Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
SEKHAR DAS
--------------------------------------------------------------------------------Permanent Address:
139, Feeder Road, Belgharia
(Flat No 201, Block B), near rail station Kolkata- 700056
Mobile: 09624551398
Email Id: dsekhar2007@gmail.com
Marital Status: Married
Date of Birth: 14th January-1979
Present Address:
C/o Bharat Heavy Electricals Ltd.
Mangla Park society
House No-B-109
Dahej Bipass Road
Bharuch -392001
PROFILE:
Deploma in Civil Engineer with overall experience of 13+ years in the construction industry mostly in power sector.
Able to work on own initiative and as part of a team. Experience in EPC project at Thermal and gas based
power plant construction since last 9 years.
MAJOR ACHIEVEMENTS:
Being a team member for accomplishment of 2x 250 MW NSPCL THERMAL POWER STATION, BHILAI
Being a team member for accomplishment of 2X350 MW COMBINED CYCLE GAS BASED PLANT IN
PIPAVAV, GUJARAT.
Being a team member for accomplishment of 6x 30 MW STEAM AND POWER GENERATION PLANT IN
ONGC PETROCHEMICAL IN DAHEJ, GUJARAT.
EXPERIENCE PROFILE:
2009-September to 2010-August
Company: M/s BHARAT HEAVY ELECTRICALS LIMITED
Designation : Engineer
Responsibility:
o On site supervision of 2x500 MW Thermal Power Plant (Owner NTPC in Rihand, Uttar
Pradesh) TG Deck Foundation works.
o Consultation with Engineers and providing expertise on the job
o Installation of VIS damper spring imported from Germany for TG Deck
o Successful completion of TG Deck in time
2005-October to 2009-September
Company: M/s BHARAT HEAVY ELECTRICALS LIMITED (Indian Multinational major power plant
equipment manufacturing company) Power sector western region
Designation : Engineer tranee
Responsibility:
o On site supervision of the project of 2x250 MW Thermal Power Plant (Owner NTPC in
BHILAI) Main Power block civil works, front line execution of Boiler foundation, ESP Foundation,
TG Foundation, Mill & Bunker Foundation,
o Architectural work of Power House Building and Service Building. Preparing of customer billing,
contractor billing, Material planning and Progress monitoring.
o Dealing with customer regarding protocol checking of site work.
o Sending progress report bar chart to project management.
o Preparation of presentation.
o Independently handle the job under Head of the department for last two years.
o Total Job value was around 310 crores.
2002-December to 2005-August
Company: M/s ITD Cementation India Ltd. (A reputed Multinational Construction Firm expertise on marine
and infrastructure Civil work)
Designation : Engineer
Responsibility: Execution of 14x52 meter span PSC River Bridge Construction in Mahananda Bridge,
Purnea,Bihar
Work as a planning engineer and preparing of Primavera programming, Progress report, Material planning
as per schedule, following up and monitoring the progress.
2001-September to 2002-November
Company: M/s ITD Cementation India Ltd.
Joined as Trainee Engineer
Execution of 39 x 24 meter span RCC Flyover Construction in Kishangunj,Bihar
Our responsibility to supervise the site execution job as per drawing, specification.
PROFESSIONAL PROFILE:
PRESENT CTC:
ASKING CTC:
NEGOTIABLE
LOCATION PREFERABLE: