.50 Tantarpata

31.80

7.50 Tantarpata

31.80

Tantarpata
9.20 Tantarpata
Tantarpata
Tantarpata

530.00

1.20 Tantarpata

636.00

8.00 Tantarpata

212.00

Tantarpata
6.75 Tantarpata
6.75 Tantarpata

5.30

Tantarpata
150.95 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

106.00

Tantarpata

USUARIO Tantarpata
50.00 Tantarpata
Tantarpata

424.00

50.00 Tantarpata

106.00

Tantarpata

159.00

Tantarpata

53.00

Tantarpata

424.00

Tantarpata
0.00 Tantarpata
Tantarpata

424.00

Tantarpata
0.00 Tantarpata
Tantarpata

53.00

Tantarpata

2.12

Tantarpata
0.00 Tantarpata
Tantarpata

424.00

Tantarpata
25.00 Tantarpata
25.00 Tantarpata

106.00

Tantarpata
1.25 Tantarpata
1.25 Tantarpata
Tantarpata
76.25 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

106.00

Tantarpata

USUARIO Tantarpata
20.00 Tantarpata

5.30

20.00 Tantarpata

424.00

Tantarpata

424.00

Tantarpata

53.00

Tantarpata

53.00

Tantarpata
0.00 Tantarpata
Tantarpata

106.00

Tantarpata

848.00

Tantarpata
0.00 Tantarpata
Tantarpata

1.59

Tantarpata

106.00

Tantarpata

2.12

Tantarpata

1.06

Tantarpata
0.00 Tantarpata
Tantarpata

954.00

Tantarpata
25.00 Tantarpata
25.00 Tantarpata

106.00

Tantarpata
1.25 Tantarpata
1.25 Tantarpata
Tantarpata
46.25 Tantarpata
Tantarpata
Tantarpata
Tantarpata

5.30

Tantarpata
Tan

NANCIAMIENTO

1.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

110.00

Tantarpata

220.00

Tantarpata

3.60

Tantarpata

216.00

Tantarpata

115.00

Tantarpata

115.00

Tantarpata

115.00

Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

12.00

Tantarpata

USUARIO Tantarpata
Tantarpata
Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
0.00 Tantarpata
Tantarpata

36.00

Tantarpata
Tantarpata
Tan

NANCIAMIENTO

12.00

Tantarpata

USUARIO Tantarpata
Tantarpata
Tantarpata
0.00 Tantarpata
Tantarpata

12.00

Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

12.00

Tantarpata

USUARIO Tantarpata
Tantarpata
Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

1.00

12.00

NANCIAMIENTO

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

3.00

Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

2.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

2.00

Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

12.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
0.00 Tantarpata
Tantarpata

36.00

Tantarpata
Tantarpata
Tan

NANCIAMIENTO

24.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

24.00

Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

20.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

20.00

Tantarpata

20.00

Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

2.00

Tantarpata

USUARIO Tantarpata

0.00 Tantarpata
Tantarpata

2.00

Tantarpata

2.00

Tantarpata

200.00

Tantarpata
0.00 Tantarpata
Tantarpata

376.00

Tantarpata
0.00 Tantarpata
Tantarpata

188.00

Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

2.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

6.00

Tantarpata

4.00

Tantarpata
0.00 Tantarpata
Tantarpata

6.00

Tantarpata
0.00 Tantarpata
Tantarpata

4.00

Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

106.00

Tantarpata

USUARIO Tantarpata
22.80 Tantarpata
Tantarpata
Tantarpata

2,120.00

Tantarpata

4.24

Tantarpata

318.00

Tantarpata
Tantarpata

19.08

Tantarpata

53.00

Tantarpata

2.12

Tantarpata

212.00

Tantarpata
Tantarpata

4,240.00

Tantarpata

2.12

Tantarpata

106.00

Tantarpata

106.00

Tantarpata
Tantarpata

106.00

10.00 Tantarpata

4,240.00

12.00 Tantarpata

6,360.00

Tantarpata

8.48

0.80 Tantarpata

8.48

Tantarpata
37.50 Tantarpata
37.50 Tantarpata

159.00

Tantarpata
1.88 Tantarpata
1.88 Tantarpata

5.30

Tantarpata
62.18 Tantarpata
Tantarpata
Tantarpata
Tantarpata

tacin FONCODES)

Tantarpata

tacin FONCODES)

Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

106.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

106.00

Tantarpata

318.00

Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
Tantarpata

Tantarpata
Tan

NANCIAMIENTO

180.00

Tantarpata

USUARIO Tantarpata
Tantarpata
Tantarpata
0.00 Tantarpata
Tantarpata

180.00

Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

2.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

2.00

Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO
Tantarpata
GOB.
LOCAL Tantarpata
0.00 Tantarpata

6.00

Tantarpata

564.00

Tantarpata

6.00

Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

1.00

NANCIAMIENTO
Tantarpata
GOB.
LOCAL Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata

15.00

Tantarpata

6.00

Tantarpata

10.00

Tantarpata

6.00

Tantarpata

5.00

Tantarpata

192.00

Tantarpata

2.00

Tantarpata

64.00

Tantarpata

128.00

Tantarpata

94.00

Tantarpata

3.00

Tantarpata

94.00

Tantarpata

3.00

Tantarpata

6.00

Tantarpata

6.00

Tantarpata

Tantarpata

1.67

Tantarpata

10.00

Tantarpata

10.00

Tantarpata

10.00

Tantarpata

10.00

Tantarpata

0.17

Tantarpata

0.33

Tantarpata

0.33

Tantarpata

0.33

Tantarpata

0.33

Tantarpata

0.67

Tantarpata

0.33

Tantarpata

0.33

Tantarpata

0.33

Tantarpata

0.33

Tantarpata
Tantarpata

0.33

Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

Tantarpata

USUARIO Tantarpata
Tantarpata
Tantarpata
0.00 Tantarpata

6.00

Tantarpata

6.00

Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

6.00

Tantarpata

USUARIO Tantarpata
Tantarpata
Tantarpata
0.00 Tantarpata
Tantarpata

6.00

Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

1.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

10.00

Tantarpata

1.25

Tantarpata
Tantarpata
Tantarpata
0.00 Tantarpata

Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

18.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
Tantarpata

18.00

Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

6.00

Tantarpata

USUARIO Tantarpata
Tantarpata
Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata

6.00

Tantarpata
Tan

NANCIAMIENTO

1.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

1.00

Tantarpata

0.50

Tantarpata

0.33

Tantarpata

0.50

Tantarpata

0.50

Tantarpata

0.50

Tantarpata

3.00

Tantarpata

0.50

Tantarpata

2.00

Tantarpata

1.00

Tantarpata

3.00

Tantarpata

1.00

Tantarpata

1.00

Tantarpata

3.00

Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

18.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata

Tantarpata
Tantarpata
Tantarpata

18.00

Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

18.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

5.99

Tantarpata
0.00 Tantarpata
Tantarpata

9.00

Tantarpata

36.00

Tantarpata

9.00

Tantarpata

5.99

Tantarpata

54.00

Tantarpata

108.00

Tantarpata
0.00 Tantarpata
Tantarpata

5.99

Tantarpata

5.99

Tantarpata

5.99

Tantarpata
0.00 Tantarpata

Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

1.00

Tantarpata

USUARIO Tantarpata
Tantarpata
Tantarpata
0.00 Tantarpata
Tantarpata

1.00

Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

1.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
Tantarpata

1.00

Tan

NANCIAMIENTO

1.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
Tantarpata

1.00

Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

18.00

Tantarpata

USUARIO Tantarpata
Tantarpata
Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

1.50

Tantarpata

USUARIO Tantarpata

18.00

0.00 Tantarpata
Tantarpata

0.50

Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

18.00

Tantarpata

USUARIO Tantarpata
Tantarpata
Tantarpata
0.00 Tantarpata
Tantarpata

18.00

Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

18.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
0.00 Tantarpata
Tantarpata

18.00

0.00 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

18.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata

18.00

Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
Tantarpata
Tan

NANCIAMIENTO

2.00

Tantarpata

USUARIO Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
0.00 Tantarpata
Tantarpata
Tantarpata
0.00 Tantarpata

2.00

ANEXO N 05: RELACIN DE INSUMOS DEL PROYECTO


1.1.1.Instalacin de riego tecnificado
N

DESCRIPCIN

UNID.

