Sei sulla pagina 1di 1

69204 Federal Register / Vol. 72, No.

235 / Friday, December 7, 2007 / Notices

DEPARTMENT OF ENERGY See 18 CFR 385.2001(a)(1)(iii) and the motion to intervene must also be served
instructions on the Commission’s Web upon each representative of the
Federal Energy Regulatory site under the ‘‘eFiling’’ link. For further Applicant specified in the particular
Commission information, contact Chris Yeakel at application.
[Project No. 2686–054] (202) 502–8132. k. Description of Request: The
Alabama Power Company (APC) is
Kimberly D. Bose,
Duke Energy Carolinas, LLC; Notice of requesting a 90-day variance of the
Secretary.
Availability of Environmental Jordan Dam Project’s minimum flow
Assessment [FR Doc. E7–23781 Filed 12–6–07; 8:45 am] requirements due to continuing drought
BILLING CODE 6717–01–P conditions in the Southeast, and to
November 30, 2007. allow continuation of a study of the
In accordance with the National effects of minimum flow reductions on
Environmental Policy Act of 1969 and DEPARTMENT OF ENERGY aquatic resources, including the
the Federal Energy Regulatory federally endangered Tulotoma snail,
Commission’s regulations, 18 CFR part Federal Energy Regulatory
Commission Tulotoma magnifica. Drought
380 (Order No. 486, 52 FR 47879) the conditions in the Coosa River Basin
Office of Energy Projects has prepared [Project No. 618–170] continue to be rated ‘‘exceptional,’’ the
an environmental assessment (EA) for most severe category recognized by the
an application filed by Duke Energy Alabama Power Company; Notice of U.S. Drought Monitoring Program. The
Carolinas, LLC (licensee) on January 16, Application for Amendment of License project license requires a flow release of
2007, requesting Commission approval and Soliciting Comments, Motions To 2,000 cfs July 1 through March 31. The
of a non-project use of project lands. Intervene, and Protests licensee proposes to provide a flow of
The licensee requests permission to
November 30, 2007. 1,600 cfs (+/¥5%) at Jordan Dam during
grant to The Point at Lake Glenville
Take notice that the following the 90-day variance, to begin December
(The Point) a lease for 0.55 acre of
hydroelectric application has been filed 2, 2007.
project land and permission to install a
private cluster dock with a capacity of with the Commission and is available l. Location of the Application: The
10 watercraft at the Westfork for public inspection: filing is available for inspection and
Hydroelectric Project (FERC No. 2686). a. Type of Application: Request for reproduction at the Commission’s
The project is located on the West Fork Temporary Variance of Minimum Flow Public Reference Room, located at 888
of the Tuckasegee River near the town Requirement. First Street, NE., Room 2A, Washington,
of Cashiers in Jackson County, North b. Project No.: 618–170. DC 20426 or by calling (202) 502–8371,
Carolina. The project does not occupy c. Date Filed: November 26, 2007. or by calling (202) 502–8371. This filing
any federal lands. d. Applicant: Alabama Power may also be viewed on the
The EA evaluates the environmental Company. Commission’s Web site at http://ferc.gov
impacts that would result from e. Name of Project: Jordan Dam. using the ‘‘eLibrary’’ link. Enter the
approving the licensee’s proposal to f. Location: On the Coosa River, in docket number excluding the last three
grant The Point a lease and permission Elmore, Chilton, and Coosa Counties, digits in the docket number field to
to replace an existing 5-slip private Alabama. access the document. You may also
cluster dock with the proposed 10-slip g. Filed Pursuant to: Federal Power register online at http://www.ferc.gov/
private cluster dock. The EA finds that Act, 16 U.S.C. 791a–825r. docsfiling/esubscription.asp to be
approval of the application would not h. Applicant Contact: Barry Lovett, notified via e-mail of new filings and
constitute a major federal action Alabama Power Company, 600 N.18th issuances related to this or other
significantly affecting the quality of the Street, P.O. Box 2641, Birmingham, AL pending projects. For assistance, call 1–
human environment. 35291, (205) 257–1258. 866–208–3676 or e-mail
A copy of the EA is on file with the i. FERC Contact: Peter Yarrington, FERCOnlineSupport@ferc.gov; for TTY,
Commission and is available for public peter.yarrington@ferc.gov, (202) 502– call (202) 502–8659. A copy is also
inspection. The EA may also be viewed 6129. available for inspection and
on the Commission’s Web site at http: j. Deadline for filing comments, reproduction at the address in item (h)
//www.ferc.gov using the ‘‘eLibrary’’ motions to intervene and protests: above.
link. Enter the docket number (P–2686) December 17, 2007. m. Individuals desiring to be included
excluding the last three digits in the All documents (original and eight on the Commission’s mailing list should
docket number field to access the copies) should be filed with: Kimberly so indicate by writing to the Secretary
document. For assistance, contact FERC D. Bose, Secretary, Federal Energy of the Commission.
Online Support at Regulatory Commission, 888 First n. Comments, Protests, or Motions To
FERCOnlineSupport@ferc.gov or toll- Street, NE., Washington, DC 20426. Intervene: Anyone may submit
free at 1–866–208–3676, or for TTY, The Commission’s Rules of Practice comments, a protest, or a motion to
(202) 502–8659. and Procedure require all intervenors intervene in accordance with the
Any comments should be filed by filing documents with the Commission requirements of Rules of Practice and
January 2, 2008 and should be to serve a copy of that document on Procedure, 18 CFR 385.210, .211, .214.
addressed to the Secretary, Federal each person whose name appears on the In determining the appropriate action to
Energy Regulatory Commission, 888 official service list for the project. take, the Commission will consider all
First Street, NE., Room 1–A, Further, if an intervenor files comments protests or other comments filed, but
Washington, DC 20426. Please reference or documents with the Commission only those who file a motion to
pwalker on PROD1PC71 with NOTICES

the project name and project number relating to the merits of an issue that intervene in accordance with the
(P–2686) on all comments. Comments may affect the responsibilities of a Commission’s Rules may become a
may be filed electronically via Internet particular resource agency, they must party to the proceeding. Any comments,
in lieu of paper. The Commission also serve a copy of the document on protests, or motions to intervene must
strongly encourages electronic filings. that resource agency. A copy of any be received on or before the specified

VerDate Aug<31>2005 16:30 Dec 06, 2007 Jkt 214001 PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 E:\FR\FM\07DEN1.SGM 07DEN1

Potrebbero piacerti anche