65726 Federal Register / Vol. 72, No.

225 / Friday, November 23, 2007 / Notices

http://www.ferc.gov under the ‘‘e- f. Location: Mississippi River in Rock l. This filing is available for review at
Filing’’ link. Island County, Illinois, and Scott the Commission in the Public Reference
s. Filing and Service of Responsive County, Iowa. It would use the U.S. Room or may be viewed on the
Documents—Any filings must bear in Army Corps of Engineers’ Mississippi Commission’s Web site at http://
all capital letters the title Lock & Dam No. 15. www.ferc.gov using the ‘‘eLibrary’’ link.
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT g. Filed Pursuant to: Federal Power Enter the docket number excluding the
TO FILE COMPETING APPLICATION’’, Act, 16 U.S.C. 791(a)–825(r). last three digits in the docket number
‘‘COMPETING APPLICATION’’, h. Applicant Contact: Mr. Jeffrey M. field to access the document. For
‘‘PROTEST’’, and ‘‘MOTION TO Auser, P.E., BPUS Generation assistance, call toll-free 1–866–208–
INTERVENE’’, as applicable, and the Development, LLC, 225 Greenfield 3676 or e-mail
Project Number of the particular Parkway, Suite 201, Liverpool, NY FERCONLINESUPPORT@FERC.GOV.
application to which the filing refers. 13088, (315) 413–2700. For TTY, call (202) 502–8659. A copy is
Any of the above-named documents i. FERC Contact: Robert Bell, (202) also available for inspection and
must be filed by providing the original 502–4126. reproduction at the address in item h
and the number of copies provided by j. Deadline for filing comments, above.
the Commission’s regulations to: The protests, and motions to intervene: 60 m. Competing Preliminary Permit—
Secretary, Federal Energy Regulatory days from the issuance date of this Anyone desiring to file a competing
Commission, 888 First Street, NE., notice. application for preliminary permit for a
Washington, DC 20426. An additional All documents (original and eight proposed project must submit the
copy must be sent to Director, Division copies) should be filed with: Kimberly competing application itself, or a notice
of Hydropower Administration and D. Bose, Secretary, Federal Energy of intent to file such an application, to
Compliance, Federal Energy Regulatory Regulatory Commission, 888 First the Commission on or before the
Commission, at the above-mentioned Street, NE., Washington, DC 20426. specified comment date for the
address. A copy of any notice of intent, Comments, protests, and interventions
particular application (see 18 CFR 4.36).
competing application or motion to Submission of a timely notice of intent
may be filed electronically via the
intervene must also be served upon each allows an interested person to file the
Internet in lieu of paper; see 18 CFR
representative of the Applicant competing preliminary permit
385.2001(a)(1)(iii) and the instructions
specified in the particular application. application no later than 30 days after
t. Agency Comments—Federal, state, on the Commission’s Web site under the
the specified comment date for the
and local agencies are invited to file ‘‘e-Filing’’ link. The Commission
particular application. A competing
comments on the described application. strongly encourages electronic filings.
preliminary permit application must
A copy of the application may be Please include the project number (P–
conform with 18 CFR 4.30 and 4.36.
obtained by agencies directly from the 12896–000) on any comments or n. Competing Development
Applicant. If an agency does not file motions filed. Application—Any qualified
comments within the time specified for The Commission’s Rules of Practice development applicant desiring to file a
filing comments, it will be presumed to and Procedure require all intervenors competing development application
have no comments. One copy of an filing documents with the Commission must submit to the Commission, on or
agency’s comments must also be sent to to serve a copy of that document on before a specified comment date for the
the Applicant’s representatives. each person in the official service list particular application, either a
for the project. Further, if an intervenor competing development application or a
Kimberly D. Bose, files comments or documents with the notice of intent to file such an
Secretary. Commission relating to the merits of an application. Submission of a timely
[FR Doc. E7–22829 Filed 11–21–07; 8:45 am] issue that may affect the responsibilities notice of intent to file a development
BILLING CODE 6717–01–P of a particular resource agency, they application allows an interested person
must also serve a copy of the document to file the competing application no
on that resource agency. later than 120 days after the specified
DEPARTMENT OF ENERGY k. Description of Project: The comment date for the particular
proposed project using the U.S. Army application. A competing license
Federal Energy Regulatory Corps of Engineers’ Mississippi Lock &
Commission application must conform with 18 CFR
Dam No. 15 and operated in a run-of- 4.30 and 4.36.
[Project No. 12896–000] river mode would consist of: (1) A new o. Notice of Intent—A notice of intent
245-foot long, 160-foot wide, 60-foot must specify the exact name, business
BPUS Generation Development, LLC; high concrete powerhouse; (2) a new address, and telephone number of the
Notice of Application Accepted for intake channel and tailrace channel in prospective applicant, and must include
Filing and Soliciting Motions To two existing gates on the northwest side an unequivocal statement of intent to
Intervene, Protests, and Comments of the river opposite the existing lock submit, if such an application may be
November 16, 2007. structure; (3) six turbine/generator units filed, either a preliminary permit
Take notice that the following with a combined installed capacity of 31 application or a development
hydroelectric application has been filed megawatts; (4) a new 26,400-foot long application (specify which type of
with the Commission and is available above ground transmission line application). A notice of intent must be
for public inspection: extending from the switchyard near the served on the applicant(s) named in this
a. Type of Application: Preliminary powerhouse to an interconnection point public notice.
Permit. with an existing transmission line north p. Proposed Scope of Studies Under
mstockstill on PROD1PC66 with NOTICES