CANTIDAD
TOTAL

Alambre galvanizado N 16

kg

1.00

Arena hormign

17.08

Aspersor VYR 60 - " / sectorial (bronce)

Unid

Cemento Portland tipo I / 42,50 kg

Bolsa

Cinta tefln

Unid

362.00

Codo HDPE de 25 mm x R/H

Unid

212.00

Codo PVC 45,


Codo PVC 45, 1

unid

7.00

Unid

51.00

Codo PVC 45, 1"

unid

36.00

Codo PVC 45, 2"


Codo PVC 90, 1

unid

3.00

Unid

15.00

Codo PVC 90, 1"


Codo PVC 90, 2

Unid

6.00

Unid

6.00

Codo PVC, 45 - 2"

Unid

10.00

Codo PVC, 45 - 3"

Unid

1.00

Codo PVC, 90 - 2"

Unid

20.00

Collarn HDPE de "

Unid

7.00

Collarn HDPE de 150 mm X 2"

Unid

3.00

Collarn HDPE de 200 mm X 1"

Unid

2.00

Collarn HDPE de 25 mm X "

Unid

73.00

Collarn HDPE de 38 mm X "

Unid

23.00

Collarn HDPE de 50 mm X "

Unid

8.00

Collarn HDPE de 75 mm X "

Unid

2.00

Fierro corrugado de

632.00

Fierro corrugado de

125.00

Fierro corrugado de 8 mm

516.00

Herramientas (5,00 % MONC)

480.10

Juego de panel reforzado (0,6*0,6*0,6 m3)

Unid

1.25

Juego de panel reforzado (0,7*0,7*0,7 m3)

Unid

2.00

Juego de panel reforzado (1,10*1,10*1,10 m3)

Unid

1.50

Juego de panel reforzado (1,50*1,50*1,50 m3)

Unid

0.25

Lija N 40

Unid

94.90

Llave bayoneta de

Unid

106.00

Llave de paso de "

Unid

106.00

Llave de paso de 1"

Unid

52.00

Llave de paso de 1

Unid

15.00

Llave de paso de 2"

Unid

11.00

106.00
67.14

Malla mosquitero verde

10.00

Manguera PEDB de 25 mm, C-4

5,300.00

Mano de obra no calificada

Jornal

1,157.16

Niple de "

Unid

106.00

Niple PVC de x 1,20 m (Elevador)

Unid

106.00

Pegamento OATEY x galn


Reduccin PVC, 1" - 1

Unid

75.42

Unid

25.00

Reduccin PVC, 2" - 1"

Unid

16.00

Reduccin PVC, 2" - 1"

Unid

10.00

Reduccin PVC, 3" - 1

Unid

13.00

Reduccin PVC, 3" - 2

Unid

10.00

Sierra metlica

Unid

19.87

Tapa metlica con seguro de 35x35 cm


Tee PVC, 1

Unid

176.00

Unid

7.00

Tee PVC, 1

Unid

15.00

Tee PVC, 2

Unid

18.00

Tee PVC, 3

Unid

26.00

Trpode metal x 1,10 m c/abraz. A presin

Unid

106.00

Tubera PVC C-7,5, 3, 5 m

20.00

Tubera PVC SAP, C-10, x 5m

7.00

Tubera PVC SAP, C-10, 1 x 5m

5,176.69

Tubera PVC SAP, C-10, 2" x 5m

3.00

Tubera PVC SAP, C-7,50, 1" x 5m

2,025.45

Tubera PVC SAP, C-7,50, 2 x 5m

1,700.33

Tubera PVC SAP, C-7,50, 3 x 5m

284.50

Unin roscada HDPE de

Unid

106.00

UPR PVC Adaptador de

Unid

21.00

UPR PVC Adaptador de 1

Unid

104.00

UPR PVC Adaptador de 1

Unid

36.00

UPR PVC Adaptador de 2

Unid

71.00

Vlvula de acople rpido de "

Unid

106.00

Vlvula doble Universal de bola de "

Unid

7.00

Vlvula doble Universal de bola de 1"

Unid

2.00

Vlvula doble Universal de bola de 2"

Unid

3.00

1.1.2.Produc. de actividades agropec. orientas al Mcdo.

DESCRIPCIN

UNID.

CANTIDAD
TOTAL

Alambre negro N 16

kg

159.00

Algodn paquete de 50,00 g

Pqte.

106.00

Alimentacin de participantes

Racin

188.00

Alimentacin pasantes

Da

Alimento balanceado

kg

Almacenado

Jornal

Alojamiento de pasantes

Noche

Antibitico (Biomycin Sper x 20 g)

Unid

53.00

Antibitico (Enropro al 20% - Frasco de 0,50 l)

Fco.

2.12

Antiparasitario ext. (Fipecto Frasco de 1,00 l)

Fco.

3.18

Banner 0,80 x 1,20 m

Unid

2.00

Barbecho o Arado o roturacion

Yunta

173.84

Ceniza

kg

636.00

Clavos de 2

kg

53.00

Clavos de 4

kg

106.00

Contratacin de Yachachiq (1 Yachachiq)

Honorar.

Cuaderno de 100 hojas T-A4

Unid

110.00

Cuyes reproductores (hembras)

Unid

848.00

Cuyes reproductores (macho)

Unid

106.00

Gallinas criollas de doble propsito

Unid

424.00

Guano de corral

Saco

4,619.60

Herramientas (5% M.O.)

Instalaciones (construccin de jaulas)

Gbl

106.00

Lapiceros punta fina

Unid

220.00

Malla arpillera

730.00

Malla gallinero

848.00

6.00
424.00
3,570.16
4.00

60.00

22.63

Manual en cocinas mejoradas y agua segura (15 hojaUnid

115.00

Manual en produccin agrcola y pecuaria (15 hojas / Unid

115.00

Manual en riego (15 hojas /manual)

Unid

115.00

Movilidad de Chungui - Vinchos (viceversa)

Pasaje

6.00

Movilidad de participantes

Pasaje

376.00

Movilidad local

Da

Movilidad Yachachiq para capacitacin (1 Yachachiq) Movil.

4.00
60.00

Papelgrafo cuadriculado

Ciento

3.60

Plantones de pino

Unid.

Plumones para papel N 47

Unid

Premios Primer Puesto

Premio

20.00

Premios Segundo Puesto

Premio

20.00

Rollizos de eucalipto =2 x 2,20 m

Unid

Seguro de Yachachiq

Seguro

Semilla de Alfalfa Super Alabama 550 PL

kg

132.50

Semilla de arveja

kg

254.40

Semilla de frejol canario

kg

254.40

Semilla de papa

kg

6,360.00

2,120.00
216.00

636.00
5.00

2.

