33748 Federal Register / Vol. 72, No.

117 / Tuesday, June 19, 2007 / Notices

individual signing these documents. be submitted in separate e-mail ‘‘eLibrary’’ link and is available for
The Letter of Assurance should be messages and/or envelopes. review in the Commission’s Public
addressed to ‘‘Chairman, Estuary Reference Room in Washington, DC.
Brenda S. Bowen,
Habitat Restoration Council’’ and sent to There is an ‘‘eSubscription’’ link on the
Army Federal Register Liaison Officer.
the address in Section X for hard copy Web site that enables subscribers to
[FR Doc. 07–3002 Filed 6–18–07; 8:45 am] receive e-mail notification when a
submittals.
BILLING CODE 3710–92–M document is added to a subscribed
F. In the project description section of
docket(s). For assistance with any FERC
the project application form the phrase
Online service, please e-mail
‘‘Estimated life cycle of the project’’ DEPARTMENT OF ENERGY FERCOnlineSupport@ferc.gov, or call
refers to the functional life of the
(866) 208–3676 (toll free). For TTY, call
project. As an example a wetland may Federal Energy Regulatory (202) 502–8659.
fill with sediment over time and its Commission Comment Date: 5 p.m. Eastern Time
functionality diminished. The ‘‘life- [Docket No. PR07–14–000] June 27, 2007.
cycle’’ would be the number of years
until the project no longer provided the Bridgeline Holdings, L.P.; Notice of Kimberly D. Bose,
original benefits. Rate Filing Secretary.
G. The proposed project should only [FR Doc. E7–11740 Filed 6–18–07; 8:45 am]
June 12, 2007. BILLING CODE 6717–01–P
be described as innovative if the Non- Take notice that on June 1, 2007,
Federal Sponsor is requesting the Bridgeline Holdings, L.P. (Bridgeline)
special cost sharing for the incremental filed a petition for rate approval DEPARTMENT OF ENERGY
costs of including testing of or a pursuant to section 284.123(b)(2) of the
demonstration of an innovative Commission’s regulations. Bridgeline Federal Energy Regulatory
technology as defined as defined in the requests the Commission to approve a Commission
application form. maximum interruptible rate of $0.3452 [Docket No. CP07–367–000]
X. Application Process per MMBtu, a maximum firm usage
charge of $0.2449 per MMBtu, a Columbia Gas Transmission
Proposal application forms are monthly reservation charge of $3.05 per Corporation; Notice of Application
available at http://www.usace.army.mil/ MMBtu, and fuel retention of 0.29
cw/cecwp/estuary_act/index.htm or by percent for transportation service under May 16, 2007.
contacting Ms. Ellen Cummings, section 311(a)(2) of the Natural Gas Take notice that on May 3, 2007,
Headquarters, U.S. Army Corps of Policy Act of 1978. Columbia Gas Transmission Corporation
Engineers, Washington, DC 20314–1000, Any person desiring to participate in (Columbia), 1700 MacCorkle Avenue,
(202) 761–4750, e-mail: this rate proceeding must file a motion SE., Charleston, West Virginia 25314,
Ellen.M.Cummings@usace.army.mil; or to intervene or to protest this filing must filed an application in Docket No.
Chip Smith, Office of the Assistant file in accordance with Rules 211 and CP07–367–000, pursuant to sections
Secretary of the Army (Civil Works), 214 of the Commission’s Rules of 7(b) and 7(c) of the Natural Gas Act for
Washington, DC (703) 693–3655, e-mail: Practice and Procedure (18 CFR 385.211 a certificate of public convenience and
Chip.Smith@HQDA.Army.Mil. The and 385.214). Protests will be necessity authorizing it to construct and
application form has been approved by considered by the Commission in operate facilities located in Ohio, West
OMB in compliance with the Paper determining the appropriate action to be Virginia, and Virginia, for its Eastern
Work Reduction Act and is OMB No. taken, but will not serve to make Market Expansion (EME) Project. This
protestants parties to the proceeding. filing is available for review at the
0710–0014 with an expiration date of
Any person wishing to become a party Commission in the Public Reference
04/30/2008. Electronic submissions are
must file a notice of intervention or Room or may be viewed on the
preferred and should be sent to
motion to intervene, as appropriate. Commission’s Web site at http://
estuary.restoration@usace.army.mil.
Such notices, motions, or protests must www.ferc.gov using the ‘‘eLibrary’’ link.
Multiple e-mail messages may be
be filed on or before the date as Enter the docket number excluding the
required to ensure successful receipt if last three digits in the docket number
indicated below. Anyone filing an
the files exceed 4MB in size. Questions field to access the document. For
intervention or protest must serve a
may also be sent to the same e-mail assistance, please contact FERC Online
copy of that document on the Applicant.
address. Hard copy submissions may be Support at
Anyone filing an intervention or protest
sent or delivered to HQUSACE, ATTN: FERCOnlineSupport@ferc.gov or toll
on or before the intervention or protest
CECW–PB, 7701 Telegraph Road #3D72, date need not serve motions to intervene free at (866) 208–3676, or for TTY,
Alexandria, VA 22315–3860. The part of or protests on persons other than the contact (202) 502–8659.
the nomination prepared to address the Applicant. As part of the EME project, Columbia
‘‘proposal elements’’ portion of the The Commission encourages is seeking authorization to construct
application should be no more than electronic submission of protests and approximately 15.26 miles of pipeline,
twelve double-spaced pages, using a 10 interventions in lieu of paper using the drill 9 new wells and recondition 14
or 12-point font. Paper copies should be ‘‘eFiling’’ link at http://www.ferc.gov. existing wells at the Crawford, Coco A,
printed on one side only of an 8.5 in. Persons unable to file electronically and Coco C storage fields, install 12,280
X 11 in. page and not bound. Only one should submit an original and 14 copies horsepower at the Lanham, Lost River,
hard copy is required. A PC-compatible of the protest or intervention to the and Seneca compressor stations, and
rwilkins on PROD1PC63 with NOTICES

