4472 Federal Register / Vol. 73, No.

17 / Friday, January 25, 2008 / Rules and Regulations

DEPARTMENT OF HOMELAND While the drawbridge is operational, to minimize any impact caused by the
SECURITY coordinators for the construction of the temporary deviation.
new Woodrow Wilson Bridge Project In accordance with 33 CFR 117.35(c),
Coast Guard indicated that the bascule span is not this work will be performed with all due
yet fully commissioned and cannot run speed in order to return the bridge to
33 CFR Part 117 at full speed, resulting in extended normal operation as soon as possible.
Interstate 95/495 traffic stoppages This deviation from the operating
[USCG–2008–0015]
during openings. Opening the new regulations is authorized under 33 CFR
RIN 1625–AA09 bascule span for a vessel at this time 117.35.
would take approximately 45 minutes in Dated: January 14, 2008.
Drawbridge Operation Regulations; a best case scenario. This has the Waverly W. Gregory, Jr.,
Potomac River, Between Maryland and potential to have a significant impact Chief, Bridge Administration Branch, Fifth
Virginia upon I–95 traffic, especially during the Coast Guard District.
10 a.m. to 2 p.m. bridge-opening time
AGENCY: Coast Guard, DHS. [FR Doc. E8–1240 Filed 1–24–08; 8:45 am]
frame currently available for
ACTION: Notice of temporary deviation commercial vessels, in accordance with
BILLING CODE 4910–15–P
from regulations. 33 CFR 117.255(a).
SUMMARY: The Commander, Fifth Coast Coordinators requested a temporary DEPARTMENT OF HOMELAND
Guard District, has approved a deviation from the current operating SECURITY
temporary deviation from the regulation for the new Woodrow Wilson
regulations governing the operation of Memorial (I–95) Bridge set out in 33 Coast Guard
the new Woodrow Wilson Memorial CFR 117.255(a).
(I–95) Bridge, mile 103.8, across Though good progress has been made 33 CFR Part 117
Potomac River between Alexandria, regarding commissioning of the north
[USCG–2008–0018]
Virginia and Oxon Hill, Maryland. This and south drawbridges (both now
deviation will allow the contractor to carrying I–95 vehicle traffic), the Drawbridge Operation Regulations;
complete commissioning and final coordinators are requesting this Elizabeth River—Eastern Branch, at
testing for the new Woodrow Wilson deviation from the normal 10 a.m. to 2 Norfolk, VA
Bridge construction project. This p.m. opening period, to proceed with
commissioning activities through March AGENCY: Coast Guard, DHS.
deviation allows the new drawbridge to
remain closed-to-navigation each day 1, 2008. From a river-user standpoint, ACTION: Notice of temporary deviation
from 10 a.m. to 2 p.m. beginning on the coordinators have received no from regulations.
January 26, 2008 until and including requests from boaters or mariners for a
SUMMARY: The Commander, Fifth Coast
March 1, 2008. bridge opening during the 10 a.m. to 2
p.m. timeframe since the passage of the Guard District, has approved a
DATES: This deviation is effective from temporary deviation from the
tall ship ‘‘Gloria’’ in July 2007.
10 a.m. on January 26, 2008, until 2 p.m. regulations governing the operation of
The coordinators requested that the
on March 1, 2008. the Norfolk Southern Railroad Bridge, at
new drawbridge not be available for
ADDRESSES: Materials referred to in this mile 2.7, across the Elizabeth River—
openings for vessels each day between
document are available for inspection or Eastern Branch at Norfolk, VA. This
the hours of 10 a.m. to 2 p.m. from
copying at Commander (dpb), Fifth deviation allows the drawbridge to
Saturday, January 26, 2008 through
Coast Guard District, Federal Building, remain closed-to-navigation beginning
Saturday, March 1, 2008. The temporary
1st Floor, 431 Crawford Street, at 7 a.m. on Monday, February 4, 2008
deviation will only affect vessels with
Portsmouth, VA 23704–5004 between until and including 6 p.m. on Saturday,
mast heights of 75 feet or greater.
8 a.m. and 4 p.m., Monday through March 8, 2008, to facilitate
Management of the Federal and
Friday, except Federal holidays. The rehabilitation of the operating
auxiliary channels will continue to be
telephone number is (757) 398–6222. machinery of the swing span.
closely coordinated between the
Commander (dpb), Fifth Coast Guard coordinators for the construction of the DATES: This deviation is effective from
District maintains the public docket for new Woodrow Wilson Bridge Project, 7 a.m. on February 4, 2008 to 6 p.m. on
this temporary deviation. the Coast Guard and vessels requesting March 8, 2008.
FOR FURTHER INFORMATION CONTACT: transit through the construction zone. ADDRESSES: Materials referred to in this
Waverly W. Gregory, Jr., Bridge Furthermore, all affected vessels with document are available for inspection or
Administrator, Fifth Coast Guard mast heights greater than 75 feet will be copying at Commander (dpb), Fifth
District, at (757) 398–6222. able to receive an opening of the new Coast Guard District, Federal Building,
SUPPLEMENTARY INFORMATION: In June drawbridge in the ‘‘off-peak’’ vehicle 1st Floor, 431 Crawford Street,
2006, the southernmost portion of the traffic hours (evening and overnight) in Portsmouth, VA 23704–5004 between 8
bascule spans for the new Woodrow accordance with 33 CFR 117.255(a). a.m. and 4 p.m., Monday through
Wilson Memorial Bridge, at mile 103.8, Maintaining the new drawbridge in the Friday, except Federal holidays. The
across Potomac River between closed-to-navigation position each day telephone number is (757) 398–6222.
Alexandria, Virginia and Oxon Hill, from 10 a.m. to 2 p.m. on January 26, Commander (dpb), Fifth Coast Guard
Maryland was publicly placed into 2008 through March 1, 2008, will help District maintains the public docket for
service, switching I–95 Northbound reduce the impact to vehicular traffic this temporary deviation.
traffic onto the new Outer Loop portion during this phase of the new bridge FOR FURTHER INFORMATION CONTACT: Bill
pwalker on PROD1PC69 with RULES

