CONSTRUCTION OF BHUJ BHACHAU ROAD PROJECT

MAJOR BRIDGE AT KM. 42+643 _ NEW BRIDGE COST


Unit

No

Total Bal.
Quantity

Cum

1228.970

90.00

110,607.30

PCC Below Pile Cap-Abutment A1

Cum

PCC Below Pile Cap-Abutment A2

Cum

108.838

400.00

43,535.28

Item No
1

Description

Amount

Excavation for Foundation


Excavation for RCC Retaining Wall 15m

Rate

M-15 PCC Levelling Course

Chipping of Extra Piles

RCC M-40 Pile Cap

1,800.00

Abutment-A1

Cum

Abutment-A2

Cum

Bell Mount Wall

Cum

Bell Mount Wall

Cum

6th Lift
7

Abutment Cap M-40 Grade

Dirtwall M-35 Pedestal

615.049

1,850.00

1,137,841.02

60.000

1,850.00

111,000.00

Cum

277.495

2,800.00

776,986.56

Cum

143.010

2,800.00

400,428.00

Cum

36.331

2,800.00

101,726.80

Pier P2

Cum

5.192

2,800.00

14,536.70

POT-PTFE Bearing

Nos

Pier P2

Cum

5.192

3,000.00

15,575.04

11

RCC M-45 Girder

Cum

57.600

5,700.00

328,320.00

12

RCC M-45 Superstructure

Cum

216.000

3,900.00

842,400.00

RCC M-20

Pier M-35 Grade

Bracket
9
10

RCC M-40 Pedestals

13

RCC M-30 Approach Slab

Cum

25.200

1,200.00

30,240.00

14

RCC M-40 Crash Barrier

Cum

Cum

144.000

1,850.00

266,400.00

15

Bitumen Wearing Coat

Cum

24.000

10,740.00

257,760.00

16

Mastic Asphalt

Sqm

24.000

546.00

13,104.00

17

Stripseal Expansion Joint

18

Drainage Spout

Nos

6.000

2,550.00

15,300.00

19

Filter Media

Cum

86.400

762.00

65,836.80

20

Weep Holes

Nos

100.000

150.00

15,000.00

21

HYSD-TMT Reinforcement

MT

3.600

11,000.00

39,600.00

204.916

5,700.00

1,168,022.85

123,434.00

2,962,416.00

Bell Mount Wall


Bell Mount Wall
RCC M-40 Pile Cap
Abutment -A1
Abutment -A2
22

Pier M 35 Grade

23

Dirtwall M-35 Pedestals

24

RCC M-40 Pedestals

25

RCC M-35 Girder

26

RCC M-45 Superstructure

27

Prestressing Steel

MT

24.000

28

Back Filling

Cum

1200.000

420.00

504,000.00

29

Pitching in Slopes (CM 1:3)

Cum

172.800

900.00

155,520.00

30

Floor Apron Stone Boulder (M-20 Grade)

Cum

864.000

733.00

633,312.00

TOTAL COST :

10,009,468.36

CONSTRUCTION OF BHUJ BHACHAU ROAD PROJECT


MAJOR BRIDGE AT KM. 42+643 _ NEW BRIDGE COST
Item No
12.01

12.02(i)

Extra

12.03

12.06

12.12

12.13

Description

Unit

Dismantling structures and pavement including disposal of


resulting material and / or salvaging useful materials complete
as per Technical Specifications Clause 202
Kerb Wall

Cum

Dismanling for Slab RCC (P5-P6-P7-P8-P9-P10)


Earthwork in excavation in soil for foundations including all
leads and lifts as per joint and technical specification Cl 304.
Foundation

Cum

Returnwall
Filling of GSB Mix materials into the Excavated area to
founding PCC Bottom Level.
Foundation for Abutments,Piers & Returnwalls
Providing and laying Cement Concrete Grade M-15 in the
levelling course of foundations as per drawing and Technical
Specification Clause 1700
PCC
Returnwall Both Side

Cum

Total Bal.
Quantity

Rate

Amount

13.375

1,000.00

13,375.00

Cum

754.251

90.00

67,882.59

Cum

101.547

824.00

83,674.73

62.790

400.00

25,116.00

Cum

Cum

Supplying and fixing of tar paper bearings complete as per


drawings and Technical Specifications Section 2000, IRC:83
(Part II) and IRC:83 (Part III) 2002.
Abutment Cap (A1 & A2)