floppy disk or CD–ROM in either Federal Energy Regulatory Commission, upgrade various existing delivery
Microsoft Word or WordPerfect format 888 First Street, NE., Washington, DC points. When completed, the facilities
may accompany the paper copy. 20426. will allow Columbia to provide up to
Nominations for multiple projects This filing is accessible on-line at 97,050 Dth per day of firm storage
submitted by the same applicant must http://www.ferc.gov, using the service, all as more fully set forth in the

VerDate Aug<31>2005 19:06 Jun 18, 2007 Jkt 211001 PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 E:\FR\FM\19JNN1.SGM 19JNN1
Federal Register / Vol. 72, No. 117 / Tuesday, June 19, 2007 / Notices 33749

application which is on file with the Procedure (18 CFR 385.214 or 385.211) DEPARTMENT OF ENERGY
Commission and open for public and the Regulations under the NGA (18
inspection. Columbia, also, proposes to CFR 157.10). A person obtaining party Federal Energy Regulatory
accelerate replacement and reliability status will be placed on the service list Commission
facility construction originally maintained by the Secretary of the
scheduled to occur within 5 years at the Commission and will receive copies of [Project No. 12726–001]
three compressor sites. This all documents filed by the applicant and
construction will involve replacing by all other parties. A party must submit Eastern Oregon Light and Power, LLC.;
22,460 horsepower of existing 14 copies of filings made with the Notice of Intent To File License
compressor facilities, and be done at the Commission and must mail a copy to Application, Filing of Pre-Application
same time as the EME units are the applicant and to every other party in Document, Commencement of
installed. the proceeding. Only parties to the Licensing Proceeding, Scoping
Any questions regarding this proceeding can ask for court review of Meetings, Solicitation of Comments on
Application should be directed to Commission orders in the proceeding. the Pad and Scoping Document, and
Fredric K. George, Lead Counsel, However, a person does not have to Identification of Issues and Associated
Columbia Gas Transmission intervene in order to have comments Study Requests
Corporation, P.O. Box 1273, Charleston, considered. The second way to June 12, 2007.
West Virginia 25325–1273 at (304) 357– participate is by filing with the a. Type of Filing: Notice of Intent to
2359 or by fax at (304) 357–3206. Secretary of the Commission, as soon as
File License Application for an original
On September 25, 2006, the possible, an original and two copies of
License and Pre-Application Document.
Commission staff granted Columbia’s comments in support of or in opposition
b. Project No.: 12726–001.
request to utilize the Commission’s Pre- to this project. The Commission will
Filing Process and assigned Docket No. c. Dated Filed: April 17, 2007.
consider these comments in
PF06–35–000 to staff activities d. Submitted by: Eastern Oregon Light
determining the appropriate action to be
involving Columbia’s EME project. and Power, LLC.
taken, but the filing of a comment alone
Now, as of the filing of Columbia’s e. Name of Project: Rock Creek
will not serve to make the filer a party
application on May 3, 2007, the Pre- Hydroelectric Project.
to the proceeding. The Commission’s
Filing Process for this project has ended. f. Location: The proposed Rock
rules require that persons filing
From this time forward, Columbia’s Hydroelectric Project would be located
comments in opposition to the project
proceeding will be conducted in Docket on Rock Creek in Baker County, Oregon.
provide copies of their protests only to
No. CP07–367–000, as noted in the The proposed project would likely
the party or parties directly involved in
caption of this Notice. occupy lands of the United States
the protest.
Pursuant to section 157.9 of the Persons who wish to comment only within the jurisdiction of the U.S. Forest
