Power Transmission and Distribution

Example, please use your own existing network


Power Automation

Progress. Its that simple.

Trainer PC IP: 192.168.1.40


Group left

Device_DIGSI PC IP: 192.168.1.1

Group right

Device_DIGSI PC IP: 192.168.1.10

Group left Device_SNTP IP: 192.168.1.5


Group right Device_SNTP IP: 192.168.1.15
Serial hub IP: 192.168.1.8 ; 7SA631
Port 5
7SJ641 Web Monitor
IP: 192.168.1.41

SNTP Server

Serial
Hub

DIGSI PC

Ethernet/IEC61850
Each Ethernet-Switch has its own and unique IP: 192.168.1.x

Device_ABB IP: 192.168.1.6


ABB
REL670

Eberle regulator IP: 192.168.1.55

Incoming Feeder IF

Bus Coupler QK Outgoing feeder OF

Group left

Device_A IP: 192.168.1.2

Device_B IP: 192.168.1.3

Device_C IP: 192.168.1.4

Group right

Device_A IP: 192.168.1.12

Device_B IP: 192.168.1.13

Device_C IP: 192.168.1.14


05/2007

Power Transmission and Distribution

Power Automation

Progress. Its that simple.

Exercises:
- The Trip Signal of ABB-Device (active without voltage)
shall be displayed in feeder OF on LED 14
- All Siprotec devices shall be synchronized with the time of
SNTP-server Insert a redundant time server

05/2007

Power Transmission and Distribution

Power Automation

Progress. Its that simple.

-Please install on one PC of each group the Software


TNP.exe to simulate the SNTP-Server
- also a Ruggedcom switch can be the timer server for testing
- Connect the PC to the switch

05/2007

Power Transmission and Distribution

Power Automation

Progress. Its that simple.

Please install on one PC of each group the Software


NTP.exe to simulate the SNTP-Server

05/2007

Power Transmission and Distribution

Settings to configure the SNTP-Server


Power Automation

Progress. Its that simple.

1.) Define the IP address of


the SNTP Server by the properties of local area connection

05/2007

Power Transmission and Distribution

Settings to configure the SNTP-Server


Power Automation

Progress. Its that simple.

Group left Device_SNTP IP: 192.168.1.5


2.) Do the settings by the properties Group
right Device_SNTP IP: 192.168.1.15
of TCP/IP and provide the
IP-address manually 192.168.1.5 (.15)

05/2007

Power Transmission and Distribution

Importing IEC61850 devices from other manufacturers


Power Automation

Progress. Its that simple.

With the new DIGSI 4, IEC61850-compliant devices with


a different functionality and from other manufacturers
can be integrated into a switchgear.
For that, import the device description of the IED (icd file)
from the file system.
At first you can check, if the ICD-file is valid, do it with
SCL-inspector as an included feature or use the webbased validator:
http://scl-validator.erlm.siemens.de/validator/upload.html

Then add the device as a user to the station - in the


same way as with SIPROTEC 4 devices.
05/2007

Power Transmission and Distribution

Power Automation

Progress. Its that simple.

Insert the external ICDs:


- Sntp Server
- ABB REL670
- eberle20

05/2007

Power Transmission and Distribution

Implementation of external ICDs


Power Automation

Progress. Its that simple.

1. Step: Allocate to CFC (IED_C)

05/2007

Power Transmission and Distribution

Implementation of external ICDs


Power Automation

Progress. Its that simple.

2. Step: Create a CFC-Chart to make the Trip signal active on


LED

05/2007

10

Power Transmission and Distribution

Time Synchronizing Server SNTP - Server


Power Automation

Progress. Its that simple.

Settings of the time synchronization & time format in DIGSI


of all SIPROTEC devices (IED_A; IED_B; IED_C)

05/2007

11

Power Transmission and Distribution

Power Automation

Progress. Its that simple.

Step 1: Actualize the users of the station

Properties of the IEC61850


station

05/2007

12

Power Transmission and Distribution

Power Automation

Progress. Its that simple.

Step 1: Actualize the users of the station

05/2007

13

Power Transmission and Distribution

Power Automation

Progress. Its that simple.

Step 2: Opening the station for the configuration

05/2007

14

Power Transmission and Distribution

Power Automation

Progress. Its that simple.

Step 3: Select the new devices and drag them to the respective subnet and
allocate the IP-addresses

1
2

05/2007

15

Power Transmission and Distribution

Power Automation

Progress. Its that simple.

Step 4: Insert a new GOOSE-application

05/2007

16

Power Transmission and Distribution

Power Automation

Progress. Its that simple.

Step 5: Select the Trip indication of REL670 as source and dedicate it to


IED_C
2

05/2007

17

Power Transmission and Distribution

Power Automation

Progress. Its that simple.

Step 6: Saving the station description (SCD)

05/2007

18

Power Transmission and Distribution

Power Automation

Progress. Its that simple.

Step 7: Updating the parameter sets (off-line)

Distributing the
allocation information
into the participating
devices
The consistency of the
data is automatically
guaranteed
Here, DIGSI acts
device-spanning for the
first time.

05/2007

19

Power Transmission and Distribution

Power Automation

Progress. Its that simple.

Step 8: Transmitting the updated parameter sets to the corresponding devices


(Initialization)

At the end, transmit each changed parameter set into the device
and
1.) check the time synchronization in all SIPROTEC devices
by changing the time of the SNTP-server
2.) check the LED-on at SIPROTEC device IED_C

05/2007

20

Power Transmission and Distribution

Power Automation

Progress. Its that simple.

Step 9:
Generating the SCD-File and export it to C:\IEC61850\...

05/2007

21