Cum

Pier (P1 to P10)


Providing and laying in position concrete in Subrstructure for
Abutment ,Pier, Side wall & Tie Wall as per detailed drawings
and technical specifications
Sub Structure
Providing and laying in position concrete in Superstructure M30 grade Solid Slab as per detailed drawings and technical
specifications

Cum

26.650

10.00

266.50

Cum

627.049

3,900.00

2,445,491.10

12.21

12.23

Extra-1

Extra-2

12.19

Span (A1-P1-P2-P3-P4-P5-P6-P7-P8-P9-P10-A2)-6 span

Cum

Span (P5-P6-P7-P8-P9-P10)-5 span


Reinforced Cement Concrete Crash Barrier M-40 grade
including reinforcement and MS pipe complete as per drawings
and Technical Specifications Sections 1500, 1600, 1700, 2200
and Clause 809.
Crash Barrier on Returnwall

Cum

Crush Barrier on Slab (A1-P1-P2-P3-P4-P5)


Providing, cutting, bending and fixing TMT (CRS) bar
reinforcement in reinforced concrete structures complete as per
drawings and Technical Specification Section 1600.
Foundation

LM

MT

Abutment A1 & A2 & Pier (P1 to P10)

MT

Returnwall Both Side

MT

Cap, Dirtwall & Bracket (A1 & A2)

MT

Pier Cap (P1 to P10)

MT

Top Slab (A1-P1-P2-P3-P4-P5-P6-P7-P8-P9-P10-A2)

MT

Top Slab (P5-P6-P7-P8-P9-P10)


Providing & fixing of 20 mm thick Joint Filler Board as per
drawing & as direction of engineer incharge complete.
Crash Barrier
Providing & fixing Anchor bars as per requirement and as
directed by engineer in charge complete.
Top Slab (P1-P2) (P2-P3) (P10-A2)
Providing weep holes in abutments, wing walls, retaining walls,
return walls etc. complete as per drawing and Technical
Specifications Clause 2706
Returnwall R1-2nd lift,3rd & 4th Lift (Bhuj)
Returnwall R2-2nd lift,3rd & 4th Lift (Bhachau)

109.480

3,900.00

426,972.00

33.400

1,850.00

61,790.00

MT

21.771

11,000.00

239,476.05

Sqm.

87.116

800.00

69,692.80

No

321.000

250.00

80,250.00

18.000

150.00

2,700.00

LM

Nr
Nr

TOTAL COST :

3,516,686.77

JGP (RA-02), May-14

Name Of work:- Improvement And Widening of BHUJ- BHACHAU Road (SH-42) Km-39+000 To 77+700
Name of Contractor:- JIVRAJBHAI G. PATEL
Client:- VALECHA ENGINEERING LTD
R.A. BILL-02
ABSTRACT SHEET
Bill Period Upto 31.05.2014
Quantity

Rates
Item No.

Description

CH: 42+673 Major Bridge (New_LHS)


Extra
RMC M -35 in bored cast in situ concrete pile
Excavation for Foundation
1
Excavation for RCC Retaining Wall 15m
M-15 PCC Levelling Course
2
PCC Below Pile Cap-Abutment A1 & A2
Chipping of Extra Piles
3
RCC M-40 Pile Cap
4
Abutment-A1
Abutment-A2
RCC M-20
5
Bell Mount Wall
Bell Mount Wall
Pier & Abutment M-35 Grade
6
Sub Structure
Abutment Cap M-40 Grade
7
Dirtwall M-35 Pedestal
8
Bracket
RCC M-40 Pedestals
9
Pier P2
POT-PTFE Bearing
10
Pier P2
11
RCC M-45 Girder
12
RCC M-45 Superstructure
13
RCC M-30 Approach Slab
14
RCC M-40 Crash Barrier
15
16
17
18
19
20
21