of the bridge. The newly-constructed construction. H. Brazier, Bridge Management


portion of the bridge will be required to The Coast Guard has informed the Specialist, Fifth Coast Guard District, at
open for vessels in accordance with the known users of the waterway of the (757) 398–6422.
current drawbridge operating closure period for the bridge so that SUPPLEMENTARY INFORMATION: The
regulations set out in 33 CFR 117.255(a). these vessels can arrange their transits Norfolk Southern Railroad Bridge (NS#

VerDate Aug<31>2005 17:51 Jan 24, 2008 Jkt 214001 PO 00000 Frm 00024 Fmt 4700 Sfmt 4700 E:\FR\FM\25JAR1.SGM 25JAR1
Federal Register / Vol. 73, No. 17 / Friday, January 25, 2008 / Rules and Regulations 4473

V2.8 Bridge), a swing-type drawbridge, revised acid rain rules into Ohio’s Title the use of special characters, any form
has a vertical clearance in the closed V operating permits program. of encryption, and be free of any defects
position to vessels of six feet, above DATES: This direct final rule will be or viruses.
mean high water. effective on March 25, 2008, unless EPA Docket: All documents in the
Norfolk Southern Railways, the bridge receives adverse comments by February electronic docket are listed in the
owner, has requested a temporary 25, 2008. If adverse comments are www.regulations.gov index. Although
deviation from the current operating received, EPA will publish a timely listed in the index, some information is
regulations set out in 33 CFR withdrawal of the direct final rule in the not publicly available, e.g., CBI or other
117.1007(a). Federal Register informing the public information whose disclosure is
To facilitate the repairs to the that the rule will not take effect. restricted by statute. Certain other
operating machinery, the NS# V2.8 material, such as copyrighted material,
ADDRESSES: Submit your comments,
Bridge will be maintained in the closed- will be publicly available only in hard
identified by Docket ID No. EPA–R05–
to-navigation position beginning at 7 copy form. Publicly available docket
OAR–2007–1198, by one of the
a.m. on Monday, February 4, 2008 until materials are available either
following methods: electronically in www.regulations.gov or
and including 6 p.m. on Saturday, • www.regulations.gov: Follow the
March 8, 2008. in hard copy during normal business
on-line instructions for submitting
The Coast Guard has informed the hours at the Environmental Protection
comments. Agency, Region 5, Air and Radiation
known users of the waterway of the • E-mail: blakley.pamela@epa.gov.
closure periods for the bridge so that Division, 77 West Jackson Boulevard,
• Fax: (312) 886–5824.
these vessels can arrange their transits Chicago, Illinois 60604.
• Mail: Pamela Blakley, Chief, Air
to minimize any impact caused by the FOR FURTHER INFORMATION CONTACT:
Permits Section, Air Programs Branch
temporary deviation. (AR–18J), U.S. Environmental Richard Angelbeck, (312) 886–9698, or
In accordance with 33 CFR 117.35(e), Protection Agency, Region 5, 77 West by e-mail at angelbeck.richard@epa.gov.
the drawbridge must return to its regular Jackson Boulevard, Chicago, Illinois SUPPLEMENTARY INFORMATION:
operating schedule immediately at the 60604. Throughout this document whenever
end of the designated time period. • Hand Delivery: At the previously- ‘‘we,’’ ‘‘us,’’ or ‘‘our’’ is used, we mean
This deviation from the operating listed EPA Region 5 address. Such EPA. This supplementary information
regulations is authorized under 33 CFR deliveries are only accepted during the section is arranged as follows:
117.35. Docket’s normal hours of operation, and I. What is being addressed in this document?
Dated: January 11, 2008. special arrangements should be made II. What are the program changes that EPA is
Waverly W. Gregory, Jr., for deliveries of boxed information. approving?