Semilla de quinua

kg

63.60

Semillas de acelga

kg

6.35

Semillas de betarraga

kg

15.24

Semillas de cebolla

kg

5.08

Semillas de coliflor

kg

3.18

Semillas de Zanahoria

kg

5.08

Tintura de Yodo al 2% x 1,00 l

Fco.

1.59

Transporte semovientes

Cbza

1,378.00

Trpticos

Millar

2.00

Implementacin y mejora de la vivienda saludable

DESCRIPCIN

UNID.

Adobe

Unid

Alambre negro N 08

kg

2.12

Alambre negro N 16

kg

4.24

Arena de asentar

2.12

Arena fina

8.48

Balde con cao x 12 litros

Unidad

Cemento Portland tipo I / 42,50 kg

Bolsa

Ceniza

kg

Chimenea de =0,12 x 1,20 m x 0,60 mm

Unid

106.00

Construccin de la cocina

Jornal

159.00

Fibraforte transparente de 1,80 x 0,80 x 0,22 mm

Unid

106.00

Fierro corrugado de

212.00

Fierro corrugado x (rejilla cenicero)

318.00

Herramientas (5,00 % MONC)

5.30

Ladrillos de pared (artesanal)

Unid

Malla electrosoldada de

Sombrero capucha 0,18 x 07,00 cm con perno abrazaUnid

3.

CANTIDAD
TOTAL
4,240.00

106.00
19.08
6,360.00

6,360.00
53.00
106.00

Tierra de chacra

8.48

Vaso de vidrio x 7 onz

Unidad

318.00

UNID.

CANTIDAD
TOTAL

Asistente Tcnico articulador

Evento

180.00

Premio a la idea del negocio ganador

Premio

2.00

Promocin de Negocios Rurales Inclusivos

DESCRIPCIN

4.

Fomento de capacidades financieras

DESCRIPCIN

UNID.

CANTIDAD
TOTAL

Banner (con imp. De logotipo y nombre del Pyto.) 2,5x1,3 m

Unid

0.33

Banner en blanco de 2x1,20 m (con ojales)

Unid

0.33

Banner para recepcin de imagen (con ojales) 2x1,50 m

Unid

0.33

Cartulinas de colores ecolgicos

Unid

128.00

Chinchotes

Caja

6.00

Clavos de cemento de 2"

Docena

6.00

Combustible - facilitador financiero

Gln

Convocatorias

Unid

564.00

Cuadernos A-4 (para actas del grupo)

Unid

3.00

Cuadernos A-5 (para notas de usuarios)

Unid

94.00

Cuchilla corta papel (cutter)

Unid

0.33

Diseo de lminas

Unid

10.00

Edicin de video (durac. 15 min)- temas central modulo

Unid

6.00

Edicin e impresin de cuadernos de mdulos para usuarios

Unid

5.00

Edicin e impresin de guas de mdulo para lderes

Unid

6.00

Edicin e impresin de guas de mdulo para yachahiq y NE

Unid

10.00

Edicin e impresin de guas de mdulos para facilit. Financ.

Unid

1.67

Facilitador financiero

Honorar.

6.00

Ganchos de plstico

Docena

0.67

Impresin de billetes y monedas plastificadas

Millar

0.17

Impresin de lminas plastificadas 8x30 cm

Unid

10.00

Impresin de lminas plastificadas A-3

Unid

10.00

Incentivos para concursos (15 usuarios del NE)

Glb

15.00

Lapiceros

Unid

94.00

Linterna

Unid

0.33

Maletn porta meteriales

Unid

0.33

Movilidad para convocatoria

Glb

6.00

Papel bond A-4

Millar

3.00

Papel craf

Unid

Papelgrafo cuadriculado

Ciento

2.00

Pasador o cuerda sinttica (grosor 50 mm)

Unid

0.33

Plumones para pizarra acrlica

Unid

64.00

Puntero graduable

Unid

0.33

Servicios de arte grfico

Unid

10.00

Tijeras punta roma medianas

Unid

0.33

Viticos facilitador (hospedaje, alimentacin y pasaje)

Da

1.25

10.00

192.00

Yachachiq financiero

Honorar.

6.00

CUADRO N 04: PRESUPUESTO DEL PROYECTO

N
A.
1.
1.1.
1.1.1.
1.1.1.1.
1.1.1.2.
1.1.1.3.
1.1.1.4.
1.1.1.5.
1.1.1.6.
1.1.1.7.
1.1.1.8.
1.1.1.9.
1.1.1.10.
1.1.1.11.
1.1.1.12.
1.1.1.13.
1.1.1.14.
1.1.1.15.
1.1.1.16.
1.1.1.17.

N DE EXPEDIENTE TCNICO:
NOMBRE DEL PROYECTO:

2,020,030,005
PROGRAMA PRESUPUESTAL: "ACCESO DE HOGARES RURALES CON
SUBSISTENCIA A MERCADOS LOCALES"

PROYECTISTA:
FECHA:
N USUARIOS:

Ing. ..
marzo, 2014
80
Familias
DESCRIPCIN

UNID.
MEDID.

CANT.

COSTO
UNITAR.

COSTO DIRECTO
Fortal.Consol. Sist. Produccin familiar rural y mejora de viviendas saludables
Implementacin de Tecnologas
Instalacin de Riego Tecnificado
Cmara de carga (0,22 - 0,44 l/s) de 0,6*0,6*0,6 m
Unid
25.000
355.40
Instalacin de collarn de captacin de 25 mm * "
Unid
49.000
160.97
Instalacin de collarn de captacin de 150 mm * 2"
Unid
9.000
253.97
Instalacin de collarn de captacin de 200 mm * 1"
Unid
4.000
258.97
Cmara rompe presin (0,22 - 0,88 l/s) de 0,7*0,7*0,7 m
Unid
64.000
382.53
Cmara rompe presin (1,32 - 3,08 l/s) de 1,10*1,10*1,10 m Unid
36.000
549.48
Cmara rompe presin (5,50 l/s) de 1,50*1,50*1,50 m
Unid
1.000
787.30
Instalacin de Codo PVC de 45 - 1"
Unid
2,601.000
3.72
Instalacin de Codo PVC de 45 - 1"
Unid
1,156.000
6.35
Instalacin de Codo PVC de 45 - 2"
Unid
100.000
9.48
Instalacin de Codo PVC de 45 - 3"
Unid
1.000
13.11
Instalacin de Codo PVC de 90 - 1"
Unid
225.000
3.72
Instalacin de Codo PVC de 90 - 1"
Unid
36.000
6.35
Instalacin de Codo PVC de 90 - 2"
Unid
36.000
9.48
Instalacin de Tee PVC de 1"
Unid
49.000
7.48
Instalacin de Tee PVC de 1"
Unid
225.000
9.74
Instalacin de Tee PVC de 2"
Unid
324.000
11.00

FINANCIAM
INVERSIN
FONCODE
TOTAL
S
###
###
###
###
###
###
###
###
8,885.00
5,603.75
7,887.53
6,601.28
2,285.73
2,049.48
1,035.88
930.88
24,481.92 16,081.92
19,781.28 15,056.28
787.30
656.05
9,686.12
7,636.54
7,345.22
6,434.30
948.40
869.60
13.11
12.33
837.90
660.60
228.74
200.38
341.42
313.06
366.72
328.10
2,192.40
2,015.10
3,565.30
3,309.98

N
1.1.1.18.
1.1.1.19.
1.1.1.20.
1.1.1.21.
1.1.1.22.
1.1.1.23.
1.1.1.24.
1.1.1.25.
1.1.1.26.
1.1.1.27.
1.1.1.28.
1.1.1.29.
1.1.1.30.
1.1.1.31.
1.1.1.32.
1.1.1.33.
1.1.1.34.
1.1.1.35.
1.1.1.36.