______________________
For:- Jivrajbhai G. Patel

Bitumen Wearing Coat


Mastic Asphalt
Stripseal Expansion Joint
Drainage Spout
Filter Media
Weep Holes
HYSD-TMT Reinforcement
Bell Mount Wall
Bell Mount Wall
RCC M-40 Pile Cap

Unit

Recommence
ment

Amount (Rs)

This Bill

Upto
Previous

Upto date

This Bill

Upto Previous

Cum

960.00

39.356

0.000

39.356

37,781.77

Cum

90.00

173.605

65.000

238.605

15,624.41

Cum
No

400.00
1,800.00

48.250
32.000

0.000
0.000

48.250
32.000

19,300.03
57,600.00

19,300.03
57,600.00

Cum
Cum

1,850.00
1,850.00

0.000
312.700

0.000
0.000

312.700

578,494.26

578,494.26

Cum
Cum

1,850.00
1,850.00

-22.000
0.000

22.000
0.000

0.000
0.000

(40,700.00)
-

40,700.00
-

Cum
Cum

2,800.00
2,800.00

38.763
-382.818

0.000
382.818

38.763
0.000

108,537.25
(1,071,889.50)

1,071,889.50

Cum

2,800.00

0.000

0.000

0.000

Cum

2,800.00

0.000

0.000

0.000

Nos
Cum
Cum
Cum
Cum

3,000.00
5,700.00
3,900.00
1,200.00
1,850.00

0.000
0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000
0.000

Cum
Sqm
m
Nos
Cum
Nos

10,740.00
546.00

0.000
0.000

0.000
0.000

0.000
0.000

2,550.00
762.00
150.00

0.000
0.000
0.000

0.000
0.000
0.000

0.000
0.000
0.000

MT
MT
MT

11,000.00
11,000.00
11,000.00

0.000
0.000
27.643

0.000
0.000
55.000

0.000
0.000
82.643

304,073.65

Upto date

5,850.00

605,000.00

37,781.77
21,474.41

108,537.25
-

909,073.65

_______________________
For:- Valecha Engineering Ltd.

JGP (RA-02), May-14

Name Of work:- Improvement And Widening of BHUJ- BHACHAU Road (SH-42) Km-39+000 To 77+700
Name of Contractor:- JIVRAJBHAI G. PATEL
Client:- VALECHA ENGINEERING LTD
R.A. BILL-02
ABSTRACT SHEET
Bill Period Upto 31.05.2014
Quantity

Rates
Item No.

Description

Abutment -A1
Abutment -A2
RCC M-45 Superstructure
26
Prestressing Stel
27
Back Filling
28
Pitching in Slopes (CM 1:3)
29
Floor Apron Stone Boulder (M-20 Grade)
30
Extra
RCC M-20 Grade for Protection Wall at Abutment A-1
CH: 42+673 Major Bridge (Widening-RHS)
Dismantling structures and pavement including disposal of resulting
12.01
material and / or salvaging useful materials complete as per
Technical Specifications Clause 202
Kerb Wall
Dismanling for Slab RCC
Earthwork in excavation in soil for foundations including all leads and
12.02(i)
lifts as per joint and technical specification Cl 304.
Foundation
Returnwall
Filling of GSB Mix materials into the Excavated area to founding PCC
Extra-0
Bottom Level.
Foundation for Abutments,Piers & Returnwalls
Providing and laying Cement Concrete Grade M-15 in the levelling
12.03
course of foundations as per drawing and Technical Specification
Clause 1700
PCC
Returnwall Both Side
Supplying and fixing of tar paper bearings complete as per drawings
12.06
and Technical Specifications Section 2000, IRC:83 (Part II) and
IRC:83 (Part III) 2002.
Abutment Cap (A1 & A2)
Pier (P1 to P5)
Providing and laying in position concrete in Subrstructure for
12.12
Abutment ,Pier, Side wall & Tie Wall as per detailed drawings and
technical specifications
Sub Structure

______________________
For:- Jivrajbhai G. Patel

Unit

Amount (Rs)

This Bill

Upto
Previous

Upto date

0.000
0.000
0.000
0.000
264.634
0.000
0.000
0.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000
264.634
0.000
0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

MT
MT
Cum
MT
Cum
Cum
Cum
Cum

Recommence
ment
11,000.00
11,000.00
5,700.00
123,434.00
420.00
900.00
733.00
1,850.00

