Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
, Ltd
Project Name:
ARTICLE
Quotation No.
Date
QTY
UNIT PRICE
FOB SHANGHAI
B. Motor:1.1KW
C. Capacity:4T/H32MH
MTQ140714
14th, July, 2014
AMOUNT
REMARK
including:
A. Model:CHL4-30
Boost pump
QUOTATION
check valve;
1
Pre.gauge.
D. In-outlet:11/4 inch
220V/60HZ/
E. Brand:CNP
3phase
including:
B. Media:sand0.5~0.8
UPVC Piping
C. Tank:FRP2162
Sand filter
Brand:Martinn
excluding media
D. In-outlet:1.5 inch
E. Controller:F21
Brand:Martinn
A. Flow Rate:3.0 T/H
including:
B. Media:Carbon 8X30Mesh
UPVC Piping
C. Tank:FRP2162
Activated Carbon
Brand:Martinn
excluding media
D. In-outlet:1.5 inch
E. Controller:F21
Brand:Martinn
Softener
including:
B. Media:resin 200L
UPVC Piping
C. Tank:FRP2162
and media
Brand:Martinn
D. In-outlet:1.5 inch
BrineTank
aircheck.
E. Controller:F21STC
Brand:Martinn
Brine Tank: BT-300L
A. Model:SFT5-20-BC
Pre-filter
B. Spec:20"5
C. Material:SS304
PP5m3PCS
1
D. Brand: Martinn
A. Model:CDLF2-13
including:
B. Motor:3kw
High pressure Pump C. Capacity:3.0T/H120MH
check valve;
1
Pre.gauge.
D. In-outlet:11/4 inch
220V/60HZ/
E. Brand:CNP
3phase
A. Model:SCRO-12000
B. Capacity:
2.0 Ton/hr25
C. Salt Rejection: >98%
D. Recovery rate:55~65%
F. Major Components:
a.4040(225PSI)8PCS
BW30-4040
b.RO pressure vessel:
(1)SS304 40804PCS
(2)END port or Side port
1/3
c.Flow Meter:
20GPM2PCS
d.Inlet Solenoid Valve:
(1)Pressure Max:150PSI
(2)In-outlet:11/2"
RO Module
(1)Pressure Max:250PSI
(2)In-outlet:1"
f.Pressure Regulator:
(1)Material:SS304
(2)In-outlet:1"
g.Control Panel:
(1)PLC control
Brand:SIEMENS
(2)conductivity monitor:
Model:CM230
Brand:Martinn
h.High Pre.Piping:UPVC
i.Pruduct water Piping:
UPVC
j.Frame:SS304
k.Sample valve:UPVC
A. Model:AKS603
B. Flow Rate:6 L/H
Chemical Dosing
C. Pressure:100psi
D. Chemical Tank:100L
Brand:SEKO
1
Package
Total
Remark:
2/3
$8,645.00
1).All prices herin are US in Dollars (Invoice payable in US Dollars only.) with the currency rate of USD1: RMB 6.05
2).Price change is subject to the currency rate change on each working day.
3).All banking fees are on the account of Buyer.
4) 50% down payment for the order entry, and balance before the shipment
5).All loss/damages claims as a result of shipping negligence must be filed with forwarder/courier. Otherwise,
all shortages/damages caused by manufacturer must be made within 60 days from manufacturer ship date.
3/3