N DE EXPEDIENTE TCNICO:
NOMBRE DEL PROYECTO:

2,020,030,005
PROGRAMA PRESUPUESTAL: "ACCESO DE HOGARES RURALES CON
SUBSISTENCIA A MERCADOS LOCALES"

PROYECTISTA:
FECHA:
N USUARIOS:

Ing. ..
marzo, 2014
80
Familias
DESCRIPCIN

Instalacin de Tee PVC de 3"


Instalacin de Reduccin PVC de 1" - 1"
Instalacin de Reduccin PVC de 2" - 1"
Instalacin de Reduccin PVC de 2" - 1"
Instalacin de Reduccin PVC de 3" - 2"
Instalacin de Llave de paso de 1"
Instalacin de Llave de paso de 1"
Instalacin de Llave de paso de 2"
Construccin de Caja de llave de paso
Instalacin de collarines para hidrantes de 25
Instalacin de collarines para hidrantes de 38
Instalacin de collarines para hidrantes de 50
Instalacin de collarines para hidrantes de 75
Instalacin de Tubera PVC SAP C-10, ="
Instalacin de Tubera PVC SAP C-10, =1"
Instalacin de Tubera PVC SAP C-7.5, =1"
Instalacin de Tubera PVC SAP C-7.5, =2"
Instalacin de Tubera PVC SAP C-7.5, =3"
Instalacin de sistema mvil

mm
mm
mm
mm

*
*
*
*

"
"
"
"

1.1.2.
Produc. de actividades agropec. orientas al Mcdo.
1.1.2.1.
Huerto fijo de hortalizas a campo abierto
1.1.2.1.1. Produccin de zanahoria

FINANCIAM
UNID.
COSTO
INVERSIN
CANT.
FONCODE
MEDID.
UNITAR.
TOTAL
S
Unid
36.000
14.26
513.50
485.14
Unid
625.000
7.74
4,840.00
4,347.50
Unid
100.000
7.26
726.40
647.60
Unid
256.000
8.76
2,243.58
2,041.86
Unid
9.000
11.52
103.72
96.62
Unid
2,704.000
11.68
31,593.54 29,462.78
Unid
4.000
19.74
78.98
75.82
Unid
16.000
27.00
432.06
419.46
Unid
3,364.000
95.53 321,356.19 318,705.36
Unid
5,329.000
164.27 875,394.83 735,508.58
Unid
529.000
166.27
87,956.83 74,070.58
Unid
64.000
167.27
10,705.28
9,025.28
Unid
4.000
174.27
697.08
592.08
m
64.920
4.79
310.77
140.36
m
5,111.770
5.59
28,560.46 15,142.06
m
2,023.450
6.87
13,890.98
8,579.43
m
1,540.330
8.92
13,742.82
9,699.46
m
284.500
15.52
4,416.01
3,669.20
Unid
###
226.76 2,547,909.07
###
222,979.47 68,587.17
ha

1.270

4,302.50

5,464.18

457.20

N DE EXPEDIENTE TCNICO:
NOMBRE DEL PROYECTO:

2,020,030,005
PROGRAMA PRESUPUESTAL: "ACCESO DE HOGARES RURALES CON
SUBSISTENCIA A MERCADOS LOCALES"

PROYECTISTA:
FECHA:
N USUARIOS:

Ing. ..
marzo, 2014
80
Familias
DESCRIPCIN

1.1.2.1.2.
1.1.2.1.3.
1.1.2.1.4.
1.1.2.1.5.
1.1.2.2.
1.1.2.2.1.
1.1.2.3.
1.1.2.3.1.
1.1.2.3.2.
1.1.2.3.3.
1.1.2.3.4.
1.1.2.4.
1.1.2.5.
1.1.2.6.
1.1.2.7.

Produccin de cebolla
Produccin de betarraga
Produccin de coliflor
Produccin de acelga
Parcela de pastos asociados
Parcela produccin de alfalfa
Miniparcelas para la produccin granos andinos
Produccin de quinua
Produccin de papa blanca
Produccin de frejol canario
Produccin de arveja
Agroforestera
Mdulo de produccin de abono orgnico - compost
Mdulo de crianza de gallinas
Mdulo de crianza de cuyes

1.1.3.
1.1.3.1.

Flete y transporte de materiales e insumos


Flete - transporte de materiales e insumos

1.2.
1.2.1.
1.3.
1.3.1.

Materiales de Capacitacin para las tecnologas


Materiales de capacitacin para las tecnologas
Capacitacin de campesino a campesino
Contratacin de Yachachiq (primer ao)

UNID.
MEDID.
ha
ha
ha
ha
ha
ha
ha
ha
ha
Familia
Mdulo
Mdulo
Mdulo

Glb

Glb
Mes

CANT.
1.270
1.270
1.270
1.270
5.300

FINANCIAM
COSTO
INVERSIN
FONCODE
UNITAR.
TOTAL
S
3,679.50
4,672.97
599.44
4,002.50
5,083.18
1,143.00
3,527.50
4,479.93
539.75
4,342.50
5,514.98
508.00
6,803.75

36,059.88

5,565.00

4.240
4,457.45
4.240 10,355.00
4.240
3,820.00
4.240
3,400.25
106.000
82.50
106.000
159.95
106.000
144.45
106.000
257.31

18,899.59
43,905.20
16,196.80
14,417.06
8,745.00
16,954.70
15,311.70
27,274.33

625.19
22,260.00
1,653.60
1,500.96
3,180.00
954.00
7,229.20
22,371.83

8,000.00
8,000.00

8,000.00
8,000.00

1.000

8,000.00

1.000

3,179.00

12.000

3,000.00

3,179.00 3,179.00
3,179.00
3,179.00
60,000.00 42,000.00
36,000.00 36,000.00

N DE EXPEDIENTE TCNICO:
NOMBRE DEL PROYECTO:

2,020,030,005
PROGRAMA PRESUPUESTAL: "ACCESO DE HOGARES RURALES CON
SUBSISTENCIA A MERCADOS LOCALES"

PROYECTISTA:
FECHA:
N USUARIOS:

Ing. ..
marzo, 2014
80
Familias
DESCRIPCIN

1.3.2.
1.3.3.
1.4.
1.4.1.
1.4.2.
1.5.
1.5.1.
1.5.2.
1.6.
1.6.1.
1.7.
1.7.1.
1.8.
1.8.1.

Contratacin de Yachachiq (segundo ao)


Contratacin de Yachachiq (tercer ao)
Seguro bsico de Yachachiq
Seguro bsico de Yachachiq (primer ao)
Seguro bsico de Yachachiq (segundo y tercer ao)
Movilidad de Yachachiq
Movilidad de Yachachiq para capacitacin (primer ao)
Movilidad de Yachachiq para capacitacin (2do. Y 3er ao)
Concursos entre Ncleos Ejecutores - NE
Concursos en la aplicacin y mejora de tecnologas
Participacin en Ferias Locales
Participacin en Ferias Locales
Pasantas Yachachiq
Pasantas Yachachiq

2.
2.1.
2.2.
2.2.1.
2.2.2.
2.3.

Implementacin y mejora de la vivienda saludable


Instalacin de cocina mejorada
Capacitacin en prcticas adecuadas mejora de vivienda, salud
Capacitacin en prcticas adecuadas de mejora de vivienda
Capacitacin en salud y nutricin familiar
Agua segura

3.