Instructions: Direct your comments to III. What action is EPA taking today?
Chief, Bridge Administration Branch, Fifth IV. Statutory and Executive Order Reviews.
Coast Guard District. Docket ID No. EPA–R05–OAR–2007–
[FR Doc. E8–1246 Filed 1–24–08; 8:45 am] 1198. EPA’s policy is that all comments I. What is being addressed in this
BILLING CODE 4910–15–P
received will be included in the public document?
docket without change, and may be The Clean Air Act (Act) requires all
made available online at state and local permitting authorities to
ENVIRONMENTAL PROTECTION www.regulations.gov, including any develop operating permits programs that
AGENCY personal information provided, unless meet the requirements of Title V of the
the comment includes information Act, 42 U.S.C. 7661–7661(f), and its
40 CFR Part 70 claimed to be Confidential Business implementing regulations, 40 CFR part
Information (CBI) or other information 70 (part 70). EPA fully approved Ohio’s
[EPA–R05–OAR–2007–1198; FRL–8521–3] whose disclosure is restricted by statute. Title V operating permits program on
Do not submit information that you August 15, 1995 (60 FR 42045). On
State Operating Permit Programs;
consider to be CBI or otherwise December 19, 1996, EPA promulgated a
Ohio; Revisions to the Acid Rain
protected through www.regulations.gov final rule (61 FR 67111) for the second
Regulations
or e-mail. The www.regulations.gov Web phase of the Nitrogen Oxides Program
AGENCY: Environmental Protection site is an ‘‘anonymous access’’ system, under Title IV of the Act. The Ohio
Agency (EPA). which means EPA will not know your Environmental Protection Agency
ACTION: Direct final rule. identity or contact information unless (OEPA) revised its acid rain rules in
you provide it in the body of your OAC Chapter 3745–103. The revised
SUMMARY: EPA is taking direct final comment. If you send an e-mail acid rain rules became effective on June
action to approve, as a revision to comment directly to EPA without going 27, 2002.
Ohio’s operating permits program, through www.regulations.gov, your e- On October 2, 2002, OEPA submitted
revisions to Ohio’s Acid Rain Permits mail address will be automatically to EPA the revised acid rain rules for
and Compliance Rules found in Chapter captured and included as part of the approval into the Ohio Title V operating
3745–103 of the Ohio Administrative comment that is placed in the public permits program. On November 27,
Code (OAC). The changes made to docket and made available on the 2002, EPA provided to OEPA comments
Ohio’s OAC 3745–103 Rules include Internet. If you submit an electronic on the acid rain rules. In response to
rules for phase II acid rain permits and comment, EPA recommends that you EPA’s comments, and pursuant to a five-
new information on items incorporated include your name and other contact year mandatory rule review, OEPA
by reference. EPA granted full approval information in the body of your again revised its acid rain rules, which
of Ohio’s operating permits program on comment and with any disk or CD-ROM became effective on January 12, 2007.
pwalker on PROD1PC69 with RULES

August 15, 1995, which became you submit. If EPA cannot read your On March 23, 2007, OEPA submitted to
effective on October 1, 1995. On March comment due to technical difficulties EPA these new and revised acid rain
23, 2007 Ohio submitted the revised and cannot contact you for clarification, rules as a revision to Ohio’s fully
acid rain rules to EPA for approval. This EPA may not be able to consider your approved Title V operating permits
Federal Register notice approves these comment. Electronic files should avoid program.

VerDate Aug<31>2005 17:51 Jan 24, 2008 Jkt 214001 PO 00000 Frm 00025 Fmt 4700 Sfmt 4700 E:\FR\FM\25JAR1.SGM 25JAR1

Potrebbero piacerti anche