RSM Mobinil RAN sites Remote Site Monirtoring PM & CM Form V1.

RSM Remote Monitoring System

Site Name
SIM dial number
SIM IP
Site Type (Indoor / Outdoor)
Power Source
Generator KVA
Diminssion of Fuel Tank 1
Diminssion of Fuel Tank 2
Total Capacity of Fuel Tanks
Rectefire Type
Rectefire Controller Model
Outdoor Camera
Indoor Camera
Infra Red

KVA
L-CM D-CM
L-CM D-CM
Litter -Diesel

H-CM
H-CM

PM & CM Procedures & Check List


1. EISU PM & CM checks
Check Item

O
k

Not OK

N/A

Verify DC connection to
Rectefire CBs
Verify Proper rating of DC
CBs (
Verify all Data Cable Prober
connection to the controller
- EISU
Check DC cables
Connectivity (from CBs to
the controller power port)
Check Equipment CB
labeling inside Rectefire /
DC box
Check Controller Grounding
(Earth)
Check Controller Power
supply 48 12 Volt input
and Output voltage
Check Powr supply
THE EGYPTIAN

Correction Action

[MOBINIL] SEPTEMBER 2014


RSM PM & CM CHECK LIST V1.0.DOC
C R E AT E D B Y : R E D A O M A R

C O M PA N Y F O R M O B I L E S E R V I C E S

RSM Mobinil RAN sites Remote Site Monirtoring PM & CM Form V1.
connection & fixation to the
Controller EISU power
socket
Check controller intenal
Hardware Alarms & leds
status
Check 48 12 V Powr supply
connection & fixation and
voltage to the WCDMA
Router
Check cables connected
between WCDMA Router
and controller EISU
Check cables connected
between WCDMA Router
and its Antennas , and the
status of Antenna itself

2. Cables arrangment , connectivity & checks

THE EGYPTIAN

[MOBINIL] SEPTEMBER 2014


RSM PM & CM CHECK LIST V1.0.DOC
C R E AT E D B Y : R E D A O M A R

C O M PA N Y F O R M O B I L E S E R V I C E S

RSM Mobinil RAN sites Remote Site Monirtoring PM & CM Form V1.

3. Indoor and Outddor Cameras checks


Check Item

O
k

Not OK

N/A

Verify DC connection to
Indoor acmera
Verify DC connection to
outdoor acmera
Verify all Data Cable Proper
connection between
acmeras and SIVU /
controller or HUB
Verify indoor and outdoor
Cameras lenses clearance
and cleaining
Check DC cables
Connectivity-from
Rectefire / DC box CBs to
the 48-12 Volt Power Supply
of the outdoor camera
Check DC cables
Connectivity-from
Rectefire / DC box CBs to
the 48-12 Volt Power Supply
of the Indoor camera
Check ID & OD Cameras
Power supply 48 12 Volt ,
input and Output voltage
Readings
Check Powr supply
connection & fixation to the
ID & OD Cameras power
socket
Check ID & OD cameras
intenal Hardware Alarms &
leds status
Check Outdoor Camera
Mounting fixation

Correction Action

INDOOR CAMERA
OUTDOOR CAMERA

Check Indoor Camera


Mounting fixation

4. Generator and Fueling Monitor checks


Check Item

O
k

Not OK

N/A

Verify Data Cable connected


to generator digital
controller
Check and verify earth
connection to the Generator
digital controller
commuincation module.
Check and Verify generator
Data Cable Proper
connection to controller
EISU proper port
THE EGYPTIAN

Correction Action

[MOBINIL] SEPTEMBER 2014


RSM PM & CM CHECK LIST V1.0.DOC
C R E AT E D B Y : R E D A O M A R

C O M PA N Y F O R M O B I L E S E R V I C E S

RSM Mobinil RAN sites Remote Site Monirtoring PM & CM Form V1.
Check and Verify generator
Analog On/off control relay
Proper connection to
controller EISU proper port
Check and verify
functionality of Generator
ATS analog ON/OFF Relay
Verify control cable
connected to the generator
analog controller On/Off
Relay.
Check and verify Generator
digital controller
functionality and
communication
Check connection of Liquid
fuel sensor cables from
sensor side
Check connectivity of liquid
fuel sensor cables between
sensors and controller EISU
Check and Verify LIQUID
FUEL SENSOR Cables Proper
connection to controller
EISU to the proper port
Check & Clean all Liquid fuel
sensor