Promocin de Negocios Rurales Inclusivos

UNID.
MEDID.
Mes
Mes
Ao
Ao
Mes
Mes
Concur.
Feria
Pasanta

FINANCIAM
COSTO
INVERSIN
FONCODE
UNITAR.
TOTAL
S
12.000
1,000.00
12,000.00
6,000.00
12.000
1,000.00
12,000.00
0.00
2,425.80 1,698.06
1.000
1,455.48
1,455.48
1,455.48
2.000
485.16
970.32
242.58
9,600.00 7,800.00
12.000
600.00
7,200.00
7,200.00
24.000
100.00
2,400.00
600.00
6,000.00 6,000.00
20.000
300.00
6,000.00
6,000.00
5,284.00 5,284.00
2.000
2,642.00
5,284.00
5,284.00
1,930.00 1,930.00
2.000
965.00
1,930.00
1,930.00

CANT.

Mdulo
106.000
y nutricin familiar
Eventos
3.000
Eventos
3.000
Mdulo
106.000

201.14
786.70
786.70
21.50

28,319.51 21,813.76
21,320.31 14,814.56
2,360.10
2,360.10
2,279.00

2,360.10
2,360.10
2,279.00

55,950.00 55,950.00

N DE EXPEDIENTE TCNICO:
NOMBRE DEL PROYECTO:

2,020,030,005
PROGRAMA PRESUPUESTAL: "ACCESO DE HOGARES RURALES CON
SUBSISTENCIA A MERCADOS LOCALES"

PROYECTISTA:
FECHA:
N USUARIOS:

Ing. ..
marzo, 2014
80
Familias
DESCRIPCIN

3.1.
3.2.

Asistencia tcnica para articulacin al mercado


Concursos de Planes de negocios 3/.

4.
4.1.
4.2.
4.3.
4.4.
4.5.

Fomento de capacidades financieras


Promocin, convocatoria y concursos
Materiales de capacitacin
Honorarios facilitador financiero
Honorarios yachachiq financiero
Viticos y apoyo logstico facilitador financiero

B.
1.
1.1.
1.2.
1.3.
1.4.
1.5.

COSTO INDIRECTO
Gastos Generales del Ncleo Ejecutor Central - NEC
Movillidad del Presidente y Tesorero del NEC
Pago de revisor de cuentas
Cartel del NE e implementacin del NEC
Gastos Bancarios del NEC
Otros gastos del NEC (materiales, servicios)

2.
2.1.
2.2.
2.3.

Gastos de elaboracin de expediente tcnico


Elaboracin de expediente tcnico
Gastos bancarios pago de proyectista
Movillidad del Presidente y Tesorero del NEC pago proyectista

FINANCIAM
UNID.
COSTO
INVERSIN
CANT.
FONCODE
MEDID.
UNITAR.
TOTAL
S
Evento
180.000
50.00
9,000.00
9,000.00
Concurs.
2.000 23,475.00
46,950.00 46,950.00

Mes
Glb
Mes
Mes
Glb

Mes
Trimest.
Glb
Mes
Mes

Pyto.
Pyto.
Pyto.

77.00
3,705.20
1,500.00
1,000.00
450.00

19,617.20 19,617.20
462.00
462.00
3,705.20
3,705.20
9,000.00
9,000.00
6,000.00
6,000.00
450.00
450.00

83.33
300.00
1,508.00
6.00
293.22

58,079.90 57,180.80
10,193.90 9,294.80
1,499.94
1,499.94
1,800.00
1,800.00
1,508.00
1,508.00
108.00
108.00
5,277.96
4,378.86

1.000 12,000.00
1.000
32.00
1.000
250.00

12,282.00 12,282.00
12,000.00 12,000.00
32.00
32.00
250.00
250.00

6.000
1.000
6.000
6.000
1.000

18.000
6.000
1.000
18.000
18.000

N DE EXPEDIENTE TCNICO:
NOMBRE DEL PROYECTO:

2,020,030,005
PROGRAMA PRESUPUESTAL: "ACCESO DE HOGARES RURALES CON
SUBSISTENCIA A MERCADOS LOCALES"

PROYECTISTA:
FECHA:
N USUARIOS:

Ing. ..
marzo, 2014
80
Familias

DESCRIPCIN

UNID.
MEDID.

3.
3.1.
3.2.
3.3.

Gastos de ejecucin del proyecto


Administracin del proyecto (contratacin del Coord. Tco. del NEMes
Seguro de Coordinador Tcnico
Ao
Movilidad de Coordinador Tcnico
Mes

4.
4.1.
4.2.
4.3.

Gastos de seguimiento del NEC


Fotografas de seguimiento de proyectos
Elaboracin de informes de gestin del NEC
Elaboracin de vdeo de implementacin de proyectos
COSTO TOTAL
PARTICIPACIN (%)

Informe
Informe
Vdeo

CANT.
18.000
1.500
18.000

18.000
18.000
2.000

FINANCIAM
INVERSIN
FONCODE
TOTAL
S
31,194.00 31,194.00
1,500.00
27,000.00 27,000.00
396.00
594.00
594.00
200.00
3,600.00
3,600.00

COSTO
UNITAR.

70.00
125.00
450.00

4,410.00
1,260.00
2,250.00
900.00

4,410.00
1,260.00
2,250.00
900.00

###
100.00%

###
89.75%

GARES RURALES CON ECONOMIA DE

FINANCIAMIENTO
GOB.
USUARIOS
LOCAL
20,527.74
###
20,527.74
###
0.00
###
0.00
###
0.00
3,281.25
0.00
1,286.25
0.00
236.25
0.00
105.00
0.00
8,400.00
0.00
4,725.00
0.00
131.25
0.00
2,049.59
0.00
910.93
0.00
78.80
0.00
0.79
0.00
177.30
0.00
28.37
0.00
28.37
0.00
38.61
0.00
177.30
0.00
255.31

GARES RURALES CON ECONOMIA DE

FINANCIAMIENTO
GOB.
USUARIOS
LOCAL
0.00
28.37
0.00
492.50
0.00
78.80
0.00
201.73
0.00
7.09
0.00
2,130.75
0.00
3.15
0.00
12.61
0.00
2,650.83
0.00 139,886.25
0.00 13,886.25
0.00
1,680.00
0.00
105.00
0.00
170.42
0.00 13,418.40
0.00
5,311.56
0.00
4,043.37
0.00
746.81
0.00 73,741.87
0.00

###

0.00

5,006.98

GARES RURALES CON ECONOMIA DE

FINANCIAMIENTO
GOB.
USUARIOS
LOCAL
0.00
4,073.53
0.00
3,940.18
0.00
3,940.18
0.00
5,006.98
0.00

30,494.88

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

18,274.40
21,645.20
14,543.20
12,916.10
5,565.00
16,000.70
8,082.50
4,902.50

0.00
0.00

0.00
0.00

0.00
0.00
18,000.00
0.00

0.00
0.00
0.00
0.00

GARES RURALES CON ECONOMIA DE

FINANCIAMIENTO
GOB.
USUARIOS
LOCAL
6,000.00
0.00
12,000.00
0.00
727.74
0.00
0.00
0.00
727.74
0.00
1,800.00
0.00
0.00
0.00
1,800.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

6,505.75
6,505.75

0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00

GARES RURALES CON ECONOMIA DE

FINANCIAMIENTO
GOB.
USUARIOS
LOCAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

899.10
899.10
0.00
0.00
0.00
0.00
899.10

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

GARES RURALES CON ECONOMIA DE

FINANCIAMIENTO
GOB.
USUARIOS
LOCAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

21,426.84
0.47%

###
9.77%

CUADRO N 06: CRONOGRAMA ANALITICO DE EJECUCIN DEL PROYECTO


#REF! #REF!

