Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
FOR FURTHER INFORMATION CONTACT: John SUMMARY: The Commander, Eighth In accordance with 33 CFR 117.35(e),
McDonald, Project Officer, First Coast Coast Guard District, has issued a the drawbridge shall return to its regular
Guard District, at (617) 223–8364. temporary deviation from the regulation operating schedule immediately at the
SUPPLEMENTARY INFORMATION: The US2 governing the operations of the Clinton end of the designated time period. This
Bridge, across Lake Champlain, mile Railroad Drawbridge, Mile 518.0, deviation from the operating regulations
91.8, between North Hero Island and Clinton, Iowa across the Upper is authorized under 33 CFR 117.35.
Grand Isle (South Hero Island), Mississippi River. This deviation allows Dated: October 5, 2007.
Vermont, has a vertical clearance in the the bridge to open on signal if at least Roger K. Wiebusch,
closed position of 13 feet at mean high 24 hours advance notice is given from
Bridge Administrator.
lake elevation and 16 feet at mean low 12:01 a.m. December 15, 2007 until 9
a.m., March 15, 2008. The deviation is [FR Doc. E7–20494 Filed 10–16–07; 8:45 am]
lake elevation. The existing drawbridge
operation regulations are listed at 33 necessary to allow time for performing BILLING CODE 4910–15–P
Drawbridge Operation Regulations; watercraft. These interests will not be Identification No. EPA–R04–OAR–
Upper Mississippi River, Clinton, IA significantly impacted due to the 2005–KY–0004. All documents in the
AGENCY: Coast Guard, DHS. reduced navigation in winter months. docket are listed on the
This temporary deviation has been www.regulations.gov Web site. Although
ACTION:Notice of deviation from
coordinated with waterway users. No listed in the index, some information is
drawbridge regulation.
objections were received. not publicly available, i.e., Confidential
VerDate Aug<31>2005 14:39 Oct 16, 2007 Jkt 214001 PO 00000 Frm 00007 Fmt 4700 Sfmt 4700 E:\FR\FM\17OCR1.SGM 17OCR1