Commission’s rules, 18 CFR 157.9, on the environmental review of this Service.
within 90 days of this Notice the project should submit an original and g. Filed Pursuant to: 18 CFR Part 5 of
Commission staff will either: Complete two copies of their comments to the the Commission’s Regulations.
its environmental assessment (EA) and Secretary of the Commission. h. Potential Applicant Contact: Mark
place it into the Commission’s public Environmental commenters will be A. Henderson. P.O. Box 247 Haines, OR
record (eLibrary) for this proceeding, or placed on the Commission’s 97833–0247, (541) 856–0247.
issue a Notice of Schedule for environmental mailing list, will receive i. FERC Contact: Matt Buhyoff (202)
Environmental Review. If a Notice of copies of the environmental documents, 502–6824 or via e-mail at
Schedule for Environmental Review is and will be notified of meetings matt.buhyoff@ferc.gov.
issued, it will indicate, among other associated with the Commission’s j. We are asking federal, state, local,
milestones, the anticipated date for the environmental review process. and tribal agencies with jurisdiction
Commission staff’s issuance of the final Environmental commenters will not be and/or special expertise with respect to
environmental impact statement (FEIS) required to serve copies of filed environmental issues to cooperate with
or EA for this proposal. The filing of the documents on all other parties. us in the preparation of the
EA in the Commission’s public record However, the non-party commenters environmental document. Agencies who
for this proceeding or the issuance of a will not receive copies of all documents would like to request cooperating status
Notice of Schedule for Environmental filed by other parties or issued by the should follow the instructions for filing
Review will serve to notify federal and Commission (except for the mailing of comments described in paragraph n
state agencies of the timing for the environmental documents issued by the below.
completion of all necessary reviews, and Commission) and will not have the right k. With this notice, we are initiating
the subsequent need to complete all to seek court review of the informal consultation with: (a) The U.S.
federal authorizations within 90 days of Commission’s final order. Fish and Wildlife Service and/or NOAA
the date of issuance of the Commission Motions to intervene, protests and Fisheries under section 7 of the
staff’s FEIS or EA. comments may be filed electronically Endangered Species Act and the joint
There are two ways to become via the Internet in lieu of paper; see, 18 agency regulations there under at 50
involved in the Commission’s review of CFR 385.2001(a)(1)(iii) and the CFR Part 402; and (b) the State Historic
this project. First, any person wishing to instructions on the Commission’s Web Preservation Officer, as required by
obtain legal status by becoming a party site under the ‘‘e-Filing’’ link. The section 106, National Historical
to the proceedings for this project Commission strongly encourages Preservation Act, and the implementing
should, on or before the below listed electronic filings. regulations of the Advisory Council on
comment date, file with the Federal Comment Date: June 6, 2007. Historic Preservation at 36 CFR 800.2.
rwilkins on PROD1PC63 with NOTICES

Energy Regulatory Commission, 888 l. Rock Creek filed a Pre-Application


First Street, NE., Washington, DC 20426, Kimberly D. Bose, Document (PAD); including a proposed
a motion to intervene in accordance Secretary. process plan and schedule with the
with the requirements of the [FR Doc. E7–11735 Filed 6–18–07; 8:45 am] Commission, pursuant to 18 CFR 5.6 of
Commission’s Rules of Practice and BILLING CODE 6717–01–P the Commission’s regulations.

VerDate Aug<31>2005 18:32 Jun 18, 2007 Jkt 211001 PO 00000 Frm 00015 Fmt 4703 Sfmt 4703 E:\FR\FM\19JNN1.SGM 19JNN1