#REF!

DESCRIPCIN

UNID.
MEDID META
A

A.
1.
1.1.
1.1.1.
1.1.2.
1.1.2.1.
1.1.2.2.
1.1.2.3.
1.1.2.4.
1.1.2.5.
1.1.2.6.
1.1.2.7.
1.1.3.

COSTO DIRECTO
Fortal.Consol. Sist. Produccin familiar rural y mejora de viviendas saludables
Implementacin de Tecnologas
Instalacin de Riego Tecnificado
Mdulo
Produc. de actividades agropec. orientas al Mcdo.
Huerto fijo de hortalizas a campo abierto
ha
Parcela de pastos asociados
ha
Miniparcelas para la produccin granos andinos
ha
Agroforestera
Familia
Mdulo de produccin de abono orgnico - compost
Mdulo
Mdulo de crianza de gallinas
Mdulo
Mdulo de crianza de cuyes
Mdulo
Flete y transporte de materiales e insumos
Glb

1.2.
1.3.
1.4.
1.5.
1.6.
1.7.
1.8.

Materiales de Capacitacin para las tecnologas


Capacitacin de campesino a campesino
Seguro bsico de Yachachiq
Movilidad de Yachachiq
Concursos entre Ncleos Ejecutores - NE
Participacin en Ferias Locales
Pasantas Yachachiq

2.
2.1.
2.2.

Implementacin y mejora de la vivienda saludable


Instalacin de cocina mejorada
Mdulo
Capacitacin en prcticas adecuadas mejora de vivienda, salud y nutricin familiar

Glb
Mes
Ao
Mes
Concur.
Feria
Pasanta

SET-NOV

PPTO.
TOTAL

6.35
5.3
16.96
106
106
106
106
1

4,459,427.07
4,355,540.36
4,267,121.56
4,036,142.09
222,979.47
25,215.22
36,059.88
93,418.65
8,745.00
16,954.70
15,311.70
27,274.33
8,000.00

1
36
3
36
20
2
2

3,179.00
60,000.00
2,425.80
9,600.00
6,000.00
5,284.00
1,930.00

106

28,319.51
21,320.31

DIC-FEB

CR
0

II

#REF! #REF!

#REF!

DESCRIPCIN

UNID.
MEDID META
A

SET-NOV

PPTO.
TOTAL

2.2.1.
2.2.2.
2.3.

Capacitacin en prcticas adecuadas de mejora de vivienda


Capacitacin en salud y nutricin familiar
Agua segura

Eventos
Eventos
Mdulo

3
3
106

2,360.10
2,360.10
2,279.00

3.
3.1.
3.2.

Promocin de Negocios Rurales Inclusivos


Asistencia tcnica para articulacin al mercado
Concursos de Planes de negocios 3/.

Evento
Concurs.

180
2

55,950.00
9,000.00
46,950.00

4.
4.1.
4.2.
4.3.
4.4.
4.5.

Fomento de capacidades financieras


Promocin, convocatoria y concursos
Materiales de capacitacin
Honorarios facilitador financiero
Honorarios yachachiq financiero
Viticos y apoyo logstico facilitador financiero

Mes
Glb
Mes
Mes
Glb

6
1
6
6
1

19,617.20
462.00
3,705.20
9,000.00
6,000.00
450.00

B.
1.
1.1.
1.2.
1.3.
1.4.
1.5.

COSTO INDIRECTO
Gastos Generales del Ncleo Ejecutor Central - NEC
Movillidad del Presidente y Tesorero del NEC
Pago de revisor de cuentas
Cartel del NE e implementacin del NEC
Gastos Bancarios del NEC
Otros gastos del NEC (materiales, servicios)

Mes
Trimest.
Glb
Mes
Mes

18
6
1
18
18

58,079.90
10,193.90
1,499.94
1,800.00
1,508.00
108.00
5,277.96

2.
2.1.
2.2.
2.3.

Gastos de elaboracin de expediente tcnico


Elaboracin de expediente tcnico
Gastos bancarios pago de proyectista
Movillidad del Presidente y Tesorero del NEC pago proyectista

Pyto.
Pyto.
Pyto.

1
1
1

12,282.00
12,000.00
32.00
250.00

DIC-FEB

CR
0

II

#REF! #REF!

#REF!

DESCRIPCIN

UNID.
MEDID META
A

SET-NOV

PPTO.
TOTAL

3.
3.1.
3.2.
3.3.

Gastos de ejecucin del proyecto


Administracin del proyecto (contratacin del Coord. Tco. del NEC)
Seguro de Coordinador Tcnico
Movilidad de Coordinador Tcnico

Mes
Ao
Mes

18
1.5
18

31,194.00
27,000.00
594.00
3,600.00

4.
4.1.
4.2.
4.3.

Gastos de seguimiento del NEC


Fotografas de seguimiento de proyectos
Elaboracin de informes de gestin del NEC
Elaboracin de vdeo de implementacin de proyectos

Informe
Informe
Vdeo

18
18
2

4,410.00
1,260.00
2,250.00
900.00

COSTO TOTAL
PARTICIPACIN (%)

4,517,506.97

DIC-FEB

CR
0

II

L PROYECTO

MAR-MAY JUN-AGO SET-NOV

III

DIC-FEB

MAR-MAY JUN-AGO SET-NOV

CRONOGRAMA DE EJECUCIN TRIMESTRAL


IV
V
VI
VII
VIII

IX

DIC-FEB

MAR-MAY JUN-AGO

XI

XII

MAR-MAY JUN-AGO SET-NOV

III

DIC-FEB

MAR-MAY JUN-AGO SET-NOV

CRONOGRAMA DE EJECUCIN TRIMESTRAL


IV
V
VI
VII
VIII

IX

DIC-FEB

MAR-MAY JUN-AGO

XI

XII

MAR-MAY JUN-AGO SET-NOV

III

DIC-FEB

MAR-MAY JUN-AGO SET-NOV

CRONOGRAMA DE EJECUCIN TRIMESTRAL


IV
V
VI
VII
VIII

IX

DIC-FEB

MAR-MAY JUN-AGO

XI

XII

CUADRO N 07: CRONOGRAMA DE EJECUCIN CUALITATIVO DEL PROYECTO


#REF! #REF!

#REF!

DESCRIPCIN

UNID.
MEDID META
A

A.
1.
1.1.
1.1.1.
1.1.2.
1.1.2.1.
1.1.2.2.
1.1.2.3.
1.1.2.4.
1.1.2.5.
1.1.2.6.
1.1.2.7.
1.1.3.

COSTO DIRECTO
Fortal.Consol. Sist. Produccin familiar rural y mejora de viviendas saludables
Implementacin de Tecnologas
Instalacin de Riego Tecnificado
Mdulo
Produc. de actividades agropec. orientas al Mcdo.
Huerto fijo de hortalizas a campo abierto
ha
Parcela de pastos asociados
ha
Miniparcelas para la produccin granos andinos
ha
Agroforestera
Familia
Mdulo de produccin de abono orgnico - compost
Mdulo
Mdulo de crianza de gallinas
Mdulo
Mdulo de crianza de cuyes
Mdulo
Flete y transporte de materiales e insumos
Glb

1.2.
1.3.
1.4.
1.5.
1.6.
1.7.
1.8.