Cum
Cum

1,000.00

Cum
Cum

90.00
90.00

376.890
0.000

0.000
0.000

376.890
0.000

Cum

824.00

0.000

0.000

0.000

Cum
Cum

400.00
400.00

10.653
0.000

0.000
0.000

10.653
0.000

Cum
Cum

100.00
10.00

0.000
0.000

0.000
0.000

0.000
0.000

Cum

3,900.00

355.427

0.000

355.427

This Bill

Upto Previous

111,146.34
-

33,920.07
-

4,261.20
-

1,386,163.35

Upto date
111,146.34
-

33,920.07
-

4,261.20
-

1,386,163.35

_______________________
For:- Valecha Engineering Ltd.

JGP (RA-02), May-14

Name Of work:- Improvement And Widening of BHUJ- BHACHAU Road (SH-42) Km-39+000 To 77+700
Name of Contractor:- JIVRAJBHAI G. PATEL
Client:- VALECHA ENGINEERING LTD
R.A. BILL-02
ABSTRACT SHEET
Bill Period Upto 31.05.2014
Quantity

Rates
Item No.

Description

12.13

Providing and laying in position concrete in Superstructure M-30


grade Solid Slab as per detailed drawings and technical specifications

Unit

Span (A1-P1-P2-P3-P4-P5-A2)-6 span


12.21

12.23

Extra-1

Extra-2

12.19

1
2

This Bill

Upto
Previous

Upto date

3,900.00

0.000

0.000

0.000

1,850.00
1,850.00

0.000
0.000

0.000
0.000

0.000
0.000

11,000.00
11,000.00
11,000.00
11,000.00
11,000.00
11,000.00

0.000
0.000
8.708
0.000
0.000
0.000

0.000
0.000
0.000
0.000
0.000
0.000

0.000
0.000
8.708
0.000
0.000
0.000

800.00

0.000

0.000

0.000

250.00

95.000

0.000

95.000

23,750.00

150.00
150.00

0.000
0.000

0.000
0.000

0.000
0.000

1,663,855.33

1,723,439.50

3,387,294.83

41,596.38
16,638.55
58,234.94

43,085.99
17,234.39
60,320.38

84,682.37
33,872.95
118,555.32

1,605,620.39

1,663,119.12

3,268,739.51

Recommence
ment

Cum

This Bill

Upto Previous

Upto date

Reinforced Cement Concrete Crash Barrier M-40 grade including


reinforcement and MS pipe complete as per drawings and Technical
Specifications Sections 1500, 1600, 1700, 2200 and Clause 809.
Crash Barrier on Returnwall
LM
Crush Barrier on Slab (A1-P1-P2-P3-P4-P5-A2)
LM
Providing, cutting, bending and fixing TMT (CRS) bar reinforcement in
reinforced concrete structures complete as per drawings and
Technical Specification Section 1600.
Foundation
MT
Abutment A1 & A2
MT
Pier (P1 to P5)
MT
Returnwall Both Side
MT
Cap, Dirtwall & Bracket (A1 & A2)
MT
Top Slab (A1-P1-P2-P3-P4-P5-A2)
MT
Providing & fixing of 20 mm thick Joint Filler Board as per drawing
& as direction of engineer incharge complete.
Sqm.
Crash Barrier
Providing & fixing Anchor bars as per requirement and as directed
by engineer in charge complete.
No
Top Slab - 6 Span
Providing weep holes in abutments, wing walls, retaining walls, return
walls etc. complete as per drawing and Technical Specifications
Clause 2706
Returnwall R1-2nd lift,3rd & 4th Lift (Bhuj)
Nr
Returnwall R2-2nd lift,3rd & 4th Lift (Bhachau)
Nr
GROSS TOTAL BILL AMOUNT (Rs.) :
Deductions :
Retention Money @ 2.5 %
Income Tax @ 1 %
Total Recovery Amount :
NET BILL AMOUNT (Rs.) :

______________________
For:- Jivrajbhai G. Patel

Amount (Rs)

95,792.51
-

95,792.51
-

23,750.00

_______________________
For:- Valecha Engineering Ltd.

Potrebbero piacerti anche