5. AC power source , DC Rectefire & Batteries


Monitroring check
Check Item

O
k

Not OK

N/A

Check & Verify DC load &


Battery sensors connection
from Rectefire side
Check & Verify DC load &
Battery sensors
Connectivity along all its
path
Check & Verify DC load &
Battery sensors
Connectivity & connection
to the proper port from
controller EISU side
Check & Verify AC phases
Current senssors connection
from AC Power cable side
THE EGYPTIAN

Correction Action

[MOBINIL] SEPTEMBER 2014


RSM PM & CM CHECK LIST V1.0.DOC
C R E AT E D B Y : R E D A O M A R

C O M PA N Y F O R M O B I L E S E R V I C E S

RSM Mobinil RAN sites Remote Site Monirtoring PM & CM Form V1.
Check & Verify AC phases
Current senssors
Connectivity along all its
path
Check & Verify AC phases
Current senssors
Connectivity & connection
to the proper port from
controller EISU side
Check readings of all DC &
AC sensors & monitoring
power meters , compared to
the clamp meter readings
and align values accordingly
Check AC power meter
onnections from AC power
cable side twards Controller
EISU proper port
Check Ethernet connection
& cables connectivity
between Rectefire digital
contreoller to the controller
EISU proper port
Check RS-232 connection ,
and cables connectivity
between Rectefire digital
contreoller to the controller
EISU proper port
Check and verify proper
readings and changing of
digital rectefire conmtroller
through monitoiring system

6.

Temprature Measurments and Infra Red alarms


check
Check Item

O
k

Not OK

N/A

Check and verify


connections and cables
connectivity between
Internal Temprature sensor
to the controller EISU
proper port
Check and verify
connections and cables
connectivity between
Outdoor Temprature sensor
THE EGYPTIAN

Correction Action

[MOBINIL] SEPTEMBER 2014


RSM PM & CM CHECK LIST V1.0.DOC
C R E AT E D B Y : R E D A O M A R

C O M PA N Y F O R M O B I L E S E R V I C E S

RSM Mobinil RAN sites Remote Site Monirtoring PM & CM Form V1.
to the controller EISU
proper port
Check readings of both
Indoor and outdoor
temoprature sensors from
monityoring system
compared to the
temprasture measurment
tool readings and align
values accordingly
Check and verify
connections and cables
connectivity between all
Inra-Red sensors to the
controller EISU proper port
Check and verify Infra-red
sensor alarm generated on
monitoring system from
each infra-red sensor
installed in the site
Check and verify
funtionality of Air-condition
on/ off
7.

Access control & Smart Door locks check


Check Item

O
k

Not OK

N/A

Check and verify


connections and cables
connectivity between
Access control units to the
controller EISU proper port
Check and verify
connections and cables
connectivity between Door
Alarm sensors to the
controller EISU proper port
Check and verify
connections and cables
connectivity between AntiTheft sound serine to the
controller EISU proper port
Check and verify
functionality of Smar
acccess control units using
Authorised access ID and
insure that the door is
properly opened & closed
and data of ID appeared on
monitoring system
Check and verify
functionality of door alarm
sensors and insure that
door alarm is appear on
monitoring system
Check and verify
THE EGYPTIAN

Correction Action

[MOBINIL] SEPTEMBER 2014


RSM PM & CM CHECK LIST V1.0.DOC
C R E AT E D B Y : R E D A O M A R

C O M PA N Y F O R M O B I L E S E R V I C E S

RSM Mobinil RAN sites Remote Site Monirtoring PM & CM Form V1.
functionality of Anti-theft
Sound Serin and insure its
activation with forced open
door alarm

8. Measurments and tests general directions


-

Analog cable (Paired Cables , Co-axial cables and audio-vedio


cables ) connectivity tested using the connectivity tester
from end to end.
Ethernet cables connecxtivity tests done using Ethernet
tester end to end.
DC measurments done using DC - Avo -meter in the ranges of
12 V and 48 V to measure voltage and dc Clamp meters with
a suitablre range to measure current.
AC measurments done using AC - Avo -meter in the ranges
of 220 / 380 V to measure voltage and AC Clamp meters with
a suitablre range to measure current.
Temprature measurment done using a suitable digital
temprature measurment tool in the range from 10 to 70 C
Earth Measurment done using earth meter in accordance to
mobinil Specs. V9.0

Comments:

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Signatures:
L1 Maint. Engineer Name:
Engineer ID:
Engineer Mobile #:
Date of Visit (dd/MM/YY)

THE EGYPTIAN

//

[MOBINIL] SEPTEMBER 2014


RSM PM & CM CHECK LIST V1.0.DOC