Materiales de Capacitacin para las tecnologas


Capacitacin de campesino a campesino
Seguro bsico de Yachachiq
Movilidad de Yachachiq
Concursos entre Ncleos Ejecutores - NE
Participacin en Ferias Locales
Pasantas Yachachiq

2.
2.1.
2.2.

Implementacin y mejora de la vivienda saludable


Instalacin de cocina mejorada
Mdulo
Capacitacin en prcticas adecuadas mejora de vivienda, salud y nutricin familiar

Glb
Mes
Ao
Mes
Concur.
Feria
Pasanta

SET-NOV

PPTO.
TOTAL

6.35
5.3
16.96
106
106
106
106
1

4,459,427.07
4,355,540.36
4,267,121.56
4,036,142.09
222,979.47
25,215.22
36,059.88
93,418.65
8,745.00
16,954.70
15,311.70
27,274.33
8,000.00

1
36
3
36
20
2
2

3,179.00
60,000.00
2,425.80
9,600.00
6,000.00
5,284.00
1,930.00

106

28,319.51
21,320.31

DIC-FEB

CR
0

II

1.06
5.30
8.48

1.06

106.00
106.00
53.00
0.05
1.00
3.00
1.00
3.00

1.00

3.00
3.00
4.00

2.2.1.
2.2.2.
2.3.

Capacitacin en prcticas adecuadas de mejora de vivienda


Capacitacin en salud y nutricin familiar
Agua segura

Eventos
Eventos
Mdulo

3
3
106

2,360.10
2,360.10
2,279.00

3.
3.1.
3.2.

Promocin de Negocios Rurales Inclusivos


Asistencia tcnica para articulacin al mercado
Concursos de Planes de negocios 3/.

Evento
Concurs.

180
2

55,950.00
9,000.00
46,950.00

4.
4.1.
4.2.
4.3.
4.4.
4.5.

Fomento de capacidades financieras


Promocin, convocatoria y concursos
Materiales de capacitacin
Honorarios facilitador financiero
Honorarios yachachiq financiero
Viticos y apoyo logstico facilitador financiero

Mes
Glb
Mes
Mes
Glb

6
1
6
6
1

19,617.20
462.00
3,705.20
9,000.00
6,000.00
450.00

B.
1.
1.1.
1.2.
1.3.
1.4.
1.5.

COSTO INDIRECTO
Gastos Generales del Ncleo Ejecutor Central - NEC
Movillidad del Presidente y Tesorero del NEC
Pago de revisor de cuentas
Cartel del NE e implementacin del NEC
Gastos Bancarios del NEC
Otros gastos del NEC (materiales, servicios)

Mes
Trimest.
Glb
Mes
Mes

18
6
1
18
18

58,079.90
10,193.90
1,499.94
1,800.00
1,508.00
108.00
5,277.96

2.
2.1.
2.2.
2.3.

Gastos de elaboracin de expediente tcnico


Elaboracin de expediente tcnico
Gastos bancarios pago de proyectista
Movillidad del Presidente y Tesorero del NEC pago proyectista

Pyto.
Pyto.
Pyto.

1
1
1

12,282.00
12,000.00
32.00
250.00

3.
3.1.
3.2.
3.3.

Gastos de ejecucin del proyecto


Administracin del proyecto (contratacin del Coord. Tco. del NEC)
Seguro de Coordinador Tcnico
Movilidad de Coordinador Tcnico

18
1.5
18

31,194.00
27,000.00
594.00
3,600.00

4.
4.1.
4.2.
4.3.

Gastos de seguimiento del NEC


Fotografas de seguimiento de proyectos
Elaboracin de informes de gestin del NEC
Elaboracin de vdeo de implementacin de proyectos

18
18
2

4,410.00
1,260.00
2,250.00
900.00

Mes
Ao
Mes

Informe
Informe
Vdeo

2.00
106.00

1.00

3.00
1.00
1.00
3.00
3.00

3.00
1.00

3.00
1.00
3.00

3.00

3.00
3.00

3.00
3.00

3.00
3.00

1.00
1.00
1.00

3.00

COSTO TOTAL
PARTICIPACIN (%)

4,517,506.97

EL PROYECTO

MAR-MAY JUN-AGO SET-NOV

III

#VALUE!

DIC-FEB

MAR-MAY JUN-AGO SET-NOV

CRONOGRAMA DE EJECUCIN TRIMESTRAL


IV
V
VI
VII
VIII

DIC-FEB

MAR-MAY JUN-AGO

IX

XI

XII

3.00
1.00
3.00

3.00

3.00

3.00

3.00

3.00

3.00

#VALUE!
1.06

1.06

1.06

1.06

3.00

3.00

3.00

3.00
4.00
1.00

3.00

3.00

8.48

53.00
53.00
0.95

53.00

3.00

3.00

3.00
4.00

3.00
4.00
1.00

3.00
1.00
3.00
4.00
1.00

53.00

53.00

2.00
1.00

1.00

90.00

90.00
1.00

3.00
1.00
3.00
3.00
0.50

3.00

3.00
1.00

3.00
1.00

3.00
1.00

3.00
1.00

3.00
3.00

3.00
3.00

3.00
3.00

3.00
3.00

3.00

3.00

3.00

3.00

3.00

3.00
0.50
3.00

3.00
3.00
1.00

3.00
3.00

3.00
3.00

3.00
3.00
1.00

3.00
3.00
0.50

3.00

CUADRO N 08: CRONOGRAMA DE EJECUCIN CUALITATIVO DEL PROYECTO


#REF! #REF!

#REF!

DESCRIPCIN

UNID.
MEDID META
A

A.
1.
1.1.
1.1.1.
1.1.2.
1.1.2.1.
1.1.2.2.
1.1.2.3.
1.1.2.4.
1.1.2.5.
1.1.2.6.
1.1.2.7.
1.1.3.

COSTO DIRECTO
Fortal.Consol. Sist. Produccin familiar rural y mejora de viviendas saludables
Implementacin de Tecnologas
Instalacin de Riego Tecnificado
Mdulo
Produc. de actividades agropec. orientas al Mcdo.
Huerto fijo de hortalizas a campo abierto
ha
Parcela de pastos asociados
ha
Miniparcelas para la produccin granos andinos
ha
Agroforestera
Familia
Mdulo de produccin de abono orgnico - compost
Mdulo
Mdulo de crianza de gallinas
Mdulo
Mdulo de crianza de cuyes
Mdulo
Flete y transporte de materiales e insumos
Glb

1.2.
1.3.
1.4.
1.5.
1.6.
1.7.
1.8.

Materiales de Capacitacin para las tecnologas


Capacitacin de campesino a campesino
Seguro bsico de Yachachiq
Movilidad de Yachachiq
Concursos entre Ncleos Ejecutores - NE
Participacin en Ferias Locales
Pasantas Yachachiq

2.
2.1.
2.2.

Implementacin y mejora de la vivienda saludable


Instalacin de cocina mejorada
Mdulo
Capacitacin en prcticas adecuadas mejora de vivienda, salud y nutricin familiar

Glb
Mes
Ao
Mes
Concur.
Feria
Pasanta

SET-NOV

PPTO.
TOTAL

DIC-FEB

II

0.00 122,644.91
0.00 120,365.91
0.00 104,326.43

63,273.10
38,224.70
26,584.70

6.35
5.3
16.96
106
106
106
106
1

4,459,427.07
4,355,540.36
4,267,121.56
4,036,142.09
222,979.47
25,215.22
36,059.88
93,418.65
8,745.00
16,954.70
15,311.70
27,274.33
8,000.00

0.00 103,926.43
4,202.54
36,059.88
46,709.32

26,584.70
4,202.54

1
36
3
36
20
2
2

3,179.00
60,000.00
2,425.80
9,600.00
6,000.00
5,284.00
1,930.00

3,179.00
9,000.00
1,455.48
1,440.00

106

28,319.51
21,320.31

8,745.00
16,954.70
13,637.17
400.00

9,000.00
1,440.00
1,200.00

965.00
0.00

2,279.00

1,573.40

#REF! #REF!