b. Project No.: 12896–000. of the powerhouse on the Iowa side of Permit—A preliminary permit, if issued,
c. Date filed: July 30, 2007. the river; and (5) appurtenant facilities. does not authorize construction. The
d. Applicant: BPUS Generation The proposed Mississippi Lock & Dam term of the proposed preliminary permit
Development, LLC. No. 15 Project would have an average would be 36 months. The work
e. Name of Project: Mississippi Lock annual generation of 172 gigawatt- proposed under the preliminary permit
& Dam No. 15 Hydroelectric Project. hours. would include economic analysis,

VerDate Aug<31>2005 16:16 Nov 21, 2007 Jkt 214001 PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 E:\FR\FM\23NON1.SGM 23NON1
Federal Register / Vol. 72, No. 225 / Friday, November 23, 2007 / Notices 65727

preparation of preliminary engineering DEPARTMENT OF ENERGY Corps of Engineers’ Tionesta Dam and
plans, and a study of environmental operated in a run-of-river mode would
impacts. Based on the results of these Federal Energy Regulatory consist of: (1) A new 100-foot long, 100-
studies, the Applicant would decide Commission foot wide, 50-foot high concrete
whether to proceed with the preparation [Project No. 12897–000] powerhouse adjacent to the existing
of a development application to stilling basin; (2) a new 125-foot long
construct and operate the project. BPUS Generation Development, LLC; steel liner in the downstream end of the
Notice of Application Accepted for Corps’ 19-foot diameter concrete outlet
q. Comments, Protests, or Motions to tunnel and a bifurcating steel fabrication
Intervene—Anyone may submit Filing and Soliciting Motions To
Intervene, Protests, and Comments in the outlet (one side of the bifurcating
comments, a protest, or a motion to outlet would be a 40-foot long, 12-foot
intervene in accordance with the November 16, 2007. diameter steel penstock leading to the
requirements of Rules of Practice and Take notice that the following powerhouse and the other side would
Procedure, 18 CFR 385.210, .211, .214. hydroelectric application has been filed be equipped with a suitable gate or
In determining the appropriate action to with the Commission and is available valve for project bypass); (3) two
take, the Commission will consider all for public inspection: turbine/generator units with a combined
protests or other comments filed, but a. Type of Application: Preliminary installed capacity of 5.3 megawatts; (4)
only those who file a motion to Permit. a new 9,800-foot long above ground
intervene in accordance with the b. Project No.: 12897–000. transmission line extending from the
Commission’s Rules may become a c. Date Filed: July 30, 2007. switchyard near the powerhouse to a
party to the proceeding. Any comments, d. Applicant: BPUS Generation
transmission connection at an existing
Development, LLC.
protests, or motions to intervene must substation that serves the town of
e. Name of Project: Tionesta Dam
be received on or before the specified Hydroelectric Project. Tionesta; and (5) appurtenant facilities.
comment date for the particular f. Location: Tionesta Creek in Forest The proposed Tionesta Dam Project
application. County, Pennsylvania. It would use the would have an average annual
r. Filing and Service of Responsive U.S. Army Corps of Engineers’ Tionesta generation of 23.2 gigawatt-hours.
Dam. l. This filing is available for review at
Documents—Any filings must bear in
g. Filed Pursuant to: Federal Power the Commission in the Public Reference
all capital letters the title
Act, 16 U.S.C. 791(a)–825(r). Room or may be viewed on the
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT Commission’s Web site at http://
TO FILE COMPETING APPLICATION’’, h. Applicant Contact: Mr. Jeffrey M.
Auser, P.E., BPUS Generation www.ferc.gov using the ‘‘eLibrary’’ link.
‘‘COMPETING APPLICATION’’, Enter the docket number excluding the