#REF!

DESCRIPCIN

UNID.
MEDID META
A

PPTO.
TOTAL

SET-NOV

DIC-FEB

II

2.2.1.
2.2.2.
2.3.

Capacitacin en prcticas adecuadas de mejora de vivienda


Capacitacin en salud y nutricin familiar
Agua segura

Eventos
Eventos
Mdulo

3
3
106

2,360.10
2,360.10
2,279.00

3.
3.1.
3.2.

Promocin de Negocios Rurales Inclusivos


Asistencia tcnica para articulacin al mercado
Concursos de Planes de negocios 3/.

180
2

55,950.00
9,000.00
46,950.00

0.00

Evento
Concurs.

4.
4.1.
4.2.
4.3.
4.4.
4.5.

Fomento de capacidades financieras


Promocin, convocatoria y concursos
Materiales de capacitacin
Honorarios facilitador financiero
Honorarios yachachiq financiero
Viticos y apoyo logstico facilitador financiero

0.00

0.00

6
1
6
6
1

19,617.20
462.00
3,705.20
9,000.00
6,000.00
450.00

0.00

Mes
Glb
Mes
Mes
Glb

B.
1.
1.1.
1.2.
1.3.
1.4.
1.5.

COSTO INDIRECTO
Gastos Generales del Ncleo Ejecutor Central - NEC
Movillidad del Presidente y Tesorero del NEC
Pago de revisor de cuentas
Cartel del NE e implementacin del NEC
Gastos Bancarios del NEC
Otros gastos del NEC (materiales, servicios)

Mes
Trimest.
Glb
Mes
Mes

18
6
1
18
18

58,079.90 12,282.00
10,193.90
0.00
1,499.94
1,800.00
1,508.00
108.00
5,277.96

9,036.65
2,955.65
249.99
300.00
1,508.00
18.00
879.66

7,132.65
1,447.65
249.99
300.00

2.
2.1.
2.2.
2.3.

Gastos de elaboracin de expediente tcnico


Elaboracin de expediente tcnico
Gastos bancarios pago de proyectista
Movillidad del Presidente y Tesorero del NEC pago proyectista

0.00

1
1
1

12,282.00 12,282.00
12,000.00 12,000.00
32.00
32.00
250.00
250.00

0.00

Pyto.
Pyto.
Pyto.

1,573.40
2,279.00
0.00

23,475.00
23,475.00

18.00
879.66

#REF! #REF!

#REF!

DESCRIPCIN

UNID.
MEDID META
A

PPTO.
TOTAL

SET-NOV

DIC-FEB

II

#REF! #REF!

#REF!

DESCRIPCIN

3.
3.1.
3.2.
3.3.

Gastos de ejecucin del proyecto


Administracin del proyecto (contratacin del Coord. Tco. del NEC)
Seguro de Coordinador Tcnico
Movilidad de Coordinador Tcnico

4.
4.1.
4.2.
4.3.

Gastos de seguimiento del NEC


Fotografas de seguimiento de proyectos
Elaboracin de informes de gestin del NEC
Elaboracin de vdeo de implementacin de proyectos
COSTO TOTAL
PARTICIPACIN (%)

UNID.
MEDID META
A
Mes
Ao
Mes

Informe
Informe
Vdeo

SET-NOV

PPTO.
TOTAL

I
0.00

18
1.5
18

31,194.00
27,000.00
594.00
3,600.00

0.00

18
18
2

4,410.00
1,260.00
2,250.00
900.00

DIC-FEB

II

5,496.00
4,500.00
396.00
600.00

5,100.00
4,500.00

585.00
210.00
375.00

585.00
210.00
375.00

4,517,506.97 12,282.00 131,681.56

70,405.75

600.00

DEL PROYECTO

MAR-MAY

III
###
###
###
###
21,293.02

JUN-AGO

SET-NOV

DIC-FEB

MAR-MAY

JUN-AGO

CRONOGRAMA DE EJECUCIN TRIMESTRAL


IV
V
VI
VII
VIII
### 103,633.17
### 57,042.02
###
50,911.86
###
11,858.39
50,911.86
4,202.54
4,202.54

SET-NOV

IX

DIC-FEB

MAR-MAY

XI

JUN-AGO

XII

7,322.00
7,322.00
0.00

7,682.54
7,682.54
4,202.54

7,682.54
7,682.54
4,202.54

3,965.16
3,965.16
0.00

3,480.00
3,480.00
0.00

3,480.00
3,480.00
0.00

3,480.00
3,480.00
0.00

0.00

4,202.54
4,202.54

4,202.54
4,202.54

0.00

0.00

0.00

0.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

3,000.00

480.00
1,200.00
2,642.00

480.00

480.00

3,000.00
485.16
480.00

480.00

480.00

480.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

46,709.32

7,655.85
13,637.17
7,600.00

7,655.85

9,000.00

9,000.00

1,440.00
1,200.00

1,440.00
1,200.00
2,642.00

3,000.00
485.16
480.00
1,200.00
965.00

2,360.10

11,446.86
10,660.16

10,660.16
10,660.16

MAR-MAY

JUN-AGO

SET-NOV

DIC-FEB

MAR-MAY

JUN-AGO

CRONOGRAMA DE EJECUCIN TRIMESTRAL


IV
V
VI
VII
VIII

III

SET-NOV

DIC-FEB

MAR-MAY

JUN-AGO

IX

XI

XII

1,573.40
786.70

786.70

0.00

4,500.00
4,500.00

27,975.00
4,500.00
23,475.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11,661.20
231.00
3,705.20
4,500.00
3,000.00
225.00

7,956.00
231.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7,582.65
1,447.65
249.99
300.00

7,132.65
1,447.65
249.99
300.00

7,330.65
1,447.65
249.99
300.00

7,582.65
1,447.65
249.99
300.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

18.00
879.66

18.00
879.66

18.00
879.66

18.00
879.66

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4,500.00
3,000.00
225.00

MAR-MAY

III

JUN-AGO

SET-NOV

DIC-FEB

MAR-MAY

JUN-AGO

CRONOGRAMA DE EJECUCIN TRIMESTRAL


IV
V
VI
VII
VIII

SET-NOV

DIC-FEB

MAR-MAY

JUN-AGO

IX

XI

XII

MAR-MAY

JUN-AGO

SET-NOV

DIC-FEB

MAR-MAY

JUN-AGO

CRONOGRAMA DE EJECUCIN TRIMESTRAL


IV
V
VI
VII
VIII

III
5,100.00
4,500.00

5,100.00
4,500.00

600.00
1,035.00
210.00
375.00
450.00
###

5,100.00
4,500.00

600.00

5,298.00
4,500.00
198.00
600.00

585.00
210.00
375.00

585.00
210.00
375.00

### 110,963.82

SET-NOV

DIC-FEB

MAR-MAY

JUN-AGO

IX

XI

XII

0.00

0.00

0.00

0.00

0.00

0.00

1,035.00
210.00
375.00
450.00

0.00

0.00

0.00

0.00

0.00

0.00

14,904.65

7,682.54

7,682.54

3,965.16

3,480.00

3,480.00

3,480.00

600.00