‘‘PROTEST’’, and ‘‘MOTION TO Development, LLC, 225 Greenfield
Parkway, Suite 201, Liverpool, NY last three digits in the docket number
INTERVENE’’, as applicable, and the field to access the document. For
Project Number of the particular 13088, (315) 413–2700.
i. FERC Contact: Robert Bell, (202) assistance, call toll-free 1–866–208–
application to which the filing refers. 3676 or e-mail
502–4126.
Any of the above-named documents j. Deadline for filing comments, FERCONLINESUPPORT@FERC.GOV.
must be filed by providing the original protests, and motions to intervene: 60 For TTY, call (202) 502–8659. A copy is
and the number of copies provided by days from the issuance date of this also available for inspection and
the Commission’s regulations to: The notice. reproduction at the address in item h
Secretary, Federal Energy Regulatory All documents (original and eight above.
Commission, 888 First Street, NE., copies) should be filed with: Kimberly m. Competing Preliminary Permit—
Washington, DC 20426. An additional D. Bose, Secretary, Federal Energy Anyone desiring to file a competing
copy must be sent to Director, Division Regulatory Commission, 888 First application for preliminary permit for a
of Hydropower Administration and Street, NE., Washington, DC 20426. proposed project must submit the
Compliance, Federal Energy Regulatory Comments, protests, and interventions competing application itself, or a notice
Commission, at the above-mentioned may be filed electronically via the of intent to file such an application, to
address. A copy of any notice of intent, Internet in lieu of paper; see 18 CFR the Commission on or before the
competing application or motion to 385.2001(a)(1)(iii) and the instructions specified comment date for the
intervene must also be served upon each on the Commission’s Web site under the particular application (see 18 CFR 4.36).
representative of the Applicant ‘‘e-Filing’’ link. The Commission Submission of a timely notice of intent
specified in the particular application. strongly encourages electronic filings. allows an interested person to file the
Please include the project number (P– competing preliminary permit
s. Agency Comments—Federal, state, application no later than 30 days after
12897–000) on any comments or
and local agencies are invited to file the specified comment date for the
motions filed.
comments on the described application. The Commission’s Rules of Practice particular application. A competing
A copy of the application may be and Procedure require all intervenors preliminary permit application must
obtained by agencies directly from the filing documents with the Commission conform with 18 CFR 4.30 and 4.36.
Applicant. If an agency does not file to serve a copy of that document on n. Competing Development
comments within the time specified for each person in the official service list Application—Any qualified
filing comments, it will be presumed to for the project. Further, if an intervenor development applicant desiring to file a
have no comments. One copy of an files comments or documents with the competing development application
agency’s comments must also be sent to Commission relating to the merits of an must submit to the Commission, on or
mstockstill on PROD1PC66 with NOTICES

the Applicant’s representatives. issue that may affect the responsibilities before a specified comment date for the
of a particular resource agency, they particular application, either a
Kimberly D. Bose,
must also serve a copy of the document competing development application or a
Secretary. on that resource agency. notice of intent to file such an
[FR Doc. E7–22834 Filed 11–21–07; 8:45 am] k. Description of Project: The application. Submission of a timely
BILLING CODE 6717–01–P proposed project using the U.S. Army notice of intent to file a development